Electrical Tenders

Electrical Tenders

South East Central Railway - SECR Tender

Works
Telecommunication Services...+2Electrical Works, Electrical and Electronics
Ireps
India
Closing Date12 Mar 2025
Tender AmountINR 1.5 Billion (USD 17.6 Million)
Details: Description:- Design & Documentation, Supply (including 10% Spares) , Installation & Commissioning of Station Tcas Equipment With Suitable Rack Consisting Of Vital Computer Peripherals, 2 Full Duplex radio Modems Uhf, Smocip, Ofc Modems, Uhf Antenna, Gps And Gsm Antenna And Interfaces For various Required Antenna As Per Rdso/spn/196/2020 Version 4.0 Or Latest . This Also Includes Earthing (earthresistancelessthan1ohm)asperrdso Rdso/spn/197ver1.0,wiringof electrical/quad/optical Cable, Relay Wiring, Connecting Of Smocip From Station Tcas, Supply Of Tool Kit and Interlocking Of Relays Including Dc-dc Converter And Suitable Power Supply Arrangement. Supply of Earthing Material And Supply Of Relays Is Covered Separately. Inspection By Rdso.(note: Wherever maintenance Free Earth Is Available, It Can Be Used For Earthing. Wherever It Is Not Available Separate schedule For Maintenace Free Will Be Operated.)

Northern Railway - NR Tender

Works
Energy, Oil and Gas
Ireps
India
Closing Date24 Feb 2025
Tender AmountINR 45.3 Million (USD 518.2 K)
Tender Id: 1158-SrDEE-NR-LKO-LUCKNOW NR DIVISION-ELECTRICAL/NORTHERN RLY | Provision Of Solar Power Plants At Balance Stations /residential Buildings & Lc Gates At Different Locations Over Lucknow Division.

Indian Institute Of Technology - IIT Tender

Works
Civil And Construction...+1Building Construction
Eprocure
India
Closing Soon10 Feb 2025
Tender AmountINR 44 Million (USD 502.8 K)
Details: Major Repair & modification of type III B-type, (10 nos. houses) IVC-type & D-type house (05 nos. of each type houses) in East Campus at IIT Delhi. Sub Head - Civil, Woodwork, Plumbing, wall & floor tiling work, C.P./chinaware fittings, and Electrical work (concealed conducting, new copper wiring, fixing of fittings and fixtures.

Water And Electricity Upgrading Project Tender

Others
Central African Republic
Closing Date3 Mar 2025
Tender AmountRefer Documents 
Description: Connection of 20,000 Households - Supply of Electrical Connection Equipment and Materials and Connection of 20,000 Households to the Enerca Distribution Network in Bangui and its Surrounding Areas.

