Fabrication Tenders
Fabrication Tenders
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n744.7|cfa|717-605-8197|jordan.d.neely@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1||
inspection And Acceptance - Short Version|8|x||x||||||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||1-866-618-5988 - Wawf Helpdesk|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
first Article Approval--contractor Testing (sep 1989)|10|||||||||||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||x||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|335931|600||||||||||||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3||||
1.the Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
remark #9 Is Hereby Removed Because It Does Not Apply.
all Other Terms And Conditions Remain The Same.
\
1.this Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2.the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3.all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
4.if Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
5.any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
6.if Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
9.offeror's Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfq N0010425qnb23, Because The Rfq N0010425qnb23 Includes An Annex Classified At The Confidential Level, Which Will Be Released Only To Offerors Possessing
the Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating (nspom)(dod 5220-22-m) And Industrial Security Regulation (dod 5220.22-r).
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.3 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
The Classified Documents And Security Level Are: ;iaw Dwg 5894148 Rev J Para 3.2.1.1dwg 5759651 Requires Dd254.;
drawing Data=15252 |10001| -|ws |d|0000.i | -|49998|0017894
drawing Data=15252 |10001| -|ws |d|0000.ii | -|49998|0022083
drawing Data=15252 |10001| -|ws |d|0001 | -|49998|0022449
drawing Data=15252 |10001| -|ws |d|0002 | -|49998|0039075
drawing Data=15252 |10001| -|ws |d|0003 | -|49998|0039563
drawing Data=15252 |10001| -|ws |d|0004 | -|49998|0032743
drawing Data=15252 |10001| -|ws |d|0005 | -|49998|0035391
drawing Data=15252 |10001| -|ws |d|0006 | -|49998|0041103
drawing Data=15252 |10001| -|ws |d|0007 | -|49998|0040455
drawing Data=15252 |10001| -|ws |d|0008 | -|49998|0036962
drawing Data=15252 |10001| -|ws |d|0009 | -|49998|0054705
drawing Data=5893737 |53711| T| |d|0001 | T|49998|0150596
drawing Data=5893737 |53711| P|pl |d|0001 | P|49998|0021727
drawing Data=5894148 |53711| J|doc|d|0001 | J|49998|0213481
drawing Data=5906555 |53711| G| |d|0001 | G|49998|0273301
drawing Data=5906555 |53711| G|fn |d|0001 | G|49998|0273323
drawing Data=6105233 |53711| D|fn |d|0001 | D|49998|0058098
drawing Data=6105244 |53711| D|fn |d|0001 | D|49998|0054172
drawing Data=6105308 |53711| B|fn |d|0001 | B|49998|0056160
drawing Data=6105321 |53711| F|fn |d|0001 | F|49998|0072768
drawing Data=6105323 |53711| C|fn |d|0001 | C|49998|0060916
drawing Data=6105355 |53711| D|fn |d|0001 | D|49998|0055168
drawing Data=6105356 |53711| C|fn |d|0001 | C|49998|0056491
drawing Data=6120457 |53711| B|fn |d|0001 | B|49998|0228728
drawing Data=6120458 |53711| A|fn |d|0001 | A|49998|0039654
drawing Data=6120458 |53711| A|fn |d|0002 | A|49998|0022255
drawing Data=6120458 |53711| A|fn |d|0003 | A|49998|0025947
drawing Data=6120458 |53711| A|fn |d|0004 | A|49998|0021640
drawing Data=6120458 |53711| A|fn |d|0005 | A|49998|0024338
drawing Data=6120458 |53711| A|fn |d|0006 | A|49998|0027564
drawing Data=6120458 |53711| A|fn |d|0007 | A|49998|0035673
drawing Data=6120458 |53711| A|fn |d|0008 | A|49998|0028395
drawing Data=6120458 |53711| A|fn |d|0009 | A|49998|0027065
drawing Data=6120458 |53711| A|fn |d|0010 | A|49998|0025363
drawing Data=6239880 |53711| C|fn |d|0001 | C|49998|0181784
drawing Data=6239881 |53711| -| |d|0001 | -|49998|0026066
