Electrical Tenders

Electrical Tenders

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 2.8 Million (USD 49.3 K)
Details: Description A.contract Id : Antipolo-08january2025-07 B.name Of Project : Improvement Of Various Stand Alone Comfort Rooms At Kaysakat Elementary School, Brgy. San Jose, Antipolo City C. Location : Brgy. San Jose, Antipolo City D.brief Description : Improvement Of Various Stand Alone Comfort Rooms E.major Item Of Works : Electrical Works; Plumbing Works; Tile Works; Roofing Works F.approved Budget For The Contract : Php 2,866,112.93 G.duration : 60 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 2.4 Million (USD 41.5 K)
Details: Description A.contract Id : Antipolo-08january2025-15 B.name Of Project : Improvement Of Two (2) Storey Four (4) Classrooms Acg Building At Kaysakat National Highschool, Brgy. San Jose. Antipolo City C. Location : Brgy. San Jose. Antipolo City D.brief Description : Improvement Of School Building E.major Item Of Works : Painting Works; Replacement Of Gutter, Ridge Roll, Flashing And Roof; Painting Works; Electrical Works F.approved Budget For The Contract : Php 2,413,459.83 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Building Construction
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Details: Sources Sought Notice sources Sought Notice page 12 Of 12 sources Sought Notice *= Required Field sources Sought Notice page 1 Of 12 this Announcement Is Not A Request For Proposal. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. the Department Of Veterans Affairs Is Seeking A Qualified Architect-engineering (ae) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project 528a5-24-504, Project Upgrade Buildings 7&8 Electric Room At The Canandaigua Vamc At 400 Fort Hill Ave, Canandaigua Ny 14424. This Project Will Expand The Existing Electrical Rooms On The Ground Floor Of Building 7 And 8, Into Adjacent Spaces And Replace Electrical Components. this Requirement Is Being Procured In Accordance With The Brooks Act As Implemented In Far Subpart 36.6. Applicable Naics Code Is 541330 And Small Business Size Standard Of $25.5 Million. Magnitude Of Construction Is Between $5,000,000.00 And $10,000,000.00. This Is A 100% Service-disabled Veteran Owned Small Business Set Aside. The Anticipated Award Date Of The Proposed A-e Contract Is On Or Before May 20th, 2025 . Potential Contractors Must Be Registered In Sam (www.sam.gov ) And Are Visible/verified/certified As Sdvosb (or Vosb) In Veterans Small Business Certification (https://veterans.certify.sba.gov/ ) At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. in Order To Assure Compliance With Vaar Clauses, 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (nov 2022) And 852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022), All Firms Submitting A Sf 330 For This Notice Are Required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e., Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation all A/e Firms Are Advised That In Accordance With Vaar 836.606-71 The Total Cost Of The Production And Delivery Of Designs, Plans, Drawings And Specifications Shall Not Exceed Six (6) Percent Of The Estimate Cost Of Construction. Other A-e Fees Are Not Included In The Six (6) Percent. Additionally, Far Clause 52.236-22 (c) - Design Within Funding Limitation, Will Be Applicable To This Procurement Action. exsisting Conditions: the Canandaigua Vamc Is Located At 400 Fort Hill Avenue, Canandaigua, Ny 14424. Building 7 And 8 Are Two Of The Main Campus Structures And Contains Sensitive Programming Including Clc S With In-patient Care. The Existing Electrical Rooms Are Insufficient In Size And Does Not Meet Current Codes/standards As Set By The Va. The Adjacent Spaces To These Electrical Rooms Consist Of Available Space For Expansion. All Electrical Equipment Shall Be Replaced Unless Otherwise Directed By The Va And All Building Services Shall Placed On Emergency Power. All Proposed Equipment Shall Meet Current Va Standards And Codes. scope Of Service Required 1. Provide Investigative, Schematic, And Design Development Services, Production Of Construction Documents, Working Drawings, Specifications, And Cost Estimates, And Perform Construction Administration Including Shop Drawing And Submittal Review As Required To Complete The Work And As Per The Architect/engineer (a/e) Required Deliverables. The A/e Firm Shall Analyze The Existing Conditions And Working With The Medical Center Staff Develop Various Proposals To Meet The Project Intent. Develop Accepted Proposal Into A Final Design And Cost Estimate To Best Suit The Needs And Constraints Of The Government, While Incorporating Vamc Canandaigua Engineering Services, Va Network 2, Or Any Other Government Comments. 2. Provide For Necessary Design For Utility Connections, Alternative Power, Phasing, And Support For Building Operations Through Construction With Minimal Interruptions. 3. Perform Load Test On Existing Generator And Emergency Power System To Confirm Existing Supply Will Support Additional Loads. 4. Provide An Independent Analysis To Locate Any Underground Or Hidden Utilities For Inclusion In The Design If Applicable, To Confirm Viability Of Planned Excavations Or Demolitions Of To Support Design Objectives. Such Analysis May Include Ground Penetrating Radar, Review Of Existing Va Documentation Or Other Viable Options To Verify These Utilities. 5. Attend All Design Review Meetings And Make All Necessary Site Visits During Design Phases To Gather Information Necessary From The Existing Site Conditions, Building Plans, Utility Plans, Etc. To Provide A Complete Assessment Of The Proposed Work. The Proposal Shall Include An Identified Number Of Visits. The Va Shall Provide Access To Hardcopy/electronic Files. The A/e Firm Shall Perform All Searches Of The Files For Any Required Reference Materials To Support Design Efforts. Limited Digital Drawings Are Available. 6. Attend Pre-bid Job Walk And Provide All Engineering Responses To Questions Asked By Potential Bidders And Issue Addendum When Necessary. 7. All Work Shall Be In Accordance With All Applicable Codes In The Department Of Veteran Affairs (va) Design Manuals And Va Publications (master Construction Specifications, Construction Standards, National Fire Protection Association (nfpa), Underwriters Laboratory, International Building Code Ibc, National Electric Code (nec), Building Codes And Standards, And Va Information Security Handbook 6500.6, Etc.) 8. All Work Containing Hazardous Materials Shall Be In Accordance With New York State Code Rule 56 Regarding Asbestos And Other Hazardous Materials, Ahera Regulations 40 Cfr Part 763.86, 763,87, And Osha 1926.1101(k)(1). 9. All Submissions Shall Include Physical And Digital Submissions Of Drawings And Specifications. 10. All Drawings Shall Be Submitted At Architectural E1 (30 X 42 ) For Full Sized Sets And Architectural C (18 X 24 ) For Half Sized Sets. All Sets Shall Be Bound. 11. All Cad Submissions Shall Be Provided In Autocad 2017 Unless Discussed Otherwise. Revit Models Shall Also Be Submitted In Addition To Cad Documents If Created. 12. The Autodesk Build Construction Management Platform (autodesk Construction Cloud Acc) Will Be Used For Information Sharing And Project Management Through The Design And Construction Phases. This Software Is Provided By The Va At No Additional Cost To The A/e. a. Platform Training Will Be Provided By The Va And Is Required By All Parties To Access. b. The A/e Shall, Upon Award, Provide A Comprehensive List Of Project Staff Who Will Need Access To Acc Including: i. Full Name ii. Company Name iii. Email Address iv. Role/position On The Project c. Completion Certificates Of Training By All Members Of The Team Shall Be Provided To The Cor Within 12 Calendar Days. d. Additional Members Can Be Added At Any Time Upon Written Request To The Cor. e. Acc Shall Be Used For All Digital Submissions, Official Project Correspondence, Submittals, Rfis, Schedules, Actionable Tasks, Photos, Surveys, Reports, Inspections, Etc. 13. Provide Design, Construction, And Post-construction Services As Listed Below. a Full Scope Of Services Including The Deliverables Will Be Included In The Formal Solicitation After A Review Of The Sf330s. Location canandaigua Vamc. 400 Fort Hill Avenue Canandaigua, Ny 14424 cost Range estimated Construction Cost Range: Between $5,000,000 And $10,000,000. type Of Contract Contemplated the Department Of Veterans Affairs Is Contemplating Awarding A Firm Fixed Price Contract. design Completion Period: The Department Of Veterans Affairs Requires Design And Contract Support Services. The A/e Shall Deliver 100% Bid Documents In 220 Calendar Days From The Notice To Proceed (ntp). selection Criteria Descriptions the Selection Criteria Descriptions Are Provided Below. professional Qualifications Necessary For Satisfactory Performance Of Required Services. offerors Will Be Evaluated In Terms Of The Qualifications, Competence And Experience Of The Key Personnel And Technical Team Proposed To Accomplish This Work. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Provide A Balanced Licensed And Or Certified Workforce In The Following Disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental Services And Fire Protection Engineering As Needed. The Designers Of Record Shall Perform And Direct The Design Within Their Respective Discipline And Shall Sign And Seal The Drawings. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. submission Requirements: Provide Resumes For All Proposed Key Personnel. Resumes Are Limited To One Page Each And Should Cite Project Specific Experience And Indicate Proposed Role In This Contract. Provide Professional Registration, Certification, Licensure And/or Accreditation. Indicate Participation Of Key Personnel In Example Projects In The Sf-330 Part 1 Section G. (2) Specialized Experience And Technical Competence specialized Experience And Technical Competence Required For This Specific Project, Including, Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. offerors Will Be Evaluated On Specialized Experience And Technical Competence In The Performance Of Services Similar To Those Anticipated Under This Contract With Regard To: experience With Design Of Inpatient Medical Care Facilities. experience With Design Of Multifunctional Offices. experience With Specialized Hvac And Electrical Distribution Systems Design For Healthcare Facilities; experience In Providing Post Construction Award Services (shop Drawing Review, As-built Drawing And Quality Assurance Plan (qap) Preparation, Construction Inspection Services, And Operating And Maintenance Manuals). experience With Government Designs And Construction. experience With Extensive Site Survey Skills submission Requirements: Provide Up To Five (5) Projects Completed Or Substantially Completed Within The Past Five (5) Years That Best Illustrate Specialized Experience Of The Proposed Team In The Areas Outlined Above And The Scope Of Work Of The Project. Example Projects Shall Note Project S Square Footage. All Projects Provided In The Sf-330 Must Be Completed By The Office/branch/regional Office/individual Team Member Actually Proposed To Manage And/or Perform Work Under This Contract. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf-330 Part 1, Section F Item 25 Firms From Section C Involved In This Project, Block (1). Include A Contract Number Or Project Identification Number In Block 21. Include An E-mail Address, And Phone Number For The Point Of Contact In Block 23(c). Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. If The Contractor Served As A Subcontractor On A Project, Indicate The Value Of The Work They Provided Towards The Performance Of The Overall Project. If A Project Was Performed By A Joint Venture, And Not All Joint Venture Partners Are On The Team Proposed For This Contract, The Offeror/team Should Specifically Address The Work Performed By The Joint Venture Partner Offering/teaming On This Contract. Likewise, If The Offeror/team Member Worked As A Subcontractor On A Project, The Description Should Clearly Describe The Work Actually Performed By The Offeror/team Member And The Roles And Responsibilities Of Each On The Project, Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Project Could Be Eliminated From Consideration. note: If The Offeror Is A Joint Venture, Information Should Be Submitted As A Joint Venture; However, If There Is No Information For The Joint Venture, Information Should Be Submitted For Either Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For This Criterion. Projects Shall Be Submitted On The Sf-330. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand-alone Contract Award. Do Not List An Idiq Contract As An Example Of A Completed Project. Instead, List Relevant Completed Task Orders Or Stand-alone Contract Awards That Fit Within The Definition Above. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Rated Lower. all Information For Criterion 1 Should Be Submitted In Part 1, Section F Of The Sf-330. The Government Will Not Consider Information Submitted In Addition To Part 1, Section F In Evaluating Criterion 1. (3) Capacity this Factor Evaluates The Ability Of The Firm, Given Their Current Projected Workload And The Availability Of Their Key Personnel, To Accomplish The Possible Myriad Of Design Projects In The Required Time. submission Requirements: Describe The Firm S Ability To Concurrently Perform And Manage Multiple Projects In Different Locations To Meet Aggressive Schedules, Multiple Disciplines, And Control Costs And The Firm S Capacity To Accomplish Multiple Projects Simultaneously. the General Workload And Staffing Capacity Of The Design Office Will Be Evaluated. list Current Projects With A Design Fee Of Greater Than $20,000 Being Designed In The Firms Office. ii. Indicate The Firms Present Workload And The Availability Of The Project Team (including Sub-consultants) For The Specified Contract Performance Period; iii. Describe Experience In Successfully Delivering Projects Per Performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates (4) Past Performance: Visn2 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm. i. Recent Is Defined As Performance Occurring Within Five (5) Years Of The Date Of This Sources Sought, Except Those Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Sources Sought. ii. Relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope Within A Va Hospital Setting In Relation To The Type Of Projects Anticipated Under The Resultant Contracts. respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Superior Performance Ratings On Relevant Projects May Be Considered More Favorably In The Evaluation. submission Requirements: Submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If There Is Not A Completed Cpars/acass Evaluation, The Past Performance Questionnaire (ppq) Included In This Notice Is Provided For The Offeror Or Its Team Members To Submit To The Client For Each Project The Offeror Includes Under Criterion 1. An Offeror Shall Not Submit A Ppq When A Completed Cpars/acass Is Available. If A Cpars/acass Evaluation Is Not Available, Ensure Correct Phone Numbers And Email Addresses Are Provided For The Client Point Of Contact. Completed Ppqs Should Be Submitted With Your Sf-330. If The Offeror Is Unable To Obtain A Completed Ppq From A Client For A Project(s) Before The Response Date Set Forth In This Notice, Offerors Should Complete And Submit With Their Responses The First Page Of The Ppq (attachment), Which Will Provide Contract And Client Information For The Respective Project(s). Offerors May Submit A Ppq Previously Submitted Under A Different Notice/rfp (legible Copies Are Acceptable) As Long As It Is On The Same Form As Posted With This Synopsis. Offerors Should Follow Up With Clients/references To Ensure Timely Submittal Of Questionnaires. If Requested By The Client, Questionnaires May Be Submitted Directly To The Government's Point Of Contact, Network Contracting Office 2 Attn: Amanda Baumler Via Email At Amanda.baumler@va.gov Prior To The Response Date. Offerors Shall Not Incorporate By Reference Into Their Response Ppqs Or Cpars Previously Submitted In Response To Other A/e Services Procurements. However, This Does Not Preclude The Government From Utilizing Previously Submitted Ppq Information In The Past Performance Evaluation. (5) Location: Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project; Provided, That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project iv. To Be Rated Acceptable For This Evaluation Factor, The A/e Firm Must Be Within 450 Miles From The Prime Contractor S Main Office Or Official Satellite Office To The Canandaigua Vamc At 400 Fort Hills Avenue. Canandaigua, Ny 14424. v. This Distance Is Determined According To Http://maps.google.com/ vi. This Factor Evaluates The Distance The Ae Firm's Design Office Or Official Satellite Office(s) From The Location Of Work (va Medical Center). Please Provide The Address (es) And Distance Of Your Closest Office To The Address Listed In Iv. Above. submission Requirements: Indicate Firms/teams Location, Including Main Offices, Branch Offices And Any Subconsultants Offices And Demonstrate How This Will Be Advantageous To The Government. (6) Veteran Owned: The Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. (7) Construction Period Services: Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services. (8) Experience Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team. submission Requirements: Offerors Shall Submit Evidence Of Individuals Experience And Qualifications In Their Respective Fields. Additionally, Documentation Must Be Provided To Show These Individuals Have Worked Together As A Team On Previous Projects And Their Role. (completing Sections E, F, And G, On The Sf-330 Meets The Documentation Requirement). Furthermore, Offerors Shall Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable. (9) Reputation Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. submission