Fabrication Tenders

Fabrication Tenders

Department Of Public Works And Highways Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date3 Dec 2024
Tender AmountPHP 2.9 Million (USD 50.3 K)
Details: Description Invitation To Bid For 25ei0082 - Construction Of Multi-purpose Building At Barangay San Vicente, Roxas, Oriental Mindoro, Phase Ii 1. The Dpwh - Southern Mindoro District Engineering Office, Through Nep 2025 Intends To Apply The Sum Of Php 2,970,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Multi-purpose Building At Barangay San Vicente, Roxas, Oriental Mindoro, Phase Ii/25ei0082. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Dpwh - Southern Mindoro District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Construction Of Multi-purpose Building At Barangay San Vicente, Phase Ii Contract Id No. : 25ei0082 Locations : Roxas, Oriental Mindoro Scope Of Works : The Scope Of Work Includes The Construction Of Bleachers On Both Side Of The Covered Court, With The Right Side Having 3 Layes And The Left Side 5 Layers, Both 30 Meters Long. This Also Includes Excavation Works, Reinforced Concrete For Column Footing, Column, Beam And Slabs, As Well As Finishing Works Such As Chb Laying, Plastering And Wall Painting. It Also Covers The Fabrication And Installation Of Rafters, Struts, Purlins, Frames And Roofing. Approved Budget For The Contract : Php 2,970,000 Contract Duration : 120 Calendar Days 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of C & D, B, A, Aa, Aaa For General Engineering. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From The Dpwh - Southern Mindoro District Engineering Office And Inspect The Bidding Documents At Dangay, Roxas, Oriental Mindoro During Weekdays From 8:00 A.m. – 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 11, 2024 - December 03, 2024 Until 10:00 A.m. From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 3,000.00. 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Dpwh - Southern Mindoro District Engineering Office Will Hold A Pre-bid Conference On November 19, 2024 At 8:30 A.m. At Dpwh - Southern Mindoro District Engineering Office, Procurement Unit, Dangay, Roxas, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_southernmindoro@dpwh.gov.ph For Electronic Submission On Or Before December 03, 2024 Until 10:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 03, 2024 @ 10:30 A.m. At Dpwh - Southern Mindoro District Engineering Office, Procurement Unit, Dangay, Roxas, Oriental Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh - Southern Mindoro District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Engr. Aleli Olly U. Manalaysay Head, Procurement Unit, E-iii Tel. No. 043 – 289 - 3102 Rubico-fetalsana.marinelle@dpwh.gov.ph Emmanuel A. Manalaysay Bac Chairperson Assistant District Engineer Tel. No. 043 – 289 - 3102 Rubico-fetalsana.marinelle@dpwh.gov.ph Approved: Emmanuel A. Manalaysay Bac Chairperson

Department Of Public Works And Highways Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date3 Dec 2024
Tender AmountPHP 2.9 Million (USD 50.3 K)
Details: Description Invitation To Bid For 25ei0084 - Construction Of Multi-purpose Building At Barangay Cawayan, Bongabong, Oriental Mindoro, Phase Ii 1. The Dpwh - Southern Mindoro District Engineering Office, Through Nep 2025 Intends To Apply The Sum Of Php 2,970,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Multi-purpose Building At Barangay Cawayan, Bongabong, Oriental Mindoro, Phase Ii/25ei0084. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Dpwh - Southern Mindoro District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Name Of Contract : Construction Of Multi-purpose Building At Barangay Cawayan, Bongabong, Oriental Mindoro, Phase Ii Contract Id No. : 25ei0084 Locations : Bongabong, Oriental Mindoro Scope Of Works : Completion Of 1-unit Multi-purpose Building (barangay Hall) At Barangay Cawayan, Phase Ii. This Includes The Installation Of Floor Tiles At Ground And Second Floors, Waterproofing (built-up And Preformed Membrane) At The Roof Deck, Complete Ceiling Systems For Ground And Second Floors, Stainless Steel Signage At Front Exterior Wall, And Additional G.i. Pipes And Square Steel Bars For Railings. Works Also Include Masonry And Concrete Painting For Interior And Exterior Areas, Ceiling Painting At Ground And Second Floors, Steel Painting Of Existing Square Bar Railings, And Fabrication And Installation Of Stainless Steel Railings At Roof Deck, And Flat Form At Session Hall. Approved Budget For The Contract : Php 2,970,000 Contract Duration : 120 Calendar Days 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of C & D, B, A, Aa, Aaa For General Engineering. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From The Dpwh - Southern Mindoro District Engineering Office And Inspect The Bidding Documents At Dangay, Roxas, Oriental Mindoro During Weekdays From 8:00 A.m. – 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 11, 2024 - December 03, 2024 Until 10:00 A.m. From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 3,000.00. 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Dpwh - Southern Mindoro District Engineering Office Will Hold A Pre-bid Conference On November 19, 2024 At 8:30 A.m. At Dpwh - Southern Mindoro District Engineering Office, Procurement Unit, Dangay, Roxas, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_southernmindoro@dpwh.gov.ph For Electronic Submission On Or Before December 03, 2024 Until 10:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 03, 2024 @ 10:30 A.m. At Dpwh - Southern Mindoro District Engineering Office, Procurement Unit, Dangay, Roxas, Oriental Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh - Southern Mindoro District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Engr. Aleli Olly U. Manalaysay Head, Procurement Unit, E-iii Tel. No. 043 – 289 - 3102 Rubico-fetalsana.marinelle@dpwh.gov.ph Emmanuel A. Manalaysay Bac Chairperson Assistant District Engineer Tel. No. 043 – 289 - 3102 Rubico-fetalsana.marinelle@dpwh.gov.ph Approved: Emmanuel A. Manalaysay Bac Chairperson

