City Of Koronadal Water District Tender

Others...+1Electrical and Electronics
Philippines
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)

City Of Antipolo Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description A.contract Id : Antipolo-08january2025-23 B.name Of Project : Improvement Of Child Development Center At Peace Village 2, Brgy. San Luis, Antipolo City C. Location : Brgy. San Luis, Antipolo City D.brief Description : Repainting Of Whole Structure And Fence; Replacement Of Ceiling And Roof Eaves; Replacement Of Gutter And Downspout E.major Item Of Works : Replacement Of Electrical Fixtures And Rewirings; Repainting Works; Plumbing Works F.approved Budget For The Contract : Php 862,565.55 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 862.5 K (USD 14.8 K)

City Of Antipolo Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description A.contract Id : Antipolo-08january2025-04 B.name Of Project : Additional Improvement Of 17m X 30m Acg Multi-purpose Covered Court At Sitio Tanza 2, Brgy. San Jose, Antipolo City C. Location : Brgy. San Jose, Antipolo City D.brief Description : Improvement Of Drainage Canal, Court Fence; Repair Of Court And Canopy Roof; Repainting Of Covered Court E.major Item Of Works : Painting Works; Electrical Works F.approved Budget For The Contract : Php 2,371,713.39 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 2.3 Million (USD 40.8 K)

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description A.contract Id : Antipolo-08january2025-07 B.name Of Project : Improvement Of Various Stand Alone Comfort Rooms At Kaysakat Elementary School, Brgy. San Jose, Antipolo City C. Location : Brgy. San Jose, Antipolo City D.brief Description : Improvement Of Various Stand Alone Comfort Rooms E.major Item Of Works : Electrical Works; Plumbing Works; Tile Works; Roofing Works F.approved Budget For The Contract : Php 2,866,112.93 G.duration : 60 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 2.8 Million (USD 49.3 K)

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description A.contract Id : Antipolo-08january2025-27 B.name Of Project : Improvement Of Four (4) Storey Twenty (20) Classrooms Dpwh Building A At Antipolo Senior Highschool, Brgy. Sta. Cruz, Antipolo City C. Location : Brgy. Sta. Cruz, Antipolo City D.brief Description : Improvement Of School Building E.major Item Of Works : Painting Works; Tile Works; Electrical Works F.approved Budget For The Contract : Php 4,999,989.50 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 4.9 Million (USD 86.1 K)

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description A.contract Id : Antipolo-08january2025-15 B.name Of Project : Improvement Of Two (2) Storey Four (4) Classrooms Acg Building At Kaysakat National Highschool, Brgy. San Jose. Antipolo City C. Location : Brgy. San Jose. Antipolo City D.brief Description : Improvement Of School Building E.major Item Of Works : Painting Works; Replacement Of Gutter, Ridge Roll, Flashing And Roof; Painting Works; Electrical Works F.approved Budget For The Contract : Php 2,413,459.83 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 2.4 Million (USD 41.5 K)

City Of Antipolo Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description A.contract Id : Antipolo-08january2025-06 B.name Of Project : Improvement Of Covered Court At Beverly Hills Subdivision, Brgy. Beverly Hills, Antipolo City C. Location : Brgy. Beverly Hills, Antipolo City D.brief Description : Improvement Of Covered Court E.major Item Of Works : Replacement Of Court And Canopy Gutter And Downspouts; Repainting Of Covered Court; Electrical Works F.approved Budget For The Contract : Php 2,107,956.75 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac
Closing Date8 Jan 2025
Tender AmountPHP 2.1 Million (USD 36.3 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. 1. General Information Veterans Health Administration (vha) Program Contracting Activity Central (pcac) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project #676-336 Fire Station Design-tomah Va Medical Center. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. 2. Project Information This Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract By Late March 2025. The Anticipated Period Of Performance For Completion Of Design Is 160 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $5,000,000 And $10,000,000. Please Note That The 160-calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. 