Fabrication Tenders
Fabrication Tenders
Tamil Nadu Newsprint And Papers Limited - TNPL Tender
Works
Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
India
Description: Fabrication And Erection Of Rain Water Gutter, Down Take Pipe And Replacement Of Damaged Sheets At Paper Machine Complex, Finishing House,
Closing Soon14 Feb 2025
Tender AmountRefer Documents
Public Health Engineering Department - PHED Tender
Works
Civil And Construction...+1Water Storage And Supply
Corrigendum : Closing Date Modified
India
Description: Construction, Testing And Commissioning Of Steel Fabricated Structure 15 Nos. Of 10 Kl Capacity Staging 9 Mtr. Including Construction Of Suitable R.c.c. Valve Chamber In Village . Providing, Laying, Jointing, Interconnection, Testing And Commissioning Of 63 Mm Dia Hdpe Class 10 Kg/sqcm Of 1350 Mtr. Valve Specials And All Fittings Including All Allied Civil Works, Supplying & Installation Of Energy Efficiant Five Star Bee Rating Isi Marked Required Capacity Three/single Phase, 50 Hz, 415v, Deep Well Submersible Pump Stainless Steel Body, Suitable For 4"/6" Tube Well With Control Panel Starter Suitable For Submersible Pump With Dry Run Protection, Connections, Including Clamps, Bore Cap Etc 15 Nos. As Required As Per Specifications But Excluding Pipe, Ss/nylonwire Rope And Connection Cable Including Verification Of Tube Well Yield. & Electric Connection From Cseb, Construction Of Brick Masonry Switch Room Of Size 1.50*1.50*3.00 Mtr (15 Nos), Providing 0 No Functional Household Tap Connection (f.h.t.c) (pe-al-pe Pipe 0 Mtr) In Individual Households And Government Instiution Etc.drilling Of 150 Mm Dia 130 M Deep Ordinary Tube Well 15 Nos. Complete With Trial Run Operation & Maintanance For 03 Months Under Single Village Piped Water Supply Scheme Under Jal Jeevan Mission For Village Bhadu, Bahora, Marangi, Samarbar, Sanna & Gurmhakona In Block Bagicha District – Jashpur.
Closing Date25 Feb 2025
Tender AmountINR 15.7 Million (USD 180.2 K)
South Eastern Railway - SER Tender
Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Description: Lot No.y.hf-1.exmp.p-1.12.24.134, Description- Scrap Steel Fabrication (heavy) And Misc. Large Bulky Assembles.tank Case Holder And Similar Receptacles .misc Items Of Steel, Such As Furniture, Buckets Iron Wire Utensils Tinboard, Fire Extinguishers Without Nf Etc. Our Offer: Scrap Steel Fabrication (heavy) Bogie Frame And Fiat Bogie Frame And Misc.battery Box,bk Cylinder,shock Absorber, Cell Container,bolster,various Sizes Of Iron Pipes, [coach Doors , Various Sizes Of Tanks, Some Quantity Of Gear Case Coated With Dry Foam Of Oil And Grease ,steel Such As Furniture, Buckets Iron Wire Utensils Tinboard, Fire Extinguishers Without Nf Etc. And Other Misc Hf-1 Items [as In The Lot] Cutting Allowed Only For Off Size Material For Loading Purpose (above Material May Or May Not Be Available In The Lot) [loading Will Be Done By Purchaser's Own Arrangement]
Closing Soon11 Feb 2025
Tender AmountRefer Documents
MECON Limited - MECON Tender
Goods
Civil And Construction
Eprocure
Corrigendum : Closing Date Modified
India
Description: Design, Materials Procurement, Manufacture / Fabrication, Shop Testing, Painting, Packing, Transportation, Delivery And Unloading At Site, Supervision Of Erection And Commissioning Of Plate Heat Exchangers
Closing Soon15 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n742.18|er6|n/a|elizabeth.m.clammer.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001, See Specifications Section C And Section E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1||
inspection And Acceptance - Short Version|8|x||x||||||
desired And Required Time Of Delivery (june 1997)|29|clin 0001aa|10|210 Days|clin 0001ab|10|210 Days|clin 0001ac|25|210 Days|clin 0001ad|26|210 Days||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications; Combo - Receiving Report & Invoice- Material.|n/a|tbd|n00104|tbd|tbd|w25g1u, W62g2t, W25g1u, W62g2t|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Form Dd1423.||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
equal Opportunity (sep 2016)|2|||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--contractor Testing (sep 1989)|10|one (1)|0001aa|30 Days|tbd|lizz Clammer - Elizabeth.m.clammer.civ@us.navy.mil|tbd|0001aa|tbd|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||x||||||||||||
small Business Program Representations (feb 2024)|4|335313|1250|||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|335313|1250||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3|||x|
1. This Requirement Is Pursuant To Emergency Acquisition Flexibilities (eaf).
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
4. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of Thefacility.
5. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System(dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
7.this Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
1. Scope
1.1 ;this Procurement Specification Contains The Requirements For Manufacture And The Contract Quality Requirements For ;an/brr-6 Proximity Sensor Seated Switch Unit; For Use On Navy Submarines.;
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
drawing Data=8590854 |53711| -| |d|0001 | -|49998|0080043
drawing Data=8590860 |53711| A| |d|0001 | A|49998|0155852
document Ref Data=mil-std-130 | | |n |121116|a| |01|
document Ref Data=mil-dtl-915 | | |g |020822|a| | |
document Ref Data=mil-dtl-915 |0008| |h |020822|a| | |
document Ref Data=mil-std-973 | | | |950113|a| 3| |
document Ref Data=iso 9001 | | | |150915|a| | |
document Ref Data=iso 10012 | | | |030415|a| | |
document Ref Data=mil-m-24041 | | |c |810817|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=ncsl Z540.3 | | | |060803|a| | |
document Ref Data=a-a-56032 | | |d |030321|a| | |
document Ref Data=eia-649c 2/19 | | | | |a| | |
document Ref Data=sae-ams2817g - 11/2016 | | | | |a| | |
document Ref Data=sae-as23053/5a - 11/2018 | | | | |a| | |
document Ref Data=navsea S9320-am-pro-020/mldg | | |2 |990801|a| | |
document Ref Data=navsea S9320-am-pro-030/mldg | | |3 |050201|a| | |
document Change Data=ams-dtl-23053/5b |sae-as23053/5a
document Change Data=ams-2817 |sae-ams2817g
document Change Data=mil-c-24231d |mil-dtl-24231e
3. Requirements
3.1 ;design And Manufacturing - The ;an/brr-6 Proximity Sensor Seated Switch Unit; Furnished Under This Contract/purchase Order Shall Meet The Material, Electrical, Mechanical, Physical And Test Requirements As Specified On Drawings 8590860 (consisting Of
item Numbers 1 Thru 8) And 8590854, Attachment-a (electrical Test Procedure), Navsea Manuals S9320-am-pro-030/mldg And S9320-am-pro-020/mldg And Including Associated Specifications Mentioned In This Procurement. ;
3.1.1 ;as Required By Note 4 Of Drawing 8590860, Item Number 4 Must Be Treated As A Connector When Referencing Drawing 8590854.;
3.1.2 ;the Switch (item No. 4 Of Drawing 8590860) Surface Preparation, Application And Inspection Of Non-conductive Coating (plasma Coating) Shall Be In Accordance With Navsea Manual S9320-am-pro-030/mldg As Specified On Drawing 8590854. ;
3.1.3 ;the Polyurethane Molding Compound Type Ii, Color Amber Shall Be In Accordance With Mil-m-24041 Requirements As Specified On Drawing 8590860.;
3.1.4 ;all Outboard Molded Cable Assemblies Shall Be Manufactured And Tested In Accordance With Navsea Manual S9320-am-pro-020/mldg Requirements As Specified On Drawings 8590860, Note 3 And 8590854, Note 4; Including Attachment-a (electrical Test Procedure).
