Civil Tenders

Civil Tenders

Department Of Public Works And Highways Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Metro Manila 1st District Engineering Office 2555 Westbank Road, Manggahan Floodway, Rosario, Pasig City Invitation To Bid 1. "the Metro Manila 1st District Engineering Office, Through The Gaa 2024 Intends To Apply The Sum Stated Below Being The Approved Budget For The Contract (abc) To Payments For The Listed Contracts. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening." 2. "the Metro Manila 1st District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works:" A) Contract Id No. : 24ob0521 Name Of Contract : Construction Of Slope Protection Structure Along Sto. Rosario River, Pateros, Metro Manila (phase 1) Location : Pateros, Metro Manila Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 96,499,942.42 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B B) Contract Id No. : 24ob0522 Name Of Contract : Construction Of Slope Protection Structure Along Sto. Rosario River, Pateros, Metro Manila (phase Ii) Location : Pateros, Metro Manila Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 96,499,593.15 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B C) Contract Id No. : 24ob0523 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 1) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,846.68 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B D) Contract Id No. : 24ob0524 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 2) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,690.60 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B E) Contract Id No. : 24ob0525 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 3) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,751.24 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B F) Contract Id No. : 24ob0526 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 4) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,814.24 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B G) Contract Id No. : 24ob0527 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 5) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,714.84 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B H) Contract Id No. : 24ob0528 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 6) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,783.52 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B I) Contract Id No. : 24ob0529 Name Of Contract : Construction Of 2-storey 2-classroom School Building At San Roque Elementary School, Barangay San Roque, City Of Marikina Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 9,949,475.34 Contract Duration : 120 Calendar Days Cost Of Bid Documents : Php 10,000.00 Pcab License Category : Small B - C&d J) Contract Id No. : 24ob0530 Name Of Contract : Construction Of 3-storey 6-classroom School Building In San Roque National High School, Barangay San Roque, Marikina City Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,575.92 Contract Duration : 150 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B K) Contract Id No. : 24ob0531 Name Of Contract : Completion Of 4-storey 8-classroom School Building At Malanday National High School, Barangay Malanday, Marikina City Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 29,849,588.36 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Small B - C&d L) Contract Id No. : 24ob0532 Name Of Contract : Construction Of 4-storey 8-classroom School Building In Sta. Lucia High School Phase 1 (3sty3cl), Barangay Sta. Lucia, Pasig City Location : Pasig City Scope Of Works : Buildings: Construction - With Piles - Low Rise - Concrete (frame) - Cast-in-place Piles (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,185.06 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B M) Contract Id No. : 24ob0533 Name Of Contract : Construction Of Nangka High School 4-storey 12-classroom, Barangay Nangka, Marikina City Location : City Of Marikina Second District Scope Of Works : Buildings: Construction - With Piles - Low Rise - Concrete (frame) - Cast-in-place Piles (1 To 5 Storeys) Approved Budget For The Contract : Php 79,599,994.88 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B N) Contract Id No. : 24ob0534 Name Of Contract : Construction Of School Building (3-storey 6-classroom) At Tañong High School, Brgy. Tañong, Marikina City Location : City Of Marikina First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,868.65 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B O) Contract Id No. : 24ob0535 Name Of Contract : Completion Of 5-storey 30-classroom At Nangka High School, Barangay Nangka, Marikina City Location : City Of Marikina Second District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 74,624,930.48 Contract Duration : 210 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B 3. "prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category As Stated In Each Contract. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents." "contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated." The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. "bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non- Discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The ""government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification." 5. "interested Bidders May Obtain Further Information From The Metro Manila 1st District Engineering Office And Inspect The Bidding Documents At West Bank Road, Manggahan Floodway, Rosario, Pasig City During Weekdays From 7:00 A.m To 4:00 P.m." 6. "a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 23, 2024 - January 14, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Specified In Each Contract" 7. "it May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids." 8. "the Metro Manila 1st District Engineering Office Will Hold A Pre-bid Conference On January 02, 2025 At 1:00p.m. At Mm1deo-conference Room, Rosario, Pasig City, Which Shall Be Open To Prospective Bidders." 9. "bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds." 10. "bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_metromanila1@dpwh.gov.ph For Electronic Submission On Or Before January 14, 2025 At 10:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18." 11. "bid Opening Shall Be On January 14, 2025 Immediately After The Deadline For Submission Of Bids At Dpwh-mm1deo Conference Room, Rosario, Pasig City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted." 12. "the Metro Manila 1st District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders." 13. For Further Information, Please Refer To: Rodel A. Santos Eduardo B. Del Rosario Head, Bac Secretariat Bac Chairman Bac Office: Mm1deo, Rosario, Pasig City Bac Office: Mm1deo, Rosario, Pasig City Telephone No.: (02) 8641-44-08 Telephone No.: (02) 8641-44-08 Eduardo B. Del Rosario Chief, Construction Section Bac Chairman Noted: Aristotle B. Ramos District Engineer
Closing Date14 Jan 2025
Tender AmountPHP 39.7 Million (USD 681.3 K)

City Of Bayawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Cement And Additives 1 506 Bag Cement, Portland (40kgs/bag), Type 1 Lot No. Ii Aggregates 2 88 Cu.m. Sand, Washed Mixing/screened 3 8 Cu.m. Round Gravel, (screened & Washed), Max. Size 38mm Dia 4 12 Cu.m. Round Gravel, (screened & Washed), Max. Size 20mm Dia Lot No. Iii Bar And Rebar 6 102 Length Angle Bar, 4mm X 25mm X 25mm X 6mm 7 50 Length Round Bar, Plain 10mm X 6.0m 9 673 Length Deformed Steel Bar, 10mm X 6m, Grade 33 10 69 Length Deformed Steel Bar, 16mm X 6m, Grade 40 11 67 Length Deformed Steel Bar, 20mm Dia X 6m, Grade 40 12 54 Length Deformed Steel Bar, 25mm X 6m, Grade 60 Lot No. Iv Construction Supplies And Materials 8 8 Sheet Phenolic Board, 18mm-20mm X 1.22m X 2.44 Type 1 13 111 Meter Tie Wire, # 16 15 10 Piece Cutting Disc, 100mm Dia, For Metal 16 2 Box Nails, Common Wire 63mm (25kgs/bx) 17 2 Box Nails, Common Wire 75mm (25kgs/bx) 18 5 Piece Cut-off Disc/wheel, 350mm, Heavy Duty 20 6 Box Rod/electrode, Welding, E6013, 1/8" (bx) Matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 21 4000 Piece Tex Screw, 63mm, For Steel (pc) 22 500 Piece Tex Screw, Hd #9 X 37mm With 12mm Dia Neoprene Bonded Steel Washer 23 3 Box Blind Rivets, 3mm Dia X 9mm Long (1000 Pcs/bx) 24 4 Tube Silicone Sealant, (300gm/300ml/tube) 28 30 Piece Expansion Bolt, 8mm X 65mm (m8), With Nut And Washer 29 3 Piece Drill Bit, 3/16" Dia For Steel 30 3 Piece Drill Bit, Masonry 3/16" Dia 31 5 Piece Drill Bit, Masonry 1/4" Dia 32 5 Piece Drill Bit, Masonry 5/16" Dia 33 5 Piece Drill Bit, Masonry 3/8" Dia 34 5 Piece Cutting Disc, Masonry/concrete, 100mm 41 5 Length Gi Pipe, 40mm Dia X 6m Sched. 40 Wt=2.9mm O.d.=48.30mm 3.247kg/m Light Gauge 42 6 Length Gi Pipe, 50mm Dia X 6m Sched. 40 Std. Heavy Gauge 43 20 Piece Scaffolding Clamp, Swivel 40mm X 40mm 44 20 Piece Scaffolding Clamp, Fixed 40mm X 40mm 45 4 Gallon Leak Plug, Rapid Setting Mortar For Plugging Leaks On Concrete (gal) 46 2 Tube Silicone Sealant And Adhesive, For Concrete, Metal And Timber With Polymer (280ml) 47 46 Gallon Primer, Epocoat Mb, White Catalyst (gal) 49 20 Piece Paint Roller W/ Handle, 175mm 50 5 Gallon Paint Primer, Metal Red Oxide (gal) 70 2 Box Gypsum Screw, 25mm X 3.5mm Dia With Tox (1000pcs/box) 73 5 Can Solvent Cement, Pvc (500 Cc/can) Lot No. V Roof Wall And Ceiling Supplies 5 74 Length C-purlins, 1.5mm X 50mm X 100mm X 6m 19 13 Can Sealant, Elastomeric/roof (1 Liter/can) 37 90 Sheet Roofing, Long Span, Rib Type, Min. T=40mm, Min. Eff. W=1.040m, Min Rib H=50mm, L=3.30m, Color: Terracotta Orange 38 25 Piece Gutter, Valley, Pre-painted, G.i., 0.40mm X 0.610m X 2.44m, Color: Terracotta Orange 39 55 Piece Fascia Flashing, G.i., Pre-painted, 0.40mm X 0.610m X 2.44m, Color: Terracota Orange 40 3 Sheet Polycarbonated Sheet, Solid, 1.20m X 4.8m, T: 4.5mm, Bronze 48 40 Pail Waterroofing, Clever Sil, Water Based Polyurethane Membrane (20kg) Lot No. Vi Gas And Gases For Oxygen And Acetylene 35 2 Tank Acetylene Gas, Refill 36 4 Tank Oxygen Gas, Refill Lot No. Vii Electrical Supplies And Materials 14 16 Piece Turn Buckle, 12mm Dia X .30m Hook & Eye 25 3 Pack Cable Tire, 250mm (100pcs/pack) 26 3 Pack Cable Tire, 350mm (100pcs/pack) 27 3 Pack Cable Tire, 400mm (14") (100pcs/pack) 51 3 Pack C-clamp/clip, Pvc, 20mm Diameter, With Concrete Nails (100s/pack) 52 3 Pack C-clamp/clip, Pvc, 25mm Diameter, With Concrete Nails (100s/pack) 53 1 Pack C-clamp/clip, Pvc, 32mm Diameter, With Concrete Nails (100s/pack) 54 150 Piece "junction Box, 100mm X 100mm, W/ Cover & Screw, Octagonal " 55 10 Set Square Box, Pvc, 150mm X 150mm X 100mm With Cover & Screw 56 75 Piece Utility Box, Plastic, Surface Type 57 100 Length Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 58 50 Length Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 59 15 Length Electrical Pvc Pipe, 32mm Dia X 3m, Thickwall Orange 60 10 Length Electrical Pvc Pipe, 40mm Dia X 3m, Thickwall Orange 61 5 Length Electrical Pvc Pipe, 48mm Dia X 3m, Thickwall Orange 62 3 Pack Pipe Connector, Pvc, Electrical, 20mm Dia (100s/pack) 63 3 Pack Pipe Connector, Pvc, Electrical, 32mm Dia (100s/pack) 64 3 Pack Pipe Connector, Pvc, Electrical, 32mm Dia (100s/pack) 65 10 Piece Connector, Split Bolt, # 1/0 Awg 66 10 Piece Connector, Split Bolt, # 2 (30mm2), Burndy 67 1 Piece Service Entrance Cap, Size 48mm Dia, Clip Type 68 2 Set Secondary Rack, W/ Single Spool Insulator 69 2 Piece Ground Rod, Steel, Galv., 16mm Dia X 3m, W/ Ground Clamp 71 50 Roll Electrical Tape, Vinyl, 177mm X 3/4inch / 19mm X 16m, Flame Retardant, 600v 72 5 Roll Electrical Tape, Rubber 18mm X 5m Self Fusing Ethylene Propylene Rubber (roll) 74 50 Meter Thw Wire, # 1/0 (50mm2), Stranded (m) Black 75 50 Meter Thw Wire, # 1/0 (50mm2), Stranded (m) White 76 35 Meter Thw Wire, # 30 Mm2, Stranded Green 77 20 Meter Thw Wire, # 6 (14mm2) Stranded (m) Black 78 20 Meter Thw Wire, # 6 (14mm2) Stranded (m) White 79 30 Meter Thw Wire, # 6 (14mm2) Stranded (m) Green 80 30 Meter Thw Wire, # 8 (8mm2) Stranded (m) Black 81 30 Meter Thw Wire, # 8 (8mm2) Stranded (m) White 82 50 Meter Thw Wire, # 8 (8mm2) Stranded (m) Green 83 2 Box Thw Wire, # 10 (5.5mm2) Stranded (150m/roll/bx) Black 84 2 Box Thw Wire, # 10 (5.5mm2) Stranded (150m/roll/bx) White 85 1 Box Thw Wire, # 10 (5.5mm2) Stranded (150m/roll/bx) Green 86 8 Roll Thw Wire, # 12 (3.5mm2) Stranded (150m/roll) , Black 87 8 Roll Thw Wire, # 12 (3.5mm2) Stranded (150m/roll) , White 88 2 Roll Thw Wire, # 12 (3.5mm) Stranded (150m/box) , Green 89 37 Piece Lighting Fixture, Led, Round Downlight, 10w, Surface Slim Type, 220v, Daylight 90 71 Piece Downlight, Lighting Fixture, Led, Round, 15w, Surface Slim Type, 220v, Day Light 91 5 Piece Downlight, Lighting Fixture, Led, Round, 24w, Surface Slim Type, 220v, Day Light 92 1 Set Kw-hr Meter, Digital, Class 200, 240v, Single Phase, 4 Jaws, 2-wire With Socket, Edmi Type 93 1 Set Distribution Panel Board, Cen. Main, 6 Branches, 60a, Bolt-on Type, Single Phase, Flsuh Type, W/ Extended Bus Bar 94 1 Set Distribution Panel Board, Cen. Main, 100a, Bolt-on Type, 2 Pole, Branches 12 Units, Single Phase, W/ Extended Bus Bar 95 1 Set Distribution Panel Board, Cen. Main, 100a, Bolt-on Type, 2 Pole, Branches 16 Units, Single Phase, W/ Extended Bus Bar 96 1 Set Distribution Panel Board, Cen. Main, 200a, Bolt-on Type, 2 Pole, Branches 4 Units, Single Phase, Flush Type W/ Extended Bus Bar 97 4 Set Convenience Outlet, W/ Plates 1 Gang 2 Devices Universal Three Prong 98 20 Set Convenience Outlet, Flush Type 2 Gang 3 Prong Grounding W/ Plates Bracket Cover & Screw Universal Type Heavy Duty 99 7 Set Switch Light, Flush Type, Single Gang W/ Plate, Bracket, Cover & Screw 100 13 Set Switch Light, Flush Type, 2 Gang W/ Plate, Bracket, Cover & Screw 101 8 Set Switch Light, Flush Type, 3 Gang W/ Plate, Bracket, Cover & Screw 102 6 Set Switch Light, 3 Way Flush Type, W/ Plate, Bracket, Cover & Screw, Single Gang 103 11 Piece Circuit Breaker, 15a 2 Pole Bolt-on 104 11 Piece Circuit Breaker, 20a 2 Pole Bolt-on 105 8 Piece Circuit Breaker, 30a 2 Pole Bolt-on 106 5 Piece Circuit Breaker, 60a 2 Pole Bolt-on 107 2 Piece Circuit Breaker, 100a 2 Pole Bolt-on 108 1 Set Circuit Breaker, 200a, Single Phase, 2 Pole, W/ Nema 3r Metallic Enclosure *** Nothing Follows *** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 10, 2024 To January 6, 2025@ 5:00 P.m. Pre-bid Conference December 17, 2024@ 9:00 Am Deadline/opening Of Bids January 7, 2025@ 9:00 Am Post Qualification January 14, 2025@ 9:00 Am Awarding Of Bids January 21, 2025@ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman
Closing Date7 Jan 2025
Tender AmountPHP 2 Million (USD 35.4 K)

