Electrical Tenders
Electrical Tenders
City Of Koronadal Water District Tender
Others...+1Electrical and Electronics
Philippines
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
City Of Antipolo Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description A.contract Id : Antipolo-08january2025-10 B.name Of Project : Improvement Of 14m X 16m Ynares Multi-purpose Covered Court At Damayan Ng Angela, Brgy. San Luis, Antipolo City C. Location : Brgy. San Luis, Antipolo City D.brief Description : Improvement Of Multi-purpose Covered Court E.major Item Of Works : Repainting Of Covered Court Flooring; Electrical Works; Repainting Of Covered Court F.approved Budget For The Contract : Php 1,050,470.94 G.duration : 90 Cd. Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: December 20, 2024 - January 08, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: December 27, 2024 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: January 08, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: January 08, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral
Closing Date8 Jan 2025
Tender AmountPHP 1 Million (USD 18.1 K)
Municipality Of Kauswagan, Lanao Del Norte Tender
Furnitures and Fixtures
Philippines
Details: Description Qty Unit Item Description Estimated Unit Price Total Unit Price 8 Pcs 4 X4 X 16ft Coco Lumber 495.00 3,960.00 15 Pcs 4 X 4 X 12ft Coco Lumber 475.00 7,125.00 50 Pcs 2 X 6 X 12ft Coco Lumber 345.00 17,250.00 100 Pcs 2 X 4 X 10ft Coco Lumber 310.00 31,000.00 100 Pcs 2 X 3 X 12 Ft Coco Lumber 145.00 14,500.00 100 Pcs 2 X 2 X 12ft Coco Lumber 125.00 12,500.00 3 Boxes Cwn #5 2,200.00 6,600.00 3 Boxes Cwn #4 2,200.00 6,600.00 1 Box Cwn #3 2,350.00 2,350.00 1 Box Cwn # 2 ½ 2,350.00 2,350.00 2 Boxes Cwn #2 2,450.00 4,900.00 100 Pcs Bamboo Poles #12 195.00 19,500.00 60 Sheets Amakan Plain 395.00 23,700.00 50 Sheets Amakan With Design 495.00 24,750.00 35 Pcs ¾ Marine Plywood 1,785.00 62,475.00 40 Bot Mahogany Varnish 110.00 4,400.00 60 Bot Clear Varnish 110.00 6,600.00 10 Gals Paint Thinner 595.00 5,950.00 15 Pcs Paint Brush #3 89.00 1,335.00 10 Pcs Pylux Sealer 395.00 3,950.00 3 Gals Qde Baguio Green 895.00 2,685.00 8 Quarts Tinting Color Thalo Blue 135.00 1,080.00 8 Quarts Tinting Color Thalo Red 135.00 1,080.00 2 Cans Flat Latex Yellow 95.00 190.00 10 Pcs Paint Brush #1 30.00 300.00 1 Unit Safety Breaker 100 Amps 1,150.00 1,150.00 1 Unit Safety Breaeker 30 Amps 750.00 750.00 20 Pcs Rubber Socket 68.00 1,360.00 30 Rolls Electrical Tape 65.00 1,950.00 20 Pcs Male Plug 79.00 1,580.00 1 Roll Flexible Hose ½ 1,150.00 1,150.00 2 Rolls Flat Cord #16 5,900.00 11,800.00 4 Pcs Junction Box 45.00 180.00 5 Boxes Staple Wire #1 110.00 550.00 5 Pcs Universal Outlet 2-gang 125.00 625.00 2 Rolls Coco Net #4 9,900.00 19,800.00 100 Rolls Coco Rope 55.00 5,500.00 6 Pairs Hinges #3 69.00 414.00 10 Pcs Cutting Disc 110.00 1,100.00 10 Pcs Drill Bit 9/64 165.00 1,650.00 100 Mtrs Trapal 95.00 9,500.00 20 Boxes Staple Wire #1 110.00 2,200.00 50 Pcs Stick Glue Big 45.00 2,250.00 5 Pcs Pvc Pipe #2 295.00 1,475.00 12 Pcs Clean Out #2 75.00 900.00 2 Cans Solvent Cement 120.00 240.00 10 Kgs Gi Tie Wire 125.00 1,250.00 20 Packs Cable Tie Black #10 395.00 7,900.00 1 Gal Rugby 790.00 790.00 1 Roll Charol 1,500.00 1,500.00
Closing Date13 Jan 2025
Tender AmountPHP 344.6 K (USD 5.9 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Details: This Is Not A Request For Proposal. This Is A Request For Standard Form (sf) 330 Architect-engineer Qualifications Packages Only. All Information Needed To Submit Sf 330 Documents Is Contained Herein. No Solicitation Package, Technical Information, Or Bidder/plan Holder List Will Be Issued. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. 1. General Information Veterans Health Administration (vha) Program Contracting Activity Central (pcac) Is Seeking Sources And Intends To Award A Firm Fixed Price Design Contract For Architect-engineering (a-e) Services For The Development Of Complete Construction Documents, Which Include Working Drawings, Specifications, And Reports, And Construction Period Services For Project #676-336 Fire Station Design-tomah Va Medical Center. The A-e Services Contract That Is Anticipated To Be Awarded Will Be Procured In Accordance With The Selection Of Architects And Engineers Statute [formerly Known As The Brooks Architect Engineer Act], Federal Acquisition Regulation (far) Subpart 36.6 Architectural And Engineering Services, Va Acquisition Regulation (vaar) 836.6, And Va Acquisition Manual (vaam) M836.6 Architect-engineer Services. In Accordance With Far 36.209, Construction Contracts With Architect-engineer Firms, No Contract For The Construction Of A Project Shall Be Awarded To The Firm That Designed The Project Or Its Subsidiaries Or Affiliates, Except With The Approval Of The Head Of The Agency Or Authorized Representative. 