Electrical Tenders
Electrical Tenders
Gas Networks Ireland Tender
Services
Others
Ireland
Details: Title: 23/054 - Provision Of Engineering Services Framework Agreement
description: The Provision Of Engineering Services Framework Will Be Six (6) Lots. Described Below, Which The Contracting Entity Is Currently Planning To Tender For Services In The Republic Of Ireland. The Contracting Entity Reserves The Right To Call Off From The Framework In Respect Of Ancillary Services That May Be Required To Be Performed In Northern Ireland. Applications To Pre-qualify For, And In Due Course Bid For, Each Lot Will Be Evaluated Separately. Please Note That Candidates Can Tender For Any Or All Of The Six Lots. The Applicant Will Be Required To Carry Out All Of The Services Outlined In Appendix 3. If A Service Provider Intends To Use An Outsourced Entity Or 3rd Party Provider, Then They Need To Reference Same Within The Resource Section In Which They Are Applying For And Complete Section 4.3. Gni Can Amend Services Within A Lot Where They Have Not Been Explicitly Mentioned Within The Lot Description Below. Applicants Should Note That From Time To Time Over The Term Of The Framework Agreement, The Contracting Entity, At Its Sole Discretion But Without Altering The Overall Nature Of The Framework Agreement, May Modify The Framework Agreement To Reflect Changes In Its Requirements. The Conditions Under Which Such An Option May Be Exercised By The Contracting Entity Will Be Outlined In The Relevant Call Off Competition Document. Below Is A Summary Of The Services For Each Lot And Please Refer To Appendix 3 For A Detailed Description Of Each Of The Lot’s Indicated Below: Lot 1: Refurbishment, Gas Decarbonisation And New Build Assets For Transmission Onshore And Offshore (end To End). Lot 2: Network Modifications, Refurbishment, Reinforcement, Gas Decarbonisation, New Connections For Transmission And Distribution (end To End). Lot 3: Biomethane, Hydrogen, District Heating And Renewable Gas New Build (end To End). Lot 4: Environmental And Planning – Environmental Screening, Planning Applications, Flood Risk Assessment. Lot 5: Electrical, Control And Instrumentation -refurbishments, Gas Decarbonisation And New Builds Assets, Project Design, Supply Of Materials (e,c And I). Lot 6: Design And Cost Estimation Of New Connection Projects And Mains Alteration Projects.
Closing Date16 Jan 2025
Tender AmountRefer Documents
St Johns River Water Management District Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: Project Description The Objective Of The Project (project) Is To Inspect All Underwater Culvert/structures Identified In Attachment A – Statement Of Work, Appendix A - Underwater Inspection List, To Assess Their Current Condition And Provide Critical Information For Repair And Maintenance Activities. Inspection Reports Will Be Supplied To The United States Army Corps Of Engineers (usace). Consultant Shall Provide An Underwater Inspection Team And Qualified Divers To Inspect All Structure Elements Which Are Primarily Below-water. The Underwater Inspection Team Shall Include Individuals Qualified By Experience And Training In The Inspection, Design, Construction And Understanding Of The Operation Of Flood Control Structures. A Minimum Of One (1) Member Of The Inspection Team Shall Be A Professional Engineer Licensed In The State Of Florida Under Chapter 471, Florida Statute. The Professional Engineer, As A Member Of The Inspection Team, Shall Be Responsible For The Overall Underwater Inspection Findings And Recommendations. All Dive Operations Shall Meet The Requirements And Qualifications Of Osha 29 Cfr Part 1910, Subpart T - Commercial Diving Operations. Underwater Inspectors Must Be Familiar With The Principles Of General Civil, Geotechnical, Structural, Electrical And Mechanical Engineering. In Addition To Osha 29 Cfr Part 1910, Consultant Shall Ensure That All Other Applicable Federal And State Safety Regulations Are Met. This Includes Providing Staff And Equipment To Meet The Requirements. Structure Underwater Inspections Shall Be Based On Usace’s Manual Em 1110-2-2902 Conduits, Pipes, And Culverts Associated With Dams And Levee Systems, Chapter 6: Inspections, Condition Assessments, And Prioritized Mitigation Plans. Other Federal Or Industry Standards Of Practice May Be Utilized For Specific Activities If Appropriate. The Following List Presents A Partial Listing Of Inspection Standards; Other Standards May Also Apply. Consultant Shall Use The Most Recent Version Of Referenced Standards. Underwater Inspection Of Bridges Fhwa-nhi-10-027; U.s. Dot/fhwa Underwater Investigations Standard Practice Manual, Level 1 Inspections, American Society Of Civil Engineer’s (asce)
Closing Date15 Jan 2025
Tender AmountRefer Documents
Province Of Cebu Tender
Others
Philippines
Details: Description Republic Of The Philippines Province Of Cebu Bids And Awards Committee - Goods Cebu Capitol, Cebu City Mode Of Procurement : Negotiated 53.9 Control No. 25-01-003 Dated : Jan. 8, 2025 Note: Please Attached Latest & Not Expired Bac Certificate Of P. R. No. 25-01-0005 Dated : Jan. 8, 2025 Registration & Omnibus Sworn Statement For Abc Worth O.r. No. 100-25-01-049 Dated : Of 500k & Above. Abc: P120,000.00 Gentlemen: Please Quote Your Prices On The Following Listed Articles Which The Province Of Cebu Desires To Buy If To The Government. For Clarification & Inquiry Call Telefax Nos. 888-2328 Local 1228 - 1229, Fax #: 1229 Or Email Us At Bacgscapitol02@gmail.com. ♥ Prices Quoted Should Be Vat Inclusive And Subject To Withholding Tax. ♥ Philgeps Registration Number: ______________________ ♥ Price Quoted Valid Until: ______________________ ♥ Terms Of Payment: _________________________ ♥ Delivery Date: 15cd Bids And Awards Committee ♥ Deadline Of Quotation: _______________________ ♥ Tin No.: ______________________________________________________________ (sgd) ♥ Place Of Delivery: Onsite Hector P. Jamora ♥ Note: Must Have A Satellite Office/service Center In Cebu (for Supplier Outside Cebu). Bac-goods & Services Chairman ♥ Please Submit Certified True Copy Of Business/mayor's Permit. Item Quantity Unit Articles And Description Brand Offer Unit Cost Total Price 1 1 Unit Industrial Fan, W/ Inst. *7.32 Meters In Diameter *1.5 Kilowatts, 220 Volts *60 Hz. Frequency Singe Phase *covering Area 1200 M² *cooling - 425,000 Cfm/ 1500 Watts *speed - 50 Rpm *no. Of Blades - 5 Or 6 Airfoil/op *max. Noise Level - 60db *weight +/- 156kg *3-years Warrantly For Spare Parts And Labor *including Of Electrical Wirings And Supply/materials Including Panel Control Protection "metal Enclosure", And Incidental Services In The Special Condition Of The Contract. Purpose: ***to Be Installed In Covered Court, Brgy. Puertobello, Tudela Cebu.(pgo)*** Page 1 Of 1
Closing Date13 Jan 2025
Tender AmountPHP 120 K (USD 2 K)
Offizielle Bezeichnung Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Germany
Description: Contract notice – general guideline, standard regulation negotiated procedure with prior publication of a call for competition/negotiated procedure (services) General planning services, architecture and engineering The district of Kassel is planning to expand the primary school in Habichtswald-Ehlen. The first construction phase will involve demolishing the pavilions and building a new 2-storey building wing. The new building will then contain 8 classrooms, differentiation rooms and a toilet facility, with a gross floor area of approximately 492 m2. The second construction phase relates to the current administration wing; for this purpose, the relocation of the teachers' room is planned due to the greater space required and the construction/extension of the changing rooms and the gymnasium. The conversion will affect a gross floor area of approximately 402 m2. The third construction phase consists of the dismantling of the last two classroom containers, construction of a cafeteria with a kitchen and ancillary rooms, as well as a caretaker's office and a small workshop. A new pellet heating system is to be planned in the basement. The gross floor area for this is approx. 316 m2. Object planning: service phases 1-9 according to Hoai 2021 as a general planning service including specialist planning services. General planning services architecture and engineering The district of Kassel is planning to expand the classroom wing by building a new 2-story building, with the old pavilions being demolished. The plan is to reorganize and remodel the administration area and the changing rooms, enlarge the sports hall and build a new cafeteria with a kitchen and ancillary rooms. The project must be completed in 3 construction phases so that school operations can continue during the construction period. The open spaces and the schoolyard will be adapted after the renovation work. The preliminary planning has already been developed holistically in a project study based on the new school concept and summarized in a feasibility study, which will be made available for further processing. The space program developed and agreed with the school is to be incorporated into the planning. A general planning service is to be provided for object planning, structural planning, thermal insulation certificate, TGA, electrical engineering, conveyor technology, sound insulation, fire protection, open space planning and SIGEKO service.