U S COAST GUARD USA Tender

Machinery and Tools
Corrigendum : Closing Date Modified
United States
Closing Soon11 Feb 2025
Tender AmountRefer Documents 
Details: General Requirements   1. Scope     1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.     2. References     coast Guard Drawings     none.     coast Guard Publications   surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements     other References     none.   3. Requirements     3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.     3.2 Period Of Performance. The Period Of Performance For This Work Is 24mar2025-05may2025   3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501. 58310_mla_1124_418 item 1: Folding Boom Cranes, Biennial Maintenance, Perform 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Inspect, Perform Maintenance, And Test Folding Boom Cranes Listed In Table 1. table 1 – List Of Folding Boom Cranes crane location manufacturer / Model Number coast Guard Tech Pub crane No. 2 main Deck, Port Side, Aft Of Frame 95 appleton Marine Inc. / Fb90-28 7903 crane No. 4 main Deck, Port Side, Aft Of Frame 90 appleton Marine Inc. / Fb90-28 7903 crane No. 3 main Deck, Stbd Side appleton Marine Inc. / Fb90-28 7903 1.2 Government-furnished Property. mti item Description nsn/pn qty estimated Cost ($/unit) y *cb-oth Mark Iv (coast Guard Drawing 26b-cb-iv-801-001) n/a 1 Ea. n/a y *long Range Interceptor Ii (lri-ii) Cutter Boat (coast Guard Drawing 35-lri-ii-801-001) n/a 1 Ea. n/a 2. References coast Guard Drawings coast Guard Drawing 26b-cb-iv-801-001, Rev -, Booklet Of General Plans coast Guard Drawing 35-lri-ii-801-001, Rev -, General Arrangement coast Guard Drawing 418a-wmsl 801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes coast Guard Drawing 750-wmsl-583-508, Rev -, Installations Iwo Aft Folding Cranes coast Guard Fleet Drawing Fl-1702-11, Rev -, Inspection Of Sheaves coast Guard Publications coast Guard Technical Publication (tp) 7903, Swbs 583, Oct 2021, Aft Boat Handling System –model Fb90-28 surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 5000 (sflc Std Spec 5000), 2022, Auxiliary Machine Systems surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2020, Power Tool Cleaning To Bare Metal 3. Requirements 3.1 General. 3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s): 3.3 Inspect And Repair Task Particulars (task #1, #2, #3 And #7) 3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative Who Is Familiar With The Folding Boom Cranes, Appleton Marine Inc. Model Fb90-28, To Accomplish The Following On Site: advise On Manufacturer's Proprietary Information Pertinent To The System. ensure Compliance With Manufacturer's Procedures And Standards During Inspections, Repairs, Calibration And Testing. 3.1.2.1 Ensure The Tech Rep Has Experience With The System/equipment Stated Above And Demonstrated On Their Résumé. 3.1.2.2 Submit The Name And Résumé Of The Tech Rep With The Contractors Bid. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.3.1 Protection Of Fine Surfaces. The Contractor Must Protect All Fine Surfaces In Accordance With Sflc Std. Spec 5000. 3.1.3.2 Hydraulic System Contamination Protection. The Contractor Must Maintain Existing Hydraulic Cleanliness In Accordance With Sflc Std. Spec 5000. 