Tenders of Dept Of The Navy Usa
Tenders of Dept Of The Navy Usa
DEPT OF THE NAVY USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Develop And Approve Dsf Package For Subpac Stand Alone Seabird System
Closing Date26 Jun 2026
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
General Hardware (m Department) Master Bpa
Closing Date19 Jul 2026
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Fiscal Year (fy) 2023-2027 Production Sonobuoy Multiple Award Delivery Order Contract (madoc) On-boarding Notice
Closing Date30 May 2027
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
See Attached Solicitation Posted On 4/19/2023.
Closing Date26 Apr 2026
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Contact Information|4|tbd|tbd|tbd|tbd|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E |
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version (jun 2002)|8|x||x||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|;bd|tbd|n50286|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year |365 Days After The Last Delivery Under This Contract |||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|333612|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
small Business Set-aside Has Been Dissolved.
solicitation Due Date Has Been Extended.
solicitation Due Date Has Been Extended.
solicitation Due Date Extended To Allow For Updated Offers.
drwaings Have Been Updated.
solicitation Due Date Has Been Extended.
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
3.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (200 Days)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
1.1.2 This ;clutch Assy; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May Require
testing.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=4687407 |80064| U| |d|0001 | U|49998|0081422
drawing Data=4687407 |80064| U| |d|0002 | E|49998|0103986
drawing Data=4687407 |80064| U| |d|0002.1 | G|49998|0073860
drawing Data=4687407 |80064| U| |d|0002.2 | N|49998|0084129
drawing Data=4687407 |80064| U| |d|0002.3 | R|49998|0043057
drawing Data=4687407 |80064| U| |d|0002.4 | U|49998|0047132
drawing Data=4687407 |80064| U| |d|0002.5 | U|49998|0050621
drawing Data=4687407 |80064| U| |d|0003 | U|49998|0104691
drawing Data=4687407 |80064| U| |d|0003.1 | R|49998|0097777
drawing Data=4687407 |80064| U| |d|0003.2 | L|49998|0097525
drawing Data=4687407 |80064| U| |d|0003.3 | U|49998|0078607
drawing Data=4687407 |80064| U| |d|0003.4 | U|49998|0044863
drawing Data=4687407 |80064| U| |d|0004 | E|49998|0038232
drawing Data=4687407 |80064| U| |d|0005 | C|49998|0057508
drawing Data=4687407 |80064| U| |d|0005.1 | R|49998|0027554
drawing Data=4687407 |80064| U| |d|0006 | G|49998|0054548
drawing Data=4687407 |80064| U| |d|0007 | N|49998|0069817
drawing Data=4687407 |80064| U| |d|0008 | G|49998|0053266
drawing Data=4687407 |80064| U| |d|0009 | G|49998|0034943
drawing Data=4687407 |80064| U| |d|0010 | G|49998|0034387
drawing Data=4687407 |80064| U| |d|0011 | G|49998|0034768
drawing Data=4687407 |80064| U| |d|0012 | N|49998|0050196
drawing Data=4687407 |80064| U| |d|0013 | G|49998|0026834
drawing Data=4687407 |80064| U| |d|0014 | G|49998|0029469
drawing Data=4687407 |80064| U| |d|0015 | G|49998|0032025
drawing Data=4687407 |80064| U| |d|0016 | G|49998|0031398
drawing Data=4687407 |80064| U| |d|0017 | G|49998|0027451
drawing Data=4687407 |80064| U| |d|0018 | A|49998|0027632
drawing Data=4687407 |80064| U| |d|0019 | G|49998|0043607
drawing Data=4687407 |80064| U| |d|0020 | G|49998|0049433
drawing Data=4687407 |80064| U| |d|0022 | U|49998|0040407
drawing Data=4687407 |80064| U| |d|0023 | L|49998|0053081
drawing Data=4687407 |80064| U| |d|0024 | B|49998|0037669
drawing Data=4687407 |80064| U| |d|0025 | B|49998|0032720
drawing Data=4687407 |80064| U| |d|0026 | G|49998|0034838
drawing Data=4687407 |80064| U| |d|0027 | G|49998|0046233
drawing Data=4687407 |80064| U| |d|0028 | G|49998|0040896
drawing Data=4687407 |80064| U| |d|0029 | G|49998|0051076
drawing Data=4687407 |80064| U| |d|0030 | G|49998|0045640
drawing Data=4687407 |80064| U| |d|0031 | G|49998|0029869
drawing Data=4687407 |80064| U| |d|0032 | G|49998|0046219
drawing Data=4687407 |80064| U| |d|0033 | G|49998|0044146
drawing Data=4687407 |80064| U| |d|0034 | G|49998|0042496
drawing Data=4687407 |80064| U| |d|0035 | G|49998|0031612
drawing Data=4687407 |80064| U| |d|0036 | G|49998|0042454
drawing Data=4687407 |80064| U| |d|0037 | D|49998|0040372
drawing Data=4687407 |80064| U| |d|0038 | G|49998|0044753
drawing Data=4687407 |80064| U| |d|0039 | G|49998|0043488