3. A-e Selection Process Firms Submitting Sf 330s In Response To This Announcement, Not Later Than The Closing Date And Time Specified Herein And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: Sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Pre-solicitation Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. In Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. All Firms Not Invited To Participate In Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. Discussions Will Be Held With The Most Highly Qualified Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Email And Provided Further Instructions, Including Any Questions Or Topics To Address. Following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. The Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit Will Be Authorized During The Negotiation Process. An Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made. 4. Selection Criteria: Firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. Primary Selection Criteria: Professional Qualifications: Professional Qualifications Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. Disciplines Requiring A Florida License Include Civil/structural And Hazardous Material Abatement/industrial Hygiene. A Resume For Each Of These Key Positions Must Be Provided In Section E Of The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To: Architect (leed Certification/us Green Build Council Certification) Cost Estimator Civil Engineer Electrical Engineer Environmental Engineer Fire Protection Engineer Mechanical Engineer Plumbing Engineer Project Manager Quality Assurance Manager Structural Engineer Physical Security Specialists Commissioning Agent Offeror Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I, [signatory Authority], Of [company Name], Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database In Compliance With Vaar 852.219-73. The Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Factor. Do Not Include This Information In Section H Unless It Is Pertinent To Support The Information Listed In The Other Sections. Specialized Experience And Technical Competence: Specialized Experience And Technical Competence In The Design And Construction Period Services Shall Be Provided For Network Infrastructure Installation, Renovations, Or Upgrades. Projects Experience Should Include Upgrading Large Scale (multi-building With Multiple Generational Oit Systems) Fiber Optics, Data Cable, Structured Cabling, Electrical Distribution Design, Electrical Upgrades, Uninterruptable Power Systems (ups), Electrical Bonding, Building Management Systems/building Automation Systems (bms/bas), Hvac, It Room Renovations/expansion/relocations, Data Centers/server Rooms Reconfiguration, And Physical Security Upgrades, Duct Bank And Direct Boring Operations. Other Specialized Experience To Provide Should Include Experience In Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, Transition, And Sustainable Design Practices. Submissions Shall Include No More And No Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope, And Complexity, And Experience With The Type Of Projects/competence Above. Relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past Five (5) Years. Include The Following For Each Submitted Project: Project Title And Location Detailed Narrative Describing The Scope Of Services Provided, Including The Type Of Work Performed By The Offeror And Its Role In The Project (i.e., Prime Contractor, Teaming Partner, Or Subcontractor) Project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. Services & Deliverables Provided Under The Contract/task Order. Period Of Performance, Including Start And Completion Dates Total Dollar Value Of The Project Ae Cost Estimate Vs. Actual Construction Cost Contract Number Associated With The Project. The Information Provided In Section F Of The Sf 330 Will Be Used To Evaluate Relevant Specialized Experience And Technical Competence. Any Projects Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. The Information Provided In Section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. The Offeror Must Include Narratives Of How The Firm Addresses Each Of The Following Topics In Section H. Simply Restating This List In Section H Will Not Be Sufficient. The Management Approaches. The Coordination Of Disciplines And Subcontractors Quality Control Procedures, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. Capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector, During The Previous Twelve (12) Months Or Any Active Projects At Pcac. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts The Prime Firm Has Been Awarded From Any Source. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Award Date, Completion Percentages, And Expected Completion Date For The Va Projects Awarded In The Previous Twelve (12) Months Or Active At Pcac. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Proposed Team/personnel Provided In The Sf 330. Past Performance: Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Reporting System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies Outside Of The Va. For Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submitted In The Sf330, A Ppq Must Be Submitted Listing Their Specific Role (key Disciplines) As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Completed Ppq Requested From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. The Government May Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Must Be Provided In Section H Of The Sf 330. For Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330. Ppqs Should Not Be Submitted To Vha Pcac Directly. Any Ppqs Will Not Be Counted Towards The Page Limitation For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. Knowledge Of Locality: Demonstrate And Describe Experience In The Local Area And The Specific Knowledge Of Certain Local Conditions Or Project Site Features The Experience Provided. This Description May Include (if Applicable): Any Prime Firm Or Subcontractor Experience Within The Visn Or At The Vamc State Or Local Construction Codes, Laws, Or Regulations Climate And Seismic Related Conditions Or Features The Information For This Factor Must Be Provided In Section H Of The Sf 330. Note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. Experience In Construction Period Services: Experience In Construction Period Services Must Be Demonstrated Via Project Experience. These May Be The Same Projects Identified Above In Factor 1; However, The Firm Shall Clearly Delineate The Types Of Construction Period Services Performed For Each. Refer To The Statement Of Work For Review Timeline Expectations. Project Descriptions Must Include Experience With: Solicitation Support Services, Professional Field Inspections During The Construction Period Coordination With Commissioning Requirements Review Of Construction Submittals Support In Answering Requests For Information During The Construction Period. Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates. Attendance At Weekly Conference Calls Providing Minutes Of Meetings Between The Ae, Va, And Contractors Pre-final Inspection Site Visits Generation Of Punch-list Reports, And Production Of As-built Documentation. The Firm Shall Provide A Detailed Description Of Projects Worked That Illustrate Experience In These Areas. Projects Must Be Within The Last Ten (10) Years. In Addition, The Firm Must Include A Description Of Experience Addressing Unforeseen Conditions And Emergent Situations, Conducting Situation Evaluations, And Making Midcourse Corrections. Include Description On How The Firm Can Be Proactive Or Responsive In These Situations. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Secondary Selection Criterion*: Geographic Location. Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Tomah Va Medical Center 500 E Veterans Street, Tomah, Wi. 54660. . Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. 5. Submission Requirements: The Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: Submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Johnna Mcgraw At Johnna.mcgraw@va.gov . This Must Include Parts I And Ii And Any Applicable Attachments. The Submission Must Include The Sf 330, Architect-engineer Qualifications (form Is Available Online At Https://www.gsa.gov/reference/forms/architectengineer-qualifications). The Sf 330 Submission Is Due By January 10th 2025 At 1pm Est. The Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. The Subject Line Of The Email Must Read: Sf 330 Submission Fire Station Design- Tomah Wi. The Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. A Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. Firms Must Include The Following Information In Section B Of The Sf 330 Submission: 1) Sam Unique Entity Identifier 2) Tax Id Number 3) Cage Code 4) Primary Point Of Contact S Email Address And Phone Number. All Questions Must Be Submitted To Johnna Mcgraw With The Subject Line Sf 330 Questions Fire Station Design-tomah Wi. The Cutoff For Question Submission Is 1:00 Pm Est On December 16th, 2024. Questions Will Be Answered Through Modification To The Pre-sol Notice Posted To Contract Opportunities At Sam.gov. This Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. All Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. All Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. Sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. It Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330.