Department Of Public Works And Highways Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Republic Of The Philippines Department Of Public Works And Highways Metro Manila 1st District Engineering Office 2555 Westbank Road, Manggahan Floodway, Rosario, Pasig City Invitation To Bid 1. "the Metro Manila 1st District Engineering Office, Through The Gaa 2024 Intends To Apply The Sum Stated Below Being The Approved Budget For The Contract (abc) To Payments For The Listed Contracts. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening." 2. "the Metro Manila 1st District Engineering Office Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works:" A) Contract Id No. : 24ob0521 Name Of Contract : Construction Of Slope Protection Structure Along Sto. Rosario River, Pateros, Metro Manila (phase 1) Location : Pateros, Metro Manila Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 96,499,942.42 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B B) Contract Id No. : 24ob0522 Name Of Contract : Construction Of Slope Protection Structure Along Sto. Rosario River, Pateros, Metro Manila (phase Ii) Location : Pateros, Metro Manila Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 96,499,593.15 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B C) Contract Id No. : 24ob0523 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 1) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,846.68 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B D) Contract Id No. : 24ob0524 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 2) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,690.60 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B E) Contract Id No. : 24ob0525 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 3) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,751.24 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B F) Contract Id No. : 24ob0526 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 4) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,814.24 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B G) Contract Id No. : 24ob0527 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 5) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,714.84 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B H) Contract Id No. : 24ob0528 Name Of Contract : Rehabilitation Of Flood Mitigation Structure Along Laguna Lakeshore Area, Taguig City (phase 6) Location : Taguig City Scope Of Works : Flood Control: Construction - Slope Protection Using Structural Measures (e.g. Revetment, Retaining Structures, Wirenet) Approved Budget For The Contract : Php 144,749,783.52 Contract Duration : 300 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B I) Contract Id No. : 24ob0529 Name Of Contract : Construction Of 2-storey 2-classroom School Building At San Roque Elementary School, Barangay San Roque, City Of Marikina Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 9,949,475.34 Contract Duration : 120 Calendar Days Cost Of Bid Documents : Php 10,000.00 Pcab License Category : Small B - C&d J) Contract Id No. : 24ob0530 Name Of Contract : Construction Of 3-storey 6-classroom School Building In San Roque National High School, Barangay San Roque, Marikina City Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,575.92 Contract Duration : 150 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B K) Contract Id No. : 24ob0531 Name Of Contract : Completion Of 4-storey 8-classroom School Building At Malanday National High School, Barangay Malanday, Marikina City Location : City Of Marikina District First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 29,849,588.36 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Small B - C&d L) Contract Id No. : 24ob0532 Name Of Contract : Construction Of 4-storey 8-classroom School Building In Sta. Lucia High School Phase 1 (3sty3cl), Barangay Sta. Lucia, Pasig City Location : Pasig City Scope Of Works : Buildings: Construction - With Piles - Low Rise - Concrete (frame) - Cast-in-place Piles (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,185.06 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B M) Contract Id No. : 24ob0533 Name Of Contract : Construction Of Nangka High School 4-storey 12-classroom, Barangay Nangka, Marikina City Location : City Of Marikina Second District Scope Of Works : Buildings: Construction - With Piles - Low Rise - Concrete (frame) - Cast-in-place Piles (1 To 5 Storeys) Approved Budget For The Contract : Php 79,599,994.88 Contract Duration : 240 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B N) Contract Id No. : 24ob0534 Name Of Contract : Construction Of School Building (3-storey 6-classroom) At Tañong High School, Brgy. Tañong, Marikina City Location : City Of Marikina First District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 39,799,868.65 Contract Duration : 180 Calendar Days Cost Of Bid Documents : Php 25,000.00 Pcab License Category : Medium A - B O) Contract Id No. : 24ob0535 Name Of Contract : Completion Of 5-storey 30-classroom At Nangka High School, Barangay Nangka, Marikina City Location : City Of Marikina Second District Scope Of Works : Buildings: Construction - Without Piles - Low Rise - Concrete (frame) (1 To 5 Storeys) Approved Budget For The Contract : Php 74,624,930.48 Contract Duration : 210 Calendar Days Cost Of Bid Documents : Php 50,000.00 Pcab License Category : Medium A - B 3. "prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category As Stated In Each Contract. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents." "contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated." The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. "bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non- Discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The ""government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification." 5. "interested Bidders May Obtain Further Information From The Metro Manila 1st District Engineering Office And Inspect The Bidding Documents At West Bank Road, Manggahan Floodway, Rosario, Pasig City During Weekdays From 7:00 A.m To 4:00 P.m." 6. "a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 23, 2024 - January 14, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Specified In Each Contract" 7. "it May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids." 8. "the Metro Manila 1st District Engineering Office Will Hold A Pre-bid Conference On January 02, 2025 At 1:00p.m. At Mm1deo-conference Room, Rosario, Pasig City, Which Shall Be Open To Prospective Bidders." 9. "bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds." 10. "bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_metromanila1@dpwh.gov.ph For Electronic Submission On Or Before January 14, 2025 At 10:00 A.m. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18." 11. "bid Opening Shall Be On January 14, 2025 Immediately After The Deadline For Submission Of Bids At Dpwh-mm1deo Conference Room, Rosario, Pasig City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted." 12. "the Metro Manila 1st District Engineering Office Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders." 13. For Further Information, Please Refer To: Rodel A. Santos Eduardo B. Del Rosario Head, Bac Secretariat Bac Chairman Bac Office: Mm1deo, Rosario, Pasig City Bac Office: Mm1deo, Rosario, Pasig City Telephone No.: (02) 8641-44-08 Telephone No.: (02) 8641-44-08 Eduardo B. Del Rosario Chief, Construction Section Bac Chairman Noted: Aristotle B. Ramos District Engineer
Closing Date14 Jan 2025
Tender AmountPHP 39.7 Million (USD 681.3 K)