drawing Data=6239881 |53711| -| |d|0002 | -|49998|0036108
drawing Data=6239881 |53711| -| |d|0003 | -|49998|0047138
drawing Data=6239881 |53711| -| |d|0004 | -|49998|0034939
drawing Data=6239881 |53711| -| |d|0005 | -|49998|0038089
drawing Data=6239881 |53711| -| |d|0006 | -|49998|0036272
drawing Data=6239881 |53711| -| |d|0007 | -|49998|0038761
drawing Data=6239881 |53711| -| |d|0008 | -|49998|0025166
drawing Data=6239881 |53711| A|fn |d|0001 | A|49998|0038710
drawing Data=6239881 |53711| A|fn |d|0002 | A|49998|0025455
drawing Data=6239881 |53711| A|fn |d|0003 | A|49998|0029623
drawing Data=6239881 |53711| A|fn |d|0004 | A|49998|0022958
drawing Data=6239881 |53711| A|fn |d|0005 | A|49998|0026582
drawing Data=6239881 |53711| A|fn |d|0006 | A|49998|0025696
drawing Data=6239881 |53711| A|fn |d|0007 | A|49998|0027845
drawing Data=6239881 |53711| A|fn |d|0008 | A|49998|0022382
drawing Data=6239882 |53711| A|fn |d|0001 | A|49998|0038669
drawing Data=6239882 |53711| A|fn |d|0002 | A|49998|0026068
drawing Data=6239882 |53711| A|fn |d|0003 | A|49998|0027259
drawing Data=6239882 |53711| A|fn |d|0004 | A|49998|0029032
drawing Data=6370928 |53711| -| |d|0001 | -|49998|0040873
drawing Data=6370928 |53711| -| |d|0002 | -|49998|0045573
drawing Data=6370928 |53711| -| |d|0003 | -|49998|0057163
drawing Data=6370928 |53711| -| |d|0004 | -|49998|0047097
drawing Data=6370928 |53711| -| |d|0005 | -|49998|0057486
drawing Data=6370928 |53711| -| |d|0006 | -|49998|0053496
drawing Data=6370928 |53711| -| |d|0007 | -|49998|0048208
drawing Data=6370928 |53711| -| |d|0008 | -|49998|0023367
drawing Data=6370928 |53711| A|fn |d|0001 | A|49998|0113604
drawing Data=6370928 |53711| A|fn |d|0002 | A|49998|0073756
drawing Data=6370928 |53711| A|fn |d|0003 | A|49998|0087005
drawing Data=6370928 |53711| A|fn |d|0004 | A|49998|0074493
drawing Data=6370928 |53711| A|fn |d|0005 | A|49998|0089297
drawing Data=6370928 |53711| A|fn |d|0006 | A|49998|0085026
drawing Data=6370928 |53711| A|fn |d|0007 | A|49998|0074676
drawing Data=6370928 |53711| A|fn |d|0008 | A|49998|0036940
drawing Data=6370928 |53711| 1|1n |d|0001 | 1|49998|0085282
drawing Data=6657093 |53711| A|fn |d|0001 | A|49998|0071141
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Cable Assembly,spec Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;5893737;
cage ;53711;
.
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
3.5 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
3.6 Production Lot Approval (contractor Testing) - Production Lot Test And Approval Is Required.
3.7 ;to Become A Qualified Manufacturer Of Any Of The Cables Listedabove, The Contractor Must Manufacture Two (2) Each Of The 5w1,5w2, 5w7, And 5w8 Cable Assemblies And Test Them Iaw Therequirements Of Specification 53711-5894148, Rev J.;
3.8 Serialization - The Supplier Shall Mark A Serial Number On Each Cable Assembly,spec In Accordance With ;iaw 5893737 Rev T Note 24
iaw 5894148 Rev J Para 3.3.4;
. Actual Serial Numbers Will Be Assigned ;apply A Government Serial Number To Each Unit Manufactured. Serial Number Shall Be Obtained From Commander, Nuwc Division Newport, Newport, Ri 02841-1708.serial Numbers Are Now Obtained From Nuwc Newport By Sending
nuwc_npt_serialnumbers@navy.mil
; .
3.9 Marking - This Assembly And Its Piece Parts Shall Be Physically Identified In Accordance With Mil-std-130.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired. ;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
4.5 ;fat Testing, All Cdrls And Production Lot Testing Has Been Waived For Otsi.;
4.6 Production Lot Test (contractor) - The Contractor Shall Perform Production Lot Testing In Accordance With ;iaw Drawing 5894148 Rev J. Para 4.2.2.1
; .
4.7 First Article Test/inspection (contractor) - The Contractor Shall Conduct ;critical Item Production Fabrication Specification Drawing 5894148 Rev J.