Province Of Eastern Samar Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date13 Dec 2024
Tender AmountPHP 6 Million (USD 101.7 K)
Details: Description Republic Of The Philippines Provincial Government Of Eastern Samar Capitol Building, Borongan, Eastern Samar, 6800 Tel No. (055)-560-8312 E-mail Address: Esamar.bac@gmail.com Bids And Awards Committee (bac) Invitation To Bid For Construction Of Multi-purpose Building (covered Court) Brgy. San Roque, Salcedo, Eastern Samar 1. The Provincial Government Of Eastern Samar, Through The 20% Edf 2024 Intends To Apply The Sum Of Six Million Pesos Only (php6,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract Itb No. 2024-11-205 Construction Of Multi-purpose Building (covered Court) Brgy. San Roque, Salcedo, Eastern Samar. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Eastern Samar Now Invites Bids, Item No. B.5 – Project Billboard/sign Board (1.00 Each), Item No. B.7- Occupational Safety And Health Program (3.00 Month), Item No. B.9 – Mobilization/demobilization (1.00 L.s.), Item No. 100(1) – Clearing And Grubbing (2,000.00 Sq.m.), Item No. 804(1)b – Embankment From Common Borrow (167.47 Cu.m.), Item No. 900(1)c2 – Structural Concrete For Slab On Fill (47.58 Cu.m.), Item No. 900(1) – Structural Concrete For Footing, Footing Tie Beam, Column, Girder/beams (48.63 Cu.m.), Item No. 902(1)) – Reinforcing Steel (deformed) (9,892.30 Kg), Item No. 90391) – Formworks And Falseworks (1.00 L.s.), Item No. 1047(2)b – Structural Steel Roof Truss (10,265.38 Kg), Item No. 1047(2)c – Structural Purlins (4,343.56 Kg), Item No. 1047(5) – Metal Structures Accessories (steel Plate) (712.72 Kg), Item No. 1047(3)b – Metal Structure Accessories (sag Rods) (312.00 Pc), Item No. 1047(3)a – Metal Structure Accessories (anchor Bolts) (48.00 Pc), Item No. 1047(3)d – Metal Structure Accessories (cross Bracing) (24.00 Pc), Item No. 1047(3)c – Metal Structure Accessories (turn Buckle) (24.00 Pc), Item No. 1014 – Prepainted Metal Sheets, Long Span (630.43 Sq.m.), Item No. 1013(2)a1 – Fabricated Metal Roofing Accessory (ridge/hi Roll) (33.00 L.m.), Item No. 1013(2)a2 – Fabricated Metal Roofing Accessory (flashing/counter Flashing) (104.21 L.m.), Item No. 1013(2)b1 – Fabricated Metal Roofing Accessory (gutter) (66.00 L.m.), Item No. 1003(11)a1 – Fascia Board, 12mm Fiber Cement Board (104.21 M), Item No. 1032(1)c1 – Painting Works (metal Painting) (883.98 Sq.m.), Item No. 1001(1)a3 – Pipes And Fittings (pvc) (100mm) (48.00m), Item No. Spl 1 – Backboard Support (1.00 Lot), Completion Of The Works Is Required Within 120 Calendar Days. Bidders Should Have Completed Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Instruction To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From The Provincial Government Of Eastern Samar And Inspect The Bidding Documents At The Address Given Below From 8:00 Am – 5:00pm, Monday To Friday. 5. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Ten Thousand Pesos Only (php10,000.00). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 6. The Provincial Government Of Eastern Samar Will Hold A Pre-bid Conference On November 28, 2024 10:00 A.m., At The Bids And Awards Committee Office, Capitol Building, Borongan City, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 7. Bids Must Be Delivered To The Address Below On Or Before December 13, 2024 10:00 A.m., At The Bids And Awards Committee Office, Capitol Building, Borongan City. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. The Procurement Process Will Be Conducted In Accordance With The Schedules Provided In Ra 9184 And Its Rirr For Advertisements, Receipt Of Letters Of Intent, And Issuance Of Bid Documents. 9. The Provincial Government Of Eastern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Nelson F. Cortez Chairman, Bids And Awards Committee Bids And Awards Committee Office Capitol Building, Borongan City Mobile No.09177583330 E-mail Address: Easternsamar.gov.ph Esamar.bac@gmail.com Nelson F. Cortez Bac Chairman

City Government Iligan Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 1.9 Million (USD 32.7 K)
Details: Description Invitation To Re-bid The Iligan City Government Bids And Awards Committee (bac), Through Gen Fund-20% / Dev. Fund, Intend To Apply The Sum Of P 1,932,326.86 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Daycare Center Building, Brgy. Kalilangan, Iligan City With Project No. Cb(b)-24-136 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Construction Of Daycare Center Building, Brgy. Kalilangan, Iligan City General Requirements •permits And Clearance •installation Of Project Billboard •occupational Safety And Health Program •mobilization And Demobilization Earthworks •staking, Lay-out Of Lines, Grades And Elevation Of The Building To Be Constructed As Per Plan And Specifications. •excavation Work For Footings, Tie Beam, Grease Trap And Septic Tank. •embankment From Common Borrow And Backfill For Sloped Ground As Per Plan And Specifications. •gravel Bed For Footings, Tie Beam, Plinth Beam, Zocalo, Ground Slab, Grease Trap And Septic Tank. Plain And Reinforced Concrete Works •installing Formworks And Erecting Scaffolding. •reinforcing Steel Of Reinforced Concrete Will Then Follow. •concreting Footing ,column,tie Beam,plinth Beam, Roof Beam, Lintel Beam,zocalo,ground Slab, Grease Trap And Septic Tank. Masonry Works •100 Mm Thick Chb For Wall, Partition,zocalo And Septic Tank With Reinforcing Steel Bar Of 10 Mm Diameter. Steel Works •fabrication And Installation Of Steel Truss, Fascia, And Steel Railings. •installation Of C-purlins. Architectural Works •painting Of Chalkboard •installation Of 30 X 30 Cm Non-slip Tiles In The Restroom And 20 X 20 Cm Tiles In The Kitchen Sink Area. •installation Of Pre-fabricated Doors And Windows As Specified In The Plan. •installation Of Ceiling Frames And Board As Specified In The Plan. •installation Of Roof And Accessories. Carpentry Works •fabrication And Installation Of Wooden Air Vent And Chalk Board As Specified In The Plan. Plumbing Works •plumbing Works Include Water Pipe, Soil Pipe,waste Pipe,grease Trap And Septic Tank. •installation Of Kitchen Sink With Full Accessories And Water Closet With Complete Fittings. Electrical Works •installation Of Lighting And Convenience Outlet And Wires. I. General Requirements A. Permits And Clearances (q = 1.00 L.s.) Includes Fire Safety Evaluation Fee, Brgy. Clearance For Construction Fee, Professional Fee, Reproduction Of Plans. B. Project Billboard ( Q = 2.00 Sets) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2"x 2"x 14' Coco, Lumber, 2"x 3"x 10' Coco Lumber, 2"x 2"x 8' Coco Lumber, Assorted Sizes C.w Nails. C. Occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. D. Mobilization / Demobilization (q = 1.00 Lot) Ii. Earthworks A. Structure Excavation (common Soil) (q = 15.97 Cu.m.) Includes Volume To Be Excavated. B. Embankment From Common Borrow (q = 80.57 Cu.m.) Includes Earthfill (with 25% Shrinkage Factor). C. Gravel Bedding (q = 10.39 Cu.m.) Includes Gravel (with 5% Shrinkage Factor). Iii.plain And Reinforced Concrete Works A.structural Concrete (q = 20.93 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel. B. Reinforcing Steel Of Reinforced Concrete (q = 1.00 Lot) Lncludes Deformed Steel Bar (16mmø), Deformed Steel Bar (12mmø), Deformed Steel Bar (10mmø), No. 16 G.i. Tie Wire. C. Formworks And Scaffolding (q = 1.00 Lot) Includes Marine Plywood 4' X 8' X 1/2" Thk., 2" X 3" X 10' Coco Lumber, 2" X 2" X 10' Coco Lumber, Assorted Sizes C.w. Nails. Iv. Masonry Works A.100 Mm Chb Non-load Bearing (including Rsb) (q = 85.41 Sq.m.) Includes 100 Mm Thick Chb, Portland Cement, Washed Sand, Deformed Steel Bar (10mmø), #16 Gi Tie Wire. V. Steel Works A. Structural Steel (q = 1.00 Lot) Includes Angular Bar 25 X 25 X 6000 Mm X 5 Mm Thk., Angular Bar 38 X 38 X 6000 Mm X 5 Mm Thk., C-purlin 50 X 75 X 6000 Mm X 1.2 Mm Thk., G.i. Pipe Schedule 40, 38 Mm Ø X 6000 Mm, Angular Bar 25 X 25 X 6000 Mm X 6 Mm Thk., Flat Bar 25 X 3.5 Mm Thick X 6000 Mm, Rail Guard Bar (16 Mm Ø Rsb), Welding Rod (6011), 4" Cutting Disk, 4” Grinding Disk, Blind Rivets (1000pcs/box), Tuks Screw #12 With Metal Screw #14 X 2" (100pcs/ Pack). Vi. Architectural Works A. Painting Works (q = 374.54 Sq.m.) Includes Schoolboard Slating Paint (green #655), Paint Roller 7" W/ Paint Tray, Tape Fiberglass Mesh (48mm X 30m), Paint Brush 1". B. Tile Works (q = 8.09 Sq.m.) Includes 0.3m X 0.3m Non-skid Ceramic Floor Tiles, 0.2m X 0.2m Glazed Ceramic Floor Tiles, Portland Cement, White Cement Joint Filler, Tile Adhesive (heavy Duty 25kg). C. Doors And Windows (q = 8.00 Sets) Includes D1: 1000 X 2100 Mm Panel Door With 50 X 150 Wooden Door Jamb With 4 Sets Of Hinges; D2: 600 X 2100 Mm Panel Door With 50 X 150 Wooden Door Jamb With 3 Sets Of Hinges; W1: 4 - 700 X 2100 Mm Casement Window W/ 1/8" Thick Glass And W/ 10 Mm Ø Bar Grills (as Shown In The Plan); W2: 3 - 700 X 2100 Mm Casement Window W/ 1/8" Thick Glass And W/ 10 Mm Ø Bar Grills (as Shown In The Plan); W3: 1- 700 X 300 Mm Casement Window W/ 1/8" Thick Glass And W/ 10 Mm Ø Bar Grills (as Shown In The Plan). D. Ceiling Works (q = 98.94 Sq.m.) Includes Fiber Cement Board (ceiling, 3.smm Thk.), Double Furring 0.4 X 17 X Mm, Wall Angle 25 X 25 X 0.4 Mm (3m), W Clip Furring, Blind Rivets (1000pcs/box), Concrete Nails (1-1/2"), Riveter. E.tinsmithry ( Q = 106.49 Sq.m.) Includes Colored Longspan Corrugated G.i. Sheet Roof 0.5mm Thick, Pin. Pre-fab G.i. Sheet Ridge Roll, 16" X 8' X 0.5 Mm Thick, Plain Sheet Fascia Cap 0.5 Mm Thick X 8 Ft', Hek Screw (12 X 65mm), Blind Rivets (1000pcs/box), Vulca Seal (1l), Touch-up Paint, #16 G.i. Tie Wire. Vii. Carpentry Works A. Chalkboard And Wooden Airvent ( Q = 1.00 Lot) Includes 3/4" Marine Plywood, 1"x 3"x 8' Good Lumber, 1"x 2"x 8' Good Lumber, 1"x 1"x 8' Good Lumber, Assorted Sizes C.w. Nails. Viii. Plumbing Works A. Pipelines And Fixtures ( Q = 1.00 Lot) Includes Pail Flush Bowl, Stainless Kitchen Sink W/ Complete Acc. 50x50cm, 4"x4" Floor Drain (stainless), Faucet Hose Bibb (heavy Duty), 1/2 Ø Gi Pipe Schedule 40, 50 Mm Ø X 10' Pvc Pipe (s-1000), 100 Mm Ø X 10' Pvc Pipe (s-1000), 100 Mm Ø Pvc Wye Connection, 100 Mm Ø Pvc Cleanout, 100 Mm Ø Pvc 45 Degree Elbow, 100 Mm Ø Pvc 90 Degree Elbow, 100 Mm Ø Pvc P-trap, Pvc Cement (400 Cc), Teflon Tape. Ix. Electrical Works A. Electric Wire And Fixtures ( Q = 1.00 Lot) Includes Electric Wire, 2.0mm2 (#14awg) Thhn Stranded Copper Wire; Electric Wire, 3.5mm2( #12awg)thhn Stranded Copper Wire; Electric Wire, 14.0mm2( #12awg)thhn Stranded Copper Wire; Switch, 1 Gang Switch W/led Set 10a 220v; Switch, 2 Gang Switch W/led Set 10a 220v;led T8 Tube 18w Box Type Set; Led Round Super Slim Downlight 12w; Duplex Convenience Outlet; Electrical Tape 3/4" X 20yds; Solvent Cement 100cc; Pvc Conduit, 15mm X3 Meters; Pvc Conduit Coupling (15mm) Dia.; Pvc 90deg Elbow (15mm); Junction Box, Pvc Octagonal W/ Cover 2"x4" Depth Type; Utility Box 2"x3" Depth Type; Circuit Breaker, 15at/50 Af, 2pcb, 230vac Bolt-on Type; Circuit Breaker 20at/50af, 2pcb, 230vac Bolt On Type; Circuit Breaker 60at/50af, 2pcb, 230vac Bolt On Type; Electrical Panelboard 4 Branches Bolt On Type; Service Entrance Cap 25mm Dia. Emt; Electrical Metallic Tubing 25mm Diameter; Emt Clamp (25mm); Tox With Screw Size 10; Emt Connector Set Screw Type 25mm; Emt Elbow 25mm; Secondary Rack 2 Pole Insulator; Grounding Rod 5/8" X4. 75 Ft. With Clamp. Approved Budget For The Contract (abc): P 1,932,326.86 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Ninety-five (95) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: November 19 – December 10, 2024 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Opening Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: November 19, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-136 (ceo-infra)