drawing Data=4687407 |80064| U| |d|0040 | G|49998|0044156
drawing Data=4687407 |80064| U| |d|0041 | G|49998|0033283
drawing Data=4687407 |80064| U| |d|0042 | G|49998|0043996
drawing Data=4687407 |80064| U| |d|0043 | G|49998|0043350
drawing Data=4687407 |80064| U| |d|0044 | G|49998|0044796
drawing Data=4687407 |80064| U| |d|0045 | G|49998|0043789
drawing Data=4687407 |80064| U| |d|0046 | G|49998|0043467
drawing Data=4687407 |80064| U| |d|0047 | G|49998|0045298
drawing Data=4687407 |80064| U| |d|0048 | L|49998|0054469
drawing Data=4687407 |80064| U| |d|0049 | G|49998|0033775
drawing Data=4687407 |80064| U| |d|0050 | G|49998|0059022
drawing Data=4687407 |80064| U| |d|0051 | G|49998|0058425
drawing Data=4687407 |80064| U| |d|0052 | G|49998|0042028
drawing Data=4687407 |80064| U| |d|0053 | G|49998|0044679
drawing Data=4687407 |80064| U| |d|0056 | D|49998|0046321
drawing Data=4687407 |80064| U| |d|0057 | G|49998|0051663
drawing Data=4687407 |80064| U| |d|0058 | C|49998|0034303
drawing Data=4687407 |80064| U| |d|0060 | G|49998|0033538
drawing Data=4687407 |80064| U| |d|0061 | L|49998|0042926
drawing Data=4687407 |80064| U| |d|0064 | D|49998|0034970
drawing Data=4687407 |80064| U| |d|0065 | C|49998|0035689
drawing Data=4687407 |80064| U| |d|0066 | L|49998|0055908
drawing Data=4687407 |80064| U| |d|0067 | G|49998|0039311
drawing Data=4687407 |80064| U| |d|0068 | G|49998|0055731
drawing Data=4687407 |80064| U| |d|0070 | G|49998|0049918
drawing Data=4687407 |80064| U| |d|0071 | G|49998|0035159
drawing Data=4687407 |80064| U| |d|0075 | C|49998|0034820
drawing Data=4687407 |80064| U| |d|0076 | G|49998|0050128
drawing Data=4687407 |80064| U| |d|0081 | D|49998|0052256
drawing Data=4687407 |80064| U| |d|0082 | G|49998|0049511
drawing Data=4687407 |80064| U| |d|0083 | G|49998|0043883
drawing Data=4687407 |80064| U| |d|0084 | G|49998|0061083
drawing Data=4687407 |80064| U| |d|0085 | G|49998|0042629
drawing Data=4687407 |80064| U| |d|0086 | G|49998|0053795
drawing Data=4687407 |80064| U| |d|0087 |d2|49998|0035499
drawing Data=4687407 |80064| U| |d|0088 | G|49998|0044728
drawing Data=4687407 |80064| U| |d|0089 | G|49998|0044905
drawing Data=4687407 |80064| U| |d|0091 | G|49998|0039442
drawing Data=4687407 |80064| U| |d|0092 | D|49998|0036313
drawing Data=4687407 |80064| U| |d|0093 | H|49998|0033673
drawing Data=4687407 |80064| U| |d|0094 | G|49998|0044508
drawing Data=4687407 |80064| U| |d|0095 | G|49998|0030860
drawing Data=4687407 |80064| U| |d|0096 | G|49998|0042124
drawing Data=4687407 |80064| U| |d|0097 | G|49998|0054898
drawing Data=4687407 |80064| U| |d|0098 | G|49998|0042829
drawing Data=4687407 |80064| U| |d|0099 | G|49998|0038173
drawing Data=4687407 |80064| U| |d|0100 | G|49998|0038936
drawing Data=4687407 |80064| U| |d|0101 | G|49998|0044630
drawing Data=4687407 |80064| U| |d|0102 | G|49998|0044510
drawing Data=4687407 |80064| U| |d|0103 | D|49998|0030036
drawing Data=4687407 |80064| U| |d|0104 | R|49998|0044812
drawing Data=4687407 |80064| U| |d|0105 | R|49998|0042858
drawing Data=4687407 |80064| U| |d|0106 | R|49998|0047041
drawing Data=4687407 |80064| U| |d|0107 | L|49998|0052795
drawing Data=4687407 |80064| U| |d|0108 | G|49998|0055644
drawing Data=4687407 |80064| U| |d|0109 | D|49998|0049074
drawing Data=4687407 |80064| U| |d|0110 | D|49998|0041442
drawing Data=4687407 |80064| U| |d|0111 | D|49998|0034433
drawing Data=4687407 |80064| U| |d|0112 | D|49998|0034487
drawing Data=4687407 |80064| U| |d|0113 | D|49998|0031938
drawing Data=4687407 |80064| U| |d|0114 | G|49998|0034350
drawing Data=4687407 |80064| U| |d|0115 | E|49998|0037282
drawing Data=4687407 |80064| U| |d|0116 | G|49998|0042210
drawing Data=4687407 |80064| U| |d|0117 | E|49998|0036062
drawing Data=4687407 |80064| U| |d|0118 | G|49998|0043910
drawing Data=4687407 |80064| U| |d|0119 | L|49998|0039227
drawing Data=4687407 |80064| U| |d|0120 | G|49998|0029980
drawing Data=4687407 |80064| U| |d|0121 | G|49998|0063533
drawing Data=4687407 |80064| U| |d|0122 | E|49998|0038610
drawing Data=4687407 |80064| U| |d|0123 | E|49998|0038002
drawing Data=4687407 |80064| U| |d|0124 | E|49998|0032596
drawing Data=4687407 |80064| U| |d|0125 | E|49998|0039189
drawing Data=4687407 |80064| U| |d|0126 | E|49998|0035808
drawing Data=4687407 |80064| U| |d|0127 | G|49998|0046227
drawing Data=4687407 |80064| U| |d|0128 | G|49998|0053067
drawing Data=4687407 |80064| U| |d|0129 | E|49998|0039054
drawing Data=4687407 |80064| U| |d|0130 | E|49998|0035874
drawing Data=4687407 |80064| U| |d|0131 | G|49998|0043259
