Electrical Tenders

Electrical Tenders

Food And Drug Administration Tender

Healthcare and Medicine
Philippines
Details: Description Np-svp(a)-2024-0375-fda Procurement For The Supply And Delivery Of Office Supplies For Various Centers/offices Of Fda (per Lot) *one Project Having Several Items Grouped Into Several Lots, Which Shall Be Awarded As Separate Contracts/po Per Lot. Documentary Requirements: A. Valid Mayor's/business Permit; B. Valid Philgeps Registration Number Or (platinum Depends); C. Latest Itr Received And Stamp Or Electronically Submitted (mandatory For Lease Of Venue Regardless Of Abc, For Svp/sswatems - Applicable For Projects With Abc Above Php500,000.00) D. Omnibus Sworn Statement (mandatory For Projects With Abc Above Php50,000.00) E. Other’s Pe’s Requirements (proposal, Brochure, Literature, Pictures) Particulars Particulars 1. Csl-atqal-php37,240.00 Item/description Quantity Unit Clipboard 1. Storage Clipboard 2. Assorted Colored Translucent Storage Clipboard 3. Metal Clip Holds One Writing Pad Or 80 Sheets 4. Size: 344.3 X 238 X 24 Mm 13 Pc Colored Paper - Red Size: 8.5 X 11 Inches; 10 Sheets Per Pack 7 Pack Colored Paper - Yellow Size: 8.5 X 11 Inches; 10 Sheets Per 7 Pack Colored Paper - Orange Size: 8.5 X 11 Inches; 10 Sheets Per Pack 7 Pack Colored Paper - Green Size: 8.5 X 11 Inches; 10 Sheets Per Pack 7 Pack Bond Paper - Yellow Size: 8.5 X 11 Inches; 500 Sheets Per Ream 7 Ream First Aid Kit (includes Gauze Pads, Medical Tape, Adhesive Strips, Gauze Bandages, Cotton, Isopropyl Alcohol, Povidone Iodine Solution) 10 Kit Ring Binder 3-ring, A4 Size , D-type; At Least 2.5inches 30 Pc Ring Binder 3-ring, A4 Size, D-type; At Least 1.5inches 20 Pc Clear Sheet Refill A4 Size, 11 Holes; 10pcs/pack 100 Pack Pvc Binding Element A4 Size, 18mm, 21 Holes; 12 Pcs/pack 20 Pack Pvc Binding Element A4 Size, 8mm, 21 Holes; 20 Pcs/pack 20 Pack Specialty Paper; 8.5" X 11", 200 Gsm, Pale Cream Color; Pack Of 10 Sheets 60 Pack Clearbook; A4 Size, 60 Pockets 10 Pc Folder; Thick Plastic (pp) Folder, Pre-punched, Long, Green Color; Pack Of 12 15 Pack Indicator Tag, Sticky Notes, Neon, Indicator Tags 10 Pack 2. Nlc-php128,910.00 Item/description Quantity Unit Printer Ink, Epson 3110 (003 Black) 80 Pc Printer Ink, Epson 3110 (003 Cyan) 60 Pc Printer Ink, Epson 3110 (003 Magenta) 60 Pc Printer Ink, Epson 3110 (003 Yellow) 60 Pc Brother Ink Bt 5000c 20 Pc Brother Ink Bt 5000m 15 Pc Brother Ink Bt 5000y 15 Pc Brother Ink Bt 5000bk 10 Pc Brother Ink Btd60bk 30 Pc Ink (brother Dcpt20dw) Set 6 Pc Ink (epson L310) Set 10 Pc Brother Ink Bt 5000c 5 Pc 3. Rfo Viii-php49,801.70 Item/description Quantity Unit Carbon Film,blue,legal 4 Box Clipboard For Long Size 10 Box Data File Box 80 Pcs. Battery, Dry Cell, Size Aa 5 Pcs. Battery, Dry Cell, Size Aaa 5 Pcs. Tape, Electrical 5 Roll Twine, Plastic 1 Pcs. Clip, Backfold, 19mm 5 Box Clip, Backfold, 50mm 5 Box Dater Stamp 2 Pcs. Paper Clip, Vinyl/plastic Coated, 33mm 10 Box Paper Clip, Vinyl/plastic Coated, Jumbo, 50mm 10 Box Paper Trimmer/cutting Machine 1 Pcs. Canon Pixma 790 (cyan) 15 Bottle Canon Pixma 790 (black) 10 Bottle Canon Pixma 790 (magenta) 15 Bottle Canon Pixma 790 (yellow) 15 Bottle 4. Mwc-php214,770.42 Item/description Quantity Unit Sticky Note, Flags, Multicolor Pack 30 Retractable Ballpen, Blue Pc 200 Clipboard With Cover, Legal Size Pc 25 Chlorine Granules, 1kg Per Pack Pack 10 Liquid Chlorine,1 Liter / Bottle Bottle 20 Cling Wrap, Size: 24 In. X 2000 Ft, Roll Roll 3 Sealed Zip Bag, Plastic, Small Size Pack 20 Sealed Zip Bag, Plastic, Medium Size Pack 20 Sealed Zip Bag, Plastic, Large Size Pack 20 Sealed Zip Bag, Plastic, X-large Size Pack 20 Plastic Bubble Wrap, 100 M,roll Roll 2 Trash Can Large Heavy Duty Pc 10 Dishwashing Soap, Paste, 400 G Pc 20 Hand Soap, Liquid, 1l Pc 20 Ink Epson C13t00s44a 003 Yellow For Epson L3110 Bottle 15 Ink Epson C13t00s14a 003 Black For Epson L3110 Bottle 25 Ink Epson C13t00s24a 003 Cyan For Epson L3110 Bottle 15 Ink Epson C13t00s34a 003 Magenta For Epson L3110 Bottle 15 Ink Bt5000 Magenta For Brother Dcp T7110w Bottle 15 Ink Bt5000 Cyan For Brother Dcp T7110w Bottle 15 Ink Bt5000 Yellow For Brother Dcp T7110w Bottle 15 Ink Btd60 Black For Brother Dcp T7110w Bottle 20 Ink Epson T7741 Black For Epson M200 Printer Bottle 20 Original Hp Ink Gt52 Cyan For Hp Ink Tank Wireless 415 Printer Bottle 10 Original Hp Ink Gt52 Yellow For Hp Ink Tank Wireless 415 Printer Bottle 10 Original Hp Ink Gt52 Magenta For Hp Ink Tank Wireless 415 Printer Bottle 10 Original Hp Ink Gt51 Black For Hp Ink Tank Wireless 415 Printer Bottle 25 Ink Epson C13t00v400 003 Yellow For Epson L3110 Printer Bottle 10 Ink Epson C13t00v300 003 Magenta For Epson L3110 Printer Bottle 10 Ink Epson C13t00v100 003 Black For Epson L3110 Printer Bottle 25 Ink Epson C13t00v200 003 Cyan For Epson L3110 Printer Bottle 10 Staple Gun With Staple Gun Wire Pc 1 Whiteboard With Stand And Wheels Pc 3 5. Slc-php39,450.00 Item/description Quantity Unit Toner Cartridge Tn-3448 For Brother Mfc-l5900dw 6. Mec-php127,757.67 Item/description Quantity Unit Ink Bottle, Epson C13t664100 (t6641), Black 100 Bottle Ink Bottle, Epson C13t664100 (t6641), Cyan 50 Bottle Ink Bottle, Epson C13t664100 (t6641), Magenta 50 Bottle Ink Bottle, Epson C13t664100 (t6641), Yellow 50 Bottle Industrial Double Tape, 1/2x15ft 14 Pack Photo Paper, No Back Print, Waterproof Glossy, A4 Size, 200 Gsm 12 Pack Certificate Holder (a4 Size) 100 Can Storage Box, At Least 150l 22 Unit Extension Cord (3 Meters) 6 Pc Document Tray, 3 Layer 12 Piece Resealable Bags (large) 30 Piece 7. Rfo Ii-php40,843.00 Item/description Quantity Unit Sticker Paper, A4 10 Sheets Pack 5 Pack Photo Paper, A4 10 Sheets/pack 5 Pack Plastic Envelope, Expanding, With Button, Clear, Legal 300 Piece White Board With Frame 90 Cm X 120 Cm 1 Piece Bubble Wrap 15 Pack Carbon Paper, Blue 1 Pack Laminating Machine, Heavy Duty Sealer Machine For Plastic: Folds, Paper, Bjet And Other Photo With Soft Laminator Film 1 Unit Laminating Sheet, A4 2 Pack Ac Power Plug Adapter, 3 In Plug 10 Pcs Plastic Storage Box, Min. 150 L 5 Pcs 8. Csl-ctqal-php104,587.27 Item/description Quantity Unit Clearbook, 20 Transparent Pockets, A4 Piece 50 Clearbook, 20 Transparent Pockets, Legal Piece 50 Battery, Dry Cell, Size Aa, Two (2) Pieces Per Blister Pack Pack 100 Battery, Dry Cell, Size Aaa, Two (2) Pieces Per Blister Pack Pack 100 Philippine National Flag Piece 2 Glue, All-purpose, 200 Grams Jar 7 Staple Wire, Standard Box 40 Tape, Masking, 24mm Roll 20 Tape, Masking, 48mm Roll 20 Tape, Packaging, 48mm Roll 2 Tape, Transparent, 24mm Roll 25 Tape, Transparent, 48mm Roll 25 Clip, Backfold, 25mm Box 60 Clip, Backfold, 32mm Box 30 Clip, Backfold, 50mm Box 30 Data File Box Piece 60 Marker, Permanent, Black Piece 50 Marker, Permanent, Blue Piece 50 Marker, Permanent, Red Piece 50 Paper Clip, Vinly/plastic Coated, 33mm Box 60 Puncher, Paper, Heavy Duty Piece 20 Rubber Band No. 18, 350g Box 10 Paper Multipurpose A4, 500 Sheets Per Ream Ream 250 Paper Multipurpose Legal, 500 Sheets Per Ream Ream 50 Ballpen, Blue Piece 350 Envelope, Plastic, Legal Piece 50 Fastener, Plastic Pack 14 Folder, Legal, With Plastic Cover Piece 100 Sticker Paper, White, A4 Pack 50 9. Rfo Car-php23,955.00 Item/description Quantity Unit Bubble Wrap, Roll 40 Inches X 100 Meters 10 Roll Staple Wire, #10 50 Box Stapler, Small/mini For #10 Staple Wire 5 Pc Tape, Transparent, 24 Mm 50 Roll Tape, Transparent, 48 Mm 50 Roll Fastener, Plastic, 50 Sets Per Box 100 Box Marker, Whiteboard, Black 3 Pc Pencil Sharpener, Rotary 2 Pc Certificate Holder, A4 Size 12 Pc Foam Tape, Double Sided Adhesive, 18 Mm X 5 Meters Long 20 Roll First Aid Kit Survival Kit Go Bag Emergency Includess At Least: Bag With Shoulder Strap, Gauze, Bandage, Band-aid, Alcohol Pads, Scissors, Elastic Bandage, Tourniquet, Medical Tape, Safety Pin, Cotton Swabs, Tweezers 1 Set 10. Csl-ctqal-php56,600.00 Item/description Quantity Unit Ink Bt Bk For Brother Printer Mfc-t800w, Black 5 Bot Ink Bt Bk For Brother Printer Mfc-t800w, Yellow 5 Bot Ink Bt Bk For Brother Printer Mfc-t800w, Cyan 5 Bot Ink Bt Bk For Brother Printer Mfc-t800w, Magenta 5 Bot Ink Bt Bk For Brother Printer Dcp-t420w, Black 5 Bot Ink Bt Bk For Brother Printer Dcp-t420w, Yellow 5 Bot Ink Bt Bk For Brother Printer Dcp-t420w, Cyan 5 Bot Ink Bt Bk For Brother Printer Dcp-t420w, Magenta 5 Bot Ink For Epson Printer L3210, Black 5 Bot Ink For Epson Printer L3210, Yellow 5 Bot Ink For Epson Printer L3210, Cyan 5 Bot Ink For Epson Printer L3210, Magenta 5 Bot Ink For Epson Printer L120, Black 2 Bot Ink For Epson Printer L120, Yellow 2 Bot Ink For Epson Printer L120, Cyan 2 Bot Ink For Epson Printer L120, Magenta 2 Bot Ink For Hp Ink Tank Wireless Printer 415, Black 5 Bot Ink For Hp Ink Tank Wireless Printer 415, Yellow 5 Bot Ink For Hp Ink Tank Wireless Printer 415, Cyan 5 Bot Ink For Hp Ink Tank Wireless Printer 415, Magenta 5 Bot Ink For Hp Deskjet Ink Advantage 2337, Black 5 Bot Ink For Hp Deskjet Ink Advantage 2337, Tricolor 5 Bot Ink For Hp Deskjet 2060, Black 5 Bot Ink For Hp Deskjet 2060, Tricolor 5 Bot Ink For Hp Deskjet 3835, Black 5 Bot Ink For Hp Deskjet 3835, Tricolor 5 Bot Ink For Canon G2010 Printer, Black 2 Bot Ink For Canon G2010 Printer, Yellow 2 Bot Ink For Canon G2010 Printer, Cyan 2 Bot Ink For Canon G2010 Printer, Magenta 2 Bot Toner For Mono Laser Printer Samsung Model No. Ml-2571 1 Bot 11. Cdrr-php83,549.30 Item/description Quantity Unit Ring Binder, Portrait, 2.5 Inches, Pvc Cover, 3 Rings, Side, Black 30 Pc Double-sided Tape, Foam Material, 3 Sizes With 1 Meter Length 15 Pc Double-sided Tape, White, Size: 18 Mm X 10yd 75 Pc Bookend, Sturdy Steel 30 Pc Plastic Envelope, Expandable. For Legal Size Documents, Clear, 3 Inches, Transparent, Gauge 8 500 Pc Plastic Envelope, Expandable. For Legal Size Documents, Clear, 4 Inches, Transparent, Gauge 8 500 Pc Storage Box, Made Of Plastic, With Lid, Handle And Wheels, At Least 120 L Capacity, Transparent 20 Pc Paper, Colored, A4 Size 20 Pack Notepad, Stick On, 40 Mm X 50 Mm (1 1/2" X 2") Min. 70 Pad Notepad, Stick On, 25 Mm X 76 Mm (1" X 3") Min. 70 Pad Tape Flags, Water-proof, Self-adhesive, Transparent (1/2 X 2 ") 130 Pc Delivery: Fda Alabang (civic Drive Alabang Muntinlupa City) Delivery Of Items: Within Fifteen (15) Calendar Days Upon Receipt Of Ntp Note /instruction To The Interested Bidders: 1. All Entries Must Be Typewritten Or Legibly Handwritten. The Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omission Of The Required Mandatory Provisions. Interested Bidders May Submit Quotations Provided That Above Matrix Details Are Completely Provided And Shall Be Submitted Using Company Letterhead; 2. Delivery Of Services/items Shall Be Within Fifteen (15) Calendar Days Upon Receipt Of Ntp. 3. Warranty Shall Be For A Minimum Period Of Three (3) Months, In The Case Of Expendable Supplies, Or A Minimum Period Of One (1) Year, In The Case Of Non-expendable Supplies, After Acceptance By The Procuring Entity Of The Delivered Supplies (not Applicable For Lease Of Venue And Rental Of Vehicles). 4. Price Validity Shall Be Sixty (60) Calendar Days; 5. Bidders May Submit Original Brochures Showing Certification Of The Product Being Offered, If Applicable; 6. Please Quote Your Government Price(s) Including Vat Or Other Applicable Taxes And Other Incidental Expenses For The Terms Listed/attached. 7. Interested Bidders/suppliers Not Directly Invited May Participate. The Duly Accomplished Rfq With Their Proposal Shall Be Submitted On Or Before The Deadline For Submission Of The Proposal Or Any Extension Thereof. The Following Supporting Documents For The Project Shall Also Be Submitted During Submission Of The Proposal/offers: A. Valid Mayor's Permit; B. Valid Philgeps Registration Number Or (platinum Depends); C. Latest Itr Received And Stamp Or Electronically Submitted (mandatory For Lease Of Venue Regardless Of Abc, For Svp/sswatems - Applicable For Projects With Abc Above Php500,000.00) D. Omnibus Sworn Statement (mandatory For Projects With Abc Above Php50,000.00) E. Other’s Pe’s Requirements 8. Please Submit Your Best Quotation/s Or Via Email Addressed Directly To: Engr. Ana Trinidad F. Rivera, Msc Chairperson, Centralized Bids And Awards Committee Food And Drug Administration Civic Drive Filinvest, Alabang, Muntinlupa City C/o Atty. Albertito C. Garcia Head Secretariat, Centralized Bids And Awards Committee Or Email At: Bacsec@fda.gov.ph Deadline Of Submission Of Quotation/s Will Be On: 03 December 2024, 01:00 Pm. 9. Late Bids Shall Not Be Accepted; 10. For Other Inquiries/ Concerns About The Items, Please Contact Bac Secretariat At Bacsec@fda.gov.ph; 11. The Food And Drug Administration Reserves The Right To Reject Any And All Bids, Declare A Failure Of The Procurement, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Incurring Any Liability To The Affected Bidder Or Bidders. 12. Warranty (section 62 Of The Revised Irr Of Ra 9184): For The Procurement Of Goods, In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Security Shall Be Required From The Contract Awardee For A Minimum Period Of Three (3) Months, In The Case Of Expendable Supplies, Or A Minimum Period Of One (1) Year, In The Case Of Non-expendable Supplies, After Acceptance By The Procuring Entity Of The Delivered Supplies. The Obligation For The Warranty Shall Be Covered By Either Retention Money In An Amount Equivalent To At Least One Percent (1%) But Not To Exceed Five Percent (5%) Of Every Progress Payment, Or A Special Bank Guarantee Equivalent To At Least One Percent (1%) But Not To Exceed Five Percent (5%) Of The Total Contract Price. The Said Amounts Shall Only Be Released After The Lapse Of Warranty Period Or, In The Case Of Expendable Supplies, After Consumption Thereof; Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under The Contract Have Been Fully Met. 13. Liquidated Damages (section 68 Of The Revised Irr Of Ra 9184): All Contracts Executed In Accordance With The Act And This Irr Shall Contain A Provision On Liquidated Damages Which Shall Be Payable By The Contractor In Case Of Breach Thereof. For The Procurement Of Goods, Infrastructure Projects And Consulting Services, The Amount Of The Liquidated Damages Shall Be At Least Equal To One-tenth Of One Percent (0.001) Of The Cost Of The Unperformed Portion For Every Days Of Delay. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, The Procuring Entity May Rescind Or Terminate The Contract, Without Prejudice To Other Courses Of Action And Remedies Available Under The Circumstances.
Closing Soon3 Dec 2024
Tender AmountPHP 907.4 K (USD 15.4 K)

Bulacan State University Tender

Others...+1Electrical and Electronics
Philippines
Details: Description 1 10 Units Item Type: Hp Server Cooling Fan (replacement) "specifications. Voltage Dc 12v Ampere 1 10a Lead 6 Pin Ampere 1 10a Size 40mm×40mm×56mm Blade Quantity: 13 Compatible For Dl360p E G8 Gen8 Bearing: Two Ball Bearing With Warranty Certificate Warranty: Minimum 1 Year" 3,000.00 2 6 Units Thermal Paste "conductivity: 8.5 W/mk Electrically Conductive: No Capacity: 100ml" 100.00 3 3 Units Cable Tester (heavy Duty) "indicator: Led Slow And Fast Test Switch Tests: Rj-45, 10 Base-t, Token Ring, Rj11/12 Cables Power Supply: 9v-battery Max. Cable Length For Testing: 1,000ft." 300.00 4 5 Pcs Crimping Tool For Pass-through "suitable To Crimp 6 & 8 Pin Rj45 Plugs And Rj11 Or Rj12 Ends Heavy Duty Crimper Complete With A Rounded Cable Stripper & Cable Cutter Ideal To Create Rj45, Rj11 Or Rj12 Cables Rust Resistant Steel Frame" 800.00 5 1000 Pcs Rj 45 (pass Through) "connector Type: Rj-45 Housing Material: Plastic Contacts Plating Material: Gold Color: Clear 100 Pcs. Per Pack" 10.00 6 100 Pcs Rj 9 (4p4c) "connector Type: Rj-9 Housing Material: Plastic Contacts Plating Material: Gold Color: Clear 100 Pcs. Per Pack" 3.00 7 1 Unit Lan Multifunctional Wire Tracer "classification: Cat5, Cat6, Cat7 Equipment Type: Network Tester Connector Type: F, Rj12, Rj45 Tone: Yes Power Source: Battery Battery Type: 9v Display Type: Lcd Model Number P:2670 Buttons No:3 Port: Usb System Requirements: Windows Os Warranty: Minimum Of 1 Year On Parts And Services With Warranty Certificate" 20,000.00 8 2 Units Rework Station "power Rated: 730w Air Flow Type: Brushless Fan Air Flow: Capable Up To 120l/min Hot Air Gun: 650w Temperature Range: 100°c-480°c Temperature Stability: ±1.8°f/1.0°c Soldering Iron: 75 W Temperature Range: 200°c-480°c Warranty: Minimum Of 1 Year Manufacturer Warranty With Warranty Certificate" 7,000.00 9 2 Units Soldering Station "input Voltage: Ac 110~127v 60hz/220~240v 50hz Power Rated: 90w Display Type: Led Digital Soldering Iron Temp. Range: 200°c~480°c/392°f~896°f Desoldering Iron Temp Range: 350°c~480°c/662°f~896°f Vacuum Suction: 0.05mpa Operating Temperature: 0-40°c/32°f-104°f Warranty: Minimum Of 6 Months With Warranty Certificate" 5,000.00 10 6 Units Branded Desktop Monitor "screen Size: 27 Inches Panel Type: Ips Brightness: 300cd/m2 Resolution: 1,920 × 1,080 Aspect Ratio: 16:9 Contrast Ration Static: 3,000:1 (typ.) Response Time: 1ms Refresh Rate: 165hz Flicker Free: Yes Warranty: Minimum Of 1-year With Warranty Certificate" 15,000.00 11 6 Units Branded External Nvme Ssd "interface: Usb 3.2 Gen 2x2 (20gbps) Capacity: 1tb Encryption: Aes 256-bit Hardware Encryption Interface: Pcie Gen 4.0 X4, Nvme 2.0 Sequential Read: Capable Up To 2,000 Mb/s Sequential Write: Capable Up To 1,950 Mb/s Uasp Mode: Supported Warranty: Minimum Of 1 Year With Warranty Certificate" 10,000.00 12 3 Units Branded Nvme Ssd "capacity: 1tb Form Factor: M.2 (2280) Interface: Pcie Gen 4.0 X4, Nvme 2.0 Sequential Read: Capable Up To 7,450 Mb/s Sequential Write: Capable Up To 6,900 Mb/s Cache Memory: 1gb Dram Warranty: Minimum Of 1 Year With Warranty Certificate" 8,000.00 13 5 Units Item Type: Hdmi Cable 20 Meters "specifications: Length: 20m Connector 1: Hdmi Connector 2: Hdmi Maximum Resolution: 4k Connector 1 Gender: Male Connector 2 Gender: Male Sheath Color: Black Size Of Strands: 0.254 Mm, 0.32 Mm Outer Sheath Material: Pvc" 1,000.00 14 2 Units Item Type: 1 In 4 Out Hdmi Splitter "specifications: Video Input Interfaces: 1 X Hdmi Type A Female Max. Distance: 5m @3840x2160@30hz Video Output Interfaces: 4 X Hdmi Type A Female Max. Distance: 20m @3840x2160@30hz Video Max. Data Rate: 10.2 Gbps Max. Pixel Clock: 340 Mhz Max. Resolution 4096 X 2160/3840 X 2160 @ 30hz Input: 1 X Hdmi Type A Female (black) Output: 4 X Hdmi Type A Female (black) Connectors Power: 1 X Dc Jack Power Consumption Dc5.3v " 1,500.00 15 1 Unit Item Type: Hdmi Wireless Video Transmitter "transmitter And Receiver Set Wireless Range: 400'/121.92 M (line-of-sight) Channel Bandwidth: 20 Mhz Frequency Range: 5 Ghz Antenna Type: Omni Directional Wireless Features Wireless Standards: Ieee 802.11ac, Ieee 802.11a, Ieee 802.11n, Ieee 802.11g, Ieee 802.11b Frequency: 5ghz, 2.4ghz Signal Rate5ghz: 11ac: Up To 433mbps(dynamic), 11n: Up To 150mbps(dynamic) 11a: Up To 54mbps(dynamic) 2.4ghz: 11n: Up To 200mbps(dynamic) 11g: Up To 54mbps(dynamic), 11b: Up To 11mbps(dynamic) Transmit Power: <20dbm (eirp) Wireless Modes: Ad-hoc / Infrastructure Wireless Security: Support 64/128 Bit Wep Wpa-psk/wpa2-psk, 802.1x Certification: Ce, Fcc, Rohs System Requirements: Windows 10/8.1/8/, Mac Os X 10.9-10.13 At Least 1 Year Warranty With Warranty Certificate" 20,000.00 16 4 Units Item Type: Usb 3.0 Extension With Active Power Amplifier 10m "specifications: Cable Type: Usb3.0 Super Speed Cable Connector: Usb3.0 Type A Male To A Female Connector Finish: Nickel-plated Data Speed: Up To 5gbps Outer Diameter: 5.5mm Compatibility: Windows 7, 8, 10, 11and Mac Os 9.x Or Above Built-in Ic Chipset" 2,500.00 17 5 Units Usb 3.0 To Ethernet Adaptor "specifications: Dimensions: 2.8 X 1.0 X 0.6 In. Output Interface: 1 10/100/1000mbps Rj45 Ethernet Port Input Interface: 1 Usb 3.0 Port Supported Systems: Windows 10 8.1/8/7 Mac Os 10.6-10.14 Chipset: Rtl8153" 1,000.00 18 5 Units Item Type: Wifi Usb Adapter "specifications: Hardware Features Interface: Usb 2.0 Dimensions (wxdxh): 15*7.1*18.6mm Antenna Type: Omni Directional Wireless Features Wireless Standards: Ieee 802.11ac, Ieee 802.11a, Ieee 802.11n, Ieee 802.11g, Ieee 802.11b Frequency: 5ghz, 2.4ghz Signal Rate5ghz: 11ac: Up To 433mbps(dynamic), 11n: Up To 150mbps(dynamic) 11a: Up To 54mbps(dynamic) 2.4ghz: 11n: Up To 200mbps(dynamic) 11g: Up To 54mbps (dynamic), 11b: Up To 11mbps(dynamic) Transmit Power: <20dbm (eirp) Wireless Modes: Ad-hoc / Infrastructure Wireless Security: Support 64/128 Bit Wep Wpa-psk/wpa2-psk, 802.1x Certification: Ce, Fcc, Rohs System Requirements: Windows 10/8.1/8/,mac Os X 10.9-10.13" 500.00 19 2 Units Item Type: 2-bay Docking Station "specifications: Material: Abs Interface: Type-c Transmission Rate: Usb3.2 Gen2 10gbps Power Supply: 12v3a Support Capacity: 36tb Data Cable: Type C To Type C/a Data Cable (pd60w Supported) Features: Support Uasp Acceleration Protocol, Straight Plug-in Dust-proof Design, Drive Free Installation With Warranty Certificate Warranty: 1 Year Warranty" 1,500.00 20 10 Sets Keyboard And Mouse Combo - Branded "type: Wireless Keycaps: Traditional Hotkeys:12 Fn Multimedia Hotkeys Splash Proof: Yes Adjustable Keyboard Legs: Yes Hardware Connectivity: Usb•branded Mouse Type: Wireless-resolution: Up To 1200 Dpi Buttons No:3 Port: Usb System Requirements: Windows Os Warranty: Minimum Of 3 To 6 Months On Parts With Warranty Certificate" 1,000.00 21 4 Units "uninterruptible Power Supply With Avr 2200va/1200 Watts 230v" "minimum Specifications: Output: Main Input Voltage: 230 V Rated Power In W: 1200 W Rated Power In Va: 2200 Va Output Connection Type: 4 Universal Receptacle Battery Type: Lead-acid Battery Network Frequency: 50/60 Hz +/- 5 Hz Auto-sensing Maximum Configurable Power In W: 1200 W Maximum Configurable Power In Va: 2200 Va Output Frequency: 50/60 Hz +/- 1 Hz Sync To Mains Ups Type: Line Interactive Surge Energy Rate: 273 J Warranty: Minimum Of 1 Year On Parts And Services With Warranty Certificate" 20,000.00 22 1 Unit Uninterruptible Power Supply 1000va/600w "main Input Voltage: 230 V Main Output Voltage: 230 V Rated Power In W: 600 W Rated Power In Va: 1000 Va Output Connection Type: 4 Universal Receptacle Battery Type: Lead-acid Battery Maximum Configurable Power In W: 600 W Surge Energy Rate: 156 J Maximum Configurable Power In W: 600 W Warranty: Minimum Of 1 Year On Parts And Services With Warranty Certificate" 7,000.00 23 10 Pcs Usb Wired Number Pad "specifications: No Num Lock Key Length: 3 Feet Usb Cord Plug And Play Os Compatibility: Windows 10, 11; Mac Os X (updated Versions) At Least 1 Year Warranty" 1,000.00 24 4 Sets Item Type: Wireless Cctv Ip Camera Kit "specifications: Nvr/auxiliary Interface Sata: 1 Capacity: Up To 6 Tb Capacity For Each Disk Usb Interface: Rear Panel: 2 X Usb 2.0 Nvr/general Power Supply: 2 Vdc Kit Accessories: Power Cable: 4 X Ipc Power Cables, 1 X Nvr Power Cable Ethernet Cable: Rj45, Cat5e Utp, 1 M. Connects Nvr And Switch Hdmi Cable: 1 X Hdmi Cable, 2 M, Black At Least 1 Year Warranty With Warranty Certificate" 30,000.00 By Item
Closing Soon2 Dec 2024
Tender AmountPHP 539.3 K (USD 9.1 K)