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: piping electrical Cables note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.3 Inspect And Repair Task Particulars. The Contractor With Tech Rep Support Must Perform Tasks Listed In Table 2 In Accordance With Sflc Std Spec 5000 And Tp 7903. See Applicable Drawings And Tech Pub In Section 2 For Technical Information And Installation Details. table 2 – Task List additional Requirements # task Type qty component Or Assembly appendix And Para. From Sflc Std Spec 5000 other tech Pub 7903 1 operate And Inspect 3 folding Boom Crane 3.2.1 submit A Cir. Document The Existing Software Program/version. note: There Is An Issue While Running Cranes #2 And #4 In Tandem (with A Load In Remote). While Hoisting, The Operator Receives Indication Crane #4 Is Overloading. Users Must Override To Operate The Cranes In Tandem. The Contractor Will Need To Conduct This “operate And Inspect” Task Under Load To Troubleshoot This Issue. 2 operate And Inspect 1 chest Pack (chest Pack Controls And Junction Boxes) 3.2.1 submit A Cir. note: There Is One Chest Pack. It Should Be Rotated Between All Three Cranes. 3 operate And Inspect 1 control Console 3.2.1 submit A Cir. 4 service & Inspect & groom & Lubricate 3 crane Assembly 3.2.2 perform All Preventive Maintenance Actions As Indicated On Table 4-1 Of Cg Tp 7903, Regardless Of Specified Interval. Inspect Hydraulic Hoses For Leaks, Abrasions, Swelling And Defects. Inspect Entire Folding Crane Assembly For Signs Of Leakage, Cracks, Structural Damage And Deformations. Submit A Cfr. note 1: Only Check The Torque Of 25% Of The Turntable Bearing Mounting Bolts (4-3.18.1) – Include A Diagram Of The Bolts That Were Checked In The Cfr For This Section. note 2: Take Off Removable Hose Sleeves And Hose Fitting Tape For Inspection, If Applicable. Reinstall Hose Sleeves And Fitting Tape Upon Completion Of Inspection 5 service And Inspect 3 cranes (mechanical/hydraulic) 3.2.2 inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, Elr Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib And Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit A Cfr. 6 partially Preserve 3 folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, And 3.2.4.5.1 7 hydraulic Lube Oil Analysis 3 hydraulic System c2.1.3.1 submit A Cir. 8 service And Inspect 1 hydraulic Power Unit (hpu) 3.2.2 inspect Prime Mover/link Motor, Hpu Pumps, Hpu Reservoir, Hpu Tank Heaters, Oil Cooler, Hpu Manifold And Hoses. Hpu Temperature Transmitter, Hpu Display, Hpu Controls, Joysticks And Control Cabinet In Accordance With Tp 7903. 9 system Relief Valves, Switches And Indicators 1 hydraulic System in Accordance With Tp 7903, Verify Set Points, Adjustment And Calibration On: pump Compensator Relief Valve system Relief Valve. winch Limit Adjustment. load Monitor Indicators crane Position Indicators submit A Cfr. 10 disassemble And Inspect 1 hydraulic Oil Heat Exchanger 3.2.3 disassemble To The Minimum Extent Necessary To Clean The Heat Exchanger. 11 service And Inspect 2 hydraulic System crane Motor A And B 3.2.2 perform Insulation Resistance Test In Accordance With Ansi/easa Ar 100-2020.and Section 3 Of Tp 7903 Submit A Cfr. 12 service And Inspect 3 cranes (electrical) 3.2.2 inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood Lights And Electrical Cables 13 operational And Weight Test 3 folding Boom Crane Assembly perform In Accordance With Paragraph 3.5 Of This Work Item. 14 fabricate And Install 3 label Plate b2.9 name Plate Must Also Include Additional Information Of Dynamic Load Test, Brake Test And Wll Weights. 