Requirements: Offerors Shall Provide Documentation (awards, Certificates, Publications, Commendations From Within The Community) As Evidence Of Reputation And Standing Of Its Firm. (10) - Claims - Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services. Offerors With Substantiated Claims Against The Firm As A Result Of Improper Architectural And Engineering Services Provided In The Last Three (3) Years. submission Requirements: Records And Any Other Documentation Of Substantiated Claims Highlighting Improper Or Incomplete Architectural Engineering Services Against The Firm Within The Last Three (3) Years. The Sf-330 Shall Contain A Statement Affirming That There Are No Records Of Significant Claims Because Of Improper Or Incomplete Architectural And Engineering Services. please Note: The Ae Evaluation Board Must Be Provided With Complete And Accurate Information For All Ten (10) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The Ae Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The Ae Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications. evaluation Scoring evaluation Factors 1, 2, 3, 5, 8, 9 And 10 Will Be Evaluated Using The Following Adjectival Ratings As Follows: outstanding: Proposal Meets Requirements And Indicates An Exceptional Approach And Understanding Of The Requirements. Strengths Far Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Very Low. good: Proposal Meets Requirements And Indicates A Thorough Approach And Understanding Of The Requirements. Proposal Contains Strengths Which Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Low. acceptable: Proposal Meets Requirements And Indicates An Adequate Approach And Understanding Of The Requirements. Strengths And Weaknesses Are Offsetting Or Will Have Little Or No Impact On Contract Performance. Risk Of Unsuccessful Performance Is Moderate. marginal: Proposal Does Not Clearly Meet Requirements And Has Not Demonstrated An Adequate Approach And Understanding Of The Requirements. The Proposal Has One Or More Weaknesses Which Are Not Offset By Strengths. Risk Of Unsuccessful Performance Is High. unacceptable: Proposal Does Not Meet Requirements And Contains One Or More Deficiencies. Proposal Is Not Awardable. The Firm S Proposal Demonstrates A Misunderstanding Of The Requirement And The Approach Fails To Meet Performance Standards. The Firm S Proposal Has Major Omissions And Inadequate Details To Assure Evaluators That The Offeror Has An Understanding Of Requirement. the Ratings Identified Below Were Used In The Evaluation Of Past Performance (criterion 4): substantial Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A High Expectation That The Offeror Will Successfully Perform The Required Effort. No Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract. satisfactory Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A Reasonable Expectation That The Offeror Will Successfully Perform The Required Effort. Little Doubt Exists Based On The Offeror S Past Performance That They Could Satisfy The Requirements Of The Contract. unknown Confidence (neutral): No Recent/relevant Performance Record Is Available Or The Offeror S Performance Record Is So Sparse That No Meaningful Confidence Assessment Rating Can Be Reasonably Assigned. limited Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectation That The Offeror Will Be Able To Successfully Perform The Required Effort. Some Doubt Exists Based On Past Performance That They Could Satisfy The Terms And Conditions Of The Contract. no Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectations That The Offeror Will Be Able To Successfully Perform The Required Effort. Significant Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract. limitations 852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022) (a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb : (1) Means A Small Business Concern - (i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar802.101, Surviving Spouse Definition); (ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran; (iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document; (iv) The Business Has Been Verified For Ownership And Control Pursuant To 38 Cfr Part 74 And Is Listed In Va's Vendor Information Pages (vip) Database At Https://www.vetbiz.va.gov/vip/; And (v) The Business Will Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size And Government Contracting Programs At 13 Cfr Parts 121 And 125, Provided That Any Reference Therein To A Service-disabled Veteran-owned Small Business Concern Or Sdvo Sbc, Is To Be Construed To Apply To A Va Verified And Vip-listed Sdvosb, Unless Otherwise Stated In This Clause. (2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16). (3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632). (4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)), Except That For A Va Contract The Firm Must Be Listed In The Vip Database (see Paragraph (a)(1)(iv) Of This Clause). (b) General. (1) Offers Are Solicited Only From Vip-listed Sdvosbs. Offers Received From Entities That Are Not Vip-listed Sdvosbs At The Time Of Offer Shall Not Be Considered. (2) Any Award Resulting From This Solicitation Shall Be Made To A Vip-listed Sdvosb Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award. (3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences. (c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Vip-listed Sdvosbs Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible Sdvosb As Defined In This Clause, 38 Cfr Part 74, And Vaar Subpart 819.70. (d) Agreement. When Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. Unless Otherwise Stated In This Clause, A Requirement In 13 Cfr Parts 121 And 125 That Applies To An Sdvo Sbc, Is To Be Construed To Also Apply To A Vip-listed Sdvosb. For The Purpose Of Limitations On Subcontracting, Only Vip-listed Sdvosbs (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Certification Requirements In This Solicitation (see 852.219-75 Or 852.219-76 As Applicable). These Requirements Are Summarized As Follows: (1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract (2) Supplies/products. (i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract. (ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Crf 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements. (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. (4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Vip-listed Sdvosbs. (5) Subcontracting. An Sdvosb Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Listed In Vip To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6. (e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: _x_by The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or __by The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Is Listed In Vip And Complies With The Requirements In 13 Cfr 125.18(b), Provided That Any Requirement Therein That Applies To An Sdvo Sbc Is To Be Construed To Apply To A Vip-listed Sdvosb. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. (g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Program For Sdvo Sbcs, And The Va Veterans First Contracting Program. (h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company's Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406-2 Causes For Debarment). submission Requirements: unless Paper Offers Are Specifically Authorized In An Individual Solicitation, All Responses To Solicitations Must Be Submitted Electronically As Described Below. Responses Submitted In A Paper Form Are Unacceptable. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award Due To Noncompliance With The Submission Requirements. email Submission Requirements Interested Firms Having The Capabilities To Perform This Work Must Submit: One (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) To Amanda.baumler@va.gov No Later Than 10am, Eastern Standard Time (est) On Tuesday, January 21st 2025 Submittals Received After The Date And Time Identified Will Not Be Considered. The Submittal Will Be Date And Time Stamped By The Microsoft Email System And Will Be The Official Record Of Receipt For The Submission. All Sf 330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Solicitation Number And Project Number And Title (abbreviated And Shortened Is Okay). Submission Is To Be No More Than A Total Of Fifty (50) Pages; Size Of Emails Is Not To Exceed 10 Megabytes (mb). If More Than One Email Is Sent, Please Number Emails In Subject Line As 1 Of 2, 2 Of 2 Etc. all Sf 330 Submissions Must Include The Following Information Either On The Sf 330 Or By Accompanying Document: 1. Cover Page With Solicitation Number, Project Number And Title 2. Table Of Contents 3. Copy Of Valid State Registration For Each Lead Designer 4. Copy Of Current Https://veterans.certify.sba.gov/ Sdvosb/vosb Certification 5. Duns Number 6. Cage Code 7. Tax Id Number 8. Email Address And Phone Number (including The Area Code) Of The Primary Point Of Contact.