drawing Data=4687407 |80064| U| |d|0132 | E|49998|0039822
drawing Data=4687407 |80064| U| |d|0133 | G|49998|0037331
drawing Data=4687407 |80064| U| |d|0134 | E|49998|0046588
drawing Data=4687407 |80064| U| |d|0135 | E|49998|0033685
drawing Data=4687407 |80064| U| |d|0136 | E|49998|0032839
drawing Data=4687407 |80064| U| |d|0137 | G|49998|0049908
drawing Data=4687407 |80064| U| |d|0138 | E|49998|0032223
drawing Data=4687407 |80064| U| |d|0139 | G|49998|0055020
drawing Data=4687407 |80064| U| |d|0140 | E|49998|0041153
drawing Data=4687407 |80064| U| |d|0141 | G|49998|0038506
drawing Data=4687407 |80064| U| |d|0142 | E|49998|0041423
drawing Data=4687407 |80064| U| |d|0143 | E|49998|0036670
drawing Data=4687407 |80064| U| |d|0144 | E|49998|0034689
drawing Data=4687407 |80064| U| |d|0145 | G|49998|0059225
drawing Data=4687407 |80064| U| |d|0147 | E|49998|0037106
drawing Data=4687407 |80064| U| |d|0148 | G|49998|0050409
drawing Data=4687407 |80064| U| |d|0149 | G|49998|0051896
drawing Data=4687407 |80064| U| |d|0150 | G|49998|0049730
drawing Data=4687407 |80064| U| |d|0151 | E|49998|0036655
drawing Data=4687407 |80064| U| |d|0152 | G|49998|0049062
drawing Data=4687407 |80064| U| |d|0153 | G|49998|0048839
drawing Data=4687407 |80064| U| |d|0154 | G|49998|0044947
drawing Data=4687407 |80064| U| |d|0155 | G|49998|0045711
drawing Data=4687407 |80064| U| |d|0156 | F|49998|0041278
drawing Data=4687407 |80064| U| |d|0157 | F|49998|0044947
drawing Data=4687407 |80064| U| |d|0158 | F|49998|0035249
drawing Data=4687407 |80064| U| |d|0159 | G|49998|0047026
drawing Data=4687407 |80064| U| |d|0160 | G|49998|0047817
drawing Data=4687407 |80064| U| |d|0161 | F|49998|0046788
drawing Data=4687407 |80064| U| |d|0162 | F|49998|0037088
drawing Data=4687407 |80064| U| |d|0163 | F|49998|0030025
drawing Data=4687407 |80064| U| |d|0164 | F|49998|0030750
drawing Data=4687407 |80064| U| |d|0165 | G|49998|0052831
drawing Data=4687407 |80064| U| |d|0166 | G|49998|0043206
drawing Data=4687407 |80064| U| |d|0167 | G|49998|0040293
drawing Data=4687407 |80064| U| |d|0168 | F|49998|0044597
drawing Data=4687407 |80064| U| |d|0169 | F|49998|0042731
drawing Data=4687407 |80064| U| |d|0170 | L|49998|0043422
drawing Data=4687407 |80064| U| |d|0171 | F|49998|0037279
drawing Data=4687407 |80064| U| |d|0172 | F|49998|0044302
drawing Data=4687407 |80064| U| |d|0173 | L|49998|0040595
drawing Data=4687407 |80064| U| |d|0174 | G|49998|0042142
drawing Data=4687407 |80064| U| |d|0175 | G|49998|0043630
drawing Data=4687407 |80064| U| |d|0176 | G|49998|0062533
drawing Data=4687407 |80064| U| |d|0177 | G|49998|0049353
drawing Data=4687407 |80064| U| |d|0178 | G|49998|0043293
drawing Data=4687407 |80064| U| |d|0180 | G|49998|0043641
drawing Data=4687407 |80064| U| |d|0181 | M|49998|0044201
drawing Data=4687407 |80064| U| |d|0183 | G|49998|0044788
drawing Data=4687407 |80064| U| |d|0184 | G|49998|0041119
drawing Data=4687407 |80064| U| |d|0185 | N|49998|0046746
drawing Data=4687407 |80064| U| |d|0186 | G|49998|0033524
drawing Data=4687407 |80064| U| |d|0187 |g2|49998|0044378
drawing Data=4687407 |80064| U| |d|0188 | G|49998|0043168
drawing Data=4687407 |80064| U| |d|0189 |g2|49998|0080367
drawing Data=4687407 |80064| U| |d|0190 | G|49998|0041185
drawing Data=4687407 |80064| U| |d|0191 | G|49998|0048241
drawing Data=4687407 |80064| U| |d|0192 | G|49998|0033595
drawing Data=4687407 |80064| U| |d|0193 | G|49998|0037382
drawing Data=4687407 |80064| U| |d|0194 | G|49998|0045508
drawing Data=4687407 |80064| U| |d|0195 | G|49998|0032919
drawing Data=4687407 |80064| U| |d|0196 | G|49998|0037573
drawing Data=4687407 |80064| U| |d|0197 |g2|49998|0058766
drawing Data=4687407 |80064| U| |d|0198 | G|49998|0050472
drawing Data=4687407 |80064| U| |d|0199 | G|49998|0045391
drawing Data=4687407 |80064| U| |d|0200 | G|49998|0054486
drawing Data=4687407 |80064| U| |d|0201 | G|49998|0060575
drawing Data=4687407 |80064| U| |d|0202 | G|49998|0040495
drawing Data=4687407 |80064| U| |d|0203 | G|49998|0037717
drawing Data=4687407 |80064| U| |d|0204 | G|49998|0032230
drawing Data=4687407 |80064| U| |d|0205 |g2|49998|0041316
drawing Data=4687407 |80064| U| |d|0206 | G|49998|0038351
drawing Data=4687407 |80064| U| |d|0207 | G|49998|0039598
drawing Data=4687407 |80064| U| |d|0208 | G|49998|0046552
drawing Data=4687407 |80064| U| |d|0209 | H|49998|0037005
drawing Data=4687407 |80064| U| |d|0210 | H|49998|0055109
drawing Data=4687407 |80064| U| |d|0211 | N|49998|0040976
drawing Data=4687407 |80064| U| |d|0212 | H|49998|0034980