2. Project Information This Project Is A 100% Set-aside For Service-disabled Veteran-owned Small Business (sdvosb) Concerns. The Naics Code For This Procurement Is 541330 Engineering Services And The Annual Small Business Size Standard Is $25.5m. A Full Design Team Is Required To Complete This Project. The Va Expects To Award The Anticipated A-e Contract By Late March 2025. The Anticipated Period Of Performance For Completion Of Design Is 160 Calendar Days After Notice Of Award (noa). The Vaar Magnitude Of Construction Is Between $5,000,000 And $10,000,000. Please Note That The 160-calendar-day Period Of Performance For The Design Completion Begins With The Issuance Of The Noa And That A Notice To Proceed (ntp) Will Not Be Issued For The Completion Of A Design Project. 3. A-e Selection Process Firms Submitting Sf 330s In Response To This Announcement, Not Later Than The Closing Date And Time Specified Herein And In Accordance With Submission Requirements, Will Be Considered For Evaluation. The Selection Will Be Made As Follows: Sf 330s Will Be Evaluated In Accordance With The Primary Selection Criteria As Stated In This Pre-solicitation Notice. These Evaluations Will Determine The Most Highly Qualified Firms For This Particular Requirement. In Accordance With Far 36.602-3(c), At Least Three Of The Most Highly Qualified Firms Will Then Be Notified Of The Government S Intent To Hold Discussions. All Firms Not Invited To Participate In Discussions Will Be Notified At This Time. In Accordance With Far 36.607(b), Any Requested Debriefings Of Successful And Unsuccessful Firms Will Be Held After Final Selection Has Taken Place And Will Be Conducted, To The Extent Practicable, In Accordance With 15.503, 15.506(b) Through (f), And 15.507(c). Note That 15.506(d)(2) Through (d)(5) Do Not Apply To Architect-engineer Contracts. Discussions Will Be Held With The Most Highly Qualified Firms In The Form Of Written Responses. The Firms Invited To Participate In Discussions Will Be Notified By Email And Provided Further Instructions, Including Any Questions Or Topics To Address. Following The Completion Of Discussions, The Firms Will Be Evaluated And Ranked Based On The Primary And (if Necessary) Secondary Selection Criteria. The Final Evaluation And Ranking Will Consider The Sf 330 Submission For Each Firm, As Well As Additional Information Obtained Via Discussions. The Highest Rated Firm Will Be Selected To Receive The Solicitation And Engage In Negotiations. The Solicitation Will Be Issued To The Highest Rated Firm As A Request For Fee Proposal (rfp). All Sow Attachments And Site-specific Documentation Will Be Provided To The Highest Rated Firm With The Rfp. A Site Visit Will Be Authorized During The Negotiation Process. An Award Will Then Be Made As Long As The Negotiation Of Rates And Hours Leads To A Fair And Reasonable Determination Of The Final Contract Price. If Negotiations With The Highest Rated Firm Are Unsuccessful, The Firm Will Be Notified That Negotiations Have Been Terminated. Negotiations Will Then Be Initiated With The Next Highest Rated Firm, And So On Until Award Can Be Made. 4. Selection Criteria: Firms Responding To This Notice Will Be Evaluated And Ranked Using The Primary And Secondary Selection Criteria Listed Below. The Factors Are Listed In Descending Order Of Importance. The Evaluation Will Consider How Each Factor Is Addressed And How It Is Formatted To Coincide With The Selection Criteria. Primary Selection Criteria: Professional Qualifications: Professional Qualifications Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located. Disciplines Requiring A Florida License Include Civil/structural And Hazardous Material Abatement/industrial Hygiene. A Resume For Each Of These Key Positions Must Be Provided In Section E Of The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To: Architect (leed Certification/us Green Build Council Certification) Cost Estimator Civil Engineer Electrical Engineer Environmental Engineer Fire Protection Engineer Mechanical Engineer Plumbing Engineer Project Manager Quality Assurance Manager Structural Engineer Physical Security Specialists Commissioning Agent Offeror Must Include The Following Statement Of Sdvosb Compliance When Submitting The Personnel Proposed To Perform The Work Under This Requirement: I, [signatory Authority], Of [company Name], Certify That The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database In Compliance With Vaar 852.219-73. The Information Provided In Sections C Through E Of The Sf 330 Will Be Used To Evaluate This