Civil Work Tenders
Civil Work Tenders
Department Of Public Works And Highways Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Laguna 1st District Engineering Office Sta. Cruz, Laguna, Region Iv-a Invitation To Bid For Contract Id Nos. 25dh0034 To 25dh0037 1. The Department Of Public Works And Highways – Laguna 1st District Engineering Office, Sta. Cruz, Laguna, Through The Fy 2025 Regular Infrastructure Program Based On Nep Intends To Apply The Sum Of Forty Nine Million Five Hundred Thousand Pesos Only (p49,500,000.00), Being The Approved Budget For The Contract (abc) To Payments Under The Contract Id Nos. 25dh0034 To 25dh0037. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Public Works And Highways – Laguna 1st District Engineering Office, Sta. Cruz, Laguna Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 1.name Of Contract : Construction Of Multi-purpose Building, Barangay Salac, Lumban, Laguna Contract Id No. : 25dh0034 Locations : Lumban, Laguna Scope Of Works : Construction Of Multi-purpose Building. Approved Budget For The Contract : P 4,950,000.00 Contract Duration : 210 C.d. 2.name Of Contract : Construction Of Multi-purpose Building (covered Court), Barangay Duhat, Santa Cruz, Laguna Contract Id No. : 25dh0035 Locations : Santa Cruz, Laguna Scope Of Works : Construction Of Multi Purpose Building (covered Court). Approved Budget For The Contract : P 19,800,000.00 Contract Duration : 270 C.d. 3.name Of Contract : Construction Of Multi-purpose Building (covered Court), Barangay Labuin, Pila, Laguna Contract Id No. : 25dh0036 Locations : Pila, Laguna Scope Of Works : Construction Of Multi Purpose Building (covered Court). Approved Budget For The Contract : P 14,850,000.00 Contract Duration : 270 C.d. 4.name Of Contract : Construction Of Multi-purpose Building (covered Court), Barangay Talortor, Majayjay, Laguna Contract Id No. : 25dh0037 Locations : Majayjay, Laguna Scope Of Works : Construction Of Multi Purpose Building (covered Court). Approved Budget For The Contract : P 9,900,000.00 Contract Duration : 270 C.d. 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B For Buildings. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "government Procurement Reform Act”. 5. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways–laguna 1st District Engineering Office And Inspect The Bidding Documents At Brgy. Calios, Sta. Cruz, Laguna During Weekdays From 8:00 A.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From January 03,2025 To January 23,2025 From The Address Below Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount As Follows: 25dh0034 - 5,000.00 25dh0035 - 25,000.00 25dh0036 - 25,000.00 25dh0037 - 10,000.00 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways – Laguna 1st District Engineering Office Will Hold A Pre-bid Conference On January 10, 2025, 10:00 A.m. At The Conference Room, Dpwh-laguna 1st District Engineering Office, Brgy. Calios, Sta. Cruz, Laguna, Which Shall Be Open To Prospective Bidders. 9. Bid Submission May Be Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_laguna1@dpwh.gov.ph For Electronic Submission On Or Before January 23, 2025 Until 9:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On January 23, 2025 Immediately After The Deadline For The Submission And Receipt Of Bid Proposals At 9:00 A.m. At The Conference Room, Dpwh-laguna 1st District Engineering Office, Brgy. Calios, Sta. Cruz, Laguna. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Duly Authorized Who Choose To Attend At The Address Below And Only One (1) Representative Per Bidder Shall Be Allowed In The Opening Of Bid. Late Bids Shall Not Be Accepted. 12. The Department Of Public Works And Highways – Laguna 1st District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. If At The Time Of The Post-qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To Section 34.3(b)(ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject Of The Bid”. Upon Post-qualification The Lowest Complying Bidder Will Be Required To Present The Originals Of Their Contractor’s Registration Certificate To The Bac Secretariat, Dpwh-laguna 1st District Engineering Office, Sta. Cruz, Laguna Together With The Following Documents For Authentication: A. Pcab License; B. Certificate Of Material’s Engineer Accreditation; C. Certificate Of Safety Officer Seminar From Department Of Labor And Employment (dole); D. Philippine Government Electronic Procurement System (philgeps) Certificate Of Registration And Order Form (documents Request List); E. Cpes Rating Relevant To The Project; F. Tax Clearance And G. Certificate And/or Proof Of Accreditation Of Contractors’ Project Engineer, As Per Department Order No. 118 Series Of 2024 Guidelines On The Accreditation And Assignment Of Contractors’ And Consultants’ Project Engineer Which Was Imposed Upon Approval Where Only Accredited Project Engineers Of The Contractors And Consultants May Be Assigned To Supervise Dpwh Projects. 14. Visitors Must Present Copies Of The Following To Security Guard On Duty; A.) One (1) Company Id And One (1) Valid Government Issued Id, And B.) Authorization Letter (if Not An Authorized Liaison Officer In The Cwa, I.e. Special Power Of Attorney For Sole Proprietorship; Or Board/partnership/joint Venture Resolution With Secretary’s Certificate For Corporation/partnership/joint Venture/cooperative) To Security Guard On Duty. 15. Pursuant To The Updated Health Protocols Following The Lifting Of The Covid-19 Public Health Emergency, Wearing Of Face Mask Is Still Encouraged For The Following: A. Elderly, B. Individuals With Comorbidities; C. Immunocompromised Individuals; D. Pregnant Women; E. Unvaccinated Individuals; And F. Symptomatic Individuals. 16. For Further Information, Please Refer To: Editha L. Laron Bac Secretariat Head, Procurement Unit Dpwh Laguna 1st District Engineering Office Brgy. Callios, Sta. Cruz, Laguna (049) 546-7094/ (049) 501-2081 Laron.editha@dpwh.gov.ph Dpwh.laguna1@gmail.com Danilo D. Apuada Jr. Bac Chairperson Dpwh Laguna 1st District Engineering Office Brgy. Callios, Sta. Cruz, Laguna (049) 546-7094/ (049) 501-2081 Date Of Posting At Philgeps: January 3, 2025
Closing Date23 Jan 2025
Tender AmountPHP 14.8 Million (USD 255.8 K)
Board Of Investments Makati City Metro Manila Tender
Software and IT Solutions
Philippines
