Cleaning Tenders
Cleaning Tenders
Sugar Regulatory Administration - SRA Tender
Textile, Apparel and Footwear
Corrigendum : Tender Amount Updated
Philippines
Details: Description Purchase Request Submitted By Engr. Normel L. Fajarito 7 Pcs Air Freshener, 280ml/150g Min, Car 7 Pcs Air Freshener, 280ml/150g Min, Room 12 Pcs Air Freshener, Gel, 180g 30 Bot Alcohol 68% - 70% Scented Ethyl, 500ml Assorted Biscuit 200 Packs Classic Instant Coffee Sticks, 1.9gram, 48 Sticks Per Pack 180 Packs Coffee Creamer, 5g Pack Of 48 7 Bot Dishwashing Liquid, 780ml Per Bottle 25 Pack Dishwashing Liquid, Refill Pack 550ml 3 Bot Disinfectant Spray, 400-500grams 12 Pack Disposable Paper Cup, Double Coated For Hot And Cold, 8oz, 50's Per Pack 15 Pack Disposable Plastic Cup, 8oz, 50's Per Pack 4 Pcs Doormat, Non-slip, Washable, 4in X 3 In, Dark Color 2 Pcs Dustpan, Heavy Duty, Big 5 Bot Furniture Polish, 330ml 12 Roll Garbage Bag, Medium, Black, 10s Per Roll 4 Roll Garbage Bag, Xxl, Black, 10s Per Roll 4 Can Insecticide, Aerosol Type, 600ml Min/can 24 Bot Liquid Hand Soap, 225ml Per Bottle 2 Bot Liquid Lye, 500ml Per Bottle 2 Pcs Microfiber Duster, Durable, Dark Color 100 Packs Mix Candy, 50; S Per Pack 3 Pcs Pail, Plastic, Blue, Large 3 Packs Plastic Coffee Stirrer, 500grms/pack 10 Pcs Scrub Sponge, 300mm X 70mm X 300mm 2 Pcs Soft Broom (walis Tambo), Thick, Heavy Duty 30 Packs Table Napkin. 2ply, 200 Sheets, 100 X 200mm 3 Bot Toilet Cleaner, 500ml For Toilet Bowl And Urinal 30 Packs Toilet Tissue, 2ply Sheets, 150 Pulls, 12 Rolls Per Pack 9 Pcs Trash Bin, 15liters, With Cover, Plastic, Durable 2 Pcs Water Dipper, Plastic, Blue, Durable Abc: Php 117,250.00
Closing Soon21 Feb 2025
Tender AmountPHP 117.2 K (USD 2 K)
Territorial community of Guyana Tender
Services
France
Description: France – Cleaning Services – Système D'acquisition Dynamique Pour L'exécution De Prestations D'entretien Et De Nettoyage De Tout Lieu Dans Lequel La Collectivité Territoriale De Guyane Est Amenée À Exercer Ses Compétences Et Missions. (bâtiments Et Locaux Administratifs, Et/ou Tout Lieu Accueillant Du Public Ou Des Usagers Du Pouvoir Adjudicateur, Et/ou Des Établissements Publics Locaux D'enseignement (eple))
Closing Date11 Sep 2028
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n774.18|pfb|see Email|stephanie.r.perez1@navy.mil|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Mechanicsburg|
equal Opportunity (sep 2016)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|334290|800 Employees|x|x||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
solicitation Is Extended And Will End On 15 May 2025.
solicitation Is Extended And Will End On 20 Sep 24.
this Solicitation Is Issued Pursuant To Emergency Acquisition Flexiblities (eaf).
Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^
a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Stephanie.r.perez1@navy.mil
b. General Requirements: Mil-std Packaging, Government Source Inspection Required.
c. All Freight Is Fob Origin.
d. This Rfq Is For A Buy/procurement. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prioor To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding.
e. Only A Firm-fixed Price (ffp) Will Be Accepted.
f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization.
g. Your Quote Should Include The Following Information For Justification Purposes:
- New Procurement Unit Price____________________
- Total Price _____________________
- Procurement Delivery Lead Time (ptat) _________________ Days
- Award To Cage _______________
- Inspection & Acceptance Cage, If Not At Award To Cage _____________
- Cost Breakdown Requested, Including Profit Rate (if Feasible).