Closing Date15 Jan 2025
Tender AmountRefer Documents
Board Of Investments Makati City Metro Manila Tender
Software and IT Solutions
Philippines
Details: Description 1. About The Procuring Entity The Board Of Investments (boi) Is An Attached Agency Of The Department Of Trade And Industry (dti) That Is The National Government Entity Responsible For The Promotion Of Investments For Both Foreign And Domestic, In Accordance With Executive Order No. 226, Also Known As The Omnibus Investments Code Of 1987, And The Recently Approved R.a. 11534 Or The Create Law. The Boi Seeks To Attract Quality Investments That Will Encourage Technological Innovations And Provide Support For Industries To Seize The Opportunities And Challenges Of Global Competition And Demands. The Agency Envisions Itself As A Global Industry Promotion Agency By 2022 Guided By The Core Values Of Integrity, Excellence, Teamwork And Passion For Knowledge. Its Mission Is To Provide Investors With Opportunities For Investments, Comprehensive Business Support Services And Fair Predictable And Consistent Industry Policies. The Current State Of The Economy Due To The On-going Pandemic Makes It More Imperative For Boi To Continuously Aim For Work Excellence, As It Is An Agency, Which Is At The Forefront Of Enticing Investments Into The Country. 2. Project Overview/objectives In Order To Effectively Fulfill The Mandate And Facilitate The Delivery Of Boi’s Core And Support Functions, A 24/7 Maintenance Operations Of The Boi Server Room At The 5th Floor That Hosts Various Application Servers And Other Communication And Network Equipment Is Needed. The Boi Server Room Caters To The Boi Local Area Network (lan). To Upgrade And Have An Existing Boi Server Room With A Fully Functional Data Center, The Boi Is Requesting To Transfer Or Create A Data Center At The Fourth Floor (4/f) Of Industry And Investments Building, 385 Sen. Gil J. Puyat Ave, Makati City. This Is To Ensure Compliance With Industry Standards For It Infrastructure And Data Protection. It Will Also Serve As The Host Of Voice, Video, And Data Requirements Of Boi. Generally, The Data Center Will Include The Following Infrastructure Components: Electrical And Civil Works Component • Site Preparation (civil, Mechanical, And Electrical Works) • Supply And Installation Of New Data Center Build-ups Such As New Static Flooring, Drywall, It Monitoring Room, Electrical Power And Lighting, Temperature, Humidity Monitoring Solution, Acoustic Ceiling, And Drip Pan For Potential Water Leak. • Provisioning Of A Monitoring Room Inside The Proposed Data Center • Installation Of New Server Rack Cabinets Complete With Their Accessories. • Transferring Of Existing Servers, Ups, And Other Data Center Components From The 5th Floor To The New Data Center, Including Mounting, Harnessing, Terminating, And End-to-end Tagging. • Transfer And Installation Of Electrical Works Of Existing 2x 20kva Ups Including Panel Boards And Electrical Wires For Its Distribution • Supply And Installation Of Electrical Works For Precision Air Conditioning Unit (pacu) • Supply And Installation Of A Stand-alone Door Access System Including Biometric Device, And Door Lock Accessories For Physical Security Of A New Data Center. • Supply And Installation Of A New 50kva Powered Diesel Generator Set Including An Isolated Dry Type Of Step-up Transformer • Supply And Installation Of New Automatic Transfer Switch (ats) And Other Components • Supply And Installation Of Temperature, Humidity Control System, And Water Leak Detection System • Supply And Installation Of Communication Grounding And Bonding System. • Supply And Installation Of Roughing-in Materials • Submission Of Test Results, As-built Plan, And Documentation • Cleaning And Retouching Of All Affected Areas Including Necessary Rectifications Network Component • Supply, Installation, And Configuration Of Core Switches • Supply, Installation, And Configuration Of Server Farm Switches • Supply, Installation, And Configuration Of Access Switches • Supply, Installation, And Configuration Of Wireless Access Points • Structured Cabling (horizontal And Vertical) • Provisioning Of Intermediate Distribution Frames (idfs) Cabinets And Other Network Components (2nd, 3rd, 4th Floors) • Supply, Installation, And Configuration Of Servers And Server Rack And Accessories • Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables • Documentation O Cabling Plan For Structured Cabling And Data Center O Final Cabling Plan As-built Plan With Line Diagram O Final Network/structured Cabling Diagram O Network Vlan Configuration O Softcopy And Hardcopy Of Core, Server Farm, Access Switch, Wlc Running Configuration • Certification Training On Installed Network Switches, Aps, And Other Components. Objectives Of The Project: • To Protect And Secure The Agency's Existing Ict Investments (firewalls, Routers Switches, Servers, Etc.); • To Ensure A Dependable, Secured, And Efficient Ict Support Services (internet, Intranet, Database And Printer Sharing, Etc.); And • To Create An Industry-standard Datacenter For Effective Management Of Network Resources. 3. Deliverables No Particulars Qty Unit 1 Datacenter Civil And Architectural Works 1 Lot 2 Electrical Works, Segregated Power Source Dedicated To Data Center Equipment’s, And Idf Deployed At 1st Floor, 3rd Floor, And 5th Floor 1 Lot 3 Transfer 2x 20kva Ups And Other It Components From The Old Data Center To The New Data Center (servers, Isp, Etc.) 1 Lot 4 Generator Set, 50kva 1 Unit 5 Automatic Transfer System (ats) 1 Unit 6 Precision Air-conditioning Units 2 Units 7 Data Rack 42u (mdf) 2 Units 8 Data Rack 24u (idf) 3 Units 9 Temperature And Humidity Monitoring System 1 Lot 10 Water Leak Detection System 1 Lot 11 Datacenter Access Control System (biometrics, Magnetic Door Lock, Etc.) 1 Lot 12 Structured Cabling 1 Lot 13 Fiber Optic Backbone 1 Lot 14 Core Switch 2 Units 15 Server Farm Switch 2 Units 16 Access Switch 4 Units 17 Access Points 63 Units 18 Transceivers (for Inter-network Link Of Devices) 32 Units 19 End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables 1 Lot 20 Softcopy And Hardcopy (hardbound) Documentation (as-built, Test Plan, Ip Address Assignment, Vlan Assignment, User’s Manual, Administrators Manual, Etc.) 1 Lot 4. Technical Requirements 4.1 The Bidder Shall Comply With The Following Minimum Specifications For The Physical Data Center And Network Components Of The Project: Item Description Bidder’s Statement Of Compliance Item No 1 Site Preparation (civil, Mechanical, And Electrical Works) • Electrical Wirings With Grounding • Service Entrances For Utilities • Ceiling Installation • Installation Of Industry-grade Data Center Main Door • Installation Of Datacenter Cooling System Item No 2 Laying Of New Electrical Power Lines Distributions/ups Transfer • Provision Of Main Distribution Panel Board (mdp) Main 125a/3p/400vac • Provisioning, Installation, And Configuration Of Dedicated Ats • Provisioning, Installation, And Configuration Of Dedicated Generator Set (at Least 50kva, 129 Amp, Three Phase Dual Voltage, 220-240v Output, At Least 60hz Frequency) • Excavation/backfilling From The Building To The Powerhouse For The Encasement Of The Feeder Line For Power, Ats, And Genset • Transfer And Re-termination Of Electrical Requirements For 2 Units 20kva Ups • Transfer Of Other It Assets From The Old Data Center To The New Data Center • Provisioning Of Electrical Distribution From Data Center Power To Mdfs Located Per Floor • Lighting Fixtures For Datacenter • Testing Of Electrical Equipment Item No 3 Tracing, Tagging, Relocation, And Transfer Of Boi Fas-itd It Equipment (servers, Switches, Routers, Etc.) From 5th Floor To 4th Floor • Tracing Of Backbone To Core Switch Connection • Tracing Of Connection Between Devices Inside The Datacenter • Tagging Of Copper And Fiber Optics Wire Inside The Datacenter • Cable Management • Vertical And Horizontal Cabling From Datacenter To Mdfs And Mdfs To End-nodes Item No 4 Provisioning Of Two (2) 42u Regular Server Racks • 42u With Roof, Side Panel, Castors, Feet, And Brackets • Adjustable Shelf • Vertical Cable Manager • At Least 1 Rack Mountable Kvm (keyboard, Video, Monitor) • Power Rail/strip Options Item No 5 Provisioning Of Three (3) 24u Server Racks To Be Deployed At Mdfs • 24u With Roof, Side Panel, Castors, Feet, And Brackets • Heavy-duty Steel Construction • Door Locks • Anti-tamper Sensors • Network Management Card, Remote Monitoring Capabilities, Snmp Support • With Power Distribution Units (pdu), And Ups Compatibility • Cable Manager Item No 6 Physical Security (door Access, Biometrics, Temperature Monitoring) • Provisioning Of A Solid Door And Tempered Glass Around The Proposed Data Center (1/2, Frameless Door) • Door Access Control Should Conform To Iso-27001 Standards • Magnetic Lock • Biometrics Based Access Control • Access Logs Should Be Maintained For A Minimum Of One Year Or Longer As Specified By The Site Security Policy. • Secured Doors Must Fail Open In A Fire Emergency. Item No 7 Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • Tracing And Tagging Of Backbone Connection From Mdf To Idf • Looping Of Excess Fiber Cable • Re-termination Of Fiber Cable If Necessary Item No 8 Monitoring Room Inside The Proposed Data Center • Provisioning Of Additional Room Inside The Data Center To Serve As A Monitoring Room Item No 9 Anti-static Flooring • Not Generate Static • Groundable After Installation • Have Permanent Static-resistant Properties That Can Provide Protection Amidst Changing Temperatures, Humidity Levels, And Foot Traffic Item No 10 Precision Air Conditioning Unit (pacu) - 2 Units • Shall Have A Nominal Capacity Of Up To Ten (10) Kw • Shall Be Free Blow Type With Plenum And Directional Air Flow Louver Grille • Panels Shall Have A Solid And Rigid Double Skin Insulated • Shall Have A Minimum Net Sensible Capacity Of Ten (10) Kw • Shall Have A Minimum Net Total Capacity Of Eleven (11) Kw • Shall Have A Built-in Touch Screen Display That Provides Informative And User-friendly Interface For Easy Navigation • Shall Have A Built-in Auto Sequencing (1unit Operational And 1unit Back-up, Every 3 Days Sequence Of Operation) • Shall Be Single Circuit Dx Type, Freon R410a • Shall Have Electronic Expansion Valve • Shall Be 380vac,3ph, 6ohz • Shall Recommend Placement Of Air Conditioner Units And Limitations To Be Observed Item No 11 Temperature And Humidity Sensor, And Water Leak Detection System • Base Unit: Sensor Gateway For Up To 4 External Probes • Poe Switch 8 Ports • Sensor Hub • Temperature And Humidity Sensor • Water Leak Sensor Probe • Extension Cable For Water & Flooding Sensor Item No 12 General Requirements Mobilization And Demobilization Labor, Installation, Engineering, And Project Supervision Testing And Commissioning As-built Plans And Documentation (inclusive Of Signed And Sealed) 4.2 Supply, Delivery, Installation, Configuration, And Commissioning Of Network Equipment. Qty Specifications Bidder’s Statement Of Compliance 2 Layer 3 Data Switch To Act As Enterprise Core Layer Switch Features 1. High Performance And Throughput • High Port Density (24-48 Ports) • At Least 960 Gbps Switching Capacity • High Forwarding Rate • Line-rate Packet Processing With Minimal Latency • Non-blocking Architecture With Wire-speed Performance Across All Ports 2. Advanced Switching Capabilities • Layer 2 And Layer 3 Switching Capabilities • Support For Multiple Switching Fabrics • Advanced Qos (quality Of Service) Mechanisms • Support For Vlan Segmentation And Routing 5 High Redundancy And Reliability • Dual Power Supplies • Hot-swappable Components • Redundant Supervisor Engines • Support For Virtual Chassis Technologies • Comprehensive Fault Tolerance Mechanisms 6 Security Characteristics • Advanced Access Control Lists (acls) • Port Security Features • Dhcp Snooping • Dynamic Arp Inspection • Ieee 802.1x Authentication • Integrated Threat Management 7 Routing Protocol Support • Bgp • Ospf • Is-is • Mpls • Multi-protocol Routing Capabilities 8 Management And Monitoring • Snmp Support • Comprehensive Network Monitoring Tools • Remote Management Interfaces • Detailed Logging And Diagnostic Capabilities • Advanced Technological Support 9 Hardware-based Packet Forwarding • Support For Software-defined Networking (sdn) • Ipv6 Compatibility • Mpls And Vpn Support 10 Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 2 Layer 3 Data Switch To Act As Server Farm Switch Features: 1. High-performance Specifications • High Port Density (24-48 Ports) • Wire-speed Performance • Low Latency Switching • Gigabit Ethernet Support • At Least 960 Gbps Switching Capacity 2. Advanced Connectivity Features • Support For Multiple Interface Types • Layer 2/layer 3 Capabilities • Fabric Connection Technologies • Vm-aware Networking 3. Redundancy And Reliability • Hot-swappable Components • Dual Power Supplies • Redundant Supervisor Engines • Non-stop Forwarding (nsf) • Stateful Failover Capabilities 4. Performance Security Features • Hardware-based Acls • Port Security • Advanced Threat Protection • Ieee 802.1x Authentication • Micro-segmentation Support 5. Management Capabilities • Advanced Monitoring Tools • Snmp Support • Comprehensive Logging • Remote Management Interfaces • Network Telemetry 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 4 Layer 3 Data Switch To Act As Access Layer Switch 1. Port Density And Connectivity • Minimum Of 48 Ports • Support For 1g/10g Interfaces • Rj45 And Sfp/sfp+ Port Options • High-density Connectivity • Poe/poe+ Support (up To 30/60 Watts) 2. Performance Characteristics • Low Latency Switching • Wire-speed Performance • Minimum 80-160 Gbps Switching Capacity • Packet Forwarding Rate: 100-240 Mpps 3. Advanced Switching Capabilities • Layer 2/layer 3 Functionality • Vlan Segmentation • Spanning Tree Protocol (stp/rstp) • Link Aggregation (lacp) • Quality Of Service (qos) Support 4. Security Features • Port Security • 802.1x Authentication • Dynamic Arp Inspection • Dhcp Snooping • Mac Address Filtering • Private Vlans • Storm Control 5. Management Capabilities • Snmp Support • Cli Access • Web-based Management • Remote Monitoring • Syslog Integration • Fast Convergence Protocols • Redundant Power Supplies 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 63 Wireless Access Points 1. Performance Characteristics • Dual-band (2.4 Ghz And 5 Ghz) • Wi-fi 6 (802.11ax) Support • Maximum Theoretical Throughput: 5.4 Gbps • Concurrent Dual-band Operation 2. Coverage And Capacity • Recommended Coverage: 150-200 Users Per Ap • Indoor Enterprise-grade Performance • Suitable For Open Offices, Conference Rooms, And Collaborative Spaces 3. Technical Specifications • 4x4:4 Mu-mimo Technology • Beamforming Support • Maximum Concurrent Clients: 512 • Transmit Power: Up To 25 Dbm 4. Advanced Features • Ai-driven Wireless Optimization • Automated Channel And Power Management • Location Services • Cloud-managed Platform 5. Security Capabilities • Wpa3 Support • 802.1x Authentication • Rogue Ap Detection • Integrated Security Fabric • Advanced Threat Protection 6. Artificial Intelligence • The Wireless Solution Must Include Virtual Network Assistant That Supports Natural Language Processing (nlp) Capabilities For Daily Operation. • Api Integration With Generic Ai Such As Google, Alexa And Siri Is Not Considered As Virtual Network Assistant Feature. • The Virtual Network Assistant Must Provide A Conversational Interactive Interface. • The Virtual Network Assistant Must Provide A Single-page Event And Data Correlation View To Eliminate The Need To Pull Up Multiple Dashboards Or Memorize Cli Commands. The Virtual Network Assistant Must Support Multi-vendor Switch Insights: • Switch-ap Affinity To Show How Many Aps Are Connected To A Switch, Reducing Impact Outages • Poe Compliance To Help Manage And Balance The Power Draw Of Connected Devices • Inactive Or Missing Wired Vlans That Are Misconfigured On Switch Ports Where Aps Are Connected But Clients Are Getting Blocked • Version Compliance For Switches Running Dissimilar Hardware • Switch Uptime To Monitor When Switches Are Online Or Offline • The Virtual Network Assistant Must Be Able To Provide Corrective Action Suggestions To Resolve Failures. • The Virtual Network Assistant Must Support Proactive Rma For Unhealthy Access Points. • The Virtual Network Assistant Must Support External Event Triggers Such As Automatic Creation Of A Ticket To External Support Systems With Email Alerts And Webhooks 1 Web-based Controller And Cloud Platform Management 1. Management Capabilities • Identity And Access Management • Centralized Cloud-based Management • Single-pane-of-glass Dashboard • Automatic Firmware Updates • Zero-touch Provisioning • Global Configuration Management 2. Ai-powered Analytics • Proactive Client Experience Monitoring • Automated Troubleshooting • Machine Learning-based Insights • Performance Prediction • Anomaly Detection 3. Security Features • Integrated Security Management • Automatic Threat Detection • Rogue Ap Identification • Compliance Reporting • Role-based Access Control 4. Key Functionalities • Network Configuration • Client Location Services • Performance Analytics • Detailed Reporting And Visualization 5. Access Methods • Web Browser Interface • Mobile Application • Continuous Monitoring And Optimization 1 Lot Structured Cabling • Cat6 Utp Cable • Information Outlet • Faceplate • Patch Panel 5. Scope Of Work Bidders Shall Comply With The Following: • Bidders Shall Be Allowed To Visit The Actual Site For The Preparation Of The Plans Prior To The Submission Of Their Proposal. Bidder Shall Submit An Architectural And Electrical Layout/design Based On User Requirements Together With Their Technical Bid Proposal. • Supply, Delivery, And Installation Of Complete Site Preparation Labor And Materials Including Other Peripherals Needed To Complete The Site Without Additional Cost To Procuring Entity. Bidder Shall Submit A Complete Bill Of Materials For The Site Preparation Component. • Transfer Of Existing Network Components, Servers, And Other It Peripherals From Current Location To New Data Centers • Supply And Installation Of Data Centers Power Distribution And Pacu Power Supply. • Supply, Delivery, And Installation Of Complete Fire Suppression System Including Hangers, Support, And Other Peripherals That May Be Needed To Complete System Without Additional Cost To Procuring Entity. • Supply, Delivery, And Installation Of Complete Security Door Access Input And Output Cables Including Rough-ins, Hangers, Supports, And Other Peripherals That May Be Needed To Complete The System Without Additional Cost To Procuring Entity. Registration Of Personnel To The Door Access System Shall Be Scheduled To Avoid Disruption Of Work. • Provisioning Of Vertical And Horizontal Cabling • Testing Of Each System Shall Be Done Accordingly And Will Be Certified As Completed After Performing And Passing The Functionality Test And The User Acceptance Test. 6. Product Support Requirement 6.1 24x7 Remote Support Through Phone And Email; And Services Assistance Thru Email, Phone, And Web-chat With A Response Time Of Not More Than An Hour Upon Receipt Of The Request From Boi. 6.2 Provision Of 24x7 On-site And On-call Services. 6.3 Provide Comprehensive Service Level Agreement 7. Bidders Eligibility And Project Team Requirements 7.1 A Philippine Contractor Accreditation Board License. At Least With Category A Level; With Classifications In Communication Facilities, Mechanical Works, Electrical Works, And Air-conditioning Works 7.2 The Contractor Must Have At Least One (1) Employed Electronics/electrical Engineer Fully Certified. A Copy Of The Certification Shall Be Provided. A Certified Engineer Must Be Employed By The Bidder For At Least Three (3) Years. 7.3 An Employed Certified Data Center Specialist Personnel; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.4 An Employed Safety Officer With A Construction Occupational Safety And Health Certificate; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years. 7.5 An Employed Certified Associate In Project Management; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.6 The Bidder Must Have Completed At Least One (1) Similar Project In The Supply, Delivery, Installation, Testing, And Commissioning Of A Datacenter Within The Last 10 Years. This Should Be Supported By A Certificate Of Completion And Acceptance By The Client. 7.7 Bidder Should Provide A Certificate That Has 24x7 Technical Support Capabilities. Bidder Should Identify The Person Responsible For Restoring Service Due To Outages And Provide His Contact Details I.e. Contact Person, Position, Contact Numbers, And Email Address. 7.8 Contractors Must Have Philippine Contractors Accreditation Board (pcab) Licenses Required By Republic Act 4566 To Perform Telecommunications /communications Installations. 7.9 A Member Of The Safety Organization Of The Philippines 7.10 A Certificate To Show The Company Is Registered With The National Privacy Commission 7.11 All Prospective Bidders Must Be Authorized Resellers Of All Equipment To Be Supported By A Certificate Issued By The Manufacturer/distributor Of Equipment/materials. 7.12 All Prospective Bidders Shall Submit The Original Copy Of The Design Proposal, Brochures, And Other Publications That Support Compliance To The Requirements. 7.13 Proposed Work Plan And Detailed Implementation Schedule For The Project Covering The Whole Period. Prospective Bidders Are Required To Conduct Site Inspections. This Is To Ensure The Reliability, Security, And Efficiency Of The Required Services That The Contractor Shall Perform. The Timeframe Should Be Specified For Each Activity To Be Done And Shall Include Gantt Chart Summary. 7.14 The Contractor Shall Be Held Solely Responsible For Any Property Or Personal Damages Or Claims, Including Damage To Existing Structures, Systems, Equipment, And/or Site Caused By The Contractor Shall Repair Or Replace It To Its Original Condition At No Additional Cost To The Office. 7.15 The Contractor Shall Be Responsible And Accountable For The Removal And Proper Disposal Of Material And Waste Generated By This Project. Debris, Surplus Materials, Equipment, Etc. Shall Be Removed Daily. 7.16 All Prospective Bidders Shall Submit Original Copy Of Design Proposal, Brochures And Other Publications That Supports Compliance To The Requirements. 8. Project Team Requirements/composition Team Composition And Qualifications The Winning Bidder Shall Assemble A Comprehensive Project Team With The Following Mandatory Positions And Qualifications: Project Management Team 8.1 Project Manager O Minimum Of 10 Years Of Experience In Large-scale It Infrastructure Projects O Proven Track Record In Data Center And Network Refresh Initiatives O Relevant Pmp (project Management Professional) Or Equivalent Certification O Demonstrated Experience In Managing Complex Technological Transformations 8.2 Deputy Project Manager O Minimum Of 7 Years Of Experience In It Infrastructure Projects O Strong Technical Background In Data Center And Network Technologies 8.3 Network Infrastructure Lead O Minimum Of 8 Years Of Specialized Experience In Enterprise Network Design O Advanced Certifications (ccie, Ccnp, Or Equivalent) O Expertise In Modern Network Technologies, Including Sdn, Cloud Integration, And Cybersecurity 8.4 Data Center Infrastructure Specialist O Minimum Of 8 Years Of Experience In Data Center Infrastructure Design And Implementation O Expert In Cooling, Power Management, And Physical Infrastructure Design O Certifications In Data Center Design And Management Support And Implementation Team 1. Senior Systems Engineers (minimum 2) O Each With At Least 6 Years Of Experience In Enterprise System Integration O Comprehensive Knowledge Of Server, Storage, And Virtualization Technologies 2. Network Engineers (minimum 2) O Each With At Least 5 Years Of Experience In Enterprise Network Implementation O Expertise In Network Configuration, Optimization, And Security Additional Team Requirements • The Winning Bidder Must Provide Detailed Cvs And Certifications For Each Key Team Member • Any Changes To The Proposed Team Composition Must Be Pre-approved By The Board Of Investments • The Team Must Demonstrate Collective Experience In Similar Large-scale Infrastructure Projects • All Team Members Must Be Available For The Full Duration Of The Project • The Bidder Must Have A Clear Succession And Backup Plan For Critical Roles The Board Of Investments Reserves The Right To Request Changes To The Team Composition If It Does Not Meet The Project's Critical Requirements. 9. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The All Equipment To Ensure Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Bidder To The Authorized Inspectors At No Charge To The Procuring Entity. 