Department Of Environment And Natural Resources - DENR Tender

Housekeeping Services
Corrigendum : Closing Date Modified
Philippines
Details: Description Terms Of Reference For The Procurement Of One (1) Year Janitorial Services For The Department Of Environment And Natural Resources Regional Office Xii (denr Ro Xii) I. Objective The Department Of Environment And Natural Resources Regional Office Xii, In Its Daily Operations, Needs To Maintain A Clean And Healthy Working Environment That Is Conducive To All Its Officials, Employees And Clients, Ensuring An Uninterrupted, Effective And Efficient Delivery Of Programs And Services. Thus, It Is Necessary To Acquire A Reputable Service Provider, Which Will Provide Necessary Assistance For The Denr Regional Office Xii Main Building, Hostel And Land Records Building Including The Grounds And Gardening. Ii. Contract Duration And Price The Proposed Service Provider For Janitorial Services Shall Be For The Period Of Twelve (12) Months, To Commence On 01 January 2025 Up To 31 December 2025, With An Approved Budget For The Contract (abc) Amounting To Two Million Pesos Only. Nine (9) Janitorial Personnel Shall Be Assigned To The Denr Regional Office Xii, Aurora Quezon Street, Barangay Zone Iv, Koronadal City, South Cotabato. Iii. Qualifications Of The Service Provider 1. Qualification Of Prospective Bidders As Set Under Ra 9184: Technical Documents A. At Least Three (3) Years Of Experience In Providing Janitorial And/or Housekeeping Services For The Past Five (5 Years). B. Solid Waste Management Plan Pursuant To Ra 9003 Or The “ecological Solid Waste Management Act"; C. Duly Licensed And Registered Service Provider With The Department Of Labor And Employment; D. Certification Of No Pending Labor Case/s From Dole; E. Duly Registered With The Securities And Exchange Commission, Department Of Trade And Industry, Or Cooperative Development Authority; F. Present One (1) Client / Customer Feedback Forms, With At Least Very Satisfactory Rating, From At Least One (1) Government Agency Or Private Corporations, With Whom The Service Provider Has Ongoing Contract Or Had Contract Within The Past 2 Years G. Registration On Securities And Exchange Commission; Social Security System (sss), Home Development Mutual Fund (pag-ibig), And Philippine Health Insurance Corporation (philhealth) Financial Documents A. Certification Of Updated Payments And Contributions---social Security System (sss), Home Development Mutual Fund (pag-ibig), And Philippine Health Insurance Corporation (philhealth); B. Submit Statement Of All Ongoing Contracts; C. Submit Statement Of Single Largest Completed Contract (slcc); D. Duly Registered With The Bureau Of Internal Revenue (bir); And E. Submit A Committed Line Of Credit Or Net Financial Contracting Capacity (nfcc) That Is At Least Equal To The Approved Budget For The Contract Or Abc Iv. Obligations Of The Winning Janitorial Service Provider A. Provide, Assign And Designate Eight (8) Janitorial Personnel, And One (1) Supervisor, On An 8-hour Basis, Six Days A Week, From Monday Through Saturday (if Needed) Excluding Holidays And Sundays On A Continuing Service Within The Contract Period; B. Provide Additional Or Reduce The Number Of Janitorial Personnel As May Be Directed By Denr Xii Through A Written Notice Under The Same Terms, Conditions And Rate Of Compensation Set Forth In The Contract Of Service; C. Rotate, Reassign, Suspend, Terminate Or Impose Disciplinary Measures On Erring Janitorial Personnel Based On The Validated Complaints Submitted And Upon Written Request Of The Chief Of The Administrative Division. Replacement/movement/termination Of Assigned Janitorial Personnel Should Not Be Done Of Effected Without Prior Notice To The Denr Xii At Least Thirty (30) Days Prior To The Intended Action Of The Service Provider, Unless For Justifiable Or Legal Cause/s, Which Requires Submission Of A Report Of The Action Taken At Least One (1) Day After The Incident; D. Provide Safety Work Clothing To Protect Worker While Performing Delicate Tasks. Safety Shall Not Be Compromised At All Times; The Service Provider Shall Not Deduct From The Salary Or Claim From The Personnel The Cost Of Uniforms; E. Provide Janitorial Supervisor Desktop Or Laptop For Reporting Duties And Paperwork; F. Ensure Strict Compliance Of Its Workers With Denr Xii Rules And Regulations And Avoid Activities That Disrupt The Discharge Of Function (i.e. Unnecessary Use Of Gadgets, Playing, Alcohol Drinking); G. Firmly Responsible And Liable For Any Loss Or Damage Of Denr Xii Property Due To Gross Negligence Or Deliberate Act Of Janitorial Personnel. The Amount Of Loss Or Damage Shall Be Deducted From The Bill. The Denr Regional Office Xii May Suspend Or Withhold Whatever Contract Payments May Be Due The Service Provider Should They Fail To Pay Such Losses Or Damages Within Fifteen (15) Days From The Date Of Notice, Or Until Such Loss Or Damage Shall Have Been Duly Paid, Restituted Or Repaired By The Service Provider, Or Go After The Performance Bond Set Forth In This Contract Agreement. Likewise, The Denr Regional Office Xii Has The Option To Demand Payment For The Replacement Value Of The Lost Properties, Or Its Replacement By Another At Least Substantially In The Same Condition As The Former; H. There Shall Be No Employer-employee Relationship Between Denr Xii And The Janitorial Personnel And Other Personnel Employed By The Service Provider; I. Hold Denr Xii Free From Any Action Or Liability Arising From Any Claims Of Janitorial Personnel And Other Personnel Employed By The Service Provider For Benefits Under The Labor Code Of The Philippines. Any Increase In Wage, Social Security Contributions, Or Any Similar Payments As May Be Imposed By Law Or Competent Authority Shall Be Subject To The Availability Of Savings And Upon Showing Actual Payment Made To Their Employees. H. Provide Brand New Equipment, Tools And Cleaning Supplies Specified In The Terms Of Reference Delivered In Accordance With The Specified Delivery Dates. Prior To The Execution Of The Contract, All Equipment, Garden Tools And Cleaning Supplies Shall Be Presented To The General Services Section (gss) For Inventory And Monitoring Purposes, And Shall Turn Over To Gss The Said Items For Safekeeping; I. Ensure That Payment Of Wages On A Regular Schedule Every 15th And 30th Of Each Month And Other Benefits In Accordance With The Existing Wage Law And Provisions Of The Labor Code And Their Implementing Rules And Regulations; J. Submit On Or Before The 5th Day Of The Succeeding Month Proof Of Compliance With Legal Requirements On The Payment Of Salaries, Remittances And Taxes, As Well As The Agency’s Monthly Performances/accomplishment Report, Secure A “certificate Of Acceptance”. These Documents Shall Serve As A Prerequisite For Payment For Every Billing Period; K. The Services Provider Shall Provide Its Personnel Their Monthly Pay Slip, Reflecting Minimum Wages And Other Benefits Mandated By Law; L. Provide Each Janitor Personnel With A Copy Of The Manual Operations/company Rules And Regulations Of The Service Provider On The Following: 1. Recruitment Of Personnel; 2. Salaries Of Personnel; 3. Attendance / Leave Credits; 4. Performance Standards; 5. Sanctions For Violation(s) Of Company Rules And Regulations; 6. Equipment Of Supplies M. Hold Denr Xii Free From Any Liability From Acts Of Its Janitorial Personnel Which Cause Damage Of Whatever Nature To Denr Xii Employees And Properties Or To Any Third Party And Their Properties; N. Ensure Appropriate Response To Situations That Require Immediate Assistance, In Any Form, To Its Employees During Emergency Or Crisis Situation, Without Any Additional Cost To Denr Xii; O. Ensure That All Supplies, Materials And Equipment Provided To The Denr Xii Are Environment Friendly; And P. Maintain At All Times The Cleanliness/sanitation Within The Denr Xii Premises, Including Gardening, Plant Propagation And Plant/tree Trimming, And Shall Fulfill Other Related Tasks That May Be Assigned By Responsible Officers Of The Denr Xii; 3. Obligations Of Denr Xii A. Process And Effect Payments Of Actual Janitorial Personnel Rendered Within Fifteen (15) Working Days From Receipt Of The Billing Statement; B. Monitor Attendance, Payment Of Salaries, Remittances, And Taxes To The Government As Required By Law; C. Conduct Periodic Inspection And Require Immediate Replacement Of Defective Janitorial Equipment; D. Conduct “quarterly Performance Evaluation” To Assess The Quality Of Work Of Individual Janitorial Personnel And The Service Provider Performance, And Determine Compliance With The Terms And Conditions Of The Contract; E. Request For A Replacement Of Any Janitorial Personnel In Cases Of Unsatisfactory Performance And/or Other Valid Causes As Determined By Proper Authority By Notifying In Writing The Service Provider; F. The General Services Section Shall Check All Equipment, Tools, Supplies And Materials Presented By The Service Provider Prior To The Execution Of The Contract; Conduct Inventory And Safekeeping Of Equipment, Tools And Supplies Turned Over By The Service Provider, And Subsequently Issue The Necessary Certificate Of Acceptance As Basis For Final Payment To The Said Service Provider 4. Service Provider Shall Provide, But Not Limited To The Following Type And Quantity Of Tools, Supplies, Materials And Equipment, Which Must Be Of Guaranteed High Quality To Ensure Maximum Cleaning Results And Carry Out The Proposed Janitorial Services Within The Contract Period In Accordance With The Specified Delivery Terms: A. The Service Provider Shall Provide The Following Equipment And Materials Upon Deployment Of Janitorial Personnel To Denr Regional Office Xii: Description Unit Quantity Equipment Mop Squeezer With Bucket Unit 8 Rolling Bin Unit 3 Caution Sign With Accessories Pieces 5 Aluminum Extension Ladder 10ft Unit 2 Garden Hose 5/8” X 50” With Nozzle Roll 2 Grass Cutter Unit 2 Pail, At Least 4-gallon Capacity Piece 42 Garden Shears Unit 2 Push Cart (steel 4x6x2) Unit 2 Pressure Washer With Nozzle (heavy Duty) Unit 1 Portable Pressure Washer Unit 1 Heavy Duty Vacuum Wet And Dry (carpets And Sofa) Unit 1 Materials Dustpan Piece 8 Ceiling Brooms Piece 4 Mop Handle, Aluminum, Heavy Duty Piece 8 Glass Squeegee Piece 8 Toilet Bowl Pump Piece 8 Push Brush Piece 8 Cleaning And Gardening Tools Trowel Piece 4 Shovel Piece 2 Rake Piece 2 Street Broom Piece 10 Bolo (heavy Duty) Piece 4 Garden Scissor With Extended Handle Piece 2 Wheelbarrow Piece 1 Personal Protective Equipment (start Of Contract) Hand Gloves Pairs 8 Safety Shoes (light Duty) Pairs 8 Garbage Clipper Pcs 8 B. The Following Supplies And Consumables Must Be Provided To The Denr Regional Office Xii In A Monthly Basis, Especially, Every First Monday Of The Month: Fabric Conditioner/softener Sachets/pcs 500 Microfiber Towel Piece 26 Chlorine Kilos 8 Detergent Powder Sachets/pcs 700 Oxalic Kilos 8 Garbage Bag Biodegradable/compostable, Xlarge (1pack = 10pcs) Transparent Rolls 20 Garbage Bag Biodegradable/compostable, Large (1pack = 10pcs) Transparent Rolls 20 Garbage Bag Biodegradable/compostable, Medium (1pack = 10pcs) Transparent Rolls 20 Scouring Pad/hand Pad Pcs 18 Glass Wiper Pcs 4 Deodorant Cake Pcs 42 C. The Following Supplies And Consumables Must Be Provided To The Denr Regional Office Xii In Quarterly Basis And Delivered Every 15th Day Of The First Month Of The Quarter: Description Unit Quantity Hand Dustpan And Brush Piece 8 Soft Broom Piece 8 Stick Broom Piece 8 Toilet Bowl Brush Piece 8 Disinfectant (cleaner) Gallon 8 Mop Head Pcs 8 Floor Polishing Pad Piece 8 Stripping Pad Piece 8 Liquid Sosa Gallon 2 Dust Grabber (duster) Piece 8 Doormat, Rectangle Shape (for Comfort Rooms) Piece 42 Glass Cleaner Gal 2 Cleaning Materials Needed For Optimal Results Shall Be Provided And Shall Be Replaced Or Replenished, If Exhausted. The Service Provider Shall Hold The Denr Regional Office Xii Free From Any Liability Arising From Loss Or Damage Of Such Materials And Equipment. Appropriate Internal Control On Inventory Management Shall Be Implemented By The Janitorial Service Provider And Shall Be Audited By Denr Regional Office Xii Authorized Representative. 5. Deployment Of Janitorial Personnel: The Service Provider Shall Deploy Janitorial Personnel Distributed To Three Buildings Of The Regional Office Including Those Outside Vicinity And Garden Of The Main Building (center Wing, Right Wing, Left Wing), Hostel Building And Land Records Building. Note: 1. List Of Area Of Deployment Shall Be Provided To The Winning Bidder. 2. Some May Be Required To Report From 8:00am To 5:00pm Or 9:00am To 6:00pm Or As Scheduled During Special Activities Or Denr Occasions. 6. Additional Documentary Requirements For Post Qualification Purposes: 6.1 Company Profile 6.1.1 Name Of Clients 6.1.2 Number Of Years Serving Each Client 6.1.3 Amount Of Contract And Corresponding Number Of Personnel Deployed 7. Janitorial Qualifications Of Janitorial Personnel A. Two (2) Years Completion In High School, Transcript Of Record Must Be Submitted; B. Must Be Physically Fit To Work, Medical Certificate / Clearance From A Government Physician, As Well As Drug Test Results Must Be Submitted; C. Must Be Of Good Moral Character, Reputation, Courteous, Alert And Without Any Criminal Or Police Record. Police And National Bureau Of Investigation (nbi) Clearances Must Be Submitted; And D. At Least One (1) Year Work Experience In A Government Agency / Facility. E. Submission Of All Janitorial Personnel’s Resume, Transcript Of Record, Medical Certificate / Clearance, Drug Test Result, And Police And Nbi Clearance Will Be Required Within Fifteen (15) Days Upon Issuance Of Notice To Proceed (ntp). 8. Duties And Responsibilities Of Janitorial Personnel, But Not Limited To The Following; A. One (1) Janitor Supervisor A. Make Rounds To Check His/her Subordinates, Provides Special Cleaning Instructions And/or Assignment, And Ascertain Compliance With Directive; B. Conducts Inspection To Check Cleanliness And Orderliness Of The Premises, And Informs His/her Subordinate Of Corrections Necessary; C. Determines And Ensures Delivery Of Materials, Supplies Needed And Timely Informs The General Services Section Of The Requirement; D. Trains Subordinates On Proper Cleaning Methods, Use Of Equipment, Safety Practice And Work Regulations. E. Informs The Gss Concerning Janitorial Services And Vice Versa F. The Supervisor Of The Janitorial Personnel Shall Receive Instructions From Responsible Officers Of The Denr Xii (chief Of The Administrative Division And Chief Of The General Services Section) On The General Implementation Of The Terms And Conditions Of The Contract; G. Submit To The Chief General Services Section A Monthly Manpower Schedules Every First Monday Of The Month; H. Submit To The Gss A Projected Monthly And Quarterly Schedule Of Cleaning Within Ten (10) Days Before Assumption Of Duties; I. Evaluate And Verify Employee Performance Through A Review Of Completed Work Assignments. He/she Shall Submit To The Gss Quarterly Performance Evaluation Of The Janitorial Staff; J. Conduct Inspection Of The Premises To Ensure Clean And Safe Conditions And Inspect Equipment For Cleanliness And Repair; K. Prepare Daily Bathroom Cleaning Checklist. Checklist Must Be Attached To The Back Of Each Cr’s Door; L. Submit Every First Monday Of The Month To The Gss A Report Of The Supplies Consumed During The Previous Month And An Inventory Of The Remaining Supplies To Be Consumed For The Year; And M. Ensure Correctness Of Daily Log Entries Of All Janitorial Personnel Assigned To The Denr Xii. B. Eight (8) Janitorial Personnel A. Maintain The Cleanliness And Orderliness Of The Building And Premises. This Includes Protection Of Properties From Damage Or Destruction In Connection With The Janitorial Activities Rendered, Preservation Of Confidentiality Of Denr Regional Office Xii Records, And Proper Collection And Disposal Of Garbage. B. Miscellaneous Services To Be Performed Whenever Required I.e., Logistical Assistance During Meetings And Conferences; Hauling Of Office Furniture, Fixtures And Equipment; And Other Necessary Errand Works Within And Outside The Denr Regional Office Xii Premises, As Requested By Denr Regional Office Xii Officials And Personnel. 9. Scope Of Services 8.1 Janitorial Personnel Shall Render Eight (8) Hours Of Work A Day, From Monday To Saturday In Order To Perform, But Not Limited To The Following Tasks: Hourly Routine Operations A. Clean, Sanitize And Deodorize Restrooms And Washrooms To Include Toilet Bowls, Urinals, Sinks, Wash Basins And Lavatories; B. Mop Restrooms Floors With Disinfectant Cleaners; C. Monitor And Refill Water Supply And Other Supplies, As Needed; Daily Periodic Routine Operations Offices, Hallways, Lobbies And Other Common Areas A. Sweeping, Dusting, Mopping And Polishing Floors Of All Rooms, Corridors, Lobbies, Stairs, Walkways, Waiting Areas And Entrances Or Areas Which May Be Specified By The Denr Regional Office Xii; B. Cleaning And Wiping Of All Office Tables, Glass Tops, Furniture And Fixture, Equipment, Appliances, Windows Ledges, Counters, Doorknobs, And Glass Partitions And Doors; C. Prepare And Serve Refreshment During Conference And/or Meetings; Parking Areas, Driveway, Outdoor And Perimeter Area D. Cleaning Of Driveways, Parking Spaces And Immediate Surroundings Of The Buildings; E. Proper Disposal Of Solid Waste From Various Parts Of The Area Assigned To The Designated Trash Storage Of The Denr Regional Office Xii Compound; F. Upkeep Of Indoor Potted Plants; And G. Maintenance Of Landscape Including But Not Limited To Watering Of Plants, Weeding Gardens, Trimming Trees And Shrubs, And Keeping Green Spaces, And Walkways Clear Of Debris And Litter. Weekly Periodic Routine Operations The Weekly Routine Services Of Janitorial Personnel Shall Include: D. Spot Scrubbing, Dirt Stain Removal And Cleaning Of Chairs, Carpets, And Rugs; E. Thorough Cleaning, Washing And Scrubbing Of All Rooms And Crs Facilities; F. Cleaning And Polishing On The Inner Surfaces Of All Window Glasses, Sun Baffles, Walls, Counters, Light Diffusers, Picture Frames And Wall Hanging; G. Washing, Scrubbing, Stripping, Waxing And Polishing Floors; H. Disinfecting Of All Bathrooms; And I. Any Other Works Advised By The Denr Regional Office Xii In Connection With The Services. Monthly Periodic Routine Operations The Monthly Routine Services Of Janitorial Personnel Shall Include: J. Dusting And Removing Of Cobwebs From Ceiling Of The Premises; K. Cleaning Of Ornamental Plants And Polishing Stairs Railings And Metal Signs; L. General Cleaning Of Draperies And Blinds; M. Spraying Of Insecticides And Other Pest Control Activities, When Necessary; N. Refilling Of Liquid Deodorizer, Liquid Soaps, And Among Other In All Bathrooms; And O. Trimming Of Grass / Shrubs In The Denr Regional Office Xii Grounds. Quarterly Periodic Routine Operations The Quarterly Routine Services Of Janitorial Personnel Shall Include: P. Thorough General Cleaning Of All Areas Including Windows; And Q. Thorough Shampooing Of All Chairs, Panels, Carpets And Rugs. Miscellaneous Routine And Other Services. Miscellaneous Services To Be Rendered By Janitorial Personnel As Per Request Of The Concerned Office Of The Denr Regional Office Xii Shall Include, But Not Limited To: R. Carrying, Transporting Or Moving Of Office Furniture, Equipment Or Supplies Within And/or Outside Premises As May Be Assigned From Time To Time Or During Major Denr Xii Activities; S. Report Any Damage/leaking Pipe Plumbing, Water And Toilet Facilities, Electrical Installations, And Any Damage Furniture And Fixture That Will Need Immediate Repair; T. Errand Services As Required By Concerned Denr Xii Office. In Performing Errand Services, The Janitorial Personnel Must Fill Out A Pass Slip, Duly Authorized By The Janitor Supervisor, Which Shall Be Submitted To The Security Guard On Duty In Order To Be Informed Of Higher Whereabouts Or Itinerary In Case Of The Need To Be Located Or Contracted; And U. Render Extra Hours Of Service During Special Occasions And Affairs Celebrated/held By Denr Xii. 10. Other Matters A. The Service Provider Shall Furnish The Denr Regional Office Xii With A Valid And Sufficient Performance Bond In Accordance With The Rules Set Forth Under Government Procurement Reform Act (r.a No. 9184) And Its 2016 Implementing Rules And Regulations (irr). B. Should There Be Any Wage Or Mandated Benefit (i.e., Sss, Pag-ibig And Philhealth) Increase In Favor Of The Assigned Janitorial Personnel Subsequent To The Execution Of The Contract Pursuant To A Law, Executive Order, Decree Or Wage Order, The Service Provider Must Inform The Denr Regional Office Xii In Writing Of The Wage Increase To Allow The Letter To Undertake The Appropriate Measures To Address The Same Before Its Implementation, Subject To The Accounting And Auditing Rules And Regulations And Upon Showing Actual Payment Made To Their Employees. C. The Service Provider Shall Furnish Denr Regional Office Xii The Monthly Billing, Together With Copies Of Payroll, Remittances (with Official Receipt Of Sss, Pag-ibig And Philhealth) And Other State Insurance Fund Contributions For All Janitorial Personnel Assigned, Every 15th Of The Month. Should The Janitorial Agency Fail To Comply, Denr Xii Shall Withhold The Payment For The Current Month Until The Latter Shall Have Complied With Subject Requirement. D. It Is Expressly Understood That No Employee-employer Relationship Exists Between The Parties Of Their Employees, Representatives And Agents. The Denr Regional Office Xii Shall Not Be Responsible For Any Claims For General Injury, Including Death Sustained By The Janitorial Personnel Or Any Third Person Arising Out Of Or During The Performance Of The Functions Of The Janitors Pursuant To This Contract. E. The Service Provider Shall Maintain Effective Discipline And Full Control And Supervision Over The Janitorial Personnel Assigned Under This Contract Agreement, As Well As The Manner Of Performance Of Their Duties. However, The Service Provider Binds Itself To Cause The Implementation And Enforcement Of All Rules, Regulations Or Directives That Denr Regional Office Xii May Issue Concerning The Conduct Of Said Janitorial Personnel. F. The Service Provider And Its Janitorial Personnel Shall Undergo Periodic Performance Evaluation Which Shall Serve As The Basis Of Continuation Of Its Services. G. Extension Of Contract Is Subject To The Provisions Of R.a. No. 9184 And Its 2016 Irr. The Extended Term Shall Automatically Terminate Upon Effectivity Of A New Contract. H. The Service Provider Agrees That The Denr Regional Office Xii, Through Property And Supply Section, Reserves The Right To Screen And Accept Or Deny The Deployment Of Any Personnel Recommended By The Service Provider. Notes: A. Should There Be Any Discrepancy With The Technical Requirements Stipulated Herein And The Terms Of Reference, Requirement/s Provided For In The Former Shall Govern. B. Any Other Term, Condition Or Provision Not Stipulated In This Document Will Be Covered By A Separate Agreement As Proposed And Agreed Upon By Denr Regional Office Xii And The Janitorial Agency. C. Bidders Must Comply With All Specifications Contained In This Pr, Tor And Supplemental Bid Bulletin, If Any. D. The Denr Regional Office Xii Has The Right To Screen Applicants And Choose The Personnel To Be Assigned. Additional Requirements The Bidder Shall Submit The Following, Within Fifteen (15) Days Upon Issuance Of The Notice To Proceed (ntp), Valid Upon Submission: A. Photo Of Janitorial Uniform Or Workwear; B. Janitorial Personnel’s Resume; C. Transcript Of Record; D. Medical Certificate/clearance (must Be Valid For One (1) Year Or Before The Deadline For The Submission And Receipt Of Offers, Preferably Issued This Year); E. Drug Test Result (must Be Valid For One (1) Year Or Before The Deadline For The Submission And Receipt Of Offers, Preferably Issued This Year); F. Police And Nbi Clearances (must Be Valid For One (1) Year Or Before The Deadline For The Submission And Receipt Of Offers, Preferably Issued This Year). Terms Of Payment Payment Shall Be Made On A Monthly Basis For Twelve (12) Months Subject To Submission Of Billing Statement And Other Supporting Documents By The Service Provider. Services Shall Only Be Billed Based On The Actual Services Received By Denr Regional Office Xii, Hence, May Be Computed By A Fraction Of A Month.
Closing Soon2 Dec 2024
Tender AmountPHP 2 Million (USD 34 K)