- Quote Expiration Date _______________ (90 Days Minimum Is Requested).
- Delivery Vehicle (if Delivery Order Requested)(e.g. If Your Cage Has A Current Boa/idiq)
h. Important Traceability Notice:
if You Are Not The Manufacturer Of The Material You Are Offering, You Must Provide An Official Letter And/or Email From The Oem Confirming That Your Company Is An Authorized Distributor Of Their Items.
\
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Synthesizer Assy .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=mil-std-129 | | |r |180524|a| | |
3. Requirements
3.1 Cage Code/reference Number Items - The Synthesizer Assy Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;15055 6868058-1;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129, Rev R, 24 May 2018; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government
evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.5 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
Closing Date15 May 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|n792.06|g5k|215-697-0275|patrick.j.horan23.civ@us.navy.mil||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
inspection And Acceptance Of Supplies|26|x||||||||||||x||||||||||||||
time Of Delivery (june 1997)|20|||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report Combo Type ||tbd|n00383|tbd|tbd|see Schedule|tbd|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|12 Months|60 Days After Discovery Of Defect|||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
limitation Of Liability--high-value Items (feb 1997)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American--balance Of Payments Program (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|12|332439|600|||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Addition To Price, The Following
non-price Evaluation Factor Shall Be Used To Evaluate Offers And Are Listed In Descending Order Of Importance.
relevant Past Performance
technical Capability
the Non-price Evaluation Factors, When Combined, Are Significantly More Important Than Price. There Are No Subfactors.
the Government Reserves The Right To Obtain Information For Use In The Evaluation Of Past Performance From Any And All Sources Including Sources Outside Of The Government. Offerors Lacking Relevant Past Performance History Will Not Be Evaluated Favorably Or
unfavorably On Past Performance. The Government Will Consider The Quality Of An Offeror's Relevant Past Performance. This Consideration Is Separate And Distinct From The Contracting Officer's Responsibility Determination. The Assessment Of The Offeror's R
relevant Past Performance Will Be Used As A Means Of Evaluating The Relative Risk Of The Offeror And Other Competitors In Successfully Meet The Requirements Of The Rfp. In Determining The Rating For The Past Performance Evaluation Factor, The Government Will Give
Greater Consideration To The Contracts Which The Government Feels Are Most Relevant To The Rfp.
the Government Reserves The Right To Award The Contract To Other Than The Lowest Priced Offeror.
page Limitation-excluding The Cover Page, Table Of Contents, Past Performance Project Forms The Technical Capability Proposal Is Limited To Fifteen (25) Pages In At Least 11pt. Font And 1" Margins. Pages In Excess Of This Limitation Will Not Be Evaluated. The
pages Excluded From Evaluation Will Be At The Discretion Of The Agency.
contractors Are Informed That It Is The Government's Desire To Make Award On Initial Proposals When Deemed Possible By The Contracting Officer, However The Government Reserves The Right To Communicate And/or Negotiate With Offerors If Later Determined Necessary.
none Price Proposal (all Non-price Factors) -the Contractor Is Required To Submit The Following Non-price Information:
1. Relevant Past Performance:
the Contractor Is Provided An Opportunity To Demonstrate Relevant Past Performance On Contracts Currently Being Performed Or Performed Within The Past Three (3) Years. The Government Will Determine Relevance By Analyzing The Scope And Magnitude Of The Reference
contracts And Comparing Them To The Instant Requirement. The Government Reserves The Right To Evaluate Submitted Projects Individually Or In The Aggregate In Order To Determine Relevance And Will Do So Consistently Across All Evaluated Offers. The Government
will Consider The Quality Of The Contractor's Relevant Past Performance.
reference Contracts:
A. The Contractor May Submit Up To A Maximum Of Three (3) Contracts For Evaluation. The Government Reserves The Right To Obtain Information From Sources Other Than Those Identified By The Contractor.