; First Article Test/inspection On ;2
; Unit(s) In Accordance With Requirements ;paragraph 3.2.1.1
paragraph 3.2.1.3 And 4.2.4.3;
.
4.8 Quality Conformance Inspection - The Contractor Is Responsible For Conducting A Quality Conformance Inspection In Accordance With ;quality Conformance Inspection Iaw Dwg 5894148 Rev J Paragraph 4.2
; , Paragraph ;paragraph 4.2.1.3 Documentation.;
And Preparing An Inspection Report In Accordance With The Contract Data Requirements List, Dd Form 1423.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 ;the Classified Documents And Security Level Are: Iaw Dwg 5894148 Rev J Para 3.2.1.1; Dwg 5759651 Requires Dd254.;
date Of First Submission=030 Dac
;preproduction Tests Are Those Tests Performed On The Sampleselected As Specified In 4.2.1.1 To Verify That The Requirementsof This Specification Are Met Prior To The Start Of Production.the Preproduction Tests Are Detailed In Figures 2 And 3.
;
date Of First Submission=asreq
;copies Of The Certificate Of Quality Compliance Cdrls Shall Bedelivered To The Engineering Support Activity, Nuwc Newport: Nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted With The Contractorsupplier To Review The Item Key Features. The Governmentengineering Support Activity, Nuwc Newport, Would Like Toparticipate In The Conference If One Is Scheduled.
;
date Of First Submission=asreq
submit Before Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Block 14 Addresses. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock Number And
item Nomenclature Specified In The Schedule Of Supply/services.
;copies Of The Certificate Of Quality Compliance Cdrls Shall Bedelivered To The Engineering Support Activity, Nuwc Newport: Nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted With The Contractorsupplier To Review The Item Key Features. The Governmentengineering Support Activity, Nuwc Newport, Would Like Toparticipate In The Conference If One Is Scheduled.
;
date Of First Submission=030 Dac
;copies Of The Certificate Of Quality Compliance Cdrls Shall Bedelivered To The Engineering Support Activity, Nuwc Newport: Nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted With The Contractorsupplier To Review The Item Key Features. The Governmentengineering Support Activity, Nuwc Newport, Would Like Toparticipate In The Conference If One Is Scheduled.
;
Closing Soon27 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Chemical Products...+1Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n774.9|cfa|717-605-1339|darian.m.holley.civ@us.navy.mil|
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|see Schedule||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg|
equal Opportunity (sep 2016)|2|||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
annual Representations And Certifications (may 2024)|13|334511|1350|x|x||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
offer Due Date Has Been Extended To 19 March 2025
this Solicitation Is Issued Pursuant To Emergency Acquisition Flexiblities (eaf).
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Darian.m.holley.civ@us.navy.mil.
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Only A Firm-fixed Price (ffp) Will Be Accepted.
f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
g. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
h. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
evaluation Factors:
evaluation Utilizing Simplified Acquisition Procedures
The Government Will Issue An Order Resulting From This Request For Quotation To The Responsible Offeror Whose Quotation Results In The Best Value To The Government, Considering Both Price And A Non-price Factors. The Following Factors Will Be Used To Evaluate
quotations In Order Of Relative Importance:
1) Price.
2) Past Performance. The Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine The Following As Appropriate: Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management,
communications Between Contracting Parties, And Customer Satisfaction.
3) Supplier Performance Risk As Described In Dfars 252.204-7024.