Municipality Of Bayambang Pangasinan Tender

Civil And Construction...+5Others, Drainage Work, Other Consultancy Services, Consultancy Services, Civil And Architectural Services
Philippines
Details: Description Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 A. Introduction The Local Government Unit Of Bayambang, Pangasinan Is Seeking A Design Consultant To Develop Its Master Flood Control Project Within The Bayambang Downtown Area For Implementation. As Part Of The Initial Stage In The Project Development Cycle, Flood Control Master Planning And Feasibility Studies Assessing The Technical, Economic, Environmental, And Social Impacts Of The Project Are Required.; The Proposed Conduct Of Data Gathering, Existing Road Topographic Survey And Investigations, Hydrology-flood Survey, And Economic Evaluation For The Feasibility Study Of This Project Is Envisaged To Be Undertaken By A Local Consultant To Be Outsourced By The Local Government Unit Of Bayambang, Pangasinan, With The Assistance Of The Municipal Engineering Office (meo), Municipal Planning And Development Office (mdpo),municipal Disaster Risk Reduction And Management Office (mdrrmo), And Ecological Solid Waste Management (eswmo). The Output Of The Consulting Service Shall Be The Conduct Of The Feasibility Study Of Bayambang Flood Control Master Plan. The Bayambang Flood Control Within The Municipality Of Bayambang, Pangasinan. Those Rivers Which Transverses In The Middle Of The Main Town Of Bayambang. During Typhoons, The Bayambang Town Proper And Parts Of Its Nearby Barangays Experience Flooding Which May Be Brought By The Shortage In Canals And Outlets And Being A Low Land Area. Further Study Is Needed To Properly Address The Needed Countermeasures And Solution To Prevent Flooding In The Mentioned Affected Areas. B. Objectives The Consultants Shall Prepare A Suitable Optimal Program Of Investments For The Project, Which Would Be Consistent With The Government’s Development Plans. The Consultants Shall Also Identify The Complementary Investments Needed To Ensure The Success Of The Road Investments. By The End Of The Consulting Period, The Consultants Is Expected To Produce A Comprehensive Feasibility Study Based On Updated Information With A Definite Implementation Plan Of The Recommended Scheme Based On The Alternatives/ Configurations Considered, Among Others, Including The Preliminary Engineering Concept/ Design And Economic Evaluation. Specifically, It Aims To Achieve The Following Undertakings: 1. Establish The Flood Control Master Plan, Policy, Strategy, Target Design Flood Magnitude And Drainage System Improvement Work And Tributaries With Consideration On Adaption On Climate Change Based On Accepted Projection; Consulting Services For The Data Gathering, Surveys And Investigations Of The Feasibility Study Of Bayambang Flood Control Master Plan 2. Identify All Possible Alternative Flood Mitigation Measures And Effective Water Infrastructure Based On Integrated Water Resource Management Principles, Including Sediment Control Works, If Necessary; 3. Recommend And Formulate Appropriate Non-structural Measures Such As Flood Hazard Mapping, Land Use Control, Flood Forecasting And Warning, Identification Of Evacuation Areas/ Routes, Solid Waste Management, Watershed Management, Etc. For Flood Disaster Risk Reduction And Management; 4. Identify Possible Geological And Geotechnical Hazards And Recommend Structural And Non- 1remarks: Bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Unamended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances. Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 19 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 Structural Measures To Reduce The Effects Of These Hazards; 5. Formulate Flood Control Project Implementation Plan; 6. Prioritize Projects Based On Technical, Economic, Social And Environmental Feasibility; 7. Recommend, Formulate And Prepare Necessary Data/ Information For The Detailed Engineering Design Stage Of The Target Flood And River Basin Areas And Tributaries; 8. Estimate The Quantities And Cost Of Each Component Of The Project; C. Scope Of Consulting Services The Scope Of Consulting Services Will Involve The Preparation Of The Master Plan, Detailed Feasibility Study Report Including The Environmental And Social Assessments Which Is The Subject Of The Terms Of Reference (tor). The Consultant's Scope Of Work Will Cover But Not Necessarily Be Limited To The Items Listed Hereunder:  Scope Area For The Proposed As-built Survey And Topographic Survey Is 6.16 Hectares.  Scope Area For The Proposed Hydrographic Survey And Analysis Is 140 Hectares The Consultants Will Conduct: 1. General 1.1 Perform Field Reconnaissance Of The Study Areas With Regards To: A. The Existing Situation Of The Rivers, Waterways, Existing Drainage System (including Existing Infrastructure) B. The Existing Situation Of Irrigable Lands C. Tentative Identification Of Alternative (possible) Flood Mitigation Measures D. Locally Available Data On Socio-economic Activities 1.2 The Consultant Shall Perform Field Investigation Of The Study Areas With Regards To: A. Additional Information On The Existing Situation (condition) Of The Flood Prone Areas B. Identification Of Alternative Improvement Plan C. Potential Environmental Impact Of Projects On Natural And Socio-cultural Setting And Hazards That Could Impact On The Project 1.3 The Local Government Unit Of Bayambang Will Provide The Available Data And Reference Materials, But The Consultant/s Shall Remain Solely Responsible For Assessing The Accuracy Of The Data; For The Preparation Of All Field Surveys And Investigations And For The Findings And Recommendation Arising Therefrom And Presented In Their Reports; 1.4 The Study Shall Be Performed In Accordance With Accepted Professional Standards Utilizing Sound Engineering, Economic Evaluation Practices, And Environmental And Social Safeguards Requirements. The Consultants Shall Adopt Any Of The Accepted Evaluation Models Which Are Also Being Used By Dpwh; 1.5 The Consultant Shall Recommend Technical Solutions With Respect To Type Of Improvement And/or Construction Required And Appropriate Justification; And 1.6 The Consultant Shall Coordinate With The Implementing Office’s Representative With Regards To The Environmental And Social Safeguards Issues During Technical And Economic Evaluation. 1.7 The Consultant Shall Conduct Research On All Available Studies And Scenarios Regarding Climate Change And Incorporate Its Possible Effects In The Flood Risk Of The Target Flood Control Project (i.e. Rainfall Intensity And Frequency, Extreme Events, Etc.) And Indicate The Possible Impact Mitigation. Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 20 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 1.8 The Study Shall Be Undertaken In Accordance With The Planning Guidelines On Integrated Water Resources Management (dpwh — The World Bank, 2016). 2. Detailed Scope Of Works 2.1 Consolidation Of Data/ Information The Consultant Shall Gather All Information Of The Study From The Different Government Agencies Listed Below: 2.1.1 Office Of Civil Defense — National Disaster And Risk Reduction Management Center/ Provincial Disaster Risk Reduction Management Office / Municipal Disaster Risk Reduction Management Office (ocd — Ndrrmc/pdrrmo/mdrrmo) The Consultant/s Shall Identify The Following For The Respective Study Area: - Historical Flood And/ Or Debris Flow Events - Location Of Flood Prone Areas - Frequency Of Flooding For The Past 10 Years - Maximum Flood Depth, Duration (hours) - Dates Of Occurrence Of Flooding - Normal Flood Depth, Duration (hours) - Name Of Particular River From Which Flood Water Has Overflowed - Flood Damage Survey Reports With Corresponding Typhoon Event 2.1.2. Administrative Information (local Government Units) - Comprehensive Land And Water Use Plan - Population Growth Distribution - Regional Economic Growth Capita - Development In The Study Area With Respect To Its Agricultural And Forestry, Tourism (public And Private Plans), Manufacturing And Processing Industries, Mining, Untapped Resources And Infrastructures - Socio-economic Profile 2.1.3 Philippine Atmospheric Geophysical And Astronomical Services Administration (dost - Pagasa) Secure Updated And Certified Data Such As The Study Area’s Hydrologic, Climatic, And Meteorological Conditions. 2.1.4. Department Of Environmental And Natural Resources — Environmental Management Bureau/ Mines And Geoscience Bureau (denr — Emb/mgb) Verify The Land Use Classification, Protected Areas And Environmental Conditions (river Morphology, Utilization Of Riverbed Materials, Mining Activities And Watershed Situation) Of The Study Area. 2.1.5 Department Of Agriculture - National Irrigation Agency (da - Nia) Identify The Water Supply And Irrigation System Of The Study Area. 2.1.6 Department Of Public Works And Highways Determine The Different Locations Of Water Supply And Existing Flood Control Structures Such As Drainage Outlets, Sabo Facilities, Etc. Basic Analysis With The Consolidated Data Gathered, The Consultants Shall Perform Hydrologic Analysis Using Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 21 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 Hydrological Models Within The Limits Of The Catchment Area That Will Provide The Appropriate Recommendation For The Flood Mitigation Measure. 2.2 Rainfall Analysis Gather Available Data Such As Climatological And Rainfall Data Of The Project Area. Probable Rainfall Shall Be Estimated For Use In The Determination Of Probable Discharge And Planning For The River Improvements In The Study Area. The Consultant Shall Use The Runoff Modeling Software Subject To The Approval Of The Proponent, Which Shall Be Supported By The Following Data To Be Collected, Gathered And Established: - Delineated Sub-drainage Using Gis Software - Modeling Of Drainage System - Data Preparation For Hydraulic Elements Of The Drainage System Model - Calculation Of Effective Rainfall 2.3 Hydrologic Analysis Gather Information From Concerned Local Government Agencies Regarding Any Proposed Drainage Improvement And Flood Mitigating Measures That May Have Significant Impact On The Flood Condition In The Area. Using Gathered Available Data, The Consultant Shall Conduct Hydrologic Analysis To Establish The Design Rainfall And Design Discharges At The Point(s) Of Discharge (15, 20, 50, And 100-year Return Period) For Comparison. For Flood Damage Assessment, Comparison Between 50 And 100 Are Necessary To Establish The Flood Prone And High-risk Areas Which Include Private And Government Properties. 2.4 Flow Capacity Analysis Flow Capacity Of Main And Important River Channels (tributaries) Shall Be Determined And Evaluated And Then Compare The Results With Probable Discharges For Present And Future Land Use Conditions. The Consultant Shall Compute The Existing Drainage System Discharge Capacity Including Those Of The Reference And Sub Reference As Well As Analyze The Water Surface Profile For The Probable Flood Discharge Of 10, 25, 50, And 100 Year Return Period Using Preferred Software For The Analysis. Identify Catchment Areas, Downstream, And Upstream Of The Whole Project And Its Adjacent Properties. Identify The Natural Drainage Outfall And Other Possible Point(s) Of Discharge, Develop Schemes To Effectively Divert And / Or Discharge Runoff From The Property And Off-site Sources To A Creek, River Or To The Nearest Existing Drainage Line, Whichever Is Possible. 2.5 Flood Inundation And Damage Analysis Conduct Field Investigation In The Vicinity Of The Project Area And Establish The Extend And Magnitude Of The Flood Occurrence And Obtain Relevant Hydrological Information Such As Flood Depths, Duration, Flood History And Flood Marks. Identify Flood Prone Areas Through Flood Inundation Maps And Flood Levels. Establish The Estimated Flood Levels At The Critical Points In The Projects Area. Establish The Most Economical Development Finish Grade Line Elevation Of The Property. Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 22 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 The Consultant Shall Perform Flood And Damage Mapping Analysis For 10, 25, 50 And 100 Year Flood Return Periods, And Shall Be Undertaken For The Following Conditions: - Without The Improvement - With The Improvement Flood Model Shall Be Used To Make Graphical And Actual Numerical Methods And Representation Of The Extent Of Inundation And Depth. Software (e.g. Arc Gis, Auto Cad, Hec-geo/ras And Grass Gis) Must Be Of The Latest Version. Flood Damage Shall Be Estimated From The Quantity Of Assets Affected, Values Of Assets And Damage Rates, Which Is A Function Of Inundation Depth. Effects Of Climate Change Shall Be Given Due Consideration In The Above Analysis. 2.6 As-built Survey The Consultant Shall Conduct Field Survey To Locate Significant And Permanent Structures Such As Road, Sidewalks, Curb And Gutter, Electrical And Telephone Poles, Drainage Facilities, Sign Boards, Bridges, Tress, Manholes, And All Other Improvements Situated Within The 6.16 Hectares Area As Stated. Preparation Of As-built Map - The As-built Map Maybe Incorporated With The Topographic Map If It Is Not Too Crowded Or Muddled. Other Specifications And Requirements Of The Design Architect/ Engineer Shall Also Be Part Of The Scope As Approved By Both Parties Topographic Survey (0.50-meter Contour Interval) – Preparation Of Topographic Survey Plan With 0.5-meter Contour Interval. Establishment Of Horizontal And Vertical Control From The Existing Reference Points To Serve As Reference Of The Survey. To Conduct Field Survey To Locate Ground Points And Significant Features Of The Terrain Within The Project Site Such As Large / Significant Trees, Power Poles, Transmission Towers, Creeks (top Banks), River (top Banks), Structure And Utilities Visible On The Surface And Existing Roadway Relative To The Property Line. Survey Operations And Preparation Of As-built Survey, Topographic/ Hydrographic Survey Plans/ Returns - The Conduct Of Topographic And Hydrographic Surveys And Preparation Of Plans Shall Be Undertaken / Supervised By A Registered Geodetic Engineer. All Plans Shall Also Be Signed And Sealed By A Registered Geodetic Engineer. The Consultant Shall Prepare The Following Plans (a1 Size Mylar Sheets Or Any Equivalent Paper) As To Quality Of Workmanship And Conformity With The Following Requirements: General Requirements Title Sheet Location Plan  Title Of The Project  Location Plan Showing The Adjoining Towns, Municipalities/barangays  Vicinity Map  General Notes For Survey Work, Including Survey Accuracy Used  Legends, Symbols And Abbreviations  Index Map  Technical Description Of All Controlling Points Plans And Profile Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 23 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1  Project Area Plotted In Grid Coordinates System  North Arrow Direction  Match Line Stationing In Every Sheet Of The Plans- Indicate All Topographic/ Physical Features Within The Limits Of Survey Area  Indicate Right-of-way/ Easement Limits  Contour Lines With Elevation In Meters  Ordinary Water Level (owl)  Maximum Experienced Flood Level (mefl)  Technical Description Of Old And New Established Horizontal And Vertical Ground Controls  Name And Location Of Natural And Man-made Features (rivers, Bridges, Etc) Box Culverts, Reinforced Concrete Pipes, Other Waterways Properly Plotted With Correct Direction Of Water Flow Indicating The Waterline Elevation  Land Use Classification Such As Rice Field, Tree Plantation, Etc.  Reference Points  Date And Time Of Survey  Gps At Every 500m, Bms At Every 500m And Ibms At Every 250m Interval, Respectively  Waiver Drafted In Every Sheet Of Plans  Name With Signature, License Number, Signature And Seal Of The Geodetic Engineer  Names Of Signatories/ Approving Officials In Every Sheet Of Plans  Profile Along The Road Centerline And Along The Left And Right Drainage Canal (top And Bottom) All Throughout The Length Of The Project Cross-sections  Cross-sections Plotted By Coordinates  Stationing For Every Cross-section As Indicated In The Plans With 5-meter Interval  Ordinary Water Level (owl)  Maximum Experience Flood Level  Indicate Actual Channel Configuration Such As Drainage Canals, Drainage Structures, Bridges And Other Hydraulic Structures And Waterways  Indicate Properties Affected Within The Row/ Easement Limits (house, Fences, Trees, Etc.) Survey Report To Include The Following: - As-built Survey, Topographic/ Hydrographic Survey Plans/ Returns – To Provide Soft & Hard Copies - Certification From The National Mapping And Resource Information Authority (namria), Denr Of Horizontal And Vertical Reference Points - Location/ Sketch/ Pictures Of Established Ground Controls (geotagged Pictures) - Survey Returns/ Computations - Pictures Of Existing Drainage System, Creeks, River Structures And Survey Activities - Certificate Of Calibration Of Survey Equipment Used - Digital Files Shall Include Survey Points In A Spreadsheet (excel), Plans And Profiles In Autocad And Geotagged Pictures Of All Established Control Points. 2.7 Cross-section Survey Of The Reference And Sub-reference Point Of The Drainage System The Consultant Shall Conduct Cross-section Survey For Each Of The Reference And Sub-reference Points, Including Two Surveys (upstream And Downstream) Of The Identified Area For Improvement And/or Protection. The Drainage Canal Mouth Should Always Be Considered If The Area To Be Constructed Is Located Near The River Or Creek. For The Main Canal / Drainage And Important Tributaries, Topographic, Hydrographic And Crosssection Survey Shall Be Extended From Fifty (50) Meters To One Hundred (100) Meters Beyond The Riverbanks And Shall Cover The Probable Inundation Area Of The Significant Regions. In Sections Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 24 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 Where No Significant Overflow Occurs, Extension Of Survey Shall Also Be Conducted Up To 50 Meters Or More Beyond The River Banks. Establishment Of Design Discharge: The Consultant Shall Adopt The Following Guidelines In The Design Of Flood Control Structures In Accordance With Dpwh Design Guidelines, Criteria And Standards (dgcs), Volume 3: Water Engineering Projects, 2015 Edition. The Consultant Shall Establish Alternative Structural Measures For Flood Control And Prepare The After Establishment Of The Improvement, The Consultant/s Shall Prepare A New Runoff And Water Surface Profile Determination Analysis For Each Possible Improvement, And Identify The Better Alternative And Combination Of Counter Measure. Corresponding Preliminary Design. 2.8 Non-structural Measures  Flood Plain Management  Watershed Management, Zoning And Land Use  Flood Hazard Map  Warning And Evacuation Plan  Solid Waste Management  Others The Consultant Shall Recommend The Above Non-structural Measures To Complement The Structural Measures For An Optimum Drainage / Creek Improvement Plan. 2.9 Summary Of The Short Term And Long-term River / Creek / Drainage Improvement Plan (master Plan) Short-term River / Creek / Drainage Improvement Plan Shall Be Established To The Priority Areas To Be Constructed And Rehabilitated. Long-term River / Creek / Drainage Improvement Plan Shall Be Proposed To Augment The Necessary Flood Control Plan Of The Drainage System, This Includes Multi-purpose Dam, Retarding Basin, Diversion, Etc. Environmental Impact Assessment (eia) The Eia For The Master Plan Shall Be Prepared After The Alternatives Are Proposed. Each Alternative Will Be Subjected To Analysis Corresponding To The Expected Impacts, Which May Cover The Following Contents A. Existing Environmental Baseline Conditions; B. Potential Environmental Impacts: Positive Or Negative, Direct Or Indirect And Temporary Or Permanent; And C. Preventive, Mitigatory, And Compensatory Measures, Generally In The Form Of An Environmental Mitigation, Or Management Plan Gender And Development (gad) 2.9.1. Undertake Public Consultation Or Multi-stakeholders’ Forum And Identify Gender Issues And Concerns In The Involvement Of Women, Youth, Senior Citizens And Disabled Persons In Infrastructure Development. Women Should Constitute At Least 30% Of The Total Participants; 2.9.2. Ensure That All Data That Will Be Gathered For The Study Concerning The Affected Population Groups Are Sex-disaggregated; 2.9.3. Conduct Gender Analysis With The Aim To Develop Gender-based Information On The Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 25 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 Following: O Trend Of Employment Of Women At All Level (actual Construction, Technical And Management) In Infrastructure Projects Or Services. O Capacity Of Women, Women’s Groups, And Gender Equality Institutes And Ngos Located In The Proposed Project Area Who Can Be Consulted To Influence Decisions About The Planning, Design, Operation, And Maintenance Of Infrastructure Facilities. O The Number Of Families, Men, Women, Boys And Girls, As Well As The Number Of Female Headed Households Resettled As A Result Of The Construction Of The Infrastructure, Access Of Women To Water, Health And Transport Services, Etc. Since It Is Noted That The Involvement Of Women In Infrastructure Development Is Very Limited. 2.9.4 Integrate Gender Sensitive Criteria Into Planning, Design, Implementation, Monitoring And Evaluation Of Programs, Projects And Initiative; 2.9.5 Formulate Gender Equality Cost And Benefits In The Economic Evaluation; . 2.9.6 Accomplish The Gender Responsiveness Checklist (see Annex 6) For The Icc Process As Required By The Department Of Finance (dof) And The National Economic And Development Authority (neda) By Adopting The Harmonized Gender And Development Guidelines (hgdg) And Providing Supporting Documents. 3. Feasibility Study The Scope Of Consulting Services Shall Involve The Preparation Of A Feasibility Study Of Flood Control Including The Economic, Environmental And Social Assessment For The Selection Of The Optimum Plan. 3.1 Cross-section, Topographic And Hydrographic Survey Of The Target Area The Consultant/s Will Conduct Topographic And Hydrographic Survey Of The Target Area For Improvement. Cross-section Will Be Conducted Every 5-meter Interval And Offset Of 5-meter (left And Right Side Of The Proposed Or Existing Drainage Canal). The Leveling Shall Be Tied To The Existing Government Benchmarks In The Area (i.e. Existing Benchmarks Of Dpwh, Dgcs And/or Namria). For Basins With Proposed Improvements Like Construction Of Multi-purpose Dam, Sabo Dam, Flood Way And/or Re-channeling, Additional Survey Points Shall Be Considered. 3.2 Survey Operations, Requirements And Submittal Of Plans: All Requirements Of Surveys Not Expressly Specified Herein Shall Be Supervised By Registered Geodetic Engineers And Conform To The Provisions Laid By The Manual For Land Surveys In The Philippines (land Administrative Order No. 4, Bl) And Design Guidelines, Criteria And Standards (dgcs) 2015 Edition Of Dpwh Volume 2b, Part 1 And/ Or Reference Manual For Surveys And Investigation Of Public Works And Highway Projects. The Consultant Shall Submit The Topographic And Hydrographic Plans In A1 Size Paper Together With All Survey Information/ Data Recorded To The Implementing Office. Once Approved, The Plans Shall Be Stored In Electronic Format And Submitted To The Implementing Office. The Review And Approval Of The Said Survey Plans By Dpwh Do Not Relieve The Consultant From Responsibility For The Accuracy Of The Survey Works And Permanency Of The Horizontal And Vertical Ground Controls And Reference Stations Due To Impregned Placement. 3.3 Cost And Benefit Analysis Cost Estimate Will Include, But Not Limited To The Following: Njq-serv-08-2024-053 Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) - Re-bid ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 26 | P A G E Terms Of Reference Procurement Of Service For Flood Study Of Bayambang (hydrologic And Survey Works) Statement Of Compliance1 A. Estimates Of Economic And Financial Costs, And B. Estimates Of Future Costs 3.4 Benefits To Be Derived Will Include, Among Others, The Following: A. Reduction Of Loss Of Lives And Damage To Properties (agriculture, Private And Public), And B. Increased Economic Activity Directly Induced By The Project I.e. Net Value Added Of Increased Agricultural Production Or Induced Tourism Benefits Vis-a-vis Generated Flood Free Benefits Benefit And Cost Estimation Of The Structures Shall Be Carried Out By The Consultant To Determine The Viability Of The Project. 3.5 Geological And Geotechnical Investigations/ Surveys Review/ Study The Geological Conditions In The Areas Traversed And, On The Basis Of Geotechnical Investigations Performed (and Also Utilizing All Available Data), Provide Appropriate Recommendations And Design Criteria To Permit Proper Foundation Design; 3.6 Implementation Timeline The Project Duration For The Provision Of The Services Described In The Preceding Section, Scope Of Work Such As The As-built Survey, Topographic/ Hydrographic Survey Plans/ Returns Will Be Completed In Maximum Period Of Seventy-five (75) Calendar Days. The Scope Of Works Shall Start Upon Issuance Of Notice To Proceed (ntp). The Time Of Completion Of All Works Shall Only Be Extended For Such Period As Maybe Necessary. 3.7 Progress Billing Downpayment – 15% First Progress Billing – 25% Upon Submission Of As-built Survey And New Topographic Final Report Second Progress Billing – 25% Upon Submission Of Hydrographic Survey Plans And Flood Discharge Return Period Analysis Final Billing – 35% Upon Submission Of Feasibility Study Repor
Closing Soon5 Dec 2024
Tender AmountPHP 1.5 Million (USD 25.5 K)