Closing Date10 Jan 2025
Tender AmountRefer Documents 

DIVISORIA NATIONAL HIGH SCHOOL BONTOC, SOUTHERN LEYTE Tender

Civil And Construction...+2Construction Material, Machinery and Tools
Philippines
Details: Description Select Item No Product/service Name Description Quantity Uom Budget 1 Construction Of Temporary Wash Facility Mobilization/temporary Structures 3 Lot 4947.27 2 Construction Of Temporary Wash Facility Safety And Health 3 Lot 4947.27 3 Construction Of Temporary Wash Facility Earthworks 56 Square Meter 1112.72 4 Construction Of Temporary Wash Facility Earthworks 27 Cubic Meter 5082.78 5 Construction Of Temporary Wash Facility Concreting Works-wall Footing-portland Cement 24 Bag 6469.68 6 Construction Of Temporary Wash Facility Wall Footing-crushed Gravel 3/4" 3 Cubic Meter 4914.69 7 Construction Of Temporary Wash Facility Wall Footing-washed Sand 2 Cubic Meter 2741.25 8 Construction Of Temporary Wash Facility Column-portland Cement 21 Bag 5660.97 9 Construction Of Temporary Wash Facility Column-crushed Gravel 1" 2 Cubic Meter 3739.50 10 Construction Of Temporary Wash Facility Column-washed Sand 2 Cubic Meter 2741.25 11 Construction Of Temporary Wash Facility Beam-portland Cement 12 Bag 3234.84 12 Construction Of Temporary Wash Facility Beam-crushed Sand 3/4" 2 Cubic Meter 2493 13 Construction Of Temporary Wash Facility Beam-washed Sand 1 Cubic Meter 1370.63 14 Construction Of Temporary Wash Facility Slab On Grade-portland Cement 27 Bag 7278.39 15 Construction Of Temporary Wash Facility Slab On Grade-crushed Gravel 3/4" 3 Cubic Meter 4914 16 Construction Of Temporary Wash Facility Slab On Grade-washed Sand 2 Cubic Meter 2741.25 17 Construction Of Temporary Wash Facility Handwashing-portland Cement 6 Bag 1617.42 18 Construction Of Temporary Wash Facility Handwashing-crushed Gravel 3/4" 1 Cubic Meter 1246.50 19 Construction Of Temporary Wash Facility Handwashing-washed Sand 1 Cubic Meter 1370.63 20 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 12mmx6m, Grade 40 690 Kilo 31473.58 21 Construction Of Temporary Wash Facility Rebar Works-deformed Round Bars, 10mmx6m, Grade 40 129 Kilo 5866.98 22 Construction Of Temporary Wash Facility Rebar Works-g.i. Tie Wire 18 Kilo 1489.50 23 Construction Of Temporary Wash Facility Rebar Works-coco Lumber, 2"x3"x12" 216 Board Feet 4903.20 24 Construction Of Temporary Wash Facility Rebar Works-plywood Ordinary, 1/4", 4'x8' 6 Piece 2922 25 Construction Of Temporary Wash Facility Rebar Works-cwn, Assorted 3 Kilo 240 26 Construction Of Temporary Wash Facility Beams-coco Lumber, 2"x2"x12" 60 Board Feet 1362 27 Construction Of Temporary Wash Facility Beams-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 28 Construction Of Temporary Wash Facility Beams-cwn, Assorted 3 Kilo 240 29 Construction Of Temporary Wash Facility Handwashing-coco Lumber, 2"x2"x12" 24 Board Feet 544.80 30 Construction Of Temporary Wash Facility Handwashing-plywood Ordinary 1/4", 4'x8' 3 Piece 1462.50 31 Construction Of Temporary Wash Facility Handwashing-cwn, Assorted 3 Kilo 240 32 Construction Of Temporary Wash Facility Masonry Works-masonry Wall-chb 6" Thk 906 Piece 27352.14 33 Construction Of Temporary Wash Facility Masonry Wall-portland Cement 24 Bag 6480 34 Construction Of Temporary Wash Facility Masonry Wall-washed Sand 3 Cubic Meter 5754 35 Construction Of Temporary Wash Facility Masonry Wall-10mm X 6m Rsb 96 Kilo 4587.84 36 Construction Of Temporary Wash Facility Masonry Wall-g.i. Tie Wire 3 Kilo 255 37 Construction Of Temporary Wash Facility Plastering-portland Cement 30 Bag 8100 38 Construction Of Temporary Wash Facility Plastering-washed Sand 3 Cubic Meter 5754 39 Construction Of Temporary Wash Facility Doors And Windows-d-3 Flush Door O 70m X 2.10m On 150mm Wooden Jamb Complete With Accessories 6 Set 24507 40 Construction Of Temporary Wash Facility Steel Works-lc 75x38x15x2.0mm 272 Kilo 13837.81 41 Construction Of Temporary Wash Facility Steel Works-l 50 X 50 X 6mm 55 Kilo 5556.98 42 Construction Of Temporary Wash Facility Steel Works-g I Pipe 75mm Sch 40 6 Piece 12432 43 Construction Of Temporary Wash Facility Steel Works-tubular 50mm X 100mm X 1.5mm 6 Piece 8227.50 44 Construction Of Temporary Wash Facility Steel Works-50mm X 75mm X 1.2mm Tubular Pipe 15 Piece 9375 45 Construction Of Temporary Wash Facility Steel Works-welding Rod 9 Kilo 