drawing Data=4687407 |80064| U| |d|0214 | J|49998|0047529
drawing Data=4687407 |80064| U| |d|0215 | J|49998|0034611
drawing Data=4687407 |80064| U| |d|0216 | J|49998|0040748
drawing Data=4687407 |80064| U| |d|0217 | J|49998|0033892
drawing Data=4687407 |80064| U| |d|0218 | J|49998|0041351
drawing Data=4687407 |80064| U| |d|0219 | K|49998|0061038
drawing Data=4687407 |80064| U| |d|0220 | K|49998|0041037
drawing Data=4687407 |80064| U| |d|0221 | K|49998|0043710
drawing Data=4687407 |80064| U| |d|0223 | N|49998|0031805
drawing Data=4687407 |80064| U| |d|0223.1 | N|49998|0027853
drawing Data=4687407 |80064| U| |d|0224 | N|49998|0048188
drawing Data=4687407 |80064| U| |d|0225 | N|49998|0023429
drawing Data=4687407 |80064| U| |d|0232 | N|49998|0029516
drawing Data=4687407 |80064| U| |d|0233 | N|49998|0030052
drawing Data=4687407 |80064| U| |d|0234 | U|49998|0030298
drawing Data=4687407 |80064| U| |d|0234.1 | U|49998|0030831
drawing Data=4687407 |80064| U| |d|0234.2 | U|49998|0014708
drawing Data=4687407 |80064| U| |d|0235 | R|49998|0027527
drawing Data=4687407 |80064| U| |d|0236 | U|49998|0024849
drawing Data=4687407 |80064| U| |d|0237 | N|49998|0025697
drawing Data=4687407 |80064| U| |d|0238 | U|49998|0033633
drawing Data=4687407 |80064| U| |d|0239 | R|49998|0029052
drawing Data=4687407 |80064| U| |d|0240 | R|49998|0024892
drawing Data=4687407 |80064| U| |d|0241 | R|49998|0014884
drawing Data=4687407 |80064| U| |d|0242 | R|49998|0015528
drawing Data=4687407 |80064| U| |d|0243 | N|49998|0020213
drawing Data=4687407 |80064| U| |d|0244 | P|49998|0025903
drawing Data=4687407 |80064| U| |d|0245 | P|49998|0030732
drawing Data=4687407 |80064| U| |d|0246 | P|49998|0044429
drawing Data=4687407 |80064| U| |d|0247 | P|49998|0033047
drawing Data=4687407 |80064| U| |d|0248 | P|49998|0027227
drawing Data=4687407 |80064| U| |d|0249 | P|49998|0027899
drawing Data=4687407 |80064| U| |d|0250 | R|49998|0018981
drawing Data=4687407 |80064| U| |d|0251 | T|49998|0041926
drawing Data=4687407 |80064| U| |d|0252 | T|49998|0046578
drawing Data=4687407 |80064| U| |d|0253 | T|49998|0027656
drawing Data=4687407 |80064| U| |d|0254 | R|49998|0029680
drawing Data=4687407 |80064| U| |d|0255 | R|49998|0030980
drawing Data=4687407 |80064| U| |d|0256 | R|49998|0018297
drawing Data=4687407 |80064| U| |d|0257 | R|49998|0038740
drawing Data=4687407 |80064| U| |d|0258 | R|49998|0032012
drawing Data=4687407 |80064| U| |d|0259 | T|49998|0026658
drawing Data=4687407 |80064| U| |d|0260 | R|49998|0040577
drawing Data=4687407 |80064| U| |d|0261 | R|49998|0024188
drawing Data=4687407 |80064| U| |d|0262 | R|49998|0021813
drawing Data=4687407 |80064| U| |d|0263 | U|49998|0033783
drawing Data=4687407 |80064| U| |d|0263.1 | U|49998|0030505
drawing Data=4687407 |80064| U| |d|0263.2 | U|49998|0017067
drawing Data=4687407 |80064| U| |d|0264 | U|49998|0026809
drawing Data=4687407 |80064| U| |d|0265 | U|49998|0022980
drawing Data=4687407 |80064| U| |d|0265.1 | U|49998|0021847
drawing Data=4687407 |80064| U| |d|0266 | U|49998|0026265
drawing Data=4687407 |80064| U| |d|0267 | U|49998|0036548
drawing Data=4687407 |80064| U| |d|0267.1 | U|49998|0029278
drawing Data=4687407 |80064| U| |d|0268 | U|49998|0029505
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=ss800-ag-man-010/p-9290 | | |a |200324|a| |42|
3. Requirements
3.1 ;this Clutch Assy Must Be Manufactured In Accordance With Navsea Drawing 4687407 Assy 263, Except As Amplified Or Modified Herein.;
3.2 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.3 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.3.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.3.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.3.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.4 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.6 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.7 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.7.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.7.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.7.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.7.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.7.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.8 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.8.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.8.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.9 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.10 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.10.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.10.2 Inspection For Completeness And Proper Type.
