Cleaning Tenders
Cleaning Tenders
DEPT OF THE NAVY USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n791.13|lpd|215.697.3528|destiny.n.wiatr.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program - Basic (jan 23)|3||||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3||||
buy American--balance Of Payments Program (nov 2014)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (mar 2023)|13|335931|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a ||
the Purpose Of This Amendment Is To Change The Closing Date To 19 Dec 2023.
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirementis Measured From Asset Return To The Date Of Asset Acceptance Under The Termsof The Contract. For Purposes Of This Section, Return Is Defined As Physicalreceipt Of The F-condition Asset
at The Contractor's Facility As Reflected Inthe Action Date Entry In The Commercial Asset Visibility (cav) System. Inaccordance With The Cav Statement Of Work, The Contractor Is Required Toaccurately Report All Transactions By The End Of The Fifth Regular
businessday After Receipt And The Action Date Entered In Cav Must Be Dated To Reflectthe Actual Date Of Physical Receipt.
the Contractor Must Obtain Final Inspection And Acceptance By The Governmentfor All Assets Within The Rtats Established In The Subsequent Contract.
required Rtat: 118 Days After Receipt Of Asset.
throughput Constraint: Contractor Must Provide A Throughput Constraint Foreach Nsn(s). Total Assets To Be Repaired Monthly After Initial Deliverycommences X/month (contractor Fill In #). A Throughput Of ##____ Per Monthreflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Anyasset Received After This Date In Days Is Not Authorized For Repair Withoutbi-lateral Agreement Between The Contractor And Navsup Wss Contractingofficer.
reconciliation:a Reconciliation Modification Will Be Issued After Finalinspection And Acceptance Of All Assets Inducted Under The Subsequentcontract.for Each Unit At The Negotiated Rtat. Such Prices Are Based On Thecontractor Meeting The Rtat Requirements
described Within The Schedule Page.if The Contractor Does Not Meet The Applicable Rtat Requirement, Considerationwill Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited Inthe Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein.
early And Incremental Deliveries Accepted And Preferred.
inspection At Originacceptance At Origin
poc Email: Destiny.n.wiatr.civ@us.navy.mil
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested And Inspected In Accordance With The Terms And Conditions Specified In The Requirements Section Of This Document.
1.2.1 Any Item Contracted For Repair Shall Have A Statement Of Work To Ensure Compliance With All Repair Procedures And Requirements.
repair Of:
power Supply ;7rh 6130 015731996 P8; Nsn , ; 080-20705-01; Part Number, Shall Be Performed Iaw: Power Supply ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Publication (s).
1.2.2 There Will Be No Repair Deviation From The Approved Written Procedures Without Review And Acceptance By The Basic Design Engineer. All Requests For Waiver/deviation Shall Be Via Form 1694 Routed Throught The Local Dcma/aco Office For Review And
recommendations Via Form 1998.
1.3 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.4 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.5 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
power Supply ;080-20705-01; P/n, ;7rh 6130 015731996 P8; Nsn, ;available Repair Manuals, Drawings And Specifications Per P/n Requirements; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
power Supply ;the Boeing Company; Company Name , ;mail Stop 45-24, P.o. Box 3707 Seattle Wa 98124-2207; Address , ;81205; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Date19 Dec 2024
Tender AmountRefer Documents
Social security organizations Tender
France
Details: This Consultation Concerns the Provision and Installation of Fabric Hand Towels, a Corresponding Stock of Reels and the Associated Laundry Service, namely: Weekly Operations of Collection, Cleaning and Provision of Reels, on Behalf of the Cpam De La Corrèze on Its Various Sites in Tulle and Brive. This Contract Is Allotted Using an Adapted Procedure, in Application of the Provisions of Articles L2113-10; L 2123-1 and R 2123-1,4,5 and 6 of the Same Code, Awarded for a Maximum Amount Excl. Tax of €20,000 on the Entire Contract According to Article R2162 Section 1 of Decree 2018-1075 Relating to Public Procurement.
Closing Soon13 Nov 2024
Tender AmountRefer Documents
Synd Rivieres School & Mare Aux Evees Tender
France
Details: The framework agreement concerns the carrying out of the maintenance and management of the vegetation and the bed of the Ecole River, the Ru de la Mare-aux-evées and their tributaries in the area of competence of Semea (department of Essonne (91) and Department of Seine-et-Marne (77)). Actions to Combat Invasive Species, . Restoration Logging / Thinning Coppicing and Rebalancing of Age Classes, Pruning Actions,. Differentiated Clearing Actions, . The resumption of a tadpole pruning or the pruning of old tree subjects, . Reasonable Management of Ice Jams, . Removal of Waste, . The maintenance of certain paths along watercourses, . Maintaining the Reed Beds in the Bed. Planting Trees, Shrubs. The maintenance of beds of invasive species treated in restoration, . Cleaning a Decanter.
Closing Date18 Dec 2024
Tender AmountRefer Documents
Municipality Of San Agustin, Isabela Tender
Philippines
Details: Description Tems: Lot 1 - Carpentry Tools & Equipment - (abc P49,888.00) 2 Pc S Bar Level, 40” 2 Pc S Carpenter Tool Holster Bag 2 Sets Chisels, Set, 12pcs 2 Sets Combination Socket Wrench, Set 2 Pcs Construction Rubber Palm Gloves 2 Sets Electric Nailer/nail Gun, Set 2 Pc Hand Plane, Metal 2 Pcs Hand Saw, 14” 2 Pcs Heavy Duty Electric Drill, Set 2 Pcs Heavy Duty Electric Grinder/sander,set 2 Sets Heavy Duty Electric Miter Saw, Set 2 Pcs Heavy Duty Hard Hat 4 Pcs Heavy Duty Tool Box 2 Pcs Heavy Duty Utility Knife 2 Sets L-square With Bar 2 Units Mma-300 Inverter Mini Welding Machine Portable 300 Amp 2 Pcs Pliers, 3-in-1 Set 2 Boxes Safety Glasses 2 Sets Screwdrivers, 6 Pcs Set Lot 2 - Electrical Installation Tools And Equipments (abc - 49,888.00) 2 Pcs Angle Grinder 850 W 2 Pcs Automatic Wire Stripper Cutting Crimper Voltage Detection Cutter 2 Pcs Cordless Drill Kit/rechargeable Cordless Drill 2 Pcs Digital Multimeter Tester Multi Tester For Electrical Tools Cat Iii 600v Ing-pt 2 Pcs Fish Tape/wire Puller-65f Longx1/8inch Wide Steel 2 Pcs Hard Hat For Head Protection 2 Pcs Heavy Duty Heat Gun-2000w-220v-dual Control Setting 2 Pcs Industrial Tool Pouch 2 Pcs Digital Ac Clamp Meter Tester Electrical Tool Ipt 2 Pairs Xl Microfiber Mechanic Gloves 2 Pcs Multipurpose Aluminum Ladder-12feet 2 Pc2 One Piece Forged Claw Hammer (16oz) 2 Units Rotary Hammer Drill With Chipping Gun-1050w 2 Sets Premium Vde 11pcs Insulated Hand Tools Set (w/ Case) Gs Approved V83411 Lot 3 - Welding Tools And Equipments (abc - 124,720.00) 5 Pcs Anvil, Pure Steel, 11kg 5 Pcs Chipping Hammer 500g 5 Boxes Cutting Disc 4", 10 Pcs 5 Sets Ear Plugs Industry Anti Noise 3m 5 Units Fully Inverter Flux Cored Portable Welding Machine (set), 165v-220v, Mma , Tig , Mig 0.8 , Mig 1.0 5 Boxes Grinding Disc 4", 25 Pcs / Box 5 Pcs Groove Steel (1m/pc Hgv V- Track) 5 Pcs Heavy Duty Tool Box Organizer 20" 5 Units Industrial Angle Grinder 750w, 4", 220-240v 5 Pcs Leather Apron (black) 97cm 5 Pcs Long Sleeves Welding Protection, 22.6" 5 Boxes Metal File (t12 High Carbon Steel), 17 Pcs 5 Pcs Multi-purpose Mig Welding Pliers, 8", Fully Hardened And Tempered 5 Pcs Round Aluminum Tube 300mm, Length 12mm, Od 8mm 10 Pcs Safety Glasses (3mm Thick, Scratch Resistant And Fog Free) 10 Pcs Welding Clamps, C-angle, 250 * 110mm / 9.8 * 4.3in 5 Pairs Welding Gloves, Heavy Duty, Size 14 5 Pcs Welding Helmet, Auto Darkening, 110mm * 90mm 5 Boxes Welding Rod/electrode, 2.5mm X 30cm, Approx. 