1012.50 46 Construction Of Temporary Wash Facility Roofing Works-long Span Roofing, Corrugated, Pre-painted, 1220mm X 0.4mm Thick 26 Meter 10313.22 47 Construction Of Temporary Wash Facility Roofing Works-flashing Ga 26, 24"x8" 6 Piece 2988 48 Construction Of Temporary Wash Facility Roofing Works-teckscrew 2-1/2" 207 Piece 517.50 49 Construction Of Temporary Wash Facility Roofing Works-roof Sealant 6 Liter 1800 50 Construction Of Temporary Wash Facility Roofing Works-polycarbonated Sheets Twin Wall 6mm Thick Including Accessories 20 Square Meter 35006.40 51 Construction Of Temporary Wash Facility Carpentry Works-ceiling-rough Lumber, Sun Dried, Tanguile, 2"x2"x12" 84 Board Feet 4121.88 52 Construction Of Temporary Wash Facility Ceiling-plywood Marine 1/4" X 4'x8' 9 Piece 5435.10 53 Construction Of Temporary Wash Facility Ceiling-finishing Nails 3 Kilo 256.20 54 Construction Of Temporary Wash Facility Ceiling-common Wire Nails 3 Kilo 292.80 55 Construction Of Temporary Wash Facility Ceiling-fascia Board, Fiber Cement 10" X 12' 12 Piece 5160.60 56 Construction Of Temporary Wash Facility Ceiling-ceiling Vent 1" X 12" X 4' With Screen 3 Piece 896.70 57 Construction Of Temporary Wash Facility Electrical Works-roughing-ins-electrical Conduit Upvc, 15mm 15 Piece 2085 58 Construction Of Temporary Wash Facility Junction Box, 4"x4" G.i. 3 Piece 120 59 Construction Of Temporary Wash Facility Utility Box, 2"x4" G.i. Wires & Fixtures 6 Piece 201.60 60 Construction Of Temporary Wash Facility 3.5 Mm2 Thw Wire, Stranded 144 Meter 6422.40 61 Construction Of Temporary Wash Facility Single Switch With Plate 9 Piece 1620 62 Construction Of Temporary Wash Facility Ceiling Receptacle 3-1/2" 9 Piece 342 63 Construction Of Temporary Wash Facility Incandescent Bulb 50w 9 Set 1847.25 64 Construction Of Temporary Wash Facility Electrical Tape 3 Piece 162.39 65 Construction Of Temporary Wash Facility Plumbing Works-water Closet 1.6gpf With Accessories 6 Set 26,220.00 66 Construction Of Temporary Wash Facility Plumbing Works-water Closet Flange 6 Set 1,809.00 67 Construction Of Temporary Wash Facility Plumbing Works-faucet, Plain Bibb, Brass 1/2" 9 Piece 1,591.20 68 Construction Of Temporary Wash Facility Plumbing Works-s S Floor Drain 4'x4" 15 Piece 1,681.95 69 Construction Of Temporary Wash Facility Plumbing Works-gate Valve, 1/2" 3 Piece 975.00 70 Construction Of Temporary Wash Facility Plumbing Works-pp-r Pipe 1/2" 15 Piece 4,350.00 71 Construction Of Temporary Wash Facility Plumbing Works-pp-r Elbow 90o X 1/2" 15 Piece 235.50 72 Construction Of Temporary Wash Facility Plumbing Works-pp-r Tee, 1/2" 9 Piece 171.90 73 Construction Of Temporary Wash Facility Plumbing Works-pp-r Coupling Reducer, 1/2" X 3/4" 3 Piece 45.90 74 Construction Of Temporary Wash Facility Plumbing Works-pp-r Adapter Female Thread 1/2" 15 Piece 1,702.35 75 Construction Of Temporary Wash Facility Plumbing Works-teflon Tape 3 Roll 86.40 76 Construction Of Temporary Wash Facility Sanitary Works-upvc Sanitary Pipe 4" 6 Piece 6,034.80 77 Construction Of Temporary Wash Facility Upvc Sanitary Pipe 2" 15 Piece 7,186.50 78 Construction Of Temporary Wash Facility Upvc Elbow 90o X 2" 9 Piece 499.50 79 Construction Of Temporary Wash Facility Upvc Tee 2"x2" 9 Piece 502.20 80 Construction Of Temporary Wash Facility Upvc Elbow 90o X 4" 9 Piece 1,114.20 81 Construction Of Temporary Wash Facility Upvc P-trap 2" 15 Piece 1,872.00 82 Construction Of Temporary Wash Facility Brass Cleanout 4"x4" 3 Piece 1,365.00 83 Construction Of Temporary Wash Facility Pvc Cement 3 Can 630.00 84 Construction Of Temporary Wash Facility Chb, 4"x8"x16", Standard 600 Piece 16974 85 Construction Of Temporary Wash Facility Deformed Round Bars, 10mmx6m, Grade 40 534 Kilo 25519.86 86 Construction Of Temporary Wash Facility Portland Cement 30 Bag 8100 87 Construction Of Temporary Wash Facility Washed Sand 6 Cubic Meter 11509.98 88 Construction Of Temporary Wash Facility G.i. Tie Wire 9 Kilo 738 89 Construction Of Temporary Wash Facility Painting Works-concrete Surface-neutralizer 1 Gallon 348.30 90 Construction Of Temporary Wash Facility Concrete Surface-latex, Flat 3 Gallon 2926.11 91 Construction Of Temporary Wash Facility Concrete Surface-latex, Semi Gloss 3 Gallon 3279 92 Construction Of Temporary Wash Facility Concrete Surface-acri Color 3 Quart 343.20 93 Construction Of Temporary Wash Facility Wood Surface-enamel Flatwall 1 Gallon 1708.50 94 Construction Of Temporary Wash Facility Wood Surface-enamel Semi Gloss 1 Gallon 1738.50 95 Construction Of Temporary Wash Facility Wood Surface-paint