Philippine Rice Research Institute Tender

Furnitures and Fixtures
Philippines
Closing Soon25 Nov 2024
Tender AmountPHP 149 K (USD 2.5 K)
Details: Description Item No. Quantity Abc Unit Item And Description Unit Price Total Amount Per Request Offer 1 7 12,000.00 Set Semi-expendable Furniture And Fixtures Expenses, Table Office Tables (fabricated Wooden Table) Approx. Length 120cm X Width 60cm X Height 75cm 2 1 6,500.00 Unit Semi-expendable Furniture And Fixtures Expenses, Table Working Table Dimensions: Approx. W 1200mm X D 600mm X H 750mm No Drawer. 3 5 5,600.00 Unit Semi-expendable Furniture And Fixtures Expenses, Chair Executive Chair 360 Degree Swivel With Nylon Caster Wheels, With Adjustable Seat Height, And A Simple Tilt Mechanism With Lock With Headrest 4 1 15,000.00 Unit Semi-expendable Furniture And Fixtures Expenses, Cabinet Filling Cabinet (layer Steel Shelf Cabinet With Sliding Glass Doors-lockable Steel Doors With Duplicate Keys, Adjustable Shelf Height, Powder Coated Finish, Heavy Duty, Commercial Grace Dimension (wxdxh):900x4000x1850 5 2 5,000.00 Unit Semi-expendable Furniture And Fixtures Expenses, Cabinet, Mobile Pedestal Cabinet Filling Cabinet Lfc-4gry 4 Drawer Lateral Filing Cabinet, 1pc Metal Divider And Hanging Metal Bar And Name Tag Holder Per Drawer Included, Gauge 21/.8mm Thick, Size: H1325xw900xd450, Color: Light Gray 6 1 5,500.00 Unit Semi-expendable Furniture And Fixtures Expenses, Cabinet Steel Mobile Filing Pedestal With 3 Drawers; 1 Central Lock, 1 Pen Tray, 1 File Divider And 5 Castors; Material: Steel With Powder Coating; Actual Dimensions: 40 (w) X 56.5 (d) X 65.5 (h) Cm Color: Beige