POLREGIO S A Tender

Others
Poland
Details: Polregio Sp. Z Oo, Invites Contractors with knowledge and experience in the subject of the Order to submit Price Information for the supply of Toilet Mirrors and Toilet Accessories This Request does not constitute an Offer within the meaning of the Civil Code. Requirements for the Contractor: 1) Order Execution – Delivery to 2 Addresses: - Polregio Sa Łódzki Zakład W Łodzi, Ul. Tuwima 22/26, 90-002 Łódź - Polregio Sa Łódzki Zakład W Łódź, Grupa Magazynowa W Częstochowa, Ul. 1 Maja 7 E, 42-200 Częstochowa 2) Deadline for Execution - 10 Business Days from the Date of Sending the Order 3) Delivery – At the Cost and Risk of the Supplier as Part of the Remuneration 4) Form of Payment – Bank Transfer 30 Days from the Date of Receipt of a Properly Issued VAT Invoice; It is possible to submit an offer only for a selected task, but for all items included in each task. In the "attachments" tab you will find: - Sample Purchase Form, - GDPR Information Clause, - Statement on Counteracting Aggression Against Ukraine.
Closing Date15 Jan 2025
Tender AmountNA 

POLREGIO S A Tender

Electronics Equipment...+1Electrical and Electronics
Poland
Details: Polregio Sa Invites Contractors With Knowledge And Experience In The Subject Of The Order To Submit Price Information For The Service Of Leasing A Ticket Videomat Together With Sales Software Used To Sell Polregio Sa Railway Tickets In Paper Form At The Oława Station, Ul. Kolejowa 1, 55-200. Lease Term: 12 Months From 18/03/2025 To 17/03/2026. The Ordering Party Reserves The Right To Invalidate The Proceedings At Any Stage (without Selecting An Offer) Without Giving A Reason. This Inquiry Does Not Constitute An Offer Within The Meaning Of The Civil Code. In the "attachments" tab you will find: - The location of the Videomat in Oława with the consent of PKP - Contractor's declaration - Attachment No. 1 to the Agreement - Technical description of the Videomat - Attachment No. 2 to the Agreement - List of Polregio Offers - Attachment No. 3 to the Agreement - Sales Reports Template - Attachment No. 4 to the Agreement - Complaint Handling Principles - Attachment No. 5 to the Agreement - List of Locations - Attachment No. 6 to the Agreement - GDPR - Attachment No. 7 to the Agreement - Delivery and Acceptance Protocol
Closing Date17 Jan 2025
Tender AmountNA 

STATE GOVERNMENTAL INSTITUTION OF THE KRASNODAR REGION DEPARTMENT FOR ENSURING FIRE SAFETY, PREVENTION AND LIQUIDATION OF EMERGENCIES AND CIVIL DEFENSE Tender