3.10.3 Verification Of Material Quality Received.
3.10.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.10.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.10.6 Identification And Protection From Improper Use Or Disposition.
3.10.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.10.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.10.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.11 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe).
3.11.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order.
3.12 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability
number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All
process Operations Including Any Subcontracted Operations, To The Finished Component.
3.12.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical,
an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed.
the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.12.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A
method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.13 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.13.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.13.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.13.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.14 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True"
are Not Acceptable.
3.14.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
3.15.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below:
13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Date28 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Nsn 7h-3040-016275559, Tdp Ver 001, Ref Nr Paai063024, Qty 35 Ea, Delivery Fob Origin. This Is A Pre-solicitation Synopsis For The New/spare Buy Of The Nsn/part Number On This Synopsis. The Government Does Not Own The Data Or The Rights To The Data Needed To Purchase This Part From Additional Sources. It Has Been Determined To Be Uneconomical To Buy The Data Or Rights To The Data. It Is Uneconomical To Reverse Engineer The Part. The Proposed Contract Action Is For Supplies For Which The Government Intends To Solicit And Negotiate With Only One Or A Limited Number Of Sources Under The Authority Of Far 6.302-1. All Responsible Sources May Identify Their Interest And Capability To Respond To The Requirement Or Submit Proposals, Quotations Or Capability Statements. This Notice Is Not A Request For Competitive Statements. However. All Proposals Received Within 15 Days After Date Of Publication Of This Synopsis Will Be Considered By The Government. A Determination By The Government Not To Compete With This Proposed Contract Based Upon Responses To This Notice Is Solely Within The Discretion Of The Government. Information Received Will Normally Be Considered Solely For The Purpose Of Determining Whether To Conduct A Competitive Procurement. Any Interested And Responsible Vendor Can Submit Proposals Or Capability Statements As Previously Indicated. However, Any Offeror Must Be An Approved New Buy Source With A Dod-cognizant Tehnical Authority. The Current Requirement Will Not Be Delayed Pending Additional New Buy Source Approvals Or Certifications When New Buy Source(s) Are Already Available And Willing To Bid With A Fair And Reasonable Offer. New Buy Source Additions Are Normally For Future Procurements Of The Same Item To Prevent Impact On Current Military Requirements. Also, As Previously Stated, The Government Does Not Own Or Have The Rights To The Data Or Drawings Necessary To Manufacture The Item. In Addition, Any Interested Vendor Indicating They Are A Distributor For The Item Must Also Have A Signed & Current Authorization Letter From The Oem On Oem Company Letterhead. The Solicitation & Award Will Not Be Delayed Pending The Processing/obtaining Of A Current Oem Authorization Letter For A Potential Distributor When There Are Approved Sources Already Available And Willing To Bid With A Fair And Reasonable Offer. The Government Will Not Pay For Any Information Offered. Compliance With Dfars 252.225-7020 Trade Agreements Certificate-basic And Dfars 252.225-7021 Trade Agreements-basic Is Required. The Solicitation Will Include Small Business Subcontracting Provisions And Clauses. Due To Far/dfars Requirements And Procurement System Limitations The Synopsis Will Be Followed By The Solicitation Using The Same Identifying Number N0010423rxc44 And Will Be Linked In Neco (navy Commerce) And The Sam.gov Public Websites If At All Possible. Award Will Be Made Only If The Offeror, The Product/service, Or The Manufacturer Meets The Qualification Requirement(s) At Time Of Award, In Accordance With Far Clause 52.209-1. The Solicitation Identifies The Office Where Additional Information Can Be Obtained Concerning Qualification Requirements And Is Cited In Each Individual Solicitation. Based Upon Market Research, The Government Is Not Using The Policies Contained In Far Part 12, Acquisition Of Commercial Items, In Its Solicitation For The Described Supplies Or Services. However, Interested Persons May Identify To The Contracting Officer Their Interest And Capability To Satisfy The Government's Requirement With A Commercial Item Within 15 Days Of This Notice. The Government Will Only Award If A Fair And Reasonable Offer Is Receivedfrom A Qualified Offeror.
Closing Date21 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
58--receiver,radar - And Other Replacement Parts, In Repair/modification Of
Closing Date31 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Machinery and Tools...+1Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Contact Information|4|n743.45|wvs|717-605-3353|sylvia.sentz@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001|4|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001|180|tbd|60|x||
buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3||||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (may 2022)|13|335931|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Amendment Is Issued To Update The Poc And Extend The Closing Date.
\
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Drawings Associated With This Solicitation Will Be Made Available On Thesam.gov Website But Will Be Restricted Access, Which Needs To Be Approved.once Access Has Been Requested, Interested Vendors Should Email The Poc Listedon The Solicitation To Inform Them Of
The Request.
3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
4. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In.
5. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (365 Days)
early And Incremental Delivery Is Acceptable At No Additional Cost To The Government.