(end Of Provision)
quotes Shall Be Received No Later Than The Date Specified In The Solicitation In Order To Be Considered.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,umbi .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.3 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
The Classified Documents And Security Level Are: ;requires A Dd254 For Dwg 5759651 Referenced In Dwg 5894184 Paragraph 3.2.1.2
;
drawing Data=2505827 |10001| K|fn |d|0001 | K|49998|0069956
drawing Data=5205453 |53711| R|fn |d|0001 | R|49998|0256761
drawing Data=5584944 |53711| K|fn |d|0001 | K|49998|0183263
drawing Data=5584944 |53711| K|fn |d|0002 | E|49998|0179735
drawing Data=5584944 |53711| K|fn |d|0003 | K|49998|0253556
drawing Data=5584944 |53711| K|fn |d|0004 | J|49998|0161381
drawing Data=5584944 |53711| K|fn |d|0005 | D|49998|0115012
drawing Data=5584944 |53711| K|fn |d|0006 | D|49998|0112414
drawing Data=5584944 |53711| K|fn |d|0007 | F|49998|0187899
drawing Data=5584944 |53711| K|fn |d|0008 | J|49998|0116711
drawing Data=5584944 |53711| K|fn |d|0009 | H|49998|0215144
drawing Data=5727490 |53711| Y|fn |d|0001 | Y|49998|0345813
drawing Data=5893798 |53711|af|fn |d|0001 |af|49998|0260503
drawing Data=5893798 |53711|af|pl |d|0001 |af|49998|0028067
drawing Data=5893798 |53711|af|pl |d|0002 |af|49998|0030754
drawing Data=5893798 |53711|af|pl |d|0003 |af|49998|0021461
drawing Data=5893799 |53711| E|fn |d|0001 | E|49998|0260362
drawing Data=5894122 |53711| C|fn |d|0001 | C|49998|0264830
drawing Data=5894184 |53711|c4|doc|d|0001 |c4|49998|1464946
drawing Data=5905703 |53711| D|fn |d|0001 | D|49998|0182911
drawing Data=5905703 |53711| D|fn |d|0002 | D|49998|0091495
drawing Data=5906555 |53711| G|fn |d|0001 | G|49998|0273323
drawing Data=6105311 |53711| D|fn |d|0001 | D|49998|0059804
drawing Data=6105312 |53711| D|fn |d|0001 | D|49998|0060032
drawing Data=6105313 |53711| F|fn |d|0001 | F|49998|0081939
drawing Data=6105314 |53711| E|fn |d|0001 | E|49998|0067116
drawing Data=6105315 |53711| E|fn |d|0001 | E|49998|0069468
drawing Data=6105316 |53711| F|fn |d|0001 | F|49998|0063173
drawing Data=6105317 |53711| D|fn |d|0001 | D|49998|0059789
drawing Data=6105318 |53711| D|fn |d|0001 | D|49998|0063558
drawing Data=6105319 |53711| E|fn |d|0001 | E|49998|0075736
drawing Data=6105320 |53711| E|fn |d|0001 | E|49998|0065444
drawing Data=6105321 |53711| F|fn |d|0001 | F|49998|0072768
drawing Data=6105322 |53711| E|fn |d|0001 | E|49998|0066748
drawing Data=6105323 |53711| C|fn |d|0001 | C|49998|0060916
drawing Data=6300526 |53711| N|fn |d|0001 | N|49998|0046326
drawing Data=6935198 |53711| C|doc|d|0001 | C|49998|1039605
drawing Data=757994 |10001| N|fn |d|0001 | N|49998|0058376
drawing Data=758023 |10001| H|fn |d|0001 | H|49998|0140618
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Cable Assembly,umbi Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;5893798;
cage ;53711;
.
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
3.5 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required.
3.6 Serialization - The Supplier Shall Mark A Serial Number On Each Cable Assembly,umbi In Accordance With ;iwa Dwg 5893798 Rev. "af" Note 9
obtain Serial Number From:
commander Naval Undersea Warfare Center
public Affairs Office
176 Howell St.
newport, Ri, 02841-1708
send Request To Nuwc_npt_serialnumbers@navy.mil
report Unused Serial Numbers To Nuwc_npt_serialnumbers@navy.mil
transfer Of Unused Serial Numbers To Other Contracts Is Prohibited Unless
authorized By The Navunseawarcendiv.;
. Actual Serial Numbers Will Be Assigned ; .
3.7 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
3.8 ;newvac Contracted Directly With The Usn In Keyport, Washingtonto Perform Tests Per Spec 5894184 With The Confident Spec5759651. Newvac Already Has Approval At Their Expense For Twoopen Contracts Sprmm1-19-c-pa02 & Sprmm1-19-p-pd91. Newvac Doesn't
require A Dd254 For Rfq N00104-23-q-xb69.