3.2 ;vendor Qualification. As Required By Drawing 8590854:;
3.2.1 ;only Vendors Which Are Qualified, Per The Audit Requirements Of Navsea Manual S9320-am-pro-020/mldg Appendix Ii-a And Listed On The Approved Vendors Lists In Appendix Ii-a Of Navsea Manual S9320-am-pro-020/mldg, Shall Be Authorized To Fabricate
submarine Outboard Cable Assemblies. ;
3.2.2 ;metal Plug Bodies Surface Preparation Is Only By Vendors Which Are Qualified, Per Audit Requirements Of Navsea Manual S9320-am-pro-030/mldg Appendix Iii-h, And Listed On The Approved Vendors Lists In Appendix Iii-i Of Navsea Manual
s9320-am-pro-030/mldg, Shall Be Authorized To Fabricate Non-conductive Plasma Sprayed Ceramic Coated Submarine Outboard Connector Metal Plug Bodies. ;
3.3 ;marking Requirements - The Supplier Shall Permanently Mark And Identify Each First Article And Production Lot Unit ;proximity Sensor Seated Switch; In Accordance With Note 8 Of Drawing 8590860 Per Mil-std-130.;per Note 7 Of Drawing 8590860,the Supplier
shall Contact Jason Krol, Jason.a.krol2.civ@us.navy.milof Nswc Philadelphia Division For Component Serialnumber Information.;;
3.3.1 ;the Supplier Shall Mark ;tag Or Bag; All Piece Parts With Contract, Drawing/ Item, Heat, Lot Or Batch And Serial Number Per Mil-std-130 Until Installed In The Designated Assembly.;
3.4 ;first Article Testing/inspection - (supplier Testing/inspection). The First Article Testing /inspection Procedure And Approval Are Required For ;proximity Sensor Seated Switch Unit;.government Approval Is Required Prior To Commencement Of First Article
unit.;
3.5 ;notification - The Supplier Shall Notify Naval Surface Warfare Center, Philadelphia Division, (nswcpd), 5001 S. Broad Street, Philadelphia, Pa 19112-1403 By Email Matthew.j.ogilvie.civ@us.navy.mil, Code 242mo After Award Of Contract.;
3.5.1 ;the Nswcpd Is The Acceptance Activity For The Contract Data Requirements List (dd1423) Data Items. Nswcpd Wawf/irapt ;acceptor; Dodacc Is ;n64498;.;
3.6 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.6.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.7 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
4.4 ;inspection System - The Supplier's Quality Inspection System Shall Be In Accordance With Mil-i-45208 Or Iso 9001 And Ncsl Z540.3 Or Iso 10012.the Supplier Shall Develop And Submit Their Written Quality Inspection And Test Plan As Indicated On The
contract Data Requirements List (dd Form 1423). Government Approval Of The Supplier's Written Quality Inspection And Test Plan Is Required By The Contract.
cdrl: Quality Inspection & Test Plan Per Mil-i-45208, Ncsl Z540.3 And Di-qcic-81110 ;
4.5 ;finished Edges - Finished Shall Be In Accordance With The Applicable Drawing Requirements.;
4.6 ;material Control - The Supplier Shall Have An Effective Material Control System That Provides For The Control Of Materials By Heat, Lot Or Batch As Ordered For First Article And Production Lot Units. ;
4.7 ;first Article Testing/inspection - (supplier Testing/inspection). The Supplier Shall Perform First Article Testing/inspection On ;proximity Sensor Seated Switch Unit; In Accordance With The Applicable Drawings, Specifications,attachment-a (electrical
test Procedure), Navsea Manuals S9320-am-pro-030/mldg And S9320-am-pro-020/mldg, And Their Approved First Article Procedure.;
4.7.1 ;the First Article Inspection Shall Be Made By The Cognizant Dcma-qar At The Supplier's And/or Subcontractor Facility. The Supplier Shall Notify Nswcpd, Code 242mo Two Weeks In Advance Prior To The Scheduled First Article Testing/inspection, So An
nswcpd Representative Has The Option Of Being Present During The First Article Testing/inspection.;
4.8 ;first Article Approval For Testing/inspection Procedure And Acceptance - (supplier Testing/inspection). The Supplier Shall Prepare And Submit Their First Article Testing/ Inspection Procedure For ;proximity Sensor Seated Switch Unit; In Accordance With
the Requirements Of Di-ndti-80603,the Applicable Drawings, Specifications, Attachment-a (electrical Test Procedure), Navsea S9320-am-pro-030/mldg And S9320-am-pro-020/mldg, And As Indicated On Thecontract Data Requirements List (dd Form 1423).government
approval Of The Of Procedure Is Required Prior To Commencement Of First Article Unit.
cdrl: First Article Testing/inspection Procedure Per Di-ndti-80603a;
4.9 ;first Article Testing/inspection- The Supplier Shall Perform 100% Examination, Inspection And Testing On The Completed First Article ;proximity Sensor Seated Switch; Unit (bulk Cable/ Component Parts/unit) In Accordance With The Applicable Drawings,
attachment-a (electrical Test Procedure), Navsea S9320-am-pro-020/mldg And S9320-am-pro-030/mldg, And Their Approved First Article Procedure. The Supplier Shall Record The Actual Measurements And Results Of Each Examination, Inspection And Test In Attachment-a
(electrical Test Procedure), Navsea S9320-am-pro-020/mldg And S9320-am Pro-030/ Mldg, And Each Dimension Identified On The Applicable Drawing. ;
4.9.1 ;the Supplier Shall Visually Inspect And Perform Electrical Continuity And Dc Insulation Resistance Testing 100% On The ;bulk Cable Type Dss-2; In Accordancewith Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Including
appendix Iid (data Sheets Ds1,ds2 And Ds3) Requirements.;
4.9.2 ;the Supplier Shall Visually And Physically Inspect 100% The Switch And Connector (item Nos. 4 And 5 Of Drawing 8590860) In Accordance With Navsea S9320-am-pro-020/ Mldg Requirements.;
4.9.3 ;the Supplier Shall Verify And Inspect 100% The Switch Proximity (item No.4 Of Drawing 8590860)surface Has Been Prepared And Plasma Coated In Accordance With Navsea S9320-am-pro-030/mldg Requirements.;
4.9.4 ;the Supplier Shall Visually And Physically Inspect 100% The Completed Unit Of Each Dimension And Keyway Location/position Identified On Drawing 8590860 Including The Identification And Markings Required By Note 8 Of The Drawing.;
4.9.5 ;the Supplier Shall Visually Inspect 100% The Molded Switch Proximity And Plug Connector On The Completed Unit In Accordance With Navsea S9320-am-pro-020/mldg Requirements.;
4.9.6 ;the Supplier Shall Perform 100% Electrical Continuity Test On The Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Including Appendix Iid (data Sheets Ds1, Ds2 And Ds3) Requirements.;
4.9.7 ;the Supplier Shall Perform 100% Insulation Resistance Test On The Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.9.8 ;the Supplier Shall Perform 100% Nondestructive Bonding Test On Molded Switch Proximity And Plug Connector On The Completed Unit In Accordance With Navsea S9320-am-pro-020/ Mldg Requirements.;
4.9.9 ;the Supplier Shall Perform 100% Hydrostatic Pressure Test On The Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.10 ;first Article Testing/inspection Reports And Acceptance - (supplier Testing/ Inspection). The Supplier Shall Submit For Completed First Article Unit ;proximity Sensor Seated Switch; Testing/inspection Reports In Compliance With The Requirements Of
di-ndti-80603, The Applicable Drawings, Specifications, Attachment-a (electrical Test Procedure), Navsea Manuals S9320-am-pro-020/mldg And S9320-am-pro-030/mldg.the Report Shall Also Include A Copy Of ;certificate Of Conformance For Plasma Coating, Polyurethane
molding Compound, Back Fill And Primer; Certificate Of Compliance For Switch Proximity, Connector, Nut, O-ring And Polychloroprene Material (per Mil-dtl-915);bulk Cable Inspection/test Report (type Dss-2 Per Mil-dtl-915/8); Identified In The Objective Quality
evidence Records Section Of This Document, And As Indicated Contract Data Requirements List (dd Form 1423).government Approval Of The Firstarticle Testing/inspection Report Is Required Prior To Commencement Of Production Units.