6. This Requires First Article Testing (ndt) To Be Performed By The Government. See Clause Far 52.209-4 For More Details.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=cpg1022 |96169| F| |d|0001 | F|49998|0030132
drawing Data=cpg1022 |96169| F| |d|0002 | F|49998|0021064
drawing Data=cpg1022 |96169| F| |d|0003 | F|49998|0022286
drawing Data=cpg1022 |96169| F| |d|0004 | F|49998|0021419
drawing Data=cpg1022 |96169| F| |d|0005 | F|49998|0022582
drawing Data=cpg1022 |96169| F| |d|0006 | F|49998|0019811
drawing Data=cpg1022 |96169| F| |d|0007 | F|49998|0022652
drawing Data=cpg1022 |96169| F| |d|0008 | F|49998|0011258
drawing Data=cpg1022 |96169| F| |d|0009 | F|49998|0023824
drawing Data=cpg1022 |96169| F| |d|0010 | F|49998|0020856
drawing Data=cpg1022 |96169| F| |d|0011 | F|49998|0014477
drawing Data=cpg1022 |96169| F| |d|0012 | F|49998|0008560
drawing Data=cpg1022 |96169| F| |d|0013 | F|49998|0018011
drawing Data=cpg1022 |96169| F| |d|0014 | F|49998|0025103
drawing Data=cpg1022 |96169| F| |d|0015 | F|49998|0023546
drawing Data=cpg1022 |96169| F| |d|0016 | F|49998|0020347
drawing Data=cpg1022 |96169| F| |d|0017 | F|49998|0025199
drawing Data=cpg1022 |96169| F| |d|0018 | F|49998|0045572
drawing Data=cpg1022 |96169| F| |d|0019 | F|49998|0040276
drawing Data=cpg1022 |96169| F| |d|0020 | F|49998|0039212
drawing Data=cpg1022 |96169| F| |d|0021 | F|49998|0030139
drawing Data=cpg1022 |96169| F| |d|0022 | F|49998|0037282
drawing Data=cpg1022 |96169| F| |d|0023 | F|49998|0033419
drawing Data=cpg1022 |96169| F| |d|0024 | F|49998|0046612
drawing Data=cpg1022 |96169| F| |d|0025 | F|49998|0042207
drawing Data=cpg1022 |96169| F| |d|0026 | F|49998|0045002
drawing Data=cpg1022 |96169| F| |d|0027 | F|49998|0009713
drawing Data=cpg1022 |96169| F| |d|0028 | F|49998|0046354
drawing Data=cpg1022 |96169| F| |d|0029 | F|49998|0005500
drawing Data=cpg1022 |96169| F| |d|0030 | F|49998|0016659
drawing Data=cpg1022 |96169| F| |d|0031 | F|49998|0041132
drawing Data=cpg1022 |96169| F| |d|0032 | F|49998|0014803
drawing Data=cpg1022 |96169| F| |d|0033 | F|49998|0013312
drawing Data=cpg1022 |96169| F| |d|0034 | F|49998|0030085
drawing Data=cpg1022 |96169| F| |d|0035 | F|49998|0031585
drawing Data=cpg1022 |96169| F| |d|0036 | F|49998|0031527
drawing Data=cpg1022 |96169| F| |d|0037 | F|49998|0012406
drawing Data=cpg1022 |96169| F| |d|0038 | F|49998|0046896
drawing Data=cpg1022 |96169| F| |d|0039 | F|49998|0010039
drawing Data=cpg1022 |96169| F| |d|0040 | F|49998|0056377
drawing Data=cpg1022 |96169| F| |d|0041 | F|49998|0005432
drawing Data=cpg1022 |96169| F| |d|0042 | F|49998|0048047
drawing Data=cpg1022 |96169| F| |d|0043 | F|49998|0052300
drawing Data=cpg1022 |96169| F| |d|0044 | F|49998|0024276
drawing Data=cpg1022 |96169| F| |d|0045 | F|49998|0034480
drawing Data=cpg1022 |96169| F| |d|0046 | F|49998|0026803
drawing Data=cpg1022 |96169| F| |d|0047 | F|49998|0012965
drawing Data=cpg1022 |96169| F| |d|0048 | F|49998|0013581
drawing Data=cpg1022 |96169| F| |d|0049 | F|49998|0010520
drawing Data=cpg1022 |96169| F| |d|0050 | F|49998|0010755
drawing Data=cpg1022 |96169| F| |d|0051 | F|49998|0018605
drawing Data=cpg1022 |96169| F| |d|0052 | F|49998|0009701
drawing Data=cpg1022 |96169| F| |d|0053 | F|49998|0024802
drawing Data=cpg1022 |96169| F| |d|0054 | F|49998|0032131
drawing Data=cpg1022 |96169| F| |d|0055 | F|49998|0014331
drawing Data=cpg1022 |96169| F| |d|0056 | F|49998|0010587
drawing Data=cpg1022 |96169| F| |d|0057 | F|49998|0015026
drawing Data=cpg1022-1 |96169| D| |d|0000.a | D|49998|0074948
drawing Data=cpg1022-1 |96169| D| |d|0000.b | C|49998|0129832
drawing Data=cpg1022-1 |96169| D| |d|0000.c | D|49998|0016731
drawing Data=cpg1022-1 |96169| D| |d|0001 | D|49998|0095662
drawing Data=cpg1022-1 |96169| D| |d|0002 | C|49998|0048488
drawing Data=cpg1022-1 |96169| D| |d|0003 | C|49998|0049407
drawing Data=cpg1022-1 |96169| D| |d|0004 | D|49998|0061828
drawing Data=cpg1022-1 |96169| D| |d|0005 | B|49998|0017369
drawing Data=cpg1022-1 |96169| D| |d|0006 | D|49998|0024738
drawing Data=cpg1022-1 |96169| D| |d|0007 | B|49998|0020905
drawing Data=cpg1022-1 |96169| D| |d|0008 | D|49998|0019097
drawing Data=cpg1022-1 |96169| D| |d|0009 | C|49998|0017763
drawing Data=cpg1022-1 |96169| D| |d|0010 | D|49998|0055696
drawing Data=cpg1022-1 |96169| D| |d|0011 | B|49998|0015906
drawing Data=cpg1025 |96169| P| |d|0001 | P|49998|0031294