2. Technical Capability
the Government Desires That Offerors Demonstrate Technical Capability To Satisfy The Government's Requirements. The Offeror's Response Will Be Evaluated To Determine Whether Its Response Poses Risk To Performance Or Whether It Will Result In Better Value To The
government. In Response To This Evaluation Factor, Offerors Shall Address Its Manufacturing Equipment; Inspection Method Sheets; Incoming Inspection Sheets; Process Sheets; Quality System Compliance; Welding Certification.
in Responding To The Above Areas Of The Technical Capability Factor, It Is Incumbent Upon The Offeror Provide A Level Of Detail The Demonstrates To The Government's Satisfaction That The Offeror Has The Technical Capability To Perform The Requirement. If The
proposal Lacks Sufficient Detail, It May Result In The Government Assessing Risk In The Proposal. While There Is No Prescribed Method For Demonstrating Technical Capability, The Below Are Items Of Interest To The Government That The Contractor May, At Its
discretion, Address To Assist The Government In Gaining An Understanding Of The Offerors Technical Capability. Offerors Are Cautioned That While These Areas Of Interest Are Not Mandatory Elements That Are Required To Be Addressed, Failure To Address Them Or
comparable Indicia Of Technical Capability, May Limit The Government's Understanding Of Technical Risk And Result In The Assignment Of Commensurate Risk. Offerors Are Also Notified That Some Of These Indicia Of Capability Are Overlapping, I.e., Two Or More May
evidence The Same Facet Of Capability.
certification Of Possession Or Access To The Following Equipment:for Aluminum And Steel Welded Containers, & Bladebox/riveted Construction
1.brake Press
2.extrusion Dies
3.cnc Machining Center(s) Capable Of Lathe And/or Milling Operations
copies Of Inspection Method Sheets Used In-process And/or At Final Inspection
copies Of Incoming Inspection Documents That Show Material Certificates Of Conformance, And If Applicable, Dimensional Conformance
process/operation Sheets To Show Ability To Conform To Drawing Requirements In The Following Areas: Weld Preparation; Welding Procedure Specifications Production Lot Testing
proof Of Compliance To Iso9001, And/or, As9100.
applicable Up-to-date Welder Certifications Showing Highest-level Certification Obtained Aws D1.1 For Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3 For Sheet Steel And Aws D1.6 For Stainless Steel.
if The Offeror Address Any Or All Of The Above, Or Provides Comparable Indicia Of Capability, It Is Encouraged To Provide Supporting Evidence And Detail, Such As But Not Limited To Receipts, Certifications, Drawings, Test Results/ Logs, Maintenance Records,
calibration Records, Inspection Reports, Audits, Etc. The Weigh Accorded To Supporting Evidence Will Be At The Discretion Of The Government.
the Technical Capability Proposals Will Be Evaluated To Determine The Risk Of Unsuccessful Performance As Well As Relative Risk Compared To Other Offerors.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Ordersdelivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
early And Incremental Deliveries Accepted And Preferred.
\
1. Scope
1.1 Due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.2 Container Shell Material Is ;polyethylene; .
1.3 Manufacturing Process Is ;rotomolded; .
1.4 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;container Research Corporation; Drawing Number ( ;05259; ) ;434e001; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.5 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.6 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
1.7 When Discrepancies Exist Between These Requirements And Those On Current
manufacturer's Drawings,contact Code ;buyer Found On Page 1 Of The Contract; Or Code N241.10
2. Applicable Documents
drawing Data=std-245 |05259| | |d| | | |
drawing Data=std-314 |05259| | |d| | | |
drawing Data=15930 |80132| | |a| | | |
drawing Data=434b003 |05259| | |d| | | |
drawing Data=434d002 |05259| | |d| | | |
drawing Data=434e001 |05259| A| |d| | | |
drawing Data=434e001 Dl |05259| | |d| | | |
drawing Data=434e004 |05259| | |d| | | |
3. Requirements
3.1 One Third (1/3) Unit Of Desiccant (mil-d-3464, Type Ii Nondusting) Per Cubic Foot Of Container Interior Volume Shall Be Placed In Desiccant Holder Of Each Container At Time Of Shipment.