10. Warranty 10.1 The Bidder Shall Provide A Preventive Maintenance Program During The Warranty Period For All The Delivered Equipment And System. 10.2 The Bidder Shall Provide Quarterly Preventive Maintenance On The Pacu, Fire Suppression, Power Distribution Units, And Door Access System During The Warranty Period. 10.3 The Bidder Shall Provide Not Less Than 4 Hours Of Response Time After Receiving Calls From The Client During The Warranty Period. 10.3 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 11. License And Subscription Renewal Provision The Board Of Investments Maintains Absolute And Unconditional Rights To Renew Or Extend All Software Subscriptions, Licenses, And Service Entitlements Beyond The Initial Warranty Or Contract Period. Upon The Expiration Of Any Initial Warranty Or Support Period, We Reserve The Comprehensive Right To Renew Existing Software Licenses, Extend Service Subscriptions, Continue Maintenance And Support Contracts, And Maintain Full Access To All Software And Platform Entitlements. The Successful Bidder Must Provide Comprehensive Documentation Of All Existing Licenses And Subscriptions. This Includes Delivering Complete Credentials, Access Keys, And Licensing Information To Facilitate Seamless Transitions And Ensure Our Continued Operational Effectiveness. We Require Full Disclosure Of Licensing Terms, Clear Renewal Pathways, And Complete Transparency In All Licensing Models. 12. Delivery The Delivery And Commissioning Of All Items For The Data Center Shall Not Exceed 120 Calendar Days Upon Issuance Of The Corresponding Notice To Proceed (ntp). The Commissioning And Initial Testing Shall Be Conducted Within 2-3 Calendar Days After Each Component Is Completed And Witnessed By The End User. After Completion Of The Data Centers, The Bac-twg Together With End User Shall Conduct Functionality Tests. These Will Ensure That All Of The Project's Specifications And Requirements Are Met Must Provide In Hard And Soft Copies Detailed Project Documentation Of The Following: A. Project Implementation Plan With Timetable, B. Installation And Configuration Manual, C. Incident And Problem Escalation Procedure With A List Of Designated Technical Support Engineers, D. Sla (service Level Agreement) E. User Acceptance Test Plan, 13. Training And Technology Transfer A. The Contractor Must Provide Training For At Least Five (5) It Personnel For The Network Equipment/switches, And Troubleshooting For The Structured Cabling And Management Of The Data Center For At Least Three (3) Days Per Module. B. To Ensure That Proper Maintenance And Sustainment Appropriate Training Shall Be Conducted By The Contractor As Essential Part Of Technology Transfer To Prepare And Equip Boi And Its Personnel In The Overall Operations And Maintenance Of Its Network Infrastructure And It Facility. C. The Contractor Shall Submit A Program Of Instruction (poi) Detailing All The Training Activities To Be Conducted For Review, Evaluation, And Approval Of Boi. Hands-on Training Shall Form Part Of The Training Program. D. Operation And Training Manuals Shall Be Provided To Each Participant. E. The Training Shall Be Conducted And Completed Before The Issuance Of The Certificate Of Project Completion And Acceptance. F. All Expenses Related To Training (e.g. Venue, Meals, Equipment, Certificate.) Shall Be Borne By The Contractor. G. Certificate Of Training/s Shall Be Given By The Contractor To All Participants. 14. Liability Of The Bidder The Bidder’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 15. Incidental Services 1. Spare Parts The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. In The Event Of Termination Of Production Of The Spare Parts/expiration Of Software Licenses O Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; O Following Such Termination Of Production, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested; O The Bidder Shall Carry Provide The List Of Vendor Of Consumable Spare Parts Or Components For The Equipment. 16. Institutional Requirements Equipment And Asset Ownership All Equipment, Hardware, Software, Infrastructure Components, And Other Tangible And Intangible Assets Procured, Installed, Or Developed During The Data Center Rehabilitation And Network Refresh Project Shall Become The Sole And Exclusive Property Of The Board Of Investments (boi). The Contractor Is Prohibited From Removing Any Delivered Items From The Project Site After Installation Or Project Completion. Specific Provisions Include: • Full Ownership To All Project-related Assets Shall Immediately Transfer To Boi Upon Delivery Or Installation • The Contractor Shall Provide All Necessary Documentation To Formally Transfer Ownership, Including But Not Limited To Equipment Lists, Serial Numbers, Warranty Information, And Certificates Of Ownership • Any Attempt To Remove Or Retain Project-related Items Without Authorization Will Be Considered A Material Breach Of Contract The Contractor Shall Submit Project Implementation And Management Plan (pimp) Within Ten (10) Calendar Days Upon Receipt Of Notice To Proceed For The Implementation Of The Proposed Solution, Which Is Subject To Review And Approval By The Boi. The Pimp Shall Include But Not Be Limited To The Following: • Scope Of Work • Project Organization • Implementation Methodology • Project Timeline • Communication And Deployment Strategy The Contractor Shall Provide Complete Documentation, One (1) Soft Copy And Three (3) Printed Copies, For Every Deliverable And At Every End Of Each Development Stage And Milestone Which Must Be Submitted To The Boi For Approval. Boi Shall Own Any And All Documents And Shall Reserve The Right To Reproduce At No Additional Cost. The Documentation Must Be Written In English With Concise And High-quality Presentation To Include But Not Limited To The Following: 1. Technical Manuals: • As Built Document • Infrastructure Diagrams And Topology • Troubleshooting And Installation Guides • Single Line Diagram • System/operation Manual 2. Operations And Maintenance Manuals 17. Intellectual Property Rights The Bidder Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 18. Approved Budget Cost The Board Of Investments Intends To Apply The Sum Of Thirty-one Million Pesos (31,000,000.00) Being The Approved Budget For The Contract (abc) For The Completion Of The Relocation And Transfer Of The Board Of Investments’ Datacenter And It Related Infrastructure From 5th Floor To 4th Floor To Be A High-performing And Scalable It Infrastructure. Bids Received In Excess Of The Abc Shall Be Automatically Disqualified At The Opening Of The Financial Proposals. Prices Are In Php And Are Vat-inclusive. 19. Source Of Funds The Budget Authorized For Procurement Of Service For The Relocation And Transfer Of Boi Datacenter From 5th Floor To 4th Floor Shall Be Sourced From The 2025 Capital Outlay (co) And Maintenance And Other Operating. Expenses (mooe), Pursuant To The Philippine General Appropriation Act Of 2025. 20. Payment 10% Project Mobilization: Covers Initial Costs, Including Project Planning And Resource Allocation, And To Submit The Project Implementation Plan 25% Network And Datacenter Infrastructure Facility Civil Works All Materials, Equipment, And Labor Necessary For The Construction Of The It Infrastructure Facility Including All Civil Works, Walls, Doors, Partitions, Flooring, Security Access Pass, Air-conditioning Unit And Other Accessories/appurtenances As Specified And As Shown In The Drawings. 25% Delivery Of Equipment And Materials, Structured Cabling, Fixing, Installation Of Cables, Conduit, Outlets Racks Ladders, And Other Components (active Components) All Materials Are To Be Used In The Installation And Cabling. Installed Cables, Conduit, And Components And Tested And Working Cable Lines. 30% Upon Submission Of Certification Of 100% Completion Of Project And Passing Of The Functionality Test To Be Administered By The Bac-twg And Witnessed By The Bac 5% Training Of Personnel For The Completed Network And It Infrastructure Facility. 5% Retention Fee 100% 21. Penalty In Case There Is A Delay In The Delivery And Installation Of The Software Where Boi Is Not At Fault, The Contracted Service Provider Shall Be Subject To Sanctions As Specified In The Contract To Be Signed By Both Parties Based On The Applicable Provisions Of The Procurement Law.