Civil And Construction...+1Others
Russia
Purchaser Name: KRASNODAR REGION DEPARTMENT FOR ENSURING FIRE SAFETY, PREVENTION AND LIQUIDATION OF EMERGENCIES AND CIVIL | Оказание Услуг По Диагностике, Техническому Обслуживанию И Ремонту Автотранспортных Средств (на Сумму 600 000 ₽ )
Closing Date21 Jan 2025
Tender AmountRUB 600 K (USD 5.7 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Healthcare and Medicine
United States
Description: Sources Sought Notice important: Read This Notice In Its Entirety Before Responding. Services Are Sporadic And No Routine Schedule Or Quantity Can Be Firmly Identified the Department Of Veterans Affairs (va), Network Contracting Office (nco) 23, On Behalf Of The Sioux Falls Sd Va Hospital, Is Seeking Information And Potential Sources For Onsite Licensed General Surgeon Gastroenterology Services. The Period Of Performance Will Be For One Year And Includes Four (4) One-year Option Periods. the Contractor Shall Provide Onsite Licensed General Surgeon Gastroenterology Services In Accordance With The Terms, Conditions, And Specifications Contained Herein To Beneficiaries Of The Department Of Veteran Affairs (va), Sioux Falls Va Health Care System (vahcs). The Total Number Of Hours Required Is 416 Hours Annually. Services May Be Required On A 24-hour Per Day, Seven Days Per Week Basis, Including Holidays And Weekends. On Call Services May Be Required. See Attached Performance Work Statement (pws) For Additional Information. the Naics For This Requirement Is 561320 Temporary Help Services, Which Has A Small Business Size Standard Of $34.0 Million. It Is The Intent Of The Va To Issue A Single Award, Firm Fixed Price Contract. this Is A Sources Sought Notice Only. This Sources Sought Notice Will Be Used To Obtain Information Regarding The Provision Of F Onsite Licensed General Surgeon Gastroenterology Services From Potential Vendors, Identify Potential Vendors That Would Be Interested And Capable Of Providing Onsite Licensed General Surgeon Gastroenterology Services Within The Requested Timeframe, And To Assist The Contracting Officer In Making A Set-aside Determination. This Source Sought Notice And Any Responses Are For Market Research Purposes Only And Shall Not Be Considered An Obligation On The Part Of The Government To Acquire Any Services. this Source Sought Notice Is Not A Solicitation, And No Contractual Arrangement Will Be Made As A Result. Vendors Are Advised That No Entitlement To Payment Of Direct Or Indirect Costs Or Charges By The Government Will Arise Because Of A Contractor Submission To This Sources Sought Notice Or The Government's Use Of Such Information. All Costs Associated With Responding To This Sources Sought Notice Are Solely At The Responding Vendors Expense. The Government Reserves The Right To Reject, In Whole Or In Part, Any Vendor's Input Resulting From This Sources Sought Notice. Information Submitted In Response To This Sources Sought Notice Will Not Be Returned. all Submitted Information Should Be Unclassified Or Non-proprietary. Vendors Are Solely Responsible For Properly Marking And Clearly Identifying Any Proprietary Information Or Trade Secrets Contained With Its Response. The Government Will Not Be Liable For Or Suffer Any Consequential Damages For Any Proprietary Information Not Properly Marked And Clearly Identified. by Responding To This Sources Sought Notice, The Vendor Provides The Government Permission To Share Its Submitted Capabilities And Contact Information With Other Government Organizations In Relationship To Similar Requirements For Market Research Purposes. To Be Considered Complete, Responses To This Sources Sought Notice Shall Include The Information Below. provide A Brief Description Of The Company Background, Experience In Providing Onsite Licensed General Surgeon Gastroenterology Services As The Prime Contractor/subcontractor, Socioeconomic Status, Past Performance With Government Contracts, And Contractor Sam Uei Number. indicate If Subcontractors/partners Be Used For Any Part Of The Delivery Of Onsite Licensed General Surgeon Gastroenterology Services? If Yes, Specify The Duties Of The Prime Contractor And Any Subcontractors/partners. if Company Is A Veteran And/or Small Business, Indicate If Able To Comply With The Limitations On Subcontracting At 13 Cfr 125.6, Which States That For Services A Small Business Concern Must Agree That It Will Not Pay More Than 50% Of The Amount Paid By The Government To It To Firms That Are Not Similarly Situated. include Copy Of Small Business Administration Verification At Veteran Small Business Certification (sba.gov) If Claiming Veteran-owned Small Business Or Service-disabled Veteran-owned Small Business Socioeconomic Status As Prime Contractor Or For Any Subcontractors/partners. provide A Copy Of Current Certificate Of Liability Insurance In Vendor S Name. all Interested Parties, Regardless Of Socioeconomic Status, Capable Of Providing The Required Onsite Licensed General Surgeon Gastroenterology Services Above Shall Submit A Response Via Email To The Contracting Specialist At Tina.bernad@va.gov No Later Than January 3, 2025, 11:00 A.m. Central Time. performance Work Statement onsite General Surgeon Gastroenterology Services general: services Provided: The Contractor Shall Provide Board Certified/board Eligible General Surgery Physician Services Onsite In Accordance With The Specifications Contained Herein To Beneficiaries Of The Va And The Royal C. Johnson Veterans Memorial Hospital (sioux Falls Va). place Of Performance: Contractor Shall Furnish Services At The Royal C. Johnson Veterans Memorial Hospital (sioux Falls Va), 2501 W 22nd St, Sioux Falls, Sd 57105. authority: Title 38 Usc 8153, Health Care Resources (hcr) Sharing Authority. Remember To Identify The Federal Acquisition Regulation (far) Parts Used (far 12 In Combination With 13, 15 And/or Va Acquisition Regulation (vaar) Part 873) policy/directives/handbooks. The Contractor Shall Be Subject To The Following Policies, Including Any Subsequent Updates During The Period Of Performance. The Policies Listed Below Can Be Accessed Electronically At The Following: Va Publications Vha Publications va Directive 1663: Health Care Resources (hcr) Contracting Buying Title 38 U.s.c. 8153 1.4.2. Vha Directive 1003.04: Vha Patient Advocacy vha Directive 1065: Productivity And Staffing Guidance For Specialty Provider Group Practice vha Directive 1088(1): Communicating Test Results To Providers And Patients vha Directive 1100.18: Reporting And Responding To State Licensing Boards vha Directive 1100.20: Credentialing Of Health Care Providers vha Directive 1100.21: Privileging vha Directive 1192.01: Seasonal Influenza Vaccination Program For Vha Health Care Personnel vha Directive 1220(1): Facility Procedure Complexity Designation Requirements To Perform Invasive Procedures In Any Clinical Setting vha Directive 1400.01: (not Applicable, Please Remove) vha Directive 1605.01: Privacy And Release Of Information vha Directive 1907.01: Vha Health Information Management And Health Records vha Handbook 1100.17: National Practitioner Data Bank (npdb) Reports vha Handbook 1400.04: (not Applicable, Please Remove) privacy Act Of 1974 (5 U.s.c. 552a) As Amended: Http://www.justice.gov/oip/foia_updates/vol_xvii_4/page2.htm acronyms/definitions: Terms Used In This Contract Shall Be Interpreted As Follows Unless The Context Expressly Requires A Different Construction And/or Interpretation. In Case Of A Conflict In Language Between The Definitions And Other Sections Of This Contract, The Language In This Section Shall Govern. abs: American Board Of Surgery Http://www.absurgery.org/ acgme: Accreditation Council For Graduate Medical Education acls: Advanced Cardiac Life Support ajic: American Journal For Infection Control aql: Acceptable Quality Level baa: Business Associate Agreement bba: Balanced Budget Act bls: Basic Life Support cdc: Centers For Disease Control And Prevention cdr: Contract Deficiency Report ceu: Certified Education Unit clinical Privileging: Clinical Privileging Is The Process By Which A Practitioner, Licensed For Independent Practice; E.g., Without Supervision, Direction, Required Sponsor, Preceptor, Mandatory Collaboration, Etc.; Is Permitted By Law And The Facility To Practice Independently, To Provide Specific Medical Or Other Patient Care Services Within The Scope Of The Individual S License, Based Upon The Individual S Clinical Competence As Determined By Peer References, Professional Experience, Health Status, Education, Training And Licensure. Clinical Privileges Must Be Facility-specific And Provider-specific, And Within Available Resources. cme: Continuing Medical Education cmp: Civil Monetary Penalty cms: Centers For Medicare And Medicaid Services co: Contracting Officer: The Person Executing This Contract On Behalf Of The Government With The Authority To Enter Into And Administer Contracts And Make Related Determinations And Findings. coi: Conflict Of Interest cor: Contracting Officer S Representative: A Person Appointed By The Co To Take Necessary Action To Ensure The Contractor Performs In Accordance With And Adheres To The Specifications Contained In The Contract And To Protect The Interest Of The Government. The Cor Shall Report To The Co Promptly Any Indication Of Non-compliance In Order That Appropriate Action Can Be Taken. cos: Chief Of Staff cpars: Contractor Performance Assessment Reporting System credentialing: Credentialing Is The Process Of Obtaining, Verifying, And Assessing The Qualifications Of A Health Care Provider To Provide Care Or Services In Or For The Va Health Care System. Credentials Are Documented Evidence Of Licensure, Education, Training, Experience Or Other Qualifications. dea: Drug Enforcement Agency ehr: Electronic Health Record - Electronic Health Record System Used By The Va epa: Environmental Protection Agency fapiis: Federal Awardee Performance And Integrity Information System far: Federal Acquisition Regulation foia: Freedom Of Information Act fppe: Focused Provider Practice Evaluation fsmb: Federation Of State Medical Boards fte: Full Time Equivalent: Va S Standard Definition Is For Full Time Working The Equivalent Of 80 Hours Every Two Weeks, 2080 Hours Per Year.  however, Providers May Propose Using Their Standard Fte Definition. hhs: Department Of Health And Human Services hicpac: Hospital Infection Practices Advisory Committee hipaa: Health Insurance Portability And Accountability Act igra: Interferon-gamma Release Assays iso: Information Security Officer key Personnel: The Individuals Specified In This Contract Who Are Essential To Work Performance. mri: Magnetic Resonance Imaging mst: Military Sexual Trauma npi: National Provider Identifier. Npi Is A Standard, Unique 10-digit Numeric Identifier Required By Hipaa. The Vha Must Use Npis In All Hipaa-standard Electronic Transactions For Individual (health Care Practitioners) And Organizational Entities (medical Centers). nppes: National Plan And Provider Enumeration System nso: National Surgery Office ogc: Office Of General Counsel oig: Office Of Inspector General oppe: Ongoing Provider Practice Evaluation or: Operating Room pop: Period Of Performance ppd: Purified Protein Derivative ppirs: Past Performance Information Retrieval System pws: Performance Work Statement qa/qi: Quality Assurance/quality Improvement qm/pi: Quality Management/performance Improvement qasp: Quality Assurance Surveillance Plan rfp: Request For Proposal scs: Specialty Care Services ssac: Sole Source Affiliate Contract tjc: The Joint Commission tst: Tuberculosis Skin Test usc: United States Code va: Department Of Veterans Affairs va-fsc: Va Financial Services Center vaar: Va Acquisition Regulation vetpro: Is Vha S Mandatory Credentialing Software Platform To Document The Credentialing Of Vha Health Care Providers. This System Facilitates Completion Of A Uniform, Accurate And Complete Credentials File. vha: Veterans Health Administration vista: Veterans Integrated Systems Technology Architecture qualifications: staff/facility license: The Contractor S Physician(s) Assigned By The Contractor To Perform The Services Covered By This Contract Shall Have A Current License To Practice Medicine In Any State, Territory, Or Commonwealth Of The United States Or The District Of Columbia) When Services Are Performed Onsite On Va Property. all Licenses Held By The Key Personnel Working On This Contract Shall Be Full And Unrestricted Licenses. Contractor S Physician(s) Who Have Current, Full And Unrestricted Licenses In One Or More States, But Who Have, Or Ever Had, A License Restricted, Suspended, Revoked, Voluntarily Revoked, Voluntarily Surrendered Pending Action Or Denied Upon Application Will Not Be Considered For The Purposes Of This Contract. board Certification: All Contractor S Physician(s) Shall Be Board Certified/board Eligible By The Abs Http://www.absurgery.org/, And Be Currently Certified In Bls, Acls Or Equivalency. All Continuing Education Courses Required For Maintaining Certification Must Be Kept Up To Date At All Times. Documentation Verifying Current Certification Shall Be Provided By The Contractor To The Va Cor On An Annual Basis For Each Year Of Contract Performance. credentialing And Privileging: Credentialing And Privileging Is To Be Done In Accordance With The Provisions Of Vha Directive 1100.20 And Vha Directive 1100.21 Referenced Above. The Contractor Is Responsible To Ensure That Proposed Physician(s) Possesses The Requisite Credentials Enabling The Granting Of Privileges. No Services Shall Be Provided By Any Contractor S Physician(s) Prior To Obtaining Approval By The Facility Medical Executive Board And Medical Center Director. if A Contractor S Physician(s) And/or Other Contract Provider(s) Are Not Credentialed And Privileged Or Has Credentials/privileges Suspended Or Revoked, The Contractor Shall Furnish An Acceptable Substitute Without Any Additional Cost To The Government. technical Proficiency: Contractor S Physician(s) Shall Be Technically Proficient In The Skills Necessary To Fulfill The Government S Requirements, Including The Ability To Speak, Understand, Read And Write English Fluently. Contractor Shall Provide Documents Upon Request Of The Co/cor To Verify Current And Ongoing Competency, Skills, Certification And/or Licensure Related To The Provision Of Care, Treatment And/or Services Performed. Contractor Shall Provide Verifiable Evidence Of All Educational And Training Experiences Including Any Gaps In Educational History For All Contractor S Physician(s) And Contractor S Physician(s) Shall Be Responsible For Abiding By The Facility's Medical Staff By-laws, Rules, And Regulations (referenced Herein) That Govern Medical Staff Behavior. continuing Medical Education (cme)/ Certified Education Unit (ceu) Requirements: Contractor Shall Provide The Cor Copies Of Current Cmes As Required Or Requested By The Facility. Contractor S Physician(s) Registered Or Certified By National/medical Associations Shall Continue To Meet The Minimum Standards For Cme To Remain Current. Contractor Shall Report Cme Hours To The Credentials Office For Tracking. These Documents Are Required For Both Privileging And Re-privileging. Failure To Provide Shall Result In Loss Of Privileges For Contractor S Physician(s). training (acls, Bls, Ehr And Va Mandatory): Contractor Shall Meet All Va Educational Requirements And Mandatory Course Requirements Defined Herein; All Training Must Be Completed By The Contractor S Physician(s) As Required By The Va. Other Training May Become Required. Va Will Communicate Any Changes To The Training Requirement To The Contractor. training frequency annual Hours acls/bls as Necessary To Maintain Certification. active Threat Training annually 30 Minutes blood Administration: Complication annually 30 Minutes ehr annually 2 Hours government Ethics annually 30 Minutes hospice And Palliative Care For Va Clinicians annually 30 Minutes military Sexual Trauma (mst) For Medical Providers annually 30 Minutes moderate Sedation In-service Training annually 30 Minutes pact Act 2022 Toxic Exposure Screening (tes) annually 30 Minutes patient Abuse annually 30 Minutes patient Rights annually 30 Minutes patient Safety annually 30 Minutes prevention/management Of Disruptive Behavior/violence Prevention Level I annually 30 Minutes prevention Of Workplace Harassment/no Fear Act annually 30 Minutes suicide Prevention: Suicide Risk Management Training For Clinicians annually 30 Minutes sux Infection Control And Blood Borne Pathogens annually 30 Minutes va Core Values Training (icare Recommitment) annually 30 Minutes va Privacy And Information Security Awareness And Rules Of Behavior annually 30 Minutes vha Mri Safety Training Level 1 Training (all Who Enter Mri Suites) annually 30 Minutes vha Privacy And Hipaa Focused Training annually 30 Minutes vista Imaging one Time 30 Minutes radiation Safety annually 30 Minutes standard Infection Control Measures (ppd, Immunizations, Etc.): Contractor Shall Provide Proof Of The Following For Physicians Within Five (5) Calendar Days After Contract Award And Prior To The First Duty Shift To The Cor And Co. Tests Shall Be Current Within The Past Year. tuberculosis Testing: Contractor Shall Provide Proof Of A Negative Tuberculosis Skin Test (tst) Or Interferon-gamma Release Assays (igra) For All Contractor S Physician(s) Upon Hire In Accordance With Cdc Guidance. (this Is Applicable To All Health Care Workers). A Negative Chest Radiographic Report For Active Tuberculosis Shall Be Provided In Cases Of Positive Tst Or Igra Results. measles, Mumps, & Rubella Testing: Contractors Shall Provide Proof Of Immunity For All Contractor Physicians {this Is Applicable To All Health Care Workers}. varicella: Contractors Shall Provide Proof Of Immunity For All Contractor Physicians {this Is Applicable To All Health Care Workers}. acellular Pertussis: Contractors Shall Provide Proof Of 1 Dose Of Tdap Vaccination For All Contractor Physicians {this Is Applicable To All Health Care Workers}. influenza: Contractors Shall Provide Proof That All Contractor Physicians Have Received The Annual Influenza Vaccine Unless It Is Contraindicated. If The Contractor Physician Has A Medical Contraindication To The Vaccine They Shall Be Required To Wear A Mask During The Influenza Season. {this Is Applicable To All Health Care Workers}. covid-19: Contractors Shall Comply With Vha Supplemental Contract Requirements For Combatting Covid-19 {this Is Applicable To All Health Care Workers}. See Section D Attachment. osha Regulation Concerning Occupational Exposure To Bloodborne Pathogens: Contractor Shall Provide Evidence Of Completing And Passing Generic Self-study Blood-borne Pathogen Training For All Contractor S Physician(s) {this Is Applicable To All Health Care Workers}; Provide Their Own Hepatitis B Vaccination Series And Hepatitisâ b Surface Antigen Test Resultsâ following The Hepatitis B Vaccination Series; Maintain An Exposure Determination And Control Plan; Maintain Required Records; And Ensure That Proper Follow-up Evaluation Is Provided Following An Exposure Incident. the Facility Shall Notify The Contractor Of Any Significant Communicable Disease Exposures As Appropriate. Contractor Shall Adhere To Current Cdc/hicpac Guideline For Infection Control In Health Care Personnel (as Published In American Journal For Infection Control - Ajic 1998; 26:289-354 Http://www.cdc.gov/hicpac/pdf/infectcontrol98.pdf) For Disease Control. Contractor Shall Provide Follow Up Documentation Of Clearance To Return To The Workplace Prior To Their Return. npi: Npi Is A Standard, Unique 10-digit Numeric Identifier Required By Hipaa. The Vha Must Use Npis In All Hipaa-standard Electronic Transactions For Individual (health Care Practitioners) And Organizational Entities (medical Centers). The Contractor Shall Have Or Obtain Appropriate Npi And If Pertinent The Taxonomy Code Confirmation Notice Issued By The Cms Nppes Be Provided To The Co With The Proposal. dea: Contractor Shall Provide Copy Of Current Dea Certificate. Conflict Of Interest (coi): The Contractor And All Contractor S Physician(s) Are Responsible For Identifying And Communicating To The Co And Cor Conflicts Of Interest At The Time Of Proposal And During The Entirety Of Contract Performance. At The Time Of Proposal, The Contractor Shall Provide A Statement Which Describes, In A Concise Manner, All Relevant Facts Concerning Any Past, Present, Or Currently Planned Interest (financial, Contractual, Organizational, Or Otherwise) Or Actual Or Potential Organizational Conflicts Of Interest Relating To The Services To Be Provided. The Contractor Shall Also Provide Statements Containing The Same Information For Any Identified Consultants Or Subcontractors Who Shall Provide Services. The Contractor Must Also Provide Relevant Facts That Show How It S Organizational And/or Management System Or Other Actions Would Avoid Or Mitigate Any Actual Or Potential Organizational Conflicts Of Interest. These Statements Shall Be In Response To The Vaar Provision 852.209-70 Organizational Conflicts Of Interest And Fully Outlined In Response To The Subject Attachment In Section D Of The Solicitation Document. citizenship Related Requirements: the Contractor Certifies That The Contractor Shall Comply With Any And All Legal Provisions Contained In The Immigration And Nationality Act Of 1952, As Amended; Its Related Laws And Regulations That Are Enforced By Homeland Security, Immigration And Customs Enforcement And The U.s Department Of Labor As These May Relate To Non-immigrant Foreign Nationals Working Under Contract Or Subcontract For The Contractor While Providing Services To Va Patient Referrals. while Performing Services For The Va, The Contractor Shall Not Knowingly Employ, Contract Or Subcontract With An Illegal Alien; Foreign National Non-immigrant Who Is In Violation Their Status, As A Result Of Their Failure To Maintain Or Comply With The Terms And Conditions Of Their Admission Into The United States. Additionally, The Contractor Is Required To Comply With All E-verify Requirements Consistent With Executive Order 12989 And Any Related Pertinent Amendments, As Well As Applicable Far. if The Contractor Fails To Comply With Any Requirements Outlined In The Preceding Paragraphs Or Its Agency Regulations, The Va May, At Its Discretion, Require That The Foreign National Who Failed To Maintain Their Legal Status In The United States Or Otherwise Failed To Comply With The Requirements Of The Laws Administered By Homeland Security, Immigration And Customs Enforcement And The U.s Department Of Labor, Shall Be Prohibited From Working At The Contractor S Place Of Business That Services Va Patient Referrals; Or Other Place Where The Contractor Provides Services To Veterans Who Have Been Referred By The Va; And Shall Form The Basis For Termination Of This Contract For Breach. this Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under 18 U.s.c. 1001. the Contractor Agrees To Obtain A Similar Certification From Its Subcontractors. The Certification Shall Be Made As Part Of The Offerors Response To The Rfp Using The Subject Attachment In Section D Of The Solicitation Document. annual Oig Statement: In Accordance With Hipaa And The Balanced Budget Act (bba) Of 1977, The Hhs Oig Has Established A List Of Parties And Entities Excluded From Federal Health Care Programs. Specifically, The Listed Parties And Entities May Not Receive Federal Health Care Program Payments Due To Fraud And/or Abuse Of The Medicare And Medicaid Programs. therefore, Contractor Shall Review The Hhs Oig List Of Excluded Individuals/entities On The Hhs Oig Web Site At Http://oig.hhs.gov/exclusions/index.asp To Ensure That The Proposed Contractor S Physician(s) Are Not Listed. Contractor Should Note That Any Excluded Individual Or Entity That Submits A Claim For Reimbursement To A Federal Health Care Program, Or Causes Such A Claim To Be Submitted, May Be Subject To A Civil Monetary Penalty (cmp) For Each Item Or Service Furnished During A Period That The Person Was Excluded And May Also Be Subject To Treble Damages For The Amount Claimed For Each Item Or Service. Cmp S May Also Be Imposed Against The Contractor That Employ Or Enter Into Contracts With Excluded Individuals To Provide Items Or Services To Federal Program Beneficiaries. by Submitting Their Proposal, The Contractor Certifies That The Hhs Oig List Of Excluded Individuals/entities Has Been Reviewed And That The Contractors Are And/or Firm Is Not Listed As Of The Date The Offer/bid Was Signed. clinical/professional Performance: The Qualifications Of Contractor Personnel Are Subject To Review By Facility Cos Or His/her Clinical Designee And Approval By The Medical Center Director As Provided In Vha Directive 1100.20 And Vha Directive 1100.21. Clinical/professional Performance Monitoring And Review Of All Clinical Personnel Covered By This Contract For Quality Purposes Will Be Provided By The Facility Cos And/or The Chief Of The Service Or His Designee. A Clinical Cor May Be Appointed, However, Only The Co Is Authorized To Consider Any Contract Modification Request And/or Make Changes To The Contract During The Administration Of The Resultant Contract. non Personal Healthcare Services: The Parties Agree That The Contractor And All Contractor S Physician(s) Shall Not Be Considered Va Employees For Any Purpose. indemnification: The Contractor Shall Be Liable For, And Shall Indemnify And Hold Harmless The Government Against, All Actions Or Claims For Loss Of Or Damage To Property Or The Injury Or Death Of Persons, Arising Out Of Or Resulting From The Fault, Negligence, Or Act Or Omission Of The Contractor, Its Agents, Or Employees. prohibition Against Self-referral: Contractor S Physicians Are Prohibited From Referring Va Patients To Contractor S Or Their Own Practice(s). inherent Government Functions: Contractor And Contractor S Physician(s) Shall Not Perform Inherently Governmental Functions. This Includes, But Is Not Limited To, Determination Of Agency Policy, Determination Of Federal Program Priorities For Budget Requests, Direction And Control Of Government Employees (outside A Clinical Context), Selection Or Non-selection Of Individuals For Federal Government Employment Including The Interviewing Of Individuals For Employment, Approval Of Position Descriptions And Performance Standards For Federal Employees, Approving Any Contractual Documents, Approval Of Federal Licensing Actions And Inspections, And/or Determination Of Budget Policy, Guidance, And Strategy. employee Status: The Contractor Shall Be Responsible For Protecting Contractor S Physician(s) Furnishing Services. To Carry Out This Responsibility, The Contractor Shall Provide Or Certify That The Following Is Provided For All Their Staff Providing Services Under The Resultant Contract: workers Compensation professional Liability Insurance health Examinations income Tax Withholding, And social Security Payments. tort Liability: The Federal Tort Claims Act Does Not Cover Contractor Or Contractor S Physician(s). When A Contractor Or Contractor S Physician(s) Has Been Identified As A Provider In A Tort Claim, The Contractor Shall Be Responsible For Notifying Their Legal Counsel And/or Insurance Carrier. Any Settlement Or Judgment Arising From A Contractor S (or Contractor S Physician(s)) Action Or Non-action Shall Be The Responsibility Of The Contractor And/or Insurance Carrier. key Personnel: the Va Full Time Equivalent (fte) For The Services Required Is 416 Hours = .20 Va Fte. the Minimum Number Of Board Certified/board Eligible General Surgery Physicians Required To Be Onsite Daily Is 1 To Be Onsite As Defined In Paragraph Hours Of Operation In This Section. the Contractor Shall Be Responsible For Providing Coverage To The Va During Periods Of Vacancies Of The Contractor S Personnel Due To Sick Leave, Personal Leave, Vacations And Additional Coverage As Required. In The Event A Scheduled Physician Is Unable To Complete An Assigned Shift, The Contractor Shall Provide Replacement Physician Coverage Within 2 Hours And Notify The Cor Immediately Of The Schedule Change. personnel Substitutions: During The First Ninety (90) Calendar Days Of Performance, The Contractor Shall Make No Substitutions Of Key Personnel Unless The Substitution Is Necessitated By Illness, Death Or Termination Of Employment. The Contractor Shall Notify The Co, In Writing, Within 7 Calendar Day(s) After The Occurrence Of Any Of These Events And Provide The Information Required Below. After 90 Days, The Contractor Shall Submit The Information Required Below To The Co At Least 60 Calendar Days Prior To Making Any Permanent Substitutions. the Contractor Shall Provide A Detailed Explanation Of The Circumstances Necessitating The Proposed Substitutions, Complete Resumes For The Proposed Substitutes, And Any Additional Information Requested By The Co. Proposed Substitutes Shall Have Comparable Qualifications To Those Of The Persons Being Replaced. The Co Will Notify The Contractor Within 7 Calendar Days After Receipt Of All Required Information Of The Decision On The Proposed Substitutes. The Contract Will Be Modified To Reflect Any Approved Changes Of Key Personnel. for Temporary Substitutions Where The Key Person Shall Not Be Reporting To Work For 2 Consecutive Workdays Or More, The Contractor Shall Provide A Qualified Replacement For The Key Person. The Substitute Shall Have Comparable Qualifications To The Key Person. Any Period Exceeding Two Weeks Will Require The Procedure As Stated Above. the Government Reserves The Right To Refuse Acceptance Of Any Contractor Personnel At Any Time After Performance Begins, If Personal Or Professional Conduct Jeopardizes Patient Care Or Interferes With The Regular And Ordinary Operation Of The Facility. Breaches Of Conduct Include Intoxication Or Debilitation Resulting From Drug Use, Theft, Patient Abuse, Dereliction Or Negligence In Performing Directed Tasks, Or Other Conduct Resulting In Formal Complaints By Patient Or Other Staff Members To Designated Government Representatives. Standards For Conduct Shall Mirror Those Prescribed By Current Federal Personnel Regulations. Should The Va Cos Or Designee Show Documented Clinical Problems Or Continual Unprofessional Behavior/actions With Any Contractor S Physician(s), S/he May Request, Without Cause, Immediate Replacement Of Said Contractor S Physician(s). The Co And Cor Shall Deal With Issues Raised Concerning Contractor S Physician(s) Conduct. The Final Arbiter On Questions Of Acceptability Is The Co. contingency Plan: Because Continuity Of Care Is An Essential Part Of Facility S Medical Services, The Contractor Shall Have A Contingency Plan In Place To Be Utilized If The Contractor S Physician(s) Leaves Contractor S Employment Or Is Unable To Continue Performance In Accordance With The Terms And Conditions Of The Resulting Contract. va Hours Of Operation/scheduling: va Business Hours: Va Clinc Days And Prouders Are From Monday Through Friday 7am To 3pm. clinic Or Or Schedule: Contract S Physician(s) Will Be Scheduled Tuesday S And Friday S Between The Hours Of 7am To 3pm. patients Must Be Seen By A Contractor S Physician(s) Onsite At The Sfvamc In A Timely Manner In Accordance With Va Rules And Regulations On Clinic Wait Times And Consult Completion. Contractor Shall Notify The Cor At Least Monthly About Any Obstacles To Meeting This Performance Measure. contractor S Physician(s) Shall Be Available And Present In Clinic During Normal Sfvamc Clinic Hours, Which Will Be Established, And May Be Revised, As Deemed Appropriate For Patient Care By The Cos. Currently, Normal Clinic Hours Are 7am To 3pm. federal Holidays: The Following Holidays Are Observed By The Va: new Year S Day president S Day martin Luther King S Birthday memorial Day juneteenth independence Day labor Day columbus Day veterans Day thanksgiving christmas any Day Specifically Declared To Be A National Holiday. cancellations: 45 Days Notice From Contractor, If No Provider S Are Available. contractor Responsibilities: clinical Personnel Required: The Contractor Shall Provide Contractor S Physician(s) Who Are Competent, Qualified Per This Performance Work Statement And Adequately Trained To Perform Assigned Duties. contractor S Physician(s) Shall Be Responsible For Signing In And Out When In Attendance. Time Sheets Will Be Used By The Cor To Confirm Hours/day And Services Provided Against The Contractor S Invoices. standards Of Care: The Contractor S Physician(s) Care Shall Cover The Range Of General Surgery Services As Would Be Provided In A State-of-the-art Civilian Medical Treatment Facility And The Standard Of Care Shall Be Of A Quality, Meeting Or Exceeding Currently Recognized The Joint Commission (tjc), Va And National Standards As Established By: the Abs Http://www.absurgery.org/ the Professional Standards Of Tjc: Http://www.jointcommission.org/standards_information/standards.aspx the Standards Of The American Hospital Association (aha): Http://www.hpoe.org/resources?show=100&type=8 the Requirements Contained In This Pws (not Applicable) medical Records: authorities: Contractor S Physician(s) Providing Healthcare Services To Va Patients Shall Be Considered As Part Of The Department Healthcare Activity And Shall Comply With The 5 U.s.c.552a (privacy Act), 38 U.s.c. 5701 (confidentiality Of Claimants Records), 5 U.s.c. 552 (foia), 38 U.s.c. 5705 (confidentiality Of Medical Quality Assurance Records) 38 U.s.c. 7332 (confidentiality Of Certain Medical Records), Title 5 U.s.c. § 522a (records Maintained On Individuals) As Well As 45 C.f.r. Parts 160, 162, And 164 (hipaa). hipaa: This Contract And Its Requirements Meet Exception In 45 Cfr 164.502(e), And Do Not Require A Baa In Order For Covered Entity To Disclose Protected Health Information To: A Health Care Provider For Treatment Of Va Patients. Based On This Exception, A Baa Is Not Required For This Contract. Health Records Generated By This Contract Or Provided To The Contractors By The Va Are Covered By The Va Privacy Act System Of Records Entitled Patient Medical Records-va (24va10a7). Contractor Generated Va Patient Records Are The Property Of The Va And Shall Not Be Accessed, Released, Transferred, Or Destroyed Except In Accordance With Applicable Laws And Regulations. Contractor Shall Ensure That All Records Pertaining To Medical Care And Services Provided To Va Patients Are Captured In The Va Electronic Health Record System As Required By Va Policy As Discussed In 4.4.4. disclosure: Contractor S Physician(s) May Have Access To Patient Medical Records For The Purpose Of Providing Medical Care And Services To Va Patients And Performing Services Under The Contract; However, Contractor Shall Obtain Permission From The Va Before Disclosing Any Patient Information Outside Va. Va Authorizes The Contractor To Discuss Patient Health Information For Coordination Of Care Within Community Health Care Providers In Compliance With Va Regulations, Hipaa And Vha Directive 1605.1, Privacy And Release Of Information. The Va Will Provide The Contractor With A Copy Of Vha Directive 1907.01, Health Information Management And Health Records And Vha Directive1605.1, Privacy And Release Of Information. The Penalties And Liabilities For The Unauthorized Disclosure Of Va Patient Information Mandated By The Statutes And Regulations Mentioned Above, Apply To The Contractor. professional Standards For Documenting Care: Care Shall Be Appropriately Documented In Medical Records In Accordance With Standard Commercial Practice And Guidelines Established By Vha Directive 1907.01 Health Information Management And Health Records: Https://www.va.gov/vhapublications/viewpublication.asp?pub_id=9235 And All Guidelines Provided By The Facility. release Of Information: The Va Shall Maintain Control Of Releasing Any Copies Of Patient Health Information Or Health Records And Will Follow Policies And Standards As Defined, But Not Limited To Privacy Act Requirements. The Contractor Will Not Release Or Disclose Copies Of Records And Will Refer All Such Requests To The Release Of Information Department At The Va Facility Where Assigned. management For Medical Records: National Archives And Records Administration Record Disposition Requirements Are Found In Rcs 10-1 Chapter 6, 6000 Series. direct Patient Care: 100% Of The Time Involved In Direct Patient Care. Contractor Shall Be Responsible For: scope Of Care: Contractor S Physician(s) Shall Be Responsible For Providing General Surgery Physician Care, Including, But Not Limited To: clinic Responsibilities: Contractor Physician(s) Shall Be Present On Time For Any Scheduled Clinics/surgeries Start Times As Documented By Physical Presence In The Clinic Or Or At The Scheduled Start Time. communication Of Test Results: Mechanisms Must Be In-place To Provide Notification Of Test Results For Patients Receiving Care In Accordance With Vha Directive 1088, Communicating Test Results To Providers And Patients. medications: Contractor S Physician(s) Shall Follow All Established Medication Policies And Procedures. No Sample Medications Shall Be Provided To Patients. discharge Education: Provide Discharge Education And Follow Up Instructions That Are