Details: Description 1. About The Procuring Entity The Board Of Investments (boi) Is An Attached Agency Of The Department Of Trade And Industry (dti) That Is The National Government Entity Responsible For The Promotion Of Investments For Both Foreign And Domestic, In Accordance With Executive Order No. 226, Also Known As The Omnibus Investments Code Of 1987, And The Recently Approved R.a. 11534 Or The Create Law. The Boi Seeks To Attract Quality Investments That Will Encourage Technological Innovations And Provide Support For Industries To Seize The Opportunities And Challenges Of Global Competition And Demands. The Agency Envisions Itself As A Global Industry Promotion Agency By 2022 Guided By The Core Values Of Integrity, Excellence, Teamwork And Passion For Knowledge. Its Mission Is To Provide Investors With Opportunities For Investments, Comprehensive Business Support Services And Fair Predictable And Consistent Industry Policies. The Current State Of The Economy Due To The On-going Pandemic Makes It More Imperative For Boi To Continuously Aim For Work Excellence, As It Is An Agency, Which Is At The Forefront Of Enticing Investments Into The Country. 2. Project Overview/objectives In Order To Effectively Fulfill The Mandate And Facilitate The Delivery Of Boi’s Core And Support Functions, A 24/7 Maintenance Operations Of The Boi Server Room At The 5th Floor That Hosts Various Application Servers And Other Communication And Network Equipment Is Needed. The Boi Server Room Caters To The Boi Local Area Network (lan). To Upgrade And Have An Existing Boi Server Room With A Fully Functional Data Center, The Boi Is Requesting To Transfer Or Create A Data Center At The Fourth Floor (4/f) Of Industry And Investments Building, 385 Sen. Gil J. Puyat Ave, Makati City. This Is To Ensure Compliance With Industry Standards For It Infrastructure And Data Protection. It Will Also Serve As The Host Of Voice, Video, And Data Requirements Of Boi. Generally, The Data Center Will Include The Following Infrastructure Components: Electrical And Civil Works Component • Site Preparation (civil, Mechanical, And Electrical Works) • Supply And Installation Of New Data Center Build-ups Such As New Static Flooring, Drywall, It Monitoring Room, Electrical Power And Lighting, Temperature, Humidity Monitoring Solution, Acoustic Ceiling, And Drip Pan For Potential Water Leak. • Provisioning Of A Monitoring Room Inside The Proposed Data Center • Installation Of New Server Rack Cabinets Complete With Their Accessories. • Transferring Of Existing Servers, Ups, And Other Data Center Components From The 5th Floor To The New Data Center, Including Mounting, Harnessing, Terminating, And End-to-end Tagging. • Transfer And Installation Of Electrical Works Of Existing 2x 20kva Ups Including Panel Boards And Electrical Wires For Its Distribution • Supply And Installation Of Electrical Works For Precision Air Conditioning Unit (pacu) • Supply And Installation Of A Stand-alone Door Access System Including Biometric Device, And Door Lock Accessories For Physical Security Of A New Data Center. • Supply And Installation Of A New 50kva Powered Diesel Generator Set Including An Isolated Dry Type Of Step-up Transformer • Supply And Installation Of New Automatic Transfer Switch (ats) And Other Components • Supply And Installation Of Temperature, Humidity Control System, And Water Leak Detection System • Supply And Installation Of Communication Grounding And Bonding System. • Supply And Installation Of Roughing-in Materials • Submission Of Test Results, As-built Plan, And Documentation • Cleaning And Retouching Of All Affected Areas Including Necessary Rectifications Network Component • Supply, Installation, And Configuration Of Core Switches • Supply, Installation, And Configuration Of Server Farm Switches • Supply, Installation, And Configuration Of Access Switches • Supply, Installation, And Configuration Of Wireless Access Points • Structured Cabling (horizontal And Vertical) • Provisioning Of Intermediate Distribution Frames (idfs) Cabinets And Other Network Components (2nd, 3rd, 4th Floors) • Supply, Installation, And Configuration Of Servers And Server Rack And Accessories • Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables • Documentation O Cabling Plan For Structured Cabling And Data Center O Final Cabling Plan As-built Plan With Line Diagram O Final Network/structured Cabling Diagram O Network Vlan Configuration O Softcopy And Hardcopy Of Core, Server Farm, Access Switch, Wlc Running Configuration • Certification Training On Installed Network Switches, Aps, And Other Components. Objectives Of The Project: • To Protect And Secure The Agency's Existing Ict Investments (firewalls, Routers Switches, Servers, Etc.); • To Ensure A Dependable, Secured, And Efficient Ict Support Services (internet, Intranet, Database And Printer Sharing, Etc.); And • To Create An Industry-standard Datacenter For Effective Management Of Network Resources. 3. Deliverables No Particulars Qty Unit 1 Datacenter Civil And Architectural Works 1 Lot 2 Electrical Works, Segregated Power Source Dedicated To Data Center Equipment’s, And Idf Deployed At 1st Floor, 3rd Floor, And 5th Floor 1 Lot 3 Transfer 2x 20kva Ups And Other It Components From The Old Data Center To The New Data Center (servers, Isp, Etc.) 1 Lot 4 Generator Set, 50kva 1 Unit 5 Automatic Transfer System (ats) 1 Unit 6 Precision Air-conditioning Units 2 Units 7 Data Rack 42u (mdf) 2 Units 8 Data Rack 24u (idf) 3 Units 9 Temperature And Humidity Monitoring System 1 Lot 10 Water Leak Detection System 1 Lot 11 Datacenter Access Control System (biometrics, Magnetic Door Lock, Etc.) 1 Lot 12 Structured Cabling 1 Lot 13 Fiber Optic Backbone 1 Lot 14 Core Switch 2 Units 15 Server Farm Switch 2 Units 16 Access Switch 4 Units 17 Access Points 63 Units 18 Transceivers (for Inter-network Link Of Devices) 32 Units 19 End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables 1 Lot 20 Softcopy And Hardcopy (hardbound) Documentation (as-built, Test Plan, Ip Address Assignment, Vlan Assignment, User’s Manual, Administrators Manual, Etc.) 1 Lot 4. Technical Requirements 4.1 The Bidder Shall Comply With The Following Minimum Specifications For The Physical Data Center And Network Components Of The Project: Item Description Bidder’s Statement Of Compliance Item No 1 Site Preparation (civil, Mechanical, And Electrical Works) • Electrical Wirings With Grounding • Service Entrances For Utilities • Ceiling Installation • Installation Of Industry-grade Data Center Main Door • Installation Of Datacenter Cooling System Item No 2 Laying Of New Electrical Power Lines Distributions/ups Transfer • Provision Of Main Distribution Panel Board (mdp) Main 125a/3p/400vac • Provisioning, Installation, And Configuration Of Dedicated