Department Of Energy Tender

United States
Closing Date9 Sep 2029
Tender AmountRefer Documents 
Details: Manufacturing Demonstration Facility Technology Collaborations For Us Manufacturers In Advanced Manufacturing And Materials Technologies oak Ridge National Laboratory (ornl) Is Seeking Industry Partners To Participate In Short-term, Collaborative Projects Within The Manufacturing Demonstration Facility (mdf) To Accelerate Development Of New Energy Efficient Manufacturing Technologies. This Opportunity Will Provide Selected Participants Access To Ornl's Experienced Staff And Unique Equipment And Capabilities To Demonstrate Advanced Concepts With Intent To Develop And Deploy New Manufacturing Processes Or Materials In U.s. Manufacturing Industries. description ut-battelle, Llc, Acting Under Its Prime Contract No. De-ac05-00or22725 With The U.s. Department Of Energy (doe) For The Management And Operation Of The Oak Ridge National Laboratory, Conducts Research And Development In Support Of The Doe Advanced Manufacturing Office (amo). The Doe Advanced Manufacturing Office Partners With Industry, Small Business, Universities, And Other Stakeholders To Identify And Invest In Emerging Technologies With The Potential To Create High-quality Domestic Manufacturing Jobs And Enhance The Global Competitiveness Of The United States. ornl Is Requesting Cost-shared Proposals From Industry To Assess Applicability Of New Technologies That Can Reduce Manufacturing Energy Intensity Or Produce New, Energy-efficient Products. As Part Of The Technology Collaborations Conducted Under This Announcement, The Proposer Will Describe The Potential Manufacturing And Life Cycle Energy Savings That May Be Realized By The Targeted Project. Projects That Focus On Advanced Manufacturing And Materials Technologies For Commercial Applications Related To Additive Manufacturing Or Carbon Fiber And Composites Are Preferred. projects Will Be Conducted During A Short-time Period. At Least 50% Cost Share, Which Can Be Funds-in To Ornl Or In-kind Contributions (e.g., Facilities, Services, And Staff Time), Is Required On The Part Of The Industrial Participant. Participant Cost-share Cannot Be Met Using Funds From U.s. Government Sources. Funds Will Not Be Provided To The Industrial Participant By Ornl. Note: This Is Not A Procurement Request. eligibility eligibility Is Limited To Industries That Currently Manufacture Or Process Materials In The U.s. For Commercial Applications, Or To Industries That Will Be Able To Do So As A Direct Result Of These Collaborative Efforts. There Is No Restriction Based On A Particular Material System Or Manufacturing Process; However Projects Should Address Advanced Manufacturing And Materials Technologies In Additive Manufacturing Or Carbon Fiber And Composites. background doe's Manufacturing Demonstration Facility (mdf) At Ornl Offers Distinctive World-leading Capabilities In Manufacturing And Materials Research Technologies And Characterization Facilities. The Mdf Provides A Collaborative, Shared Infrastructure To Help Industry Adopt Energy Efficient, Rapid, And Flexible Manufacturing Technologies To Lower Production Cost, And Create New Products And Opportunities For High-paying Jobs. Ornl's Expertise In Material Synthesis, Characterization, And Process Technology Will Assist Manufacturing Industries In Conducting Assessments Of New Fabrication Concepts And Methods For Improving Existing Technologies. The Materials And Processing Technologies Developed Are Expected To Be Deployed In New Or Existing Manufacturing Facilities. More Information About The Ornl Mdf Can Be Found At: Http://web.ornl.gov/sci/manufacturing/ from Concept To Commercialization, Ornl's World-leading Facilities And Expertise Enable Research Focused On Reducing The Energy Intensity Of U.s. Industry, Supporting Development Of New Products, And Strengthening Our Nation's Clean Energy Economy To Meet The Commercial And National Security Needs Of Tomorrow. objective the Objective Of These Mdf Technology Collaborations Is To Collaborate With Industry To Investigate, Improve, And Scale Process Methodology To Reduce The Risk And Accelerate The Development And Deployment Of Innovative Energy Efficient Manufacturing And Materials Technologies. Creation And Preservation Of Domestic Manufacturing Jobs Is A primary Goal Of This Solicitation. the Primary Focus Of This Announcement Is To Target Projects That Will Impact The Technical Areas Of additive Manufacturing Utilizing A Broad Range Of Direct Manufacturing Technologies For Metal And Polymer Feedstocks Using A Variety Of Both Established And Innovative Deposition Systems And Technologies. carbon Fiber And Composites Utilizing A Broad Range Of Carbon Fiber Synthesis, Characterization, And Compositing Technologies From Precursor Evaluation Through Carbon Fiber Pilot Scale Production (25 Metric Tons/year) For Low Cost, Lightweight, And Higher-performance Composite Products Incorporating Carbon Fibers And Other Material Reinforcements. in Addition To The Above Mentioned High Priority Technology Categories, Projects With Sufficient Merit May Be Approved In The Following Areas: lightweight Metals Processing Using Advanced Synthesis And Processing Technologies For Low-cost Titanium Alloys, Magnesium Alloys, And Metal Matrix Composite Products roll-to-roll Processing Using Pulse Thermal Processing And Other Advanced Processing Technologies To Develop Low-cost Manufacturing Of Flexible Electronics, Photovoltaics, Energy Storage Systems, And Other Products battery Manufacturing Innovative Processing Using Ornl's Unique Prototyping Materials And Evaluation Facilities laboratory Support it Is Anticipated That Industrial Partners Will Work Collaboratively With Members Of The Mdf Staff To Conduct Project Activities Across The Various Areas Of Expertise Within The Mdf. intellectual Property And Proprietary Data projects With The Potential For The Generation Of Intellectual Property Will Be Performed With A Cooperative Research And Development Agreement (crada) As The Contract Instrument. See The Announcement Package For A Sample Crada Agreement. Doe And Ornl Respect The Importance Of Industry's Intellectual Property And Data Security While Balancing The Need To Document The Benefits Of Public Expenditures. Provisions Relating To Proprietary Information And Intellectual Property Are Set Forth In The Crada. A Non-disclosure Agreement (nda), If Required, Can Be Put Into Place During Development Of The Project To Facilitate Discussions While Protecting The Partner's Proprietary Information. it Is Preferred That Proprietary Information Not Be Included In The Proposal. If Company Proprietary Information Is Included In The Proposal, The Specific Information Should Be Marked As Such, And Ut-battelle/ornl Will Treat That Information As Business Confidential. proposal Guidelines proposals Should Be Completed Using The Attached Template In The Announcement Package proposers Are Encouraged To Consult With Ornl Technical Staff To Develop A Work Scope That Is Technically Feasible And Compatible With Ornl Facilities And Capabilitie  proposal Deadline And Submission this Solicitation Will Remain Open Subject To Availability Of Funding From The Doe Advanced Manufacturing Office. completed Proposals May Be Submitted In Pdf File Format By Email To Mdfcollaboration@ornl.gov. The Subject Line Should Include: Ornl Mdf Technology Collaborations And The Name Of The Proposer. proposal Evaluation And Timeline this Is An Open Announcement. Selection Of Winning Proposals Will Be At The Discretion Of The Doe Amo. Proposal Evaluation Criteria Will Include Compatibility With Ornl Facilities And Capabilities, Technical Feasibility And Merit, The Potential To Commercialize New Products And Create Us Jobs, And The Potential For Industrial Energy Savings. Amo And The Mdf Reserve The Right To Select All, A Portion, Or None Of The Submissions.