Municipality Of Kauswagan, Lanao Del Norte Tender

Furnitures and Fixtures
Philippines
Closing Date13 Jan 2025
Tender AmountPHP 344.6 K (USD 5.9 K)
Details: Description Qty Unit Item Description Estimated Unit Price Total Unit Price 8 Pcs 4 X4 X 16ft Coco Lumber 495.00 3,960.00 15 Pcs 4 X 4 X 12ft Coco Lumber 475.00 7,125.00 50 Pcs 2 X 6 X 12ft Coco Lumber 345.00 17,250.00 100 Pcs 2 X 4 X 10ft Coco Lumber 310.00 31,000.00 100 Pcs 2 X 3 X 12 Ft Coco Lumber 145.00 14,500.00 100 Pcs 2 X 2 X 12ft Coco Lumber 125.00 12,500.00 3 Boxes Cwn #5 2,200.00 6,600.00 3 Boxes Cwn #4 2,200.00 6,600.00 1 Box Cwn #3 2,350.00 2,350.00 1 Box Cwn # 2 ½ 2,350.00 2,350.00 2 Boxes Cwn #2 2,450.00 4,900.00 100 Pcs Bamboo Poles #12 195.00 19,500.00 60 Sheets Amakan Plain 395.00 23,700.00 50 Sheets Amakan With Design 495.00 24,750.00 35 Pcs ¾ Marine Plywood 1,785.00 62,475.00 40 Bot Mahogany Varnish 110.00 4,400.00 60 Bot Clear Varnish 110.00 6,600.00 10 Gals Paint Thinner 595.00 5,950.00 15 Pcs Paint Brush #3 89.00 1,335.00 10 Pcs Pylux Sealer 395.00 3,950.00 3 Gals Qde Baguio Green 895.00 2,685.00 8 Quarts Tinting Color Thalo Blue 135.00 1,080.00 8 Quarts Tinting Color Thalo Red 135.00 1,080.00 2 Cans Flat Latex Yellow 95.00 190.00 10 Pcs Paint Brush #1 30.00 300.00 1 Unit Safety Breaker 100 Amps 1,150.00 1,150.00 1 Unit Safety Breaeker 30 Amps 750.00 750.00 20 Pcs Rubber Socket 68.00 1,360.00 30 Rolls Electrical Tape 65.00 1,950.00 20 Pcs Male Plug 79.00 1,580.00 1 Roll Flexible Hose ½ 1,150.00 1,150.00 2 Rolls Flat Cord #16 5,900.00 11,800.00 4 Pcs Junction Box 45.00 180.00 5 Boxes Staple Wire #1 110.00 550.00 5 Pcs Universal Outlet 2-gang 125.00 625.00 2 Rolls Coco Net #4 9,900.00 19,800.00 100 Rolls Coco Rope 55.00 5,500.00 6 Pairs Hinges #3 69.00 414.00 10 Pcs Cutting Disc 110.00 1,100.00 10 Pcs Drill Bit 9/64 165.00 1,650.00 100 Mtrs Trapal 95.00 9,500.00 20 Boxes Staple Wire #1 110.00 2,200.00 50 Pcs Stick Glue Big 45.00 2,250.00 5 Pcs Pvc Pipe #2 295.00 1,475.00 12 Pcs Clean Out #2 75.00 900.00 2 Cans Solvent Cement 120.00 240.00 10 Kgs Gi Tie Wire 125.00 1,250.00 20 Packs Cable Tie Black #10 395.00 7,900.00 1 Gal Rugby 790.00 790.00 1 Roll Charol 1,500.00 1,500.00

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date22 Jan 2025
Tender AmountPHP 4.4 Million (USD 76.7 K)
Details: Description A.contract Id : Antipolo-22january2025-28 B.name Of Project : Improvement Of Four (4) Storey, Twelve (12) Rooms Dpwh-bod School Building At Sumilang Elementary School, Brgy. San Jose, Antipolo City C.location : Brgy. San Jose, Antipolo City D.brief Description : Improvement Of School Building E.major Item Of Works : Repair Of Windows; Replacement Of Accordion Door; Repainting Works; Electrical Works F.approved Budget For The Contract : Php 4,496,424.19 G.duration : 120 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: January 03 - 22, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: January 10, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 22, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 22, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac

City Of Antipolo Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date8 Jan 2025
Tender AmountPHP 1 Million (USD 18.1 K)
Details: Description A.contract Id : Antipolo-08january2025-10 B.name Of Project : Improvement Of 14m X 16m Ynares Multi-purpose Covered Court At Damayan Ng Angela, Brgy. San Luis, Antipolo City C. Location : Brgy. San Luis, Antipolo City D.brief Description : Improvement Of Multi-purpose Covered Court E.major Item Of Works : Repainting Of Covered Court Flooring; Electrical Works; Repainting Of Covered Court F.approved Budget For The Contract : Php 1,050,470.94 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral

City Of Koronadal Water District Tender

Others...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Closing Date10 Jan 2025
Tender AmountRefer Documents 
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. 1. General Information Veterans Health Administration (vha) Program Contracting Activity Central (pcac) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project #676-336 Fire Station Design-tomah Va Medical Center. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. 2. Project Information This Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract By Late March 2025. The Anticipated Period Of Performance For Completion Of Design Is 160 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $5,000,000 And $10,000,000. Please Note That The 160-calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. 3. A-e Selection Process Firms Submitting Sf 330s In Response To This Announcement, Not Later Than The Closing Date And Time Specified Herein And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: Sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Pre-solicitation Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. In Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. All Firms Not Invited To Participate In Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. Discussions Will Be Held With The Most Highly Qualified Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Email And Provided Further Instructions, Including Any Questions Or Topics To Address. Following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. The Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit Will Be Authorized During The Negotiation Process. An Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made. 4. Selection Criteria: Firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. Primary Selection Criteria: Professional Qualifications: Professional Qualifications Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. Disciplines Requiring A Florida License Include Civil/structural And Hazardous Material Abatement/industrial Hygiene. A Resume For Each Of These Key Positions Must Be Provided In Section E Of The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To: Architect (leed Certification/us Green Build Council Certification) Cost Estimator Civil Engineer Electrical Engineer Environmental Engineer Fire Protection Engineer Mechanical Engineer Plumbing Engineer Project Manager Quality Assurance Manager Structural Engineer Physical Security Specialists Commissioning Agent Offeror Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I, [signatory Authority], Of [company Name], Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database In Compliance With Vaar 852.219-73. The Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Factor. Do Not Include This Information In Section H Unless It Is Pertinent To Support The Information Listed In The Other Sections. Specialized Experience And Technical Competence: Specialized Experience And Technical Competence In The Design And Construction Period Services Shall Be Provided For Network Infrastructure Installation, Renovations, Or Upgrades. Projects Experience Should Include Upgrading Large Scale (multi-building With Multiple Generational Oit Systems) Fiber Optics, Data Cable, Structured