50pcs / Box Lot 4 - Baking Materials Tools & Equipments / Gas Range (abc - 24,944.00) 1 Set Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 2 Boxes Thick Silicon Baking Gloves 1 Set Aluinum Round Baking Pans Set Of 6 Atleast 3 Inches Height (7-11inches) 1 Set Aluminum Rectangular Baking Pans Set Of 6 At Least 3 Inches Height (9-14 Inches) 3 Pcs 12 Holes Square Carbon Steel Non-stick Cupcake Mold Muffin Tray Pan Bakeware 3oz 3 Pcs Mixing Bowl Stainless 30cm Height 13.3cm 4.0l 1 Pc Electric Hand Mixer With Stand And Stainless Steel Bowl 2 Pcs Stainless Steel Wire Whisk 12inches 1 Set Silicon Rubber Spatula Set (3pcs) 2 Sets Piping Set With Nozzles 2 Sets Plastic Measuring Cups And Spoon Set 1 Set 3pcs In 1 Set Slicer, Design Maker - Cake Scrapper 1 Pc Heavy Duty Wooden Rolling Pin (16 Inches) 1 Pc Digital Kitchen Weighing Scale 4 Pcs Flat Sheet Baking Tray 12' X 16' 2 Pcs Bread/loaf Moulder Set (3pcs) (s,m,l) 1 Pc Double Pocket Splash Proof Apron (pc) 1 Pc Kitchen Hairnet Cap (pc) 4 Packs Disposable Plastic Hand Gloves 100pcs (pack) 20 Trays Large Eggs 33 Packs White Refined Sugar 500g / Pack 40 Packs All Purpose Flour 1kg / Pack (class A) 8 Packs Yeast 500g / Pack Lot 5 - Baking Materials Tools & Equipments (abc-49,888.00) 2 Pcs Electric Oven 80l 4 Boxes Thick Silicon Baking Gloves 2 Sets Aluminum Round Baking Pans Set Of 6 At Least 3 Inches Height (7-11inches) 2 Sets Aluminum Rectangular Baking Pans Set Of 6 At Least 3 Inches Height (9-14 Inches) 4 Sets 12 Holes Square Carbon Steel Non-stick Cupcake Mold Muffin Tray Pan Bakeware 3oz 6 Pcs Mixing Bowl Stainless 30cm Height 13.3cm 4.0l 2 Pcs Electric Hand Mixer With Stand And Stainless Steel Bowl 4 Pcs Stainless Steel Wire Whisk 12inches 2 Sets Silicon Rubber Spatula Set (3pcs) 4 Pcs Piping Set With Nozzles 4 Sets Plastic Measuring Cups And Spoon Set 2 Sets 3pcs In 1 Set Slicer, Design Maker - Cake Scrapper 2 Pcs Heavy Duty Wooden Rolling Pin (16 Inches) 2 Pcs Digital Kitchen Weighing Scale 8 Pcs Flat Sheet Baking Tray 12' X 16' 4 Sets Bread/loaf Moulder Set (3pcs) (s,m,l) 2 Pcs Double Pocket Splash Proof Apron (pc) 2 Pcs Kitchen Hairnet Cap (pc) 4 Packs Disposable Plastic Hand Gloves 100pcs (pack) 20 Trays Large Eggs 40 Packs White Refined Sugar 500g / Pack 64 Packs All Purpose Flour 1kg / Pack (class A) 14 Packs Yeast 500g / Pack Lot 6 - Snack Vending Materials Tools & Equipments, "ihaw-ihaw" (abc - P24,944.00) 1 Pc Glass Food Display 1 Pc Stainless Steel Charcoal Barbeque Grill 100*33.5*70cm Heavy Duty 1 Pc Retractable 3x3 Tent 5 Packs Plastic Cups Disposable 12oz- 50pc 5 Packs Plastic Cups Disposable 16oz- 50pc 2 Pcs Juice Container With Laddle 2 Pcs Square Table 1 Sack Charcoal 5 Kg Boneless Pork Meat For Bbq 1 Bottle Soy Sauce , 1.5l To 2l / Bottle 1 Bottle Vinegar, 1.5 L To 2l / Bottle 10 Packs Hotdog Classic, 500g / Pack 5 Packs Brown Sugar , 1 Kg. / Pack 5 Packs Black Pepper 1 Kg. / Pack 10 Kg Isaw 10 Kg Day-old 10 Kg Bugok 1 Pc Double Pocket Splash Proof Apron 1 Box Kitchen Hairnet Cap 1 Box Disposable Plastic Hand Gloves 100pcs Lot 7 - Carinderia Material Tools And Equipments, "pancit" / "sopas" (abc - 24,944.00) 1 Set Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 2 Sets Square Plastic Table With 4 Pcs Chair 2 Pcs Wide Umbrella With Adjustable Extension Handle 40" 2 Pcs Water Jug Cooler, 8l 1 Pc Ice Box Cooler 30liters 1 Pc Pot Double Handle, 30x30x21cm, Aluminum 2 Pcs Talyasi 42cm 4 Pcs Casserole 24cm, Swing Handle With Cover, Stainless Steel 4 Pcs Ladle 41cm, Stainless Steel 2 Packs Fork, Stainless Steel (by 12s) 2 Packs Spoon, Stainless Steel (by 12s) 4 Packs Serving Spoon, 8.5", Stainless Steel (by 12s) 4 Pcs Plastic Bowl 6" Round, Reusable (by 12s) 1 Container Soy Sauce 3.75l / Container 2 Containers White Vinegar 3.75l / Container 2 Containers Cooking Oil 3.75l / Container 4 Trays Egg (medium/tray) 4 Packs Iodized Salt 1kg / Pack 8 Kgs Pork Lean Meat 1kg / Pack 10 Kgs Whole Dressed Chicken, Approx 1 Kg / Pc 6 Kgs Elbow Pasta 1kg 10 Kgs Miki Lot 8 - Carinderai Materials Tools & Equipments (abc-74,832.00) 3 Sets Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 3 Sets Square Plastic Table With 4 Pcs Chair 3 Pcs Wide Umbrella With Adjustable Extension Handle 40" 3 Pcs Water Jug Cooler, 8l 3 Pcs Ice Box Cooler 30liters 3 Pcs Pot Double Handle, 30x30x21cm, Aluminum 3 Pcs Kawali With Single Handle 34cm, Aluminum 12 Pcs Casserole 24cm, Swing Handle With Cover, Stainless Steel 12 Pcs Food Warmer/ Tray With Cover 32x26x8cm, Rectangle Stainless 3 Pcs Ladle 41cm, Stainless Steel 6 Packs Fork, Stainless Steel (by 12s) 6 Packs Spoon, Stainless Steel (by 12s) 3 Packs Serving Spoon, 8.5", Stainless Steel (by 12s) 6 Packs Plastic Plates 10" Round, Reusable (by 12s) 6 Containers Soy Sauce 3.75l / Container 6 Containers White Vinegar 3.75l / Container 6 Containers Cooking Oil 3.75l / Container 12 Packs Brown Sugar 1kg / Pack 12 Packs Iodized Salt 1kg / Pack 15 Kgs Beef Sirloin, @ 1kg / Pack 30 Kgs Pork Lean Me1at 1kg / Pack 30 Kgs Whole Dressed Chicken, Approx 1 Kg / Pc. 3 Sacks Well-milled Rice (50 Kgs / Sack) Lot 9 - Fried Chicken Vending Materials, Tools & Equipments (abc-24,944.00) 1 Set Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 1 Set Monoblock Dining Table With Monoblock Chair Set (30x30) Four Seater 1 Pc Wide Umbrella With Adjustable Extension Handle 40" 5 Packs Disposable Plastic Cups (6oz X 50pcs) 5 Packs Disposable Plastic Cups (10oz X 50pcs) 2 Pcs Juice Container With Ladle 10l Capacity 8 Packs Powdered Juice 500g (gulaman, Melon, Buko Pandan) 2 Pcs Stainless Skimmer/strainer With Long Handle 18cm 2 Pcs Deep Frying Pan (medium) 4 Pcs Rectangle Stainless Food Warmer/ Tray With Cover 32x26x8cm 4 Containers Cane Vinegar 3.78l / Container 4 Containers Banana Catsup 3.2kg / Container 8 Kg Flour (1kg/ Pack 8 Kg Fried Chicken Breading Mix 1kg / Pack 10 Packs Iodize Salt 1kg / Pack 10 Packs Chicken Quarter Leg Part, @ 1 Kilo / Pack 10 Packs Chicken Wings, @ 1 Kilo / Pack 10 Containers Cooking Oil 3.78l / Container 5 Trays Chicken Egg (30pc Large Size) 1 Pc Double Pocket Splash Proof Apron 1 Box Kitchen Hairnet Cap 2 Boxes Disposable Plastic Hand Gloves 100pcs Lot 10 - Motorcycle Parts Supply Materials (p49,888.00) 12 Pcs Exterior Tire Motorcycle(300x17) 12 Pcs Exterior Tire Motorcycle (250x17) 4 Pcs Motorcycle Battery 3l 4 Pcs Motorcycle Battery 4l 4 Pcs Motorcycle Battery 6.5l 14 Bottles Motorcycle Oil 1l / Bottle 14 Bottles Motorcycle Oil 800 Ml / Bottle 14 Bottles Motorcycle Oil 1l / Bottle 14 Bottles Motorcycle Oil 800 Ml / Bottle 14 Pcs 2 Stroke Motor Oil 350ml 16 Pcs Motorcycle Chain #428h 110l 16 Pcs Motorcycle Chain #428h 120l 14 Pcs Wheel Bearing #6202, Heavy Duty 14 Pcs Wheel Bearing #6305 , Heavy Duty 14 Pcs Wheel Bearing #6306, Heavy Duty 30 Pcs Grease (sachet, Approx. 