3.2 Reference To Cadmium Plating Shall Be Deleted And The Following Substituted: "finish Shall Be Electrodeposited Alkaline Zinc-nickel Alloy In Accordance With Astm B 841 Class 1, Type B, Grade 3."
all Containers Must Be Affixed With A Nameplate That Includes A
unique Identification (uid) Marking As Referenced In The Drawing Package
drawing ;(80132) 15930; And Iaw Mil-std-130 Latest Revision. The Contractor
shall Contact Navicp Code ;buyer On Page 1 Of The Contract; Or Code 0771.10 For The Alphanumeric
sequential Serial Number Group That Makes Up Part Of The Uid.
the Uidwill Be Included On The Nameplate In Data Matrix Format.
when A First Article Is Required, The Contractor Shall Submit A Paper Copy Of The Drawings (size 11" X 17"), Contracts And Approved Ecp's Eco's, Deviations Waivers, And Modifications In The Records Recepticle Or Inside The Container Submitted For The First
article.
contact Code ;buyer On Page One; Or Code N241.10 To Arrange For First Article Test Location
4. Quality Assurance
4.1 100% Production Leak Tests. Each Container Shall Be Prepared For Testing By Sealing All Breathing Devices And Inserting Pressurizing Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic - Pressure Technique Of
method 5009 Of Federal Test Method Standard No. 101c Shall Be Used To Detect Leakage. An Initial Pressure Setting Equal To 0.5 + 0.1-0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess Of
0.05 Psig (adjusted For Changes In Temperature And Barometric Pressure) Shall Be Cause For Rejection. Any Deformation Of The Container Shell, While Pressurized, Which Is Greater Than Three Quarters Of An Inch Beyond Its Point At Ambient Pressure Shall Also Be
cause For Rejection.
Warning
container May Explode Or Fasteners May Fail During This Test. Use Protective Barriers To Avoid Injury To Personnel.
100% Production Leak Tests. Each Container Shall Be Prepared For Testing By Sealing All Breathing Devices And Inserting Pressurizing Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic - Pressure Technique
of Method 5009 Of Federal Test Method Standard No. 101c Shall Be Used To Detect Leakage. An Initial Pressure Setting Equal To 0.55 + 0.1-0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess
of 0.025 Psig (adjusted For Changes In Temperature And Barometric Pressure) Shall Be Cause For Rejection. Any Deformation Of The Container Shell, While Pressurized, Which Is Greater Than Three Quarters Of An Inch Beyond Its Point At Ambient Pressure Shall Also
be Cause For Rejection.
welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards. Additionally, Cleaning Preparations Shall Be In Accordance With Mil-c-5541 And The Cleaning Paragraph Located In The Welding Requirements Section Of The Contract.
4.2 The Tests To Be Performed Under The First Article Approval Clause (far 52.209-4) Of The Contract Are Listed Below.
4.2.1 Dimensional Test (special)
;to Drawing (05259) 434e001 And Sub-drawings Is Applicable;
4.2.2 Requirements Of:
;to Drawing (05259) 434e001 And Sub-drawings Are Applicable.;
4.2.3 Form:
;applies;
4.2.4 Fit:
;applies;
4.2.5 Function
;applies;
4.2.6 Compliance With Drawing ( ;05259; ) ;434e001; , Revision ;latest; And Specifications Referenced Therein.
4.3 In Addition To The Above Tests, The First Article(s) To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With Contract Requirements Requirements.
4.4 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Testing.
4.5 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;12000; For The First Article Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government Will
require Such Testing.
4.6 Disposition Of Fat Samples
4.6.1 ;zero; Sample(s) Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing.
4.6.2 ;all; Unless Otherwise Provided For In The Contract, Sample(s) Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval From The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
;n/a; Sample(s) Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due.
4.7 Test Sample Coating Instructions
4.7.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative.