Cabling, Electrical Distribution Design, Electrical Upgrades, Uninterruptable Power Systems (ups), Electrical Bonding, Building Management Systems/building Automation Systems (bms/bas), Hvac, It Room Renovations/expansion/relocations, Data Centers/server Rooms Reconfiguration, And Physical Security Upgrades, Duct Bank And Direct Boring Operations. Other Specialized Experience To Provide Should Include Experience In Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, Transition, And Sustainable Design Practices. Submissions Shall Include No More And No Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope, And Complexity, And Experience With The Type Of Projects/competence Above. Relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past Five (5) Years. Include The Following For Each Submitted Project: Project Title And Location Detailed Narrative Describing The Scope Of Services Provided, Including The Type Of Work Performed By The Offeror And Its Role In The Project (i.e., Prime Contractor, Teaming Partner, Or Subcontractor) Project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. Services & Deliverables Provided Under The Contract/task Order. Period Of Performance, Including Start And Completion Dates Total Dollar Value Of The Project Ae Cost Estimate Vs. Actual Construction Cost Contract Number Associated With The Project. The Information Provided In Section F Of The Sf 330 Will Be Used To Evaluate Relevant Specialized Experience And Technical Competence. Any Projects Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. The Information Provided In Section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. The Offeror Must Include Narratives Of How The Firm Addresses Each Of The Following Topics In Section H. Simply Restating This List In Section H Will Not Be Sufficient. The Management Approaches. The Coordination Of Disciplines And Subcontractors Quality Control Procedures, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. Capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector, During The Previous Twelve (12) Months Or Any Active Projects At Pcac. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts The Prime Firm Has Been Awarded From Any Source. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Award Date, Completion Percentages, And Expected Completion Date For The Va Projects Awarded In The Previous Twelve (12) Months Or Active At Pcac. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Proposed Team/personnel Provided In The Sf 330. Past Performance: Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Reporting System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies Outside Of The Va. For Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submitted In The Sf330, A Ppq Must Be Submitted Listing Their Specific Role (key Disciplines) As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Completed Ppq Requested From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. The Government May Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Must Be Provided In Section H Of The Sf 330. For Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330. Ppqs Should Not Be Submitted To Vha Pcac Directly. Any Ppqs Will Not Be Counted Towards The Page Limitation For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. Knowledge Of Locality: Demonstrate And Describe Experience In The Local Area And The Specific Knowledge Of Certain Local Conditions Or Project Site Features The Experience Provided. This Description May Include (if Applicable): Any Prime Firm Or Subcontractor Experience Within The Visn Or At The Vamc State Or Local Construction Codes, Laws, Or Regulations Climate And Seismic Related Conditions Or Features The Information For This Factor Must Be Provided In Section H Of The Sf 330. Note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. Experience In Construction Period Services: Experience In Construction Period Services Must Be Demonstrated Via Project Experience. These May Be The Same Projects Identified Above In Factor 1; However, The Firm Shall Clearly Delineate The Types Of Construction Period Services Performed For Each. Refer To The Statement Of Work For Review Timeline Expectations. Project Descriptions Must Include Experience With: Solicitation Support Services, Professional Field Inspections During The Construction Period Coordination With Commissioning Requirements Review Of Construction Submittals Support In Answering Requests For Information During The Construction Period. Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates. Attendance At Weekly Conference Calls Providing Minutes Of Meetings Between The Ae, Va, And Contractors Pre-final Inspection Site Visits Generation Of Punch-list Reports, And Production Of As-built Documentation. The Firm Shall Provide A Detailed Description Of Projects Worked That Illustrate Experience In These Areas. Projects Must Be Within The Last Ten (10) Years. In Addition, The Firm Must Include A Description Of Experience Addressing Unforeseen Conditions And Emergent Situations, Conducting Situation Evaluations, And Making Midcourse Corrections. Include Description On How The Firm Can Be Proactive Or Responsive In These Situations. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Secondary Selection Criterion*: Geographic Location. Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Tomah Va Medical Center 500 E Veterans Street, Tomah, Wi. 54660. . Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. 5. Submission Requirements: The Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: Submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Johnna Mcgraw At Johnna.mcgraw@va.gov . This Must Include Parts I And Ii And Any Applicable Attachments. The Submission Must Include The Sf 330, Architect-engineer Qualifications (form Is Available Online At Https://www.gsa.gov/reference/forms/architectengineer-qualifications). The Sf 330 Submission Is Due By January 10th 2025 At 1pm Est. The Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. The Subject Line Of The Email Must Read: Sf 330 Submission Fire Station Design- Tomah Wi. The Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. A Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. Firms Must Include The Following Information In Section B Of The Sf 330 Submission: 1) Sam Unique Entity Identifier 2) Tax Id Number 3) Cage Code 4) Primary Point Of Contact S Email Address And Phone Number. All Questions Must Be Submitted To Johnna Mcgraw With The Subject Line Sf 330 Questions Fire Station Design-tomah Wi. The Cutoff For Question Submission Is 1:00 Pm Est On December 16th, 2024. Questions Will Be Answered Through Modification To The Pre-sol Notice Posted To Contract Opportunities At Sam.gov. This Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. All Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. All Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. Sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. It Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330.