Ats • Provisioning, Installation, And Configuration Of Dedicated Generator Set (at Least 50kva, 129 Amp, Three Phase Dual Voltage, 220-240v Output, At Least 60hz Frequency) • Excavation/backfilling From The Building To The Powerhouse For The Encasement Of The Feeder Line For Power, Ats, And Genset • Transfer And Re-termination Of Electrical Requirements For 2 Units 20kva Ups • Transfer Of Other It Assets From The Old Data Center To The New Data Center • Provisioning Of Electrical Distribution From Data Center Power To Mdfs Located Per Floor • Lighting Fixtures For Datacenter • Testing Of Electrical Equipment Item No 3 Tracing, Tagging, Relocation, And Transfer Of Boi Fas-itd It Equipment (servers, Switches, Routers, Etc.) From 5th Floor To 4th Floor • Tracing Of Backbone To Core Switch Connection • Tracing Of Connection Between Devices Inside The Datacenter • Tagging Of Copper And Fiber Optics Wire Inside The Datacenter • Cable Management • Vertical And Horizontal Cabling From Datacenter To Mdfs And Mdfs To End-nodes Item No 4 Provisioning Of Two (2) 42u Regular Server Racks • 42u With Roof, Side Panel, Castors, Feet, And Brackets • Adjustable Shelf • Vertical Cable Manager • At Least 1 Rack Mountable Kvm (keyboard, Video, Monitor) • Power Rail/strip Options Item No 5 Provisioning Of Three (3) 24u Server Racks To Be Deployed At Mdfs • 24u With Roof, Side Panel, Castors, Feet, And Brackets • Heavy-duty Steel Construction • Door Locks • Anti-tamper Sensors • Network Management Card, Remote Monitoring Capabilities, Snmp Support • With Power Distribution Units (pdu), And Ups Compatibility • Cable Manager Item No 6 Physical Security (door Access, Biometrics, Temperature Monitoring) • Provisioning Of A Solid Door And Tempered Glass Around The Proposed Data Center (1/2, Frameless Door) • Door Access Control Should Conform To Iso-27001 Standards • Magnetic Lock • Biometrics Based Access Control • Access Logs Should Be Maintained For A Minimum Of One Year Or Longer As Specified By The Site Security Policy. • Secured Doors Must Fail Open In A Fire Emergency. Item No 7 Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • Tracing And Tagging Of Backbone Connection From Mdf To Idf • Looping Of Excess Fiber Cable • Re-termination Of Fiber Cable If Necessary Item No 8 Monitoring Room Inside The Proposed Data Center • Provisioning Of Additional Room Inside The Data Center To Serve As A Monitoring Room Item No 9 Anti-static Flooring • Not Generate Static • Groundable After Installation • Have Permanent Static-resistant Properties That Can Provide Protection Amidst Changing Temperatures, Humidity Levels, And Foot Traffic Item No 10 Precision Air Conditioning Unit (pacu) - 2 Units • Shall Have A Nominal Capacity Of Up To Ten (10) Kw • Shall Be Free Blow Type With Plenum And Directional Air Flow Louver Grille • Panels Shall Have A Solid And Rigid Double Skin Insulated • Shall Have A Minimum Net Sensible Capacity Of Ten (10) Kw • Shall Have A Minimum Net Total Capacity Of Eleven (11) Kw • Shall Have A Built-in Touch Screen Display That Provides Informative And User-friendly Interface For Easy Navigation • Shall Have A Built-in Auto Sequencing (1unit Operational And 1unit Back-up, Every 3 Days Sequence Of Operation) • Shall Be Single Circuit Dx Type, Freon R410a • Shall Have Electronic Expansion Valve • Shall Be 380vac,3ph, 6ohz • Shall Recommend Placement Of Air Conditioner Units And Limitations To Be Observed Item No 11 Temperature And Humidity Sensor, And Water Leak Detection System • Base Unit: Sensor Gateway For Up To 4 External Probes • Poe Switch 8 Ports • Sensor Hub • Temperature And Humidity Sensor • Water Leak Sensor Probe • Extension Cable For Water & Flooding Sensor Item No 12 General Requirements Mobilization And Demobilization Labor, Installation, Engineering, And Project Supervision Testing And Commissioning As-built Plans And Documentation (inclusive Of Signed And Sealed) 4.2 Supply, Delivery, Installation, Configuration, And Commissioning Of Network Equipment. Qty Specifications Bidder’s Statement Of Compliance 2 Layer 3 Data Switch To Act As Enterprise Core Layer Switch Features 1. High Performance And Throughput • High Port Density (24-48 Ports) • At Least 960 Gbps Switching Capacity • High Forwarding Rate • Line-rate Packet Processing With Minimal Latency • Non-blocking Architecture With Wire-speed Performance Across All Ports 2. Advanced Switching Capabilities • Layer 2 And Layer 3 Switching Capabilities • Support For Multiple Switching Fabrics • Advanced Qos (quality Of Service) Mechanisms • Support For Vlan Segmentation And Routing 5 High Redundancy And Reliability • Dual Power Supplies • Hot-swappable Components • Redundant Supervisor Engines • Support For Virtual Chassis Technologies • Comprehensive Fault Tolerance Mechanisms 6 Security Characteristics • Advanced Access Control Lists (acls) • Port Security Features • Dhcp Snooping • Dynamic Arp Inspection • Ieee 802.1x Authentication • Integrated Threat Management 7 Routing Protocol Support • Bgp • Ospf • Is-is • Mpls • Multi-protocol Routing Capabilities 8 Management And Monitoring • Snmp Support • Comprehensive Network Monitoring Tools • Remote Management Interfaces • Detailed Logging And Diagnostic Capabilities • Advanced Technological Support 9 Hardware-based Packet Forwarding • Support For Software-defined Networking (sdn) • Ipv6 Compatibility • Mpls And Vpn Support 10 Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 2 Layer 3 Data Switch To Act As Server Farm Switch Features: 1. High-performance Specifications • High Port Density (24-48 Ports) • Wire-speed Performance • Low Latency Switching • Gigabit Ethernet Support • At Least 960 Gbps Switching Capacity 2. Advanced Connectivity Features • Support For Multiple Interface Types • Layer 2/layer 3 Capabilities • Fabric Connection Technologies • Vm-aware Networking 3. Redundancy And Reliability • Hot-swappable Components • Dual Power Supplies • Redundant Supervisor Engines • Non-stop Forwarding (nsf) • Stateful Failover Capabilities 4. Performance Security Features • Hardware-based Acls • Port Security • Advanced Threat Protection • Ieee 802.1x Authentication • Micro-segmentation Support 5. Management Capabilities • Advanced Monitoring Tools • Snmp Support • Comprehensive Logging • Remote Management Interfaces • Network Telemetry 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 4 Layer 3 Data Switch To Act As Access Layer Switch 1. Port Density And Connectivity • Minimum Of 48 Ports • Support For 1g/10g Interfaces • Rj45 And Sfp/sfp+ Port