drawing Data=cpg1025 |96169| P| |d|0002 | P|49998|0013077
drawing Data=cpg1025 |96169| P| |d|0003 | P|49998|0011923
drawing Data=cpg1025 |96169| P| |d|0004 | P|49998|0021385
drawing Data=cpg1025 |96169| P| |d|0005 | P|49998|0020123
drawing Data=cpg1025 |96169| P| |d|0006 | P|49998|0012596
drawing Data=cpg1025 |96169| P| |d|0007 | P|49998|0020575
drawing Data=cpg1025 |96169| P| |d|0008 | P|49998|0025829
drawing Data=cpg1025 |96169| P| |d|0009 | P|49998|0025129
drawing Data=cpg1025 |96169| P| |d|0010 | P|49998|0025305
drawing Data=cpg1025 |96169| P| |d|0011 | P|49998|0026218
drawing Data=cpg1025 |96169| P| |d|0012 | P|49998|0023610
drawing Data=cpg1025 |96169| P| |d|0013 | P|49998|0024504
drawing Data=cpg1025 |96169| P| |d|0014 | P|49998|0020909
drawing Data=cpg1025 |96169| P| |d|0015 | P|49998|0025043
drawing Data=cpg1025 |96169| P| |d|0016 | P|49998|0024761
drawing Data=cpg1025 |96169| P| |d|0017 | P|49998|0027299
drawing Data=cpg1025 |96169| P| |d|0018 | P|49998|0042937
drawing Data=cpg1025 |96169| P| |d|0019 | P|49998|0040502
drawing Data=cpg1025 |96169| P| |d|0020 | P|49998|0036449
drawing Data=cpg1025 |96169| P| |d|0021 | P|49998|0036830
drawing Data=cpg1025 |96169| P| |d|0022 | P|49998|0033796
drawing Data=cpg1025 |96169| P| |d|0023 | P|49998|0027339
drawing Data=cpg1025 |96169| P| |d|0024 | P|49998|0041721
drawing Data=cpg1025 |96169| P| |d|0025 | P|49998|0036782
drawing Data=cpg1025 |96169| P| |d|0026 | P|49998|0037911
drawing Data=cpg1025 |96169| P| |d|0027 | P|49998|0019706
drawing Data=cpg1025 |96169| P| |d|0028 | P|49998|0031258
drawing Data=cpg1025 |96169| P| |d|0029 | P|49998|0028386
drawing Data=cpg1025 |96169| P| |d|0030 | P|49998|0034996
drawing Data=cpg1025 |96169| P| |d|0031 | P|49998|0037489
drawing Data=cpg1025 |96169| P| |d|0032 | P|49998|0026677
drawing Data=cpg1025 |96169| P| |d|0033 | P|49998|0017312
drawing Data=cpg1025 |96169| P| |d|0034 | P|49998|0030851
drawing Data=cpg1025 |96169| P| |d|0035 | P|49998|0028589
drawing Data=cpg1025 |96169| P| |d|0036 | P|49998|0009063
drawing Data=cpg1025 |96169| P| |d|0037 | P|49998|0004112
drawing Data=cpg1025 |96169| P| |d|0038 | P|49998|0013152
drawing Data=cpg1025 |96169| P| |d|0039 | P|49998|0009572
drawing Data=cpg1025 |96169| P| |d|0040 | P|49998|0012321
drawing Data=cpg1025 |96169| P| |d|0041 | P|49998|0009310
drawing Data=cpg1025 |96169| P| |d|0042 | P|49998|0006784
drawing Data=cpg1025 |96169| P| |d|0043 | P|49998|0006124
drawing Data=cpg1025 |96169| P| |d|0044 | P|49998|0008489
drawing Data=cpg1025 |96169| P| |d|0045 | P|49998|0007044
drawing Data=cpg1025-1 |96169| M| |d|0000.a | M|49998|0758554
drawing Data=cpg1025-1 |96169| M| |d|0000.b | G|49998|1277830
drawing Data=cpg1025-1 |96169| M| |d|0000.c | M|49998|0763525
drawing Data=cpg1025-1 |96169| M| |d|0001 | L|49998|1091102
drawing Data=cpg1025-1 |96169| M| |d|0002 | M|49998|1201771
drawing Data=cpg1025-1 |96169| M| |d|0003 | L|49998|1102853
drawing Data=cpg1025-1 |96169| M| |d|0004 | E|49998|0841196
drawing Data=cpg1025-1 |96169| M| |d|0005 | D|49998|0392069
drawing Data=cpg1025-1 |96169| M| |d|0006 | B|49998|0547744
drawing Data=cpg1025-1 |96169| M| |d|0007 | D|49998|0409468
drawing Data=cpg1025-1 |96169| M| |d|0008 | B|49998|0424196
drawing Data=cpg1025-1 |96169| M| |d|0009 | L|49998|0555538
drawing Data=cpg1025-1 |96169| M| |d|0010 | J|49998|0536845
drawing Data=cpg1025-1 |96169| M| |d|0011 | B|49998|0594238
drawing Data=cpg1025-1 |96169| M| |d|0012 | A|49998|0635118
drawing Data=cpg1025-1 |96169| M| |d|0013 | F|49998|0683845
drawing Data=cpg1025-1 |96169| M| |d|0014 | C|49998|0649459
drawing Data=cpg1025-1 |96169| M| |d|0015 | A|49998|0543639
drawing Data=cpg1025-1 |96169| M| |d|0016 | C|49998|0683318
drawing Data=cpg1025-1 |96169| M| |d|0017 | D|49998|0554866
drawing Data=cpg1025-1 |96169| M| |d|0018 | D|49998|0421953
drawing Data=cpg1025-1 |96169| M| |d|0019 | K|49998|0559184
drawing Data=cpg1025-1 |96169| M| |d|0020 | K|49998|0762215
drawing Data=cpg1025-1 |96169| M| |d|0021 | M|49998|0397387
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080310|a| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-dtl-24231 |0011| |e |130426|a| | |
document Ref Data=mil-dtl-24231 |0013| |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Cpg 1025, Except As Amplified Or Modified Herein. Cpg 1025 Ordering Data Information Is Provided Below.