cdrl: First Article Testing/inspection Report Per Di-ndti-80809b;
4.11 ;production Lot. ;
4.12 ;bulk Cable - The Supplier Shall Perform 100% Examination, Inspection And Testing On The Production Lot (bulk Cable, Type Dss-2) In Accordance With The Applicable Requirements Listed In Specification Mil-dtl-915/8 (quality Conformance Inspection) Basic
electrical, Groups A, B And C. The Supplier Shall Record The Actual Measurements And Results Of Each Examination, Inspection And Test Specified In The Applicable Specification.;
4.13 ;proximity Sensor Seated Switch Unit The Supplier Shall Perform 100% Examinationinspection And Testing On Each Completed Production Lot Unit (bulk Cable/component Parts/ Unit) In Accordance With The Applicable Drawings, Attachment-a (electrical Test
procedure), Navsea S9320-am-pro-020/mldg And S9320-am-pro-030/mldg. The Supplier Shall Record The Actual Measurements And Results Of Each Examination, Inspection And Test In Attachment-a (electrical Test Procedure), Navsea S9320-am-pro-020/mldg And
s9320-am-pro-030/mldg, And Each Dimension Identified On The Applicable Drawings. ;
4.13.1 ;the Supplier Shall Visually Inspect And Perform Electrical Continuity And Dc Insulation Resistance Testing 100% On The ;bulk Cable, Type Dss-2; In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.13.2 ;the Supplier Shall Visually And Physically Inspect 100% Each Switch Proximity And Connector (item Nos. 4 And 5 Of Drawing 8590860) In Accordance With Navsea S9320-am-pro-020/mldg Requirements.;
4.13.3 ;the Supplier Shall Verify And Inspect 100% Each Switch Proximity (item No. 4 Ofdrawing 8590860) Surface Has Been Prepared And Plasma Coated In Accordance Withnavsea S9320-am-pro-030/mldg Requirements.;
4.13.4 ;the Supplier Shall Visually And Physically Inspect 100% Each Completed Unit Of Each Dimension And Keyway Location/position Identified On Drawing 8590860 Including The Identification And Markings Required By Note 8 Of The Drawing.;
4.13.5 ;the Supplier Shall Visually Inspect 100% The Molded Switch And Plug Connector On Each Completed Unit In Accordance With Navsea S9320-am-pro-020/mldg Requirements.;
4.13.6 ;the Supplier Shall Perform 100% Electrical Continuity Test On Each Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.13.7 ;the Supplier Shall Perform 100% Insulation Resistance Test On Each Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.13.8 ;the Supplier Shall Perform 100% Nondestructive Bonding Test On Molded Switch Proximity And Plug Connector On Each Completed Unit In Accordance With Navsea S9320-am-pro-020/ Mldg Requirements.;
4.13.9 ;the Supplier Shall Perform 100% Hydrostatic Pressure Test On Each Completed Unit In Accordance With Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg Requirements.;
4.13.10 ;the Supplier Shall Conduct Pre-shipment Inspection And Verification Of Connector O-ring's (item No. 8) Is Individually Packed And Shipped With Unit In Accordance With Note 2 Of Drawing 8590860 And Navsea S9320-am-pro-020/mldg. ;
4.13.11 ;production Lot Testing/inspection Report And Acceptance - (supplier Testing/ Inspection).the Supplier Shall Submit For The Completed Production Units ;proximity Sensor Seated Switch; Testing/ Inspection Reports In Compliance With The Applicable Data
item Descriptions (dids), Drawings And Specifications,attachment-a (electrical Test Procedure), Navsea Manuals S9320-am-pro-020/mldg And S9320-am-pro-030/mldg. The Production Lot Testing/ Inspection Report Shall Consist Of ;bulk Cable Inspection/test Report
(type Dss-2 Per Mil-dtl-915/8); Certificate Of Conformance For Plasma Coating, Polyurethane Molding Compound, Back Fill And Primer; Certificate Of Compliance For Switch Proximity, Connector, Nut, O-ring And Polychloroprene Material (per Mil-dtl-915); Bulk Cable
inspection/test Report (type Dss-2) Per Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg; Proximity Sensor Seated Switch Unit Inspection/test Report Per Attachment-a (electrical Test Procedure) And Navsea S9320-am-pro-020/mldg And
mercury Exclusion Certification; Identified In The Objective Quality Evidence Records Section Of This Document, And As Indicated On The Production Lot Test/inspection (plt) Contract Data Requirements List (dd Form 1423).government Approval Of The Production Lot
testing/inspection Report Is Required Prior To Shipment Of Production Lot Units.
cdrl: Production Lot Testing/inspection Report Per Di-ndti-80809b;
4.14 ;production Lot Inspection/acceptance - (supplier Testing/inspection). The Supplier Shall Submit For The Production Lot Units, The Inspection And Test Reports Identified In The Objective Quality Evidence Records Section Of This Document And As
indicated On The Production Lot Testing/ Inspection (plt) Contract Data Requirements List (dd Form 1423). Government Approval Is Required Prior To Shipment Of Production Units. ;
4.15 ;final Inspection And Acceptance - Final Inspection And Acceptance Of Production Lots Shall Be Made By The Cognizant Dcma-qar In Conjunction With The Specific Government Inspection Instructions (sgiis) Furnished By Nswcpd. In Addition To The Normal
dcma Surveillance, The Production Unit(s) Shall Be Under The Surveillance Of Nswcpd Quality Assurance Specialist As Required.;
4.16 ;objective Quality Evidence Records - The Supplier Shall Maintain Objective Quality Evidence Data (oqeds) Of Raw Material And Finished Parts Of ;an/brr-6 Proximity Sensor Seated Unit;. Records Shall Be Traceable By Drawing/item, Bulk Cable Master Reel,
heat, Lot Or Batch, Serial And Contract Number. All Oqeds Shall Shall Be Clearly Legible Including Name And Title. The Supplier May Provide Exact (quality) Photocopies Of Objective Quality Evidence Records Being Delivered Under This Purchase Order Instead Of
originals.;
4.16.1 ;the Supplier Shall Furnish A Copy Of The Following Oqeds Listed Below And As Indicated On The Contract Data Requirements List (dd Form 1423) For Acceptance. The Reports Shall Be Correlated To The Drawing/item, Heat, Lot Or Batch, Contract And
assembly Serial Number. Supplier Format Is Acceptable For The Below Listed Cdrls.
a. The Supplier Shall Submit Production Bulk Cable (type Dss-2, Dwg. 8590860, Item #3) Examination, Inspection And Test Reports In Accordance With Specification Mil-dtl-915/8 (quality Conformance Inspection) Basic Electrical, Groups A, B And C. The Reports
shall Show All The Characteristics, The Actual Measurement And Results Of Each Examination, Inspection And Testing Units Tested Including Contract Number, Name Of Supplier, Specification Number/date, Bulk Cable Master Reel, Manufacturer Part, Test Start And
stop Times, Gauge Serial Number, Gauge Calibrated Date/due Date Of Finished Bulk Cable, Item Nomenclature And Inspector?s Acceptance Signature And Date.
cdrl: Bulk Cable (type Dss-2/mil-dtl-915/8) Inspection/test Report Per Di-ndti-80809b
b. Certificate Of Conformance For:
(1) Plasma Coat (certifying Drawing 8590860, Item No. 4 Has Been Plasma Coated Per Drawing And Navsea S9320-am-pro-030/mldg Requirements).