Environmental Management Bureau Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Date22 Jan 2025
Tender AmountPHP 553.7 K (USD 9.4 K)
Details: Description Request For Quotation (rfq) Supply Of Labor And Materials For The Proposed Beautification Of Emb Executive Lobby Rfq No. Emb-pgss-2024-248 1. The Department Of Environment And Natural Resources – Environmental Management Bureau (denr-emb) Hereinafter Referred To As The “purchaser” Now Requests For Submission Of Price Quotations For The Procurement Of The Aforesaid Items Described In The Technical Specifications/scope Of Works/terms Of Reference. No. Description Qty Uom Uom Abc Supply Of Labor And Materials For The Proposed Beautification Of The Executive Lobby 1 Lot 1. A. Site Works And Clearing 1 Lot 11,000.00 B. Wall Partitions 1 Lot 60,000.00 C. Door Windows And Glass Partitions 1 Lot 130,000.00 D. Electrical Works 1 Lot 10,000.00 E. Paitning Works 1 Lot 11,000.00 F. Others 1 Lot 153,300.00 Total Cost Of Materials 363,300.00 Total Cost Of Labor 58,600.00 Total Direct Cost 421,900.00 Total Indirect Cost 105,475.00 Ocm (15%) 63,285.00 Profit (10%) 42,190.00 Tax (5%) 26,368.75 Total Project Cost Php553,743.75 2. A Set Of Technical Requirements Are Provided In Attachment/s. Item/s Listed Under The Purchaser’s Terms Of Reference/s Must Be Complied With On A Pass-fail Basis. Failure To Meet Any One Of The Requirements May Result In Rejection Of The Quotation. The Approved Budget For This Contract Is Php553,743.75. 3. Bidding Procedures Will Be Conducted In Accordance With The Provisions Of The Implementing Rules And Regulations (irr) Of Republic Act 9184. 4. It Is The Intent Of The Purchaser To Evaluate The Bid/quotation On A Lot Basis. And Award Will Be Made To The Bid/quotation Or Combination Of Quotations Resulting In The Lowest Evaluated Quotation Meeting The Purchaser’s Technical Specifications. 5. Quotations Must Be Delivered At The Address Below Not Later Than Of 02:00 P.m. Of January 22, 2024. Department Of Environment And Natural Resources Environmental Management Bureau Emb Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 6. Prices Must Be Quoted In Philippine Peso And Must Include The Unit Price And Total Price, Inclusive Of All Taxes To Be Paid And Other Incidental Cost To The Delivery Site/s If The Contract Is Awarded. 7. Bid/quotation Submission Maybe Typewritten And Must Be Placed In A Sealed Envelope Marked Supply Of Labor And Materials For The Proposed Beautification Of The Emb Executive Lobby Under Rfq No. Emb-od-2024-12-248 Sealed Bids Must Be Forwarded To Bac Secretariat (administrative, Financial And Management Division) Located At Emb-afmd, Hrd Building Ground Floor Or May Email To Embquotations@gmail.com Submission Must Be Or On Before The Indicated Date At Time. Late Bids And Proposals Above The Abc Shall Be Automatically Disqualified. 8. Bids/quotations Shall Be Valid For Sixty (60) Calendar Days From The Deadline Of Submission Of Bids. 9. The Delivery Period Shall Be Within Fifteen To Thirty (15-30) Calendar Days From Receipt Of The Purchase Order (po) And/or Job Order (jo). The Supplier Must Inform The Purchaser At Least Three (3) Days Before The Date Of Delivery. The Delivery Will Be Made Only During Working Days And Hours. 10. Delivery Sites: See Delivery Sites Enumerated In The Quotation Form Environmental Management Bureau Hrd Building Ground Floor Denr Compound, Visayas Avenue, Diliman, Quezon City Attention: Afmd-property And General Services Section 11. The Applicable Rate For Late Deliveries Is One Tenth (1/10) Of One (1) Percent Of The Cost Of The Unperformed Portion Of The Contract For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of Contract. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Contract Amount, The Purchaser Shall Rescind The Contract Without Prejudice To Other Courses Of Action And Remedies Open To It. 12. The Purchaser Reserves The Right To Accept Or Reject Any Quotation, And To Annul The Bidding/shopping Process Or Reject All Quotations At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder/bidders. The Purchaser Also Reserves The Right To Waive Minor Deviations/defects Or Infirmities Therein. A Minor Deviation/defect Or Infirmity Is One That Does Not Materially Affect The Overall Functionality Of The Material And The Capability Of The Supplier To Perform The Contract. 13. Participating Service Provider/s Must Abide By The Existing Health, Safety, Environment, Quality And Other Related Laws And Procedures As Prescribed By The Philippine Government. 14. Documents To Submit The Following: A) Quotation Form With Technical Specifications. B) Mayor’s/business Permit. C) Philgeps Registration Number/proof Of Philgeps Registration D) Tax Clearance Certificate E) Omnibus Sworn Statement-original & Notarized F) Valid Pcab License (category C Or Above) Engr. Rodney V. Diaz Oic-property & General Services Section Attachment 1 Republic Of The Philippines Department Of Environment And Natural Resources Environmental Management Bureau Technical Specifications Item No. 1 Supply Of Labor And Materials For The Proposed Beautification Of Emb Executive Lobby Quantity: 1 Lot Country Of Origin: Brand/model: All Items Listed Under The Purchasers’ Specifications Must Be Complied On A Pass-fail Basis. Failure To Meet Any One Of The Requirements May Result To Rejection. Qty Uom Purchaser’s Specifications Bidder’s Specifications 1 Lot Supply Of Labor And Materials For The Proposed Beautification Of Emb Executive Lobby 1 Lot A. Site Works And Clearing 1 Lot 1 Lot B. Wall Partitions 1 Lot C. Door Windows And Glass Partitions 1 Lot D. Electrical Works 1 Lot E. Paitning Works 1 Lot F. Others 1 Lot Note: Please Call (02) 8539-4378 Local 107 Or 145 For The Copy Of Tor Name Of Company : _________________________________ Postal Address : _________________________________ Email Address : _________________________________ Telephone & Fax No. : _________________________________ Signature Over Printed Name : _________________________________ Designation : _________________________________ Other Requirements 1. Quotation Submission Requirements - Supplier Must Submit A Duly Accomplished And Signed Price Quotation, And Supplier’s Line By Line Technical Specifications Compliance. - Supplier’s Must Accomplish/fill All Required Pages To Facilitate Documentation - Supplier Must Be Philgeps Registered. - Business Permit/license Permit - Failure To Follow The Above Requirements May Result To Outright Rejection Of Submitted Quotation/s. 2. Evaluation And Awarding Of Quotation - The Purchaser Will Evaluate And Compare The Offers, Which Have Been Determined As Responsive Pursuant To The Completeness Of The Purchaser Requirements - Compliance To The Technical Specifications - Awards Shall Be Made To The Lowest Evaluated And Responsive Quotation. - Submission Of Requirements Containing False Information Or Falsified Documents That Contain False Information Or Concealment Of Such Information In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Procurement Process May Result To Blacklisting Guidelines As Provided In The Irr Of Ra 9184. 