4.8 Fat Approval Criteria
4.8.1 Far 52.209-4 Applies
(a) The Contractors Shall Deliver ;one (1); ; Unit(s) Of The Following Cage ( ;05259; ; ) Part Number ;434e001; ; , Revision ;latest; ; Within ;90; ; Calendar Days From The Date Of This Contract To The Government At
;contact Buyer On Page 1
nswc Indian Head Division,
Detachment Picatinny;
;
marking Of Test Sample(s) Shipping Container Shall Be As Follows, Citing This Contract Number: "for First Article Testing. Not Rfi Material. Do Not Take Up In Stock Contract Number:____________"
for First Article Test, The Shipping Documentation Shall Contain This Contract Number And Lot/item Identification. The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract.
(b) Upon Shipment Of First Article Sample(s), Two (2) Copies Of The Material Inspection And Receiving Report (dd Form 250) Bearing The Qar's Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp- Philadelphia Code Cited In Block
10.a Of Sf33, With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility. The Envelopes Shall Be Clearly Marked: "do Not Open In Mail Room".
within ;60; ; Days After Receipt Of The Samples, The Test Site Shall Complete Testing/evaluation And Submit Two (2) Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10.a Of The Sf33.
(c) Within ;120; ; Calendar Days After The Government Receives The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor.
a Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request, Shall Submit An Additional First Article For Testing. After Each Request, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First Article Or
select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Furnish Any Additional First Article To The
government Under The Terms And Conditions And Within The Time Specified By The Government. The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph (b) Above. The Government Reserves The Right To Require An Equitable
adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Deliver Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract
(f) Unless Otherwise Provided In The Contract, The Contractor -
(1) May Deliver The Approved First Article As Part Of The Contract Quantity, Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing: And
(2) Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (b) Or (c) Above The Contracting Officer Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance
dates And/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts Support, And Repair Of The First Article During Any First Article Test.
(i) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Of, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocable To This Contract For (1) Progress Payments, Or (2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government
(j) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article.
(k) The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him/her Of The Shipment Of Any Article(s) Furnished In Accordance With This Clause. Such Notification Must Be Addressed To The Attention Of The
navicp Code Specified In Block 10.a Of The Sf33, With Copies To Navicp Code 072 And To The Testing Activity. Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of
the Results Thereof.
(l) Fourteen (14) Days Prior To Shipment Of First Article Samples, The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date, With An Information Copy To The Pco, Navicp Philadelphia, Attn: (cite Code Found In Block
10.a Of The Sf33). The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc/qar.
4.9 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The
government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section
1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And One
that Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article
approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government.
Offeror's Proposed Alternate Delivery Schedule
(based On Waiver Of First Article Approval Requirements)
within Days:
item No. _______________ Quantity:_______ After Date Of Contract:__________
4.10 100% Production Leak Test. Each Container Shall Be Prepared For Testing By Sealing All Breathing Devices And Inserting Suitable Pressurized Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. Each Container, Uninstrumented
and Without Dummy Load, Shall Then Be Subjected To A Single 18 Inch Flat Drop. The Pneumatic-pressure Technique Of Method 5008 Of Federal Test Method Standard No. 101c Shall Be Used To Detect Leakage. An Initial Setting Equal To 0.5 + 0.1 - 0 Psig Shall Be
used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure Over A 30 Minute Period That Exceeds 25% Of The Stabilized Pressure Shall Be Cause For Rejection; Tests Shall Be Conducted To Ascertain Sources Of Leaks
and Corrective Action Taken. Any Deformation Of The Container Shell While Pressurized Which Is Greater Than Three-quarters Of An Inch Beyond Its Point At Ambient Pressure Shall Also Be Cause For Rejection.