Department Of Public Works And Highways - DPWH Tender

Philippines
Closing Soon27 Nov 2024
Tender AmountPHP 257.7 K (USD 4.3 K)
Details: Description Republic Of The Philippines Department Of Public Works And Highways Camarines Sur 5th District Engineering Office Sta. Teresita, Baao, Camarines Sur, Region V Name Of Procuring Entity: Rfq No. & Date: 24-11-018/nov. 21, 2024 Revised On: P.r. No. & Date: 24-11038/nov. 19, 2024 Standard Form/title: Request For Quotation Office/end User: Company Name: Address: Tel No./fax No.: Please Quote Your Lowest Price On The Item/s Listed Below, Subject To The Terms And Conditions Stated Below And Submit Your Quotation Duly Signed By Your Representative Not Later Than 10:00 A.m. Of November 27, 2024 In The Return Of Envelope Attached Herewith, To The Bac Secretariat For Goods, Dpwh Camarines Sur 5th District Engineering Office, Sta. Teresita, Baao, Camarines Sur. Terms And Conditions: 1 All Entries Must Be Typewritten Or Legibly Written 2 Delivery Period Within (35) Thirty Five Calendar Days Upon Receipt Of The Approved Funded Purchase Order (p.o.) Adminsitrative Penalties Pursuant To Section 29 Of The Revised Irr-ra 9184 Shall Be Imposed For Non Delivery W/out Valid Reason. 3 Warranty Shall Be For A Minimum Of Three (3) Months For Supplies & Materials; One Year (1) For Equipment; Three Years For It Equipment From Date Of Acceptance By The End-user. Nida P. Pontillas, Mpa Bac Chairman Chief, Maintenance Section 4 Price Validity Shall Be For A Period Of Sixty (60) Calendar Days. 5 Philgeps Registration Certificate, Mayor's Permit, Dti Or Sec, Tax Clearance, Omnibus Sworn Statement Shall Be Attached Upon Submission Of The Qoutation. Must Be Certified True Copy. 6 Bidders Shall Submit Original Brochures Showing Certifications Of The Product If Applicable. 7 Please Indicates The Brand For Each Items Being Offered. (if Aplicable) 8 The Approved Budget Ceiling For This Procurement Is ₱257,730.00 Item No. Items And Description Qty. Unit Unit Price Total Price Former De Office & Conference Room Airconditioning Unit 3tr General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Flushing Drain Line 1 Lot Ade Office Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Bac Unit Airconditioning Unit 5tr Replacement Of Indoor Sensor 1 Lot Replacement Of Electrical Wiring 1 Lot Replacement Of Rubber Insulation 1 Lot General Cleaning/flushing 2 Lot Recharging Of Freon 1 Lot Airconditioning Unit Split Type General Cleaning/flushing 2 Lot Additional Of Freon 1 Lot It Unit Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Admin Section Office Airconditioning Unit 3tr General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Magnetic Contactor 1 Pc Repair/replacement Of Magnetic Contactor 1 Lot Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Records Unit Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Supply Unit Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Coa Office Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Construction Section Office Airconditioning Unit 5tr General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Airconditioning Unit Split Type General Cleaning/flushing 7 Lot Additional Of Freon 7 Lot Finance Section Office Airconditioning Unit 5tr General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Planning Section Office Airconditioning Unit Split Type Fabrication Of Indoor Bracket 1 Lot General Cleaning/flushing 6 Lot Recharging Of Freon 6 Lot Airconditioning Unit 5tr General Cleaning/flushing 2 Lot Recharging Of Freon 2 Lot Quality Assurance Section Office Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Airconditioning Unit 5tr General Cleaning/flushing 2 Lot Recharging Of Freon 2 Lot Airconditioning Unit Split Type General Cleaning/flushing 2 Lot Additional Of Freon 2 Lot Maintenance Section Office Airconditioning Unit Split Type General Cleaning/flushing 2 Lot Additional Of Freon 2 Lot Airconditioning Unit Window Type General Cleaning/flushing 2 Lot Recharging Of Freon 2 Lot Equipment Service Unit Airconditioning Unit Window Type General Cleaning/flushing 1 Lot Quarters Office Airconditioning Unit Split Type General Cleaning/flushing 1 Lot Additional Of Freon 1 Lot Airconditioning Unit 5tr General Cleaning/flushing 1 Lot Recharging Of Freon 1 Lot Chapel Airconditioning Unit Split Type General Cleaning/flushing 4 Lot Additional Of Freon 4 Lot Total Total Amount: (please Specify Total Amount In Words) Note: The Awarding For This Rfq Will Be On A Lump Sum Basis. Prospective Suppliers Must Quote For All The Items. Warranty: ___________________________ Brand And Model :____________________________________ Price Validity:________________________ Delivery Period:______________________________________ Delivery Period, Warranty And Price Validity Are Left Blank. It Means That I Concur With The Terms And Conditions Specified By Printed Name/ Signature/date Tel. No./cellphone No./ E-mail Address