Options • High-density Connectivity • Poe/poe+ Support (up To 30/60 Watts) 2. Performance Characteristics • Low Latency Switching • Wire-speed Performance • Minimum 80-160 Gbps Switching Capacity • Packet Forwarding Rate: 100-240 Mpps 3. Advanced Switching Capabilities • Layer 2/layer 3 Functionality • Vlan Segmentation • Spanning Tree Protocol (stp/rstp) • Link Aggregation (lacp) • Quality Of Service (qos) Support 4. Security Features • Port Security • 802.1x Authentication • Dynamic Arp Inspection • Dhcp Snooping • Mac Address Filtering • Private Vlans • Storm Control 5. Management Capabilities • Snmp Support • Cli Access • Web-based Management • Remote Monitoring • Syslog Integration • Fast Convergence Protocols • Redundant Power Supplies 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 63 Wireless Access Points 1. Performance Characteristics • Dual-band (2.4 Ghz And 5 Ghz) • Wi-fi 6 (802.11ax) Support • Maximum Theoretical Throughput: 5.4 Gbps • Concurrent Dual-band Operation 2. Coverage And Capacity • Recommended Coverage: 150-200 Users Per Ap • Indoor Enterprise-grade Performance • Suitable For Open Offices, Conference Rooms, And Collaborative Spaces 3. Technical Specifications • 4x4:4 Mu-mimo Technology • Beamforming Support • Maximum Concurrent Clients: 512 • Transmit Power: Up To 25 Dbm 4. Advanced Features • Ai-driven Wireless Optimization • Automated Channel And Power Management • Location Services • Cloud-managed Platform 5. Security Capabilities • Wpa3 Support • 802.1x Authentication • Rogue Ap Detection • Integrated Security Fabric • Advanced Threat Protection 6. Artificial Intelligence • The Wireless Solution Must Include Virtual Network Assistant That Supports Natural Language Processing (nlp) Capabilities For Daily Operation. • Api Integration With Generic Ai Such As Google, Alexa And Siri Is Not Considered As Virtual Network Assistant Feature. • The Virtual Network Assistant Must Provide A Conversational Interactive Interface. • The Virtual Network Assistant Must Provide A Single-page Event And Data Correlation View To Eliminate The Need To Pull Up Multiple Dashboards Or Memorize Cli Commands. The Virtual Network Assistant Must Support Multi-vendor Switch Insights: • Switch-ap Affinity To Show How Many Aps Are Connected To A Switch, Reducing Impact Outages • Poe Compliance To Help Manage And Balance The Power Draw Of Connected Devices • Inactive Or Missing Wired Vlans That Are Misconfigured On Switch Ports Where Aps Are Connected But Clients Are Getting Blocked • Version Compliance For Switches Running Dissimilar Hardware • Switch Uptime To Monitor When Switches Are Online Or Offline • The Virtual Network Assistant Must Be Able To Provide Corrective Action Suggestions To Resolve Failures. • The Virtual Network Assistant Must Support Proactive Rma For Unhealthy Access Points. • The Virtual Network Assistant Must Support External Event Triggers Such As Automatic Creation Of A Ticket To External Support Systems With Email Alerts And Webhooks 1 Web-based Controller And Cloud Platform Management 1. Management Capabilities • Identity And Access Management • Centralized Cloud-based Management • Single-pane-of-glass Dashboard • Automatic Firmware Updates • Zero-touch Provisioning • Global Configuration Management 2. Ai-powered Analytics • Proactive Client Experience Monitoring • Automated Troubleshooting • Machine Learning-based Insights • Performance Prediction • Anomaly Detection 3. Security Features • Integrated Security Management • Automatic Threat Detection • Rogue Ap Identification • Compliance Reporting • Role-based Access Control 4. Key Functionalities • Network Configuration • Client Location Services • Performance Analytics • Detailed Reporting And Visualization 5. Access Methods • Web Browser Interface • Mobile Application • Continuous Monitoring And Optimization 1 Lot Structured Cabling • Cat6 Utp Cable • Information Outlet • Faceplate • Patch Panel 5. Scope Of Work Bidders Shall Comply With The Following: • Bidders Shall Be Allowed To Visit The Actual Site For The Preparation Of The Plans Prior To The Submission Of Their Proposal. Bidder Shall Submit An Architectural And Electrical Layout/design Based On User Requirements Together With Their Technical Bid Proposal. • Supply, Delivery, And Installation Of Complete Site Preparation Labor And Materials Including Other Peripherals Needed To Complete The Site Without Additional Cost To Procuring Entity. Bidder Shall Submit A Complete Bill Of Materials For The Site Preparation Component. • Transfer Of Existing Network Components, Servers, And Other It Peripherals From Current Location To New Data Centers • Supply And Installation Of Data Centers Power Distribution And Pacu Power Supply. • Supply, Delivery, And Installation Of Complete Fire Suppression System Including Hangers, Support, And Other Peripherals That May Be Needed To Complete System Without Additional Cost To Procuring Entity. • Supply, Delivery, And Installation Of Complete Security Door Access Input And Output Cables Including Rough-ins, Hangers, Supports, And Other Peripherals That May Be Needed To Complete The System Without Additional Cost To Procuring Entity. Registration Of Personnel To The Door Access System Shall Be Scheduled To Avoid Disruption Of Work. • Provisioning Of Vertical And Horizontal Cabling • Testing Of Each System Shall Be Done Accordingly And Will Be Certified As Completed After Performing And Passing The Functionality Test And The User Acceptance Test. 6. Product Support Requirement 6.1 24x7 Remote Support Through Phone And Email; And Services Assistance Thru Email, Phone, And Web-chat With A Response Time Of Not More Than An Hour Upon Receipt Of The Request From Boi. 6.2 Provision Of 24x7 On-site And On-call Services. 6.3 Provide Comprehensive Service Level Agreement 7. Bidders Eligibility And Project Team Requirements 7.1 A Philippine Contractor Accreditation Board License. At Least With Category A Level; With Classifications In Communication Facilities, Mechanical Works, Electrical Works, And Air-conditioning Works 7.2 The Contractor Must Have At Least One (1) Employed Electronics/electrical Engineer Fully Certified. A Copy Of The Certification Shall Be Provided. A Certified Engineer Must Be Employed By The Bidder For At Least Three (3) Years. 7.3 An Employed Certified Data Center Specialist Personnel; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.4 An Employed Safety Officer With A Construction Occupational Safety And Health Certificate; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years. 