Factor. Do Not Include This Information In Section H Unless It Is Pertinent To Support The Information Listed In The Other Sections. Specialized Experience And Technical Competence: Specialized Experience And Technical Competence In The Design And Construction Period Services Shall Be Provided For Network Infrastructure Installation, Renovations, Or Upgrades. Projects Experience Should Include Upgrading Large Scale (multi-building With Multiple Generational Oit Systems) Fiber Optics, Data Cable, Structured Cabling, Electrical Distribution Design, Electrical Upgrades, Uninterruptable Power Systems (ups), Electrical Bonding, Building Management Systems/building Automation Systems (bms/bas), Hvac, It Room Renovations/expansion/relocations, Data Centers/server Rooms Reconfiguration, And Physical Security Upgrades, Duct Bank And Direct Boring Operations. Other Specialized Experience To Provide Should Include Experience In Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, Transition, And Sustainable Design Practices. Submissions Shall Include No More And No Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope, And Complexity, And Experience With The Type Of Projects/competence Above. Relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past Five (5) Years. Include The Following For Each Submitted Project: Project Title And Location Detailed Narrative Describing The Scope Of Services Provided, Including The Type Of Work Performed By The Offeror And Its Role In The Project (i.e., Prime Contractor, Teaming Partner, Or Subcontractor) Project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. Services & Deliverables Provided Under The Contract/task Order. Period Of Performance, Including Start And Completion Dates Total Dollar Value Of The Project Ae Cost Estimate Vs. Actual Construction Cost Contract Number Associated With The Project. The Information Provided In Section F Of The Sf 330 Will Be Used To Evaluate Relevant Specialized Experience And Technical Competence. Any Projects Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. The Information Provided In Section G Of The Sf 330 Will Be Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. The Offeror Must Include Narratives Of How The Firm Addresses Each Of The Following Topics In Section H. Simply Restating This List In Section H Will Not Be Sufficient. The Management Approaches. The Coordination Of Disciplines And Subcontractors Quality Control Procedures, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. Capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector, During The Previous Twelve (12) Months Or Any Active Projects At Pcac. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts The Prime Firm Has Been Awarded From Any Source. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Award Date, Completion Percentages, And Expected Completion Date For The Va Projects Awarded In The Previous Twelve (12) Months Or Active At Pcac. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Proposed Team/personnel Provided In The Sf 330. Past Performance: Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Reporting System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies Outside Of The Va. For Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submitted In The Sf330, A Ppq Must Be Submitted Listing Their Specific Role (key Disciplines) As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Completed Ppq Requested From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. The Government May Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Must Be Provided In Section H Of The Sf 330. For Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330. Ppqs Should Not Be Submitted To Vha Pcac Directly. Any Ppqs Will Not Be Counted Towards The Page Limitation For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. Knowledge Of Locality: Demonstrate And Describe Experience In The Local Area And The Specific Knowledge Of Certain Local Conditions Or Project Site Features The Experience Provided. This Description May Include (if Applicable): Any Prime Firm Or Subcontractor Experience Within The Visn Or At The Vamc State Or Local Construction Codes, Laws, Or Regulations Climate And Seismic Related Conditions Or Features The Information For This Factor Must Be Provided In Section H Of The Sf 330. Note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. Experience In Construction Period Services: Experience In Construction Period Services Must Be Demonstrated Via Project Experience. These May Be The Same Projects Identified Above In Factor 1; However, The Firm Shall Clearly Delineate The Types Of Construction Period Services Performed For Each. Refer To The Statement Of Work For Review Timeline Expectations. Project Descriptions Must Include Experience With: Solicitation Support Services, Professional Field Inspections During The Construction Period Coordination With Commissioning Requirements Review Of Construction Submittals Support In Answering Requests For Information During The Construction Period. Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates. Attendance At Weekly Conference Calls Providing Minutes Of Meetings Between The Ae, Va, And Contractors Pre-final Inspection Site Visits Generation Of Punch-list Reports, And Production Of As-built Documentation. The Firm Shall Provide A Detailed Description Of Projects Worked That Illustrate Experience In These Areas. Projects Must Be Within The Last Ten (10) Years. In Addition, The Firm Must Include A Description Of Experience Addressing Unforeseen Conditions And Emergent Situations, Conducting Situation Evaluations, And Making Midcourse Corrections. Include Description On How The Firm Can Be Proactive Or Responsive In These Situations. The Information For This Factor Must Be Provided In Section H Of The Sf 330. Secondary Selection Criterion*: Geographic Location. Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Tomah Va Medical Center 500 E Veterans Street, Tomah, Wi. 54660. . Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). *the Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Discussions. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf 330 Submission Highly Qualified Or Not Highly Qualified. 5. Submission Requirements: The Below Information Contains The Instructions And Format That Must Be Followed For The Submission Of The Sf 330 Statement Of Qualifications: Submit One (1) Sf 330 Statement Of Qualifications To Contract Specialist Johnna Mcgraw At Johnna.mcgraw@va.gov . This Must Include Parts I And Ii And Any Applicable Attachments. The Submission Must Include The Sf 330, Architect-engineer Qualifications (form Is Available Online At Https://www.gsa.gov/reference/forms/architectengineer-qualifications). The Sf 330 Submission Is Due By January 10th 2025 At 1pm Est. The Sf 330 Must Be Submitted In One Email And Have A File Size No Larger Than 5 Mb. No Hard Copies Will Be Accepted. The Subject Line Of The Email Must Read: Sf 330 Submission Fire Station Design- Tomah Wi. The Sf 330 Submission Must Not Exceed A Total Of 50 Pages. This Includes Title Page, Table Of Contents, And Any Other Relevant Information. Any Pages Submitted By An Offeror That Exceed The Limit Will Not Be Considered During The Evaluation. Each Page Must Be In Arial Size 12 Font, Single Spaced. Part Ii Of The Sf 330 And Any Cpars Or Ppqs Will Not Count Toward The Page Limitation. A Ppq Obtained For Another Sf 330 Submission May Be Submitted For This Project. However, If Significant Portions Of The Project Have Been Completed Since The Ppq Was Filled Out, A New Ppq Should Be Submitted To Accurately Assess The Project. Firms Must Include The Following Information In Section B Of The Sf 330 Submission: 1) Sam Unique Entity Identifier 2) Tax Id Number 3) Cage Code 4) Primary Point Of Contact S Email Address And Phone Number. All Questions Must Be Submitted To Johnna Mcgraw With The Subject Line Sf 330 Questions Fire Station Design-tomah Wi. The Cutoff For Question Submission Is 1:00 Pm Est On December 16th, 2024. Questions Will Be Answered Through Modification To The Pre-sol Notice Posted To Contract Opportunities At Sam.gov. This Procurement Is A 100% Set-aside For Sdvosb Concerns. Offers Received From Other Than Sdvosbs Will Not Be Considered. Offerors Must Be Certified As Sdvosbs By The U.s. Small Business Administration (sba) And Visible In The Veteran Small Business Certification (vetcert) Database (https://veterans.certify.sba.gov/) At The Time Of Sf 330 Submission, Written Response Submission, And Award. Failure To Be Certified In The Vetcert Database At These Times Will Result In The Offeror Being Deemed Ineligible For Award. All Joint Ventures Must Be Sba Certified At The Time Of Sf 330 Submission, Written Response Submission, And Award And Must Submit Agreements That Comply With 13 Cfr 128.402 Prior To Contract Award. All Prime Firms Must Meet The Naics Code Requirement Specified In This Notice. The Contracting Officer Will Verify The Naics Code In Vetcert. Failure To Meet The Naics Code Requirement May Result In The Rejection Of The Sf 330 Submission. Sf 330 Submissions Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Evaluated. All Information Must Be Included In The Sf 330 Submission Package. It Is The Offeror S Responsibility To Check The Contract Opportunities Website At Sam.gov For Any Revisions To This Announcement Prior To Submitting Their Sf 330.