(2) Polyurethane Molding Compound Material Type Ii, Color Amber (certifying Material, Type And Color Has Not Exceeded The Shelf Life Recommended By The Manufacturer As Required By Mil-m-24041).
(3) Back Fill Material And Primer Per Navsea S9320-am-pro-020/mldg (certifying Material And Type Has Not Exceeded The Shelf Life Recommended By The Manufacturer).
Cdrl: Certificate Of Conformance Per Di-misc-82386
c.certificate Of Compliance For:
(1) Switch Proximity (certifying Item No. 4 To Drawing 8590860 And The Applicable Manufacture Part Number Requirements).
(2) Connector (certifying Item No. 5 To Drawing 8590860 And The Manufacture Part Number Xsj-2-ccr Requirements).
(3) Nut (certifying Item No. 7 To Drawing 8590860 And The Applicable Manufacture Part Number Requirements).
(4) O-ring (certifying Item No. 8 To Drawing 8590860 And The Manufacture Part Number 5-058-n674-70 Requirements).
(5) Polychloroprene Material (certifying Material To Drawing 8590854 And Mil-dtl-915 Requirements).
cdrl: Certificate Of Compliance Per Di-misc-82386
d. The Supplier Shall Submit Production Bulk Cable (type Dss-2/dwg. 8590860, Item #3) Examination, Inspection And Test Reports (consisting Of Visual Inspection, Electrical Continuity Test And Dc Insulation Resistance Test In Accordance With Attachment-a
(electrical Test Procedure) And Navsea Manual S9320-am-pro-020/mldg, Appendix Ii D (data Sheets Ds1, Ds2 And Ds3). The Reports Shall Also Include The Contract Number, Name Of Supplier, Drawing/item Number, Drawing Revision Letter, Specification Number/date,
bulk Cable Master Reel, Item Nomenclature And Inspector's Acceptance Signature And Date.
cdrl: Bulk Cable (type Dss-2, Navsea S9320-am-pro-020/mldg) Inspection/test Report Per Di-ndti-80809b
e. The Supplier Shall Submit Production Proximity Sensor Seated Switch Unit Examination, Inspection And Testing Reports (consisting Of Visual Inspection Of Molded Connectors, Electrical Continuity Test, Insulation Resistance Test, Nondestructive And
destructive Bonding Test On Molded Connectors, Hydrostatic Pressure Test And Pre-shipment Inspection/verification (item No. 8 Of Drawing 8590860) In Accordance With Attachment-a (electrical Test Procedure) And Navsea Manual S9320-am-pro-020/mldg, Appendix Ii D
data Sheets Ds4 Thru Ds8, Ds9. The Reports Shall Also Include Cable Assembly Dimensional Inspection (drawing 8590860), Contract Number, Name Of Supplier, Drawing/item Number, Drawing Revision Letter, Cable Assembly Serial, Item Nomenclature And Inspector's
acceptance Signature And Date.
cdrl: Proximity Seated Switch Unit Inspection/test Report Per
di-ndti-80809b
f.mercury Exclusion Certification (representing The Contract Units Shipment)
cdrl: Mercury Exclusion Certification Per Di-misc-82386;
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 ;external Document Titled, "attachment-a (electrical Test Procedure)" Available Upon Request From Navsup N7 Contracting Officer. The Document Has Been Added To The Checklist In Workflow Pro.;
date Of First Submission=asreq
;;approval Of The Quality Inspection Plan By Nswc Philadelphia Division Is Required Prior To First Article.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A001. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
date Of First Submission=asreq
;;approval Of The Procedure By Nswc Philadelphia Division Is Required Prior To Commencement Of First Article Unit.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A002. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
date Of First Submission=asreq
;;approval Of The Report By Nswc Philadelphia Division Is Required Prior To Commencement Of Production Lot Units.;;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A003. Nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
date Of First Submission=asreq
;;supplier Format Is Acceptable.; ;
;;plt Rpt Shall Consist Of Oqed Records In Contract Sect E: Bulk Cable Inspection/test Report (mil-dtl-915/8, Dwg. 8590860/item #3); Certificate Of Conformance Material, Certificate Of Compliance (dwg. 8590860/item #4, 5, 7 & 8) And Polychloroprene Material; Bulk
cable Inspection/test Report (type Dss-2) Navsea S9320-am-pro-020/ Mldg); Proximity Sensor Seated Switch Unit Inspection/test Report And Mercury Exclusion Certification.;;
;;approval Of The Report By Nswc Philadelphia Division Isrequired Prior To Shipment Of Production Lot Units.; ;
;;nswcpd Is The Acceptance Activity For Cdrl Data Item A004.nswcpd Wawf/irapt Acceptor Dodacc Is "n64498".;;
Closing Date5 Mar 2025
Tender AmountRefer Documents
Bridge And Roof Company India Limited Tender
Works
Civil And Construction...+1Road Construction
Eprocure
Corrigendum : Closing Date Modified
India
Description: Supplying, Fabricating, Blasting, Primer Painting, Final Painting, Transportation And Delivery Of Fabricated Structural Steel Components To The Project Site At Ongc Uran Plant, Dist. Raigad, Maharashtra In Connection With Civil And Structural Works
Closing Soon17 Feb 2025
Tender AmountINR 94.4 Million (USD 1 Million)
South Central Railway - SCR Tender
Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Description: Mixed Scrap : Actual Lot No. 03122501 0516. Pl No.98050047 (15) (hsn Code 72044900-gst18% On Fcm Basis) Scrap Of Cond. & Unserviceable Mixed Scrap Of Ms, Cs, Ci, Gi, Ss Contains Pipes End Body Pcs. Horizontal Levers Hand Brake Wheels Angle And Channel Pcs, Rod Pcs Stands Valves Levers Bolts And Nuts Rivets Washers Pins Foot Steps Cut Bits Side Barer Housings Pipe Pcs Straps Liners Sheets Pipe Pcs Pins Throwers Locks Races Collars Axle Box Covers, Air Brake Pipes, Guard Seats, Ms End Body Pcs, Ms Sheets, Ms Cut Bits, Ms Rod Pcs, Sab Parts, Gi Wire, Ms Ladders, Ms Channels, Door Hangers, Tool Box, Ms Meshes, Bp Fp Hose Pipes, Knuckles, Crushed Paint Drums, Grease Seals, Yoke Support Plates, Yoke Pins, Sheet Strips, Ms Pipes And Pcs, Rubber Pads, Chairs, Roof Sheets, Grease Drum, Auxiliary Reservoirs, Cone Bearing, Hoop Iron. Wedges Hyd. Hoses Fabricating Scrap And Other Misc Items Of Wagons Sorts & Sizes Full Or Broken With Or Without Attachments Location: Road No.3 (single Cut Permitted For Loading Purpose Only) (note: 1. If Any Ss/ Corten Steel & Non-ferrous Items Found During Loading / Delivery Shall Be Return To The Railways By The Purchaser 2. In Case Of Clubbed Lots, Purchaser Has To Clear The Lots In The Sequence As Mentioned In The Lot Description And No Deviation Is Accepted. 3. No Picking And Choosing Of Material Is Permitted While Taking Delivery )
Closing Date28 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n744.4|cfa|email Only|james.e.lewis5@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
production Lot Testing|1||
inspection And Acceptance - Short Version|8|||||||||
desired And Required Time Of Delivery (june 1997)|29|0001|217|365 Days|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|receiving Report And Invoice Combo|na|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|0001|30|tbd|james Lewis - James.e.lewis5@navy.mil|tbd|0001|tbd|||
limitations On Pass-through Charges (jun 2020)|1||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334511|1350||||||||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||||||
type Of Contract (apr 1984)|1|ffp|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
the Following Clauses Are Hereby Removed:
wsstermlz10
wsstermmz01
52.247-47
252.215-7008
52.219-13
52.219-6
the Following Clauses Are Hereby Added:
52.247-50
small Business Set Aside Updated To Not Set Aside To A Small Business.
updated Fill-ins For Clause 52.209-3 (see Below)
due Date Extended To 28 Feb 2025.