7.5 An Employed Certified Associate In Project Management; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.6 The Bidder Must Have Completed At Least One (1) Similar Project In The Supply, Delivery, Installation, Testing, And Commissioning Of A Datacenter Within The Last 10 Years. This Should Be Supported By A Certificate Of Completion And Acceptance By The Client. 7.7 Bidder Should Provide A Certificate That Has 24x7 Technical Support Capabilities. Bidder Should Identify The Person Responsible For Restoring Service Due To Outages And Provide His Contact Details I.e. Contact Person, Position, Contact Numbers, And Email Address. 7.8 Contractors Must Have Philippine Contractors Accreditation Board (pcab) Licenses Required By Republic Act 4566 To Perform Telecommunications /communications Installations. 7.9 A Member Of The Safety Organization Of The Philippines 7.10 A Certificate To Show The Company Is Registered With The National Privacy Commission 7.11 All Prospective Bidders Must Be Authorized Resellers Of All Equipment To Be Supported By A Certificate Issued By The Manufacturer/distributor Of Equipment/materials. 7.12 All Prospective Bidders Shall Submit The Original Copy Of The Design Proposal, Brochures, And Other Publications That Support Compliance To The Requirements. 7.13 Proposed Work Plan And Detailed Implementation Schedule For The Project Covering The Whole Period. Prospective Bidders Are Required To Conduct Site Inspections. This Is To Ensure The Reliability, Security, And Efficiency Of The Required Services That The Contractor Shall Perform. The Timeframe Should Be Specified For Each Activity To Be Done And Shall Include Gantt Chart Summary. 7.14 The Contractor Shall Be Held Solely Responsible For Any Property Or Personal Damages Or Claims, Including Damage To Existing Structures, Systems, Equipment, And/or Site Caused By The Contractor Shall Repair Or Replace It To Its Original Condition At No Additional Cost To The Office. 7.15 The Contractor Shall Be Responsible And Accountable For The Removal And Proper Disposal Of Material And Waste Generated By This Project. Debris, Surplus Materials, Equipment, Etc. Shall Be Removed Daily. 7.16 All Prospective Bidders Shall Submit Original Copy Of Design Proposal, Brochures And Other Publications That Supports Compliance To The Requirements. 8. Project Team Requirements/composition Team Composition And Qualifications The Winning Bidder Shall Assemble A Comprehensive Project Team With The Following Mandatory Positions And Qualifications: Project Management Team 8.1 Project Manager O Minimum Of 10 Years Of Experience In Large-scale It Infrastructure Projects O Proven Track Record In Data Center And Network Refresh Initiatives O Relevant Pmp (project Management Professional) Or Equivalent Certification O Demonstrated Experience In Managing Complex Technological Transformations 8.2 Deputy Project Manager O Minimum Of 7 Years Of Experience In It Infrastructure Projects O Strong Technical Background In Data Center And Network Technologies 8.3 Network Infrastructure Lead O Minimum Of 8 Years Of Specialized Experience In Enterprise Network Design O Advanced Certifications (ccie, Ccnp, Or Equivalent) O Expertise In Modern Network Technologies, Including Sdn, Cloud Integration, And Cybersecurity 8.4 Data Center Infrastructure Specialist O Minimum Of 8 Years Of Experience In Data Center Infrastructure Design And Implementation O Expert In Cooling, Power Management, And Physical Infrastructure Design O Certifications In Data Center Design And Management Support And Implementation Team 1. Senior Systems Engineers (minimum 2) O Each With At Least 6 Years Of Experience In Enterprise System Integration O Comprehensive Knowledge Of Server, Storage, And Virtualization Technologies 2. Network Engineers (minimum 2) O Each With At Least 5 Years Of Experience In Enterprise Network Implementation O Expertise In Network Configuration, Optimization, And Security Additional Team Requirements • The Winning Bidder Must Provide Detailed Cvs And Certifications For Each Key Team Member • Any Changes To The Proposed Team Composition Must Be Pre-approved By The Board Of Investments • The Team Must Demonstrate Collective Experience In Similar Large-scale Infrastructure Projects • All Team Members Must Be Available For The Full Duration Of The Project • The Bidder Must Have A Clear Succession And Backup Plan For Critical Roles The Board Of Investments Reserves The Right To Request Changes To The Team Composition If It Does Not Meet The Project's Critical Requirements. 9. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The All Equipment To Ensure Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Bidder To The Authorized Inspectors At No Charge To The Procuring Entity. 10. Warranty 10.1 The Bidder Shall Provide A Preventive Maintenance Program During The Warranty Period For All The Delivered Equipment And System. 10.2 The Bidder Shall Provide Quarterly Preventive Maintenance On The Pacu, Fire Suppression, Power Distribution Units, And Door Access System During The Warranty Period. 10.3 The Bidder Shall Provide Not Less Than 4 Hours Of Response Time After Receiving Calls From The Client During The Warranty Period. 10.3 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 11. License And Subscription Renewal Provision The Board Of Investments Maintains Absolute And Unconditional Rights To Renew Or Extend All Software Subscriptions, Licenses, And Service Entitlements Beyond The Initial Warranty Or Contract Period. Upon The Expiration Of Any Initial Warranty Or Support Period, We Reserve The Comprehensive Right To Renew Existing Software Licenses, Extend Service Subscriptions, Continue Maintenance And Support Contracts, And Maintain Full Access To All Software And Platform Entitlements. The Successful Bidder Must Provide Comprehensive Documentation Of All Existing Licenses And Subscriptions. This Includes Delivering Complete Credentials, Access Keys, And Licensing Information To Facilitate Seamless Transitions And Ensure Our Continued Operational Effectiveness. We Require Full Disclosure Of Licensing Terms, Clear Renewal Pathways, And Complete Transparency In All Licensing Models. 