Tenders of Dept Of The Army Usa

Tenders of Dept Of The Army Usa

DEPT OF THE ARMY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Parachute Spring - W519tc-25-q-2060

DEPT OF THE ARMY USA Tender

Automobiles and Auto Parts
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
The U.s. Army Corps Of Engineers (usace), St. Paul District Has A Requirement For A Contractor To Provide A Side By Side (sxs) Utility Terrain Vehicle (utv) With A Power Dump Box. This Procurement Includes Delivery To The Lake Traverse Project Office Located In Wheaton, Mn On Or Before April 30, 2025. A Polaris Ranger Is Offered As A Trade-in. the North American Industry Classification System (naics) Code For This Project Is 336999, All Other Transportation Equipment Manufacturing With A Size Standard Of 1,000 Employees. the Resulting Contract Shall Be A Firm, Fixed-price Contract. the Solicitation Is A Total Small Business Set-aside. the Solicitation Is A Request For Quote (rfq). the Following Is A Brief Description Of The Product Specifications. They Are Further Defined In The Solicitation (sf 1449). side By Side (sxs) Utility Terrain Vehicle: capacity (passenger): 2 cargo Box Capacity: 1,000 Lbs payload: 925 Lb cab: Hard Enclosed Cabin With Heater & Air Conditioning powereddump Box fixed Glass Windshield single Latch Tailgate towing Capacity: 2,000 Lb tow Hitch: 2 Inch Hitch Receiver ground Clearance: 11 Inches steering: Powered transmission: Automatic, 4wd With Locking Differential fuel Capacity: 8 Gal 4 Cycle Gasoline Engine, Liquid Cooled, Fuel Injection 50 Hp 1 Year Warranty trade In / Exchange: xp Polaris Ranger 800 Xp Eps 4x4 purchased: 2012 vin # 4xath7ea4c4273043 engine Serial#: 0120439706096 800 Cc Gasoline Engine operating Hours: 275 Hr mileage: 2,004miles major Repairs In Last 3 Years: No Repairs known Issues: None no Cd's Or Hard Copies Of The Solicitation Will Be Available. Offerors Are Responsible For Checking The Contract Opportunities Website (https://sam.gov/content/opportunities) For Any Update(s) To The Solicitation. The Government Is Not Responsible For Any Loss Of Internet Connectivity Or For An Offeror's Inability To Access The Document Posted At The Referenced Website. there Is No “plan Holder List” For This Project. The Interested Vendors List Is Listed As Part Of The Solicitation Posting On The Contract Opportunities Website. In Order To View This List, Vendors Will Need To Sign-in To Their Sam Account. in Order For Contractors To Conduct Business With The Department Of Defense, The Contractor Must Provide Registration Information To The System For Award Management (sam). All Offerors Must Be Registered In Sam Prior To Receiving An Award, Have An Active Sam Account, And Have The Representations And Certifications (far And Dfars) Sections Completed Prior To Award. Registration Instructions May Be Obtained, And Online Registration May Be Accomplished, At Https://sam.gov/content/entity-landing. as Required By 15 U.s.c. 644(w), The Corps Of Engineers’ Policy And Procedures, As Well As Past Performance Information, In Regard To Definitization Of Requests For Equitable Adjustments Is Found At Https://www.usace.army.mil/business-with-us/partnering.

DEPT OF THE ARMY USA Tender

Others
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Maintenance And Repair Services For Chlorination And Fluoridation Systems Located In United States Army Garrison (usag) Bavaria: Tower Barracks (tb) Grafenwoehr, Rose Barracks (rb) Vilseck And Hohenfels

DEPT OF THE ARMY USA Tender

Others
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
The U.s. Army Corps Of Engineers, Kansas City District, Has A Need For Refuse Services At Its Rathbun Lake Project Office In Centerville, Iowa.

DEPT OF THE ARMY USA Tender

Energy, Oil and Gas
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Sp-pol-cmp-inspect-fy25-edw (po 05)