Closing Date15 Jan 2025
Tender AmountPHP 31 Million (USD 530.7 K)
National Irrigation Administration Tender
Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description 1 Unit 32 Channel Network Video Recorder With Face Recognition 2 Pcs 8tb Video Storage 1 Unit Led Monitor 55" 21 Pcs 4mp Bullet Camera Full Color 9 Pcs 4mp Dome Camera Full Color 2 Pcs 4mp Ptz 25x Camera With Night Vision 1 Unit Ptz Camera Keyboard Controller 4 Pcs 4port Poe Switch With 48v Power Supply 5 Pcs 8port Poe Switch With 48v Power Supply 126 Pcs Rj45 Connector 25 Pcs C1 Junction Box 8 Pc Metal Enclosure Maintermination Box 4 Spl Utp Cable Cat6 Indoor/outdoor 7 Pc 8port Gigabit Switch Hub 1 Lot Electrical Utilities & Consumables 1 Lot New Wiring And Camera Installation And Configuration System Updates And Display Relocation 1 Unit 16 Channel Network Video Recorder 1 Pcs 8tb Video Storage 1 Unit Led Monitor 32" 16 Pcs 4mp Bullet Camera Full Color 2 Pcs 4port Poe Switch With 48v Power Supply 2 Pcs 8port Poe Switch With 48v Power Supply 96 Pcs Rj45 Connector 16 Pcs C1 Junction Box 3 Pc Metal Enclosure Maintermination Box 2.5 Spl Utp Cable Cat6 Indoor/outdoor 4 Pc 8port Gigabit Switch Hub 1 Lot Electrical Utilities & Consumables 1 Lot New Wiring And Camera Installation And Configuration System Updates And Display Relocation 1) All Entries Must Be Printed Or Type Written. 2) The Total Approved Budget For The Contract (abc) Is Php731,295.00 . All Bids In Excess Of The Abc Shall Be Automatically Rejected 3) Delivery Period Within ___ Calendar Day/s From The Receipt Of Purchase Order. 4) Price Validity Shall Be For A Period Of ______ Calendar Day/s 5) Lot Award All Items To Be Grouped Together To Form One (1) Complete Lot That Will Be Awarded To One Bidder To Form One (1) Complete Contract. Bidder Must Offer/quote On All Items, Otherwise, Bidder Shall Automatically Be Disqualified. 6) Warranty Shall Be For The One (1) Year For Equipment And 6 Months For Supplies And Materials From Date Of Approval Of The Report Of Inspection & Acceptance (ria) By The Authorized National Irrigation Administration Representative.(if Applicable) 7) Bidders Shall Submit Only One (1) Bid/request For Quotation (rfq) In One (1) Copy Together With The Following Licenses And Legal Documents Also In One (1) Copy Namely: A) Registration Certificate From Sec For Corporations, Dti For Sole Distributor Or Cda For Cooperatives, Or Any Proof Of Such Registration; B) Valid Mayor’s/ Business Permit Issued By The City Or Municipality, Where The Principal Place Of Business Of The Prospective Bidder Is Located; C) Bir Registration D) Philgeps Registration Number E) Product Brochure/specifications( If Applicable) 8) If An Awardee Has Accepted A Purchase Order But Fails To Deliver The Require Product(s) Within The Time Called For In The Same Order, The Awardee Shall Extend A Maximum Of Fifteen (15) Calendar Days Under Liquidated Damages To Make Good Delivery. Thereafter, If Awardee Has Not Completed Delivery Within The Extended Period, The Subject Purchase Order Shall Be Cancelled And The Award For The Undelivered Balance Withdraw From The Awardee. The National Irrigation Administration (nia) Shall Then Purchase The Required Item(s) From Such Other Source(s) As It May Determine, With The Difference In Price To Be Charged Against Defaulting Awardee. Refusal By The Defaulting Awardee To Shoulder The Price Difference Shall Be Ground For His Disqualification From Future Bids Of The Same Or All Items, Without Prejudice To The Imposition Of Other Sanction As Prescribed Under Ra9184 And Its Irr-a Non Submission Of Any Of The Documents Above Mentioned Shall Be A Ground For Outright Rejection Of The Bid/rfq. Note: 1. Bid Quotation May Be Submitted To Administrative Section, Administrative And Finance Division, Nia Region 3, Tambubong San Rafael Bulacan. 8166808 2. Please Make Certain To Affix The Signature Of The Owner, Manager Or Any Of Its Duly Authorized Representative In A Clear Legible Manner. 3. Bidder Shall Submit One(1) Quotation Only. Alternate Bid Shall Be Rejected.
Closing Date2 Jan 2025
Tender AmountPHP 731.2 K (USD 12.6 K)
Villacin National High School Tender
Machinery and Tools
Philippines
Details: Description Invitation To Bid For The Provision Of Materials For Installation Of Smaw Workshop Station Public Bidding No. 2025-shs-019 Funding Source: Government Of The Philippines Through General Appropriations Act (gaa) Fy 2025. 1. The Procurement Service Invites Philgeps Registered Suppliers To Bid For The Following Items: Provision Of Materials For Installation Of Smaw Workshop Station Estimated Budget ------------23,900.00 Provision Of Materials For Installation Of Smaw Workshop Station. Quantity Item Description Unit Estimated Unit Cost Estimated Cost 3 Marine Plywood 3/4 Pcs 1,300.00 3,900.00 3 Hinges 3` Pcs 140.00 420.00 1 Barrel Bolt Lock Pcs 350.00 350.00 1 Plain Sheet Gi #14 Pcs 2,600.00 2,600.00 3 Angle Bar 1 1/2 Pcs 380.00 1,140.00 8 Angle Bar 1 3/16 Pcs 270.00 2,160.00 5 Marine Plywood 1/2 Pcs 900.00 4,500.00 500 T-screw 1` Pcs 2.00 1,000.00 50 Electrical Pdx #12 (50 Meter) Meter 65.00 3,250.00 1 60 Amps Circuit Breaker Pcs 540.00 540.00 1 30 Amps Circuit Breaker Pcs 410.00 410.00 1 20 Amps Circuit Breaker Pcs 380.00 380.00 5 3 Gang Outlet Pcs 320.00 1,600.00 5 2 Gang Outlet Pcs 280.00 1,400.00 5 Electrical Tape Pcs 50.00 250.00 2. The Summary Of The Bidding Activities Is As Follows: Posting Of Invitation To Bid December 18, 2024 Issuance And Availability Of Bid Documents December 20, 2024 Pre-bid Conference December 26, 2024 Last Day Of Submission Of Written Clarification December 27, 2024 Last Day Of Issuance Of Bid Bulletin January 2, 2025 Deadline For Submission January 7, 2025 Opening Of Bids Immediately After The Deadline Of Submission Of Bids 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. 4. Bidding Is Restricted To Filipino Citizens / Sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. 5. Interested Bidders May Obtain Further Information From The Procurement Service And Inspect The Bidding Documents At The Address Given Below During Office Hours. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From Villacin National High School At Bac Office., And Upon Payment Of A Nonrefundable Fee For The Bidding Documents, In Amounts Pursuant To The Schedule. 6. Bid Opening Shall Be Conducted On January 7, 2025, 10:00am, Villacin National High School At The Bac Office Located In Brgy. Tinampaan, Cadiz City, Negros Occidental. Bids Shall Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend The Opening. Late Bids Shall Not Be Accepted. Unsealed Or Unmarked Bid Envelopes Shall Be Rejected Also. 7. Bidders Shall Drop Their Duly Accomplished Eligibility Requirements, Technical And Financial Proposals In Two Separate Sealed Envelopes In The Designated Bid Box Located At The Bidding Room. 8. The Procurement Service Reserves The Right To Accept Or Reject Any Bid, To Annual The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 9. For Further Inquiries, Please Look For Noel R. Bullos, Bac Secretariat, Or Feel Free To Call At +63-947-3668161 And Email At Vnhs.shs@gmail.com Nelly S. Echavez Chairperson Bids And Awards Committee
Closing Date7 Jan 2025
Tender AmountPHP 23.9 K (USD 412)
Parks Canada Tender
Civil And Construction...+1Civil Works Others
Canada
Details: Bids Received By Fax And Email Will Be Accepted As Official. Parks Canada Is Not Currently Accepting Bids Via Sap Ariba, You Must Submit Your Bid Via Fax Or Email As Indicated In The Solicitation Document. Bids Received In-person Or By Courier Will Not Be Accepted. The Only Acceptable Email Address For Responses To The Bid Solicitation Is Soumissionsami-bidsrpc@pc.gc.ca. Bids Submitted By Email Directly To The Contracting Authority Or To Any Email Address Other Than Soumissionsami-bidsrpc@pc.gc.ca Will Not Be Accepted. The Only Acceptable Facsimile For Responses To Bid Solicitations Is 1-855-983-1808. The Maximum Email File Size That Parks Canada Is Capable Of Receiving Is 15 Megabytes. The Bidder Is Responsible For Any Failure Attributable To The Transmission Or Receipt Of The Emailed Bid Due To File Size. The Bidder Should Be Cognisant Of The Size Of The Email As A Whole, And Not Only The Attachments. Please Take Into Consideration That Some Attachments, When Sent, May Be Resized During The Email Transfer. If The Email Size Is Too Large, The Bidder Should Send The Bid In Multiple Emails Properly Labeled With The Solicitation Number, Project Name, And Indicate How Many Emails Are Included (ex. 1 Of 2). Emails With Links To Bid Documents Will Not Be Accepted. Bid Documents Must Be Sent As Email Attachments. Special Instructions To Bidders (si) This Is A Two Stage Selection Process. Bidders Responding To This Selection Process Are Requested To Submit A Bid In Two Stages. This Posting Is The First Stage (stage One) Of A Two-stage Solicitation Process: The First Stage Will Evaluate The Qualifications Of All Interested Suppliers; The Second Stage (stage Two) Will Invite The Qualified Suppliers To Provide A Financial Bid On The Project Based On The Specifications And Drawings. Upon Award Of Contract In Stage Two The Pre-qualification List Will Expire And Will Not Be Used In Any Other Solicitation. The Qualification List Will Expire Within 180 Days Or Upon Award Of A Contract In Stage Two, Whichever Is Earlier, And The Prequalification List Will Not Be Used In Any Other Solicitation. Following The Evaluation Of The Submissions Of Stage One, Bidders Will Be Advised Of Their Qualification Result And The Status Of The Tender. Stage Two Bidders Will Be Provided An Invitation To Tender (itt) For The Financial Evaluation In Relation To The Specifications And Drawings. Requirement An Exterior Cool Pool Deck Glycol System Has Been Installed At The Radium Aqua Court. Parks Canada Seeks To Pre-qualify Mechanical/electrical Trades Bidders. The Successful Contractor Will Be Responsible For The Hook Up Of This System. Work Includes The Purchase And Installation Of Hydronic Piping And Energy Supply System For The Cool Pool Deck. Work Will Also Include, But Is Not Limited To, The Purchase And Installation Of A Boiler, Associated Electrical Hook-ups, And Hydronic Piping To Connect The Boiler To The Existing Glycol System. To Assist With Bonding And Insurance Requirements, This Project Is Estimated At A Value Between $100,001 > $ 250,000, Taxes Extra. Period Of Contract / Delivery Date Contractor Shall Perform And Complete The Work No Later Than May 30, 2025. Enquiries All Enquiries Of A Technical And Contractual Nature Are To Be Submitted To The Contracting Authority. Enquiries Regarding This Solicitation Must Be Submitted In Writing And Should Be Received No Later Than Five Business Days Prior To The Date Set For Solicitation Closing To Allow Sufficient Time To Provide A Response. Enquiries Received After That Time May Result In An Answer Not Being Provided. Information National Parks Regulations Require That All Work Is To Be Performed In Accordance With The Ordinances, Laws, Rules And Regulations Set Out In The National Park Act. Bidders That Consider Themselves Qualified To Provide This Work And Intend To Submit Bids On This Project Should Obtain Documents From The Government Electronic Tendering Service Through The Government Of Canada Tendering Service At Www.canadabuys.canada.ca/en/tender-opportunities. Addenda, When Issued, Will Be Available From The Government Of Canada Tendering Service. Bidders That Elect To Base Their Bids On Documents Obtained From Other Sources Do So At Their Own Risk. Late Submissions Will Not Be Considered. The Crown Retains The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada. Parks Canada Has Made Every Effort To Provide Equivalent Documents In Both Official Languages, However, If You Find Any Discrepancies Between The English And French Documents, Please Notify The Contract Officer Listed In This Opportunity As Soon As Possible So That We Can Rectify The Situation.