10g) Lot 11 - "puto" Making Materials Tools & Equipments (abc-24,944.00) 1 Set Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 2 Pcs Strainer (fine) Stainless Steel (big) 2 Pcs Puto Moulder (medium X 50 Pcs) 34 Packs Cassava Flour 1kg / Pack 20 Cans Evap Milk 410ml 3 Pcs Mixing Bowl Stainless 30cm Height 13.3cm 4.0l 2 Pcs Stainless Steel Wire Whisk 12inches 10 Packs White Refined Sugar 500g / Pack 10 Packs Brown Sugar 500g / Pack 1 Set Plastic Measuring Cups And Spoon Set 1 Pc Digital Kitchen Weighing Scale 20 Pcs Plastic Bilao 12" 20 Pcs Plastic Bilao 14" 20 Pcs Palstic Bilao 16" 20 Pcs Plastic Bilao 18" 1 Pc Double Pocket Splash Proof Apron (pc) 1 Pc Kitchen Hairnet Cap (pc) 1 Roll Aluminum Foil (12" X 30m) 1 Roll Cling Wrap (12" X 30m) 4 Packs Food Coloring, Powder, 125g/ Pack(yellow, Violet, Red, Green) 4 Bottles Food Flavoring, Liquid 375 Ml / Bottle (pandan, Ube, Banana, Vanilla) 4 Boxes Cheese 450g / Box 1 Pack Disposable Plastic Hand Gloves 100pcs (pack) 10 Trays Large Eggs 2 Pcs 3 Layer Aluminum Steamer 46cm 34 Packs All Purpose Flour 1kg / Pack(class A) 7 Packs Yeast 500g / Pack Lot 12 - Sari-sari Store Supplies (abc-249,440.00) 10 Boxes Pancit Canton Original 80g/box 72pcs / Box 10 Boxes Pancit Canton Calamansi 80g Box 72pcs / Box 10 Boxes Instant Noodles Chicken 55g Box 72pcs / Box 10 Boxes Sardines Green 155g /can, 100 Cans / Box 10 Boxes Sardines Red 155g / Can, 100 Cans / Box 10 Boxes Corned Beef 150g / Can, 48 Cans / Box 10 Boxes Meatloaf 150g/can, 48 Cans / Box 200 Cans L Evaporated Liquid Creamer 360ml 200 Cans Condensed Milk 390g 600 Bottles Fish Sauce 100ml 600 Bottles Vinegar 100ml 600 Bottles Soy Sauce100ml 40 Ties Creamy Latte Coffee Mix 3 In 1 Twin Pack (by 10 Packs / Tie) 40 Ties White Coffee Mix 3-in1 Twin Pack (by 10 Packs / Tie) 40 Ties Twin Pack 3 In 1 Coffe, Brown (by 10 Packs / Tie) 40 Ties Powdered Milk Drink Swak 33g By (by 8s / Tie) 40 Ties Powdered Chocolate Drink 24g (by 10's / Tie) 190 Packs Brown Sugar 500g / Pack 200 Packs White Refined Sugar 500g / Pack 80 Packs Iodized Salt, 1 Kg / Pack 40 Ties All In One Food Seasoning Granules, Powder, 8g /sachet, 14 Tsachet / Ties 50 Ties Detergent Powder Soap, Twin Pack, Active Clean Technology, (by 12s / Tie) 50 Ties Detergent Powder Soap, Twin Pack, Perfect Clean, (by 12s / Tie) 50 Ties Detergent Powder Soap, W/ Oxyclean Power, Twin Pack (by 12s / Tie) 60 Ties Anti Kulob Fabric Conditioner 28ml (by 12s / Tie) 40 Ties Fabric Softener, / Conditioner W/ Perfume Capsules 25-28ml / Sachet (by 12s / Tie) 50 Ties Naturals Shampoo, Twin Pack (by 12s / Tie) 40 Ties Smooth & Manageable Shampoo, Twin Pack (by 12s / Tie) 50 Ties Anti Dandruff Shampoo Twin Pack (by 12's / Tie) 50 Ties Bath Soap / Germicidal Soap, 60g 12's / Tie 40 Bottles Dishwashing Liquid 40ml / Bottle Lot 13 - Snack Vending Materials Tools & Equipments (abc-24,944.00) 1 Set Double Burner With 11kg Gas Tank With Clamp, Regulator, And Hose 1 Set Square Plastic Table With 4 Pcs Chair 1 Pc Wide Umbrella With Adjustable Extension Handle 40" 1 Pc Water Jug Cooler, 8l 2 Pcs Juice Container 10l With Ladle, 37.5x22.5x31.5cm, Rectangular 1 Pc Ice Box Cooler 30liters 2 Pcs Kawali With Single Handle 34cm, Aluminum 4 Pcs Food Warmer/ Tray With Cover 32x26x8cm, Rectangle Stainless 1 Pc Ladle 41cm, Stainless Steel 2 Pcs Skimmer/strainer With Stainless Long Handle 20cm, Stainless Steel 5 Pcs Canister/ Container 750ml, Round, Transparent, Reusable Plastic 4 Pcs Food Tong 9", Stainless Steel 2 Pcs Food Tong 14", Stainless Steel 10 Packs Disposable Plastic Cups 8oz (50s) 10 Packs Disposable Plastic Cups 12oz (50s) 10 Packs Bamboo Skewers (by 100s) 1 Container Cooking Oil, Pure Vegetable, 16kg, 14l 4 Containers Soy Sauce , Made From Premium Soybeans, 3.75l / Container 4 Containers Cane Vinegar 3.75l / Container 2 Containers Banana Catsup 3.75l / Container 10 Packs Brown Sugar 1kg / Pack 10 Packs Iodized Salt 1kg / Pack 10 Packs All Purpose Flour 1kg / Pack 20 Packs Fishball 1kg / Pack 20 Packs Kikiam 500g / Pack 20 Packs Chicken Balls 250g / Pack 20 Packs Squid Balls 250g / Pack 10 Packs Jumbo Hotdog 500g/ Pack 5 Trays Eggs Small 30pcs 2 Packs Powdered Juice 500g / Pack (melon) 2 Packs Powdered Juice 500g / Pack(sago’t Gulaman) Lot 14 - Talipapa Supplies & Equipment (abc-174,608.00) 7 Units Chest Freezer (at Least 3.7 Cu Ft.) 14 Bundles Sando Bag Small (100pcs/pack) 14 Bundles Sando Bag Medium (100pcs/pack) 35 Packs Hotdog Jumbo 1kg / Pack 35 Packs Hotdog Classic 500g / Pack 35 Packs Jumbo Hotdog 500g/ Pack 35 Packs Regular Cheesedog 250g / Pack 35 Packs Regular Chicken Hotdog 250g 35 Kgs Whole Chicken (kg), Approx. 1 Kg / Pc 35 Trays Egg Small (tray) 161 Bottles Fish Sauce 100ml / Bottle 35 Packs Iodized Salt, 1 Kg / Pack 35 Packs Food Seasoning Powder Granules 8g / Sachet, 14 Sachet / Pack 35 Packs Beef Tapa 250g / Pack 35 Packs Pork Tapa 250g / Pack 35 Packs Pork Tocino 250g / Pack 35 Packs Boneless Bangus 3pcs / Pack 35 Packs Regular Sweet Ham 250g / Pack 35 Packs Whole/cracked/ground Pepper , Approx 0.25g / Sachet 35 Packs Monosodium Glutamate , Umami Flavor, Msg 12g /sachet, 18 Sachet /pack 35 Packs Ginisa Flavor Seasoning Mix 7g To 8g / Sachet, 16 Sachets / Pack 35 Packs Sinigang Sa Sampaloc Mix 22g / Sachet (by 12s) 35 Packs Pork/chicken/beef Cubes 10g / Cubes, (by 12s / Pack) 7 Pcs 10kg Capacity Analog Weighing Scale 35 Kg Red Onion (kg) 35 Kg Garlic (kg) 28 Packs Chicken Ball 500g / Pack 28 Packs Squid Ball 500g / Pack 28 Packs Lumpiang Shanghai 30pcs / Pack 35 Packs Chicken Skinless Longganisa 250g / Pack Lot 15 - Ukay2 Vending Supplies (abc-p24,944.00) 1 Bale Pants (1 Bale) 1 Bale Kids Clothes (1 Bale) 1 Bale T-shirts Adults (1 Bale) 1 Bale Short Pants Adult (1 Bale) 1 Bale T-shirts (1 Bale) Prospective Bidders Should Have Experienced An Undertaking Similar To The Abovementioned Project With An Amount Of At Least 50% Of The Abc. The Eligibility Check / Screening As Well As The Preliminary Examination Of Bids Shall Use Non-discretionary “pass Or Fail” Criteria. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least (60%) Interest Of Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Organization Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. All Particulars Relative To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bid Conference, Bid Evaluation, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of Ra 9164 And Its Revised 2016 Irr-a. Failure To Submit The Required Document Under The Bidding Documents Or The Submission Of A Document Which Does Not Comply With The Legal Formalities, Shall Be Rated “failed” The Local Government Unit Of San Agustin, Isabela Reserves The Right To Reject Any Or All Bids, Waive Any Required Formality And Award The Contract To The Bidder Whose Proposal Has Been Evaluated By The Bac As The Most Advantageous To The Local Government Unit And The Right To Confiscate The Bid Bond And/or Pursue Appropriate Legal Action Should The Winning Bidder Refuse To Accept The Award. Further, The Local Government Unit Of San Agustin, Isabela Assumes No Obligations Whatsoever To Compensate Or Indemnify The Bidder For Any Expense Or Loss That They May Incur In This Undertaking Nor Does It Guarantee That An Award Will Be Made.