Thinner 1 Gallon 753 96 Construction Of Temporary Wash Facility Tile Works-wall-glazed Wall Tiles 20cm X 20cm 1092 Piece 21294 97 Construction Of Temporary Wash Facility Wall-tile Adhesive 25kg/bag 9 Bag 2621.97 98 Construction Of Temporary Wash Facility Wall-tile Trim 6mm 12 Piece 1476 99 Construction Of Temporary Wash Facility Wall-tile Grout 5 Kg/bag 6 Bag 1170 100 Construction Of Temporary Wash Facility Flooring-unglazed Floor Tiles 20cm X 20cm 291 Piece 5674.50 101 Construction Of Temporary Wash Facility Flooring-tile Adhesive 25kg/bag 3 Bag 873.60 102 Construction Of Temporary Wash Facility Flooring-tile Grout 5kg/bag 3 Bag 585 103 Construction Of Temporary Wash Facility Handwashing-unglazed Floor Tiles 20cm X 20cm 195 Piece 3802.50 104 Construction Of Temporary Wash Facility Handwashing-tile Adhesive 25kg/bag 3 Bag 872.99 105 Construction Of Temporary Wash Facility Handwashing-tile Grout 5kg/bag 3 Bag 585
Closing Date21 Jan 2025
Tender AmountPHP 504.6 K (USD 8.6 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Building Construction
United States
Details: Presolicitation Notice This Is A Pre-solicitation Notice, This Not A Request For Proposals. This Is A Request For Sf-330 Architect/engineer Qualification Packages Only. All Information Needed To Submit Sf330 Documents Is Contained Herein. No Solicitation Packages Or Technical Information Will Be Issued In This Phase. Site Visits Will Not Be Arranged During This Phase. Architect/engineering (a/e) Design Services Project: 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms Project Location: Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233 Period Of Performance: 160 Days. Estimated Magnitude Of Construction: Between $1,000,000 And $2,000,000. Naics: 541330 Engineering Services. Size Standard: $25.5 Million. Set-aside: 100% Service-disabled Veteran Owned Small Business (sdvosb). The Department Of Veteran Affairs Network 7 Contracting Office Is Seeking Qualified Architect-engineering (ae) Firms To Submit Standard Form 330 (sf 330) Architect/engineering Statement Of Qualifications For Project # 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms | Birmingham Va Medical Center Facilities In Network 7 (state Of Alabama). Firms Submitting Qualification Packages Must Be Fully Licensed To Perform Designs As A Registered Professional Ae Firm In The United States To Be Considered For This Opportunity. Also, See Geographic Location Restriction In Paragraph 5 Of This Notice. Network Contracting Office (nco) 7 Va Facility Locations Include: Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233. This Acquisition Is 100% Set-aside For Small Disabled Veteran-owned Small Business (sdvosb). Prospective Contractors Are Cautioned That Proposal Submitted In Response To This Solicitation Must Meet The Criteria Identified By 38cfr, Part 74. The Sdvosb Concern Agrees That In The Performance Of The Contract, The Concern Will Comply With The Limitation On Subcontracting Requirements In Accordance With Vaar Clause 852-219-73 (jan 2023) (deviation), Va Notice Of Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses. For A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Vetcert (veterans.certify.sba.gov) And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualification And Reporting To Vets - 4212 Federal Contractor Reporting In Accordance With Far 52.222-37, Employment Reports On Veterans At The Following Website: Dol.gov/agencies/vets/programs/vets4212. Failure Of A Prospective Sdvosb To Be Verified By The Veteran Small Business Certification At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13 Cfr 125.15 Prior To Contract Award. Contract Overview A Firm Fixed Price A/e Design Service Contract Is Contemplated For Project 521-25-104 | Remove Abandoned Equipment From Sub-basement And Mechanical Rooms. The Estimated Magnitude Of Construction For This Project Is Between $1,000,000 And $2,000,000. The Estimated/target Design Completion Period Is 160 Calendar Days After Issuance Of Notice To Proceed. The Naics Code For This Acquisition Is 541330, Engineering Services With A Size Standard Of $25.5 Million. Project Scope: The A/e Team, Including Architects, Engineers, Surveyors, And Professional Consultants Shall Provide Complete Design Services For The Development Of Specifications And Drawings For Project 521-25-104 Remove Abandoned Equipment From Sub-basement And Mechanical Rooms. This Project Is To Remove Abandoned Pieces Of Equipment Such As Heat Exchangers, Air Dryers, Pumps, Etc. And All Associated Piping From Sub-basement And Mechanical Rooms