3.3.1 Materials. The Contractor Must Provide All Parts (i.e. All Greases, Lubricating Oils, Hydraulic Fluid, Hydraulic Oil Filters, Tank Breather Elements And Other Miscellaneous Materials) And Materials Including, But Not Limited To, The Items Listed In Table 3 Below, To Conduct The Required Maintenance Actions Listed Above. table 3 – List Of Parts quantity part Number description source Of Supply 1 ymd-8861-r hpu Hydraulic Return Filter appleton Marine Inc. 1 ymd-10416 hpu Hydraulic Return Filter 2 ymd-12209-r pressure Filters (for Crane No.2 & 4) 1 ymd-12234-r (0280d005bh4hc) pressure Filters (for Crane No.3) 1 ymd-12234-r (0060d005bh4hc) pressure Filters (for Crane No.3) 3.3.2 Hose Inspection. The Contractor Must Visually Inspect The Condition Of All Flexible Hoses; Tp7903 Has A Comprehensive List Of Hoses And Their Locations. Submit A Cfr With The Following: hose Number hose Physical Condition service Life Dates (date For Required Hose Renewal; If Not Specified, Add Twelve Years To Installation Date) 3.3.2.1 If Not Present, The Contractor Must Provide New Hose Tags, In Accordance With Sflc Std Spec 5000, Paragraph C2.2.1.4. Ensure Tag Color Coding Of Black On Natural Or Black On White. Ensure That Tags Must Be Attached Using Materials That Will Not Damage Hose Assembly In Any Way Or Interfere With The Normal Flexing Motion Of The Hose. 3.3.2.2 The Contractor Must Stamp, Engrave, Or Etch The Following Information On Each Tag. Handwritten Information On Each Tag Is Not Acceptable. Utilize The Cutter’s Hose Log For Information As Necessary. hose Log Item Number (serial Number) hydrostatic Test Pressure (psi) hydrostatic Test Date (dd/mm/yy) service Life (replacement Date) Date (qtr "q"/fy) 3.4 Preservation Requirements. The Contractor Must Perform The Following Work To Accomplish The First Bulleted Requirement Of Sflc Std Spec 5000 (para 3.2.4.3.2). 3.4.1 All Other Requirements As Specified From Sflc Std Spec 5000 Regarding “partially Preserve” Remain Applicable. 3.4.2 In Addition To Partial Preservation, Abrade Entire Crane Surface And Provide Aesthetic Topcoat. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. note certain Water Weight Bags May Be Too Large To Fit Within The Notch. Ensure Test Weights Are Able To Fit Within The Notch To Accomplish All Testing. caution do Not Exceed The Working Load Limit (wll) Of The Cranes For Any Of The Tests Listed In Appendix A, Cg Tp 7903. Exceeding The Wll Could Result In Equipment Damage And/or Personnel Injury. 3.5 Operational And Weight Testing. The Contractor Must Perform The Appleton Marine Inc. “start-up And Overhaul Test Procedure”, Appendix A Of Cg Tp 7903 Items 1-10. Static Load Test (item 2.1) Is Not Required. Perform All Testing With Cutter At Or Near 0-degree Trim And 0-degrees List. Record And Provide All Testing Data Of Appendix A, Cg Tp 7903 Via A Cfr. Utilize Test Weights That Will Ensure The Boom Can Be Extended Horizontal In The Notch. 3.5.1 The Contractor Must Supply Weights And A Certified Dynamometer To Conduct Load Testing, Submit Cfr With Certification Details. Perform All Testing In The Presence Of The Coast Guard Inspector And The Tech Rep. 3.5.2 Upon Successful Completion Of The Load Testing, Operational Testing Must Be Performed Using The Various Gfp Small Boats In Accordance With The Test Procedure Detailed In Appendix A, Cg Tp 7903. 3.6 Bearing Wear Inspection. The Contractor Must Conduct A Bearing Wear Inspection Of The Turntable Bearing, For All Cranes In Table 1, In Accordance With Cg Tp 7903 Appendix B. Submit A Cfr With Test Results As Compared With The Baseline Measurements In Table 4. table 4 – Cgc Waesche Turntable Bearing Baseline (15july2018) 3.7 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.8 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Exterior And Interior Surfaces To Match Existing Adjacent Surfaces, In Accordance With Sflc Std Spec 6310. Abide By All Touch-up Requirements Outlined In Sflc Std Spec 6310. 4. Notes this Section Is Not Applicable To This Work Item.