Department Of Education Division Of Tangub City Tender

Others
Philippines
Details: Description 1. The Department Of Education – Division Of Tangub City, Through The General Appropriations Act 2024 Intends To Apply The Sum Of Three Million Nine Hundred Seventy-eight Thousand One Hundred Six Pesos (php 3,978,106.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools With Identification Number Tvl - 2024 – Rx – Tangub City – 030. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. Quantity Unit Item Description Abc Lot 1. Lorenzo Tan National High School (caregiving Nc Ii)- Php 400,403.00 5 Piece Airpot 1.type: Water Heater 2. Outer Material: Hard Plastic, (pp) Polypropylene, Heat Resistant 3.cavity Material: Stainless Steel 4. Capacity: 2.5 Liters 5.voltage: 220/240/volts 6.ac 50/60 Hz. Power In Watts: 500 To 800 Watts 7.comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 8. The Item Must Be Branded And Good Quality. 10 Piece Apron 1.type: Bib Apron 2. Material: Polyester-cotton Fabric 3.length: 20 To 40 Inches (minimum) 4. With 2 To 3 Bottom Pockets; 5.color: Any 6.the Item Must Be Of Good Quality 2 Piece Bath Tub, Baby 1. Material: Hard/sturdy Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: (l X W X H) 670 To 700 Mm X 400 To 420 Mm X 160 To 190 Mm (minimum) 4. Thickness: 3 Mm To 6 Mm (minimum) 5.color: The Item Must Be Of Good Quality 10 Piece Baby Blanket 1. Type: Blanket 2. Material: 100% Cotton 3.color: White 4. Dimension: (l Xw) 38 To 42 Inches X 28 To 32 Inches (minimum) 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Basin (small) 1.material: Hard Plastic, (pp) Polypropylene 2. Color: Any 3.dimension: 280 - 320 Mm Diameter X 80 - 120 Mm Higher (mimimum) 4. Thickness: 2 Mm To 4 Mm (minimum) 5. The Item Must Be Of Good Quality 20 Piece Bath-towel, Towellete 1. Type: Bath Towel 2. Material: 100% Cotton 3.color: White 4. Dimension: ( L X W ) 120 - 125 Cm X 60 - 65 Cm (minimum) 5.washable 6.the Item Must Be Of Good Quality 5 Piece Bedpan 1.material: Hard Plastic, (ps) Polystyrene 2. Color: Any Color 3.dimension: ( L X W X H) 22 - 26 Cm X 27 - 32 Cm X 7 - 12 Cm (minimum) Approximate 4. Capacity: 1 Liter (minimum) 5.thickness: 2 To 5 Mm 6.saddle-shaped And Lightweight 7. The Item Must Be Of Good Quality 10 Piece Blanket 1. Type: Blanket 2. Material: Cotton 3.color: White 4. Dimension: (l X W) 80 - 90 Inches X 54 -64 Inches Approximate 5. Washable 6. The Item Must Be Of Good Quality 3 Piece Bottle Sterilizer, Electric 1. Type: Electric Steam Sterilizer 2. Material: Hard Plastic (p E) Polyethylene Or Its Equavalent 3.color: Any Color 4. Capacity: 6 Bottles (minimum) 5.sterilizes Bottle And Accessories By Steam 6. With Automatic Power Shut-off Function 7. Dimensions: 8. Power Supply: 220 V-240v Ac, 50/60 Hz. 9. The Item Must Be Of Good Quality 5 Piece Bread Toaster 1. Type: Electric Bread Toaster 2. Dimensions ( W X D X H): 25 - 30 Cm X 15 -20 Cm X 18 - 22 Cm (minimum) Approximate 3. Capacity: 2 Slices 4. Power Supply: 220v-240v Ac, 50/60 Hz. 5. 400 To 600 W (minimum) 6. The Item Must Be Of Good Quality 10 Piece Burping Cloth 1. Type: Burping Cloth 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: Length: 17 -19 Cm Width: 14 -16 Cm (minimum) 5.washable 6. The Item Must Be Of Good Quality 10 Piece Cane 1.type: Adjustable Offset-walking Cane 2. Material: Aluminum 3.tip Size: 18 4. Height Adjustment: 31 Inches To 39 Inches (with 1 Inch. Increment) 5.weight Capacity: 200 - 250 Lbs. (minimum) 6.with Rubber Handle; With Push-botton Height Adjustment 7. The Item Must Be Of Good Quality 5 Piece Carpet 4ft. X 8 Ft 1.material: Polyster 2. Color: Any Patterned Color 3.dimension:48 Inches X 96 Inches (minimum) 4.the Item Must Be Of Good Quality 5 Set China Ware 1.material: Porcelain 2. Fit To Be Used In Ovens And Microwaves 3.specific Dimensions: Dinner Plate Diameter: 10 Inches (minimum) 4. Salad Plate Diameter: 7 Inches (minimum) 5.bowl Diameter: 5 Inches (minimum) 6.mug: 12 Oz. (minimum) 7. The Item Must Be Of Good Quality 8. Set Includes: 1 Piece Dinner Plate, 1 Set Salad Plate, 1 Piece Bowl, 1 Piece Mug 10 Piece Clothes Brush 1. Type: Rectangular Clothes Brush 2. Handle Material: Wood 3. Bristle Material: Plastic Bristle 4. Color: Any Color 5.overall Dimension: ( L X W X H) 140 -160 Mm X 45- 60 Mm X 20 -30 Mm (minimum) 6. The Item Must Be Of Good Quality 10 Piece Clothes Hamper 1. Type: Square Hamper 2. Material: Polyester 3. Color: Any Color 5. Dimension: ( L X W X H) 32 To 34 Cm X 36 To 38 Cm X 56 To 58 Cm (minimum) 5. The Item Must Be Of Good Quality 2 Piece Clothes Rack 1.type: Single-pole Clothes Rack 2. Material: Stainless Steel 3. Dimension: ( L X W X H) 30 To 32 Inches X 14 To 38 Inches X 62 To 64 Inches (minimum) 4. Comes With 4 Caster Wheels 5. The Item Must Be Of Good Quality 3 Piece Comforter 1.type:comforter 2. Material: Polyester 3.color: Any Color 4. Dimension: ( L X W) 84 To 88 Inches X 62 To 65 Inches (minimum) 5.thickness: 20-30 Mm (minimum) 6.washable 7. The Item Must Be Of Good Quality 3 Piece Commode 1.type: Foldable Commode 2. Durable Plastic Snap- On Seat And Lid Withouot Pushing Buttons 3. Blue Powder-coated Steel-welded Construction 4. Plastic Arms For Added Comfort 5.comes Complete With 12 Qt. Commode Bucket With Carry Handle, Cover And Splash Shield 6. Specifications: Width 18 Inches Between Arms/ 22.5 Inches Outside Approximate 7. Set Dimensions: W 32 -36 Cm X D 35 -40 Cm, Height 38 -54 Cm Approximate 8. Weight 13 Lbs., Weitgh Limit 350 Lbs. 9. The Item Must Be Of Good Quality 5 Set Cooking Utensils 1. Material: Stainless Steel 2. The Set Is Comprised Of Ff:; 1 Pc. -16 X 9.5 Cm Sauce Pan With Glass Lid (minimum) 3. 1 Pc. - 16 X 95 Cm Casserole With One Glass Lid, (minimum) 4. 1 Pc. - 18 X 10.5 Cm Casserole With Glass Lid, (minimum) 5.1 Pc. - 20 X 11. 5 Cm Casserole With Glass Lid, (minimum) 6. The Item Must Be Of Good Quality 2 Piece Crutches, Adjustable 1.type: Adjustable Crutches 2. Set Includes: 3 Pcs./set 3.material: Aluminum Powder-coated 4. Color: Any Color 5.weight Capacity: 300 Lbs. (minimum) 6. Dimensions: Youth Size 7. User Heights: 4 Ft. 6 Inches To 5 Ft. 2 Inches 8. Underarm Height: 37 Inches To 46 Inches 9. Adult Size: User Heights: 5 Ft. 2 Inches To Ft. 10 Inches 10. Underam Heights: 45 Inches To 53 Inches 11. Tall Adult Size: User Heights: 5 To 10 Inches 12. Underam Height: 53 Inches To 61 Inches 13. The Item Must Be Of Good Quality 10 Piece Cutlery 1.material: Stainless Steel 2. 20 Pieces Set For 4 3. 4 Dinner Knives 4. 4 Dinner Forks 5. 4 Dinner Spoons 6. 4 Salad Forks 7. 4 Tea Spoons 8. The Item Must Be Of Good Quality 10 Piece Cutting Board, Plastic 1. Material: Polyethylene Plastic 2. Color: Any Color 3. Dimension: ( L X W X H) 240 - 260 Mm X 140 - 160 Mm X 10 - 15 Mm (minimum) 4. Reversible Cutting Surface 5. The Item Must Be Of Good Quality 10 Piece Digital Thermometer, 32 C-42.9 C (90.0f-109.9f 1. Case Material: Hard Plastic (pe) Polyethylene 2. Color: Any Color 3. Range: 32 C - 42.9 C (90.0f-109.9f) 4. Accuracy: + 0.1c 35.5c-42.0c(+ 0.2 F 95.9f-107.6f) 5. Battery Operated 6.memory: Last Measuring Reading 7.alarm: Approx. 10 Seconds Sound Signal When Peak Temperature Reached. 8. The Item Must Be Of Good Quality 2 Piece Dressing Trolley 1.material: Shelves: Powder-coated Steel Sheet 2. Dimensions: ( W X D X H) 48 - 50 Cm X 48 - 50 Cm X 83 - 85 Cm (minimum) 3.number Of Shelves: 2 4. With Four Revolving Castors, Two Lockable 5. The Item Must Be Of Good Quality 10 Piece Electric Knife 1. Type: Electric Knife 2. Material: Stainless Steel And Hard Plastic, (pe) Polyethylene 3. Power Supply: 220/240 Volts, Ac 50/60 Hz. 4. Dimensions: 4.25 X 2.75 X 11.88 Inches (minimum) 5.comes With Touch Button Control, Safety Lock And English User & 39;s Manual 6. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 7. The Item Must Be Of Good Quality 10 Piece Face Towel/towellete 1. Type: Face Towel 2. Material: 100% Cotton 3. Color: White 4. Dimension: ( L X W ) 28- 32 Cm X 28 -32 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Feeding Bottle Brush 1. Bristle Material: Nylon 2. Color: Any Color 3. Handle Material: Hard Plastic, (ps) Polystyrene 4. Total Length: 280 -320 Mm (minimum) 5. Fit With The Standard Feeding Bottle For The Baby 6.comes With Nipple Brush 7. Washable 8. The Item Must Be Of Good Quality 5 Set Feeding Utensils (child) 1.material: Hard Plastic, (ps) Polystyrene 2. Sets Includes: 6 Pcs./set 3. 1 Pc Knife 4. 1 Pc- Plate 5. 1 Pc. -bowl 6. 1 Pc. - Cup 7. 1 Pc. -fork 8.1 Pc. - Spoon 9. Color: Any 10. The Item Must Be Of Good Quality 7 Set First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1 Pc; Sterize Gauge Swab (4x 4 X 12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band-aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5 Cm X 5 Cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90 Cm X 90 Cm X 120 Cm, 2 Pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2 Pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2 Pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5 Cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms, 2 Pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2-3 Years Expiration, 1 Tube; Medical Tweezers Min. 8 Cm, Plastic, 2 Pcs; Plastic Bags, Resealable, Minimum Of 24 Pcs, 100mm X 180mm, 24 Pcs, 150mm X 230mm; Cotton Balls, 50 Balls In A Sealed Package, 2 Packs; Hot And Cold Pack, Reusable, 1 Pack; Water Resistant And Sturdy Case W/ Handle That Can Accomodate All The Listed Items. 20 Piece Flat Sheet 1.type:bed Sheet 2. Material: 100% Cotton 3. Color: White 4. Dimension: Width - 137 - 145 Cm Length - 180 -200 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Garbage Bin Type: Swivel Lid Garbage Bin Body Shape: Round Material: Hard Plastic, Polypropylene Dimension: 4 Gallons ( Minimum) Removable Dome Shape Lid With Spring Return Swivel Preferably With Packing Case Color: Any Color Smooth And No Rough Surfaces 20 Box Gloves, Rubber (15 Mils) Medium Size (#8) Super Nitrile, Flocklined Interior (acid/solvent Resistant) Individually Packed For Hand Protection 10 Box Gloves, Surgical (disposable) 1.material: Latex 2. Color: White 3. Thickness: .09 Mm (minimum) 4. Disposable And Sterile 5. The Item Must Be Of Good Quality 20 Piece Gown (hospital) 1.type:unisex Hospital Gown 2. Material: Polyester- Cotton 3. Color: Any Color 4. Size: One Size Fits All 5. Comes With Overlap Back Closure 6. The Item Must Be Of Good Quality 5 Set Grooming Kit (hairbrush Comb, Nail Cutter, Nail Brush) 1. Set Includes: 6 Pcs./ Set (minimum) 2. Materials: Stainless Steel And Hard Plastic 3. 2 Nail Clippers/ Trimmers Of Different Sizes 4.1 Multipurpose Scissors 5. 1 Ear Pick 6. 1 Tweezer 7. 1 Comb 8. The Item Must Be Of Good Quality 10 Piece Hand Towel 1. Type: Hand Towel 2. Material: 100% Cotton 3. Color: Any Color 4. Dimension: ( L X W) 65 -75 Cm X 32 -42 Cm (minimum) 5. Washable 6. The Item Must Be Of Good Quality 3 Piece High Chair/booster Seat/ Portable Seat 1. Material: Foldable Powder Coated Steel Frame Or Its Equavalent 2. Phone Type: Corded 3. Polyester Harness, Seat/back Cushion 4. Overall Dimensions: ( L X W) 65 -75 Cm X 50 -60 Cm X 90 - 102 Cm (minimum) 5. Capacity: 40 Lbs. (minimum) 6. With 3-position Seat Recline 7. The Item Must Be Of Good Quality 10 Piece Hot Water Bag 1. Material: Rubber Or Its Equavalent 2. Color: Any Color 3. Overall Dimension: (lxw) 200- 300 Mm X 150 -200 Mm (minimum) 4. Leak-proof And Washable 5. The Item Must Be Of Good Quality 10 Piece Kettle 1. Material: Heat-resistant Hard Plastic 2. Capacity: 1- 1.5 Liters (minimum) 3. Height: 25-35 Cm (minimum) Approx 4. Voltage: 220/240 Volts, Ac 50/60 Hz 5. Power In Watts: 1000 To 1500 Watts 6.comes With Automatic Shut-off Feature And Permanent Water Level Indicator 7. Pitcher-type With Pouring. 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, 9. The Item Must Be Of Good Quality 10 Set Measuring Cups .. 1/4, 13, 1/2 1 Cup Set 1. Materials: Stainless Steel 2. Set Includes: 4 Pcs./set; 3. 1 Pc. - 1/4 Cup (60 Ml) 4. 1 Pc- -1/3 Cup (80ml) 5. 1 Pc.- 1/2 Cup (125 Ml) 6. 1 Pc. - 1 Cup ( 250 Ml) 7. Thickness: .5 Mm To 1 Mm (minimum) 8. The Item Must Be Of Good Quality 10 Piece Medical Tray 1. Type: Tray 2. Material: Stainless Steel 3. Overall Dimension: (lxw X D) 300- 350 Mm X 200 -250 Mm X 12 - 19 Mm (minimum) 4. Thickness: .7 To 1 Mm (minimum) 5. The Item Must Be Of Good Quality 2 Set Mixing Bowl, Stainless, 6-piece Set 1. Material: Stainless Steel 2. Quantity Of Set: 6 Pcs./set 3. Dimension: 3/4 Qt., 1.5 Qt., 3 Qt., 4 Qt., 5 Qt., 8 Qt., 4. The Item Must Be Of Good Quality 10 Piece Pail, Plastic, 10 Liters 1. Material: Polyethylene Plastic 2. Dimension: 25-30 Cm Diameter X 23-27 Cm Depth (minimum) 3. Color: Any Color 4. Chromed Finished Handle 5. Capacity: 10 Liters (minimum) 6. Material Must Be Non-toxic 7. The Item Must Be Of Good Quality 10 Piece Pans 1. Type: Frying Pan 2. Material: Stainless Steel 3. Handle: With Hard Plastic Heat Insulation 4. Tempered Glass Lid With Steam Hole 5. Size 23 -26 Cm With Lid 6. The Item Must Be Of Good Quality 10 Piece Peeler 1. Type: Peeler 2. Blade Material: Stainless Steel 3. Handle Material: Stainless Steel 4. Overall Dimensions: 18 X 8 Cm (minimum) 5. Comes With Self-locking 6. The Item Must Be Of Good Quality 10 Piece Pick Up Forcep 1. Type: Curved Forceps 2. Material: Stainless Steel 3. Overall Length: 100-130 Mm (minimum) 4. Comes With Self-locking 5. The Item Must Be Of Good Quality 10 Piece Pillow 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 20 Piece Pillow Case 1. Material: Cotton 2. Color: Any Color 3. Dimensions: ( L X W) 50 - 56 Cm X 75 - 180 Cm (minimum) 4. With 4 Inches Hems 5. Washable 6. The Item Must Be Of Good Quality 10 Piece Portable Mixer 1. Type: Portable Mixer 2. Material: Stainless Steel, Clear Acrylic 3. Capacity: 16-18 Oz. (minimum) 4. Size: 170 - 220 Mm X 75- 100 Mm 5. Requires 2 Aaa Batteries 6. Power In Watts: 250 To 300 Watts 7. The Item Must Be Of Good Quality 10 Piece Potato Masher 1. Type: Portable Masher 2. Material: Stainless Steel And Hard Plastic 3. Mesh Head Diameter: 70-90 Mm (minimum) 4. Overall Length: 250 - 270 Mm (minimum) 5. Handle Length: 120-140 Mm (minimum) 6. Washable 7. The Item Must Be Of Good Quality 5 Set Pots 1. Type: Cooking Pot 2. Material: Stainless Steel 3. Set Includes: 4 Pcs./set 4. 1 X Pot With Lid 5. 1 X Pan With Lid 6. 1 X Strainer 7. 1 X Egg Streamer 8. Size: (l X W X H) 40 To 42 Cm X 12 To 14 Cm X 26 To 28 Cm 9. The Item Must Be Of Good Quality 5 Piece Skillet 1. The Item Shall Have The Following Specifications. Material Including Handle: Cast Iron 2. Color: Any Color 3. Dimension ( Dia. X Depth): 250 - 320 Mm X 50 - 70 Mm (minimum) 4. Handle Casted With The Body And Having Plastic Or Rubber Heat Insulator 5. Body Thickness: 1.5 - 3 Mm (minimum) 6. Washable 7. The Item Must Be Branded And Have Good Quality. 5 Piece Sphygmomanometer 1. Type: Aneroid 2. Material: Nylon Cuff And Inflation Bag, Die - Cast Zinc Manometer 3. Package Inlcluded: 1 X Aneroid Sphygmomanometer. 4. Size: ( L X W X H Cm) = 18 To 20 Cm X 11 To 13 Cm X 11 13 Cm 5. Nylon Zippered Carrying Case 6. Capacity: 0 To 300 Mm Hg 7. The Item Must Have Good Quality. 5 Piece Stethoscope 1. Type: Dual Head Stethoscope 2. Material: Stainless Steel Chestpiece And Eartubes 3. Reinforced Pvc Tubing 4. Soft Pvc Eartips 5. Color: Any Color 6. Bell Diameter: 18-25 Mm Approx. 7. Diaphragm Diameter: 25-50 Mm Approx. 8. Overall Length: 66-75 Cm (minimum) 9. The Item Must Be Of Good Quality 5 Piece Urinal 1. Type: Unisex Portable Urinal 2. Material: Hard Plastic, (pp) Polypropylene 3. Color: Any Color 4. Total Capacity: 28 Oz. Minimum 5. Dimension: ( L X W X H) 270 To 290 Mm X 145 To 160 Mm X 70 To 80 Mm ( Minimum) 6. Thickness: 1 Mm To 3 Mm (minimum) 7. The Item Must Have Good Quality. 5 Piece Vacuum Cleaner 1. Material: Plastic (pp) Polypropylene Or Its Equavalent 2. Color: Any Color 3. Suction Power: 18 To 22 Kpa (minimum) 4. Tank Capacity: 24 Liters (minimum) 5. Vacuum Hose Length: 6 To 8 Ft. (minimum) 6. Power Supply: 220 V - 240 Ac , 50/60 Hz. 7. With Accesories: Extension Wand, Utility Nozzle, Standard Paper Filter 8. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide 9. The Item Must Be Branded And Good Quality 3 Piece Wheel Chair 1. Type: Foldable Wheel Chair 2. Overall Dimensions: ( L X W X H) 40 - 44 Inches X 26 - 30 Inches X 34 - 38 Inches ( Minimum) 3. Folded Dimensions: ( L X W X H ) 40 To 44 Inches X 10 To 14 Inches X 34 To 38 Inches (minimum) 4. Capacity: 350 Lbs. (minimum) 5. With Padded Arm Rests; With Push-to-lock Wheel Brakes 6. The Item Must Be Of Good Quality Lot 2. Sta. Maria National High School (hairdressing Nc Ii)- Php 323,170.00 5 Pcs. Bowl, Mixing, Plastic With 10.5 Cm X 6cm 2 Pcs. Bowl, Shampoo, Stainless Steel Frame, Bowl Dimensions: 19 Inch X 20 Inch X 10 Inch With Hose Attachment Of 7 Ft. 5 Box Box, Hairpin, Metal With 3.5 X 4.5 X 0.5 Inches(100 Pcs Per Box) 5 Pcs. Brush, Applicator, Plastic With 70mm X 80mm 5 Pcs. Brush, Hair, Plastic Bristle And Wooden Handle, Width - 2 Inches 10 Pcs. Cap, Frosting, With Hook, Silicone With 31cm X 22cm,rounded Metal Hook 10 Pcs. Cap, Heating, Waterproof, Cordless With 21-24 Inches 10 Pcs. Cape, Polyester With 125 Cm X 140 Cm 5 Pcs. Chair,high, Metal Painted With Anti Rust With 15 Inches X 33 Inches, Synthetic Leather Seat 5 Pcs. Chair, Hydraulic, Metal Base With 59 Cm X 54 Cm X 51-78cm, 180kg, 360' Rotation 10 Pcs. Clamp, Plastic, Length:9.5cm, Thickness:10mm 10 Pcs. Clamp, Duck Bill, Metal, Length: 11 Cm, Elasticity Stainless Steel Spring 5 Pcs. Clipper, Hair, Body Material: Hard Plastic, Blade Material: Carbon Steel, 6 Watts 10 Pcs. Comb, Afro, Plastic, Length: 7 Inches, Width: 3.25 Inches, Number Of Teeth: 12 Teeth, Teeth Height: 2.5 Inches 10 Pcs. Comb, All Purpose, Plastic, 18 Cm Long , Has Both Fine And Medium Teeth Position On One Side Only, Height Of The Teeth: 2 Cm 10 Pcs. Comb, Haircutting, Hard Plastic, Length Including The Handle:180mm, Width: 30mm With Detachable Steel Blades And Blade Holder 10 Pcs. Comb, Large Toothed, Plastic, Size:15 Cm, Number Of Teeth: 10 Teeth, Gap Between Comb's Teeth: 0.4 To 0.5 Cm , Teeth Size: 0.3 Cm X 4cm 10 Pcs. Comb, Tail, Plastic, Size : 8 Inches X 1 Inches, Tail Length: 4 Inches Tooth Length: 3/4 Inch 10 Pcs. Comb, Teasing, Plastic,1st Row: Large Teeth 25 Mm Long, 2nd Row: Small Teeth 19 Mm, Over-all Size: 20cm X 3.8 Cm 5 Pcs. Comb, Wide Tooth, Plastic, Size:15 Cm, Number Of Teeth:10 Teeth, Gap Between Comb's Teeth:0.4 To 0.5 Cm, Teeth Size: 0.3cm X 4cm 8 Pcs. Crimpers, 25 Watts, Size:38 Cm X 15.5 Cm X 9 Cm, Maximum Temp.: 200 Degrees Centigrade, Rated Voltage:10 -230volts Ac 5 Pcs. Curling Iron, Ceramic, 65watts, 210-240volts Ac, Barrel Size: 1 Inch, Adjustable Heat Setting Of 200 Degrees Centigrade, Swivel Cord Up To 360 Degree 5 Pcs. Drip Pan, Hard Plastic, Size:17.5 X 25.8 X 1 Inches, Thickness: 1/8 Inch, Shallow Rectangular Type 5 Pcs. Dryer, Hair, 1000w, Rated Voltage: 220vac, 18.5cm X 16cm X 6.5cm With Plastic Handle Design 10 Box Gloves, Disposable, Size: 25cm X 23cm, 100 Pcs Per Box 5 Pouch Gloves, Rubber, Medium, Thickness: 4 Mil, Acid Resistant 5 Pouch Gown, Smock, Polyester, Sizes: Small (50inches X 56inches);medium (52inches X 58inches); Large (54 Inches X 60inches) 10 Pouch Hairclips, Metal, Size:67mm X 19mm 10 Pack Hairnet, Invisible, Nylon, Size: 55mm, Stretchable, Color: Black 10 Pc Headband, 6 Inches, Woven Crochet Tube 10 Pc Headband, Flannel, Cloth, Size : 45 Cm, Width: 8 Cm 6 Pc Infrared Iron, Ionic Ceramic Tourmaline-infused Plates And Abs Plastic Body, Power: 70 Watts, Power Rating: 220-240 Volts Ac; Over-all Size: 24 Cm, Heating Plate 50 Mm, Heating Time: Within 30 Seconds;variable Heat Settings: From 250 To 450 Degrees Fahrenheit 10 Pc Mirror, Hand, Plastic, Size 15 Cm Diameter, Frame Thickness: 6.5mm, Over-all Length With The Handle: 20 Cm 3 Pc Mirror, Modular, Plain Mirror, Mirror Material: Glass, Frame Material: Aluminum (cut To Fit), Dimensions: 75 Cm X 65 Cm, Mirror Thickness: 6mm 10 Pc Prong Clip, Double, Steel, Size: 45 Mm 10 Pc Prong Clip, Single,steel, Size: 55 Mm 10 Pc Razor, Straight, High Carbon Steel, Foldable Straight Razor, Replaceable Blade; Dimensions: 14 Cm X 2 Cm When Folded; Double-edged Razor Blades 3 Dz Roller Pins, Metal, Size: 60mm Long, Quantity By Dozen(12 Pieces) 10 Pc Rollers, Jumbo, Plastic 44mm In Diameter X 64mm 10 Pc Rollers, Large Sized, Plastic, Size: 40mm Diameter X 60mm Long 10 Pc Rollers, Medium Sized, Plastic; Diameter: 38 Mm ,length: 58mm 4 Pc Scissor, Cutting, Stainless Steel,length: 17cm,blade Width 10 Cm 4 Pc Scissor, Thinning, High Carbon Steel, Blade Length 6cm, Style: Right Handed Scissor, Length: 17cm 5 Pc Scoop, Plastic, Capacity:1/2 Cup, Rounded Edges With Handle Thickness: 1.5 Mm 5 Pc Shower Cap, Plastic, Size: One Size Fits All Or 30cm 5 Pc Spatula, Plastic, Dimension: 7.5 Cm X 1.5 Cm 5 Pc Spray Gun, Transparent Plastic, Capacity: 300ml, Dimension: Bottom Is 7 Cm And The Height Is 17cm 3 Pc Steamer, Hair, 450 Watts, 220 Volts/50-60hz, Hood Material: Polycarbonate, Hood 30 Cm Diameter Opening X 25 Cm, Timer Setting Is Up To 60 Minutes, 32 Ounce Water Reservoir, Adjustable Height 100- 150cm 30 Pcs. Stool, Metal, Electroplated, Load Capacity: 150kg, Design: Swivel Stool With Backrest With Hydraulic Lift To Adjust Height Freely Lot 3. Sta. Maria National High School (wellness Massage Nc Ii)-php 198,338.00 5 Pcs. Dummy, Anatomical, Plastic, 32" Tall, 27 Removable Parts That Are Held On By Metal Screws, Posts, And Hooks, Brain (2parts), Lungs (2 Parts), Heart (2 Parts, Liver, Intestines, Stomach, Base Is 13" X 9" (removable), Weighs 12 Lbs. 5 Pcs. Massage Bed/table, Hard Wood With Steel Bracings, Hardwood Frame, Marine, Plywood Deck; Color: Black, Dimensions: W:75 Cm X L:183 Cm X H: (adjustable) Height: Adjustable From 24 In. - 33in., Leg Thickness - 35mm, Cushion System: High Density Foam (7.5 Cm / 2.95") With Pu Leather Cover (1mm Thick), Weight Capacity: 250 Kg(minimum), Gross Weight: 21 Kg 2 Pcs. Massage Chair, Padded With 3" Thick, High-density, Small-cell Foam, Size: 14"-diameter Seat But Without Back And Arm Rest, With Metal Post And Hard Plastic Star, Pneumatic Spring Will Effortlessly Adjust The Height From 18" To 24" With The Pull Of A Lever, Five Heavy-duty, Smooth-rolling Wheels, Load Capacity: 265 Lbs / 120 Kg (maximum), Smooth Surface And No Sharp Edges 6 Pcs. Sphygmomanometer, 33 To 42 Cm Arm Diameters, Accuracy: ±3mm Hg;measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg Index And Range Markings On The Dial For Clear Readings, Nylon Cuff Is Durable And Stain Resistant With A Velcro Closure 6 Pcs. Stethoscope, Stainless Steel Double Chest Piece, Color: Black, Tubing Description: Y-tube Pvc, Uses Extra Soft Replaceable And Pivotable Ear Tips, The Binaural Is Chromium-plated, Chest-piece Diameter: 44 Mm And Non-chill Rim, Overall Length: 29" /74 Cm 6 Pcs. Talking Sphygmomanometer, Nylon Cuff Sizes: 33 To 42 Cm Arm Dia, Dimensions: 98mm*126mm*60mm, Measurement Range : 0mm Hg To 300mm Hg; Smallest Scale: 1mm Hg, Weight: 450g , Range: 20~280mmhg(0.4kpa-37.3kpa), Pressure Accuracy: ±3mmhg(±0.4kpa), Pulse Measurement Range: 40 ~199 Beats /min, Voltage: 4*aaa Alkaline Batteries 25 Pcs. Talking Thermometer, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f), Power Supply: 1.5v Dc, Lr41 Alkaline-magnesium Button Battery Real Voice, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, Dimension Approx.: 2.0 (w) X 4.4 (h) X 1.2 (d) Inches / 51 (w) X 110 (h) X 30 (d) Mms 26 Pcs. Thermometer, Digital, Hard Plastic, Sensing Unit: Thermistor, Measurement Range: 32 C - 42 C (89.6f-107.6f), Measurement Accuracy: ± 0.1c 32c-42.0c (± 0.2 F 89.6.9f-107.6f) Power Supply: 1.5v Dc, 1 Lr41 Alkaline-magnesium Button Battery , Power Consumption: 0.1mw, Temperature Display: 3-digit, +deg C (deg F) Display In 0.1 Degree Increment, External Size (mm): 19.4(w) × 132.5 (l) × 10.0(d) 10 Pcs. White Board, White Formica Laminated, Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm Wih Plastic Corner Caps, The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube , Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels, Height From Floor: 210 To 214cm Lot 4. Sumirap National High School And Tangub City National High School (bpp Nc Ii)-php 519,702.00 10 Set Air Compressor With Airbrush Cake Decorating Set(airbrush Gravity Feed Dual Action Airbrush Compressor Kit 0.2/0.3/0.5mm Needle Air Brush For Cake Decorating Painting. Material: Aluminum + Copper Type: Single Cylinder Piston Compressor Power: 1/5 Hp Plug Type: Eu Voltage: 220-240v/50hz Speed: 1450 Rpm Air Volume Per Minute/liter: 23l/min Maximum Pressure: 7bar (100psi) Working Pressure Of Spray Gun: 15-50psi Low Noise: ≤50db Accessories: Pressure Gauge, Pressure Gauge, Air Filter Automatic Stop, Starts At 2.8 Bar, Stops At 4 Bar (special Pressures Available) Connection: With Connection G 1/8" Bsp Cable: Approx. 1.8m / 6ft) 40 Pc Egg Beater(stainless Steel Semi-automatic Mixer/manual Whisk Egg Beater Kitchen Cooking Tool) 40 Set Board, Chopping ,6 Color( Type: Food Grade Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Comes With No Sharp Edges And With Hole For Storage Purposes) 10 Pc Double Boiler (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Rivetedhandle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) 80 Set Bowl, Mixing Set Stainless (premium Stainless Steel Mixing Bowls Bowl Sizes Are: 5 Qt, 4 Qt, 3qt, 1.5qt, And ¾ Qt And They Each Fit Perfectly Within One Another) 70 Set Cake Pan, Round, Size: 4''x3'' (non-stick Aluminum Alloy Cake Round Pan) 30 Set Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tier Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3 : 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Assembled Column Is Used For Maximum Strength And Stability Of The Stand Must Be Packed In Set ) 60 Pc Cake Turn Table (type: Turn Table Body Shape : Circular Material: Cast Aluminum Plate.and Cast Iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm Turntable With Ball Bearing To Turn Easier Preferably Packed In Any Kind Of Packaging Comes With No Sharp Edges To Rotate Smoothly In 360 Degrees Clockwise Or Counter Clockwise ) 30 Pc Coupler (type: Foood Grade Body Shape: Tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case The Materials Used Must Be Non-toxic And Dishwasher Safe ) 50 Set Cup, Measuring (stainless Steel Measuring Cup Set For Dry Ingredients. Composed Of 1 Cup, 3/4 Cup, 1/2 Cup, 1/4 Cup, 1/8 Cup) 50 Set Cup, Measuring 250 Ml. For Liquid Glass (250 Ml Heat Resisting Measuring Glass) 40 Set Cup, Measuring 500 Ml. For Liquid Glass (500ml Heat Resisting Measuring Glass) 40 Pc Cutter, Dough (type: Scrapper Body Shape: Straight Blade Material: Stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Lenght : 15 Cm X Width: 11 Cm X Thickness: 1.2 Mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) 40 Pc Cutter, Pie (stainless Steel Rolling Knife/pizza Cutter) 30 Pc Flour Sifter,hand Cranked (type: Hand Cranked Body Shape: Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm ( Minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh # 30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Spring Action Squeeze Handle Stainless Steel Preferably With A Packing Case Dishwasher Safe) 40 Pc Grater (type: Four Sided Box Grater Body Shape: Box In Shape Material: Stainless Steel Blade And Plastic (polypropylene Handle) Grater Dimensions: Height- 25 Cm X Width-13 Cm X Depth-10 Cm (minimum) Side 1: Large-hole Shredder With 6 Mm Hole Side 2: Slicer Side 3: Small-hole Shredder With 3 Mm Hole Side 4: Grater With Strips About 1.27 Cm To 2.54 Cm Length Preferably With Packing Case Food Grade & Dishwashing Safe) 50 Pc Knife, Kitchen (premium Quality Stainless Steel Kitchen Knife, 6-8” In Length) 20 Pc Knife, Pallete (premium Quality Stainless Steel Pallete Knife Ideal For Butter.) 50 Pc Ladle, 3oz (premium Quality Stainless Steel Soup Ladle, 3oz) 40 Pc Loaf Pan, Big (carbon Steel Non-stick Loaf Pan, Size: L=32,w=13,h=7cm Minimum) 40 Pc Loaf Pan, Medium (carbon Steel Non-stick Loaf Pan, Size: L=28, W=15.5, H=7cm Minimum) 40 Pc Loaf Pan, Small (carbon Steel Non-stick Loaf Pan, Size: L=25.5, W=13.5, H=6cm Minimum) 40 Pc Muffin Pan, Big (carbon Steel Non-stick Muffin Pan, 12 Holes,3oz) 40 Pc Muffin Pan, Medium (carbon Steel Non-stick Muffin Pan, 9 Holes,3oz) 40 Pc Muffin Pan, Small (carbon Steel Non-stick Cupcake Pan, 6 Holes) 70 Pc Pie Pan, 10'' (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 10” In Diameter) 70 Pc Pie Pan, # 8 (premium Stainless Steel/aluminum Pie Plate. Thick And Durable, 8” In Diameter) 50 Set Pillars, Cake (premium Quality Acrylic Cake Support Pillar, 12cm In Diameter(minimum),straw Size Diameter ) 60 Pack Piping Bag (reusable Silicone Piping Bag, Biggest Size, 100pcs Per Pack) 40 Pc Rectangular Pan (carbon Steel Non-stick Rectangular Cake Pan. Size: L=10.8", W=7", H=1.5", Minimum) 70 Pc Rolling Pin, Plastic (non-stick Rolling Pin Made With Food Grade Nylon, Size:13") 100 Pc Rubber Scraper, Silicone (size: 21cm X 4.1cm, Material: Silicone) 40 Pc Sauce Pan Non Stick (non-stick Sauce Pan With Lid, Size: 20cm) 40 Pc Sheet Pan / Cookie Sheet (aluminum Baking Sheet, Size: 13x18”) 50 Set Spoon, Measuring (premium Quality Stainless Steel Measuring Spoon Set, Compost Of 1/8tsp, 1/4tsp, 1/2tsp, 1tsp, 1/4tbsp, 1/2tbsp, 1tbsp)) 70 Pc Spoon,wooden (premium Quality And Durable Long Handled Wooden Spoon/ladle. Length: 30.5cm Minimum) 40 Pc Strainer (stainless Steel, Fine Mesh Strainer, Size: 18cm) 40 Set Tip, Decorating, Large (type: Tube Tips Body Shape: Nozzles With Different Shape Material: Stainless Steel Tube Height: 3.5 Cm To 5 Cm Tube Diameter: 2 Cm To 3.5 Cm Thickness: 0.5 Mm (minimum) Tube Tip: Assorted Designs (create Swirls, Rosettes, Flowers, Roping,stars, Leaves And Other Designs Comes With 24 Different Shapes Of Nozzles Packed In Plastic Storage Box Smooth And Deformities Free Must Be Branded) 30 Pc Weighing Scale, 10 Kg. (kitchen Weighing Scale, 10kg Maximum) 40 Pc Weighing Scale, 5 Kg. Digital(digital Kitchen Weighing Scale, Digital Price Computing Weight Electronic Scale, Capacity Is At Least 5kilograms, Pan Size 34.5 X 23.5cm) 70 Pc Wire Whisk, Medium (stainless Steel Wire Whisk, Size: 14”) Lot 5. Sumirap National High School And Tangub City National High School ( Cookery Nc Ii )-php 1,405,964.00 30 Pcs. Apple Corer, Body Shape: Tubular Material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Preferably With Packing Case Dishwasher Safe. 4 Pcs. Bain Marie, Table, (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Soiuce: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60 Hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 20 Pcs. Blender, Electric Heavy Duty, Body Shape: Round Jar Material Housing: Plastic (polypropylene) Jar Height : 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220 Volts / 240 Volts,50 Hz / 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades 40 Pc Board, Chopping/ Cutting, Plastic, Body Shape: Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) With Hole For Storage Purposes Preferably With Packing Case Food Grade And Dishwasher Safe. 20 Pcs. Boiler, Double, Material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) 30 Pcs. Braising Pan, Medium, Body Shape: Round Material: Enameled Cast Iron And Stainless Steel Size: Diameter: 28 Cm X Height: 10 Cm (minimum) Capacity: 4 Liters (approximate) With Stainless Steel Cover, Solid Cast Stainless Steel Side Handles And Riveted Handle On Both Side: Length: 10 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm 30 Pcs. Can Opener, Body Shape: Materials: Stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Multi-use: 3 In 1 Can Opener Also Opens Bottle Tops- Can Lids And Tabs. 30 Pcs. Casserole,medium Pot, Body Shape:round Material:stainless Steel, 0.7 Mm Thick Dimension: Diameter- 24 Cm X Height -14 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Preferably With Packing Case . 30 Pcs. Casserole,small Pot, Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick Dimension: Diameter- 20 Cm X Height -12 Cm (minimum) Tempered Glass Lid Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm. 20 Pcs. Colander, Medium, Medium Body Type: Round Material: 304 Stainless Steel Diameter: 30 Cm (minimum) Capacity: 8 Quarts (9 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 To 10 Mm Body Thickness: 0.8 Mm (minimum) 20 Pcs. Colander, Small, Body Shape: Round Material: 304 Stainless Steel Diameter: 26 Cm (minimum) Capacity: 5 Quarts (5.6 Liters) Welded Handle On Both Sides, Size: 7.5 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Body Thickness: 0.8 Mm (minimum) Full-ring Support Base, 15 Cm Diameter Preferably With Packing Case Food Grade And Dishwasher Safe 20 Set Cup,measuring( For Solid) Set Body Shape: Round Material: Stainless Steel, 0.7 Mm Thick (minimum) Each Set Contains The Following: 1 Pc - 1 Cup (237 Ml) 1 Pc - 1/2 Cup (118 Ml) 1 Pc - 1/3 Cup (79 Ml) 1 Pc - 1/4 Cup (59 Ml) Handle Dimension: Length-12 Cm X Width-1 Cm (minimum) Measuring Capacity Engraved On The Handle Strip Handles Have Provision For Hanging Preferably With Packing Case Smooth Surfaces And Dishwasher Safe 20 Pcs. Dispenser,paper Towel Body Shape: Rectangular Material: Abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Mounting Style: Wall Mounted Tissue Box 12 Pcs. Fan, Electric, Ceiling Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names 6 Pcs. Fire Extinguisher With Contents .for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 20 Pcs. Fish Poacher,medium, Body Shape: Oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12 Cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm Includes Stainless Steel Lid With Handle And Removable Insert 20 Pcs. Fork, Carving Body Shape: Square Shape Prong Prong Material:high Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prong Comes With Square- Shaped Prongs And Pointed Tips Abs Plastictriple-riveted Handle Preferably With Packing Case 400 Pcs. Fork, Kitchen Body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle :abs Plastic Number Of Tines: 2 Tines With Tapered End 36 Dozen Frying Pan, Large, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-30 Cm (minimum) X Height- 5.5 Cm (minimum) 40 Pcs. Frying Pan, Medium, Non Stick, Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-24 Cm (minimum) X Height- 4.5 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 19 Cm Long (minimum) Preferably With A Packing Case 30 Pcs. Frying Pan Small, Non Stick , Body Shape: Round Pan Material: Aluminum With Non-stick Coating Thickness: 3 Mm Thick (minimum) Dimension: Diameter-20 Cm (minimum) X Height- 3.8 Cm (minimum) Handle Material: Stainless Steel With Silicone Riveted Handle: 12 Cm Long (minimum) Preferably With A Packing Case Oven Safe Up To 250⁰f 22 Pcs. Funnel, S/s, Medium, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-15 Cm (minimum) X Height- 15.8 Cm (minimum) Tube Diameter: 2 Cm X Length: 7.3 Cm (minimum) Comes With Handle For Easy Hanging Preferably With Packing Case Dishwasher Safe 22 Pcs. Funnel, S/s, Small, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Garbage Bin, Body Shape: Round Material: 304 Stainless Steel Dimension: Diameter-11 Cm (minimum) X Height- 10 Cm (minimum) Tube Diameter: 1.5 Cm X Length: 5 Cm (minimum) Comes With Handle For Easy Hanging Preferably With A Packing Case Dishwasher Safe. 20 Pc Glass Rack, Body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 1/2 Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case 20 Pc Ice Cream Scoop, Stainless Steel Ice Cream Scoop 45mm. Simply Squeeze Handle. 30 Pc Knife,boning, Body Shape: Ergonomic Material: High Carbon Steel Overall Length: 28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets Preferably Wiht Packing Case Dishwasher Safe 30 Pc Knife,chef, Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) 30 Pc Knife,cleaver, Cutting Edge: Straight, Pointed End Type: Cleaver Knife Body Shape: Flat Blade Material: Forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets Blade Thickness: 3 Mm (minimum) 30 Pc Knife,oyster, Body Shape: Ergonomic Blade Material: Stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) 4 Pc Light,emergency, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector 4 Pc Meat Slicer, Body Shape: Circular Housing Material: Die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v 30 Set Pastry Tube, Stainless Steel Pastry Tube 24, Big 40 Pc Peeler, Y -type, Rack Dimension: Length: 38 Cm X Width 23 Cm (minimum) Type: Y-type Peelers Body Shape: Ergonomic Material: Stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Handle Material: Stainless Steel Handle Length: 4 3/4 Inches X 1 Inch Diameter (minimum) 2 In 1 Design With 2 Blade Reel, Built In Potato Eye Remover And Hole For Hanger Preferably With A Packing Case 14 Set Pepper And Salt Mill Food Grade And Non-toxic Material. Mill Cookery Nc Ii Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism 20 Pack Piping Bag, Body Shape: Triangular Material: Transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) 10 Pc Plate Rack Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) 12 Set Preparation Table With Sink, Heavy Duty Wire Shelving, 2.6 Mm Diameter (minimum) Table With Sink Cookery Nc Ii Type: Preparation Table With Sink & Sheleves Body Shape: Rectangular Material: Stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Table Top And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) 4 Pc Pressure Cooker, Cooker Body Shape: Round Material: Polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring 24 Pc Roasting Pan , Body Shape:rectangular Material: Stainless Steel Dimension: Length: 40 Cm X Width-35 Cm X Height -7 1/2cm (minimum) Thickness: 1.5 Mm Thick (minimum) Welded Handles On Both Sides Removable Stainless Steel Wire Rack 40 Pc Scissor, Kitchen Type:kitchen Scissor Body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum ) Width: 7.5 Cm (minimum) 30 Pc Siever,small Type: Fine Mesh Siever Body Shape: Round Material: Stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Preferably With A Packing Case 30 Pc Skimmer, Fine Type: Medium Fine Mesh Skimmer Body Shape: Round Material: Stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Handle Has Hole For Hanging Preferably With A Packing Case 30 Pcs. Skimmer,spider, Dishwashing Safe Type: Skimmer, Spider Body Shape: Round Material: Stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm (minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Preferably With A Packing Case Dishwasher Safe. 24 Pcs. Soup Cup, Rack Body Shape: Square Material: Polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm No. Of Compartment: 16 Compartments 20 Pc Soup Ladle, 12oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 34 Cm (minimum) Capacity: 12 Oz. (341 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle, 3 Oz Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 28 Cm (minimum) Capacity: 3 Oz. (85 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe Must Be Branded 20 Pc Soup Ladle 6 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 6 Oz. (170 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case Dishwasher Safe 20 Pc Soup Ladle 8 Oz. Body Shape: Round Material: Stainless Steel Thickness: 1 Mm Thick (minimum) Handle Length: 30 Cm (minimum) Capacity: 8 Oz. (236 Ml) Ladle Type: Round Bottom Hooked Handle Design Allows It To Easily Sit On The Edge Of Pots. Preferably With A Packing Case 62 Pc Spatula, Type: Offset Spatula Body Shape: Flat Blade Material: Stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches Preferably With A Packing Case Dishwasher Safe Must Be Branded. 400 Pc Spoon, Kitchen Body Shape: Oval Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type Preferably With A Packing Case Heat Resistant Up To 220 ° C Dishwasher Safe Must Be Branded. 60 Pc Spoon, Kitchen (slotted) Kitchen Spoon Slotted Body Shape: Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) 30 Set Spoon, Measuring Body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. ( 7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) 40 Pcs. Spoon, Parisienne Body Shape: Round Double Headed Parisiennes Scoop Bar Tool Material: Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Draining Small Hole In The Scoop 40 Pc Spoon, Serving Preferably With A Packing Case Type: Serving Spoon Body Shape: Oval Materials: Stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 30 Pc Spoon,wooden Body Shape: Oval Material: Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Preferably With A Packing Case Smooth Surface Finished And No Sharp Edges 20 Pc Stock Pot,large . Body Shape: Round Material: Stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) 30 Pc Strainer, Chinois,small Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer,chinois,medium Medium Body Shape: Conical Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) 26 Pc Strainer,medium,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) 30 Pc Strainer, Small,fine Body Shape: Round Material: Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) 30 Pc Tenderizer, Medium Aluminum Meat Tenderizer 16 Pc Thermometer,pocket/pin Pocket/pin Food Thermometer 20 Pc Tong,12'' Body Shape: Standard Material: Stainless Steel Size: 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 20 Pc Tong 8'' Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pc Tray,baking,small, Tray Body Shape: Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) 36 Pc Tray,utility,medium,plastic White Plastic, White Multi Purpose 13”x10”utility Tray 30 Pc Turner,3'x6'', Slotted Turner, 3" X 6" Type: Slotted Turner, 3" X 6" Body Shape: Straight Material: Stainless Steel Blade Size (lx W): 6 Inches X 3 Inches (minimum) Handle Length: 5 Inches (minimum) Overall Length: 13 Inches (minimum) Solid Turner With Straight Slotted Blade Wooden Handle With Triple Rivets Preferably With A Packing Case Dishwasher Safe Must Be Branded 4 Pc Utility Cart, Stainless Steel 3 Tier Trolley Cart 75x40x85. 