Closing Date16 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Chemical Products
United States
Description: Contact Information|4|n9743f|feb|717-605-7237|karen.m.barlet.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
special Shipping And Marking Instructions|6|x|||x|||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd|n/a|n/a|n/a|n/a|navsupwawf.wss.ftc@navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
annual Representations And Certifications (may 2024)|13|336310|1050||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
government Source Inspection Per Far 52.246-2 Is Required.
delivery 90 Days.
shelf Life Requirement Must Be Met In Order To Be Considered Responsive.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Depositedin The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture Of The O-ring .
2. Applicable Documents - Not Applicable
3. Requirements
3.1 Manufacturing And Design - The O-ring Furnished Under This Contract/purchase Order Shall Meet The Material And Physical Requirements As Specified ;p/n: N0674 2-128 O-ring Mfg. Parker Hannifin Cage Code (45681); .
3.2 Marking - Unless Marking Requirements Are Specified By A Document Or Drawing Cited In This Solicitation All Items Delivered Under This Contract/purchase Order Shall Be Marked And Identified In Accordance With The Applicable Military Standards And
specifications As Follows:
Mechanical Parts, Assemblies And Equipments - Mil-std-130
Electrical And Electronic Parts - Mil-std-1285, Method 1.
Electrical And Electronic Parts And Assemblies Not Covered
By Mil-std-1285-use Mil-std-130.
Electronic Equipment - Mil-std-454 Requirement Number 67.
Electrical Equipment - Mil-p-15024/5 (ships)
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.4 Shelf Life Requirement - The Following Is Excerpts From Dod 4140.27-m Shelf Life Management Manual. This Requirement Is Mandated By Mil-std-129p And Later And Is Required Under The Under The Preservation, Packing And Marking Portion Of This Tdp.
2-12. 85 Percent Shelf-life Remaining Requirement Applicable To Acquisition/procurement
A. Acquisition/procurement Documentation Must Specify That Shelf-life Items/material Will Have Not Less Than 85 Percent (allowing For Rounding To Whole Months) Of Shelf-life Remaining At Time Of Receipt By The First Government Activity. Any Delivery
from A Contractor Not Having At Least 85 Percent Shelf-life Remaining Must Normally Be Considered Non-conforming. Refer To Appendix E Of This Manual To Determine The Amount Of Time That 85% Equates To In Terms Of Remaining Shelf Life For Type I Or Type Ii
shelf-life Codes.
B. In Supporting Imminent Use Or Consumption, The 85% Shelf-life Remaining On Receipt By First Government Activity May Be Modified Or Adjusted As Deemed Prudent At The Discretion Of Pms And Imms, When Support Alternative Arrangements Such As Ec, Pv, Dvd
or Local Purchase Are Effected. Use Of Support Alternatives For Shipment/delivery To Storage Facilities As Stock Will Conform To The 85% Rule.
2-13. Contractor Marking. Shelf Life Items Will Be Marked For Identification And Control. Markings, Shown Below The Item Identification Data Are Required On All Units, Intermediate, And Exterior Packs Or Unpacked Items, Must Be Per Mil Std 129, Mil-std-130,
mil Std 290 (fsc 9150 Only), Or Fed Std 123, (references (m) Through (p)) Respectively, And Will Include The Following:
A. For Type I Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Rubber Products Only), Date Assembled, Or Date Packed (subsistence Only); And Expiration Date.
B. For Type Ii Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Other Rubber Products Only), Date Assembled, And Date Packed (subsistence Only), And Inspect/test Date.
C. For Both Type I And Type Ii Markings In Subparagraphs A And B Above: The Date Must Be Expressed By The Numeric Month And The Last 2 Digits Of The Calendar Year; I.e., 06/95, With The Day Of That Month Being The Last Day.
D. Different Dates On Identical Items. When Two Or More Unit
packs Of Identical Items Bear Different Dates Of Manufacture, Dates Of Cure, Dates Of Pack, Or Dates Of Assembly, The Earliest Date Must Be Shown On The Shipping Container.
E. For Type I Drugs And Biologicals: The Expiration Date Only Is Required. The Expiration Date Should Be Marked In Accordance With Fed-spec Ppp C 186 (reference (q)). Manufacturer Date Must Not Be Shown For Medical Items Having Expiration Dates.
F. For Cure-dated Items: Shelf Life Markings On Physical Material Are Expressed By Month Or Quarter And Year Designations (i.e., 11/2001,or 3q2001). Shelf Life Periods End On The Last Day Of The Cited Month Or Quarter.
Appendix E
shelf Life Codes
Required Number Of Months/quarters
Remaining Upon Receipt By The First
Government Activity
Type I Type Ii Months Quanters
shelf Life Period
non-deteriorative 0 0 N/a N/a
no Shelf-life Applies (zero) (zero)
01 Month A N/a 25 Days N/a
02 Months B N/a 50 Days N/a
03 Months C 1 75 Days N/a
04 Months D N/a 3 1
05 Months E N/a 4 1
06 Months F 2 5 2
09 Months G 3 8 3
12 Months (1.00-years) H 4 10 3
15 Months (1.25-years) J N/a 13 4
18 Months (1.50-years) K 5 15 5
21 Months (1.75-years) L N/a 18 6
24 Months (2.00-years) M 6 21 7
27 Months (2.25-years) N N/a 23 8
30 Months (2.50-years) P N/a 26 9
36 Months (3.00-years) Q 7 31 10
48 Months (4.00-years) R 8 41 14
60 Months (5.00-years) S 9 51 17
72 Months (6.00-years) I N/a 61 20
84 Months (7.00-years) T N/a 71 24
96 Months (8.00-years U N/a 82 27
variable Such As: V N/a 77, 113, 26, 38, 61
90, 132,216,228, Etc. 184, 194 65, Etc.
months Or Any Other Etc.
number Of Months Not
specifically Assigned.