12. Delivery The Delivery And Commissioning Of All Items For The Data Center Shall Not Exceed 120 Calendar Days Upon Issuance Of The Corresponding Notice To Proceed (ntp). The Commissioning And Initial Testing Shall Be Conducted Within 2-3 Calendar Days After Each Component Is Completed And Witnessed By The End User. After Completion Of The Data Centers, The Bac-twg Together With End User Shall Conduct Functionality Tests. These Will Ensure That All Of The Project's Specifications And Requirements Are Met Must Provide In Hard And Soft Copies Detailed Project Documentation Of The Following: A. Project Implementation Plan With Timetable, B. Installation And Configuration Manual, C. Incident And Problem Escalation Procedure With A List Of Designated Technical Support Engineers, D. Sla (service Level Agreement) E. User Acceptance Test Plan, 13. Training And Technology Transfer A. The Contractor Must Provide Training For At Least Five (5) It Personnel For The Network Equipment/switches, And Troubleshooting For The Structured Cabling And Management Of The Data Center For At Least Three (3) Days Per Module. B. To Ensure That Proper Maintenance And Sustainment Appropriate Training Shall Be Conducted By The Contractor As Essential Part Of Technology Transfer To Prepare And Equip Boi And Its Personnel In The Overall Operations And Maintenance Of Its Network Infrastructure And It Facility. C. The Contractor Shall Submit A Program Of Instruction (poi) Detailing All The Training Activities To Be Conducted For Review, Evaluation, And Approval Of Boi. Hands-on Training Shall Form Part Of The Training Program. D. Operation And Training Manuals Shall Be Provided To Each Participant. E. The Training Shall Be Conducted And Completed Before The Issuance Of The Certificate Of Project Completion And Acceptance. F. All Expenses Related To Training (e.g. Venue, Meals, Equipment, Certificate.) Shall Be Borne By The Contractor. G. Certificate Of Training/s Shall Be Given By The Contractor To All Participants. 14. Liability Of The Bidder The Bidder’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 15. Incidental Services 1. Spare Parts The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. In The Event Of Termination Of Production Of The Spare Parts/expiration Of Software Licenses O Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; O Following Such Termination Of Production, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested; O The Bidder Shall Carry Provide The List Of Vendor Of Consumable Spare Parts Or Components For The Equipment. 16. Institutional Requirements Equipment And Asset Ownership All Equipment, Hardware, Software, Infrastructure Components, And Other Tangible And Intangible Assets Procured, Installed, Or Developed During The Data Center Rehabilitation And Network Refresh Project Shall Become The Sole And Exclusive Property Of The Board Of Investments (boi). The Contractor Is Prohibited From Removing Any Delivered Items From The Project Site After Installation Or Project Completion. Specific Provisions Include: • Full Ownership To All Project-related Assets Shall Immediately Transfer To Boi Upon Delivery Or Installation • The Contractor Shall Provide All Necessary Documentation To Formally Transfer Ownership, Including But Not Limited To Equipment Lists, Serial Numbers, Warranty Information, And Certificates Of Ownership • Any Attempt To Remove Or Retain Project-related Items Without Authorization Will Be Considered A Material Breach Of Contract The Contractor Shall Submit Project Implementation And Management Plan (pimp) Within Ten (10) Calendar Days Upon Receipt Of Notice To Proceed For The Implementation Of The Proposed Solution, Which Is Subject To Review And Approval By The Boi. The Pimp Shall Include But Not Be Limited To The Following: • Scope Of Work • Project Organization • Implementation Methodology • Project Timeline • Communication And Deployment Strategy The Contractor Shall Provide Complete Documentation, One (1) Soft Copy And Three (3) Printed Copies, For Every Deliverable And At Every End Of Each Development Stage And Milestone Which Must Be Submitted To The Boi For Approval. Boi Shall Own Any And All Documents And Shall Reserve The Right To Reproduce At No Additional Cost. The Documentation Must Be Written In English With Concise And High-quality Presentation To Include But Not Limited To The Following: 1. Technical Manuals: • As Built Document • Infrastructure Diagrams And Topology • Troubleshooting And Installation Guides • Single Line Diagram • System/operation Manual 2. Operations And Maintenance Manuals 17. Intellectual Property Rights The Bidder Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 18. Approved Budget Cost The Board Of Investments Intends To Apply The Sum Of Thirty-one Million Pesos (31,000,000.00) Being The Approved Budget For The Contract (abc) For The Completion Of The Relocation And Transfer Of The Board Of Investments’ Datacenter And It Related Infrastructure From 5th Floor To 4th Floor To Be A High-performing And Scalable It Infrastructure. Bids Received In Excess Of The Abc Shall Be Automatically Disqualified At The Opening Of The Financial Proposals. Prices Are In Php And Are Vat-inclusive. 19. Source Of Funds The Budget Authorized For Procurement Of Service For The Relocation And Transfer Of Boi Datacenter From 5th Floor To 4th Floor Shall Be Sourced From The 2025 Capital Outlay (co) And Maintenance And Other Operating. Expenses (mooe), Pursuant To The Philippine General Appropriation Act Of 2025. 20. Payment 10% Project Mobilization: Covers Initial Costs, Including Project Planning And Resource Allocation, And To Submit The Project Implementation Plan 25% Network And Datacenter Infrastructure Facility Civil Works All Materials, Equipment, And Labor Necessary For The Construction Of The It Infrastructure Facility Including All Civil Works, Walls, Doors, Partitions, Flooring, Security Access Pass, Air-conditioning Unit And Other Accessories/appurtenances As Specified And As Shown In The Drawings. 25% Delivery Of Equipment And Materials, Structured Cabling, Fixing, Installation Of Cables, Conduit, Outlets Racks Ladders, And Other Components (active Components) All Materials Are To Be Used In The Installation And Cabling. Installed Cables, Conduit, And Components And Tested And Working Cable Lines. 30% Upon Submission Of Certification Of 100% Completion Of Project And Passing Of The Functionality Test To Be Administered By The Bac-twg And Witnessed By The Bac 5% Training Of Personnel For The Completed Network And It Infrastructure Facility. 5% Retention Fee 100% 21. Penalty In Case There Is A Delay In The Delivery And Installation Of The Software Where Boi Is Not At Fault, The Contracted Service Provider Shall Be Subject To Sanctions As Specified In The Contract To Be Signed By Both Parties Based On The Applicable Provisions Of The Procurement Law.