20 Pc Weighing Scale 1 Kg. Digital Type: Digital Weighing Scale Body Shape: Rectangular Materials: Engineering Plastic And Stainless Steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm ) 163 Mm X 245 Mm X 79 Mmm (minimum) 20 Set Weighing Scale 5kg. Type: Mechanical Weighing Scale Body Type: Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Delivery Must Include Instruction Manual Written In Good English With Service Centers Located In The Major Cities In The Philippines Warranty Period Of 1 Year (parts And Service) Must Be Branded 40 Set Wire Skimmer Small, Type: Skimmer, Wire Mesh Body Shape: Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Preferably With A Packing Case Dishwashing Safe Must Be Branded. 40 Pc Wire Whisk Heavy Duty Type: Wire Whisk, Heavy Duty Body Shape: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk, Medium, Type Wire Whisk, Medium Body Shape: Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 40 Pc Wire Whisk,small, Type: Wire Whisk, Small Body Shape: Baloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Preferably With A Packing Case Dishwasher Safe Must Be Branded. 18 Pc Wok,medium Type: Wok, Medium Body Shape:round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 18 Pc Wok,small Type: Wok, Small Body Shape: Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Preferably With A Packing Case Dishwashing Safe Must Be Branded 12 Pc Working Table, Stainless, 4 Seaters Stainless Working Table , Two Layer (120x60x80) 30 Pc Zester, Type: Cheese Zester Body Shape: Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe The Plastic Material Used Must Be Non-toxic Must Be Branded. Lot 6. Sumirap National High School (housekeeping Nc Ii)-php 326,452.00 1 Pc Alarm Clock Alarm Clock, Digital, Overall Dimensions: 13.5 X 8 X 4.5 Cm (approx.) Material: Plastic (pe/abs) Illuminated Lcd Digital Display: Time (12/24), Calendar (mm/dd), Temperature, Alarm Status (on/off), Snooze Display Size: 10 X 5 Cm (minimum), Time Can Be Read 30 Ft Day Time. Runs On Aaa Battery Which Come Together With The Item Smooth Surface, No Sharp Edges, Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting) 25 Pc Apron, Polyester-cotton (bib Apron, Sleeveless Adjustable Neck Loop Material : Polyester - Cotton Fabric Dimension : 70 To 60 Cm (minimum) With 2 Or 3 Pockets Uni-color, Dark No Sharp Edges And Loose Threads) 5 Pc Baskets, Laundry (3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 1 Set Bed, Queen (bed Set, Queen Size (60 X 75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 20 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 1 Set Bed, Single (bed, Single Size (w36 X L75 Inch) Rectangular 1) Frame: Knock-down Type, All Steel, Powder Coated Including Head Board, Bare Weight: 13 Kg (minimum) No Wobble And Noise 2) Comes With Fabric Covered Foam 6 Inches Thick Foam Density: 29 -33 Kg/cu.m. 3) No Sharp Edges) 10 Pc Board, Ironing (type: Foldable Type Ironing Board Body Shape : Standard Material : 25 Mm Tubing Approx., 0.8 Mm Thickness Board Size: 32 Inches (minimum ) Body Size :120 Cm X 30 Cm X 5 Cm Color : Any Comes With Box No Sharp Edges) 25 Pair Boots, Safety, Plastic (upper Material: Elastic Pvc Sizes: 7 Inches - 5pcs 8 Inches - 5pcs 9 Inches - 5pcs 10 Inches -5pcs 11 Inches - 5pcs Height: 13 To 14 Inches Plain Toe Type Of Boots: Unisex Rain Boots With Rugged Tractor Lug Outsole Packed With Carton Box Per Size) 15 Pc Brushes, For Housekeeping (brush, Floor Scrubbing, Angled Long Handle Bristle Material : Plastic, Stiff Handle Material : Metal Tubular Corrosion Reistant, Overall Length : 120 Cm. (minimum) Bristle Length : 5 Cm (=/- 1cm) Scrubbing Surface : 25 X 6 Cm (+/-1 Cm) No Sharp Edges) 10 Pc Buckets, Water (water Bucket Bucket Material : Hard Plastic, Round Body Capacity : 10 To 12 Liters Handle Material : Steel Smooth And Glossy Surface, No Sharp Edges) 10 Pc Caddy, Toilet (carrying Caddy For Toilet Cleaning Supplies Holds Spray Bottles And Other Cleaning Supplies, No. Of Compartments: 3 (minimum) Material :plastic Tray Depth: 11 Cm (approx.) Overall Dimension: 36 X 26 Cm (approx.) Smooth Surface, No Sharp Edges) 1 Unit Carpet Sweeper (carpet Sweeper, Cordless Electric Motorized Single Brush Roll (removable) Body Material : Hard Plastic ,(abs) Or Its Equivalent, Any Color Equipped With Rechargeable Battery (16 Minutes Run Time On Carpet), Removable Dirt Box Sweep Width : 8 Inches (minimum) Capacity (volume) : 0.35 Lit.(minimum) Handle: Metal, Powder- Coated, With Plastic/rubber Grip, Swivel Steering Assembled Height: 44 Inches (minimum) Comes With Battery Charger 220/240vac, 50/60hz With Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) No Sharp Edges Includes User's Manual Which Contains Operation Procedure, Name Of Parts, Safety Precautions, Trouble Shooting.) 1 Unit Cart, For Housekeeping Nc Ii (housekeeping Cart Trolley, Equipped With Three-shelves With Steel/laminated Panels Single Door, Top Layer With Divider, Bag Holder, And 4 Wheels. Cart Frame: Steel, Powder Coated. Wheels: 2non-swivel 2 Swivel, 6 Inch Diameter, Non-markings. Overall Dimensions : Rectangular 90 X 48 X 1010 Cm (minimum) Comes With Accessory Linen Bag Smooth Surface, No Sharp Edges) 50 Pc Cleaning Cloth, Linth-free (lint Free Cleaning Cloths Material : Cotton Dimensions : Rectangular 16 X 26 Inch) 1 Unit Coffee Maker (coffee Maker, Electric Material: Metal, Plastic, Glass. Capacity: 6 Cups (minimum). Detachable Tank, With Water Level Indicator. Non-stick Warming Plate : Removable And Washable Filter Non-drip Valve : Lighted On/off Switch Power Supply: 220 V -240 V Ac 50/60 Hz , 500w Minimum Comes With A Heat Resistant Glass Pitcher. With A 1 Meter (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option). Smooth Surface, No Sharp Edges With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item. Comes With English Manual That Contains: Users Guide, List Of Parts, Maintenance Guide, Safety Guide. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines) 5 Pc Dust Pan (dust Pan, Upright Standing Material: Plastic Overall Length: 65 Cm (minimum) Pan: Round Back, 24 X 26 X 9 Cm (minimum) Smooth Surface, No Sharp Edges) 5 Pc Duster, Anti-static (anti-static Duster Duster Material : Polypropylene Micro Fiber Duster: Length : 30 Cm (minimum), Overall Length: 50 Cm (minimum) Handle Material : Hard Plastic, No Sharp Edges) 7 Unit Fan, Electric ( Stand Fan, Electric Material: Metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220 / 240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Removable Metal Guard On Front And Rear 3-speed Settings Comes With 1.5 Meters Power Cord And With Molded Male Plug To Adapt Type A Outlet (or Providing 3a Minimum Plug Adapter Is An Option) Smooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 1 Year Warranty Parts And Service) 3 Pc Fire Extinguisher(with Contents) (1.for Type A, B, C Fire: Dry Chemicals (monoammonium Phosphate) 2.portable Type 3.capacity : 5 - 6 Kgs 4.rechargeable Cylinder Metal 5.working Pressure Of Cylinder : 400 Psi 6.brass Valve With Pressure Gage 7.with Rubberized Hose And Aluminum Nozzle Attached 8.with Squeeze Lever To Discharge And Safety Pin 10.painted With Metal Primer And Red Enamel Paint 11.includes With User's Guide In English That Contains: A. Operating Procedure On How To Use The Equipment B. Safety Precaution When Using The Equipment 12.1 Year Warranty Parts And Service 13.the Item Must Be Branded And Have Good Quality) 10 Pc Flashlight (flashlight Led 1,000 Lumens (minimum), Color : White , Battery: Rechargeable, At Least 3,500 Mah , Can Be Used Also With 3 X Aaa Batteries; Body: Aluminum Alloy, No Sharp Edges Dimensions : 5 Inches X 1 Inch Diameter (minimum) Operating Duration Of Battery When Fully Charged : At Least 2 Hours; Includes 220/240vac, 50/60hz Power Adapter /charger And User's Manual In English Which Includes: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, With 1 Year Warranty 10 Pc Flat Iron (clothes Flat Iron, Electric Material : Metal /plasic Body, Heat-resistant Plastic Handle, Aluminum Sole Overall Dimension : (l X W X H) 25 Cm X 12 Cm X 12 Cm (minimum) Power Rating : 220/240 Vac, 50/60 Hz; 1000 Watts (minimum) Equipped With Light Indicator, Variable Temperature Control, Overheat Protection, Power Cord And Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges, Comes With English Manual That Contains : Users Guide, List Of Parts, Maintenance Guide, Safety Guide. The Item Must Be Branded, With Dti-bps Certification 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines.) 10 Pc Foam, Scrubbing (1. Material: Cellulose And A Scouring Pad On One Side 2. Dimension: Length : 140 - 180 Mm ; Width : 80 - 100 Mm ; Thickness : 12 - 20 Mm 3. The Item Must Be Of Good Quality) 4 Pc Garbage Receptacles (1.bucket / Tub Material : Hard Plastic, (ps) Polystyrene 2.bucket / Tub Color : Any Color 3.capacity (gallons) : 3 Gal. (minimum) Comes With A Cover 4.the Item Must Have Good Quality) 30 Pair Gloves, Rubber (1.heavy-duty Latex-free Vinyl Rubber Gloves 2.thickness : 4 Mil 3.color : Any Color 4.size : Medium 5.other Features: Acid/solvent Resistant. 6.the Item Must Be Of Good Quality) 15 Pc Goggles, Safety (safety Goggles, Clear Polycarbonate - One Piece Lens With 180° Panoramic View, Non-fog Size/dimension: L 17 - 18.5 Cm X W 8 Cm X D 5-7.5 Cm High Impact Resistant, Ansi "z87" Compliant Firm And Comfortable Seal Around Forehead, Cheeks, Nose And Temples Protects Against Splash, Chemicals, Dust Adjustable Head Strap Shall Bear Mark Z87 Embossed Or Engraved Or Etched On The Item. Smooth Surface, No Sharp Edges) 1 Pc Hairdryer( Electric Hairdryer, With Concentrator Nozzle Two Heat Setting And 1 Speed (minimum) Rating : 220/240 Vac, 1200 W (minimum) Body Length Including Nozzle: 20 Cm Folding Handle Design, With Hanging Ring Smooth Surface, No Sharp Edges Branded, Brand Name And Electric Rating Permanently Mark On The Item, With Dti-bps Certification With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. With Service Centers Located In Major Cities In The Philippines. 1 Year Warranty(parts & Service) 2 Roll Hose, Water(water Hose Material: Pvc Fiber Reinforced, Three (3) Layers; Any Color; Hose Length: 50 Feet; Hose Diameter: 5/8 Inches; Pressure Capacity: 200 Pounds Per Square Inch (minimum); Fitted With Male And Female Brass Couplers (nh, 11.5 Tpi) For Spray Nozzle No Sharp Edges) 3 Pc Kettle, Electric(electric Kettle Cordless (with Pouring Spout), Hinged Lid, Detachable From And Can Rotate On Its Corded Base Material : Round Stainless Body, Plastic Handle, Lid And Base Capacity : 1.5 To 2 Liter Automatic Shut - Off, With Power Indicator Light Power Rating: 220//240vac, 50/60hz, 1000 -1600 Watts Base With A 50 Cm (minimum) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges; Dti-bps Certified Comes With English Manual That Contains: Operation Procedure, Maintenance And Safety Guide. The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 5 Pc Laundry Sorter(3 - Bag Laundry Sorter, With Wheels Bag: Polyester, Rectangular Shape, Detachable From Frame With Metal Handle And Hanging Hook Bag Dimensions : Rectangular 22 X 15 X 8 Inch (minimum) Frame Material : Corrosion Resistant Steel, Sturdy No Wobble Frame Overall Dimensions : Rectangular, 31 X 30 X15 Inch (minimum) With Four Casters, 2 Inch Diameter (minimum) Smooth Surface, No Sharp Edges) 2 Pc Light, Emergency(emergency Light, 2 Heads Led Materials: Metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector Power Rating: 220 -240 Vac , 50/60 Hz 20-24 Hours Charge Time Dimensions: Rectangular 27 X 7 X 27 Cm (approx.) Sooth Surface, No Sharp Edges Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures The Item Must Be Branded, Brand Name And Electrical Ratings Permanently Mark On The Item.) 2 Pc Mirror Wall Mirror With Frame Flat Glass Mirror, 2 Mm Thick (minimum), Clear With No Distortion Frame: Wood Or Plastic Commercial Finish Rectangular Shape, 3600 Sq.cm (minimum) Includes Mounting Accessories Smooth Surface, No Sharp Edges) 20 Pc Mop (mop, Handle And Mop Head Set, Refillable Head Handle: Aluminum Or Anti-rust Coated Steel, With Hard/stiff Plastic Mop Head Holder, Clip Type With Tightening Knob Overall Handle Dimension: 130 X 19 Cm (minimum) Mop Head: Cotton Thread/yarn, Sewn Tailband, L 34 X 16 X 4 Cm (minimum), White Handle: Plated Steel Tube Or Wood, Length : 40 (minimum), No Sharp Edges 1 Set Polisher, Floor, Electric, With Accessories(electric Floor Polisher With Accessories Material: Stainless Steel, Aluminum Alloy Handle: Stainless Tube, Adjustable Height 1 Meter Long (approximate), With Dual Switch Lever Size/capacity :13 Inch (minimum) Diameter Power Supply: 220/240 Vac, 50/60 Hz. Power: 1/3 Hp (minimum) Rotation Speed : 160 Rpm (minimum) Heavy Duty (royal) Power Cord Length : 12 Meters (minimum) With Type A Plug (or Providing 10a Plug Adapter Is An Option) With Pair Of Rubber Wheels, Smooth Surface, No Sharp Edges Comes With Pad Holder, 2 Pcs - Polishing Brush And 3 Pcs - Floor Polishing Pads Includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures Branded, Brand Name And Electric Rating Permanently Mark On The Item, With 1 Year Warranty Parts And Service The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 5 Pc Shelving(shelving, Open, Knockdown Type, Adjustable Shelves Metal Powder Coated Frame Number Of Shelves : 5 Overall Dimensions : 85 X 30 X 180 Cm(minimum) Sturdy Connection, No Wobble Smooth Surface, No Sharp Edges) 5 Pc Sign, Caution(caution Sign, A Shape-2 Panel Self Standing, With D-handle, Collapsible For Easy Storage Material : High Impact Plastic, Panel Dimension : Rectangular (lxw) 55-65 Cm X 25 X 61 0m (minimum), Panel Depth : 2 Cm (minimum) Color : Yellow Print Description : "caution: Wet Floor" On One Side "cleaning In Progress On The Other Side, Both Messages Provided With Graphics Printed In Black. Font Size: 100 -120 Mm X 50 -70 Mm, Arial Smooth Surface, No Sharp Edges) 10 Pc Sponges, Dish(dish Sponge, Cellulose, Non-scratch Dimensions : 5 X 3 X 1 Inch (minimum) Branded) 10 Pc Spray Gun, Water(barber/salon Spray Gun Material: Hdpe Transparent Plastic Capacity: 300 Ml.(minimum) Trigger Type Sprayer Dimension: Diameter :7 Cm. X Height: 16.3 Cm (minimum) Rotating Nozzle To Adjust Spray Patterns Smooth Surface, No Sharp Edges Must Be Branded) 10 Pc Squeegee(squeegee, Short Handle Head/blade Material: Stainless, Rubber Handle: Plastic Or Stainless Steel Blade Length: 25 - 30 Cm Overall Length (handle And Head) 20 - 32 Cm No Sharp Edges ) 5 Pc Squeezer, Mop(mop Bucket With Squeezer/wringer And Wheels Hand Lever To Squeeze, Made Of Metal, With Hand Grip Material : Hard Plastic, (ps) Polystyrene Or Its Equivalent Capacity : 30 L (minimum) Overall Dimension (excluding Handle: ( L X W X H ) 40 X 27 X 57 Cm (minimum) Color : Yellow With 3 Inches Non-marking Rubber Casters "caution" Printed In Black On Both Sides Of The Mop Bucket Smooth Surface, No Sharp Edges) 1 Pc Step Ladder(material: Aluminum U Channel Capacity: 250 Lbs (minimum) Type: Flatform Type Number Of Step: 6 (including Top Step) Reach Height: 6 To 8 Feet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum) Twin Steps With Gripped Treads To Prevent Slipping Step Braces On Top And Bottom Step Heavy Duty Aluminum Foot Bracket With Slip-resistant Foot Pad With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, Brandedfeet(minimum) Width: 15 Inches Minimum Spread: 4 Feet (minimum)) 2 Pc Vacuum Cleaner, Dry And Wet(electric Vacuum Cleaner, Wet And Dry Function, Sucks Even Screws, With 4 Swivel Caster Wheels Material : Hard Plastic, (abs) Or Rust Proof Body Equivalent Power Supply : 220/240vac, 50/60hz, 1000 Watts (minimum) Auto Shut Off Tank Capacity : 20 Liters (minimum) Equipped With Complete Accessories I.e., Detachable Vacuum Hose Assembly (flexible Non-kink), Extension Tubes/wands, Carpet (long Square) Brush Nozzle, Wet And Dry Floor Brush Nozzle, Crevice Nozzle, Hepa Filter, Sponge Filter/washable Cloth Bag. Comes With 4 Meters (minimum) Heavy Duty (royal) Power Cord, Molded Male Plug To Adapt Type A Outlet (or Providing 10a Plug Adapter Is An Option) Smooth Surface, No Sharp Edges With User's Manual Written In English That Contains Operating Procedure, Parts With Description, Safety Procedure, And Maintenance. The Item Must Be Branded, Brand Name And Electric Rating Permanently Mark On The Item. 1 Year Warranty Parts And Service With Service Centers Located In Major Cities In The Philippines. The Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 1 Unit Washer, Laundry(1. Front Load Electric Washer, Laundry 2. Electronic Control, Digital Indicator Display , Transparent Glass Door 3. Body Material : Steel, Powder Coated, Any Color 4. Dimensions (wxdxh): 590 Mm (minimum) X 490 Mm (minimum) X 820 Mm (minimum) 5. Drum Material : Stainless Steel 6. Capacity : 8 Kg (minimum) 7. Spin Speed : 1200 Rpm (minimum) 8. Power Rating: 220 /240vac, 50/60 Hz. 9. Comes With A 1 Meter (minimum) Heavy Duty Power Cord With Male Plug To Adapt Type A Outlet (or Providing 20a Plug Adapter Is An Option) 10. Smooth Surface, No Sharp Edges 11. With Dti-bps Certification, Brand And Electrical Ratings Clearly And Permanently Mark On The Item 9.includes User's Manual In English Which Contains: A. A Diagram Of The Parts With Their Names, B. Operating Procedures On How To Use The Equipment, C. Safety Precautions When Using The Equipment, D. Basic Troubleshooting And Maintenance Procedures 12.the Item Must Be Branded, Dti-bps Certified, 1 Year Warranty Parts And Service 13. With Service Centers Located In Major Cities In The Philippines. 14.the Offered Brand Of The Item Must Be An International Brand With At Least 5 Years Presence At The Local Market And Global Presence In The Usa, Europe Or In Japan Market.) 2 Pc White Board(white Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform. Board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Caps Comes With Metal Tray For Marker And Eraser The Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobble With 4 Lockable Hard Plastic Caster Wheels Overall Height From Floor: 210 To 214cm Smooth Surface, No Sharp Edges) Lot 7. Tangub City National High School (food And Beverage Services Nc Ii) Php 571,245.00 50 Pcs Chair, Dining Type : Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimesion: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box The Item Must Have Good Quality 4 Pcs Coffee Pot, 2 Pints Type: Manual Drip Body Shape: Round Material : Stainless Steel With Cover Capacity : 2 Pints Outside Diameter : 90 -110 Mm Over-all Height : 200 - 230 Mm Thickness : 0.5 - 1 Mm With Handle And Spout Packed In Carton Box The Item Must Have Good Quality 6 Pcs Container, Creamer Design: Type: Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter : 50 - 65 Mm Height : 80 - 105 Mm Color : White Appearance : Glossy White Packed In Carton Box The Item Must Have Good Quality 24 Set Cups Ans Saucers 5-6 Oz. 1. Material : Porcelain 2. Capacity : 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color : White 5. The Item Must Be Of Good Quality 6. Packed In Carton Box 10 Pcs Folder, Menu Type: Leather Menu Folder Body Shape: Rectangular Material: Leather With 2 Partitions And 6 Inserts Size: 31.5cm X 24.5cm Color: Brown/black Applicable Paper Size: A4 50 Pcs Fork, Cocktail 1. Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design 2. Type : Rounded Tip Handle 3. Over-all Length : 110 - 165 Mm 4. Width : 20 - 30 Mm (minimum) 5. Handle Thickness : 2 Mm To 4 Mm 6. Handle Length : 75 - 90 Mm 7. Small, 8. Color : Silver 9. The Item Must Be Branded And Have Good Quality. 50 Pcs Fork, Dessert Type : Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance : Stainless Steel, Highly Polished,with Plain Design, Rounded Tip Handle Length : 150 Mm - 175 Mmwidth : 20 - 30 Mmhandle Thickness : 1.5 Mm - 3 Mm Number Of Tines : 4 Handle : 130 Mm (minimum) Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 60 Pcs Fork, Dinner Type: Dinner Fork Body Shape: Fork Shape Material / Appearance : Stainless Steel, Highly Polished, With 4 Tines Over - All Length : 120 - 175 Mm Thickness Of Handle : 2 - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Fish Type : Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance : Stainless Steel, Highly Polished, With Plain Design Over-all Length : 180 - 215 Mm Fork Width : 1.5 Mm - 3 Mm Fork Thickness : 1 Mm - 2 Mm Number Of Tines : 4 Length Handle : 120 - 130 Mmhandle Thickness : 2 Mm - 3 Mm Color : Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 36 Pcs Fork, Oyster Type: Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Packed In Plastic Pouch The Item Must Be Of Good Quality 24 Pcs Glass, Champagne Flute Type : Flute Glass Body Shape: Round Material: Clear Crystal Glass Dimension : Height: 20 -24 Cm, Top Diameter: 50 -70 Mm, Bottom Diameter: 60 - 80 Mm Capacity: 250 Ml. (minimum) Thickness: 1.5 - 3 Mm Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Collins Type: Tumbler Body Shape: Round Material : Clear Glass Capacity : 10 Oz To 14 Oz Thickness : 1.5 -3 Mm (minimum) Packed In Carton Box The Item Must Have Good Quality 36 Pcs Glass, Juice/hi-ball 1. Material : Clear Glass 2. Type : Hi-ball 3. Height : 140 - 160 Mm 4. Bottom Diameter : 50 -70 Mm 5. Top Diameter : 50 - 70 Mm 6. Thickness : 2 - 4 (minimum) 7. Capacity : 8 Oz. To 10 Oz. 8. Diswasher Safe 9. The Item Must Be Branded And Good Quality 10. Packed In Carton Box 36 Pcs Glass ,pilsner(ice Tea Glass) Type:falired Rim,body Shape:round Slender Bowl,material:clear Glass Capacity:20 0z To 23 Oz With Flaired Rimand Slender Shape Packed In Carton Box.the Item Must Have Good Quality. 36 Pcs Glass, Red Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity : 250 -300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 85 - 90 Mm Base Diameter : 75 - 85 Mm Base Thickness : 2 - 4 Mm 40 Pcs Glass, White Wine Type: Royalty Body Shape: Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter : 55 - 60 Mm Thickness : 1.5 - 3 Mm Over -all Length : 200 -220 Mm Capacity : 270 - 300 Ml Stem Diameter : 6 - 8 Mm Stem Length : 75 - 85 Mm Base Diameter : 70 - 80 Mm Base Thickness : 2 - 5 Mm 4 Pcs Gravy Boats Type: Steel Type Body Shape: Boat Shape With Handle Material: Stainless Steel Capacity : 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Packed In Plastic Pouch 4 Pcs Ice Bucket, 2 Liters With Tongs Type: Steel Type Body Shape: Circular Set Includes: A. Ice Bucket Material : Stainless Steel Diameter : 140 - 180 Mm Height : 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity : 2 Liters (minimum) The Item Must Have Good Quality 24 Pcs Knife, Butter 1. Material : Stainless Steel W/ Highly Polished Appearance 2. Over-all Length : 140 Mm - 150 Mm 3. Handle Thickness : 3 Mm - 5 Mm 4. With Dull Edge And Rounded Tip 5. The Item Must Have Good Quality. 6. Packed In Carton Box 24 Pcs Knife, Dinner Type: Dinner Knife Body Shape: Flat With Round Tip Material / Appearance : Stainless Steel Blade Highly Polished Handle Material : Stainless Steel Overall Length : 160 - 190 Mm Blade Thickness : 2 - 4 Mmhandle Thickness : 3 - 6 Mm Serrated Blade With Rounded Tip Packed In Carton Box The Item Must Have Good Quality 24 Pcs Knife, Fish Type : Fish Knife Body Shape: Flat With Pointed Tip Material / Appearance : Stainless Steel, Highly Polished W/ Plain Design Overall Length : 200 - 220 Mm Width Blade : 20 - 25 Mm Thickness Of Blade : 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Wide Blade, Dull Edge, Tip Made With A Notched Point Color : Silver Packed In Carton Box The Item Must Have Good Quality 20 Pcs Napkin Holder (stainless) Type: Steel Type Body Shape: Rectangular Material : Stainless Steel With Highly Polished Appearance Dimension : Width : 70 - 90 Mm X Length : 150 - 170 Mm , Thickness : 0.7 Mm -2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Order Pads Type: Numbered Pads Body Shape: Rectangular Material : 80 Gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Can Take 1000 Orders Before You Run Out Packed In A Plastic Pouch 12 Pc Pepper And Salt Mill Type: Pepper & Salt Mill Body Shape: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices Preferably With A Packing Case Food Grade And Nontoxic Must Be Branded 50 Pc Plate Covers Type: Steel Type Body Shape: Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Plate, Dessert, 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color : White Inner Diameter: 145 To 165 Mm Thickness : 3 To 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 60 Pc Plate, Dinner, 10" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Color: White Inner Diameter : 200 Mm - 215 Mm Outer Diameter : 250 - 260 Mm Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Plate, Fish, 8" To 9" Type: Plain Type Body Shape: Circular Material : Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color : White Inner Diameter : 165 Mm - 190 Mm (minimum) Thickness : 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 10 Pcs Round Table (8's) Type: Foldable Body Shape: Round Material: High Density Polyethylene Table Top Powder Coated Steel Frame Size: 154cm X 74cm X4.5cm (minimum) Good For 8 To 10 Seater Capacity Tube Size : 28 Mm Diameter X 1 Mm Thickness Packed In A Carton Box The Item Must Have Good Quality 50 Pcs Salad Forks Type: Salad Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, With 4 Tines Length: 150 Mm - 175 Mm Thickness Of Handle : 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality 50 Pcs Salad Knife Type: Salad Knife Body Shape: Semi Rectangular Blade With Pointed Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Overall Length: 145 -160 Mm Blade Thickness: 2 Mm To 4 Mm Handle Thickness: 4 Mm To 6 Mm Handle Material: Stainless Steel Rounded Tip Handle Packed In Carton Box The Item Must Have Good Quality 50 Pcs Salad Plates 7" To 8" Type: Plain Type Body Shape: Circular Material: Porcelain With No Design Supply Must Be A Set Consisting Of One (1) Each: 7 Inches And 8 Inches Plates Color: White Diameter (inner): 150 Mm - 165 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 20 Pcs Salt And Pepper Shakers Type: Glass Type Body Shape: Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Aluminum Cover Packed In Carton Box The Item Must Have Good Quality 25 Pcs Sauce Laddles Type: Spouted Bowl Body Shape: Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Color: Silver With Hang Hole For Hanging And Easy Access Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Server, Cake 1. Material : Stainless Steel Blade , Highly Polished Appearance 2. Over-all Length : 220 To 270 Mm 3. Width : 60 - 80 Mm 4. Thickness : 1.5 Mm To 2 Mm 5. Handle : 120 -140 Mm Long, Non-toxic Plastic 6. Shape : Shovel-shaped 7. Color : Silver 8. The Item Must Have Good Quality 9. Packed In Carton Box 50 Pcs Service Forks Type : Service Fork Body Shape: Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Packed In Plastic Pouch 25 Pcs Service Tray Type: Plastic Body Shape: Rectangular Material: Plastic (pp) Size : 14 Inches X 18 Inches X 1 Inch (minimum) Color : Any Packed In Plastic Pouch The Item Must Have Good Quality 25 Set Show/service/base Plates 11" To 14" Type: Plain Type Body Shape: Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Smooth And Glossy Surfaces 50 Pcs Side Plates Or Bread Plates 6'' Type: Plain Type Body Shape: Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness : 3 Mm - 6mm Smooth And Glossy Surfaces Packed In Carton Box The Item Must Have Good Quality 50 Pcs Side Towels Type: Chef's Towel Body Shape: Rectangular Material: Oxford Polyester Soft Cloth Over-all Length : 640 - 680 Mm Over-all Width : 420 -460 Mm Color : Plain White Packed In Plastic Pouch The Item Must Have Good Quality 25 Pcs Silver Platter Type: Steel Type Body Shape: Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Packed In Plastic Pouch The Item Must Have Good Quality 50 Pc Soup Bowl Type: Plain With Two Handles Body Shape: Circular Material : Porcelain Capacity : 24 Oz. (minimum) Packed In Carton Box The Item Must Have Good Quality Packed In A Carton Box 25 Pc Soup Laddle Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length : 220 -235 Mm Ladle Bowl Details : 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Handle Details : 145 - 155 Mm Long X 12 - 25 Mm Wide X 1.5 -3 Mm Thick Color : Silver With Hang Hole For Hanging And Easy Access 15 Pc Soup Tureen Type: Steel Body Shape: Round Material: Stainless Steel Capacity: 7 - 11 Quart Size : 60 X 35 X 32 Cm (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dinner Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoon, Dessert Type : Dessert Spoon Body Shape: Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length : 175 To 190 Mm Thickness : 2 Mm - 3 Mm Shorter Handle : 120 -130 Mm Color : Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Service Type : Service Spoon Body Shape: Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Spoons, Soup (cream And Cosume) Type: Soup Spoon Body Shape: Round Material/appearance : Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length : 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Shorter Handle : 110 Mm - 170 Mm Thickness : 1.5 Mm - 3 Mm Color : Silver Packed In Plastic Pouch 50 Pc Steak Knife Type: Steak Knife Body Shape: Flat With Serrated Edge Material: Stainless Steel Steel Blade With Wooden Handle Length: 170 Mm To 203 Mm Handle Wood Thickness: 10 - 14 Mm With Serrated Blade Packed In Carton Box The Item Must Have Good Quality 25 Pc Sugar Container Type: Glass Type Body Shape: Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Packed In Carton Box The Item Must Have Good Quality 50 Pc Table Cloth, 54 X 54 Inches Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Color: Plain White Dimension: L 54 Inches X W 54 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 100 Pc Table Cloth, Rectangular Type: Plain Cloth Body Shape: Rectangle Material : Linen Size : 120cm X160cm (minimum) Color : Any Color But Not Black Feature: Washable Packed In A Plastic Pouch 100 Pc Table Napkins, Cloth, 16"x16" Type: Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Size: L 16 Inches X W 16 Inches (minimum) Color: Plain White Packed In Plastic Pouch The Item Must Have Good Quality 80 Pcs Table Skirting Cloth 90" To 90" Type: Plain Cloth Body Shape: Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Table, Square/rectangular (4's Or 6's) Type: Foldable Plastic Body Shape: Square/rectangle Material: High Density Polyethylene Table Top Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Good For 4 Persons Packed In Carton Box The Item Must Have Good Quality 20 Pcs Tea Pot, 2 Pints Type: Porcelain Type Body Shape: Round With Handle And Pouring Spout Material : Porcelain Capacity : (2 Pint) Color : White Packed In Carton Box The Item Must Be Of Good Quality 50 Pcs Teaspoon Type : Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Packed In Plastic Pouch The Item Must Have Good Quality 15 Pcs Tong, 8 Inches Type: Tong, 8 Inches Body Shape: Standard Material: Stainless Steel Size: 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Food Grade And Dishwasher-safe Must Be Branded 30 Pcs Tooth Pick Holder Type: Steel Type Body Shape: Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch The Item Must Have Good Quality 20 Pcs Tray Stand Type: Foldable Body Shape: Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Packed In Plastic Pouch The Item Must Have Good Quality 30 Pcs Tray, Bill Folders/change 1. Material : Heavy Duty Plastic ( Abs ) Or Its Equivalent 2. Height : 190 - 220 Mm 3. Width : 120 -140 Mm 4. Thickness : 2 Mm To 3 Mm (minimum) 5. Color : Black 6. With Check And Pen Holder 7. The Item Must Have Good Quality 8. Packed In Plastic Pouch 20 Pcs Tray, Round (bar) Type: Plastic Body Shape: Round Material: ( Pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Packed In Plastic Pouch The Item Must Have Good Quality 50 Pcs Water Goblet Type: Water Goblet Body Shape: Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Packed In Carton Box The Item Must Have Good Quality 30 Pcs Water Pitcher (stainless) Type: Steel Type Body Shape: Circular Material: Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Dishwasher Safe Packed In Plastic Pouch The Item Must Have Good Quality Lot 8. Tangub City National High School (front Office Services And Local Guiding Services) Php 232,832.00 50 Pcs Calculator Type: Simple Calculator, Non Scientific Body Material: Hard Plastic Minimum Size: 110mm Width X 140mm Long Lcd Display: At Least Font Size Is 8mm X 5mm With Dual Power; Solar Cell And Battery With At Least 8 Digits Display Includes Spare Battery Packed With Protective Carton Box User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment, 1 Pcs Cart, Bell Boy Type:hotel Luggage Trolley Capacity: At Least 450 Kilograms Minimum Dimensions: Length - 1000mm X Width - 600mm X Height - 1700mm Frame Material: Stainless Steel Tubing Stainless Tube Diameter: At Least 35mm Black Powder Coated Steel Platform With Carpeted Surface And Rubber Bumper At The Edge With 4 Pieces X 200mm Diameter Black Pneumatic Swivel Wheels Packed With Shipping Carton Box Branded 1 Pcs Cash Register With Drawer Printer: Width: 57mm (minimum) Speed: 2 Lines/sec (minimum) Lcd Display Size: 5cm Width X 10cm Long(minimum) With Drawer At Least 4 Bills And 5 Coins Compartments With Drawer Dimension At Least 410mm Width X 450mm Depth Input Method: Numeric 10-key Interface With At Least 2 Ports Power Source: 220-240volts Ac, 50/60hz; With Ac/dc Adapter Can Be Operated With Battery Programmable User's Manual In English Which Includes: A. Parts Manual With Labels, 1 Pcs Credit Card Imprinter Height Of The Imprinter 2 1/2 Inch (minimum) X Width 5 1/2 Inch (minimum) X Length 11 Inches (minimum) Carriage Material: Steel Body:plastic Color: Black 20 Characters Per Line Card Mounting Can Accepts At Least 0.030" Thick Size Credit Cards Plate Can Accommodate Up To 5 Lines, Manual Type With User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures 30 Pc Credit Card Voucher Holder Material: 3 Mm Thick Clear, Acrylic, Dimensions: Height: At Least 255 Mm, Width: At Least 210 Mm, Thickness: At Least 70 Mm 1 Pcs Detector, Fake Bills Led Display; Led Display Size: At Least 5 Cm Width X 10 Cm Long; Hard Plastic Casing; Ultraviolet (uv) And Magnetic (mg) Sensors; Power Source: Built In Rechargeable Battery,12v Output And Ac 100- 240v Adapter; With Complete Detection; Accessories Includes: Tough Plastic Carrying Case, Power Cord, Cleaning Brush, And Power Charger; User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, 3 Pcs Guest Folio Rack Material: Hard Plastic; Accommodates At Least 50 Room Divider Indexes; With Divider Boards With Metal Tabs; A4 Size Divider; With Metal Sidings 1 Pc Hypercom Memory: 1 Mb Ram (minimum) Lcd Display; 160 X 80 Pixel Graphics (minimum) With Card Reader Magnetic Stripe Pin Pad Port: 4-wire, Rs485; With Peripheral Ports For Pc Connection; Electronic Cash Register Or Journal Printer; With At Least 2400bps Modem; Support Synchronous (sdlc) And Asynchronous, Lan Operation; With Pin Encryption; With Thermal Printer At Least 576 Dots Per Line; Thermal Paper – 2 Inches Wide X 3 Inches Roll Diameter (min.); Keypad: Membrane, 12 Keys, Water-resistant; 1 Pc Key Card Maker With Verifier Set Of Hotel Door Lock System With Management Software; A) 1 Unit - Card Type Door Lock With Inductive Distance At Least 4cm B) 1 Unit - Card Encoder Unit With 25 Pieces Door Room Key Cards Computer Software System For Door Lock And Making Cards With Complete Accessories Including The Usb Type A Cable Interface To The Computer User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions C. Operating Procedures On How To Use The Equipment 1 Pcs Key Rack Rack Material: Wood Number Of Racks: Can Accommodate At Least 40 Key Cards Minimum Rack Size: 70mm Width X 110mm Height Depth Of The Rack At Least 50mm Any Color Paint Type:wall Mounted Rack Pack With Shipping Carton Box 1 Pc Safety Deposit Box Vault Material: Metal, Powder Coated, Solid Steel Door Thickness: 4mm(minimum) Body Thickness: 2mm(minimum) Minimum Outer Dimension: L: 30cm X H: 20cm X W: 20cm Electronic Lock System Battery Operated Digital Panel: Requires 4 X ‘aa’ Batteries User's Manual In English Which Includes: A. Parts Manual With Labels, B. Assembly Instructions, C. Operating Procedures On How To Use The Equipment, Branded 20 Pcs Speaker, Lapel Frequency At Least 500mhz With Audio Input Connector With Operation Range At Least 50meters Receiver/70ma Earphone Output Level: 32ohm, 65mw Operates With Energizer Battery With Minimum Powerconsumption Of Transmitter At Least 3v/70ma Receiver: 3v/70ma 25 Sets First Aid Kit Type: Emergency Case; Contents: First Aid Quick Reference Guide, 1pc; Sterize Gauge Swab(4 X4 X12 Ply) 100 Pcs/pack, 1 Pack; Adhesive Strips/band -aid, 50 Pcs/pack, 2 Packs; Gloves, Disposable, Medium Size, 2 Pairs; Hypo Allergenic Adhesive Tape, 5cm X 5cm, 2 Rolls; Triangular Bandage/arm Sling, Min 90cm X 90cmx 120cm, 2pcs; Safety Pins, 1 1/4 Inches, (12 Pcs), 1 3/4 Inches (12 Pcs); Stainless Steel Bandage Scissors, 2pcs; Betadine, 60ml, 2 -3 Years Expiration, 2 Bottles; Dust Mask, 2pcs; Hand Towels Or Face Towels, White Color, 6 Pcs; Gauze Bandage, Minimum 5cm X 4cm, 2 Rolls; Antiseptic Handwash/germicidal Soap, 60 Gms , 2pcs; Torniquet, 2 Pcs; Spirit Of Ammonia, 30ml, 2-3 Years Expiration, 1 Bottle; Burn Cream Ointment, 20g To 30g, 2- 3years Expiration, 1 Tube; Medical Tweezers Min. 8cm, Plastic, 2pcs; Plastic Bags, Resealable, Minimum Of 24pcs, 100mm X 180mm, 24pcs, 150mm X 230mm Cotton Balls , 50 Balls In A Sealed Package, 2 Packs Hot And Cold Pack, Reuseable, 1 Pack Water Resistant And Sturdy Case W/ Handle That Can Accommodate All The Listed Items. 4 Pcs Megaphone Battery Operated (4 Pcs - Size D Battery) With Built-in Siren Power Output: 20-watts (minimum) Range: 700 Meters (minimum) With Hand Grip And Carrying Strap Branded With Users Manual That Contains The Specification, List Of Parts, Instruction Guide, Troubleshooting, Safety Instruction. 100 Pcs Whistle Anodized Aluminum;size : Length - 6.5cm X 3cm Diameter; Handy And Lightweight; Loud Whistle Can Be Heard For Far Distance Of 100 Meters; With Key Ring For Attachment 2 Pcs White Board, Floor Standing, Rolling Board: White Formica Laminated, Plane Will Not Deform.board Size: Rectangular 1800mm W X 1000 To 1200mm H, Board Edges Secured With Aluminum Clip Edging 17 Mm (minimum) Wih Plastic Corner Capscomes With Metal Tray For Marker And Eraserthe Stand And Frame Are Constructed With Aluminum Or Powder Coated Steel 25mm Square Tube (minimum), Sturdy, No Wobblewith 4 Lockable Hard Plastic Caster Wheelsoverall Height From Floor: 210 To 214cmsmooth Surface, No Sharp Edges Total Abc 3,978,106.00 2. The Department Of Education – Division Of Tangub City Now Invites Bids For The Above Procurement Project. Procurement Of Learning Tools And Equipment For Technical Vocational Livelihood To Deped-public Schools. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Department Of Education – Division Of Tangub City And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. To 5:00 P.m. , Mondays To Fridays Except Holidays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 14, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Lot 1 - Five Hundred Pesos (p500.00) Lot 2 - Five Hundred Pesos (p500.00) Lot 3 - Five Hundred Pesos (p500.00) Lot 4 – One Thousand Pesos (p1,000.00) Lot 5 - Five Thousand Pesos (p5,000.00) Lot 6 - Five Hundred Pesos (p500.00) Lot 7 – One Thousand Pesos (p1,000.00) Lot 8 - Five Hundred Pesos (p500.00) The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Education – Division Of Tangub City Will Hold A Pre-bid Conference On November 21, 2024, 9:00 Am At Division Office Conference Hall Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 9:00 A.m. On December 3, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be December 3, 2024, 9:00 A.m. At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Bidders Or Its Authorized Representatives Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. 11. The Department Of Education – Division Of Tangub City Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Gina L. Mandawe Head, Bac Secretariat Deped, Division Of Tangub City, Anecito Siete St., Mantic, Tangub City 7214 (088) 530-5988 Depedtangub.bacsec@deped.gov.ph Https://tangub.deped.gov.ph/ 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Https://tangub.deped.gov.ph/ Erlinda G. Dael, Phd., Cese Assistant Schools Division Superintendent Bac Chair
Closing Soon3 Dec 2024
Tender AmountPHP 3.9 Million (USD 67.7 K)