3. Terms Of Payment - 100% Of The Contract Price Will Be Paid Upon Verification/inspection And Acceptance Of The Services In Compliance To Existing Government Auditing And Accounting Procedures. Quotation Form Date: ____________________ Attention: Afmd-property And General Services Section Environmental Management Bureau Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 1) Having Examined The Subject Request For Quotation (rfq) Including The Technical Specifications, We, The Undersigned Offer To Supply And Deliver The Following: No. Description Delivery Site Quantity Uom Unit Price Total Price 1. Supply Of Labor And Materials For The Proposed Beautification Of Emb Executive Lobby Environmental Management Bureau, Hrd Building Ground Floor, Afmd Denr Compound, Visayas Avenue, Diliman, Quezon City 1 Lot A. Site Works And Clearing 1 Lot 1 Lot B. Wall Partitions 1 Lot C. Door Windows And Glass Partitions 1 Lot D. Electrical Works 1 Lot E. Paitning Works 1 Lot F. Others 1 Lot Note: Please Call (02) 8539-4378 Local 107 Or 145 For The Copy Of Tor 1 Lot 2) We Undertake, If Our Quotation Or Bid Is Accepted, To Deliver The Above Goods Within The Fifteen To Thirty (15-30) Calendar Day Delivery Period From Receipt Purchase Order (po) Or Job Order (jo). 3) We Agree To Abide By This Quotation/bid For A Period Of Sixty (60) Days After The Deadline Of Submission Specified In The Rfq. 4) We Understand That Payment For Items Delivered Will Be Made To The Winning Supplier After The Inspection And Acceptance Of Goods Delivered. Name Of Company : _________________________________ Postal Address : _________________________________ Email Address : _________________________________ Telephone & Fax No. : _________________________________ Signature Over Printed Name : _________________________________ Designation : _________________________________ Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct. 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted. 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree. [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree. [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____

DIVISORIA NATIONAL HIGH SCHOOL BONTOC, SOUTHERN LEYTE Tender

Civil And Construction...+2Construction Material, Machinery and Tools
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 504.6 K (USD 8.6 K)
Details: Description Select Item No Product/service Name Description Quantity Uom Budget 1 Construction Of Temporary Wash Facility Mobilization/temporary Structures 3 Lot 4947.27 2 Construction Of Temporary Wash Facility Safety And Health 3 Lot 4947.27 3 Construction Of Temporary Wash Facility Earthworks 56 Square Meter 1112.72 4 Construction Of Temporary Wash Facility Earthworks 27 Cubic Meter 5082.78 5 Construction Of Temporary Wash Facility Concreting Works-wall Footing-portland Cement 24 Bag 6469.68 6 Construction Of Temporary Wash Facility Wall Footing-crushed Gravel 3/4" 3 Cubic Meter 4914.69 7 Construction Of Temporary Wash Facility Wall Footing-washed Sand 2 Cubic Meter 2741.25 8 Construction Of Temporary Wash Facility Column-portland Cement 21 Bag 5660.97 9 Construction Of Temporary Wash Facility Column-crushed Gravel 1" 2 Cubic Meter 3739.50 10 Construction Of Temporary Wash Facility Column-washed Sand 2 Cubic Meter 2741.25 11 Construction Of Temporary Wash Facility Beam-portland Cement 12 Bag 3234.84 12 Construction Of Temporary Wash Facility Beam-crushed Sand 3/4" 2 Cubic Meter 2493 13 Construction Of Temporary Wash Facility Beam-washed Sand 1 Cubic Meter 1370.63 14 Construction Of Temporary Wash Facility Slab On Grade-portland Cement 27 Bag 7278.39 15 Construction Of Temporary Wash Facility Slab On Grade-crushed Gravel 3/4" 3 Cubic Meter 4914 16 Construction Of Temporary Wash Facility Slab On Grade-washed Sand 2 Cubic Meter 2741.25 17 Construction Of Temporary Wash Facility Handwashing-portland Cement 6 Bag 1617.42 18 Construction Of Temporary Wash Facility Handwashing-crushed Gravel 3/4" 1 Cubic Meter 1246.50 19 Construction Of Temporary Wash Facility Handwashing-washed Sand 1 Cubic Meter 1370.63 20 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 12mmx6m, Grade 40 690 Kilo 31473.58 21 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 10mmx6m, Grade 40 129 Kilo 5866.98 22 Construction Of Temporary Wash Facility Rebar Works-g.i. Tie Wire 18 Kilo 1489.50 23 Construction Of Temporary Wash Facility Rebar Works-coco Lumber, 2"x3"x12" 216 Board Feet 4903.20 24 Construction Of Temporary Wash Facility Rebar Works-plywood Ordinary, 1/4", 4'x8' 6 Piece 2922 25 Construction Of Temporary Wash Facility Rebar Works-cwn, Assorted 3 Kilo 240 26 Construction Of Temporary Wash Facility Beams-coco Lumber, 2"x2"x12" 60 Board Feet 1362 27 Construction Of Temporary Wash Facility Beams-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 28 Construction Of Temporary Wash Facility Beams-cwn, Assorted 3 Kilo 240 29 Construction Of Temporary Wash Facility Handwashing-coco Lumber, 2"x2"x12" 24 Board Feet 544.80 30 Construction Of Temporary Wash Facility Handwashing-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 31 Construction Of Temporary Wash Facility Handwashing-cwn, Assorted 3 Kilo 240 32 Construction Of Temporary Wash Facility Masonry Works-masonry Wall-chb 6" Thk 906 Piece 27352.14 33 Construction Of Temporary Wash Facility Masonry Wall-portland Cement 24 Bag 6480 34 Construction Of Temporary Wash Facility Masonry Wall-washed Sand 3 Cubic Meter 5754 35 Construction Of Temporary Wash Facility Masonry Wall-10mm X 6m Rsb 96 Kilo 4587.84 36 Construction Of Temporary Wash Facility Masonry Wall-g.i. Tie Wire 3 Kilo 255 37 