;
3.9 ;iaw Dwg 5894184 Rev C4.
paragraph 3.2.3 Environmental
the Type Ii Interface Cable Assemblies Shall Be Capable Of Withstanding Thefollowing Environmental Conditions:
3.2.3.1 Shock. - Paragraphs 3.2.3.1.1 Through 3.2.3.1.3
3.2.3.2 Vibration. - Paragraphs 3.2.3.2.1 Through 3.2.3.2.3
3.2.3.3 Temperature And Humidity.
3.2.3.4 Low Temperature. - Paragraphs 3.2.3.4.1 And 3.2.3.4.2
3.2.3.5 High Temperature. - Paragraphs 3.2.3.5.1 And 3.2.3.5.2
3.2.3.6 Service Life, Operating.;
3.10 ;this 5w5 Cable Assembly Is Defined As Consisting Of A Multiconductor Cable With A Housing Assembly (the Cable Seal Body) As Shown On Dwg 5893798.;
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
4.5 First Article Test/inspection (contractor) - The Contractor Shall Conduct ;critical Item Production Fabrication Specification Drawing 5894184 Rev C4.;
first Article Test/inspection On ;2
; Unit(s) In Accordance With Requirements ;paragraph 3.1 Thru 3.2.1.2
; .
4.6 Production Lot Test (contractor) - The Contractor Shall Perform 100% Production Testing In Accordance With ;test Shall Be Performed In Accordance With Drawing 5894184 Rev C4
paragraph 3.4.1;
.
4.7 Quality Conformance Inspection - The Contractor Is Responsible For Conducting A Quality Conformance Inspection In Accordance With ;iaw Dwg 5894184 Rev. C4
Documentation
; , Paragraph ;paragraph 4.2.1.3 Documentation
; And Preparing An Inspection Report In Accordance With The Contract Data Requirements List, Dd Form 1423.
4.8 Production Lot Test (contractor) - The Contractor Shall Perform Production Lot Testing In Accordance With ;iaw Dwg 5894184 Rev C4.
paragraphs 3.4.1, 3.4.2, 4.2.1.1 And 4.2.1.2;
.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
date Of First Submission=030 Dac
;certificate Of Quality Compliance (coqc).
certificates Of Quality Compliance For The Following Cableassembly Requirements Shall Be Delivered To The Governmentvia Contract Data Requirements List (cdrl).
preproduction Sample Quality Conformance Inspection Andtest Data.
production Quality Conformance Inspection And Test Data.
periodic Sample Quality Conformance Inspection And Testdata.
certificates Of Quality Compliance For The Followingsource Control And Vendor Item Controlled Cable Assemblycomponents Shall Be Delivered To The Government Viacontract Data Requirements List (cdrl).
connector, Receptacle High Pressure, Underwater(pn 5727490-1, -2, -11) Contact Assy, #20 (pn 757994)
copies Of The Certificate Of Quality Compliance Cdrlsshall Be Delivered To The Engineering Support Activity,nuwc Newport:
nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted Withthe Contractor/supplier To Review The Item Key Features.the Government Engineering Support Activity,nuwc Newport, Would Like To Participate In Theconference If One Is Scheduled.
;
date Of First Submission=030 Dac
;copies Of The Certificate Of Quality Compliance Cdrlsshall Be Delivered To The Engineering Support Activity,nuwc Newport:
nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted Withthe Contractor/supplier To Review The Item Key Features.the Government Engineering Support Activity,nuwc Newport, Would Like To Participate In Theconference If One Is Scheduled.
;
date Of First Submission=asreq
;pocs:
nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
;
Closing Date19 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n763.08|na|na|sophia.noel@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||iso9002||||||
wide Area Workflow Payment Instructions (jan 2023)|16|tbd||tbd|tbd|tbd|tbd|tbd|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Data - Basic (mar 2014)|2|||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
first Article Approval--contractor Testing (sep 1989)|10|tbd|tbd|tbd||||||||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (jan 2025)|12|336412|1500|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
evaluation Of First Article Testing|3||||
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130, Revision Level "l" Or Latest Revison, And Iaw The Drawing Requirements.
1.2 . The Contractor Shall Include On The Detailed Process/operation Sheets Developed, (1) All In House Manufacturing Processes And (2) The Identity Of All Manufacturing Sources Performing Processes/operations Outside Their Facility. These Sheets Shall Not Be
revised Or Altered After The Successful Completion Of First Article Or Production Lot Testing Without Approval From The Basic Design Engineering Activity, Via The Pco.