Coordinated With The Next Care Setting For All General Surgery Clinical Or Surgical Patients. (not Applicable) qa/qi Documentation: The Contractor S Physician(s) Shall Complete The Appropriate Qm/pi Documentation Pertaining To All Procedures, Complications And Outcome Of Examinations. patient Safety Compliance And Reporting: Contractor S Physician(s) Shall Follow All Established Patient Safety And Infection Control Standards Of Care. Contractor S Physician(s) Shall Make Every Effort To Prevent Medication Errors, Falls, And Patient Injury Caused By Acts Of Commission Or Omission In The Delivery Of Care. All Events Related To Patient Injury, Medication Errors, And Other Breeches Of Patient Safety Shall Be Documented In The Medical Record Of Those Impacted And Disclosed To The Patient Or Surrogate. As Soon As Practicable (but Within 24 Hours) Contractors Shall Notify Cor Of Incident And Submit An Entry In The Va Patient Safety Reporting System, Following Up With Cor As Required Or Requested. performance Standards, Quality Assurance (qa) And Quality Improvement(qi): quality Management/quality Assurance Surveillance: Contract Personnel Shall Be Subject To Quality Management Measures, Such As Patient Satisfaction Surveys, Timely Completion Of Medical Records, And Peer Reviews. Methods Of Surveillance: Focused Provider Practice Evaluation (fppe) And Ongoing Provider Practice Evaluation (oppe). Contractor Performance Will Be Monitored By The Government Using The Standards As Outlined In This Pws And Methods Of Surveillance Detailed In The Qasp. The Qasp Shall Be Attached To The Resultant Contract And Shall Define The Methods And Frequency Of Surveillance Conducted. patient Complaints: The Co Will Resolve Complaints Concerning Contractor Relations With The Government Employees Or Patients. The Co Is Final Authority On Validating Complaints. If The Contractor Is Involved And Named In A Validated Patient Complaint, The Government Reserves The Right To Refuse Acceptance Of The Services Of Such Personnel. This Does Not Preclude Refusal In The Event Of Incidents Involving Physical Or Verbal Abuse. the Government Reserves The Right To Refuse Acceptance Of Any Contractor Personnel At Any Time After Performance Begins, If Personal Or Professional Conduct Jeopardizes Patient Care Or Interferes With The Regular And Ordinary Operation Of The Facility. Breaches Of Conduct Include Intoxication Or Debilitation Resulting From Drug Use, Theft, Patient Abuse, Dereliction Or Negligence In Performing Directed Tasks, Or Other Conduct Resulting In Formal Complaints By Patient Or Other Staff Members To Designated Government Representatives. Standards For Conduct Shall Mirror Those Prescribed By Current Federal Personnel Regulations. The Co And Cor Shall Deal With Issues Raised Concerning Contractor S Conduct. The Final Arbiter On Questions Of Acceptability Is The Co. performance Standards: measure: Provider Quality Performance performance Requirement: All Contractor S Physician(s) Shall Perform In Accordance With Clinical Standards standard: Oppe Documentation For All (100%) Staff Providing Services Under The Contract. All Staff (100%) Meet Standards aql: 100% Meet Standards surveillance Method: Oppe Data Pertinent To Care Performed For Each Provider Working Under This Contract. Oppe Data Will Review The Following Elements: patient Care Performance medical/clinical Knowledge practiced Based Learning And Improvement interpersonal And Communication Skills professionalism system Based Practice frequency: Annual measure: Qualifications Of Key Personnel performance Requirement: All Contractor S Physician(s) Shall Be Board Certified/board Eligible Accordance With Abs Standards For General Surgery standard: All (100%) Contractor S Physician(s) Are Board Certified/board Eligible aql: 100% surveillance Method: Periodic Inspection Of Qualification Documents frequency: Bi-annually measure: Scope Of Practice/privileging performance Requirement: Contractor S Physician(s) Perform Within Their Individual Scopes Of Practice/privileging standard: All (100%) Contractor S Physician(s) Perform Within Their Scope Of Practice/privileges 100% Of The Time aql: 100% Contractor S Physician(s) Perform Within Their Scope Of Practice/privileges 100% Of The Time surveillance Method: Random Sampling Of Records frequency: Every 6 Months measure: Patient Access performance Requirement: The Contractor Shall Provide Contractor S Physician(s) In Accordance With The Operating Hours And Va Clinical Schedule Outlined In This Pws standard: All (100%) Contractor S Physician(s) Are On Time And Available To Perform Services aql: Contractor S Physician(s) Is On-time And Available To Perform Services 95% Of The Time surveillance Method: Periodic Inspection Of Time And Attendance Sheets frequency: Daily measure: Patient Safety performance Requirement: Patient Safety Incidents Shall Be Reported Using Va Patient Safety Reporting System. All Incidents Reported Immediately (within 24 Hours.) standard: All (100%) Of Patient Safety Incidents Are Reported Using Va Patient Safety Reporting System Within 24 Hours Of Incident aql: 100% Of Patient Safety Incidents Are Reported Using Va Patient Safety Reporting System Within 24 Hours Of Incident surveillance Method: Periodic Inspection frequency: Daily measure: Maintains Licensing, Registration, And Certification performance Requirement: Updated Licensing, Registration And Certification Shall Be Provided As They Are Renewed. Licensing And Registration Information Kept Current standard: All (100%) Licensing, Registration(s) And Certification(s) For Contractor S Physician(s) Shall Be Provided As They Are Renewed. Licensing And Registration Information Kept Current aql: 100% Licensing, Registration(s) And Certification(s) For Contractor S Physician(s) Shall Be Provided As They Are Renewed. Licensing And Registration Information Kept Current. No Acceptable Deviation. surveillance Method: Periodic Inspection frequency: Annually measure: Mandatory Training performance Requirement: Contractor Shall Complete All Required Training On Time Per Facility Policy standard: All (100%) Of Required Training Is Complete On Time By Contractor S Physician(s) aql: 95% Completions surveillance Method: Periodic Inspection Or Random Sampling frequency: Annually measure: Privacy, Confidentiality And Hipaa performance Requirement: Contractor Is Aware Of All Laws, Regulations, Policies And Procedures Relating To Privacy, Confidentiality And Hipaa And Complies With All Standards Zero Breaches Of Privacy Or Confidentiality standard: All (100%) Contractor S Physician(s) Comply With All Laws, Regulations, Policies And Procedures Relating To Privacy, Confidentiality And Hipaa aql: 100% Compliance surveillance Method: Periodic Inspection; Contractor Shall Provide Evidence Of Annual Training Required By The Facility, Reports Violations Per Va Handbook 6500.6 frequency: Annually registration With Contractor Performance Assessment Reporting System as Prescribed In Far Part 42.15, The Va Evaluates Contractor Past Performance On All Contracts That Exceed The Simplified Acquisition Threshold And Shares Those Evaluations With Other Federal Government Contract Specialists And Procurement Officials. The Far Requires That The Contractor Be Provided An Opportunity To Comment On Past Performance Evaluations Prior To Each Report Closing. To Fulfill This Requirement Va Uses An Online Database, Cpars, Which Is Maintained By The Naval Sea Logistics Center In Portsmouth, New Hampshire. Cpars Has Connectivity With The Past Performance Information Retrieval System (ppirs) Database, Which Is Available To All Federal Agencies. Ppirs Is The System Used To Collect And Retrieve Performance Assessment Reports Used In Source Selection Determinations And Completed Cpars Report Cards Transferred To Ppirs. Cpars Also Includes Access To The Federal Awardee Performance And Integrity Information System (fapiis). Fapiis Is A Web-enabled Application Accessed Via Cpars For Contractor Responsibility Determination Information. each Contractor Whose Contract Award Is Estimated To Exceed The Simplified Acquisition Threshold Requires A Cpars Evaluation. A Government Focal Point Will Register Your Contract Within Thirty Days After Contract Award And, At That Time, You Will Receive An Email Message With A User Id (to Be Used When Reviewing Evaluations). Additional Information Regarding The Evaluation Process Can Be Found At Www.cpars.gov Or If You Have Any Questions, You May Contact The Customer Support Desk @ Dsn: 684-1690 Or Comm: 207-438-1690. for Contracts With A Period Of One Year Or Less, The Co Will Perform A Single Evaluation When The Contract Is Complete. For Contracts Exceeding One Year, The Co Will Evaluate The Contractor S Performance Annually. Interim Reports Will Be Filed Each Year Until The Last Year Of The Contract, When The Final Report Will Be Completed. The Report Shall Be Assigned In Cpars To The Contractor S Designated Representative For Comment. The Contractor Representative Will Have Sixty (60) Days To Submit Any Comments And Re-assign The Report To The Co. failure For The Contractor S Representative To Respond To The Evaluation Within Those Sixty (60) Days, Will Result In The Government S Evaluation Being Placed On File In The Database With A Statement That The Contractor Failed To Respond; The Contractor S Representative Will Be Locked Out Of The Evaluation And May No Longer Send Comments. government Responsibilities: va Support Personnel, Services Or Equipment: Not Needed contract Administration/performance Monitoring: After Award Of Contract, All Inquiries And Correspondence Relative To The Administration Of The Contract Shall Be Addressed To: (enter Contract Administration If Not Already Listed In Another Area- List The Title (not Name) And Contact Information For Cor, Clinical Point Of Contact, And Any Other Relevant Personnel Involved). co Responsibilities: the Co Is The Only Person Authorized To Approve Changes Or Modify Any Of The Requirements Of This Contract. The Contractor Shall Communicate With The Co On All Matters Pertaining To Contract Administration. Only The Co Is Authorized To Make Commitments Or Issue Any Modification To Include (but Not Limited To) Terms Affecting Price, Quantity Or Quality Of Performance Of This Contract. the Co Shall Resolve Complaints Concerning Contractor Relations With The Government Employees Or Patients. The Co Is Final Authority On Validating Complaints. In The Event The Contractor Effects Any Such Change At The Direction Of Any Person Other Than The Co Without Authority, No Adjustment Shall Be Made In The Contract Price To Cover An Increase In Costs Incurred As A Result Thereof. in The Event That Contracted Services Do Not Meet Quality And/or Safety Expectations, The Best Remedy Will Be Implemented, To Include But Not Limited To A Targeted And Time Limited Performance Improvement Plan; Increased Monitoring Of The Contracted Services; Consultation Or Training For Contractor Personnel To Be Provided By The Va; Replacement Of The Contract Personnel And/or Renegotiation Of The Contract Terms Or Termination Of The Contract. cor Responsibilities: the Cor Shall Be The Va Official Responsible For Verifying Contract Compliance. After Contract Award, Any Incidents Of Contractor Noncompliance As Evidenced By The Monitoring Procedures Shall Be Forwarded Immediately To The Co. the Cor Will Be Responsible For Monitoring The Contractor S Performance To Ensure All Specifications And Requirements Are Fulfilled. Quality Improvement Data That Will Be Collected For Ongoing Monitoring Includes But Is Not Limited To: Enter Data That May Be Collected. the Cor Will Maintain A Record-keeping System Of Services By Electronical Fileinvoice Payment Process System (ipps). The Cor Will Review This Data Monthly When Invoices Are Received And Certify All Invoices For Payment By Comparing The Hours Documented On The Va Record-keeping System And Those On The Invoices. Any Evidence Of The Contractor's Non-compliance As Evidenced By The Monitoring Procedures Shall Be Forwarded Immediately To The Co. the Cor Will Review And Certify Monthly Invoices For Payment. If In The Event The Contractor Fails To Provide The Services In This Contract, Payments Will Be Adjusted To Compensate The Government For The Difference. all Contract Administration Functions Will Be Retained By The Va. special Contract Requirements: reports/deliverables: The Contractor Shall Be Responsible For Complying With All Reporting Requirements Established By The Contract. Contractor Shall Be Responsible For Assuring The Accuracy And Completeness Of All Reports And Other Documents As Well As The Timely Submission Of Each. Contractor Shall Comply With Contract Requirements Regarding The Appropriate Reporting Formats, Instructions, Submission Timetables, And Technical Assistance As Required. the Following Are Brief Descriptions Of Required Documents That Must Be Submitted By Contractor: Upon Award; Weekly; Monthly; Quarterly ; Annually, Etc. Identified Throughout The Pws And Is Provided Here As A Guide For Contractor Convenience. If An Item Is Within The Pws And Not Listed Here, The Contractor Remains Responsible For The Delivery Of The Item. note To Contracting: These Items Must Be Described In 52.212-1 Addendum To Instructions To Offerors what submit As Noted submit To quality Control Plan: Description And Reporting Reflecting The Contractor S Plan For Meeting Of Contract Requirements And Performance Standards upon Proposal And As Frequently As Indicated In The Performance Standards co other Than Cost And Price Information Supporting Proposed Physician Rate (required For Affiliate Onsite Hourly- Remove If It Does Not Apply) upon Proposal, To Submit Epa Request, Upon Change In Key Personnel co copy Of Subcontracting Plan Is Required For All Large Businesses. Copy Of Contractor Certification Statement If No Subcontracting Possibilities Exist upon Proposal And As Updated co copies Of Any And All Licenses, Board Certifications, Npi, To Include Primary Source Verification Of All Licensed And Certified Staff upon Proposal And Upon Renewal Of Licenses And Upon Renewal Of Option Periods Or Change Of Key Personnel co With Proposal; Renewal Submitted To Vetpro System certification That Staff List Has Been Compared To Oig List upon Proposal And Upon New Hires co proof Of Indemnification And Medical Liability Insurance upon Proposal And Upon Renewals co certificates Of Completion For Cyber Security And Patient Privacy Training Courses before Receiving An Account On Va Network And Annual Training And New Hires. co acls/bls Certification upon Award And Every Two Years After Award cor contingency Plan For Replacing Key Personnel To Maintain Services As Required Under The Terms Of The Contract upon Proposal And As Updated cor billing: invoice Requirements And Supporting Documentation: Supporting Documentation And Invoice Must Be Submitted No Later Than The Last Workday Of The Month. Subsequent Changes Or Corrections Shall Be Submitted By Separate Invoice. In Addition To Information Required For Submission Of A Proper Invoice In Accordance With Far 52.212-4 (g), All Invoices Must Include: name And Address Of Contractor invoice Date And Invoice Number contract Number And Purchase/task Order Number date Of Service contractor S Physician(s) (name Of Contractor S Employee) hourly Rate quantity Of Hours Worked total Price vendor Electronic Invoice Submission Methods: invoices Will Be Electronically Submitted To The Tungsten Website At Https://www.tungstenautomation.com/. Tungsten Automation Direct Vendor Support Number Is 877-489-6135 For Va Contracts. The Va-fsc Pays All Associated Transaction Fees For Va Orders. During Implementation (technical Set-up) Tungsten Automation Will Confirm Your Taxpayer Id Number With The Va-fsc. This Process Can Take Up To 5 Business Days To Complete To Ensure Your Invoice Is Automatically Routed To Your Certifying Official For Approval And Payment. To Successfully Submit An Invoice To Va-fsc Please Review How To Create An Invoice Within The How To Guides. All Invoices Submitted Through Tungsten Automation To The Va-fsc Should Mirror The Current Submission Of Invoice. Clarification Of Additional Requirements Should Be Confirmed With Your Certifying Official (your Co Or Buyer). Payment Will Only Be Made For Actual Services Rendered. Payments Shall Be Made Monthly In Arrears. The Va-fsc Requires Specific Information In Compliance With The Prompt Pay Act And Business Requirements. The Contractor Shall Be Reimbursed Upon Receipt Of A Proper Invoice. For Additional Information, Please Contact: tungsten Support phone: 1-877-489-6135 website: Https://www.tungstenautomation.com/ department Of Veterans Affairs Financial Service Center https://www.fsc.va.gov/einvoice.asp â  reduction In Services: This Is A Fixed Quantity Contract For A Specified Number Of Hours. If, At The End Of The Pop, The Government Has Not Utilized The Total Number Of Hours Required Under This Contract Because Of A Change In Its Requirements, The Parties Agree That They Will Attempt To Negotiate In Good Faith A Contract Modification Reducing The Scope Of The Contract With A Corresponding Adjustment In The Total Contract Price. In No Event Will The Va Pay For Hours That Exceed The Total Number Of Hours Specified In The Contract For The Pop. payments In Full/no Billing Va Beneficiaries: The Contractor Shall Accept Payment For Services Rendered Under This Contract As Payment In Full. Va Beneficiaries Shall Not Under Any Circumstances Be Charged Nor Their Insurance Companies Charged For Services Rendered By The Contractor, Even If Va Does Not Pay For Those Services. This Provision Shall Survive The Termination Or Ending Of The Contract. to The Extent That The Veteran Desires Services Which Are Not A Va Benefit Or Covered Under The Terms Of This Contract, The Contractor Must Notify The Veteran That There Will Be A Charge For Such Service And That The Va Will Not Be Responsible For Payment. the Contractor Shall Not Bill, Charge, Collect A Deposit From, Seek Compensation, Remuneration, Or Reimbursement From, Or Have Any Recourse Against, Any Person Or Entity Other Than Va For Services Provided Pursuant To This Contract. It Shall Be Considered Fraudulent For The Contractor To Bill Other Third-party Insurance Sources (including Medicare) For Services Rendered To Veteran Enrollees Under This Contract. contractor Security Requirements (va Handbook 6500.6): Pulled From Ecms, Team Should Select Language From Each Section As Applicable.
Closing Date3 Jan 2025
Tender AmountRefer Documents 