Throughout The Facility. This Project Will Additionally Remove Abandoned Electrical Feeders And Concrete Pads. Work May Include, But Is Not Limited To, Architectural, Electrical, Hvac, Fire Protection And Plumbing. Systems Impacted May Include Fire Alarm, Security Access Systems, And Med Gas. Due To The Requirement For Site Visits And Coordination On Design Reviews, A/e Firms Will Be Required To Attend Various Meetings In Person On Site At Birmingham, Al Vamc Facilities. Due To This Requirement, The Area For Consideration For This Acquisition Is Restricted To A/e Firms With An Operating Office Located Within 400 Miles Of Birmingham Va Medical Center, 700 19th Street South, Birmingham, Al., 35233. Eligible Prime Contractor Firms Must Have A Main And/or Branch Office Geographically Located Within The 400-mile Driving Distance. Determination Of Mileage Eligibility Will Be Based On Upon Www.google.com/maps. Selection Criteria. The A/e Source Selection Team Shall Utilize The Following Selection Criteria Listed In Descending Order Of Importance. Professional: Professional Qualifications Necessary For Satisfactory Performance Of Required Service And Working Together As A Team (in-house And/or Consultants(s)). Note: The Firm And A/e On Staff Representing The Project Or Signing Drawings In Each Discipline Must Be Registered/licensed To Practice In The United States Provide Your Information On The Sf 330 Clearly Marked By Providing A Current Architect And/or Engineering License Numbers And Proof Of Licensure. The Va Will Confirm The Individuals Are Current And In Good Standing With The Respective State Licensing Board.â Specialized: Specialized Experience And Technical Competence In The Type Of Work Required, Including But Not Limited To: Architecture, Electrical, Plumbing, Mechanical, Fire Protection, Abatement/industrial Hygiene, Cost Estimation, Project Management And Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials. Include Government And Private Experience On Similar Projects. Capacity: Capacity To Accomplish Work In The Required Time. This Factor Evaluates Firm's Experience With Similar Size Projects And The Available Capacity Of Key Disciplines When Evaluating The Capacity Of A Firm To Perform The Work In The Required Time. The General Workload And Staffing Capacity Of The Design Office Will Be Evaluated. List Current Projects With Similar Design Fee Being Designed In The Firms Office. Indicate The Firms Present Workload And The Availability Of The Project Team (including Sub-consultants) For The Specified Contract Performance Period; Describe Experience In Successfully Delivering Projects Per Performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates. Past Performance: Cpars Data Or Past Performance Questionnaires Must Be Provided For Projects Submitted Under Factor 2 (specialized Experience). Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. Past Performance As It Relates To Cost Control, Quality Of Work, And Compliance With Performance Schedules. The Following Information Is Required For All Projects: Contract/task Order Number, Project Title, Prime Firm, Start Date, And Completion Date. Evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. Past Performance Will Be Evaluated On Recent And Relevant Contracts With Government Agencies Or Private Industry. Recent Is Defined As Performance Occurring Within 5 Years Of The Date Of This Notice, Except That Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Notice. Relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope To The Types Of Projects Anticipated Under The Resultant Contracts. Respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Location: Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Local Construction Methods, Construction Firms And Trades Labor Availability, And Local Laws And Regulations. That Your Proximity To The General Geographical Area Enables You To Respond To Emergency Calls In Person Within 24 Hours If Required. (sf 330 Submittal Should Show Your Knowledge Of The Locality Of The Project.) Eligible Prime Contractor Firms Must Have A Main And/or Branch Office Geographically Located Within The 400-mile Radius. Distance Will Be Determined By Google Maps. Commitment: The Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. Construction Period Services: Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates. Reputation: Standing/reputation Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. Mention Applicable Awards, Outstanding Merits, And Recommendations. Additional