BULACAN AGRICULTURAL STATE COLLEGE Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Bulacan Agricultural State College Early Procurement Activity For Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility November, 2024 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 11 1. Scope Of Bid 12 2. Funding Information 12 3. Bidding Requirements 12 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 12 5. Eligible Bidders 13 6. Origin Of Associated Goods 13 7. Subcontracts 13 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 14 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 15 14. Bid And Payment Currencies 15 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 16 18. Opening And Preliminary Examination Of Bids 16 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 20 1. Scope Of Contract 21 2. Sectional Completion Of Works 21 3. Possession Of Site 21 4. The Contractor’s Obligations 21 5. Performance Security 22 6. Site Investigation Reports 22 7. Warranty 22 8. Liability Of The Contractor 22 9. Termination For Other Causes 22 10. Dayworks 23 11. Program Of Work 23 12. Instructions, Inspections And Audits 23 13. Advance Payment 23 14. Progress Payments 23 15. Operating And Maintenance Manuals 24 Section V. Special Conditions Of Contract 25 Section Vi. Specifications 27 Section Vii. Drawings 37 Section Viii. Bill Of Quantities 58 Section Ix. Checklist Of Technical And Financial Documents 67 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan, 3010 Invitation To Bid For Early Procurement Activity Construction Of 2-storey Agroforestry Building With Water Catchment Facility] 1. The Bulacan Agricultural State College, Through The General Appropriations Act Of 2025 (gaa) Under The Capital Outlay For The Fy 2025 Intends To Apply The Sum Of Twenty Five Million Pesos (php 25,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 2024-01-infra: Construction Of 2-storey Agroforestry Building With Water Catchment Facility. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required On Or Before The Two Hundred Seventy (270) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Bulacan Agricultural State College And Inspect The Bidding Documents At The Address Given Below From From 8:30 Am To 4:30 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 9, 2024 To December 2, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos (php 25,000.00). Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6. The Bulacan Agricultural State College Will Hold A Pre-bid Conference On November 18, 2024, 09:00 Am Via Zoom Platform (meeting Id: 828 5597 7530; Passcode: 662401) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 08:30 Am Of December 2, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 2, 2024, 9:00am At The The Conference Room, Ground Floor, Farmers Training Center, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Observers Will Be Invited To Attend And Witness The Bid Proceedings. 11. The Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13. You May Visit The Following Websites: Www.basc.edu.ph November 9, 2024 Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Bulacan Agricultural State College Invites Bids For The Proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility, With Project Identification Number 2024-01-infra. The Procurement Project (proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Gaa Fy 2025 In The Amount Of Php25,000,000.00 2.2. The Source Of Funding Is: A. Nga, The National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time Via Online Platform As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction, Renovation, Rehabilitation, Repair Of School, Laboratory And Office Buildings. 7.1 Subcontracting Is Not Allowed. 10.3 Appropriate Pcab License Commensurate To The Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Civil Engineer/ Architect At Least 5 Years At Least 5 Years Materials Engineer At Least 5 Years At Least 5 Years Foreman At Least 5 Years At Least 5 Years Safety Officer At Least 5 Years At Least 5 Years Skilled Laborer At Least 3 Years At Least 3 Years Laborer - - 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Mini Dump Truck Or Elf Truck 1 Concrete Mixer One Bagger 2 Cut Off/ Bar Cutter - 2 Bar Bender - 2 Concrete Vibrator - 2 Welding Machine Heavy Duty 2 12 Alternative Bids Are Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php500,000.0 [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P1,250,000.00 [ Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Building Permit, Occupancy Permit, Locational Clearance, Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone.etc. 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And (pert/cpm) Or Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 The Intended Completion Date Of Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Is Two Hundred Seventy (270) Calendar Days From The Date Of The Receipt Of Notice To Proceed. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor Is Upon The Receipt Of The Notice To Proceed. 6 The Site Investigation Reports Are: 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 7 Calendar Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Progress Billing. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price To Be Paid Upon Written Request Of The Contractor Reconciling On The Date Of The Notice To Proceed And Upon Submission Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, And Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission. 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Fifteen (15) Calendar Days From Completion Of Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 0.1% Of The Final Contract Amount. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Proposed Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Basc Drt Campus Technical Specifications Bulacan Agricultural State College Pinaod, San Ildefonso, Bulacan November 2024  Specifications 1. General Requirements 1.1 These Specifications Are Intended To Cover All Labor And Materials Required For The Complete Construction Of The Proposed Projects As Shown In The Working Drawings As Described Herein. 1.2 Materials And/ Or Work Not Specifically Mentioned In The Specifications, Working Drawings, And Other Contract Documents But Is Implied And Deemed Necessary To Complete The Work Shall Be Supplied By The Contractor And Executed In A Workman-like Manner, Of Appropriate Number, Location, And Size Of The Highest Quality Available Without Extra Cost To The Owner. 1.3 The Owner Reserves The Right To Alter And/or Omit Any Part Of The Plans With The Approval Of The Architect Or Engineer As The Case May Be. Any Extra Charge Must Be Situated To The Architect And/or Project Manager For Approval Before Final Acceptance. 1.4 The Contractor Shall Secure All Permits And Licenses As Required And Also Shall Be Responsable For All The Liabilities, Under Workmen’s Compensation, Sss, Insurance, Etc. 1.5 The Contractor Shall Furnish For Approval Of The Architect/engineer, With Promptness, Samples As Specified Or Required. Works Shall Be In Accordance With The Approved Samples. 1.6 The Contractor Shall Guarantee The Words, Except For Those With Specific Guarantee For A Period Of One (1) Year After Final Acceptance By The Owner. He Shall Repair,replace And Make Good At His Expenses Any And All Defects, Which May Arise During That Term Of Guarantee And Warranty Due To Defective Workmanship And/or Interior Quality Of Materials. 2. Methods Of Construction 2.1 The Construction Shall Be Done In The Manner That Would Cause Least Disturbance To Neighborhood And Occupant Of The Area. The Contractor Will Be Allowed To Work 24 Hours If Necessary To Complete The Work On Time Subject To Approval Of The Owner. 2.2 All Works To Be Done Shall Be Of The Best Quality And Workmanship. 3. Masonry 3.1 Exterior Wall Should Be Chb 5 Inches Wall Bearing With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars. 3.2 Partition Wall Should Be Chb 4 Inches With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars In Rooms,hallway,and Toilet. 3.3 Low Partition Should Be Chb 4 Inches 1.80 Meters High With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meters For Vertical And For Every 3 Layer Of Chb For Horizontal Bars In Toilet Partition/cubicles. 4. Wall Finishes 4.1. Interior Walls Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; Paint Finish (boysen Paint Or Approved Equal) W/ 4” Base Board. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. 4.2. Exterior Wall Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; 2 Coat Paint Finish (boysen Paint Or Approved Equal). 4.3. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) From Finish Floor Line To 1.80 Meter High, For All Toilet And Cubicles 4.4. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) For Splashboards For Lavatories In Laboratory/ Kitchen. 4.5. Provide 2” Thick Simulated Stone Cladding (asi, Stone Age Or Approved Equal), See Plans And Drawings. 5. Ceiling Finishes 5.1. All Interior Ceiling - 6 Mm Thick Fiber Cement Hardiflex Ceiling Board Riveted On Metal Furring Channels Providing A V-cut In Every Joint; Prevent Rivet Head To Exposed In Ceiling Surface; Patching All Rivets And Joints W/ Skim Coat; 2 Coat Paint Finish Flat Latex Paint (boysen Or Approved Equal). 5.2. Outside Ceiling – 8” X L X 0.4 Mm Thick Spandrel (union Brand Or Approved Equal). 5.3. Provide Eaves Hole For Ventilation (see Plans And Drawings) 5.4. Provide 4” Ceiling Drop If Necessary (see Plans And Drawings). 6. Carpentry Works 6.1. Cabinets Beneath The Lavatory/ Kitchen Counters In 2” X 3” Kd Treated Wood Frame; ¾” Mdf Membrane Press Doors W/ Liston; Paint Finish. 6.2. Provide Concealed Hinges And Handle For Cabinet Doors. 6.3. All Door Jamb Should Be 2’ X 6” Steel, Paint Finish. 7. Doors/hardwares 7.1. 1.0 M X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; Varnish Finish. For Classrooms (see Plans And Drawings). 7.2. 0.9 M X 1.2 M Flush Door W/ Jamb, For Common And Pwd Cr; Varnish Finish 7.3. 0.6 M X 1.60 M Aluminum (analok) Door W/ Handle, Hinges And Locksets For Cubicle In Toilets. 7.4. 0.8m X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; For Stockroom/electrical Room/beneath The Stairs; Varnish Finish. 7.5. Provide 1 Set Of Door Knob (yale Or Approved Equal) And 4 Pcs Of 3-1/2” Hinges (loose Pin Stanley Or Approved Equal) Each Panel-type Door. 8. Windows 8.1. 2.4 M X 1.2 M And 1.2 M X 1.2m Sliding Window 0.90m From Finísh Floor Line For Classrooms (see Plans And Drawings) 8.2. 0.5 M X 0.5 M And 0.6 M X 1.2 M Aluminum And Glass Awning Window Elevated 1.80m & 1.55m From Finísh Floor Line For Toilets. (see Plans And Drawings) 8.2. 1.2 M X 1.8 M Aluminum And Glass Awning & Fixed Type Window Elevated 0.35m From Finísh Floor Line For Ramps. (see Plans And Drawings) 8.3. All Windows Shall Have Grills Made Of 1” X 1” X 1.2 Mm Thick Galvanize Iron Square Tube Welded Except For Ramp Windows (see Plans And Drawings); Quick Drying Enamel Paint Finish. 8.4. All Aluminum Frames Shall Be Of The Best Quality, Analok Finish Free From Internal Defects. 8.5. All Glass Shall Be ¼” Thick Brown In Color, Unless Specify On Plan. 9. Tile Works 9.1. 60 Cm X 60 Cm Non-skid Tiles, Eurotiles Or Approved Equal, For Flooring At All Floors And 60 Cm X 60 Cm Unglazed For Hallways (submit Sample For Approval). 9.2. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal For Landing,thread,and Riser In All Stairs. (submit Sample For Approval). 9.3. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal, For Walls Of Toilets And Cubicles. (submit Sample For Approval). 9.4. 60 Cm X 60 Cm Doublé Polish Glazed Tiles, Eurotiles Or Approved Equal For Countertops For Sink And Lavatories. (submit Sample For Approval). 9.5. Provide Tile Grout For Tile Joints. 9.6. Provide 2 Coats Of Wáter Proofing Before Laying Of Floor Tiles In All Toilets In The Second Floor-fourth Floor. 10. Sanitary Work/ Fittings & Fixtures 10.1. Fittings & Fixtures 10.1.1. Wáter Closet - Closed-coupled Wáter Closet Dual Flush By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.2. Lavatory - Basin-type Counter Lavatory By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.3. Lavatory Faucet - Basin Mixer W/ Complete Accessories By Hcg Or Approved Equal And Hose Bibb For Every Wáter Closet. (submit Sample For Approval). 10.1.4. Urinal - Wash Down/ Gravity-flushing By Hcg Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval) 10.1.5. Soap Holder – By Pozzi Or Approved Equal. 10.1.6. Tissue Holder – By Pozzi Or Approved Equal. 10.1.7. Floor Drain – 4” X 4” Stainless Steel Floor Drain. 10.2. 25 Mm And 20 Mm Polypropylene Random (ppr) Pipes And Ppr Fittings For Wáter Supply Lines/ Cold Wáter Lines. (as Per Plan). 10.3. 100mm (4”) And 50 Mm (2”) Diameter Unplasticized Polyvinyl Chloride (upvc) Sanitary Pipes And Fittings (neltex Orange Series 1000). (as Per Plan). 10.4. One (1) Septic Tank (as Per Plan) 10.5. Drainage System And Catch Basins (as Per Plan) 10.6. Provide P-trap To All Floor Drains And Sink. 11. Painting Works Materials Brand – Boysen Or Approved Equal. 11.1. For Interior/exterior Concrete Plaster: Pre-treatment : Concrete Neutralizer. Test With Litmus Or Ph Paper First Coat : Water-based Epoxy Primer (for Badly Weathered Concrete Or When Long Lasting Durability Is Desired) Patchwork : Patch-eeze Patching Compound. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. Second Coat : Two (2) Coats Of Semi-gloss Latex. 12.2. For Interior Ceilings: First Coat : Interior Primer And Sealer Patchwork : Skim Coat Second Coat : Two (2) Coats Of Flat Latex 12.3. For Interior Woodworks And Doors: First Coat : Wood Putty Second Coat : Two (2) Coats Of Quick Drying Enamel. 12. Electrical Works 12.1. Wires / Conductors 12.1.1. Power Line - Insulated Copper Wire For 600v Level, Thw For Main Feeder And Tw For Load Side, Sycwin, Philflex Or Approved Equal. 12.2. Conduits 12.2.1. Service Entrance – Rigid Steel Consduit (rsc), Galvanized Iron Schedule 40. 12.2.2. Internal & Embedded – Pvc Pipes By Powerguard Or Approved Equal 12.3. Fixtures & Devices 12.3.1. Utility Box – 2” X 4” Poly Or Approved Equal. 12.3.2. Junction Box – 4” X 4” W/ Cover Poly Or Approved Equal. 12.3.3. Switches – 2” X 4” Switch Set By Panasonic Or Approved Equal (1 Gang/2 Gang/3 Gang) See Plans And Drawings. 12.3.4. Outlets – 2” X 4” Dúplex Convenience Outlet Set By Panasonic Or Approved Equal. 12.3.5. Panel Board – Ga. # 16 Metal Enclosure With Copper Bus Bar, Dead Front, Flush Mounted, Nema Brand Or Approved Equal. 12.3.6. Circuit Breaker – Molded Case Polyester Resin, Bolt Ton Type Thermal Magnetic Type, Common Internal Trip, 250v Ac, 10kaic Mínimum, General Electric Or Approved Equal (ampere Rating As Specified On Plans). 12.3.7. Grounding System – 16 Mm Dia. X 3000mm Hot Dipped Galvanized Steel Ground Rod. 12.4. Lighting Fixtures 12.4.1. Louver 4x20 With 20 Watts Luminaire Led T8 Light W/ Aluminum Reflector (surface Type). 15.4.2. 6” Dia. Receptacle W/ 16 Watts Led Bulb Firefly Or Approved Equal. 13. Concrete Works 14.1. Class A Mixture (1 Part Portland Cement, 2 Part Sand, And 4 Part Gravel) For Slabs In 2nd Floor And Landings, Stairs, Columns, Beams, Lintel Beams, Tie Beams, Column Footings, Wall Footings, Canopy And Septic Tank. 14.2. Class B Mixture (1 Part Portland Cement, 2-1/2 Part Sand, And 5 Part Gravel) For Slabs In Ground Floor And All Other Concrete Not Mention In 14.1. 14.3. Cement Plaster Must Be 1 Part Portland Cement, And 3 Part Sand. 14. Miscellaneous 14.1. Provide ¼” Thick X 4 Ft. High Mirror Glass For Wall Of All Toilets Covering The Entire Length Of Countertops Of Lavatory. 14.2. Provide Peebles Stone Or Waffle Tiles For All Ramp-up And Exterior Steps/stairs Covering The Thread And Riser. 14.3. Stairs And Pwd Ramp-up - Provide 2” Ø X 1.5 Mm Thick Stainless Tube (mirror Type Sus 304) For Stairs Handrail And Main Post; 1-1/2” Ø X 1.5 Mm Thick Stainless Tube For Vertical Members; 1” Ø X 1.5 Mm Thick Stainless Tube For Horizontal Members. Buffing Finish. 14.4. Corridor Railing – Provide 2” Ø Pipe For Handrail; All Joints Must Be Welded Together. Paint Finish. 14.5. Provide 4 Ceiling Fan 16” (asahi Or Approved Equal) Each Classroom. 14.6. Provide 2 Sets Of 4’ X 8’ White Board W/ Aluminum Frame Each Classroom. 14.7. Provide 35 Sets Of Arm Chair (monoblock) Each Classroom. 14.8. Provide Teacher’s Table & Chair Each Classroom. 14.9. Provide Fire Extinguisher 10lbs For Each Classroom. 14.10. Provide Emergency Light For Each Classroom. 14.11. Provide Emergency Fire Alarm For Every Floor. 14.12. Provide Exhaust Fan 12” At Each Toilet. Provide Also Manhole Cover At Each Toilet And Storage Room On Both Floors. 14.13. Provide 4-ibc (intermediate Bulk Container) Tanks For Rainwater Catchment (1000 L Capacity Each), 2- Elevated Wáter Tank (1000 L Capacity Each) (install Horizontal) With Booster Pump 1.5hp. 14.14. Provide Also Pvc Accordion Type Partition At 2ndfloor. 14.15. Provide 10mm Roof Insulation Double-sided At Roofing. 14.16. Provide (2) Sets Of Split Type Airconditioning Unit 2hp – Supply And Install Section Vii. Drawings                                       Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Bill Of Quantities Item Description Unit Qty Unit Cost Amount I. Design And Permit A. Detailed Engineering And Architectural Design Lot 1.00 250,000.00 250,000.00 B. Permits, Insurance And Bonds Lot 1.00 Ii. General Requirements A. Mobilization/demobilization Lot 1.00 B. Temporary Facilities Lot 1.00 C. Safety And Health Requirements Lot 1.00 Ii. Earth Works A. Staking And Layout Lot 1.00 B. Excavation Works Cu.m 242.43 C. Backfilling Works Cu.m 170.90 D. Gravel Bedding Cu.m 35.75 E. Soil Poisoning Lot 1.00 F. Disposal And Hauling Of Materials Lot 1.00 Iii. Structural/civil Works A. Concrete Works Structural Concrete Cu.m 369.38 Reinforcing Steel Including Ties Kgs 38,213.68 Formworks And Scaffoldings Sq.m 2,755.79 B. Roof Framing Works Lot 1.00 Iv. Architectural Works A. Masonry Works Sq.m 1,820.07 B. Ceiling Works Sq.m 650.00 C. Floor Finishes Sq.m 1,073.16 D. Wall Finishes Sq.m 1,820.07 E. Doors And Windows 1000x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 16.00 900x2100 Solid Wood (tanguile) Panel Door With Stainless Steel Kick Plate On 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 2.00 900x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 4.00 800x1200 Aluminum Panel Door On 50x150mm Steel Jamb; Complete With Hardware And Accessories Latch Lock Sets 14.00 800x2100 Solid Wood (tanguile) Panel Door 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 6.00 2400x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1150x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1200x1800 6mm Thk Tempered Glass On Powder Coated Aluminum Frame Fixed & Awning Type Window; Provide With Complete Hardware Accessories Sets 3.00 600x1600 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 4.00 500x500 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 2.00 F. Thermal & Moisture Protection Lot 1.00 G. Railings Lot 1.00 H. Tinsmithry Works Lot 1.00 Including Pe Insulation 10mm X Double Sided I. Miscellaneous Emergency Light. Twinhead Sets 12.00 White Board, 4'x8' With Eraser Sets 16.00 Teacher's Tables, Wooden With Cabinet Sets 8.00 Teacher's Chair Sets 8.00 Student Arm Chair, Plastic Sets 280.00 V. Electrical Works A. Roughing Ins Lot 1.00 B. Wires And Cables Lot 1.00 C. Lighting Fixtures Lot 1.00 D. Wiring Devices Lot 1.00 Vi. Mechanical Works Fire Extinguisher 10lbs Set 8.00 Fire Alarm Set 2.00 Exhaust Fan Set 6.00 Split-type Aircon, 2hp Set 2.00 Ceiling Fan Set 32.00 Consumables Lot 1.00 Folding Partition (pvc Accordion) Lot 1.00 Lavatory Counter Cabinets Lot 1.00 Viii. Plumbing Works A. Plumbing Fixtures Water Closet With Accessories (tank Type) Set 16.00 Urinal (with Privacy Partition) Set 8.00 Bidet Spray Set 16.00 Counter Lavatory With Granite And Accessories Set 18.00 Mirror Set 4.00 Lavatory Faucet Pcs 18.00 Hose Bibb Faucet Pcs 16.00 Tissue Paper Holder Pcs 16.00 Floor Drain Pcs 20.00 B. Sewer Line And Vent System Lot 1.00 C. Waterline System Lot 1.00 D. Storm Drainage System Lot 1.00 E. Others (tank) Ibc Tanks (1000l) - Rainwater Catchment Set 4.00 Water Tank - 1000l Set 2.00 Booster Pump, 1.5hp Set 1.00 Septic Tank Lot 1.00 Grand Total Cost (inclusive Of Ocm, Profit And Vat) I Hereby Certify To Comply With All The Above Technical Specifications As Per Prices Quoted In The Bill Of Quantities. Name Of Company/bidder Signature Over Printed Name Of Date Representatives Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter. Bid Form For The Procurement Of Infrastructure Projects [shall Be Submitted With The Bid] _________________________________________________________________________ Bid Form Date : _________________ Project Identification No. : _________________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: A. We Have No Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Project: [insert Name Of Contract]; B. We Offer To Execute The Works For This Contract In Accordance With The Pbds; C. The Total Price Of Our Bid In Words And Figures, Excluding Any Discounts Offered Below Is: [insert Information]; D. The Discounts Offered And The Methodology For Their Application Are: [insert Information]; E. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein And Reflected In The Detailed Estimates, F. Our Bid Shall Be Valid Within The A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; G. If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The The Allowable Forms Of Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; H. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; I. We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And J. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. K. We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The [name Of Project] Of The [name Of The Procuring Entity]. L. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: ___________________________________________________________________ Legal Capacity: ____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________ Date: ___________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1 Notice Of Award (for Government Projects) 2 Notice To Proceed (for Government Projects) 3 Contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A. Owner Name B. Address C. Telephone Nos. Nature Of Work Contractor’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information, Certificate Of Good Performance Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] Republic Of The Philippines) City Of _______________________) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [[insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Net Financial Contracting Capacity Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date: _______________________________________
Closing Soon2 Dec 2024
Tender AmountPHP 25 Million (USD 425.7 K)