Special Aviation Guard of the Operational and Ritual Service of Civil Protection of the State Service of Ukraine from Emergency Situations Tender

Electrical and Electronics...+1Electrical Works
Ukraine
Purchaser Name: Special Aviation Guard of the Operational and Ritual Service of Civil Protection of the State Service | Сир Кисломолочний 9% Жирності 1кг - Сир Кисломолочний Виробляють Сквашуванням Молока Заквашувальними Препаратами. Дсту 4554:2006, Маючи Відповідні Сертифікати І Висновки Державної Санітарно-епідеміологічної Експертизи. Смак I Запах - Характерний Кисломолочний Без Сторонніх, Присмаків Та Запахів. Колір - Білий Або Кремовий, Pавномірний За Всією Масою. По Фізико-хімичним Показникам Повинно Відповідати Вимогам: 1. Масова Частка Жиру В 100 Г, Не Менше - 9% 2. Кислотність, Не Бльше Ніж - 170-250,00т 3.волога -65-80% 4. Bміст В 100 Г Продукту:білок15,0 Г; Вуглеводи 1,5 Г. Енергетична Цінність На 100 Г Продукту 180 Ккал. Температура Під Час Випуску З Підприємства Повинна Бути 4±20 С, Ступінь Чистоти Не Нижче 1 Групи; Фосфатаза - Відсутні. По Мікробіологічним Показникам Повинно Відповідати Вимогам: 1.кількість Мезофільних Та Факультативно-анаеробних Мікроорганізмів, Куо В 1г, Не Більше - 1 X 10 ⁵. 2.бактерії Групи Кишкових Паличок - Не Допускаються. 3.патогенні Мікроорганізми, В Т.ч. Бактерії Роду Сальмонелла- Не Допускаються. Гарантійний Термін Зберігання Фасування До 10 Діб При Температурі (0 0с +4 0с). Сир Кисломолочний Фасується В Вакуумну Упаковку 1кг Без Гмо, Що Має Бути Зазначено На Упаковці. Учасник У Складі Тендерної Пропозиції Повинен Надати: Документи, Що Підтверджують Якість Продукції: Сертифікати Відповідності, Та/або Посвідчення Про Якість, Та/або Декларації Виробника, Або Інше Документальне Підтвердження Походження Продуктів Харчування, Що Є Предметом Закупівлі Разом З Документом Виданим Державною Лабораторією Або Випробувальним Центром Відповідного Напрямку (протокол Випробувань Або Експертний Висновок Виданий На Ім’я Учасника), Щодо Оцінки Відповідності Товару Вимогам Нормативних Документів, Державного Стандарту, А Саме З Відображенням Відсутності Складових Рослинного Походження (дата Видачі Не Раніше 2024 Року). Сканована Кольорова Копія Оригіналу Акту Складеного За Результатами Проведення Планового (позапланового) Заходу Державного Контролю (інспектування) На Підприємстві Учасника Стосовно Додержання Операторами Ринку Вимог Законодавства Про Харчові Продукти Та Корми , Здоров’я Та Благополуччя Тварин За Формою Затвердженою Наказом Міністерства Аграрної Політики Та Продовольства України 08 Серпня 2023 Року № 1503 (акт Без Виявлених Порушень Датований Не Раніше 2024 Року). Документи, Які Підтверджують Інформацію Про Транспортні Засоби Та Контейнери, Що Використовуються Для Перевезення Харчових Продуктів, Що Вони Чисті, Продезінфіковані (засобами, Дозволеними Для Використання Моз України), Утримуються У Належному Стані (санітарний Паспорт), А Працівники, Які Контактують З Харчовими Продуктами (експедитори, Водії, Вантажники) Перед Початком Роботи Обов’язково Проходять Температурний Скринінг Та Забезпечені Спецодягом, Засобами Індивідуального Захисту (масками, Рукавичками) Та Дезінфектантами, Антисептиками. Інформаційна Довідка Учасника Щодо Здійснення Дезінфекції, Дератизації Складських Приміщень Із Зазначенням Інформації Щодо Способу Здійснення Такої Дезінфекції: Власними Силами Або На Основі Договору З Установою (надати Сканований Оригінал Договору На Ім`я Учасника), Уповноваженою На Проведення Цього Виду Діяльності Та Документи, Що Підтверджують Здійснення Дезінфекції, Дератизації Складських Приміщень У Поточному Році. Відповідно До Закону України «про Основні Принципи Та Вимоги До Безпечності Та Якості Харчових Продуктів» Та Закону України «про Забезпечення Санітарного Та Епідеміологічного Благополуччя Населення» Учасник Повинен Надати В Складі Тендерної Пропозиції Експертний Висновок Або Звіт Про Результати Дослідження Паталогічного (біологічного) Матеріалу (зроблений В Поточному Році), Що Підтверджує Здійснення Процедури Виявлення Бактеріального Забруднення Середовища Життєдіяльності Людини Методом Змивів На Наявність Та/або Відсутність Бактерії Групи Кишкової Палички (санітарно – Мікробіологічне Дослідження) З Поверхні Яка Контактує З Харчовими Продуктами, Зокрема: Кузову(ів) Автотранспорту З Середини; Столу(ів) Для Фасування Та/або Пакування; Холодильної(их) Та/або Морозильної(их) Камер(и); Тари Для Продуктів Харчування. Надати Сканований Оригінал Договору На Ім`я Учасника На Лабораторні Дослідження. Залишковий Термін Придатності На Момент Постачання Повинен Складати Не Менше Ніж 90% Від Загального Терміну Зберігання. Ціна За Одиницю Товару, Що Надана В Складі Цінової Пропозиції Не Повинна Перевищувати Середньостатистичну Вартість Товару, Встановлену Державною Службою Статистики України На Дату Електронних Торгів. Доставка Товару Проводиться Власним Транспортом Постачальника З Дотриманням Товарного Сусідства.. Строк Поставки Товару: Січень - Грудень 2025 Р. Продукція Повинна Бути Вітчизняного Виробника. Розвантажувальні Роботи Виконуються Фахівцями Які Забезпечені Особовими Медичними Книжками Та Спецодягом. Доставка Та Розвантаження Продукції (в Морозильну Камеру), Проводиться Дрібнооптовими Партіями За Рахунок Постачальника.
Closing Date17 Jan 2025
Tender AmountUAH 61.2 K (USD 1.4 K)