Municipality Of Argao, Cebu Tender

Philippines
Closing Date17 Dec 2024
Tender AmountPHP 2.4 Million (USD 41.4 K)
Details: Description The Bids & Awards Committee (bac) Of Municipality Of Argao, Cebu, Invites All Interested Suppliers/manufacturers/distributors/contractors/consultants To Apply For Eligibility And To Submit Bids For The Following: B.9 Mobilization /demobilization Quantity 1.00 L.s. Dpwh Standard Output Per Hour (oph)= 1.00 L.s. 1.00 L.s. Mobilization /demobilization Direct Cost: A. Materials: B. Manpower: C. Equipment And Water: Number Of Hours 6.00 1.00 A. Backhoe (0.80 Mᶾ) 6.00 1.00 B. Dumptruck (12 Ydᶾ) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.5 Project Billboard/signboard Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Project Billboard/signboard Direct Cost: A. Materials: 64.00 Sq.ft. A. Tarpaulin (4' X 8') 37.00 Bd.ft. B. Lumber Coco 1.00 Kg C. Common Nails Assorted 2.00 Sheets D. Plywood Marine (1/4" X 4' X 8') B. Manpower: Number Of Days 4.00 1.00 A. Construction Foreman 4.00 1.00 B. Skilled Laborer 4.00 2.00 C. Unskilled Laborer C. Equipment And Water: Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.7(2) Occupational Safety And Health Program Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Occupational Safety And Health Program Direct Cost: A. Materials: 2769.00 Man-days A. Safety Helmet 2769.00 Man-days B. Safety Shoes 2769.00 Man-days C. Working Gloves 1.00 Set D. First Aid Kit B. Manpower: Number Of Days 22.00 1.00 A. Safety Practitioner/officer (part Time) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) B.3 Permits And Clearances Quantity 1.00 L.s. Dpwh Standard Output Per Day (opd)= 1.00 L.s. 1.00 L.s. Permits And Clearances Direct Cost: A. Materials: 1.00 L.s. Permits And Other Clearances - Building Permit Processing Fees Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 803(1)a Structure Excavation (common Soil) Quantity 20.16 M3 Dpwh Standard Output Per Hour (oph)= 20.00 M3 20.16 M3 Structure Excavation (common Soil) Direct Cost: A. Materials: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. Backhoe (0.80 Mᶾ) 1.00 2.00 B. Dumptruck (12 Ydᶾ) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(1)a Embankment From Structure Excavation Quantity 17.64 M3 Dpwh Standard Output Per Hour (oph)= 9.84 M3 17.64 M3 Embankment From Structure Excavation Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Plate Compactor (5 Hp) 0.75 1.00 B. Backhoe (0.80 M3) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 804(4) Gravel Bedding Quantity 4.84 M3 Dpwh Standard Output Per Hour (oph)= 1.2 M3 4.84 M3 Gravel Bedding Direct Cost: B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Plate Compactor (5 Hp) Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c2 " Structural Concrete (footing, Slab On Fill " Quantity 11.16 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 11.16 M3 "structural Concrete (footing, Slab On Fill)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c3 " Structural Concrete (footing Tie Beam, Wall Footing)" Quantity 5.76 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 5.76 M3 "structural Concrete (footing Tie Beam, Wall Footing)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c4 " Structural Concrete (columns)" Quantity 8.19 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 8.19 M3 "structural Concrete (columns)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 900(1)c5 " Structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Quantity 4.48 M3 Dpwh Standard Output Per Hour (oph)= 0.357 M3 4.48 M3 "structural Concrete (roof Beams, Lintel Beams, Cantilever Beams)" Direct Cost: A. Materials: 1.00 M3 A. Gravel 0.50 M3 B. Sand 9.10 Bags C. Portland Cement B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One Bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 902(1) " Reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Quantity 1,899.17 Kg Dpwh Standard Output Per Hour (oph)= 143.438 Kg 1899.17 Kg "reinforcing Steel Of Reinforced Concrete Structures, Grade-40" Direct Cost: A. Materials: 1.00 Kg A. Deformed Reinforcing Steel - G40 0.02 Kg B. #16galvanized Iron Wire C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 5.00 B. Skilled Laborer 1.00 12.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.50 1.00 A. Bar Cutter 0.50 1.00 B. Bar Bender Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 903 (2) Formworks And Falseworks Quantity 31.50 M2 Dpwh Standard Output Per Hour (oph)= 3.24 M2 31.50 M2 Formworks And Falseworks Direct Cost: A. Materials: 0.35 Pcs A. Ordinary Plywood - 3 Uses 7.19 Bd Ft B. Good Lumber - 3 Use 0.21 Kg C. Assorted Common Wire Nail D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Installation 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer Removal 0.41 1.00 A. Construction Foreman 0.41 6.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1046.00 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Quantity 102.40 M2 Dpwh Standard Output Per Hour (oph)= 3.825 M2 102.40 M2 100 Mm Chb Non Load Bearinglload Bearing (including Reinforcing Steel) Direct Cost: A. Materials: 13.00 Pc A. 100 Mm Thk Chb (non-load Bearing) 0.53 Bag B. Cement 0.04 Cu.m C.sand 3.24 Kg D. Reinforcing Steel 0.05 Kg E. #16 Tie Wire B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 1.00 A. One-bagger Mixer Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1027(1) Cement Plaster Finish Quantity 210.76 M2 Dpwh Standard Output Per Hour (oph)= 7.125 M2 210.76 M2 Cement Plaster Finish Direct Cost: A. Materials: 0.33 Bag A. Cement 0.03 Cu.m B. Sand B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)b Structural Steel Roof Truss Quantity 2,224.80 Kg Dpwh Standard Output Per Hour (oph)= 85 Kg 2224.80 Kg Structural Steel Roof Truss Direct Cost: A. Materials: 1.00 Kg A. Structural Steel (channel Bar A36) 0.01 Kg B. Acetylene 0.02 Kg C. Oxygen 0.02 Kg D. Welding Rod E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 6.00 C. Unskilled Laborer Erection 0.49 3.00 A. Skilled Laborer 0.49 5.00 B. Unskilled Laborer C. Equipment And Water: Number Of Hours 0.75 1.00 A. Welding Machine 0.25 1.00 B. Cutting Outfit 0.49 1.00 C. Truck Mounted Crane (20-25 Mt) 0.00 - Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (2)c Structural Steel Purlins Quantity 387.70 Kg Dpwh Standard Output Per Hour (oph)= 90.45 Kg 387.70 Kg Structural Steel Purlins Direct Cost: A. Materials: 1.05 Kg A. Structural Steel Framing Including Cross 0.02 Kg B. Acetylene 0.00 - C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 3.00 B. Skilled Laborer 1.00 5.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 1.00 2.00 A. Welding Machine Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (6) Metal Structure Accessories (steel Plates) Quantity 22.00 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 22.00 Kg Metal Structure Accessories (steel Plates) Direct Cost: A. Materials: 1.05 Kg A. Steel Plates B. Manpower: Number Of Hours Fabrication 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (7)b Metal Structure Accessories (sag Rods) Quantity 41.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 41.98 Kg Metal Structure Accessories (sag Rods) Direct Cost: A. Materials: 1.05 Kg A. Sag Rods With Nuts & Bolts B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (4) Metal Structure Accessories (cross Bracing) Quantity 51.98 Kg Dpwh Standard Output Per Hour (oph)= 12.995 Kg 51.98 Kg Metal Structure Accessories (cross Bracing) Direct Cost: A. Materials: 1.05 Kg A. Cross Bracing B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1047 (3)c Metal Structure Accessories (turnbuckle) Quantity 16.00 Each Dpwh Standard Output Per Hour (oph)= 1 Each 16.00 Each Metal Structure Accessories (turnbuckle) Direct Cost: A. Materials: 1.05 Kg A. Turnbuckle B. Consumables (3% Of The Material Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1014.00 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Quantity 101.49 M2 Dpwh Standard Output Per Hour (oph)= 2.769 M2 101.49 M2 Prepainted Metal Sheets (rib Type, Long Span, 0.427 Mm Thk.) Direct Cost: A. Materials: 1.00 M A. Prepainted Metal Sheets (rib Type, Long Span, 0.427mm Thk. 10.00 Pc B. Tek Screw C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(1) Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Quantity 38.80 M Dpwh Standard Output Per Hour (oph)= 10.6 M 38.80 M Fabricated Metal Roofing Accessory (flashings& Metal Fascia) Direct Cost: A. Materials: 1.05 M A. Flashings (bended) 19.00 Pc B. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)c Fabricated Metal Roofing Accessory (gutter) Quantity 19.60 M Dpwh Standard Output Per Hour (oph)= 0 M 19.60 M Fabricated Metal Roofing Accessory (gutter) Direct Cost: A. Materials: 1.05 M A. Gutter (0.4 Mm) 3.00 Pc B. 12" X 1" Plain Gi Strap 16.00 Pc C. Blind Rivets C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1013(2)a1 Fabricated Metal Roofing Accessory (ridge Roll) Quantity 12.00 M Dpwh Standard Output Per Hour (oph)= 11.8 M 12.00 M Fabricated Metal Roofing Accessory (ridge Roll) Direct Cost: A. Materials: 1.05 M A. Prepainted Ridge Roll, Ga. 24 (0.701mmx2.44mm) 19.00 Pc B. Blind Rivets 0.00 - C. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1038(1) " Reflective Insulation" Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 5.56 M2 94.08 M2 "reflective Insulation" Direct Cost: A. Materials: 1.00 M2 A. Reflective Insulation B. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1) 4.5mm Fiber Cement Board On Metal Frame Ceiling Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 1.243 M2 94.08 M2 4.5mm Fiber Cement Board On Metal Frame Ceiling Direct Cost: A. Materials: 0.37 Pc "a. 4.5mm Fiber Cement Board" 1.13 Pc "b.metal Furring 3m Length " 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1003(1)e2 Metal Spandrel On Metal Frame Ceiling Quantity 94.08 M2 Dpwh Standard Output Per Hour (oph)= 0 M2 94.08 M2 Metal Spandrel On Metal Frame Ceiling Direct Cost: A. Materials: 1.05 Sq.m. "a. Pre-painted Sheet - Spandrel" 1.13 Pc "b.metal Furring 3m Length" 0.36 Pc C. Carrying Channels 1.00 Pc D. Hanger Bars/rod 6.00 Pc E. Channel Clip 0.24 Pc F. Wall Angle 14.00 Pc G. Rivets 4.00 Pc H. 1" Metal Screw B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1009(1)a Jalousie Glass Quantity 10.22 M2 Dpwh Standard Output Per Hour (oph)= 0.27 M2 10.22 M2 Jalousie Glass Direct Cost: A. Materials: 1.00 M2 A.jalousie (window Glass, Inc. Jalousie Casing) 0.00 - B. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1004(2) Finishing Hardware Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Finishing Hardware Direct Cost: A. Materials: 33.00 Set A.door Locks (schlage Or Equivalent) 132.00 Pc B. Hinge (50mmx101mm) B. Manpower: Number Of Hours Labor Cost For This Items Are To Be Considered/included In The Installations Of Doors, Windows Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (4) Wooden Doors & Windows Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Wooden Doors & Windows Direct Cost: A. Materials: 2.00 Set A.door Jamb (d-1) 4.00 Set B.window Jamb (w-2) C. Consumables (5% Of The Material Cost) B. Manpower: Number Of Hours 2.00 1.00 A. Construction Foreman 2.00 1.00 B. Skilled Laborer 2.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1010 (2)b Door (wooden Panel) Quantity 4.32 M2 Dpwh Standard Output Per Hour (oph)= 0.36 M2 4.32 M2 Door (wooden Panel) Direct Cost: A. Materials: 1.00 M2 A.wooden Panel Door B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 1.00 B. Skilled Laborer 1.00 2.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1100(10) Conduit Works, Boxes And Fittings Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Conduit Works, Boxes And Fittings Direct Cost: A. Materials: 20.00 Length A. 25 Mm Ø X 3.00 M Rsc Pipe 80.00 Length B. 15 Mm Ø X 3.00 Mm Pvc Pipes 10.00 Pcs C. 15mm Ø Pvc Coupling 30.00 Pcs D. 15mm Ø Pvc Elbow 25.00 Pcs E. Utility Box 30.00 Pcs F. Junction Box 1.00 Pcs G. 25mm Ø Entrance Cap H. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 47.39 1.00 A. Construction Foreman 47.39 2.00 B. Skilled Laborer 47.39 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1101(33) Wires And Wiring Devices Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Wires And Wiring Devices Direct Cost: A. Materials: 250.00 M A.3.5 Mm2 Electric Wire Thhn 180.00 M B.5.5 Mm2 Electric Wire Thhn 25.00 M C. 8.00 Mm2 Electric Wire (thhn) 4.00 Set D. One-gang Switch 4.00 Set E. Two-gang Switch 6.00 Set F. Three-gang Switch 13.00 Set G. Duplex Convenience Outlet 0.00 - H. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 28.05 1.00 A. Construction Foreman 28.05 2.00 B. Skilled Laborer 28.05 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1102(1) Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Quantity 1.00 Set Dpwh Standard Output Per Hour (oph)= 1 Set 1.00 Set Panel Board With Main Breaker/branches, 3 Wires, 1 Neutral, 50 Amp - 200 Amp Direct Cost: A. Materials: 1.00 Set A. Panel Board With Main Breaker And 8 Branches 50 Amp - 200 Amp 1.00 Pcs B. 60 Amp. Plug-in Breaker 2.00 Pcs C. 30 Amp. Plug-in Breaker 2.00 Pcs D. 20 Amp. Plug-in Breaker 2.00 Pcs E. 15 Amp. Plug-in Breaker F. Consumables (3% Of Materials Cost) B. Manpower: Number Of Hours 5.50 1.00 A. Construction Foreman 5.50 2.00 B. Skilled Laborer 5.50 3.00 C. Unskilled Laborer Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1103(1) Lighting Fixtures Quantity 1.00 I.s. Dpwh Standard Output Per Hour (oph)= 1 I.s. 1.00 I.s. Lighting Fixtures Direct Cost: A. Materials: 5.00 Set A. 2-40 Watts Flourescent Lamp(t5) 2.00 Units B. Emergency Lamp (twin Head) B. Manpower: Number Of Hours 29.00 1.00 A. Construction Foreman 29.00 2.00 B. Skilled Laborer 29.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10 % Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)a Painting Works (masonry Painting) Quantity 205.00 M2 Dpwh Standard Output Per Hour (oph)= 2.1 M2 205.00 M2 1032(1)a Direct Cost: A. Materials: 0.02 Gal A. Concrete Neutralizer 0.04 Gal B. Concrete Sealer/prime 0.05 Gal C. Patching Compound 0.08 Gal D. Semi Gloss Latex (two Coat Only) E. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 4.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1032(1)c Painting Works (metal Painting) Quantity 129.40 M2 Dpwh Standard Output Per Hour (oph)= 2 M2 129.40 M2 Painting Works (metal Painting) Direct Cost: A. Materials: 0.05 Gal A. Red Oxide Primer 0.10 Gal B. Enamel Paint 0.25 L C. Paint Thinner 0.00 - D. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 1.00 1.00 A. Construction Foreman 1.00 2.00 B. Skilled Laborer 1.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax) 1051(6) Railings Quantity 1.00 L.s Dpwh Standard Output Per Hour (oph)= 1 L.s 1.00 L.s Railings Direct Cost: A. Materials: 5.00 Pc/s A.50mm Gi Pipe (sched. 40) 25.59 Kg/s B. Welding Rod 0.00 C. Consumables (5% Of Materials Cost) B. Manpower: Number Of Hours 60.00 1.00 A. Construction Foreman 60.00 2.00 B. Skilled Laborer 60.00 3.00 C. Unskilled Laborer C. Equipment And Water: Number Of Hours 40.00 1.00 A. Welding Machine (500) 40.00 1.00 B. Cutting Outfit Minor Tools (10% Of Labor Cost) Indirect Cost Contractor's Profit Overhead, Contingencies And Miscellaneous (ocm) Expenses Tax (vat/withholding Tax)