\
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposalconstitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
3. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Name, Street Address, And Cage Of The Facility.
4. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas).provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Shall Be A Rated Order.
5. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page Under Contract Opportunities On Sam.gov Website. After Requesting Access, Send An Email To The Poc Listed On The Solicitation.
6. This Solicitation Requires First Article Testing (fat). See Far 52.209-3 First Article Approval - Contractor Testing For More Details.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Guidance Cable Asse .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.3 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
The Classified Documents And Security Level Are: ;dd254 Is Required Iaw 6935198 Para 3.2.1.2 Navsea Drawing 5759651.;
drawing Data=2505827 |10001| K|fn |d|0001 | K|49998|0069956
drawing Data=5205453 |53711| P| |d|0001 | P|49998|0016807
drawing Data=5727490 |53711| Y|fn |d|0001 | Y|49998|0345813
drawing Data=5893799 |53711| E|fn |d|0001 | E|49998|0260362
drawing Data=5894122 |53711| C|fn |d|0001 | C|49998|0264830
drawing Data=6370406 |53711| F|fn |d|0001 | F|49998|0105125
drawing Data=6657093 |53711| A|fn |d|0001 | A|49998|0071141
drawing Data=6935198 |53711| C|doc|d|0001 | C|49998|1039605
drawing Data=7052639 |53711| J|fn |d|0001 | J|49998|0125199
drawing Data=7052720 |53711| G|fn |d|0001 | G|49998|0227151
drawing Data=7052721 |53711| E|fn |d|0001 | E|49998|0265449
drawing Data=7052721 |53711| D|pl |d|0001 | D|49998|0009074
drawing Data=7053298 |53711| C|fn |d|0001 | C|49998|0077683
drawing Data=7053299 |53711| C|fn |d|0001 | C|49998|0077695
drawing Data=7053300 |53711| C|fn |d|0001 | C|49998|0076948
drawing Data=7053321 |53711| B|fn |d|0001 | B|49998|0108937
drawing Data=7561442 |53711| B| |d|0001 | B|49998|0081451
drawing Data=757994 |10001| N|fn |d|0001 | N|49998|0058376
drawing Data=758023 |10001| H|fn |d|0001 | H|49998|0140618
document Ref Data=mil-std-129 | | |p |041029|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
document Ref Data=mil-std-973 | | | |950113|a| |03|
3. Requirements
3.1 Design, Manufacture, And Performance - Except As Modified Herein,
the Guidance Cable Asse Furnished Under This Contract/purchase Order Shall Meet The
design, Manufacture, And Performance Requirements Specified On Drawing ;7052721;
cage ;53711
0f1x1
63127;
.
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until
another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted,
the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority.
Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below.
The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788.
Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
3.5 Security Clearance Required - This Contract/purchase Order Requires The Contractor To Have A Government Security Clearance In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
3.6 Production Lot Approval (contractor Testing) - Production Lot Test And Approval Is Required.
3.7 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required.
3.8 ;cage 0f1x1 Is Waived From Fa Since They Have Produced Dwg 7052721 With In The Last 5 Years. There Are No Significant Change To Fa Requirements.;
3.9 Serialization - The Supplier Shall Mark A Serial Number On Each Guidance Cable Asse In Accordance With ;iaw 7052721 Rev "e" Note 14.;
. Actual Serial Numbers Will Be Assigned ;apply A Government Serial Number To Each Unitmanufactured. Serial Number Shall Be Obtainedfrom Commander, Naval Undersea Warfare Centerdivision Newport, Newport, Ri 02841-1708.nuwc_npt_serialnumbers@navy.mil.;
.
;quality Assurance Provisions (qaps)
i.articles To Be Furnished Hereunder Must Be Manufactured, Tested And Inspectedin Accordance With Drawing Numbers Listed Below And All Details And Specifications Referenced Therein.
this Qap Applies To The Following Cable:
53711-7052721- Cable Assembly, 5w5 (1355-01-481-8700)
the 5w5 Umbilical/torpedo Interface Cable Assembly (53711-7052721) Is An Assembly Of Multiconductor Cable With Attached Connectors And Appropriate Protective Jacketing Within The Cable Housing (53711-7052720).
Key Supporting Documents
53711-6935198 - Torpedo Mk 48 Adcap Modifications Critical Item Performance Specification 5w5 Cable Assembly, 20 May 2003, Revision C
this Specification Establishes The Requirements For The Manufacture And Acceptance Of The 5w5 Cable Assembly, Naval Sea Systems Command (navsea) Drawing 7052721.
53711-5759651 - (c) Pressure Tests (u)
ref: 6935198 Para 3.2.1.2: The 5w5 Cable Assembly Shall Withstand An External Hydrostatic Pressure Of The Proof Pressure Value Of Navsea Drawing 5759651 For Five (5) +1/-0 Minutes Without Exhibiting Signs Of Damage Or Leakage. For Preproduction And Periodic
quality Conformance Tests, The 5w5 Cable Assembly Shall Meet This Requirement Ten (10) Consecutive Times.
53711-5893799 - Cable Assembly, 5w5 Umbilical/torpedo Interface, Wiringdiagram
this Is The Wiring Diagram For The 5w5 Cable Assembly.
53711-5894122 - Cable Assembly, 5w5 Umbilical/torpedo Interface, Cabling Diagram This Is The Cabling Diagram For The 5w5 Cable Assembly.
ii.cable Acquisition Requirements Are Specified In Section 6.2 Of 53711-6935198- Torpedo Mk 48 Adcap Critical Item Product Fabrication Specification For 5w5cable Assembly 20 May 2003, Revision C:
6.2 Ordering Data - Procurement Documents Should Specify The Following:
a.title, Specification Number, Revision Letter, Date Of The Revision Of This Specification.
b.exceptions To This Specification, Applicable Drawings, Or Other Referenced Documents.
c.desired Completeness And Availability Of Test Data, Including Data Cards.
d.type And Degree Of Contractor Quality Assurance Systems Required.
e.whether Or Not The Test Samples Required Are Included In The Number Of 5w5 Cable Assemblies Ordered.
f.activities Designated By The Government To Perform The Preproduction And Periodic Production Monitoring Tests Per Figures 3 And 4. (currently The Government Is Designating The Contractor To Perform The Tests. Government Would Like To Be Notified When Testing
will Be Performed In Case They Wantto Have Government Witness The Tests.)
g.level Of Preservation And Packaging.
h.method Of Shipment.
iii. Reference Documents
N
a
iv. Quality/inspection Requirements
A. During The Performance Of This Contract, The Contractor/supplier Mustmaintain A Quality Management System In Accordance With As9100/iso-9001 Or Equivalent.
due To The Critical Application Of This Part, It Is Recommended That Themajor Characteristics And Key Features Of The Part, Identified Below, Beemphasized When Communicating With The Contractor/supplier.
b.all Quality Assurance Operations Performed By The Supplier Will Besubjected To Government Verification At Any Time. Verification Will Consistof (a) Tests, (b) Surveillance Of The Supplier's Operations, (c) Analysis,(d) Process Inspection, And (e) Product
inspection. Failure Of The Supplierto Promptly Correct Deficiencies Discovered By The Supplier Or Of Which Thesupplier Is Notified Shall Be Cause For Suspension Of Product Acceptanceuntil Corrective Action Has Been Made Or Until Conformance To The
prescribedcriteria Has Been Demonstrated.
c. Quality Assurance Provisions For The Fabrication/assembly Of The Cables Are Specified In 53711-6935198.
cable Assembly Production Sampling
1. Preproduction Sampling - A Preproduction Sample Of Two (2) 5w5 Cable Assemblies Will Be Manufactured Using The Methods And Procedures Proposed For Production. The Sample Will Pass The Quality Conformance Tests As Specified In Figure 3 Prior To Submission To
an Activity Designated By The Procuring Agency To Determine Compliance With The Requirements Of The Specifications And Drawings. Further Production Of The 5w5 Cable Assembly By The Contractor Prior To The Approval Of The Contracting Agency Will Be At The
supplier's Risk. (currently The Government Is Designating The Contractor To Perform Inspection And Testing Required To Verify Compliance With Specifications And Drawings. Government Would Like To Be Notified When Inspection And Testing Will Be Performed In Case
they Want To Have Government Witness Present.)
preproduction Cable Assembly Testing Requirements:
preproduction Tests Conducted By The Contractor (figure 3):
performance Verification
low-pressure Leakage
hydrostatic Pressure (one Cycle)
electrical Performance
4. Quality Assurance
4.1 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.1.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize This If Desired.;
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
4.4 First Article Test/inspection (contractor) - The Contractor Shall Conduct ;iaw 6935198 Rev "c";
first Article Test/inspection On ;2;
unit(s) In Accordance With Requirements ;6935198 Para 3.2.1.2;
.