Closing Date28 Nov 2024
Tender AmountPHP 997.7 K (USD 17.1 K)
City Of Canlaon Tender
Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Republic Of The Philippines City Of Canlaon Office Of The Bids And Awards Committee Invitation To Bid For The Early Procurement Activity (epa) For The Procurement Of Construction Materials For The Construction Of Cr The Local Government Of Canlaon City, Through The Aip 2025 Intends To Apply The Sum Three Hundred Twenty-one Thousand, Five Hundred Eighty-eight (p321,588.00) Being The Abc To Payments Under The Contract For The Supply And Delivery Of Various Construction Materials For Use In The Construction Of Cr, Gaboc Plaza, Brgy. Malaiba, Canlaon City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Award Of The Contract Is Subject To The Effectivity Of The General Appropriations Act (gaa) For Fy 2025. The Local Government Of Canlaon City Is Conducting This Procurement Through The Early Procurement Activity (epa) For Fy 2025 To Ensure The Timely Delivery Of Goods, Implementation Of Infrastructure Projects And Rendition Of Consultancy Services, Consistent With The Gppb Resolution No. 14-2019 Dated July 17, 2019. Epa Shall Refer To The Conduct Of Procurement Activities, From Posting Of The Procurement Opportunity, If Required, Until Recommendation Of The Bids And Awards Committee (bac) To The Hope As To The Award Of The Contract For Goods To Be Delivered, Infrastructure Projects To Be Implemented And Consulting Services To Be Rendered In The Following Fiscal Year (i.e Fy 2025), Pending Approval Of Their Respective Funding Sources. The Bidders, Therefore, Are Herewith Informed Of The Following: A. Interested Bidders Are Invited/requested To Submit Their Bid Proposals Based On Indicative Budget (i.e. Subject To Final Approval) Through This Invitation To Bid, Together With The Bidding Documents; B. The Local Government Of Canlaon City, Will Evaluate The Bid Proposal And Determine The Winning Bidder. The Financial Bid Proposal Of The Winning Bidder Will Be The Contract Price/amount Which Is Considered Fixed Price. However, The Notice Of Award (noa) Will Only Be Issued Upon The Approval Of The Budget. C. Would There Be A Delay In The Award As Affected By The Possible Delay In The Budget Approval, The Bid Validity As Specified In The Bidding Documents (which Is A Maximum Of 120 Calendar Days), The Winning Bidder May Be Requested To Extend The Validity, If The Bidder Refuses To Extend The Bid Validity, The Bid Submitted By Said Bidder Will Be Rejected. The Local Government Of Canlaon City, Now Invites Bids For The Supply And Delivery Of Various Construction Materials For Use In The Construction Of Cr, Gaboc Plaza, Brgy. Malaiba, Canlaon City. Delivery Of The Goods Is Required 7 Calendar Days After Issuance And Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Ten Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184 Interested Bidders May Obtain Information For The City Government Of Canlaon City Thru The Office Of The Bids And Awards Committee And Inspect Bidding Documents During Office Hours (8:00am To 5:00pm), Monday To Friday. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On November 4, 2024 To November 25, 2024 Until 10:00 Am At The Office Of The Bids And Awards Committee, Canlaon City, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos Only (p500.00) Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Facsimile. The Local Government Of Canlaon City Will Hold A Pre-bid Conference On November 12, 2024 – 2:00 Pm At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City, Which Shall Be Open To Prospective Bidders Bids Must Be Received By The Bac Secretariat Through Manual Submission On Or Before November 25, 2024, 10:00 Am At The Office Of The Bids And Awards Committee, 2nd Floor, City Hall Building, Canlaon City. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On November 25, 2024, 10:00 Am At The At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. For The Purpose Of Constituting A Quorum, Either The Physical And Virtual Presence Of The Bac Member Shall Be Considered Pursuant To Gppb Resolution No. 09-2020. The Local Government Unit Of Canlaon Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Alice D. Mcguiggan Bac Secretariat Mobile No. 0917-561-7931 Email Address: Bacofficelgucanlaon@yahoo.com Date Of Posting: November 3, 2024 Doris Y. Flores Bac Chairperson Republic Of The Philippines City Of Canlaon Bids And Awards Committee Control No.: #1 Bid Form Name Of Project: Construction Of Cr Brief Description: Supply And Delivery Of Various Construction Materials Location: Gaboc Plaza, Brgy. Malaiba, Canlaon City Bill Of Quantities Stock No. Quantity Unit Item Description Unit Cost Unit Cost Total Cost 1. 4 Shts 0.40mm Thk Corr. Gi Roofing Sheet X 10' 819.00 2. 4 Shts 0.40mm Thk. Plain Gi Sheet X 8' 670.00 3. 5 Sets. 0.70m X 2.10 Pvc Door, White W/ Complete Accessories (hinges And Screws) 3,137.00 4. 10 Pcs. ½"ф Pvc Coupling, Blue 11.00 5. 34 Pcs. ½"ф Pvc Elbow 90°, Blue 16.00 6. 10 Pcs. ½"ф Pvc Female Adapter, Blue 23.00 7. 4 Pcs. ½"ф Pvc Gate Valve, Blue 385.00 8. 12 Pcs. ½"ф Pvc Pipe, Blue 110.00 9. 11 Pcs. ½"ф Pvc Tee, Blue 20.00 10. 8 Pcs. 1" X 2" X 20' Tubular Section Section/rhs, Gi 545.00 11. 6 Pcs. 1.0mm Thk 2" X 3" C-purlins, Gi 779.00 12. 1 Pcs. ¼" X 1" X 20' Flat Bar 567.00 13. 5 Shts ¼" X 4' X 8' Ordinary Plywood 547.00 14. 4 Pcs. ⅛"x1"x1" Angular Bar 435.00 15. 5 Pcs. 10mm Square Bar 246.00 16. 122 Pcs. 10mmф Def. Bar 239.00 17. 2 Pc. 13"ф Cutting Disc For Cut-off Machine 578.00 18. 1 Pc. 14"ф Diamond Tile Cutter Blade 526.00 19. 1 Pc. 14"ф Disc Cutter For Cut-off 578.00 20. 5 Pcs. 2"ф Pvc Coupling, Orange 25.00 21. 2 Pcs. 2"ф Pvc Elbow 45°, Orange 29.00 22. 10 Pcs. 2"ф Pvc Elbow 90°, Orange 37.00 23. 10 Pcs. 2"ф Pvc Pipe S-500, Orange 145.00 24. 1 Pc. 2"ф Pvc Sanitary Pipe, Orange 150.00 25. 2 Pcs. 2"ф Pvc Tee 51.00 26. 6 Kgs. 2.40mmф E6013 Ordinary Welding Rod, Wipweld 176.00 27. 11 Pcs. 4" X 4" Pvc Floor Drain 100.00 28. 36 Pcs. 4"ф Cutting Disc 150.00 29. 2 Pcs. 4"ф Grinding Disc 317.00 30. 2 Pcs. 4"ф Pvc Clean Out With Plug 112.00 31. 10 Pcs. 4"ф Pvc Coupling, Orange 50.00 32. 5 Pcs. 4"ф Pvc Elbow 90°, Orange 108.00 33. 11 Pcs. 4"ф Pvc Pipe S-500, Orange 391.00 34. 2 Pcs. 4"ф Pvc Tee, Orange 204.00 35. 5 Pcs. 4"ф Pvc Wye, Orange 195.00 36. 2 Pcs. 4"ф X 2"ф Reducer Tee, Orange 145.00 37. 6 Pcs. 4"ф X 45° Elbow, Orange 81.00 38. 850 Pcs. 4"x8"x16"chb 19.00 39. 134 Bd.ft. 50-2"x2"x8' Rough Lumber, Gemelina 55.00 40. 1 Sht. 8"x8" Tarpaulin W/print 4,500.00 41. 20 Kgs. Abc Tile Grout, Gray 2kg/pack 83.00 42. 9 Cu.m. Crushed Gravel ¾" 2,378.00 43. 2 Kg. Cwnails 1½ 101.00 44. 5 Kg. Cwnails 2" 97.00 45. 7 Kgs. Cwnails 3" 92.00 46. 10 Kgs. Cwnails 4" 89.00 47. 100 Pcs. Espana Classic, 40cm X 40cm, Floor Tiles Misty Grey 110.00 48. 10 Pcs. Faucet, Water Tee 185.00 49. 15 Cu.m. Fine Sand 1,348.00 50. 3 Mtrs. Flexible Conduit Pipe, ½"ф Upvc Coilable, Moldex, Orange 30.00 51. 15 Kg. Ga. 16 Gi Tie Wire 103.00 52. 24 Pcs. Glass Block, 8" X 8", Clear 300.00 53. 11 Bags Heavy Duty Tile Adhesive, 25kg/bag 550.00 54. 2 Bags Heavy Duty Tile Adhesive, 25kg/bag 550.00 55. 135 Pcs. Italgress Premium, Wall Tiles 60cm X 60cm Terrazo Gray 215.00 56. 5 Sets. Keyless, Door Knob, W/complete Accessories 1,500.00 57. 30 Pcs. Master Tile Trim, 10mm X 2.50m Aluminum/silver 185.00 58. 13 Pcs. Master Tile Trim, 10mm X 2.50m Aluminum /silver 185.00 59. 2 Pcs. Paint Brush 2" 52.00 60. 70 Pcs. Platinum Thomson, Wall Tiles 30cm X 60cm Grey 140.00 61. 5 Sets. Porcelain Water Closet, Pail Flush 2,500.00 62. 214 Bags Portland Cement, Republic 272.00 63. 6 Can Pvc Solvent, 200ml 110.00 64. 2 Gals Red Lead, Primer Paint 1,015.00 65. 5 Rolls Teflon Tape ¾", Tombo 44.00 66. 132 Pcs. Tekscrew For Metal 2½" 5.00 67. 2 Pcs. Utility Box, 2"x4" Upvc Orange Color 35.00 Total Brand Model:_____________ Delivery Period:______________________ Warranty: After Having Carefully Read & Accepted Your General Conditions. I/we Quote On The Item/s Price/s Noted Above. Total Bid Price (in Words) Bid Security: Amount: Submitted By: Bidder/supplier Date:_________________________
Closing Date25 Nov 2024
Tender AmountPHP 321.5 K (USD 5.5 K)
Department Of Agriculture Tender