Closing Soon15 Jan 2025
Tender AmountPHP 31 Million (USD 534.1 K)
BUREAU OF FISHERIES AND AQUATIC RESOURCES 9 Tender
Agriculture or Forestry Works
Philippines
Details: Description Job Order - Labor And Materials For The Development Of Regional Seaweed Culture-seaweed Land Based Facility Of Bfar-ix At Integrated Mariculture Outreach Station (imos) At Isabela City, Basilan Province Seaweed Scope Of Work; I. Generl Requirements Ii. Civil / Structure Works (land Based Seaweeds Facility) Iii. Shuttering / Formworks 1. The Bureau Of Fisheries And Aquatic Resources Regional Office No. Ix, Through The General Appropriation Act Cy 2024 Intends To Apply The Sum Of Five Million Four Hundred Ninety Nine Thousand Nine Hundred Ninety Two And 03/100 Pesos Only (php 5,499,992.03), Being The Abc To Payments Under The Contract For "job Order – Labor And Materials For The Establishment Of Land Based Seaweeds Facility In Imos, Isabela City, Basilan". Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Fisheries And Aquatic Resources Regional Office No. Ix, Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By One Hundred Twenty Working Days (120 Working Days). Bidders Should Have Completed, Within 2 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Under Section 23.4.1.2 Of The 2016 Revised Irr Of Ra No. 9184 Exists:] Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184. 4. Prospective Bidders May Obtain Further Information From Bureau Of Fisheries And Aquatic Resources Regional Office No. Ix, And Inspect The Bidding Documents At The Address Given Below During 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 31,2024 From The Given Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php 10,000.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees. [note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots.] 6. The Bureau Of Fisheries And Aquatic Resources Regional Office No. Ix, Will Hold A Pre-bid Conference On January 7,2025 At 2:00 O’clock In The Afternoon At Bfar Bac Office, R.t. Lim Boulevard, Zamboanga City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before January 20, 2025 At 10:00 O’clock In The Morning. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 20, 2025 At 2:00 O’clock In The Afternoon At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Bureau Of Fisheries And Aquatic Resources Regional Office No. Ix, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. In Compliance To Memorandum Dated December 18, 2020 Signed By The Secretary Of Department Of Agriculture To All Heads Of Attached Agencies Including The Bac Offices The Inclusion To Notice / Announcement That The “department Of Agriculture Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff / Employees Or Any Other Party, Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation”. Muhaimin S. Maharail Bureau Of Fisheries And Aquatic Resources No. Ix R.t. Lim Boulevard Cawa-cawa, Zamboanga City December 27, 2024 Erlinda M. Puy, Mfm, Sgd. Bac Chairperson 09171194186
Closing Date20 Jan 2025
Tender AmountPHP 5.4 Million (USD 94.7 K)
Manila International Airport Authority Tender
Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid The Manila International Airport Authority (miaa For Brevity), Now Invites Bids For The Procurement Project, Particularly Described As: Project Name / Title Proposed Construction Of Additional Comfort Rooms At Naia Terminal 1, 2, And 3 Contract Duration Two Hundred Twenty-four (224) Calendar Days Bidder Eligibility Must Have Experience In The General Building Construction Involving Civil And Architectural Works, Electrical Works And Mechanical Works. Source Of Funding And Year Cy 2024 Cob Approved Budget For The Contract (abc) Amount In Words Pesos: One Hundred Twenty-one Million Nine Hundred Twelve Thousand Five Hundred Ninety-five And 31/100 Only Amount In Figures Php121,912,595.31 In Philippine Currency Procurement Project/ Identification Number Responsibility Center Code No. 24-e23d-10604010-22 Source Of Funding And Year Cy 2024 Cob Particulars: Intends To Apply The Sum Of Php121,912,595.31 Corresponding To Each Lot/item Per 24-e23d-10604010-22 Or Each Lot/item Being The Abc To Payments Under The Contract For Each Lot/item. The Schedules Of Bac Activities Are As Follows: Activities Date And Time Venue 1. Issuance Of Bid Documents Prospective Bidders May Obtain Further Information From Bac Secretariat And Inspect The Bidding Documents. Cost Of Bidding Documents Php50,000.00 Only. January 03, 2025 To January 28, 2025 (8:00 Am-5:00 Pm) Bac Secretariat 4/f, Miaa Administration Building 2. Pre-bid Conference 14 January 2025 At 02:00 Pm Audio Visual Room, 4/f, Miaa Administration Building 3. Submission And Receipt Of Bids Must Be Duly Received By The Bac Secretariat. Late Bids Shall Not Be Accepted 28 January 2025 Not Later Than 12 Nn. Bac Secretariat 4/f, Miaa Administration Building 4. Bid Opening 28 January 2025 At 2:00 Pm Audio Visual Room, 4/f, Miaa Administration Building Bids Received In Excess Of The Abc Are Automatically Rejected At Bid Opening. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Instruction To Bidders (itb) Clause 14. The Miaa Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Mr. Benjamin T. Manalili Iii Bids And Awards Committee Nos. 88771109 Loc. 3736,3838 And 3010 E-mail: Bac@miaa.gov.ph / Miaa.bac.secretariat@gmail.com Date Of Issue: January 03, 2025 …. --------------------------------------------------------------------------------------- Mgen. Manuel V. Sequitin, Pa (ret) Cese Chairperson, Miaa Bids And Awards Committee
Closing Date28 Jan 2025
Tender AmountPHP 121.9 Million (USD 2.1 Million)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 48.9 Million (USD 844.2 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 1.9 Million (USD 34 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 48.9 Million (USD 844.3 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 48.9 Million (USD 844.2 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 2.9 Million (USD 51.1 K)
Department Of Public Works And Highways Tender
Civil And Construction...+1Road Construction
Philippines