4.5 Production Lot Test (contractor) - The Contractor Shall Perform Production Lot Testing In Accordance With ;iaw 6935198 Para 4.2.1.1, 4.2.2.1, And 4.2.1.2
a Preproduction Sample Of Two (2) 5w5 Cable Assemblies Will Be Manufacturedusing The Methods And Procedures Proposed For Production.
from Each Production Lot Of 50 5w5 Cable Assembliesthat Have Passed Thequality Conformance Tests Asspecified In Figure 2, A Sample Of Two (2) 5w5 Cableassemblies Will Be Selected At Random By Thegovernment Inspector For Submission To An Activitydesignated By
the Procuring Agency To Determine Compliance With The Specifications And Drawings.;
.
4.6 Quality Conformance Inspection - The Contractor Is Responsible For Conducting A Quality Conformance Inspection In Accordance With ;iaw 6935198 Rev "c". 3.4.2;
, Paragraph ;para 4.2.1.3;
And Preparing An Inspection Report In Accordance With The Contract Data Requirements List, Dd Form 1423.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
date Of First Submission=030 Dac
;certificates Of Quality Compliance For The Followingcable Assembly Requirements Shall Be Delivered Tothe Government Via Contract Data Requirements List (cdrl).
preproduction Sample Quality Conformance Inspection And Test Data.
production Quality Conformance Inspection And Test Data.
periodic Sample Quality Conformance Inspection And Test Data.
certificates Of Quality Compliance For The Followingsource Control And Vendor Item Controlled Cableassembly Components Shall Be Delivered To Thegovernment Via Contract Data Requirements List (cdrl).
connector, Receptacle, Electrical, Solder Type,solder Mounting, Bayonet Coupling (pn 7053321)contact Assy, #20 (pn 757994)power Cables 7053298-1/-2, 7053299-1/-2/-3,7053300-1/-2/-3.
copies Of The Certificate Of Quality Complianceshall Be Delivered To The Engineering Support Activity,nuwc Newport:
Nwpt.nuwc_8554_qapcdrl@navy.mil
james.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
recommend A Post Award Conference Be Conducted Withthe Contractor/supplier To Review The Item Keyfeatures. The Government Engineering Support Activity,nuwc Newport, Would Like To Participate In Theconference If One Is Scheduled.
;
date Of First Submission=030 Dac
;isea Poc: James.c.ferguson1.civ@us.navy.mil
richard.d.penfold2.civ@us.navy.mil
patrick.r.faerber.civ@us.navy.mil
newport, Ri 02841-1708
phone: 401-832-4593
dsn: 432-4593
fax: 401-832-4194
e-mail: Patrick.faerber@navy.mil
;
Closing Date28 Feb 2025
Tender AmountRefer Documents
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Details: Update: This Notice Has Been Updated To Extend The Response Date To March 7th, 2025
nasa Ames Research Center (arc) Is Hereby Soliciting Information From Potential Sources For Manufacturing Process Development Of High-rate Composites For Aerospace Applications.
description
the National Aeronautics And Space Administration (nasa) Ames Research Center (arc), On Behalf Of The Engineering Directorate And Aeronautics Directorate, Is Hereby Soliciting Information From Potential Sources Regarding High-rate Thermoplastic Manufacturing Technologies And Process Development. Nasa Is Interested In Engaging With Government, Industry, And Academia For Collaborations To Develop Thermoset And Thermoplastic Manufacturing Processes Tailored, But Not Limited, To Aerospace Applications With The Ames High-rate Composite Manufacturing Facility (ahrcm). The Ahrcm Supports The Research And Development Of Aerospace Materials Processes (particularly For Thermoplastic Composites), Modeling, And Large Structures With The Goal Of Mitigating Labor-in-the-loop Manufacturing Bottlenecks By Increasing Volumetric Fabrication Throughput Of Composites And Reducing Inertial Assembly Errors As A Virtue Of Robotic Automation.
this Request For Information (rfi) Serves To Solicit Organizations That Have Demonstrated Heritage Referencing Composite Materials For Aerospace Applications, Particularly Those Pertaining To Aeronautics, Spacecraft, Intelligent Structures, Automotive, And Other High-rate Thermoset & Thermoplastic Manufacturing Applications.
background
the Emerging Advanced Air Mobility (aam) Industry Must Rely Heavily On Advanced Composite Materials To Build Vehicles That Will Meet The Performance And Safety Requirements Needed To Achieve Commercial Success. These Electrically Powered Vertical Takeoff And Landing (evtol) Vehicles Must Make Extensive Use Of Light-weight Carbon Fiber Composite Structures And Components To Maximize Vehicle Range And Payload Achievable With The Energy Storage Density Of Foreseeable Battery Technology. Using Conventional Metallic Materials For This Application Is Not An Option Because:
· Metallic Structures Are Heavy, Reducing The Achievable Vehicle Payloads And Ranges To Impractical Levels.
· Traditional Aircraft Production Rates, Utilizing The Current State-of-the-art In Materials And Production Methods Approach 1,000 Aircraft Per Year. To Be Economically Feasible, Aam Aircraft Production Rates Must Reach 5,000 Or More Aircraft Per Year.
significant Reductions In Composite Manufacturing Costs, Large Improvements In Manufacturing Consistency And Rates Of Production, Will Be Required To Meet Vehicle Cost Goals And Allow Mass-produced Components To Be Certified By The Faa. The Automotive Industry Has Begun To Develop High-rate Manufacturing Processes For Automobiles That Achieve Significant Reductions In Manufacturing Cost, But These Methods Have Not Yet Been Applied To The Manufacture Of Aerospace Components That Require Very High Levels Of Quality Assurance.
ames Research Center Developed Ahrcm In 2021 As A Composite Manufacturing Facility That Specializes In The Rapid Processing Of Thermoset Carbon Fiber Reinforced Polymers (cfrp). The Facility Was Created To Reduce The Time-to-part For Aerospace Components, Using Industry-standard High-pressure Resin Transfer Molding (hp-rtm) And Thermoset Cfrp Thermoforming, Also Referred To As Prepreg “stamp-forming” Or “drape-molding.”
located In The High Bay Of A Historic Aviation Hangar, Thermoforming Is Accommodated By Two Independent Automated Manufacturing Lines: Preforming And Final Thermoforming. The Preforming Stage Currently Contains A 6-dof Abb Robotics Charge Loading Manipulator, A Conductive And Infrared Heating Platen, 20 Pneumatic Grippers Mounted On A Shuttling System, A 300-ton Press, And A 6-dof Abb Unloading Manipulator. This Capability Was Designed For Thermoset Cfrp Preforming, And As Such Can Subject A ~1-foot By 4-foot Cfrp Prepreg 7-ply Charge Through ~350c In The Preforming Platen And ~250c In A Preforming Drape Mold With Up To 300 Tons Of Force. The Final Thermoforming Line Contains A 6-dof Abb Charge Loading Manipulator, A 3,600-ton Press, A Heating System That Can Heat Molds With ~250c Via Thermal Fluid, A 6-dof Abb Unloading Manipulator And An Hp-rtm Capability Which Can Be Integrated For Compatibility With Non-prepreg Composites.