120 Months (10-years) W N/a 102 34
180 Months (15-years) Y N/a 153 51
240 Months (20-years) Z N/a 204 68
shelf-life Period Greater N/a X 85 Percent 85 Percent
than 60 Months For Type Of Number Of Number
ii Extendible Items Months Months
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 Commercial Brand Name Description - This Contract/purchase Order Covers A Commercial Brand Name Description. If An Alternate Item Is Proposed, Submit A Complete Technical Description Of The Item With Your Proposal For The Government's Review To Determine
if The Item Meets The Minimum Requirements Of This Contract/purchase Order.
p/n: N0674 2-128 O-ring Mfg. Parker Hannifin Cage Code (45681)
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture Of The O-ring .
2. Applicable Documents - Not Applicable
3. Requirements
3.1 Manufacturing And Design - The O-ring Furnished Under This Contract/purchase Order Shall Meet The Material And Physical Requirements As Specified ;p/n N0674 2-232; .
3.2 Marking - Unless Marking Requirements Are Specified By A Document Or Drawing Cited In This Solicitation All Items Delivered Under This Contract/purchase Order Shall Be Marked And Identified In Accordance With The Applicable Military Standards And
specifications As Follows:
Mechanical Parts, Assemblies And Equipments - Mil-std-130
Electrical And Electronic Parts - Mil-std-1285, Method 1.
Electrical And Electronic Parts And Assemblies Not Covered
By Mil-std-1285-use Mil-std-130.
Electronic Equipment - Mil-std-454 Requirement Number 67.
Electrical Equipment - Mil-p-15024/5 (ships)
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.4 Shelf Life Requirement - The Following Is Excerpts From Dod 4140.27-m Shelf Life Management Manual. This Requirement Is Mandated By Mil-std-129p And Later And Is Required Under The Under The Preservation, Packing And Marking Portion Of This Tdp.
2-12. 85 Percent Shelf-life Remaining Requirement Applicable To Acquisition/procurement
A. Acquisition/procurement Documentation Must Specify That Shelf-life Items/material Will Have Not Less Than 85 Percent (allowing For Rounding To Whole Months) Of Shelf-life Remaining At Time Of Receipt By The First Government Activity. Any Delivery
from A Contractor Not Having At Least 85 Percent Shelf-life Remaining Must Normally Be Considered Non-conforming. Refer To Appendix E Of This Manual To Determine The Amount Of Time That 85% Equates To In Terms Of Remaining Shelf Life For Type I Or Type Ii
shelf-life Codes.
B. In Supporting Imminent Use Or Consumption, The 85% Shelf-life Remaining On Receipt By First Government Activity May Be Modified Or Adjusted As Deemed Prudent At The Discretion Of Pms And Imms, When Support Alternative Arrangements Such As Ec, Pv, Dvd
or Local Purchase Are Effected. Use Of Support Alternatives For Shipment/delivery To Storage Facilities As Stock Will Conform To The 85% Rule.
2-13. Contractor Marking. Shelf Life Items Will Be Marked For Identification And Control. Markings, Shown Below The Item Identification Data Are Required On All Units, Intermediate, And Exterior Packs Or Unpacked Items, Must Be Per Mil Std 129, Mil-std-130,
mil Std 290 (fsc 9150 Only), Or Fed Std 123, (references (m) Through (p)) Respectively, And Will Include The Following:
A. For Type I Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Rubber Products Only), Date Assembled, Or Date Packed (subsistence Only); And Expiration Date.
B. For Type Ii Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Other Rubber Products Only), Date Assembled, And Date Packed (subsistence Only), And Inspect/test Date.
C. For Both Type I And Type Ii Markings In Subparagraphs A And B Above: The Date Must Be Expressed By The Numeric Month And The Last 2 Digits Of The Calendar Year; I.e., 06/95, With The Day Of That Month Being The Last Day.
D. Different Dates On Identical Items. When Two Or More Unit
packs Of Identical Items Bear Different Dates Of Manufacture, Dates Of Cure, Dates Of Pack, Or Dates Of Assembly, The Earliest Date Must Be Shown On The Shipping Container.
E. For Type I Drugs And Biologicals: The Expiration Date Only Is Required. The Expiration Date Should Be Marked In Accordance With Fed-spec Ppp C 186 (reference (q)). Manufacturer Date Must Not Be Shown For Medical Items Having Expiration Dates.
F. For Cure-dated Items: Shelf Life Markings On Physical Material Are Expressed By Month Or Quarter And Year Designations (i.e., 11/2001,or 3q2001). Shelf Life Periods End On The Last Day Of The Cited Month Or Quarter.
Appendix E
shelf Life Codes
Required Number Of Months/quarters
Remaining Upon Receipt By The First
Government Activity
Type I Type Ii Months Quanters
shelf Life Period
non-deteriorative 0 0 N/a N/a
no Shelf-life Applies (zero) (zero)
01 Month A N/a 25 Days N/a
02 Months B N/a 50 Days N/a
03 Months C 1 75 Days N/a
04 Months D N/a 3 1
05 Months E N/a 4 1
06 Months F 2 5 2
09 Months G 3 8 3
12 Months (1.00-years) H 4 10 3
15 Months (1.25-years) J N/a 13 4
18 Months (1.50-years) K 5 15 5
21 Months (1.75-years) L N/a 18 6
24 Months (2.00-years) M 6 21 7
27 Months (2.25-years) N N/a 23 8
30 Months (2.50-years) P N/a 26 9
36 Months (3.00-years) Q 7 31 10
48 Months (4.00-years) R 8 41 14
60 Months (5.00-years) S 9 51 17
72 Months (6.00-years) I N/a 61 20
84 Months (7.00-years) T N/a 71 24
96 Months (8.00-years U N/a 82 27
variable Such As: V N/a 77, 113, 26, 38, 61
90, 132,216,228, Etc. 184, 194 65, Etc.
months Or Any Other Etc.
number Of Months Not
specifically Assigned.
120 Months (10-years) W N/a 102 34
180 Months (15-years) Y N/a 153 51
240 Months (20-years) Z N/a 204 68
shelf-life Period Greater N/a X 85 Percent 85 Percent
than 60 Months For Type Of Number Of Number
ii Extendible Items Months Months
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 Commercial Brand Name Description - This Contract/purchase Order Covers A Commercial Brand Name Description. If An Alternate Item Is Proposed, Submit A Complete Technical Description Of The Item With Your Proposal For The Government's Review To Determine
if The Item Meets The Minimum Requirements Of This Contract/purchase Order.
p/n: N0674 2-232 O-ring Mfg. Parker Hannifin Cage Code (45681)
Closing Date16 Jan 2025
Tender AmountRefer Documents
Municipality Of Don Victoriano Chiongbian, Mis Occidental Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Solar Installation and Products
Philippines
Details: Description Invitation To Bid The Local Government Unit Of Don Victoriano, Through Its Bids And Awards Committee (bac), Invites Suppliers/contractors To Apply For Eligibility And To Bid For The Hereunder Project: Name Of Project: Installation Of Single Arm Post Streetlight W/ Solar Panel, Led 300w Location: Tuno, Don Victoriano, Misamis Occidental Source Of Funds: Sglg Incentives Funds Cy-2024 Approved Budget For The Contract: Php 1,153,000.00 Brief Description: Installation Of 42 Post Single Arm Streetlight W/ Solar Panel, Led 300w And 0.25m X 0.25m Concrete Pedestal. Project Title Location/description Abc Dv-2024-i26 Installation Of Single Arm Post Streetlight W/ Solar Panel, Led 300w Tuno, Don Victoriano, Misamis Occidental Item Of Works: I. Excavation Works - 12.096 Cu.m. Ii. Gravel Bedding - 2.00 Cu.m. Iii. Steel Works - 490.57 Kgs. Iv. Concrete Works - 7.69 Cu.m. V. Metal Works - 42.00 Units Vi. Electrical Works - 42.00 Units Spl Project Billboard - 2.00 Units Php 1,153,000.00 The Complete Schedule Of Activities Is Listed As Follows: Bac Activities Schedule 1. Posting Period/advertisement December 20, 2024 2. Issuance Of Bid Documents December 20-31, 2024 Up To January 1-9, 2025 3. Pre-bid Conference December 27, 2024 @ 9:00am 4. Deadline Of Submission Of Bid January 9, 2025 @ 9:00am 5. Opening Of Bid January 9, 2025 @ 9:30am Bid Documents Will Be Available Only To Prospective Bidders Upon Payment Of Non-refundable On Amount Of: A.) Five Thousand (php 5,000.00) Pesos For The Installation Of Single Arm Post Streetlight W/solar Panel, Led 300w. The Local Government Unit Of Don Victoriano Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of The Bid.
Closing Date9 Jan 2025
Tender AmountPHP 1.1 Million (USD 19.8 K)
5841-5850 of 6739 archived Tenders