Experience: Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project. Selection Procedures. This Requirement Is Being Procured In Accordance With The Brooks Act Of 1972, Federal Acquisition Regulation 36.6 (far) And Va Acquisition Regulation 836.6 (vaar) And Va Acquisition Manual (vaam) 836.6. Firms Responding To This Announcement By Submitting A Qualifying Sf 330, Before The Closing Date And Time, Will Be Considered For Initial Selection Evaluation. Following Initial Evaluation Of The Sf330s Received Three Or More Firms That Are Considered The Most Highly Qualified To Provide The Type Of Services Required Will Be Selected For Interviews. Selected Firms Will Be Notified By Telephone Or Email Of Selection And Provided Further Instructions. Selection And Evaluation Of Firms Shall Be Made Based On Sf 330 Submissions And Direct Responses To The Selection Criteria Identified Herein. Failure To Address All Selection Criteria Will Result In A Decreased Rating. Evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Contracting Officer Knowledge Of Current Project Performance. Failure To Provide Requested Data, Could Result In A Firm Being Removed From Consideration. If Relevant Cpars Evaluation(s) Are Available, Report(s) Shall Be Submitted With The Completed Sf330 Package. If There Is Not A Completed Cpars Evaluation, The Ppq Included With This Notice Is Provided For The Offeror Or Its Team Members To Submit For Each Project Included In Criterion (2). Official Cpars Evaluation(s) Found In In Government Databases Will Take Precedence. Completed Ppqs Should Be Submitted With Your Sf330. Firms That Design Or Prepare Specifications In Conjunction With This Contract Are Prohibited From Participating On Any Future Construction Contracts Based On Those Documents. All Projects Identified On The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. Submission Requirements. The Sf 330 Form May Be Downloaded From Http://www.gsa.gov/portal/forms/type/sf. Completed Sf 330 S Shall Include The Primary Firms, Subcontractor Firms And Any Consultants Expected To Be Used On The Project. Do Not Submit Information Incorporating By Reference. Prospective Firms Shall Address All Selection Criteria Factors Within Their Submitted Sf330 Packages. The Following Format Should Be Used: Cover Page With Solicitation Number, Project Title. Table Of Contents. Sf 330. Acceptability Under Other Appropriate Evaluation Criteria, I.e., Sf 330, Section H. Copy Of Current A/e State Engineer/architect License. Unique Entity Id (uei). Tax Id Number. The E Mail Address And Phone Number Of The Primary Point Of Contact. Sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf 330 And Attachments (as Applicable) No Later Than 01/21/2025 At 1:00 P.m. Et. Email Capacity Is Limited To Ten (10) Megabytes (mbps). All Sf330 Submittals And Questions Must Be Sent Electronically To The Attention Of Contracting Officer Gregory Snyder, Gregory.snyder@va.gov. Please Also Copy Ryan.crispin@va.gov And Joseph.osborn@va.gov In Emailed Sf 330 Package. Please Include The Pre-solicitation Number, Project Title, And Firm Name In Subject Line Of Email. When Submitting Sf330s, If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of __ . Submittals Received After The Date And Time Identified On Page One (1) Will Not Be Considered. Firms Not Providing The Required Information May Be Negatively Evaluated. Facsimile Submittals Will Not Be Accepted. All Information Must Be Included In The Sf330. The Sf-330 Including Title Page, Table Of Contents, And Any Other Relevant Information Shall Not Exceed A Total Of 50 Pages In A Common Font Size 12 Font, Single Spaced. The Proposal Shall Be Submitted As A Single Application-generated (not Scanned), Searchable Pdf Document. A Page Is Defined As Each Face Of An 8.5 X 11-inch Sheet Of Paper Containing Information. The Page Limitation Does Not Apply To The Licenses, Contract Performance Evaluations, (i.e., Cpars) And Award Documentation. This Information Should Be Provided As Attachments To The Sf 330. All Questions Regarding This Announcement Must Be Emailed To The Contracting Officer Gregory.snyder@va.gov No Later Than 01/14/2025 By 1:00 P.m. Et. Site Visits Will Not Be Arranged During This Phase. This Announcement Is Not A Request For Proposal. This Is A Pre-solicitation Notice For Architect/engineering (a/e) Design Services; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf-330. Only The A/e Firms Responding To This Announcement By Submitting An Sf330 Package On Time Will Be Considered For Initial Evaluation.
Closing Date21 Jan 2025
Tender AmountRefer Documents 