South Central Railway - SCR Tender

Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Closing Date13 Dec 2024
Tender AmountRefer Documents 
Description: 12231ms24h,98050175, Quantity- 120 Mts. Scrap Condemned Unserviceable Ms-gi-ci Rusted, Corroded,dusted Mixed Scrap Of C And W,loco,p. Way,signal Interlocking Material Consisting Of All Type Of Sheets,boxes,ms High Gauge,pipes,footsteps,rings,strips,filters,trusses,patch Cut Parts,gutters,drum Clocks,distribution Boards,u Rack,boring Rod,ms Panel Body,ms Battery Charger Covers,hand Cuffs,driver Seat,hand Cart,push Trolley,packing Strips,ms Body Of Block Instrument,ms Boiler Coil Cut Pieces,42 U Rack Ms Body,ms Collapsible Gate,ms Termination Box,ms Bathroom Ventilator,ms Body Of Data Logger,ms Heater Coil,screen Guard,nuts,bolts,lavatory Doors,ms Carriage Doors,pins,rivets,links,rods,angle Cut Pieces,structural Frames,brackets,drums,cocks,basins,wire Meshes,wire Ropes,water Tank Cut Up Parts,casings,corrugated Sheets,filter Top And Bottom Caps,clamps,washer Plates,stands,frames,sheet Cuts,plate Cuts,joists,channels,bases,plates,flats Cut Pieces,vestibule Frames,window,door,shutters,head Stocks Cut Up Parts,broken T And P Items,racks,compensating Rings,bindings,washers,dust Bins,chains,berth Strips,gate Frames,iron Furniture,motor Bodies,screw Rods,levers,flats,rod Cut Pieces,trolley Wheels,gi Ducts,glow Sign Boards,ms Electrical Scrap,building Rods,packing Strips,ms Body Of Rru,air Cooler Empty Bodies,cbf Filter,corrugated Sheets,drums,blower Motor Frames,ucb Packing Frames,under Frame Cut Up Parts,berth Frames,supports,cylinder Blower Covers,valves,end Shield Covers,traction Motor Yokes,shafts,piston Rings,gears,brake Shoe Heads,brake Gear Items,straps,cotters,springs,equalizing Stays,fan Hub,end Shield,pinions,ms Covers,signal Arms,lc Gate Pipes,ladders,angles,signal Booms,rounds,signal Buckets,pulleys,fabricated Posts,signal Lamp Structures,liners,screws,spikes,air Brake Cylinders,brake Hangers,bss Hangers,battery Boxes,battery Containers,junction And Location Boxes,sleepers Cut Pieces,axle Counter Empty Box,dc-dp Ips Empty Rack ,sge Block Instrument Empty Box ,reset Counter Box,gps Clock ,42 V Rack,transformer Bay,ms Chain Pulley Blocks,beam Scale Parts,idly Cooker With Steam Generator Body,wheel Barrow,fry Pan Single Burner,ms Floor Stand,ms Sliders,ms Body Wet Grinder,fry Pan,jara,ms Ips Rack Rifle Safety Chain,ms Air Pump,foot Spray,antenna,spiral Binding Machine,ms Man Drill,trbc Covers,hand Cart Push Trolley,expresser Fan Guard,ms First Aid Box,hacksaw Frame,tool Box,tie Bars,ci Brake Blocks,composite Brake Blocks,ci Pulleys,buckets,ms Gear Wheels,gym Equipment,roti Maker,bicycle Parts,axle Box,bfr Cut Up Parts,grills,mesh,gate Wheels,girders Cut Pieces,collars,trolleys,foot Plates,signal Point Rods And Any Other Ms-gi-ci Material Present In The Lot With Or Without Attachments Of Nf,ss,rubber,nylon And Plastic. Ms Pan Mortars,wire Claws,wire Baskets,crow Bars,jim Crow,dip Lorry,weld Filling Body,sleeper Hooks,rail Dollies,rail Cutting Frames,augers,pick Axe,tongue For Rails,spades,beaters,ballast Rake,powrahs,rail Cum Road Mono Trolley,case Tin,h.s.lamps,rail Dolly Clips,shovels,trolley Wheels And Similar Gang Man Items Of Sorts And Sizes,with Or Without Attachments.fiber,glass,windows,frp Glass Windows,window Frames Of Sorts And Sizes,broken Or Unbroken,with Or Without Attachments Of Nf Window Shutters. [aluminium - 2 Percent] Note- 1. Nf Material,axles,wheel Discs,and Rails Or Material Not Mentioned In The Description,if Found During The Delivery Are To Be Returned To Railways. 2. Track And Track Fittings Running Through This Area Are Excluded. 3. Nf And Stainless-steel Attachments Are Approximately 0.1 Percent Of The Lot Quantity. 4. Gas Cutting Permitted To Facilitate Loading. Location- Bin No- 231, Right Side Of Road No- 2.hsn Code- 72044900. Gst- 18 Percent. Note- Delivery On Actual Weighment Basis Only. Special Note: Overload Of The Carrying Capacity Of The Vehicle Will Not Be Permitted At The Time Of Taking Delivery