Warning
container May Explode Or Fasteners May Fail During Test. Use Protective Barriers To Avoid Injury To Personnel.
sampling Per Ansi/asq Z1.4, Sample Plan S-2aql 1.0 (13 Pcs)
accept 0, Reject 1.one (1) Rejection Will Require 100% Of The Shipment To Be Tested. A Lot Shall Consist Of Any Scheduled Shipment Quantity Under Contract. Representative Sampling Shall Be Used, I.e. The Samples Are To Be Selected At Random Throughout The
lot.remove Either The Vortex Or Breather Valve And
install A Suitable Airtight Fitting.draw A Vacuum On The Sample Container(s) To .025+/- 0.01 Psig.stabilize Vacuum Within Tolerance For A Minimum Of 15 Minutes, Then Disconnect The Vacuum Input And Test Monitor The Container For 15 Minutes.the Vacuum Should
hold Within +/- 0.05 Psig At The End Of The 15 Minutes For The Container To Pass.
testing Specifications For Cases:
drop Test:fed-std-101c. Method 5007.1 Paragraph 6.3,procedure -a- Level -a-.
procedure A Falling Dart Impact: Ata 300, Category I,general Requirements
for Category I & Ii Reusable Containers Vibration (loose Cargo):
fed-std-101c, Method Of 5019 Vibration (sweep):ata300, (jan 15th/96),which States In Appendix Ii, B4 Simulated Method 506.4, Procedure Ii Of 4.1.2
fed-std-101c Method 5009.1, Section 6.7.1.
all Costs And Responsibilities Related To The First Article Test Submission Container Shipment To And From The First Article Test Facility Are To Be Borne By The Contractor
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
block 9: Statement B, Us Government, Naval Inventory Control Point
block 14: When Navicp 02 Is Referenced In Distribution, Forward To The Navicp Code Cited On Block 10.a. On Page 1.
block 3: Separate Reports Shall Be Provided For The Below Listed Subtitles And Shall Include Certification That All Vendors Performing These Processes Are Prime (oem) Approved Sources. In The Case Where Other Than The Oem's Specifications Are To Be Utilized,
separate Certifications Are Required.
block 12: First Submission To Be Made Upon Submission Of ;one; Testing Sample.
^ Block 14: Make Submission To ;code N241.15; .
Closing Soon21 Feb 2025
Tender AmountRefer Documents
Oriental Mindoro Tender
Automobiles and Auto Parts
Corrigendum : Tender Amount Updated
Philippines
Details: Description Republic Of The Philippines Provincial Government Of Oriental Mindoro Capitol Complex, Calapan City 5200, Oriental Mindoro Procurement Division Bids And Awards Committee For Goods And Services (1m And Above) Invitation To Bid Purchase Of Vehicle Parts And Accessories For Repair And Maintenance Of Various Provincial Heavy Equipment Ib No. Gsa 2025-03-020 1. The Provincial Government Of Oriental Mindoro, Through The General Fund Intends To Apply The Sum Of One Million Nine Hundred Ninety Nine Thousand Seven Hundred Twenty Eight Pesos Only (php 1,999,728.00) Being The Abc To Payments Under The Contract For Purchase Of Vehicle Parts And Accessories For Repair And Maintenance Of Various Provincial Heavy Equipment. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Oriental Mindoro – Procurement Division Goods And Services Section Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Seven (7) Calendar Days Upon Signing Of The Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Item No. Item Description Qty./unit 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 99 97 98 99 100 101 102 103 104 105 106 Dt # 01, Nissan Ud Pn: 2004-05-080-0108-8751 Oil Filter, D0-609 Oil Filter, D0-306 Fuel Filter Df-505 Relay W/ Socket 24v Dt # 02, Nissan Ud Pn: 1991-05-080-0134-8751 Gasket Maker Gasket Cement Oil Filter, D0-306 Fuel Filter Df-505 Temperature Gauge Oil Gauge Tint Radiator Overhaul Dt # 06, Isuzu 6bg1 Pn: 2000-06-010-0084-8751 Piston, Std. Cylinder Liner, Std. Dt # 08, Isuzu 6bg1 Pn: 2000-06-010-0083-8751 Tires W/ Inner Tube & Flap, 8.25 X 20 Rr Dt # 10, Isuzu 6bg1 Pn: 2011-05-080-0107-8751 Tires W/ Inner Tube & Flap, 8.25 X 16 Frt Sand Paper Dt #11, Isuzu 6bgi Pn: 2011-05-080-0105-8751 Cog Belt B-55 Wiper Motor Assy. 24v Flasher Relay Air Governor Dt # 12, Isuzu 6bg1 Pn: 2011-05-080-0106-8751 Battery 3smf Battery Terminal Tie Rod End Dt # 13, Hino W04d Pn: 2012-05-080-0104-8751 Oil Seal, Transmission Propeller Bolt Air Filter Dt # 14, Hino W04d Pn: 2012-05-080-0100-8751 Tint Dt # 15, Hino W04d Pn: 2012-05-080-0101-8751 Brake Hose Air Filter Air Brake Master Repair Dt # 16, Hino W04d Pn: 201205-080-0102-8751 Tires W/ Inner Tube & Flap, 8.25 X 16 Frt Rubber Cap 1-7/16” Rubber Cap 1-3/16” Sand Paper Brake Cleaner Hub Oil Seal Air Filter Dt # 18, Sinotruk Howo Pn: 2021-05-080-0089-8751 Wiper Blade 24” Wiper Blade 16” Qde White Qde Yellow Qde Blue Dt #21, Sinotruk Howo Pn: 2021-05-080-0090-8751 Tire Wrench W/ Handle 17x32 Air Horn 24v Dt # 22, Sinotruk Howo Pn: 2021-05-080-0086-8751 Tire Wrench W/ Handle 17x32 Towing Cable, 30mm X 6mtrs Dt # 23, Sinotruk Howo Pn: 2021-05-080-0094-8751 Qde White Thinner Masking Tape Spray Paint Dt # 24, Sinotruk Howo Pn: 2021-05-080-0091-8751 Mudguard Clearance Light 24v Electrical Tape Spray Paint Towing Cable, 30mm X 6mtrs Dt # 25, Sinotruk Howo Pn: 2021-05-080-0087-8751 Fuel Hose 1/2” Bonded Washer Hub Bolts Freon 134a Charging Dt # 30, Sinotruk Howo Pn: 2023-05-080-0006-8751 Tires W/ Inner Tube & Flap, 12.00 X 20 Rr Dt #31, Sinotruk Howo Pn: 2024-05-080-0006-8751 Mudguard Penetrating Fluid Isuzu 4bd1, Tadano Pn: 2015-05-080-0133-8751 Oil Treatment Silicon Oil Oil Filter C-506 Oil Filter C-513 Fuel Filter Fc-8607 Qde White Thinner Primer Gray Pl # 35, Tcm 830 Pn: 1997-05-080-0110-8751 Electrical Tape Toggle Switch Auto Wire #16 Door Glass Panel Pl # 38, Lonking Cdm863 Pn: 2024-05-080-0004-8751 Air Hose Air Cock Valve Pl # 39, Lon King Cdm863 Pn: 2024-05-080-0003-8751 Hose Clamp Relay W/ Socket Air Hose Bd # 1f, Komatsu D65a Pn: 2015-05-080-0116-8751 Starter Solenoid Switch Welding & Cutting Outfit Bd # 3f, Komatsu D65ex-16 Pn: 2019-05-080-0122-8751 Rear Cabin Windshield Side Door Glass Acetylene Refill Oxygen Refill Fuel Filter 600-311-3750 Bd # 10, Komatsu D65e Pn: 2010-05-080-0117-8751 Battery 2d Battery Terminal Temperature Gauge Auto Wire #16 Welding Cable Electrode Holder Welding & Cutting Outfit Alternator Assy. 24v Fuel Filter P2299 Rg # 3c, Komatsu Gd313 Pn: 2015-05-080-0127-8751 Feed Pump Sand Paper Inner Tube 10.00 X 20 Horn 24v Relay W/ Socket 24v Auto Wire #16 Rg #08, Komatsu Gd511a Pn: 2012-05-080-0123-8751 Radiator Overhaul Rr # 1e, Sakai Pn: 2012-05-080-0130-8751 Radiator Overhaul Pm # 15, Hino 700 Profia Pn: 