ames Is Particularly Interested In Collaborating To Develop Advanced Composite Modeling And Thermoplastic Composite Manufacturing Processes By Retrofitting Ahrcm’s Current Thermoforming Lines. Thermoplastic Cfrp Requires Elevated Temperatures At ~300c - 385c, Varying With Respect To The Specific Fiber And Resin Matrix Utilized. Initial Feasibility Studies And Empirical Testing Demonstrate That Ahrcm May Be Retrofit For Compatibility With Thermoplastic Cfrp, While Maintaining The Current High-rate Automated Configuration.
additional Information Regarding The Facility May Be Referenced At:
https://www.nasa.gov/ahrcm/
requested Information
-descriptions Of Composite Manufacturing Techniques Utilized, With Applications Demonstrating Developed Technical Heritage By The Interested Party. Of Particular Interest Are High-rate, Large-scale Manufacturing Processes For Thermoplastic And Thermoset Materials In Aerospace Applications.
-non-metallic Materials Testing Conducted By The Interested Party, Including Details Referencing Developed Mechanical Properties, Material Properties, And Non-destructive Evaluation Techniques.
-demonstrated Expertise Of Process Development For Non-metallic Materials. Specific Capabilities Of Interest Are Line Modeling, In-situ Process Control, And Process Qualification.
-applications Of Interest For Applying High-rate Thermoplastic And Thermoset Composite Manufacturing Processes.
the National Aeronautics And Space Administration (nasa) Arcis Seeking Capability Statements From All Interested Parties, Including All Socioeconomic Categories Of Small Businesses And Historically Black Colleges And Universities (hbcu)/minority Institutions (mi) For The Purposes Of Determining The Appropriate Level Of Competition And/or Small Business Subcontracting Goals Formanufacturing Process Development Of High-rate Composites For Aerospace Applications. The Government Reserves The Right To Consider A Small, 8(a), Women-owned (wosb), Service Disabled Veteran (sd-vosb), Economically Disadvantaged Women-owned Small Business (edwosb) Or Hubzone Business Set-aside Based On Responses Received.
no Solicitation Exists; Therefore, Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released, It Will Be Synopsized On Sam.gov. Interested Firms Are Responsible For Monitoring This Website For The Release Of Any Solicitation Or Synopsis.
vendors Having The Capabilities Necessary To Meet Or Exceed The Stated Requirements Are Invited To Submit Appropriate Documentation, Literature, Brochures, And References.
all Responses Shall Be Submitted Electronically Via Email To Alex Mazhari At N210@nasa.onmicrosoft.com And A.mazhari@nasa.gov No Later Than March 7th, 2025 At 22:00 Pst. Please Reference Ahrcm Rfi In Any Response.
this Synopsis Is For Information And Planning Purposes Only And Is Not To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. Respondents Will Not Be Notified Of The Results Of The Evaluation.
Closing Date8 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n792.13|t2x|n/a|brian.t.kent.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo|source|tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (jan 2025)|12|336413|1250|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a ||
the Small Business Administration Representative At Navsup Wss Has Reviewed This Requirement And Determined That A Set-aside Recommendation Was Not Applicable For This Procurement.
this Rfq Is For Repair. Navsup Wss Requests That Contractors Submit A Quote That Includes Either A Firm-fixed Price Or Tt&e Pricing As Well As Estimate Costs To Repair This Item.
this Contract/delivery Order/purchase Order/modification Is Issued By The Government When Deposited In The Mail, Transmitted By Facsimile Or Sent By Any Electronic Commerce Method, Including Email. The Government's Acceptance Of The Contractor's Proposal
constitutes Bilateral Agreement To Issue This Contract/delivery Order/purchase Order/modification.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.3 . The Contractor Shall Include On The Detailed Process/operation Sheets Developed, (1) All In House Manufacturing Processes And (2) The Identity Of All Manufacturing Sources Performing Processes/operations Outside Their Facility. These Sheets Shall Not Be
revised Or Altered After The Successful Completion Of First Article Or Production Lot Testing Without Approval From The Basic Design Engineering Activity, Via The Pco.
1.4 . Unless Otherwise Specified, For Fabricated Parts, The Inspection
method Sheets/ Final Inspection Sheets Shall List The Characteristics
of Each Item Produced Under The Contract.
the Manufacturer Shall Be Required To Provide Certifications Of All Raw
material Including Castings And Forgings. The Material Source Shall Be
identified And The Documentation Shall Be Able To Identify The Customer
and/or Contract Number. The Manufacturer Shall Maintain All Raw Material
documentation For A Minimum Of Ten (10) Years.
the Contractor Is Responsible For Providing Completed Inspection Method Sheets/final Inspection Sheets Showing The Actual Dimensions Taken For
all Characteristics,in Addition, Critical Characteristics Shall Be
annotated.
1.5 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved
will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The
sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation:
(a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The
same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval.
(b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors.
(c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents.
(d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings,
forgings, Etc.
(e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics
should Be Discernible From All Other Characteristics.
the Above Requirements Are A Subset Of Requirements Specified In The Aso
source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With
mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval
brochure.
1.6 The Material Covered In This Contract/purchase Order Will Be Used In A
crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been
designated As Critical Material And Special Control Procedures Are Invoked
to Ensure Receipt Of Correct Material.
1.7 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;619447; Drawing Number ( ;80020; ) ;m; , Revision ;nawc Lakehurst; And All Details And Specifications Referenced Therein.
1.8 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.9 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=619447 |80020| M| |c| | | |
3. Requirements
unique Requirements:
a. All Records Pertaining To Alre Cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizant Techincal Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years.
b. This Overhaul/repair Tdr Is Requiring The Submission Of Data Covering All Parts Components And Assemblies,including Material Certifications, Non-destructive Inspection Process Data, Welding Procedures/qualifications(as Applicable), Etc. Submission Of Certain
data May Be Rendered Inapplicable, Contingent Upon Items Being Either Overhauled Or Replaced, Based On Its Conditition And Per The Guidelines Of Approved Overhaul/repair Procedures.
4. Quality Assurance
4.1 Review Documentation As Provided Under Dd 1423 Requirements.
4.2 Critical Manufacturing Processes
( ;n/a; ) Heat Treat
( ;n/a; ) Welding
( ;n/a; ) Cadmium Plating
( ;n/a; ) Engineering Chrome Plating
( ;n/a; ) Nickel Chrome Plating
( ;n/a; ) Casting(s)
( ;n/a; ) Forging(s)
( ;n/a; ) Mpr (material Processing Requirements)
4.3 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below
4.3.1 Dimensional Test (special)
;close Machine Tolerances;
4.3.2 Requirements Of:
;lke Drawing Package;
4.3.3 Form
;applies;
4.3.4 Fit
;n/a;
4.3.5 Function
;n/a;
4.3.6 Compliance With Drawing ( ;80020; ) ;m; , Revision ;applies; And Specifications Referenced Therein.
4.4 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements
4.5 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection
4.6 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing.
4.6.1 The Qar Shall Be Present To Witness All First Article Testing.
4.6.2 The Following Additional Personnel Shall Witness The First Article Testing: ;applies;
4.7 Disposition Of Fat Samples
4.7.1 ;n/a; Sample(s) May Be Destroyed During Testing.
4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
4.8 Test Sample Coating Instructions
4.8.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required.
4.9 Notice To Government Of Testing At The Contractors Facility.
4.9.1 Far 52.209-3 Applies
(a) The Contractor Shall Present ;one; ; Unit(s) Of The Following Cage( ;80020; ; ), Part Number ;619447-2; ; , Revision ;m; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The Contractor
shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests.