Details: Description Invitation To Bid December 26, 2024 1. The Dpwh–biliran District Engineering Office, Through Gaa Fy-2025, Intends To Apply The Sum Of The Approved Budget For The Contract (abc) Stated Below Being The Abc To Payments Under The Contracts Below. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening And Declared Non-complying/failed. 2. The Dpwh–biliran District Engineering Office, Through Its Bids And Awards Committee (bac) Now Invites Bids For The Hereunder Works Of The Following Contract/s: 1. Procurement Id/contract Id : 25ia0117 Contract Name : Network Development - Road Widening - Secondary Roads - Biliran Circumferential Rd- K1084+018 -k1084+914, K1086+112 – K1086+940 Contract Location : Caibiran, Biliran (11.563842°, 124.570051° - 11.56508°, 124.575899°; 11.563979°, 124.586687° - 11.55929°, 124.592931°) Project Description/scope Of Work : Road Concreting Of 3.448 Lane Kilometer, Shouldering, Drainage, Slope Protection And Solar Lightings. Approved Budget For The Contract : P 77,198,022.59 Contract Duration : 290.00 C.d. Cost Of Bidding Documents : P 50,000.00 2. Procurement Id/contract Id : 25ia0118 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+660 - K1039+710 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.504446°, 11.586165° To 124.504884°, 11.586058°) Project Description/scope Of Work : Construction Of 2073.61 Sq.m / 50 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,997,784.96 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 3. Procurement Id/contract Id : 25ia0119 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+710 - K1039+750 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran District (124.50488°, 11.586064° To 124.505242°, 11.586159°) Project Description/scope Of Work : Construction Of 2083.95 Sq.m / 40 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,000.00 Contract Duration : 222.00 Cd Cost Of Bidding Documents : P 25,000.00 Page 2 Of 4 4. Procurement Id/contract Id : 25ia0120 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+750 - K1039+780 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.505235°, 11.586134 To 124.50549°, 11.586166°) Project Description/scope Of Work : Construction Of 2094.3 Sq.m / 30 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,521.14 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 5. Procurement Id/contract Id : 25ia0121 Contract Name : Rehabilitation/ Reconstruction Of Roads With Slips, Slope Collapse, And Landslide - Secondary Roads - Naval-caibiran Cross Country Rd., K1039+910 - K1039+945 Contract Location : Sitio Canceso, Brgy. Cabibihan, Caibiran, Biliran (124.506375°, 11.58622° To 124.507009°, 11.586235°) Project Description/scope Of Work : Construction Of 2057.63 Sq.m / 35 Ln.m Road Slope Protection Structure Approved Budget For The Contract : P 48,998,530.99 Contract Duration : 222.00 C.d. Cost Of Bidding Documents : P 25,000.00 6. Procurement Id/contract Id : 25ia0122 Contract Name : Construction Of Multi-purpose Building, Barangay Bacolod, Culaba, Biliran Contract Location : Brgy. Bacolod, Culaba, Biliran (11.667799⁰, 124.518964⁰) Project Description/scope Of Work : Construction Of 1-storey Building Approved Budget For The Contract : P 4,948,478.42 Contract Duration : 110.00 C.d. Cost Of Bidding Documents : P 5,000.00 7. Procurement Id/contract Id : 25ia0123 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay San Pablo, Naval, Biliran Contract Location : Barangay San Pablo, Naval, Biliran 11.541517, 124.422666 Project Description/scope Of Work : Completion Of 1 Unit 1-storey Multi-purpose Building (covered Court) Approved Budget For The Contract : P 2,968,130.81 Contract Duration : 85.00 C.d. Cost Of Bidding Documents : P 5,000.00 8. Procurement Id/contract Id : 25ia0124 Contract Name : Construction (completion) Of Multi-purpose Building, Barangay Tabunan, Almeria, Biliran Contract Location : Barangay Tabunan, Almeria, Biliran (11.65315, 124.361759) Project Description/scope Of Work : Construction Of 2-storey Building Approved Budget For The Contract : P 1,978,237.98 Contract Duration : 90.00 C.d. Cost Of Bidding Documents : P 5,000.00 Page 3 Of 4 Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of Small B & Medium A As Per Pcab Resolution No. 201, Series Of 2017, (b) Completion Of A Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid Costing At Least 50% Of The Abc, And (c) Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc. Contractors/applicants Who Wish To Participate In The Biding Are Encouraged To Enroll With The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Building, Bonifacio Drive, Port Area Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From Dpwh, Biliran District Engineering Office, Naval, Biliran And Inspect The Bidding Documents At The Address Given Below From 8:00a.m. To 5:00 P.m. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From The Address Below And Upon Payment Of An Applicable Fee For The Bidding Documents In The Amount Stated Above. Bidding Documents Fee May Be Refunded In Accordance With The Aforementioned Guidelines Based On The Grounds Provided For Under Section 41 Of The R.a. 9184 And Its Irr. Bidders Can Make Payments For The Purchase Of Bidding Documents At Any Dpwh Field Offices. The Schedule Of Key Procurement Activities For This Contract Is Shown Below: Activity Time Place Date Of Posting December 27, 2024 – January 15, 2025 Dpwh Web / Philgeps / Bulletin Board Issuance Of Bidding Documents December 27, 2024 – January 15, 2025 Bac Office, Biliran-deo, Naval, Biliran Pre-bid Conference January 3, 2025; 10:00 A.m. Bac Conference Room, Biliran-deo, Naval, Biliran Receipt By The Bac Of Bids January 15, 2025, 1:00 P.m. Bac Office, Biliran-deo, Naval, Biliran Opening Of Bids January 15, 2025; 1:00 P.m. Conference Room, Biliran-deo, Naval, Biliran 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That The Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. Pre-bid Conference And Opening Of Bids Will Be Held At The Bac Office, Dpwh-biliran District Engineering Office, Naval, Biliran Which Shall Be Open To All Interested Parties. Bidding For The Above Contract Shall Be Conducted “short Of Award” Pending Availability/ Receipt Of Fy-2025 Funds/saa. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_biliran For Electronic Submission On Or Before January 15, 2025 At 1:00 P.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Page 4 Of 4 11. Bid Opening Shall Be On January 15, 2025 At 1:00 P.m. Immediately After The Deadline Of The Dropping Of Bids At Bac Conference Room, Biliran-deo, Naval, Biliran. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Dpwh-biliran District Engineering Office, Naval, Biliran Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of R.a. 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Head, Bac Secretariat Bac Office, Dpwh Biliran District Engineering Office Brgy. Calumpang, Naval, Biliran Province Telefax No.: (053) 500-9097 Email Add: Dpwh.bdeo@gmail.com Approved: Rosario B. Rosete Assistant District Engineer Bac Chairperson Noted: Irwin L. Antonio, Asean Eng. Oic-district Engineer encoded/printedbyrcpancito December 26, 2024
Closing Soon15 Jan 2025
Tender AmountPHP 48.9 Million (USD 844.3 K)
4021-4030 of 4101 active Tenders