Others
Philippines
Details: Description Invitation To Bid For The Provision Of Security Services Of Da Rfo 1 For The Period Of January 1, 2025 To December 31, 2025 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of Sixteen Million Six Hundred Sixty-seven Thousand Forty Pesos (php16,667,040.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Provision Of Security Services Of Da Rfo 1 For The Period Of January 1, 2025 To December 31, 2025 With Project Identification Number Da-rfo-1-2025-goods-002. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Particulars/descriptions Da Rfo-i Proper (city Of San Fernando, La Union), 3 Posts With 3 Regular Shifts Per Post Da Iliarc, Sapilang (bacnotan, La Union), 1 Post With 3 Regular Shifts Per Post 1 Night Shift Da-prec, Sta. Barbara, Pangasinan (main Office), 1 Post With 3 Regular Shifts Per Post Plus 1 Night Shift Da-prec, Sta. Barbara, Pangasinan (breeding Station), 1 Post With 3 Regular Shifts Per Post Plus 1 Night Shift Da-prec, Sual, Pangasinan, 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-prec, Sual, Pangasinan (incubation Hub), 3 Posts With 3 Regular Shifts Da-inrec (batac Office), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-inrec (dingras Livestock Station), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-inrec (dingras Admin Office/crops Station), 1 Post With 3 Regular Shifts Plus 1 Night Shift Da-regional Integrated Agricultural Laboratories (rial) Building In Tebag, Sta Barbara, Pangasinan, 1 Post With 3 Regular Shifts Koica Rpc, Sta. Barbara, Pangasinan, 1 Post With 3 Regular Shifts Isrec, San Juan, Ilocos Sur, 1 Post With 3 Regular Shifts Plus 1 Night Shift Total Number Of Guards = 56 For Night Shift 9:00 Pm To 5:00 Am Regular Shift (3 Shifts 7:00am To 3:00pm; 3:00pm To 11:00pm; 11:00pm To 7:00am) Terms And Conditions: I. Security Service Provider Guarantees To Deploy Licensed, Competent, Uniformed, Armed And Bonded Security Guards In Accordance With R.a. 5487 As Amended, To Wit: 1. Filipino Citizen, Of Legal Age But Not Over 55 Years Of Age; 2. Physically, Psychologically And Mentally Fit In Accordance With Para-military Standards Including Height And Weight; 3. Neuro-psychological And Drug-test Eligible; 4. Of Good Moral Character, Cleared By Law Enforcement Agencies W/ No Derogatory Record Of Criminal Offense, Moral Turpitude Or Previous Conviction Of Any Wrong Doing; 5. Alert, And Preferably With Functional Emergency Or Disaster Preparedness Training Certified By Concerned Agencies; 6. No Record As Adversarial Party To Any Previous Or Pending Judicial Or Quasi-judicial Case With Da Rfo 1 Or Its Stations; 7. With Agency-paid And Up-to-date/timely Remittance Of Sss, Philhealth Or Pag-ibig Premiums; 8. Preferably Knows How To Drive, With Professional Driver's License; 9. Preferably With Personal Accident Insurance; 10. Must Be Neat And Clean In Proper Uniform And Armed With A Functional Long Fire Arms (shotgun For Stations) Or Pistol With Ammunition And Metal Detector At All Times During His/her Tour Of Duty. Ii. Security Service Provider Must Comply With The Additional Set Of Technical Parameters For Security Guards Pursuant To Gppb Res. 024-2007, Dated September 28, 2007. Iii. The Security Service Provider Must Be An Active Employer Registered With The Following Agencies: (1) Social Security System (sss); (2) Home Development Mutual Fund (pag-ibig Fund), And (3) Philippine Health Insurance Corporation (philhealth). Iv. The Security Service Provider Must Provide, Install And Maintain Cctv Cameras With Complete Accessories For The Security Purposes Of The Following Offices/stations: 1. Da Rfo1 (43 Cameras) 2. Inrec Batac (35 Cameras) 3. Inrec Dingras (18 Cameras) 4. Isrec San Juan (10 Cameras) 5. Iliarc (20 Cameras) 6. Prec Sta. Barbara (main) (38 Cameras) 7. Prec Sta. Barbara (breeding) (18 Cameras) 8. Prec Sual (19 Cameras) 9. Prec Sual (incubation Hub) (10 Cameras) 10. Rial-sta. Barbara, Pangasinan (5 Cameras) V. Security Service Provider Must Submit The Ff: (1) Dole Certification Of Bidder's Compliance With Existing Labor Laws; (2) Certification From Nlrc Indicating That The Bidder Has No Pending/on-going Cases; (3) Dole Registration As Service Contractor Pursuant To Dole Department Order No. 174, Series Of 2017; (4) Sworn Statement Of The Bidder Of No Adverse Decision Rendered By The Dole And Nlrc Within Five (5) Years. Vi. The Security Service Provider Must Have Security Plans Which Shall Be Carried Out In All Offices/stations Where Guards Will Be Posted And Must Pay The Salary Of The Security Personnel On Time. Vii. The Security Service Provider Must Provide Copy For Da-rfo 1 The Ff: (1) Good Moral Character, Cleared By Law Enforcement Agencies W/ No Derogatory Record Of Criminal Offense, Moral Turpitude Or Previous Conviction Of Any Wrong Doing; (2) Neuro-psychological Eligibility; (3) Drug-test Eligibility. Viii. The Security Service Provider Must Be Willing To Allow Its Security Guards To Be Subjected To Further Neuro Psychological And Drug Testing As May Be Necessary Upon Due Notice. Ix. The Security Service Provider Must Have Headquarters/offices/ Supervisors Within The Province Of Deployment Of The Security Guards To Enable Them To Conduct Inspection Or Supervision Even During Wee Hours. X. The Security Service Provider Must Provide One (1) Motorcycle Service For Incubation Hub-sual, Pangasinan. The Contract For The Provision Of Security Service Shall Start On January 1, 2025. Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From October 30, 2024 To November 18, 2024 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php25,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 06 November 2024, 10:00 Am At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 18 November 2024, 2:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 18 November 2024, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1 Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2 The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ October 29, 2024 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-002
Closing Date18 Nov 2024
Tender AmountPHP 16.6 Million (USD 286.1 K)
CENTRALE UNICA DI COMMITENZA TRA I COMUNI DI VIMODRONE, CASSINA DE' PECCHI, RODANO, PIOLTELLO, CAMBIAGO Tender
Italy
Details: The service includes ordinary and extraordinary maintenance interventions of green areas, transit and connection avenues, attached courtyards, tiled and brecciated areas and irrigation systems, with the aim of protecting the vegetative well-being of all public herbaceous, shrubby and arboreal plant species. , Ensuring the aesthetic decoration of the green areas as a whole, proceeding, where necessary, with the restoration of situations of aesthetic, functional and agronomic degradation, with the removal of risk situations, with extraordinary maintenance interventions. Ordinary maintenance consists, mainly but not exhaustively, of: ▪ lawn maintenance; ▪ Maintenance of hedges, shrubs and bushes; ▪ Expeditious Tree Maintenance (suckering, trunk cleaning, dry branches, etc.); ▪ Execution of ordinary fertilization and phytosanitary interventions; ▪ Management of Irrigation Systems; ▪ Maintenance of gravelled areas, roads/avenues and driveways; ▪ Management of braces and anchors; ▪ Management of foreign material and waste; ▪ Maintenance of grass sports fields; ▪ Maintenance of equipped play areas; Extraordinary maintenance concerns, predominantly but not exhaustively, the following interventions which are predictable but not repetitive and/or programmable as they are connected to factors for which it is not possible to predict a priori frequency and quantity: ▪ Tree foliage pruning interventions (stage raising, training, reduction, dry cleaning, containment); ▪ Tree felling operations, both isolated and in groups; ▪ Stump Removal Interventions; ▪ Arboricultural care (consolidations, root treatments, special pruning, endotherapy, etc.); ▪ Supply and planting of new trees, shrubs, hedges and ground covers, including preparatory materials and activities; ▪ Emergency Irrigation; ▪ Construction and repair of irrigation systems; ▪ Special needs due to extraordinary or unexpected and unpredictable interventions.