South Central Railway - SCR Tender

Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Closing Date13 Dec 2024
Tender AmountRefer Documents 
Description: 12153ms24h, 98050011, Quantity: 66.124 Mts. Scrap Condemned Unserviceable Ms-cs-ci Mixed Scrap Of Diesel And Electrical Loco Items Consisting Of Piston Heads, Head Light Lamps, Links, Inter Cooler Head, Inter Cooler Plates, Explosion Door Test Stand, Manifold Chamber, Labyrinth Rings, Drive Roller, Nylock Nut, Tirfor Ms Parts, Trolley Wheels, Traction Links, Spears, Lube Oil Cooler Housing And Header, Cattle Guard, Stay Rod, Engine Block [cummins Diesel Engine], Iron Skids, Brake Handle, Di And Fi Selectors, Roller Pins, Header Pipes, Ocb Cones, Door Hinges, Loco Door Locks, Brake Hanger, Clevis Pins, Tm Bearings [inner And Outer Racers], Sand Box, Turbo Casing, Supports, Cylinder Liners, Cylinder Head, Connecting Rods, Fip Support, Cr Bush, Set Of Nipples, Terminal Block, Track Rods, Egr Spring, Panto Servo Motor Ms Body, Piston Carriers, Rocker Lever,tb And Pb Units, Chimney For Turbo, Connection Stopper Rod, Baring Device, Brake Cylinders, Cups, Cones, Rollers Of Ctrb Bearing, Oil Bath Filters, Mcp Coupling Hub, Crown Wheel, Expansion Water Tank, Extension Shaft Gear Headers, Feed Valve Base, Drilling Machine Stand, Ce Pe Bearing Brackets, Cam Gear, Bracket, Cylinder Links, Compressor Fans, Cp Heads Dampers, End Shield Cover, Alternator Pads, Driver Seat, Tie Bar Rods, Sprocket, Chain, Check Nut And Lock Washer, Damper Vibration, Reverser Units, Hp Fan Body, Air Duct Pieces, Centre Pivot, Centre Pivot Housing, Ermeto Couplings, Fttm Shaft, Chain With Hooks, Compressor Base, Mvmt End Shield, Mmmt Impellers, Leaf Spring Suspension, After Cooler Covers, Lifters, Connecting Rod Shell, Eye Bolts, Cummins Diesel Engine Spares, Lever Hangers, Axle Plate, Hhp Pistons, Air Inlet Elbows, Dbr Cut Parts, Hexagonal Bolt, Cam Gear Covers, Ecc Stand, Water Raiser, Gear Box, Motor Base, Brake Shoe Set, Loco Hand Brake Assembly, Hand Brake Wheel, Fan Mark V, Cr Bearing, Hp Pipes, Tie Rods, Axle Box Covers, Pe Shield, Cylinder Blower Covers, Pistons, Loco Pipes, Bellow Plates, Motor Bodies Without Nf, Valves, Bases, Impellers, End Shield Covers, Traction Motor Yokes, Shafts, Distance Piece For Axle Box Housing, Spare Parts Of Vehicles, Suspension Tubes, Piston Rings, Ms Gears, Steel Caps, Radiator Fan Hub, Housings, Flanges, Shafts, Bearing Ends, Yoke For Valve, Fuel Injector Pump, Injectors, Guide Cups, Point Clamps, Pull Rods, Slack Adjuster, Axle Box Horn Liners, Liners For Air Compressor, Ctrb, Roller And Ball Bearings, Roller Bearings Extractor Spares, Blower Casings, Intermediate Casings, Rods, Brake Shoe Heads, Brake Gear Items, Draw Gears, Straps, Pipe Cut Pieces, Disc Plates, Cut Pieces Of Angles, Channels, Plates, Rods, Screw Rods, Anchor Links,cam Rollers, Levers, Safety Strap, Shock Absorbers, Silent Blocks, Nuts, Bolts, Pins, Rivets, Cotters, Small Dia. Springs, Spring Seaters, Spring End Plates, Under Frame Cut Pieces, Equalizing Stays, Pinions, Turret Lathe Spares, Air Diet, Psb Tube,centre Pivot Pin, Braking Resistance, Transmission Unit, Filter Feed Pump, Radiator Headers, Lube Oil Sump, Sump Covers, Servomotor Parts, Pantograph Parts, Air Dryer, Rsb Tubes, Tm Back Plates, Rake Chain, Chain Pulley Block, Anchoring Devices, Compressor Unit Beds, Push Pull Rods, Msu Tube, Expressor Inter Cooler Covers, Fork Lifter Spares, Fork Rods, Blade Rods, Turbo Supports, Axle Covers, Split Gears, Bull Gears, Studs, Horizontal Shaft With Pulley, Water Connection Pipes, Top Covers, Traction Housing, Traction Link Rod, Osta Housing, Wire Rope Sling, Manifold Covers, Traction Covers, Boxes, Wheels, Fabricated Items, Armatures, Hooks, Rings, Wipers,air Maze Housings, Rttm Blower Housing, Rttm Blower Safety Covers, Cyclonic Filter Housing, Air Maze Cut Pieces And Other Diesel Loco, Electrical Loco, Mmts,tower Car,emu And Dmu Scrap Materials Of Sorts And Sizes, With Or Without Attachments. Location- Bin No- 153. Left Side Of Road No- 1. Hsn Code- 72044900. Gst- 18 Percent.
1431-1440 of 1551 active Tenders