Construction Of Temporary Wash Facility Plastering-portland Cement 30 Bag 8100 38 Construction Of Temporary Wash Facility Plastering-washed Sand 3 Cubic Meter 5754 39 Construction Of Temporary Wash Facility Doors And Windows-d-3 Flush Door O 70m X 2.10m On 150mm Wooden Jamb Complete With Accessories 6 Set 24507 40 Construction Of Temporary Wash Facility Steel Works-lc 75x38x15x2.0mm 272 Kilo 13837.81 41 Construction Of Temporary Wash Facility Steel Works-l 50 X 50 X 6mm 55 Kilo 5556.98 42 Construction Of Temporary Wash Facility Steel Works-g I Pipe 75mm Sch 40 6 Piece 12432 43 Construction Of Temporary Wash Facility Steel Works-tubular 50mm X 100mm X 1.5mm 6 Piece 8227.50 44 Construction Of Temporary Wash Facility Steel Works-50mm X 75mm X 1.2mm Tubular Pipe 15 Piece 9375 45 Construction Of Temporary Wash Facility Steel Works-welding Rod 9 Kilo 1012.50 46 Construction Of Temporary Wash Facility Roofing Works-long Span Roofing, Corrugated, Pre-painted, 1220mm X 0.4mm Thick 26 Meter 10313.22 47 Construction Of Temporary Wash Facility Roofing Works-flashing Ga 26, 24"x8" 6 Piece 2988 48 Construction Of Temporary Wash Facility Roofing Works-teckscrew 2-1/2" 207 Piece 517.50 49 Construction Of Temporary Wash Facility Roofing Works-roof Sealant 6 Liter 1800 50 Construction Of Temporary Wash Facility Roofing Works-polycarbonated Sheets Twin Wall 6mm Thick Including Accessories 20 Square Meter 35006.40 51 Construction Of Temporary Wash Facility Carpentry Works-ceiling-rough Lumber, Sun Dried, Tanguile, 2"x2"x12" 84 Board Feet 4121.88 52 Construction Of Temporary Wash Facility Ceiling-plywood Marine 1/4" X 4'x8' 9 Piece 5435.10 53 Construction Of Temporary Wash Facility Ceiling-finishing Nails 3 Kilo 256.20 54 Construction Of Temporary Wash Facility Ceiling-common Wire Nails 3 Kilo 292.80 55 Construction Of Temporary Wash Facility Ceiling-fascia Board, Fiber Cement 10" X 12' 12 Piece 5160.60 56 Construction Of Temporary Wash Facility Ceiling-ceiling Vent 1" X 12" X 4' With Screen 3 Piece 896.70 57 Construction Of Temporary Wash Facility Electrical Works-roughing-ins-electrical Conduit Upvc, 15mm 15 Piece 2085 58 Construction Of Temporary Wash Facility Junction Box, 4"x4" G.i. 3 Piece 120 59 Construction Of Temporary Wash Facility Utility Box, 2"x4" G.i. Wires & Fixtures 6 Piece 201.60 60 Construction Of Temporary Wash Facility 3.5 Mm2 Thw Wire, Stranded 144 Meter 6422.40 61 Construction Of Temporary Wash Facility Single Switch With Plate 9 Piece 1620 62 Construction Of Temporary Wash Facility Ceiling Receptacle 3-1/2" 9 Piece 342 63 Construction Of Temporary Wash Facility Incandescent Bulb 50w 9 Set 1847.25 64 Construction Of Temporary Wash Facility Electrical Tape 3 Piece 162.39 65 Construction Of Temporary Wash Facility Plumbing Works-water Closet 1.6gpf With Accessories 6 Set 26,220.00 66 Construction Of Temporary Wash Facility Plumbing Works-water Closet Flange 6 Set 1,809.00 67 Construction Of Temporary Wash Facility Plumbing Works-faucet, Plain Bibb, Brass 1/2" 9 Piece 1,591.20 68 Construction Of Temporary Wash Facility Plumbing Works-s S Floor Drain 4'x4" 15 Piece 1,681.95 69 Construction Of Temporary Wash Facility Plumbing Works-gate Valve, 1/2" 3 Piece 975.00 70 Construction Of Temporary Wash Facility Plumbing Works-pp-r Pipe 1/2" 15 Piece 4,350.00 71 Construction Of Temporary Wash Facility Plumbing Works-pp-r Elbow 90o X 1/2" 15 Piece 235.50 72 Construction Of Temporary Wash Facility Plumbing Works-pp-r Tee, 1/2" 9 Piece 171.90 73 Construction Of Temporary Wash Facility Plumbing Works-pp-r Coupling Reducer, 1/2" X 3/4" 3 Piece 45.90 74 Construction Of Temporary Wash Facility Plumbing Works-pp-r Adapter Female Thread 1/2" 15 Piece 1,702.35 75 Construction Of Temporary Wash Facility Plumbing Works-teflon Tape 3 Roll 86.40 76 Construction Of Temporary Wash Facility Sanitary Works-upvc Sanitary Pipe 4" 6 Piece 6,034.80 77 Construction Of Temporary Wash Facility Upvc Sanitary Pipe 2" 15 Piece 7,186.50 78 Construction Of Temporary Wash Facility Upvc Elbow 90o X 2" 9 Piece 499.50 79 Construction Of Temporary Wash Facility Upvc Tee 2"x2" 9 Piece 502.20 80 Construction Of Temporary Wash Facility Upvc Elbow 90o X 4" 9 Piece 1,114.20 81 Construction Of Temporary Wash Facility Upvc P-trap 2" 15 Piece 1,872.00 82 Construction Of Temporary Wash Facility Brass Cleanout 4"x4" 3 Piece 1,365.00 83 Construction Of Temporary Wash Facility Pvc Cement 3 Can 630.00 84 Construction Of Temporary Wash Facility Chb, 4"x8"x16", Standard 600 Piece 16974 85 Construction Of Temporary Wash Facility Deformed Round Bars, 10mmx6m, Grade 40 534 Kilo 25519.86 86 Construction Of Temporary Wash Facility Portland Cement 30 Bag 8100 87 Construction Of Temporary Wash Facility Washed Sand 6 Cubic Meter 11509.98 88 Construction Of Temporary Wash Facility G.i. Tie Wire 9 Kilo 738 89 Construction Of Temporary Wash Facility Painting Works-concrete Surface-neutralizer 1 Gallon 348.30 90 Construction Of Temporary Wash Facility Concrete Surface-latex, Flat 3 Gallon 2926.11 91 Construction Of Temporary Wash Facility Concrete Surface-latex, Semi Gloss 3 Gallon 3279 92 Construction Of Temporary Wash Facility Concrete Surface-acri Color 3 Quart 343.20 93 Construction Of Temporary Wash Facility Wood Surface-enamel Flatwall 1 Gallon 1708.50 94 Construction Of Temporary Wash Facility Wood Surface-enamel Semi Gloss 1 Gallon 1738.50 95 Construction Of Temporary Wash Facility Wood Surface-paint Thinner 1 Gallon 753 96 Construction Of Temporary Wash Facility Tile Works-wall-glazed Wall Tiles 20cm X 20cm 1092 Piece 21294 97 Construction Of Temporary Wash Facility Wall-tile Adhesive 25kg/bag 9 Bag 2621.97 98 Construction Of Temporary Wash Facility Wall-tile Trim 6mm 12 Piece 1476 99 Construction Of Temporary Wash Facility Wall-tile Grout 5 Kg/bag 6 Bag 1170 100 Construction Of Temporary Wash Facility Flooring-unglazed Floor Tiles 20cm X 20cm 291 Piece 5674.50 101 Construction Of Temporary Wash Facility Flooring-tile Adhesive 25kg/bag 3 Bag 873.60 102 Construction Of Temporary Wash Facility Flooring-tile Grout 5kg/bag 3 Bag 585 103 Construction Of Temporary Wash Facility Handwashing-unglazed Floor Tiles 20cm X 20cm 195 Piece 3802.50 104 Construction Of Temporary Wash Facility Handwashing-tile Adhesive 25kg/bag 3 Bag 872.99 105 Construction Of Temporary Wash Facility Handwashing-tile Grout 5kg/bag 3 Bag 585
8551-8560 of 9550 archived Tenders