DEPT OF THE ARMY USA Tender

Machinery and Tools
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
This Is A Sources Sought (ss) Issued By The Army Combat Capabilities Development Command (devcom), Armaments Center (ac), Munitions Engineering & Technology Center (metc) And Aeroballistics Division. This Effort Is For Information To Plan An Acquisition Strategy And Contract To Install Piping To Support A Hypersonic Windtunnel Upgrade. Responders To This Ss Notice Are Asked To Provide Capability Statements Related To Experience With The Ability To Furnish The Following Requirements For High Powered Industrial Air And Pipe Systems: quantity Of (2) 350-psig (oil Filled Screw Type) In-door Air Compressors Must Be Piped Approximately 75-feet Into Quantity Of (2) Remote Out-door Air Coolers. Pipe Must Penetrate Through Concrete Wall To Go Outside From Compressor Room And Must Be Properly Mounted, Supported, And Sealed. Piping From Compressor To Cooler Must Be 2-½-inch Diameter, Include 2-½-inch Hand-operated Ball Valve At Compressor Outlet, Include Mount And Support. Confirm Ball Valve. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. separate In And Out Lines Must Be Piped Between Compressors And Coolers To Cool The Oil. In-line Pipe Specifications From Compressor To Cooler Must Be 2-inch Diameter, Include 2-inch Hand-operated Ball Valve At Compressor Outlet, Include Mount And Support. Out-line Pipe Specifications From Cooler To Compressor Must Be 2-inch Diameter, Include Mount And Support, Include 2-inch Hand-operated Ball Valve At Compressor Inlet. The In And Out Lines Between Compressors And Coolers Must Be Manifolded Together With A Single ½-inch Pipe. Oil Lines That Run Outdoors Must Include Heat Tracer. Ensure Proper Fluids Are Added To The Oil Lines With Required Amount Of Manufactured Approved Oil. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. quantity Of (2) Remote Out-door Air Coolers Must Be Piped Approximately 75-feet Into Quantity Of (2) In-door 500-gallon Wet Tanks To Remove Condensate From The Compressed Air. Pipe Must Penetrate Through Concrete Wall And Return Inside The Compressor Room And Must Be Properly Mounted, Supported, And Sealed. Piping From Cooler To Wet Tank Must Be 2-½-inch Expanded To 3-inch Diameter Using An Expander And Include Mount And Support. Confirm Expander. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. quantity Of (2) Remote Out-door Air Coolers Must Be Piped Approximately 25 To 50-feet Into Quantity Of (1) In-door Auxiliary Pump To Pump Condensate Into The Drain. Pipe Must Penetrate Through Concrete Wall And Return Inside The Compressor Room And Must Be Properly Mounted, Supported, And Sealed. Piping From Cooler To Auxiliary Pump Must Be ¾-inch. Each Outdoor Cooler Will Have A Dedicated ¾-inch Pipe (2 Separate Gravity Fed Condensate Lines) Going Back Into The Compressor Room And Into The Auxiliary Pump To Pump Condensate Into The Drain. Condensate Lines That Run Outdoors Must Include Heat Tracer. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. quantity Of (2) In-door 500-gallon Wet Tanks Must Be Piped Approximately 10-feet Into Quantity Of (2) In-door Desiccant Dryers To Remove Remaining Moisture From The Compressed Air. Piping From Wet Tank To Desiccant Dryer Must Be 3-inch Reduced To 2-inch Diameter Using A Reducer, Include Mount And Support, Include Hand-operated Ball Valve At Desiccant Dryer Inlet, Include A Separate 2-inch Diameter Pipeline With Hand-operated Ball Valve To By-pass Desiccant Dryer. Confirm Ball Valves And Reducers. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. quantity Of (2) In-door Desiccant Dryers Must Be Piped Approximately 50-feet Into Quantity Of (2) Out-door 10,000-gallon Air Storage Tanks. Desiccant Dryers Must Include Exhaust Pipe Vents. Existing Vents Are Available On-site. Pipe Must Penetrate Through Concrete Wall To Go Outside From Compressor Room And Must Be Properly Mounted, Supported, And Sealed. Air Storage Tanks Are 6-feet Apart And Will Supply Air For Wind Tunnel Operations. Piping From Desiccant Dryer To Air Storage Tank Must Be 2-inch Expanded To 3-inch Diameter Using An Expander, Include Hand-operated Ball Valve At Desiccant Dryer Outlet, Include Mount And Support, Include Hand-operated Ball Valve At Air Storage Tank Inlet, Include A Separate 3-inch Diameter Pipeline With Hand-operated Ball Valve To By-pass Air Storage Tank. 3-inch Diameter By-pass Pipeline Must Join A 6-inch Diameter Pipeline Coming From Outlet Of Air Storage Tank Which Will Join An Existing Airline. Confirm Ball Valve And Expander. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. piping From In-door Desiccant Dryers To Air Storage Tanks Must Be Replaced And Account For Thermal Expansion. Ensure Pipe Fitting And Size Are Correct And Must Be Properly Mounted, Supported, And Sealed. quantity Of (2) Out-door 10,000-gallon Air Storage Tanks Must Be Manifolded Together And Piped Approximately 50-feet To Return Inside The Compressor Room Where The Pipe Will Join An Existing Airline (t-junction) With A 3-way Diverter Valve, Or (2) Butterfly Valves, Or (1) Ball Valve. Pipe Must Penetrate Through Concrete Wall And Return Inside The Compressor Room And Must Be Properly Mounted, Supported, And Sealed. Piping From Air Storage Tanks To Existing Airline Must Include 6-inch Expanded To 10-inch Diameter Pipe Using An Expander. 10-inch Diameter Pipeline Will Be The Existing Air Supply. Confirm Diverter Valve And Expander. Ensure Pipe Fitting And Size Are Correct. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. Ensure Redundant Regulator Is Installed. both Compressors Must Be Piped For Oil Cooling Lines. The Oil Lines Run From Each Compressor Out To The Remote Oil Coolers Located Outside Rear Of The Facility In The Same Cooler System Used To Cool The Compressed Air. each 500-gallon Wet Tank Must Be Piped For Condensate Drainage. The Piping Will Run From Each Wet Tank To The Oil/water Separators (filter Type - Crp Series 500 – 2000) Then Gravity Drained To The Auxiliary Pump Inside The Compressor Room Then The Condensate Will Be Pumped Into The Drain. Piping From Wet Tanks To Auxiliary Pump Is Gravity Fed Utilizing A Separator And Approximately 25-feet. Pipe Must Be Properly Mounted, Supported, And Sealed. Confirm Redundant Regulator. Ensure Pipe Fitting And Size Are Correct. Ensure Proper Mounting For Separators During Installation. Ensure Equipment Is Tested For Leaks, Properly Secured And Sealed, And Safe For Operation. Quantity Of (2) Filters Located Near Auxiliary Pump In Compressor Room. Must Have One Filter For Each Wet Tank. must Include Quantity Of (4) Condensate Drain Clean Out Ball Valves To Be Mounted At The Bottom Of (2) 10,000-gallon Air Storage Tanks And (2) 500-gallon Wet Tanks. Piping Will Require 45° Or 90° Elbows And Must Include Mounts And Supports. Valves Must Be Easily Accessible Outside Air Storage Tank Shielding. Air Storage Tanks And Wet Tanks Must Include Redundant Regulators For Condensate Drain. Must Include 1.25-inch Diameter Npt Condensate Drain Clean Out Ball Valves For The 10,000-gallon Air Storage Tanks. Must Include 1.00-inch Diameter Npt Condensate Drain Clean Out Ball Valves For The 500-gallon Wet Tanks. the Contractor Shall Also Deliver And Install The Following: the 3-way Valve, Or (2) Butterfly Valves, Or (1) Ball Valve Will Either: A) Direct Air Flow Downstream Towards The Wind Tunnel At 350 Psig. B) Direct Air Flow Towards The Existing (8) 2000 Cubic Feet Air Storage Tanks Using A Regulator To Reduce The Pressure From 350 Psig To 150 Psig. Ensure Redundant Regulator Is Installed. Add Redundant Regulators At 3-way Intersection. Have Pressure Transducers Before, After, And In Between Regulators To Ensure Regulators Are Performing Adequately. If One Regulator Starts To Fail, System Sends A Feedback Alarm To The Control And Enter Failsafe Mode To Avoid Pressure Going In Undesired Direction. Attempt To Put Valves And Regulators At The Lowest Diameter Section Of Piping With Minimal Impact On Performance If Possible. include Cost Of Capped Off T-junction At Some Intersection Along The 6-inch 350 Psi Pipeline With An End Cap Before Air Enters The 3-way To Divert The 350 Psi Air Down Towards Room 1 (location Tbd In Future). request That All Responses Included The Following Information: filly Company Name (legal Entity): cage Code: website (if Applicable): contact Information: business Size Status.

DEPT OF THE ARMY USA Tender

Others
United States
Closing Date16 Jan 2025
Tender AmountRefer Documents 
Acc Apg Local Divisions Advanced Planning Brief To Industry (apbi) January 2025

DEPT OF THE ARMY USA Tender

Civil And Construction...+2Building Construction, Aerospace and Defence
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents 
Design-build And Construction Services Matoc To Support Industrial Base Modernization At Government Owned - Contractor Operated (goco) Facilities

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Building Construction
United States
Closing Date19 Jan 2025
Tender AmountRefer Documents 
Bizai Fire And Rescue Station Reno, Lithuania

DEPT OF THE ARMY USA Tender

Civil And Construction...+1Civil Works Others
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents 
Industry Day For Norfolk Csrm Phase 1a Construction Project Located In Norfolk, Va
1101-1110 of 1226 archived Tenders