1.3 . Unless Otherwise Specified, For Fabricated Parts, The Inspection
method Sheets/ Final Inspection Sheets Shall List The Characteristics
of Each Item Produced Under The Contract.
the Manufacturer Shall Be Required To Provide Certifications Of All Raw
material Including Castings And Forgings. The Material Source Shall Be
identified And The Documentation Shall Be Able To Identify The Customer
and/or Contract Number. The Manufacturer Shall Maintain All Raw Material
documentation For A Minimum Of Ten (10) Years.
the Contractor Is Responsible For Providing Completed Inspection Method Sheets/final Inspection Sheets Showing The Actual Dimensions Taken For
all Characteristics,in Addition, Critical Characteristics Shall Be
annotated.
1.4 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;rolls Royce; Drawing Number ( ;63005; ) ;23004669; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.5 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents - Not Applicable
3. Requirements - Not Applicable
4. Quality Assurance
4.1 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below
4.1.1 Dimensional Test (special)
;applies At Contractors Facility;
4.1.2 Requirements Of:
;na;
4.1.3 Form
;applies;
4.1.4 Fit
;na;
4.1.5 Function
;na;
4.1.6 Compliance With Drawing ( ;63005; ) ;23004669; , Revision ;latest; And Specifications Referenced Therein.
4.2 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements
4.3 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection
4.4 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing.
4.4.1 The Qar Shall Be Present To Witness All First Article Testing.
4.4.2 The Following Additional Personnel Shall Witness The First Article Testing: ;navsup Wss N23
dcma
frcse;
4.5 Disposition Of Fat Samples
4.5.1 ; ; Sample(s) May Be Destroyed During Testing.
4.5.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.6 Test Sample Coating Instructions
4.6.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required.
4.7 Notice To Government Of Testing At The Contractors Facility.
4.7.1 Far 52.209-3 Applies
(a) The Contractor Shall Present ;1; ; Unit(s) Of The Following Cage( ;63005; ; ), Part Number ;23004669; ; , Revision ;latest; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The
contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests.
(b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;navsup Wss Code N23
frcse
dcma; ;
the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements.
(c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The
contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First
article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another
report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any
additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract.
(f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For
acceptance.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates
and/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair
of The First Article During Any First Article Test.
(i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article.
(j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On
form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test
report.
4.8 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The
original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run.
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States
code, Section 1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And
one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First
article Approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government.
Offeror's Proposed Alternate Delivery Schedule
(based On Waiver Of First Article Approval Requirements)
within Days:
item No. _____________ Quantity:_______ After Date Of Contract:_________
4.9 Production Lot Test Requirements: The Tests To Be Performed Under The Production Lot Sample Testing Provisions Of The Contract Are As Follows:
4.9.1 Workmanship
production Lot Samples Shall Be Inspected To Determine General Workmanship.
4.9.2 Dimension Check
production Lot Samples Shall Be Inspected To Determine Compliance With Applicable Drawings And/or Specifications.
;applies / Plt To Be Performed At The Contractors Facility Witnessed And Accepted By The Dcma Qar;
4.9.3 Form:
;applies;
4.9.4 Fit:
;na;
4.9.5 Function:
;n/a;
4.9.6 Requirement Of:
;n/a;
4.10 In Addition To The Above Tests, The Production Lot Samples To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Samples Comply With The Contract Requirements.
4.11 The Contractor Will Be Responsible For Providing The Necessary Parts And Repair Of The Production Lot Samples During Testing.
4.12 Disposition Of Test Samples
4.12.1 ; ; Samples Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing.
4.12.2 ;applies; Unless Otherwise Provided For In The Contract, Samples Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Samples Can Be Refurbished To Ready For Issue Condition And Provided The
samples Have Inspection Approval Of The Cognizant Dcmc Qar. Samples May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.12.3 ; ; Samples Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due.
4.13 Production Lot Test Criteria:
4.14 (a) As Specified In This Contract, The Contractor Shall Test ;2; Selected At Random By The Cognizant Government Inspector (dcmc) As Production Lot Samples. At Least Fourteen (14) Calendar Days Before Beginning The Production Lot Sample Tests, The
contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So The Government May Witness The Tests.
(b) The Contractor Shall Submit The Production Lot Sample Test Report Within 15 Calendar Days From The Date Of Testing. Forward Copies Of The Report In Accordance With The Distribution Cited On The Dd1423. Mark Reports As Follows: "production Lot Sample Test
report, Contract No. ________ Lot/item No. ____." Within Forty-five (45) Calendar Days After The Government Receives The Test Report, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The
production Lot Samples. A Notice Of Disapproval Shall Cite The Reasons For The Disapproval. Unless Expressly Permitted Elsewhere In This Contract, The Delivery Of The Production Articles Shall Not Be Made Until After Notification By The Government Of The
approval/disapproval Of The Production Lot Samples; Any Production Items Delivered Prior To The Notification Of The Approval/ Disapproval Of The Production Lot Samples Shall Be At The Contractor's Risk.