(a) Penetrator, Connector Type, Electrical; Cpg 1025.
(b) ;connectorized Hull Penetrator Assemblies, Multiple Connector Type, Cpg 1025/1, Part Number Cpg 1025/1-103;
(c) Special Wiring And Inboard Cables Are Not Required.
(d) Pressure Proof Receptacle Caps Are Not Required.
(e) Level Of Preservation, Packaging, And Marking Must Be As Specified Elsewhere In The Contract/purchase Order.
3.2 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.3 ;the Fat Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.4 ;paragraph 4.1 Of Cpg 1025 Does Not Apply.;
3.5 ;this Penetrator Assembly Must Be Furnished With Both Washers; Cpg 1022/1-006 And Cpg 1025/1-005. First Article Testing May Be Performed With Either Washer.;
3.6 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;penetrator Body (cpg 1025/1-001), Penetrator Cover (m24231/11-008), Nut (cpg 1022/1-005), And Washers (cpg 1022/1-006) And (cpg 1025/1-005);
material - ;qq-n-286, Alloy Uns N05500, Form 2, Annealed And Age Hardened Or Qq-n-286, Form 7, Annealed And Age Hardened. Mechanical Properties To Be In Accordance With Cpg 1025, Paragraph 3.3.2.;
part - ;receptacle Body (m24231/13-010);
material - ;qq-n-281, Class A And Must Meet The Requirements Of Mil-dtl-24231 Paragraph 3.3.2.1;
3.7 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Quality Conformance/compliance Inspection
item - ;each Penetrator Assembly;
performance - ;cpg 1025, Paragraph 4.5;
acceptance - ;cpg 1025, Paragraph 4.5;
attribute - Annealing And Age Hardening
item - ;each Penetrator Body (cpg 1025/1-001), Penetrator Cover (m24231/11-008), Nut (cpg 1022/1-005), And Washers (cpg 1022/1-006) And (cpg 1025/1-005);
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Time Temperature Plots And Certified Calibration Records Of Furnace Temperature Measuring Devices
item - ;each Penetrator Body (cpg 1025/1-001), Penetrator Cover (m24231/11-008), Nut (cpg 1022/1-005), And Washers (cpg 1022/1-006) And (cpg 1025/1-005);
performance - ;when Required By Cpg 1025, Paragraph 3.3.1.2.;
test - ;dye Penetrant Inspection;
item - ;each Penetrator Body (cpg 1025/1-001), Penetrator Cover (m24231/11-008), Nut (cpg 1022/1-005), And Washers (cpg 1022/1-006) And (cpg 1025/1-005);
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
3.8 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.9 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.9.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.9.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22
of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.9.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;penetrator Body (cpg 1025/1-001), Penetrator Cover (m24231/11-008), Nut (cpg 1022/1-005), And Washers (cpg 1022/1-006) And (cpg 1025/1-005); . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any
welding Or Brazing.
3.14 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.14.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.14.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.14.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.15 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.16 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.16.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.17 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1) Each Of The Penetrator Assembly, Header, And Inboard Plug Assembly; Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270
(207-438-5445) Kittery Maine, 03904; For First Article Tests In Accordance With The ;requirements Of Cpg 1025, Paragraph 4.4. Underwater Explosion Testing Is Not Required; .
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The S
Closing Date18 Apr 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (jan 2025)|13|327999|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
offer Due Date Extended To 26 March 2025.
The Irpod For This Procurement Has Been Updated And Is Available Through Bpmi/e-commerce.
amendment Closing Date Extended.
solicitation Poc Changed To Rebecca Aglow.
this Solicitation Remains Open Until 31 May 2023.
unless Otherwise Specified, Pricing For This Quotation
is Valid For 60 Days After The Closing Date As Indicated On The Quotation.
please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via Email Or Neco,
please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Depositedin The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To 'issue' Contractual Documents Asdetailed Herein.
The Following Applies If Reports Of Test And Inspection (roti) Are Required:
the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). Adedicated Roti Fax Has Been Added For Your Submittal Convenience.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
mark This Item With The Nomenclature Cited In The Irpod.
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Date26 Mar 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Item Unique Identification And Valuation (mar 2022)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|see Schedule|tbd|||n/a||||||
transportation Of Supplies By Sea (feb 2019)|2|||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
annual Representations And Certifications (may 2022)|13|326220|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Solicitation Closing Date Has Been Updated As Shown Elsewhere.
all Other Terms And Conditions Remain The Same.
unless Otherwise Specified, Pricing For This Quotation
is Valid For 60 Days After The Closing Date As Indicated On The Quotation.
please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via Email Or Neco,
please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Bpmi Ecommerce Website Is Being Moved To A New Url (https://logistics.unnpp.gov/ecommerce) Effective 17 July, 2019. The Current Site Address (https://logistics.bpmionline.net) Will Be Active Until 1 August, 2019, But We Encourage You To Ensure You Are Able To
Access The New Website At Your Earliest Convenience. If You Have Any Questions, Please Contact The Poc Listed Below.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May
be Made Only With Prior Approval Of The Naval Sea Systems Command.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
date Of First Submission=eoc
submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired.
the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Date27 Mar 2025
Tender AmountRefer Documents
2091-2100 of 2123 active Tenders