Handwerkskammer Ostmecklenburg Vorpommern Tender

Others
Germany
Details: Description of the procurement (type and scope of the service or information on needs and requirements) House 1000: - Repair work in the sanitary and toilet rooms or in the bakery and confectionery area after the wall tiles were removed, approx. 1,650 m² - Repair work after closing the door opening, approx. 40 m² - Repair work after wall demolition, approx. 40 m² - Renewal of plaster on damp wall surfaces, approx. 500 m² Houses 2200-2400: - Repair work after installing new glass facades, approx. 200 m² - Repair work after closing the door/wall opening, approx. 290 m² - Repair work after wall demolition, approx. 40 m² - Rapp plaster on sand-lime brick walls and concrete surfaces, approx. 35 m³ House 4000: - Repair work after laying electrical cables for sun protection, approx. 200 M - Repair work after making a new door opening - Repair work after resealing wall openings for technical installations
Closing Date31 Mar 2025
Tender AmountEUR 6.5 Million (USD 6.8 Million)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|combo||tbd|n00104|tbd|tbd|tbd|tbd|tbd|tbd|tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| contractor Purchasing System Administration-basic (may 2014)|1|| authorized Deviations In Clauses (nov 2020)|2|federal Acquisition Regulation |chapter 1| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| small Business Program Representations (feb 2024)|4||||| royalty Information (apr 1984)|1|| certification Regarding Knowledge Of Child Labor For Listed End Products(feb 2021))|4||||| annual Representations And Certifications (may 2024)|13|334412|750 Employees|||||||||||| requirements For Submission Of Proposals Via Electronic Media (jan 2018)|1|email Only| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7|||||||| type Of Contract (apr 1984)|1|ffp| alterations In Solicitation (apr 1984)|3|||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1|| the Reason For This Amendment Is The Add The Below Terms To This Solicitation / Resultant Contract: 1: The Government's Required Delivery Date (rdd) Is 31 December 2026 Or Earlier On All Deliveries. 2: The Following Term Applies To This Solicitation And Resultant Contract/order: "this Order �solicitation� Is Issued Under And Pursuant To The Provisions Of The Basic Ordering Agreement (boa). The Terms And Conditions Of The Boa Are Hereby Incorporated By Reference And, Except As Provided Herein By This Order �solicitation�, Remain In Full force And Effect. If Any Conflict Arises In The Terms Of This Order Versus The Terms In The Boa, The Terms Of The Boa Shall Apply." \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Heater Assembly,rad . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Heater Assembly,rad Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 5188230; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Modulator . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Modulator Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 5336325; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 6166870; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Electrostatic Discharge Control - The Contractor Shall Comply With The Electrostatic Discharge Control Requirements Established In Mil-std-1686. 3.5 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 5543728; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Supply,electric . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Supply,electric Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;15090 6309885; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Radar Set . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Radar Set Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 6170342; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 6570452; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Cable Assembly,spec Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 7044468; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Ot
Closing Soon5 Dec 2024
Tender AmountRefer Documents 