(b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;peter Schoerner Nawc Qa At Fax (732) 323-1381.; ;
the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements.
(c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The
contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First
article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another
report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any
additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract.
(f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For
acceptance.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates
and/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair
of The First Article During Any First Article Test.
(i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article.
(j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On
form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test
report.
4.10 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The
original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run.
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States
code, Section 1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And
one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First
article Approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government.
Offeror's Proposed Alternate Delivery Schedule
(based On Waiver Of First Article Approval Requirements)
within Days:
item No. _____________ Quantity:_______ After Date Of Contract:_________
4.11 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying
office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of
witnessing The Final Inspection. The Contractor Shall Notify By Email Or
telefax Pco And Nawc Lakehurst Qa ;roy Janney Nawc Qa Fax (732) 323-1381.; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units.
4.12 . Mandatory Inspection Requirements:
100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar).
during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows:
A. Level Of Inspection (loi).
1. Critical Characteristics: 100% Inspection Shall Apply.
2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar.
B. Critical Characteristics:
;all Actual Dimensions Of Any Major Or Critical Characteristics Shall Be Recorded. The Ambeint Temperature Shall Be Recorded At Time Measurements Are Taken. Certifications To Be On File For A Minimum Of Seven Years After Delivery;
C. Major And Minor Characteristics
1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications.
4.13 Special Inspection Requirements
( ;n/a; ) Magnetic Particle Inspection
( ;applies; ) Surface Inspection
( ;n/a; ) Penetrant Inspection
( ;n/a; ) Radiographic Inspection
( ;n/a; ) Ultrsonic Inspection
( ;applies; ) High Shock Test
( ;applies; ) Mechanical Vibration Test
quality Assurance Requirements
1. First Article Testing:
the Contractor Shall Conduct First Article Testing On This Item Of Alre/se And Must Address All Elements Listed Below And Prepare A First Article Test Report Documenting The Outcome. Unless Otherwise Specified,the Report And Its Acceptance Shall Be Per The
provisions Of The Applicable Contract Data Requirements List (cdrl).
a. Requirements:
i. First Article Quantity Is One (1); In Uncoated Condition.
ii. The First Article Shall Be Available For Government Quality Assurance Representative (qar) Evaluation Per The Contract Schedule. The Evaluation Shallbe Conducted In The Presence Of The Government Personnel. Accordingly, The Contractor Shall Allow Time To
arrange For Nawc Participation In Accordancewith The "nawcadlke Inspection Witness Option";
iii. The Contractor Shall Provide Facilities And Personnel Sufficient To Conduct All Necessary Tests To Establish Conformance;
iv. The Contractor Shall Have Available For Review All Certificationstest Reports, In-process Inspection Documents Needed To Substantiateproduct Quality; This Same Documentation Shall Also Be Included In The Firstarticle Test Report;
v. The Contractor Shall, At The Time Of First Article, Have Corrected Any Problem Areas Deemed Significant And Documented As Deficient By The Government Quality Assurance Representative (qar) Within His/her Quality Assurance System Not Previously Identified
during Prior Evaluations And/or Surveys; Any Problems Identified During The Conduct Of The Test Will Also Require Correction.
b.testing And Evaluation:
the Contractor Shall Accomplish 100% Inspection And/or Testing Of All Critical,major, And Minor Dimensions And/or Requirements Identified In The Drawings,drawing Notes, And Process And Fabrication Specifications.
results Shall Consist Of Actual Dimensions, Measurements, And Test Outcomes And Included In The First Article Test Report. Attributes For Hardness And Non-destructive Testing Shall Be In-spected 100%.
c.acceptance/reject Criteria:
satisfactorily Meeting All Requirements Cited In Paragraph 7a And Satisfactorily Demonstrating 100% Con-formance To The Test And Evaluation Elements Cited In Paragraph 7.b Shall Constitute Acceptance Of The First Article;
ii.failure To Meet Any Of The Conditions In Paragraph 7.a And 7.b Shall Be Cause For Rejection.
d.delivery:
the Accepted First Article Exhibit May Be Delivered And Counted Along With The Contract Production Quanti-ties Providing The Item Has Not Been Damaged During Testing, And Has Been Found To Be Conforming;
ii.the Contractor Is Responsible For Preparing The First Article Test Report In Accordance With Cdrl's.
2. Production Lot Special Tests: N/a
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
this Is A Alre Critical Application Item. For Drawing Updates, See Attached Nawc Lke Drawing Update Sheet.
(for Navsup Refernce Only) Tdr 21-10032a Repair Tdr
Tdr 24-10132 Procurement Tdr.
The Components Being Acquired Under This Solicitation Have Been Classified As "critical" Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Submitted & Been Approved Will Be Eligible For Award Under This Solicitation.
Any Company May Submit A Source Approval Request As Outlined In This Solicitation.
all Records Pertaining To Alre Cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizant Technical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years.
date Of First Submission=asreq
data Requirements:
(as Required Based On Repair Or Overhaul Process/procedure)
a. Copies Of All Approved Requests For Variations.
b. Material Certifications Per Drawing 619447.
c. Dimensional Inspection Per Drawing 619447.
d. Part Identification Per Drawing 619447.
e. Material And Mill Certification Per Drawing 619447
f. Evidence Of Compliance To Operational Requirements In Note 1 Of Drawing 619447
g. Hydrostatic Test Per Note 5 Of Drawing 619447.
h. Leakage Test Per Note 6 Of Drawing 619447.
i. Life Test Per Note 7 Of Drawing 619447 Or Copy Of Last Certification And Statement Of No Change In Design, Material And Manufacture Methods.
j. Environmental Test Per Note 8 Of Drawing 619447 Or Copy Of Last Certificatioand Statement Of No Change In Design, Material And Manufacture Methods.
k. Shock And Vibration Test Per Note 9 Of Drawing 619447 Or Copy Of Last Certifacation And Statement Of No Change In Design, Material And Manufacture Methods.
l. Maintenance And Repair Instruction Manual Per Note 3 Of Drawing 619447.
m. Preservation And Packaging Per Drawing 619447.
n. 100% Inspect, And Record The Readings For The Pitch And Functional Diameters And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed-std-h28/20 Per Drawing 619447.
date Of First Submission=asreq
16. Remarks/data Requirements: (as Required Based On Repair Or Overhaul Process/procedure)
a. Copies Of All Approved Requests For Variations.
b. Material Certifications Per Drawing 619447.
c. Dimensional Inspection Per Drawing 619447.
d. Part Identification Per Drawing 619447.
e. Material And Mill Certification Per Drawing 619447.
f. Evidence Of Compliance To Operational Requirements In Note 1 Of Drawing 619447
g. Hydrostatic Test Per Note 5 Of Drawing 619447.
h. Leakage Test Per Note 6 Of Drawing 619447.
i. Life Test Per Note 7 Of Drawing 619447 Or Copy Of Last Certification And Staof No Change In Design, Material And Manufacture Methods.
j. Environmental Test Per Note 8 Of Drawing 619447 Or Copy Of Last Certificatioand Statement Of No Change In Design, Material And Manufacture Methods.
k. Shock And Vibration Test Per Note 9 Of Drawing 619447 Or Copy Of Last Certification And Statement Of No Change In Design, Material And Manufacture Methods.
l. Maintenance And Repair Instruction Manual Per Note 3 Of Drawing 619447.m. Preservation And Packaging Per Drawing 619447.
n. 100% Inspect, And Record The Readings For The Pitch And Functional Diametersand Document That The Inspection Results Are Acceptable And Are Iaw System22 Of Fed-std-h28/20 Per Drawing 619447.
Closing Soon18 Feb 2025
Tender AmountRefer Documents
1481-1490 of 1680 active Tenders