Closing Date28 Nov 2024
Tender AmountEUR 4 Million (USD 4.3 Million)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|25|300|0001ab|lot|see Dd1423|0001ac|1|180||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report |material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other
|tbd|n00104|tbd|certifications - N39040; Material -s4306a|n50286|tbd|133.2|na|na|certifications-n39040|na|na|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Deliery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x||
evaluation Of First Article Testing|3|x|$42,000||
this Amendment Is Issued To Extend The Closing Date To 12nov2024.
the Small Business Set-aside Is Hereby Dissolved.
\
1. This Solicitation Is Being Issued Under Emergency Acquisition Flexibilities. Government Financing Is Not Authorized.
2. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
3. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
4. If Drawings Are Included In The Solicitation, Access Must Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website.
5. Unless Otherwise Stated On The Dd 1423, Submission Of All Dd Form 1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To The Material (line Item 0001aa) Delivery Date. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of
cdrls. Final Delivery Of Material Will Be On Or Before 300 Days After The Effective Date Of The Contract.
6. This Solicitation Requires First Article Testing. See Far 52.290-4 First Article Approval - Government Testing For More Details.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080211|f| |01|
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.;
3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.;
3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.;
3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;receptacle Body, Item 14;
material - ;qq-n-281, Class A;
part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h;
3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;each Electrical Hull Fitting Assembly;
performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258;
acceptance - ;mil-dtl-24231;
test - ;dye Penetrant Inspection;
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Annealing And Age Hardening
item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5;
performance - Qq-n-286
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240.
(207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; .
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt
- Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding.
this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - See Clause 52.209-3 For Submittal Timeframes.
Closing Soon12 Nov 2024
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n723.12|b5l|2156975801|chad.m.fichter.civ@us.navy.mil|
commercial Item Procurement Notice - Award|4|||||
commercial Product Procurement Notice|5||||||
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|||||||||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days After Delivery Of Unit|45 Days From Detect Was Found|||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
contract Terms And Conditions Required To Implement Statutes Or Executiveorders--commercial Products And Commercial Services (may 2024))|82|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
continued: Contract Terms And Conditions Required To Implement Statutes Or Executive Orders--commercial Products And Commercial Services (feb 2024))|15||||||||||||||||
offeror Representations And Certifications--commercial Products And Commercialservices (may 2024))|3||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|336320|1000|||||||||||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
evaluation--commercial Products And Commercial Services (nov 2021)|4|||||
the Following Is An Addendum To Far 52.212-4 Contract Terms And Conditions.
commercial Items:
far Clause 52.246-2 Inspection Of Supplies - Fixed Price Applies As Amended Herein. All Product Audits Performed At The Discretion Of The Dcma Qar Shall Be Conducted By Witnessing Contractor Inspections Or Tests On Non-interference Basis. (e.g., When Advance
notification Is Furnished Of The Time Contractor Inspections Or Tests Will Be Performed, And That Time Arises And The Qar Is Unavailable, The Contractor Shall Proceed. Verification Shall Then Be Accomplished By Records Review.)
the Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso9001:2015 "quality Management Systems - Requirements / As9100d "quality Management Systems - Requirements For Aviation,
space And Defense Organization" And A Calibration System That Address The Elements Of Iso-10012-2, Ansi/ncsl Z540 Or An Equivalent Program Approved By The Navy.
the Government Reserves The Right To Assess The Contractor's Compliance To Its Documented Quality System Throughout The Performance Of This Contract. The Quality System Procedures, Planning, And All Other Documentation, Media, And Data Which Comprise The Quality
system Shall Be Made Available To The Government For Their Review And Use. The Acceptance Of Non-conforming Supplies Is A Prerogative Of And Shall Be As Prescribed By The Government. The Government Reserves The Right To Disapprove The Quality System Or Portions T
thereof When It Fails To Meet Its Intended Objectives.
the Contractor Shall Not Make Any Configuration Changes, Engineering Changes Or Part Number Changes To The Contract/purchase Order Items, Including, But Not Limited To, The Item's Hardware, Software Or Firmware, Unless Approved By Procurement Contracting Officer
(pco). In Addition, Approval By Appropriate Technical Authority May Also Be Required. Guidance On How To Submit A Proposed Engineering Or Part Number Change May Be Obtained From The Pco.
the Contractor Shall Not Manufacture Any Item For Acceptance By The Government That Incorporates A Known Departure From Technical Or Contractual Requirement Unless A Request For A Deviation Has Been Approved. Authorized Deviations Are A Temporary Departure From
the Requirements Only And Do Not Authorize A Change To The Item's Configuration Baseline. Any Deviation, Major Or Minor, Must Be Approved By The Pco Prior To Acceptance."
repair Turnaround Time (rtat) Definition: The Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor?s Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Reportall Transactions By The End Of The Fifth Regular
business Day After Receipt And Theaction Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt.
the Contractor Must Obtain Final Inspection And Acceptance By The Governmentfor All Assets Within The Rtats Established In This Contract.
required Rtat: 119 Days After Receipt Of Asset
throughput Constraint: Contractor Must Provide A Throughput Constraint For Each Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences X/month (contractor Fill In #). A Throughput Of ##____ Per Month Reflects No Throughput Constraint.
induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer.
reconciliation: A Reconciliation Modification Will Be Issued After Final Inspection And Acceptance Of All Assets Inducted Under The Subsequent Contract. The Parties Have Agreed To A Price (shown On The Schedule Page) For Each Unit At The Negotiated Rtat. Such
prices Are Based On The Contractor Meeting The Rtat Requirements Described Within The Schedule Page. If The Contractor Does Not Meet The Applicable Rtat Requirement, Consideration Will Be Assessed And Subject To Negotiation.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted.
all Terms And Conditions Are In Accordance With Boa: N00383-24-g-aq01.
\
1. Scope
1.1 . Markings Shall Be In Accordance With Mil-std-130.
1.2 Articles To Be Furnished Hereunder Shall Be Repaired, Tested Andinspected In Accordance With The Terms And Conditions Specified In Therequirements Section Of This Document.
1.3 Unless Expressly Provided For Elsewhere In This Clause, Equipment Suchas Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Orany Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.4 The Use Of Mil-w-81381 Wire In Any Item To Be Delivered Under This Procurement Is Prohibited. The Foregoing Prohibition Applies Notwithstanding Any Reference To Mil-w-81381 Wire That May Be Made In Any Of The Drawings Or Specifications For This
procurement. Sae-as22759 Series Wire Shall Be Used In Lieu Of Mil-w-81381 Wire, In Any Place Where Mil-w-81381 Wire Is Cited In This Procurement. Any Questions Concerning This Requirement Should Be Directed To The Procuring Contracting Officer.
1.5 If Mil-std-454 Is Referenced In The Drawings Or In The Specification,the Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c Personnel Performing Tasks In Accordance With Ipc/eiaj-std-001c Shall Be Trained And Certified As Requried By
ipc/eiaj-std-001c Paragraph 5.1.4.