Closing Date10 Jan 2025
Tender AmountRefer Documents
Municipality Of Consolacion, Cebu Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description 1. The Municipality Of Consolacion, Through The General Fund Intends To Apply The Sum Of Two Million Two Hundred Thirty Thousand Pesos (p 2,230,000.00) Being The Abc To Payments Under The Contract For Stage Rental With Lights, Sounds, And Led Wall For Sarok Festival 2025 (short Of Award). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Municipality Of Consolacion Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By 10cd. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non- Discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bac Office Of The Municipality Of Consolacion And Inspect The Bidding Documents At The Address Given Below During Mondays To Fridays From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 18, 2024 To January 7, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p 5,000.00). 6. The Municipality Of Consolacion Will Hold A Pre-bid Conference On December 26, 2024 At 9:00 O’clock In The Morning At The Bac Office Located At The 4th Floor, Municipal Building, Poblacion Oriental, Consolacion, Cebu, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 3:00 O’clock In Afternoon, January 7, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025 At 3:00 O’clock In Afternoon At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Municipality Of Consolacion Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Jakhelene C. Tubin Bac Office 4th Floor, Municipal Building Poblacion Oriental, Consolacion, Cebu 268-3736/232-0392 Consolacionbac@gmail.com 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: A. Lguconsolacion.gov.ph Or B. Philgeps Website Atty. Paolo Crispino C. Sucalit Bac Chairperson 1. Installation Of Stage Extension To Be Used From Feb. 3-5, 2025 Stage Specification: 20x30x4 Ft 2. Installation Of Stage With Ramp For Sarok Festival 2025 Stage Specifications: 60x100x4 Ft 3. Lights, Sound System, Led Wall For: A. February 3, 2025 - Cultural Night B. February 4, 2025 - Fun Run C. February 5, 2025 - Sarok Making Contest Sound System: Das Aero 12 A Line Array Speakers 8 Unit Xlr Cable Long 2 Unit Powered Monitor 2 Unit Si Impact 32-channel Mixer 1 Unit Dbx Crossover 1 Unit 32-channel Snake Wire 1 Unit Sub-speaker Halimaw Original 4 Unit Pro Atlantic Power Amp 1 Unit Speaker Wire With 2 Jumper 2 Unit Wireless Mic 4 Unit Wired Mic 2 Unit Mic Stand 2 Unit Main Line 1 Unit Power Rack With Kupo 1 Unit Xlr Long 80 Meter Xlr Short 30 Meter Extension Outlet 35 Pc Kupo With Outlet 4 Pc Cable Hump 4 Pc Masking Tape 2 Pc Duct Tape 1 Pc Electrical Tape 1 Pc Battery 2 Pack Lights: Ledpar Rgbw 24 Pc Amber White 8 Pc Follow Spot 1 Pc Moving Head 8 Unit Smoke Machine 1 Unit 1024 Light Controller 1 Unit Dmx Splitter 2 Unit Light Stand 2 Pc C Clamp 12 Pc Led Wall: Ledwall 9x12 Ft 5 Set Sender Card 5 Pc Processor 5 Unit Wiring And Cables 1 Lot Scaffolding And Support 1 Lot Elevation 4 Ft 4. Lights, Sound System, Ledwall And Band Equipment For: A. February 2, 2025 - Consolacion Pop Sound System: Das Aero 12 A Line Array Speakers 8 Unit Xlr Cable Long 2 Unit Powered Monitor 2 Unit Si Impact 32-channel Mixer 1 Unit Dbx Crossover 1 Unit 32-channel Snake Wire 1 Unit Sub-speaker Halimaw Original 4 Unit Pro Atlantic Power Amp 1 Unit Speaker Wire With 2 Jumper 2 Unit Wireless Mic 4 Unit Wired Mic 2 Unit Mic Stand 2 Unit Main Line 1 Unit Power Rack With Kupo 1 Unit Xlr Long 80 Meter Xlr Short 30 Meter Extension Outlet 35 Pc Kupo With Outlet 4 Pc Cable Hump 4 Pc Masking Tape 2 Pc Duct Tape 1 Pc Electrical Tape 1 Pc Battery 2 Pack Lights: Ledpar Rgbw 24 Pc Amber White 8 Pc Follow Spot 1 Pc Moving Head 8 Unit Smoke Machine 1 Unit 1024 Light Controller 1 Unit Dmx Splitter 2 Unit Light Stand 2 Pc C Clamp 12 Pc Led Wall: Ledwall 9x12 Ft 5 Set Sender Card 5 Pc Processor 5 Unit Wiring And Cables 1 Lot Scaffolding And Support 1 Lot Elevation 4 Ft Band Equipment: Drum Yamaha With Carpet And Drum Trone 1 Set Drum Mic Carol 1 Set Bass Amp Line 6 1 Unit Guitar Amp Line 6 1 Unit Keyboard Amp Laney 1 Unit Keyboard Stand 1 Unit Lyric Stand 1 Unit Di 2 Unit Genset 1 Set 5. Stage Rental With Lights, Sound System, And Led Wall For Sarok Festival 2025 Sound System: Das Aero 12 A Line Array Speakers 12 Unit Soundcraft Digital Mixer 32-channel 1 Unit Dbx Crossover 1 Unit 32-channel Snake Wire 1 Unit Sub Speaker Halimaw Original 4 Unit Pro Atlantic Power Amp Ca 20 1 Unit Monitor Powered Speaker 4 Unit Units Wireless Mic 6 Unit Wired Microphone 2 Unit Sets Of Compset With Base 6 Set Main Line 2 Unit Xlr Cable Short 140 Meter Xlr Cable 30 Meter Royal Cord With Outlet 12 Pc Royal Cord Mugbo 12 Pc Power Pack 2 Unit Kupo With Outlet 6 Pc Intelligent System: Ledpar 3-watts Rgbw 40 Unit Mac Aura Led Par 8 Pc Amber White 16 Unit Follow Spot Aerolites 2 Unit Audience Light Molfay 4 Unit Stormy Lights 4 Unit Moving Head 22 Unit Haze Machine 2 Unit Smoke Machine 2 Pc Avolites Pearl 2010 Light Controller 1 Pc Light Stand 4 Pc Led Wall: Led Wall 16 Set Processor 16 Pc Complete Wiring And Cables 16 Lot Complete Scaffolding And Support 16 Lot Sliding For Led Wall 16 Lot Stage: Stage With Ramp 60x100x4ft 1 Lot Stage With Ramp 30x40x4ft 1 Lot
Closing Date7 Jan 2025
Tender AmountPHP 2.2 Million (USD 38.4 K)
Electrical Energy System Operator Ead Tender
Services
Others
Bulgaria
Purchaser Name: Electrical Energy System Operator Ead | Bulgaria – Repair And Maintenance Services Of Trucks – Техническо Обслужване И Ремонт, Включително Доставка На Резервни Части, Материали И Консумативи За Товарни И Специални Автомобили И Техника, Собственост На Есо Еад - 2 Обособени Позиции
Closing Date8 Jan 2025
Tender AmountBGN 325 K (USD 170.5 K)
Electrical Energy System Operator Ead Tender
Others
Bulgaria
Purchaser Name: Electrical Energy System Operator Ead | Maintenance And Repair, Including Delivery Of Spare Parts, Materials And Consumables For Trucks And Special Vehicles And Equipment, Owned By Eso Ead - 2 Separate Positions
Closing Date9 Jan 2025
Tender AmountBGN 325 K (USD 170.5 K)
5881-5890 of 6591 archived Tenders