2020-05-080-0131-8751 Diaphragm T30 Brake Lining X-x-x 1 Pc 2 Pcs 1 Pc 1 Pc 1 Pc 1 Pc 2 Pcs 2 Pcs 1 Pc 1 Pc 1 Set 1 Set 1 Set 4 Pcs 2 Pcs 6 Pcs 2 Pcs 1 Pc 1 Pc 1 Pc 2 Pcs 2 Pcs 1 Set 1 Pc 4 Pcs 1 Pc 1 Set 1 Pc 1 Pc 2 Pcs 8 Pcs 4 Pcs 3 Pcs 1 Pc 2 Pcs 1 Pc 1 Pc 1 Pc 1 Gal 1 Ltr 1 Ltr 1 Pc 1 Set 1 Pc 1 Pc 1 Gal 1 Gal 3 Pcs 8 Pcs 8 Ft 8 Pcs 1 Pc 6 Pcs 1 Pc 8 Pcs 12 Pcs 4 Pcs 8 Pcs 20 Ft 1 Pc 2 Pcs 5 Pcs 1 Pc 1 Pc 1 Pc 3 Gal 2 Gal 1 Itr 1 Pc 1 Pc 20 Mtrs 1 Pc 7 Mtrs 2 Pcs 2 Pcs 1 Set 5 Mtrs 1 Pc 1 Set 1 Pc 1 Pc 2 Tanks 4 Tanks 2 Pcs 2 Pcs 4 Pcs 1 Pc 10 Mtrs 15 Mtrs 2 Pcs 1 Set 1 Pc 2 Pcs 1 Pc 1 Pc 1 Pc 1 Set 1 Pc 5 Mtrs 3 Pcs 2 Pcs 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Activities Schedule Advertisement/posting Of Ib February 20, 2025 Bulletin Board Of The Pgom February 20, 2025 Pgom Website – Www.ormindoro.gov.ph February 20, 2025 Geps Website – Www.philgeps.net February 20, 2025 Issuance Of Bidding Documents February 20, 2025 To March 11, 2025 Pre-bid Conference February 27, 2025 At 10:00 Am Ppeso Conference Room Deadline Of Submission Of Bids March 11, 2025 At 9:30 Am At Ppeso Conference Room Opening Of Bids In Sealed Envelope March 11, 2025 At 10:00 Am At Ppeso Conference Room A) Eligibility Requirements And Technical Proposal March 11, 2025 At 10:00 Am At Ppeso Conference Room B) Financial Proposal March 11, 2025 At 10:00 Am At Ppeso Conference Room 4. Prospective Bidders May Obtain Further Information From Provincial Government Of Oriental Mindoro-procurement Division Goods And Services Section And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 20, 2025 To March 11, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only (php 5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Provincial Government Of Oriental Mindoro-procurement Division Goods And Services Section Will Hold A Pre-bid Conference On February 27, 2025 At 10:00am At Ppeso Conference Room, Provincial Capitol Complex, Camilmil Calapan City, Oriental Mindoro Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Procurement Division Goods And Services Section, On Or Before March 11, 2025 At 9:30 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On March 11, 2025 At 10:00 Am At Ppeso Conference Room, Provincial Capitol Complex, Camilmil Calapan City Oriental Mindoro. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Pgom – Procurement Division Goods And Services Section Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Marissa O. Acuzar Bac For Goods And Services Provincial Capitol Complex Camilmil, Calapan City Oriental Mindoro 5200 Antonio M. Magnaye, Jr. Bac Chairperson
Closing Date11 Mar 2025
Tender AmountPHP 1.9 Million (USD 34.5 K)
Bassetlaw District Council Tender
United Kingdom
Description: Soft Market Test - Cleaning Contract Bassetlaw District Council
Closing Date22 Jul 2025
Tender AmountGBP 1.5 Million (USD 1.8 Million)
UK Battery Industrialisation Centre Tender
United Kingdom
Description: Provision Of Cleaning Services
Closing Date23 Jul 2025
Tender AmountRefer Documents
Bassetlaw District Council Tender
United Kingdom
Description: Soft Market Test - Cleaning Contract Bassetlaw District Council
Closing Date23 Jul 2025
Tender AmountGBP 1.5 Million (USD 1.8 Million)
8281-8290 of 10000 active Tenders