2. Applicable Documents - Not Applicable
3. Requirements
the Contractor Shall Maintain A Quality Control System Which Meets The Requirements Of Mil-i-45208a, Mil-q 9858,iso-9000 / 9001 / 9002 Or Equivalent.
responsibility For Inspection: Unless Otherwise Specified, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified
herein. Except As Otherwise Specified, The Contractor May Use His Own Or Any Other Facility Suitable For The Performance Of The Inspection Requirements Specified Herein.
procedures:the Contractor Shall Prepare And Maintain Quality Control
documentation, Test And Repair Procedures, And Inspection Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential Diagrams Of The Test, Repair, And Inspection Process, As Well As The
performance Spcifications To Perform The Procedures.
quality Assurance Program Plan: The Contractor Shall Develop, Implement And Maintain A Repair Quality Plan In Compliance With The Requirements Of Mil-i-45208a, Mil-q-9858, Iso,9000 / 9001 / 9002, Or Equvalent.the Plan Shall Define The Specific Methods By Which
compliance With Contractual Requirements
will Be Assured. All Quality Assurance Data Shall Be Provided To The Government For Review And Approval Upon Request.
purchased Material Control: The Contractor Shall Establish And Maintain A System Of Control Over Purchased Material Which Shall Assure That The Necessary Requirements Of This Contract Are Included. In All Sub
contract Agreements. A Parts Control System Shall Establish A Record Of Performance For Each Purchased And Internally Manufactured Part And Shall Be Used To Evaluate Continued Use Of The Source. The Contractors Control System Shall Be In Compliance Wil
either Mil-i 45208a/mil-q-9858 Or Equivalent Quality Quality Assurance Standared.(iso/as:9000, 9001, 9002).
receiving Inspection Of Purchased Material: Purchased Items Shall Be Inspected Upon Receipt At The Contractors Facility To Assure Conformance With All Requirements Of The Technical Data Package (tdp). Evidence Of Such Inspections Shall Be Maintained For
government Review At Least Twelve (12) Months Following Acceptance Of The End Item. Inspection Reports Shall Be Maintained By The Contractor. The Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material,
finish, And Process With Appropriate Pass/fail Criteria, Such Ascertifications, And Actual Dimensional Readings.
failure Analysis And Corrective Action:all Failure Analysis And Corrective Action Reports/plans Shall Be Submitted To The Government.
nonconforming Material:the Contractor Shall Establish An Effective System For Controlling Nonconforming Material Including Procedures For Identification, Segregation, And Disposition.
contractor Internal Review Board (irb):irb Authority Is Delegated To The Contractor For This Contract Only. The Irb May Be Used Only For Disposition Of Materials Exhibiting Minor Non-conformances, Scrap Or Rework To Return A Part To Conformance With Drawings Or
specifications As Authorized By The Approved Repair Procedures.irb Shall Not Use "as-is" Disposition. A Complete File Of Irb Actions Shall Be Maintained For Review By The Government For Concurrance Of Classification.
material Review Board (mrb):formal Mrb Authority For Disposition Of "as-is"and For Minor Non-conformances Is Retained By The Government. The Contractor Shall Submit The Appropriate Request For Variance Via The Dcmc To The Navsup Contracting Officer.
responsibility For Compliance: All Items Must Meet All Requirements Of This Statement Of Work. The Inspection Requirements Set Forth In This Sow Shall Become Part Of The Contractors Overall Inspection System Or Quality Program. The Absence Of Any Inspection
requirements In The Sow Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Government Equipment Submitted For Acceptance Comply With All Requirements. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective
items, Either Indicated Or Actual, Nor Does It Commit The Procuring Activity To Acceptance Of Any Defective Items.
repair Assessment Testing: The Government May Select Samples Of The Contract Line Items (clins) Which Have Completed Repair And Have Been Accepted By The Government Representative For The Purpose Of Conducting Performance Testing, Environmental Testing, And
quality Conformance Examination In A Repair Assessment Test Program. A Quantity Of Clin's May Be Randomly Selected From Each Quaterly Repair Production Completion For Shipment To The Cfa Or Other Government Designated Location To Conduct This Testing.
records Of Data Collection: The Contractor Shall Maintain A Historical Record File To Contain Copies Of Applicable Data And Documents For Individual Clin's
and Assemblies By Clin Serial Number. The Historical Record File Shall Include,but Not Be Limited To The Following Types Of Historical Records:
receipt Inspection Documentation.
repair Shop Travelers Or Repair Cards.
parts Replacement Records.
parts Inspection Data Before And After Repair As Applicable.
acceptance Test Data.
qa Personnel Shall Maintain A Complete Receipt Inspection,test, Repair
re-test, History Card For Each Item Processed. This Information Shall Be Made Available To The Government Upon Request.
3.1 1.0 General
3.1.1 This Statement Of Work (sow) Establishes The Criteria For Repair And Testing /inspection Of The Subject Item. It Includes Inspection, Component Repair And Replacement,reassembly And Testing Procedures Required To Return Units Back Into A Servicable
condition.
3.2 2.0 Definitions.
3.2.1 Contractor: Is Defined As The Successful Offeror Awarded A Contract, Orderor Issued A Project Work Order. The Term "contract" Encompasses A Contract, An Order, Or A Project Work Order.
3.2.2 Overhaul: An Overhauled Part Is One Which Has Been Disassembled, Cleaned, Inspected, Repaired As Necessary (by Replacing Or Repairing All Components Which Have Been Found To Exceed Limits Established By The Repair/overhaul Manual) Reassembled And Tested
in Accordance With The Approved Repair/overhaul Manual Listed In This Sow And Returned To A Ready For Issue (rfi) Condition (refer To Contract Schedule For Items To Be Overhauled).
3.2.3 Repair: A Repaired Part Is One Which Has Been Restored To A Ready For Issue(rfi) Condition (by Replacing Or Repairing Those Components Found To Be Defective, Broken, Damaged Or Inoperative During The Initial Evaluation And Troubleshooting Phase) And
tested In Accordance With The Approved Repair/overhaul Manual Listed In This Sow (refer To Contract Schedule For Items To Be Repaired).
3.3 3.0 Scope
3.3.1 General. The Items To Be Furnished Hereunder Shall Be Overhauled, Upgraded,repaired, Tested, Inspected, And Accepted In Accordance With The Terms And Conditions Specified In This Contract. Unless Expressly Provided Government Furnished Property,
including Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Special Test Equipment, Or Any Other Manufacturing Aid Required For The Repair, Manufacture, And/or Testing Of The Subject Item(s) Will Not Be Provided By The Government And
shall Be The Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing, Manual, Or Specification For The Contract Items.
3.3.2 Repair Upgrade Requirements:the Contractor Shall Provide The Necessary
facility, Labor, Materials, Parts, And Test And Tooling Equipment Required To To Return The Following Items To A Ready For Issue (rfi) Condition:
control,electric Li ;712860-1; P/n, ;014350198; Nsn, ;most Recent; Tech Publications
3.3.3 Rfi Is Defined As That Condition Allowing The Items To Perform Properly And Reliably In An Operational Environment In A Manner They Were Intended To Operate.the Contractor Must Perform All Repairs/upgrades At The Facility Identified Within This Sow.
repairs Performed By The Contractor Or Subcontractor Shall Be Performed In Accordance With The Specified Drawings And Repair Manual(s).
3.4 Changes To Such Manuals Used For Repairs Under This Contract, Or Changes To Drawings Or Specifications Used In The Manufacture Of Parts Utilized In These Repairs, Require Procuring Contracting Officer (pco) Approval In Accordance With The Configuration
management Provisions Of This Statement Of Work Or Contract. Under No Circumstances Should The Repair, Test, And Inspection Extend Beyond The Requirements Of This Paragraph Unless Authorized By The Government Qar.in Addition, Requests For Approval Of Changes
to A Repair Source Or Repair Facility Shall Be Submitted In Writing To The Pco Prior To Making Any Such Change.
3.4.1 Any Repairs Performed Using Unapproved Changes To Such Manuals, Drawings, Specifications, Or Changes To Repair Source Or Facility Are Done At The Contractor's Own Risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any
delivered Items Repaired Using Such Unapproved Manuals,drawing, Specification, Repair Source Or Repair Facility Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The Government's Disapproval Of A
requested Change To Manuals, Drawings, Specifications, Or To A Repair Source Or Facility.
3.4.2 References On Drawings And Specifications:for Repair And Overhaul Purposes Only. All References To The "prime Contractor" Or The "actual Manufacturer" Appearing On The Drawings And / Or Specifications Or Technical Data Furnished By The Government Shall Be
read As The "government Designated Agency"
3.4.3 Process Control Documentation: The Contractor Shall Prepare And Maintain Repair Procedures, And Test / Inspection Information / Procedures Which Shall Be Made Available To The Government For Review And Approval. The Procedures Shall Include Sequential
diagrams Of Processes, As Well As The Performance Specifications To Perform The Testing / Inspection Procedures. Those Processes Shall Be Frozen After Approval Of The Inspection / Test.
3.4.4 Beyond Economical Repair (ber). An Item Is Ber If The Cost Of The Repair Exceeds 75% Of The Production Quantity Price To Replace The Item, Current At Time Of Award. This Replacement Price Is For The Purposes Of Ber Determinations Only, And May Not Be
used Or Relied On By The Offeror In The Pricing Of The Repairs Required By This Contract. Items Determined Ber Are Not Included In The Contract Price. The Contractor Shall Obtain Written Concurrence From Dcma For All Units Determined By The Contractor To Be
ber. All Such Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence Shall Be Provided By The Contractor To The Pco, With A Copy To The Inventory Manager. After Receipt Of
the Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. The Contractor Is Not Authorized To Proceed With The Repair Until Notification To Proceed Is Received From The Pco. Any
disposal Ordered Shall Be Performed By The Contractor In Accordance With All Applicable Regulations And In Accordance With All Dcma Disposal Procedures And Requirements.