(c) In The Event The Contractor Does Not Receive Written Notification Of Approval Or Disapproval Of The Samples For A Particular Production Lot Within Forty-five (45) Days From Their Submission For Such Testing, The Contract Delivery Schedule Shall Be
equitably Adjusted As Necessary.
(d) If The Contractor Fails To Deliver The Test Report For Any Production Lot Samples Within The Time Or Times Specified, Of If The Contracting Officer Disapproves Any Production Lot Samples, The Contractor Shall Be Deemed To Have Failed To Make Delivery
within The Meaning Of The Default Clause Of This Contract, And This Contract Shall Be Subject To Termination For Default.
(e) In Order For A Production Lot To Be Acceptable, All Samples Representative Of The Lot Must Pass All Of The Contract Requirements. In The Event A Sample Fails To Pass Such Requirements The Lot Will Be Rejected. In Such Event, The Government May, At Its
option And At No Additional Cost To The Government, (i) Terminate All Or Any Portion Of This Contract For Default, (ii) Require The Manufacture Of A New Production Lot, Or A Rework Of The Rejected Production Lot If The Means And Procedures Proposed By The
contractor For Rework Are Acceptable To The Government, Or (iii) Require The Submission Of Additional Samples For Test. The Foregoing Procedures Shall Apply To New Or Reworked Production Lots In The Same Way As They Did To The Original Production Lot.
(f) For Each Additional Sample Or Each Resubmission Of A Modified Sample Which The Contractor Is Required To Submit For Approval Hereunder As A Result Of The Failure Of A Previous Sample To Conform To The Requirements Of The Specifications, The Contractor
shall Pay The Government The Costs Of Reinspection, Shipping, Examination, And Retesting By The Government, And The Contractor And His Sureties (if Any) Shall Be Liable For The Amount Of Such Costs.
4.15 Alternate Offerors - Waiver Of Production Lot Testing Approval Requirements
unless Otherwise Specified In Section E Of This Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The Production Lot Testing Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production
articles Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of Production Lot Testing Approval Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee Responsible For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequence Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime
manufacturer, And
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section
1001.)
(b) In The Event Waiver Of The Production Lot Testing Approval Requirements Is Granted, The Delivery Schedule For The Production Units Shall Be One Hundred And Sixty-five (165) Days Earlier Than That Which Is Desired Had The Waiver Not Been Granted. If The
offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule He Offers The Government.
Offeror's Alternative Proposed Delivery Schedule
(based On Waiver Of Production Lot Testing Approval Requirements)
within Days:
item No._____________ Quantity: _________ After Date Of Contract: ____________
4.16 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar).
during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows:
A. Level Of Inspection (loi).
1. Critical Characteristics: 100% Inspection Shall Apply.
2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar.
B. Critical Characteristics:
;pressure Test Passages L (zone B6) And M Zone (c5) Per Eis 1875 Class A To 100 Psig
the Casting Is To Provide The Capability Of Meeting Final Pressure Test Requirements.;
C. Major And Minor Characteristics
1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications.
4.17 . Quality/inspection Requirements
the Following Quality/inspection Requirements Apply:
mil-i-45208a And Paragraphs 3.1-3.5, 5.1-5.2, 6.1-6.2 Of Mil-q-9858.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date24 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Details: Amendment 0001 Is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The First Amendment.
amendment 0002 Is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Second Amendment.
amendment 0003is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Second Amendment.
amendment 0004 Is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Fourth Amendment.
amendment 0005 Is Posted In The Linksprovided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Fifth Amendment.
amendment 0006 Is Posted In The Linksprovided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Sixth Amendment.
amendment 0007 Is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Seventh Amendment.
amendment 0008 Is Posted In The Links Provided For This Procurement. Please Ensure You Access The Updated Documentation Provided As Part Of The Eighth Amendment.