GOVERNOR CELESTINO GALLARES MULTI SPECIALTY MEDICAL CENTER Tender

Housekeeping Services
Philippines
Details: Description Invitation To Bid For Supply And Delivery Of Janitorial Services (epa 2025) For Gov. Celestino Gallares Multi-specialty Medical Center 1. The Gov. Celestino Gallares Multi-specialty Medical Center (gcgmsmc), Through The General Appropriations Act (gaa)- Maintenance And Other Operating Expenses (mooe) 2025 Intends To Apply The Sum Of Three Million Forty-two Thousand Six Hundred Ninety-eight Pesos Only (php3,042,698.00) Being The Abc To Payments Under The Contract For Cb-2024-11-0006. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Gcgmsmc, Through The General Appropriations Act (gaa)- Maintenance And Other Operating Expenses (mooe) 2025 Intends To Apply The Sum Of Three Million Forty-two Thousand Six Hundred Ninety-eight Pesos Only (php3,042,698.00) Being The Abc To Payments Under The Contract For Each Lot/item.et Al. Lot No. Item/description Quantity Unit Cost Total Cost 1 Provision Of Janitorial Services With Cleaning Supplies And Equipment 1 Php3,042,698.00 Php3,042,698.00 Janitorial Services W/ Equipment (three Months Package) Month 1 (25 Utilty Worker/janitor) 25 35,243.24 881,081.05 Month 2(25 Utilty Worker/janitor) 25 35,243.24 881,081.05 Month 3 (25 Utilty Worker/janitor) 25 35,243.24 881,081.05 Cleaning Supplies And Materials (three Months Supply) Mop Bucket Squeezer, 36l 5 3,575.00 17,875.00 Water Dipper 20 83.00 1,660.00 Bolo, Long 2 550.00 1,100.00 Bongay, Long 2 550.00 1,100.00 Heavy Duty Garden Grass Scissor / Plant Trimmer Set 2 700.00 1,400.00 Dust Mop Set, Standard , 36" 25 1,595.00 39,875.00 Dust Mop Head Refill Standard, 36" 25 770.00 19,250.00 Dust Mop Set, Acrylic, 24" 25 1,760.00 44,000.00 Dust Mop Head Refill, Acrylic, 24" 25 1,070.00 26,750.00 Mop Head #400, Twine 100 170.00 17,000.00 Mop Handle Aluminum 5f, Blue 20 418.00 8,360.00 Mop Handle Aluminum 5f, Green 20 418.00 8,360.00 Mop Handle Aluminum 5f, Yellow 20 418.00 8,360.00 Flat Mop Head Refill 50 150.00 7,500.00 Flat Mop W/ Bucket Set 20 2,200.00 44,000.00 Floor Sponge Magic Mop 10 550.00 5,500.00 Floor Brush, 4ft 5 264.00 1,320.00 Ceiling Broom 5 250.00 1,250.00 Soft Broom / Silhig Ibjok 50 130.00 6,500.00 Upright Dust Pan, With Cover 20 1,040.00 20,800.00 Hand Brush 15 55.00 825.00 Aluminum Window Squeegee 20 880.00 17,600.00 Window Washer 10 500.00 5,000.00 Telescopic Pole, 2.4 Meters 10 1,172.00 11,720.00 Calibrated Trigger Spray 60 110.00 6,600.00 Micro Fiber Cleaning Cloth Blue 60 120.00 7,200.00 Yellow 60 120.00 7,200.00 Green 60 120.00 7,200.00 Chamois Cloth 25 574.00 14,350.00 Hand Gloves Water Proof And Elastic, Medium,blue 125 110.00 13,750.00 Hand Scrubbing Pad, #96etc Green 6" X 9" 1/4" 120 46.00 5,520.00 Belt Bag, 4 Pocket 25 220.00 5,500.00 Big Toilet Bowl Rubber Plunger Double Layer , Aluminum 10 200.00 2,000.00 Toilet Bowl Brush Plastic W/ Cuddy 20 220.00 4,400.00 Hand-held Tool Bucket 20 424.00 8,480.00 Spatula 5 30.00 150.00 Grand Total Php3,042,698.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Gcgmsmc, Now Invites Bids For The Above Procurement Project. Delivery And Supply Of The Goods Is Required Within 10 Calendar Days. Bidders Should Have Completed, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Gcgmsmc Through Electronic Mail Via Procurement@cpspecialtycenter.org Or Through The Cellular Number 09209437250. 5. A Complete Set Of Bidding Documents May Be Acquired And Downloaded By Interested Bidders From Gcgmsmc Google Drive From (procurement@cpspecialtycenter.org) On November 30- December 23, 2024 And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Indicated Below In Accordance With The Following Schedule: Lot No. Item/description Total Cost Bidding Documents Fee (in Philippine Peso) 1 Provision Of Janitorial Services With Cleaning Supplies And Equipment Php3,042,698.00 5,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Online Banking Or Online Deposit With The Following Bank Details: Bank Name: Development Bank Of The Philippines Account Name: Gcg Multi-specialty Medical Complex Account Number: 00-0-15490-780-5 "for Bidders Choosing To Pay Via Online Transfer Or Bank Deposit, Please Ensure That Proof Of Your Successful Transaction Is Promptly Sent To The Procurement Email Address: Procurement@cpspecialtycenter.org. In Compliance With Coa Circular Number 2021-014, Clause 5.2, An Acknowledgement Receipt Will Be Issued As Proof Of Verified And Received Payment. Access To Bidding Documents Will Be Granted Only Upon Presentation Of This Acknowledgement Receipt. 6. The Gcgmsmc Will Hold A Pre-bid Conference On The 10th Day Of December 2024 At 1330h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before The 23rd Day Of December 2024 At 1330h At Gcgmsmc Procurement Office Room 3c-w327 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur, Cortes, Bohol. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The 23rd Day Of December 2024 At 1330h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Together With Their Company Id. 10. The Gcgmsmc Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Submission Of Hardcopies: Bidders Shall Submit Their Original Eligibility And Technical Documents Described In Itb Clause 10 In One Sealed Envelope Marked "original - Technical Component", And The Original Of Their Financial Component In Another Sealed Envelope Marked "original Financial Component", Sealing Them All In An Outer Envelope Marked "original Bid". Each Copy Of The First And Second Envelopes Shall Have 2 Copies And Similarly Sealed Duly Marking The Inner Envelopes As "copy No. 1 Technical Component" And "copy No. 1- Financial Component” And "copy No. 2- Technical Component" And "copy No. 2- Financial Component" And The Outer Envelope As "copy No. 1" And "copy No. 2" Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. Please Take Note That All Notarized Documents Must Be Treated As Original Copies For All The Submitted Documents (original, Copy 1, And Copy 2). It Is Imperative That Each Copy Retains Its Original Notarization To Ensure Legal Validity And Compliance. The Original And The Number Of Copies Of The Bid As Indicated In The Itb Clause 15 Shall Be Typed Or Written In Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. All Envelopes Shall: A. Contain The Name Of The Contract To Be Bid In Capital Letters; B. Bear The Name And Address Of The Bidder In Capital Letters; C. Be Addressed To The Procuring Entity's Bac In Accordance With Itb Clause 1; D. Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1. 11. For Further Information, Please Refer To: Mary Grace L. Simbajon Jessa O. Quiñal Procurement Office Procurement Office Malayo Sur, Cortes, Bohol Malayo Sur, Cortes, Bohol Procurement@cpspecialtycenter.org Procurement@cpspecialtycenter.org +639209437250 +639452478632 November 28, 2024 Approved By, (signed) Doreen A. Lugo, Lpt Bac Chairperson Noted By, (signed) Laurence Elliot R. Tirol, Md, Fpcp Medical Center Chief I Head Of Procuring Entity ------------------------------------------------------------------------------------------------------------------------ Item: 1 Unit: Lot Qty: 1 Unit Cost: 3,042,698.00 Grand Total: 3,042,698.00 Description: 1 1 Lot Provision Of Janitorial Services Provision Of Janitorial Services With Cleaning Supplies And Equipment Janitorial Services W/ Equipment (three Months Package) 25 Month 1 (25 Utilty Worker/janitor) 25 Month 2(25 Utilty Worker/janitor) 25 Month 3 (25 Utilty Worker/janitor) Cleaning Supplies And Materials (three Months Supply) 5 Mop Bucket Squeezer, 36l 20 Water Dipper 2 Bolo, Long 2 Bongay, Long 2 Heavy Duty Garden Grass Scissor / Plant Trimmer Set 25 Dust Mop Set, Standard , 36" 25 Dust Mop Head Refill Standard, 36" 25 Dust Mop Set, Acrylic, 24" 25 Dust Mop Head Refill, Acrylic, 24" 100 Mop Head #400, Twine 20 Mop Handle Aluminum 5f, Blue 20 Mop Handle Aluminum 5f, Green 20 Mop Handle Aluminum 5f, Yellow 50 Flat Mop Head Refill 20 Flat Mop W/ Bucket Set 10 Floor Sponge Magic Mop 5 Floor Brush, 4ft 5 Ceiling Broom 50 Soft Broom / Silhig Ibjok 20 Upright Dust Pan, With Cover 15 Hand Brush 20 Aluminum Window Squeegee 10 Window Washer 10 Telescopic Pole, 2.4 Meters 60 Calibrated Trigger Spray Micro Fiber Cleaning Cloth 60 Blue 60 Yellow 60 Green 25 Chamois Cloth 125 Hand Gloves Water Proof And Elastic, Medium,blue 120 Hand Scrubbing Pad, #96etc Green 6" X 9" 1/4" 25 Belt Bag, 4 Pocket 10 Big Toilet Bowl Rubber Plunger Double Layer , Aluminum 20 Toilet Bowl Brush Plastic W/ Cuddy 20 Hand-held Tool Bucket 5 Spatula Provision Of Janitorial Services I. General Overview A. The Gov. Celestino Gallares Multi-specialty Medical Center Seeks For Qualified And Competent Bidders To Provide Janitorial Services With Equipment And Supplies. B. The Approved Budget For The Contract Is Inclusive Of All Government Taxes, Services Charges, And Remunerations. C. Bidders Must Comply With All Specification Contained In This Pr, Technial Specifiations, And Supplemental Bid Bulletin, If Any. D. Any Other Term, Condition, Or Provision Not Stipulated In This Document Will Be Covered By A Separate Agreement Between Gcgmsmc And The Janitorial Agency. Ii. Qualifications Of The Service Provider A. The Janitorial Agency Should Have At Least One (1) Year Of Experience In Providing Janitorial And/or Housekeeping Services. B. Must Have An Established Organizational Set-up – With Good And Efficient Office Set-up, Personnel, Office Tools, And Equipment. C. Must Be Duly Licensed And Registered With The Department Of Labor And Employment. D. Must Be Duly Registered With The Securities And Exhcange Commission (sec) Or Department Of Trade And Industry (dti) E. Must Be Duly Registered With The Social Security System (sss), Home Development Mutual Fund (pagibig) , And Philippine Health Insurance F. Must Be Duly Registered With The Bureau Of Internal Revenue G. Well-trained, Physically And Mentally Fit, Of Good Moral Character And Covered By Appropriate Clearances From Doh-accredited Health Centers, Nbi, Police And Barangay; H. Must Have A Very Satisfactory Rating From At Least One (1) Government Agency Or Private Corporations, With Whom The Bidder Has A Part Or Ongoing Contract, Evidenced Through One (1) Client / Customer Feedback Forms Iii. Logistics A. The Janitorial Agency Will Provide The Daily Time Record (dtr), Other Logistical Supplies Such As Logbooks, And Uniforms. B. Disinfectants, Chemicals, And Other Non-consumables Will Be Provided By The Hospital. C. The Janitorial Agency Shall Provide Relievers And/or Replacement At All Times In Case Of Absence Of Its Personnel D. The Janitorial Agency Must Submit Their Standard Cleaning Procedures Upon Seven (7) Calendar Days After The Receipt Of Po. E. The Service Provider Shall Comply With Existing Labor Laws, Rules And Regulations Governing Employee’s Compensation, Philhealth, Social Security And Other Labor Standards Applicable To Each Of Personnel Employed By The Service Provider. The Service Provider Shall Ensure That The Payment Of Salaries, Allowances And Other Applicable Benefits To Its Personnel Are Within Legal Rates Or Should Not Be Less Than The Minimum Wage As Mandated By Law. - The Schedule Of Contribution For Sss And Philhealth And Other Statutory Benefits Shall Be The Latest As Issued By The Respective Agencies. - The Employer May Require An Employee To Work On Any Holiday But Such Employee Shall Be Paid A Compensation Equivalent To Twice His Regular Rate Iv. Scope Of Works Provision Of Janitorial Works And Related Services With Twenty-five (25) Personnel For Three (3) Months With An Eight (8)-hour Work Per Day, Six (6) Days A Week (monday To Saturday). The Services Shall Be In Accordance With The Scope Of Service/work, Standards, Approved Janitoral Plan, And Manpower And Deployment Plan. (refer To Table Iv.i For The Services To Be Observed By The Service Provider) A. The Service Provider Manpower Shall Use Their Own Equipment As Required In This Contract And Be Available For Use And Functional During The Performance Of General Cleaning, Maintenance, And Other Related Services. (refer To Table Iv.ii For The Equipment To Be Brought By The Service Provider) B. This Contract Includes The Supply Of Cleaning And Sanitizing Supplies For Three (3) Months Consumption To Be Turned-over To Gcgmsmc Supply Chain For Recording And Proper Storing. (refer To Table Iv.iii For The Supplies To Be Provided By The Service Provider) Table Iv.i Services Items/areas To Be Cleaned Frequency Minimum Requirements A Janitorial Services 1 Sweeping, Mopping, Spot Scrubbing Floor Areas Of The Office Building Daily 2 Dusting/damp Wiping And Polishing Vertical And Horizontal Surfaces, Tables, Chairs, Cabinets, Racks, Computers/ Printers, And Other Furnitures/ Equipment Daily 3 Trash Removal: Emptying And Cleaning Of Waste Cans/baskets And Proper Disposal Of Garbage Garbage Bins Daily/ At The End Of The Day 4 Cleaning, Deodorizing And Disinfecting Comfort Rooms, Washrooms, And Pantries Daily 5 Cleaning Window Glass Interior, Shelves Or Filing Cabinets Daily 6 General Cleaning With Disinfection All Areas Every Saturday B Miscellaneous Services 1 Carrying Or Hauling Of Furniture And Fixtures, Supplies, Records, Etc As Needed 2 Other Janitorial Activities And Related Services That Maybe Assigned From Time To Time By Gcgmsmc-efmd Officials And Employees As Needed 3 Reporting Of All Breakage And Electrical Malfunction, Plumbing, Necessary Repair Works, Etc. Immediately Table Iv.ii Equipment Minimum Quantity (units) 1 Back Pack Vacuum Cleaner, 4l 2 2 Floor Polisher With Floor Polisher Pads 2 - Red (for Buffing) - Black ( For Stripping) - White (for Polishing) Table Iv.iii Tools/supplies Quantity (units) 1 Mop Bucket Squeezer, 36l 5 2 Water Dipper 20 3 Bolo, Long 2 4 Bongay, Long 5 5 Heavy Duty Garden Grass Scissor / Plant Trimmer Set 2 6 Dust Mop Set, Standard , 36" 25 7 Dust Mop Head Refill Standard, 36" 25 8 Dust Mop Set, Acrylic, 24" 25 9 Dust Mop Head Refill, Acrylic, 24" 25 10 Mop Head #400, Twine 100 11 Mop Handle Aluminum 5f, Blue 20 12 Mop Handle Aluminum 5f, Green 20 13 Mop Handle Aluminum 5f, Yellow 20 14 Flat Mop Head Refill 50 15 Flat Mop W/ Bucket Set 20 16 Floor Sponge Magic Mop 10 17 Floor Brush, 4ft 5 18 Ceiling Broom 5 19 Soft Broom / Silhig Ibjok 50 20 Upright Dust Pan, With Cover 20 21 Hand Brush 15 22 Aluminum Window Squeegee 20 23 Window Washer 10 24 Telescopic Pole, 2.4 Meters 10 25 Calibrated Trigger Spray 60 26 Micro Fiber Cleaning Cloth : 27 Blue 60 Yellow 60 Green 60 28 Chamois Cloth 25 29 Hand Gloves Water Proof And Elastic, Medium,blue 125 30 Hand Scrubbing Pad, #96etc Green 6" X 9" 1/4" 120 31 Belt Bag, 4 Pocket 25 31 Big Toilet Bowl Rubber Plunger Double Layer , Aluminum 10 32 Toilet Bowl Brush Plastic W/ Cuddy 20 32 Hand-held Tool Bucket 20 33 Spatula 5 V. Duties And Responsibilities Of The Service Provider A. The Service Provider Shall Be Held Responsible For Any Damage/destruction To Any Office Furniture And Fixtures, Equipment, And Plumbing Fixtures Due To The Fault And Negligence Of Its Personnel. B. Observe Office Rules And Regulations Prescribed By The Gcgmsmc Including Subjecting All Janitors To Appropriate Security Inspection Every Time They Enter And Leave The Premises C. Require Their Employees To Always Wear The Prescribed Uniform, Identification Card And Safety Gadgets. D. The Service Provider Must Provide All Necessary Equipment And/or Transportation Services, If Necessary, To Its Personnel In Case Of Community Emergencies Or Calamities To Continously Provide Its Service To Gcgmsmc. E. The Service Provider In The Performance Of Its Services, Shall Secure, Maintain At Its Own Expense All Registration, Licenses Or Permits Required By National Or Local Laws And Shall Comply With Rules And Regulations And Directives Of Oversight Regulatory Authorities/agencies And Commissions. D. Should There Be A Law And Other Social And Labor Legislation Enacted After The Execution Of This Contract Mandating Additional And/ Or Increase In Wages, Allowance, And Other Benefits To Service Providers Janitorial Personnel, The Service Provider And The Gcgmsmc Will Discuss And Negotiate On The Adjustment Of The Rate, Provided That, Such Adjustment In The Contract Rate Shall Only Cover The One "due To The Janitorial Personnel" And "due To The Government". The Corresponding Incremental Rate (agency Fee) For The Service Provider Shall Not Be Adjusted During The Contract Period. V. Manpower And Deployment Schedule A. The Houskeeping Agency Must Provide Twenty Five (25) Janitorial Personnel Starting In January 2025 For 3 Months And One (1) Of Which Will Be Designated As The Team Leader Who Will Be In-charge With The Supervision Of Janitorial Attendants. A. The Schedule Of Deployment Shall Be As Follows: * Monday To Friday Twenty Five (25) Janitorial Personnel With 8-hr Shifts From January To March Shift 1 - 6:00 Am To 3:00pm (with 1 Hour Breaktime) Shift 2 - 9:00 Am To 6:00pm (with 1 Hour Breaktime) Shift 3 - 8:00 Am To 5:00pm (with 1 Hour Breaktime) *saturday All Janitorial Personnel - 8:00 Am - 5:00 Pm (with 1 Hour Breaktime) B. Deployment Schedule - Annex A C. The Housekeeping Agency, Through A Designated Team Leader, Shall Provide The Schedule For The Month Indicating The Attendant On-duty. Reshuffling Of Personnel Should Not Be Done Without Approval Of The Procuring Entity. D. The End-user Requires A Team Leader With At Least Five (5) Years Of Practical Experience In Janitorial And Housekeeping Operations And With Knowledge In Operating Different Housekeeping Equipment. D. Sleeping While On Duty Is Not Allowed. The Houskeeping Agency Must Impose Disciplinary Action To Its Janitorial Personnel Caught Sleeping While On His/her Duty. E. The Housekeeping Service Provider Must Provide Appropriate Uniform With Id And Protective Gears, If Necessary, And Ensure That They Shall Observe Proper Personal Hygiene And Appear Neat And Clean At All Times. F. Minimum Qualifications Of Janitorial Service Personnel F.1 Janitorial Attendants - Must Be Presentable In Physical Apperance - Must Be At Least 18 Years Of Age - Must Be Physically Fit To Work. Medical Certificate From A Government Physician, As Well As Drug Test Results Are Required. - Must Be Of Good Moral Character, Courteous, Alert And Without Any Criminal Or Police Record. Nbi Clearance Must Be Submitted - Must Have Finished At Least High School Level Duly Supported By A Biodata/curriculum Vitae - Preferably, Has Acquired Tesda Nc Ii - Housekeeping Certification For The Supervisor - Must Have At Least One (1) Year Work Experience In Housekeeping A Government/private Facility - The Individual Bio-data Or 201 File Of Janitorial Service Personnel Shall Be Submitted Upon Bid Submission. Other Supporting Documents Such As Medical Certificate, Drug Test Results, Nbi Clearance, Will Be Required Upon The Issuance Of Po. - The Designated Team Leader Shall Submit A Curriculum Vitae Upon Bid Submission, Indicating The Educational Background And Work Experience Or Certificate Of Employment If Applicable. Other Supporting Documents Required Such As Medical Certificate, Drug Test Results, Nbi Clearance, Will Be Required Upon The Issuance Of Po. G. The Service Provider Shall Pay Its Personnel Not Less Than The Minimum Wage And Other Benefits Mandated By The Laws, Rules, And Regulations. They Shall Provide Their Personnel Their Monthly Payslip Containing The Necessary Information On It. H. The Service Provider Shall Ensure That Safety Shall Be The First Priority In The Performace Of Its Functions, And Avoid Creation Of Safety Hazards Both In The Condition Of The Work Performed And While Doing The Work. I. The Service Provider Shall Ensure The Confidentialty Of Information. J. The Service Provider Shall Endorse And Submit The Names And Information Of The Twenty Five (25) Janitorial Personnel. Vi. Services And Methodology - Annex B Vii. Payment Terms Monthly Payment For The Services Rendered Will Be Processed Upon Receipt Of Monthly Billing Statement, Daily Time Record (dtr), Summary Of Attendance And Accomplishment Report Of Utility Personnel And Upon Issuance Of Certificate Of Acceptance Of Output By The End-user, And The Proof That The Sss, Philhealth, And Pag-ibig Monthly Remittance Have Been Made In Favor Of The Janitorial Personnel Deployed At The Gcgmsmc. Annex A No. Of Janitorial Attendants Areas Of Coverage Duty Schedule (monday To Saturday) 2 Male/female Bldg C Public Toilet Male, Female (5c) (*s3) 8:00 - 5:00 Pm Covered Function Area Pantry Open Function Area 5c East (2) Lobbies 4 Male/female Bldg C 4th Floor (4c) (*s3) 8:00 - 5:00 Pm 4c East (2) Lobbies 4c East And West Hallway 4c Public Toilet Male, Female And Pwd 4c East And West Occupied Office 5 Male/female Bldg C 3rd Floor (3c) (*s1) 6:00am - 3:00pm (*s2) 10:00am - 7:00pm 3c East (2) Lobbies 3c East Hallway 3c Offices E301-e311 3c Public Toilet Male, Female And Pwd 3c West Hallway 3c Offices W301-w328 4 Male/female Bldg C 2nd Floor (2c) (*s1) 6:00am - 3:00pm (*s2) 10:00am - 7:00pm 2c East (2) Lobbies 2c East Hallway 2c East Occupied Offices 2c Public Toilet Male, Female And Pwd 4 Male/female Bldg C Upper Ground Floor (ugc) (*s1) 6:00am - 3:00pm (*s2) 10:00am - 7:00pm Ugc West (2) Lobbies Ugc West Hallway Ugc West Occupied Office Ugc Public Toilet Male, Female And Pwd 6 Male Bldg C Lower Ground Floor (lgc) (*s1) 6:00am - 3:00pm (*s2) 10:00am - 7:00pm Lgc West (2) Lobbies Lgc East And West Hallway Lgc West Occupied Office Lgc Public Toilet Male, Female And Pwd Lgc Storage Rooms Parking , Stairs And Pavillion *s1 - Shift 1 *s2 - Shift 2 *s3 - Shift 3 Annex B Services And Methodology Scope Of Service/subject Areas/items Standard Methodology Frequency Floors, Stairways, Ceiling And Other Horizontal Surfaces Free From Dirt, Dust, Marks, And Stains, Glossy And Non-slippery Floors And Other Horizontal Surfaces Resilient Flooring - Dust Mop To Remove Loose Dirt, Dust And Litter. - Damp Mop With A Water And Mild Liquid Soap. - Pick The Rinse Water With A Mop Or Wet/dry Vacuum Cleaner - Polish The Floor With A Floor Polisher - Vacuum Clean Dusty Areas - Remove Stubber Dirt On The Floors With Spatula And Cleaning Solution - Brush, Rinse, And Mop Wet/muddy Areas - Dust, Wash/wipe Light Diffusers To Keep Brighter Illumination - Remove Cobwebs From Ceiling - Report To Fmd Any Damage Or Water Marks - Daily - Daily - Daily - Weekly - Weekly - As Needed - Weekly - Weekly - Daily - Immediately Walls, Doors, Partitions, And Other Vertical Surfaces Walls, Air Vents, Outlets, Glass Partitions, And All Vertical Surfaces Within The Premises Free From Dirt, Dust, Marks, And Stains -clean/wipe Off Smudges On Walls, Doors, Partitions, Ets -wipe All Door Knobs With Disinfectant -report Any Damaged Surfaces To Efmd - Daily - Daily - Immediately Windows, Frames, And Glass Panes Free From Dirt, Dust, Marks, And Stains, Clear,and Polished - Wash And Squegee All Glass Panes Inside And Outside For A Clean And Clear View - Polish All Frames Of Windows To Minimize Rust And Dust Accumulation - Weekly - Weekly Patient Rooms - Clean Bed Linens And Mattress Covers, Floors, Walls, And Ceilings, Furniture And Equipment - Daily - Daily - Immediately Comfort Rooms Toilet Fixtures, Mirrors, Resilent Walling And Flooring, Should Be Free From Stains, Dirt, And Foul Smell - Empty, Wash, And Disinfect Trash Receptacles. Tie Up Old Liner And Insert New Liner - Scrub, Rinse, And Wipe Vents, And Ledges - Brush, Rinse, And Wipe The Resilient Floors And Wall -apply Cleaning Solution To Urinals And Water Closets. Clean Interior And Exterior Of Urinals And Water Closets Including The Flush Valves - Spray Glass Cleaner And Wipe Mirrors - Scrub, Rinse, Wipe And Disinfect Sinks, Countertops And Faucets -dust And Wipe Wall Partitions - Declog Lavatories, Sinks, And Floor Drains - Report Defective Toilet Fixtures/others To Fmd - Daily - Daily - Daily - Daily - Daily - Daily - Daily - Monthly Or As The Need Arises - Immediately Other Janitorial Services - Make Available Janitors To Attend To Urgent Requests For Additional Cleaning Works - Daily
Closing Date23 Dec 2024
Tender AmountPHP 3 Million (USD 51.8 K)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n7m2.16|bsabsg|see Email|ethan.k.lentz.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo| |to Be Determined (tbd)|n00104|tbd|tbd|see Schedule|tbd| ||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mech| equal Opportunity (sep 2016)|2||| critical Safety Item (aug 2011)|4|niin: 012335961|niin: 012481343|niin: 015611978|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334412|750 Emp|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Solicitation Is Issued Pursuant To Emergency Acquisition Authority (eaa). dfars 252.225-7020 & 252.225-7021 Applies To Niin 016294616, Dfars252.225-7000& 252.225-7001 Applies To All Other Niins On This Solicitation. all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution.. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: ________ government Source Inspection (gsi) Is Required. please Note Freight Is Handled By The Navy As Per The Commercial Asset Visibility (cav) Statement Of Work. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractors Facility As Reflected In The Aaction Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Not-to Exceed (nte): ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A ""reconciliation Modification"" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 5543725; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Electrostatic Discharge Control - The Contractor Shall Comply With The Electrostatic Discharge Control Requirements Established In Mil-std-1686. 3.5 Soldering - The Requirements For Soldered Electrical And Electronic Assemblies Shall Conform To Ipc J-std-001, Class ;3; . 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 6166858; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Circuit Card Assemb . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Circuit Card Assemb Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall be Performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other contractor Or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 7485694; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Cca,rate Int Gyro . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Cca,rate Int Gyro Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 6307247-002; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Cable Assy, Aegis . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Cable Assy, Aegis Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;53711 7044504-002; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Closing Date15 Jan 2025
Tender AmountRefer Documents 
8901-8910 of 9346 active Tenders