The Autobahn GmbH Of The Bundes NL Ost Tender

Others
Germany
Closing Date20 Feb 2025
Tender AmountRefer Documents 
Description: To the tender 'am Dessau - Conversion of tool hall, Lot 4: Electrical work'

Statens Vegvesen Tender

Others
Norway
Closing Date5 Mar 2025
Tender AmountRefer Documents 
Description: 9163 Inland Electrical 2025-2030

Land Berlin Sonderverm Gen Immobilien Des Landes Berlin Tender

Others
Germany
Closing Soon13 Feb 2025
Tender AmountRefer Documents 
Description: Electrical Cable and Wiring Systems in Buildings and Electrical Work

City Of Antipolo Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date19 Feb 2025
Tender AmountPHP 38 Million (USD 655.3 K)
Details: Description A.contract Id : Antipolo-19february2025-14 B. Name Of Project :construction/ Completion Of School Building At Brgy. San Isidro, Antipolo City (2025-package 18) A. Construction Of Four (4) Storey-eight (8) Classrooms Ynares School Building At Bagong Nayon Ii National High School - Annex, Brgy. San Isidro, Antipolo City B. Completion Of Construction Of Four (4) Storey-eight (8) Classrooms Ynares School Building At Bagong Nayon Ii National High School - Annex, Brgy. San Isidro, Antipolo City C. Location : A.&b. Brgy. San Isidro, Antipolo City D. Brief Description : A. Construction Of School Building B. Completion Of School Building E. Major Item Of Works : A. Structural/ Concrete Works; Masonry Works; Steel Works; Carpentry Works B. Plumbing Works; Tile Works; Painting Works; Electrical Works F. Approved Budget For The Contract : Php 38,027,595.64 G. Duration : 240 C.d Republic Of The Philippines City Government Of Antipolo Invitation To Bid / Request For Expression Of Interest The City Government Of Antipolo Through The Bids And Awards Committee (bac), Invites Contractors Duly Registered With The Philippines Contractors Accreditation Board (pcab) To Bid For The Following Project/s Chargeable To Their Respective Funds. The Proponent – Contractor Is To Undertake The Proposed Project/s On A Turnkey Basis. The Bac Will Conduct The Procurement Process In Accordance With The Revised Irr Of R.a. 9184. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of Bid. To Bid For The Aforementioned Contract, A Contractor Must Purchase Bid Documents And Must Meet The Following Major Criteria (a) Filipino Citizen Or 75% Filipino – Owned Partnership, Corporation, Cooperative, Or Joint Venture, (b) With Pcab License Applicable To The Type, Kinds Of Project, Respective Size Ranges And Cost Of This Contract, (c) Completion Of A Similar Contract Costing At Least 50% Of Abc Within A Period Of L0 Years, And (d) Net Financial Contracting Capacity At Least Equal To Abc. The Bac Will Use Non-discretionary Pass / Fail Criteria In The Eligibility Check And Preliminary Examination Of Bids. Interested Contractors Shall Manually Submit Their Bids, Together With Their Duly Accomplished Bid Documents (sealed In Envelopes) Addressed To The Chairman Of The Antipolo City Bids & Awards Committee (acbac) And Shall Be Guided By Hereunder Listed Schedules Of Activities And Locations; Issuance Of Bid Documents: January 31 - February 19, 2025 @ 10:00 A.m.at Office Of The City Engineer, City Government Of Antipolo, Brgy. San Roque, Antipolo City Pre-bid Conference: February 07, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Submission Of Bids: February 19, 2025 Not Later Than 11:00 A.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City Opening Of Bids: February 19, 2025 @ 1:00 P.m. At 2nd Floor, Antipolo City Hall Building (main), M.l. Quezon, Cor. Carigma St. Brgy. San Roque, Antipolo City And Upon Payment Of Refundable Fee For The Bidding Documents, Pursuant To The Guidelines Issued By The Gppb, Per Schedule Of Values And/or Project Cost Payable To This City’s Treasurer’s Office. Partial Set Of The Subject Bid Documents May Also Be Downloaded Free Of Charge From The Website Of The Phil-geps And The Website Of This City While Its Completion May Be Purchased By Prospective Bidders As Stated. Bid Security Must Be In The Form Of A) Cash Or Cashier’s/manager’s Check, Issued By A Universal Or Commercial Bank, B) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Foreign Bank, C) Surety Bond Callable On Upon Demand Issued By A Surety Or Insurance Company Duly Certified By A Surety Or Insurance Company Duly Certified By The Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security, D) Bid Securing Declaration, And E) Any Combination Of Identified Forms. The City Government Of Antipolo Reserves The Right To Reject Any Or All Bids, To Declare A Failure Of Bidding, Waive Any Minor Defect Therein, And Accept The Offer Most Advantageous To The Government And Assumes No Responsibility Whatsoever To Compensate Or Indemnify The Bidders For Any Expenses Incurred In The Preparation Of The Bid. For Further Information Prospective And Qualified Bidders May Inquire At The Office Of The Bac Chairman, Through Its Secretariat At City Government Of Antipolo, Brgy. San Roque, Antipolo City. (sgd) Atty. Cedrick Justice U. Capiral Chairman Of The Bac

New Forest District Council Tender

Software and IT Solutions...+2Electrical and Electronics, Electrical Works
United Kingdom
Closing Date3 Mar 2025
Tender AmountGBP 250 K (USD 310.6 K)
Description: E-itt For The Provision Of Electrical Maintenance Services
3911-3920 of 9606 active Tenders