this Solicitation Is For The Procurement Propulsor Demonstration Hardware. The Advanced Propulsor Management Office (code 808) In The Naval Architecture And Engineering Department (department 80) Of The Naval Surface Warfare Center, Carderock Division (nswccd) Is Responsible For Managing The Research And Development (r&d), Design, Testing, And Delivery Of Us Navy Submarine Propulsors. The Apmo Requires The Design And Development For Prototype Propulsors, Shafting And Bearing Components, Mechanical Design Specification, And Manufacturing Plans To Support The Peo Ssn/ssbn Submarine Programs.
the Objective Of This Procurement Is To Provide Manufacturing Design Drawings, Engineering, Fabrication, Inspection, And Assembly Of Prototype Propulsor, Shafting And Bearing Components As Well As The Equipment Needed To Support Propulsor Research & Development, Testing And Evaluation (rdt&e) For Department 80. These Manufactured Articles Include Scaled And Full-scale Hardware, As Well As Hardware Suitable For At-sea Demonstration. Additionally, This Contract May Be Used To Support Vendor Qualification Of Fleet Hardware And May Be Utilized For Production Efforts Outside Of Other Propulsor Production Contracts, Including But Not Limited To: Lifting And Handling Fixtures, Machining Fixturing And Tooling, Shipping Support Hardware, And Fasteners And Other Support Hardware. The Product And Service Code (psc) For This Procurement Is Predominantly Psc Ac32, National Defense Research & Development Services. Applied Research–defense Other: Services (engineering Development). Additionally, Apmo Will Use Psc 2010, Ship And Boat Propulsion Components And Psc H220, Equipment And Materials Testing- Ship, For Propulsor And Shafting Prototypes And Manufacturing Efforts.
drawings And Reference Documents Will Provided Via Dodsafe By Request Only.
please Ensure All Email Correspondence Are Sent To The Contract Specialist, Charles Renno, At Charles.l.renno.civ@us.navy.mil, And Procurement Contract Officer, Carlos Triay, At Carlos.a.triay.civ@us.navy.mil.
Closing Soon28 Feb 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
United States
Description: W91237-25-r-0002, Winfield Lock And Dam Flap And Roller Gate Fabrication
Closing Soon27 Feb 2025
Tender AmountRefer Documents
Gujarat State Electricity Corporation Limited - GSECL Tender
Works
Corrigendum : Closing Date Modified
India
Description: Work Of Fabrication/removal/repairing /erection Of Metallic Expansion Bellows At Various Locations Of Air / Flue Gas Ducts And Its Support Of 210 Mw Boiler Of Unit- 4,5,6 & 7 Of Wanakbori Tps As When Required Basis.
Closing Soon1 Mar 2025
Tender AmountINR 1.2 Million (USD 14.7 K)
Western Railway - WR Tender
Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Description: Scrap Ms Released U/s 1] Fabricated Bogie Frames Of Electric Locomotives , Qty: 02 Nos, Approximate Disposable Weight 8 Mt, Sr. No. Bb33c60036/5000155r, Po 9186037 Drg17191201159/03 Make Bhel, 2]casted Bolster , Qty. 10 Nos. Appx. Disposable Weight 15 Mt, Sr. No. /make Sfr1446/clw, Sfr 1047/clw, Sfr1250/clw, Sl-70/bec, Sl16/bec, Sl-119/simplex, Sl-71/bec, Sfr1536/clw, Sfr1437/clw, Sl-74/simplex, Custodian Sse Trs Ns Bl, Total Lot Qty. 12 Nos And Total Approximate Disposable Weight Of Entire Lot Is 23 Mt , Location: At M4 Hr Pit No. 6 Middle Area, At Electric Loco Shed Valsad, , Mode Of Delivery In Numbers , Loading By Purchaser, To Be Sale On As And Where Is Basis, Note: 1] Purchasers Are Requested To See The Lot/site Before Bidding. 2] Fdp 50 Days . 3] Cutting Is Permitted At Lot Location , 4] Sse Trs Ns Bl's Lot No. Bl-17
Closing Soon5 Mar 2025
Tender AmountRefer Documents
Hindustan Aeronautics Limited - HAL Tender
Goods
Machinery and Tools...+1Aerospace and Defence
GEM
Corrigendum : Corrigendum Added
India
Description: CATEGORY: Custom Bid for Services - Outsourcing of manufacturing of
212 Line of Machining Parts to be fabricated from HAL
Supplied Raw Material required for SU30 ROH Aircraft
Closing Date24 Jan 2025
Tender AmountRefer Documents
1521-1530 of 1710 active Tenders