3.4.5 Missing On Induction (moi). A Weapons Repairable Assembly (wra) Is Subject To This Moi Provision If The Item Received By The Contractor For Repair Is Missing One Or More Shop Replaceable Assemblies (sras). Contractor Replacement Of Moi Sras Is Not
included In The Contract Price. The Contractor Shall Immediately Notify Dcma When An Item Is Received With Moi Sra(s) And Shall Obtain Written Verification From Dcma For All Wras Determined To Have Moi Sra(s). The Contractor Shall Provide All Such
determinations, Including Identification Of The Missing Sra(s), And The Dcma Written Verification, To The Inventory Manager With A Copy To The Pco And Aco Prior To Induction And/or Repair Of The Wra. The Contractor Shall Not Induct And/or Repair Wras With Moi
sras Until Instructions On How To Proceed Are Provided To The Contractor By The Inventory Manager (where No Adjustment Price To The Contract Is Required) Or By The Pco. Items Received By The Contractor Missing Consumable Parts Are Not Moi Items. Rather,
repair Of Such Items And Replacement Of The Missing Consumable Parts Are Included In The Contract Price And The Item Shall Be Inducted And Repaired By The Contractor Under This Contract.
3.4.6 Replacing Failed Or Missing Shop Replaceable Assembly (sra) When Repairinga Weapons Replaceable Assembly (wra).
3.4.7 A. When The Contractor Believes One Or More Sra(s) Within A Wra Are Either:
3.4.8 Beyond Economic Repair (ber) Or Beyond Repair (br) I. E. The Unit Is Not Capable Of Being Repaired Because Of The Extent Of Physical Damage), Or Missing On Induction (moi), The Contractor Shall Obtain Written Verification From Dcma And Advice From The
inventory Manager Whether A Sra May Be Replaced By One Or More Of The Following Options: Ship In Place From An Existing Spares Or Repair Contract, If Any, Milstrip The Sra(s), Otherwise Be Provided Direction For Obtaining The Sra(s) At No Cost To The
contractor.the Detailed Procedures Are Set Forth In Section 6.0 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work.
3.4.9 B.when Not Otherwise Provided For (or Precluded) By Other Terms Of This Contract, The Contractor May Seek Written Authorization To Replace Failed Sra(s) With Ready For Issue Sra(s). When Authorized, The Procedures Set Forth In Paragraph 3.0 Of Section
6.2 Of The Web-based Commercial Asset Visibility (cav) Statement Of Work Shall Be Followed.
3.4.10 Over And Above Repair (oar). An Item Sent To The Contractor Shall Be Considered To Require Over And Above (oar) Repair Effort If The Repair Required Is Not The Type Of Repair That Would Be Anticipated As A Result Of Normal Navy Operation Of The Item And
is Not Included In The Contract Pricing Due To The Nature Or Scope Of The Repair Needed For That Particular Item. Therefore, Repair Of Oar Items May Be Subject To Equitable Adjustment. The Contractor Shall Obtain Written Concurrence From Dcma For All Units
determined By The Contractor To Require Oar Effort. All Such Oar Determinations, Including The Basis For The Determination, The Repair Required, The Proposed Price To Repair And The Dcma Written Concurrence, Shall Be Provided By The Contractor To The Pco Prior
to Undertaking Repair Of The Item.
after Receipt Of The Required Documentation, The Pco Shall Provide The Contractor Disposition Instructions Or Contractual Authority For Repair Of The Item. Any Ordered Disposal Shall Be Performed By The Contractor In Accordance With All Applicable Regulations
and Dcma Disposal Procedures And Requirements.
3.5 4.0 Parts And Materials
3.5.1 General. The Contractor Is Responsible For Supplying All Parts And Material Necessary To Perform The Required Repairs Under This Contract Unless Parts Or Material Are Specifically Identified As Government Furnished Material (gfm). All Parts And Material
used In Performance Of This Contract Shall Be In Accordance With The Latest Approved Revision Of Applicable Drawings And Specifications And Shall Be New In Accordance With Far 52.211-5, Material Requirements, Which Is Incorporated By Reference Herein.
authorization To Use Other Than New Material As Defined By Far 52.211-5 Requires Written Approval From The Pco. In Addition, Cannibalization Must Be Approved By The Pco. Cannibalization Of Units That Have Not Been Inducted Is Not Typically Authorized And
requires Specific Approval By The Pco.
3.5.2 The Contractor Shall Ensure It Has Access For The Duration Of This Contract To Updated Drawings And Specifications For Parts And Material Required For Repairs Performed Under This Contract. Any Change To Such Parts/material Drawings Or Specifications
requires Government Approval In Accordance With The Configuration Management Provisions Of This Statement Of Work. Written Approval From The Pco Must Be Obtained Prior To Any Change To The Manufacturing Source Or Manufacturing Facility For All Parts Which
require Source Approval, Unless The Contractor Is The Design Control Agent (dca) (i.e. The Entity Responsible For Maintaining The Latest Configuration Data) For The The Contract Item. If The Contractor Is The Dca, The Contractor May Approve Approve Changes To
manufacturing Source Or Manufacturing Facility For All Parts, Including Those Which Require Source Approval. Any Repairs Performed Using Unapproved Changes To Such Drawings, Specifications Or Manufacturing Source Or Facility Are Done At The Contractor's Own
risk. If The Government Disapproves The Requested Change, The Contractor Shall Replace Any Delivered Items Repaired Using Such Unapproved Change. The Contractor Is Not Entitled To Any Equitable Adjustment To The Contract Price Or Terms Based On The
government's Disapproval Of A Requested Change To The Drawings, Specifications Or Manufacturing Source Or Facility.
3.5.3 Purchased Material Control And Parts Control. The Contractor Shall Establish And Maintain A System Of Control Over Purchased Parts And Material. Such Controls Shall, At A Minimum, Assure That The Parts And And Material Purchased Are In Compliance With The
requirements Of This Contract.
3.5.4 Receiving Inspection Of Purchased Parts And Material. (1)purchased Items Shall Be Inspected Upon Receipt At The Contractor's Facility To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications Or (2)the Contractor Shall
provide Prior To The Contract Award Evidence For Government Review And Approval Of A Purchased Parts And Material System Which Provides For The Inspections To Assure Conformance With All Requirements Of The Applicable Drawings And Specifications. Evidence Of
such Inspections Of Such Inspections Shall Be Maintained By The Contractor Or Subcontractor For Government Review.the Inspection Report Shall, At A Minimum, Include A Record Of All Dimensional Data (coordinate/positional), Material, Finish, And Process With
appropriate Pass/fail Criteria Such As Certifications
and Actual Dimensonal Readings.
3.5.5 ^^^note^^^part Cannibalization Is Not Authorized Unless Specifically Approved By Navsup Wss And The Bde.
3.5.6
3.6 Source And Location Of Repair Source:
3.6.1 The Contractor Shall Specify The Name Of The Source/division Performing The Work And The Actual Location Where Work Will Be Performed.
control,electric Li ;ge Aviation System Llc, D/b/a Ge Aviation; Company Name , ;1000 Macarthur Memorial Hwy, Ronkonkoma, Ny 11779; Address , ;19623; Cage Code
inspection Will Be Accomplished On The Contractor's Equipment
3.7 5.0 Contractor Quality Requirements:
3.7.1 Quality Program. The Contractor Shall Establish, Implement, Document And Maintain A Quality System That Ensures Conformance To All Applicable Requirements Of Iso 9001/ Sae As9100. The Contractor's Quality Management System/program Shall Be Designed To
promptly Detect, Correct And Prevent Conditions That Adversely Affect Quality.
3.7.2 Calibration System Requirements. Contractor Shall Maintain A Calibration System That Meets The Requirements Of Ansi/ncsl Z540.3, Iso-10012-1 Or An Equivalent Calibration Program Acceptable To The Government.
3.8 6.0 Configuration Management (cm):
3.8.1 The Contractor Shall Maintain A Configuration Management Plan In Accordance With The Provisions Of Navsup Wss Configuration Management Clause Navicpia18. (refer To Contract).
3.9 7.0 Markings.
3.9.1 Marking Shall Be As Indicated In The Contract When Applicable.
3.10 8.0 Storage;
3.10.1 The Contractor Shall Provide A Proper Enclosed Warehouse Environment For Both Material Items Awaiting Repair And Assets Which Have Been Repaired And Are Awaiting Shipment To Ensure The Items Are Not Damaged While Being Stored.
4. Quality Assurance Provisions - Not Applicable.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
Closing Soon8 Nov 2024
Tender AmountRefer Documents
9131-9140 of 9192 active Tenders