Special Aviation Guard of the Operational and Ritual Service of Civil Protection of the State Service of Ukraine from Emergency Situations Tender

Others
Ukraine
Purchaser Name: Special Aviation Guard of the Operational and Ritual Service of Civil Protection of the State Service | Молоко Коров'яче, Пастеризоване, 2,5%, Плівка Поліетиленова, Дсту 2661, 1000г
Closing Date17 Jan 2025
Tender AmountUAH 123.7 K (USD 2.9 K)

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Automobiles and Auto Parts
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Supply And Delivery Of Various Bucor Vehicles 2025 (procurement/contract No. 010) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 16 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 22 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 29 Section Viii. Bidding Forms 34 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid For Supply And Delivery Of Various Bucor Vehicles 2025 1. The Bureau Of Corrections, Through The National Expenditure Program Fy 2025 (capital Outlay) Intends To Apply The Sum Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00) Being The Abc To Payments Under The Contract For Supply And Delivery Of Various Bucor Vehicles 2025 With Identification Number __epa-010__. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Thirty (30) Calendar Days. Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On __december 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)___ From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five (₱25,000.00) Thousand Pesos Only. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On __january 06, 2025 (01:30pm)____ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before __january 20, 2025 (01:29pm)__. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On __january 20, 2025 (01:30pm)__ At The Given Address Below Bac Conference Room Nbp Reservation Muntinlupa City, Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Schedule Of Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents December 29, 2024 (08:00am To 05:00pm) To January 20, 2025 (08:00am To 01:29pm)_ Supply Division Bureau Of Corrections Muntinlupa City 2. Pre-bid Conference January 06, 2025 (01:30pm Bac Conference Room Bureau Of Corrections Muntinlupa City 3. Submission And Opening Of Bid Documents January 20, 2025 (01:30pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 11. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Maria Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt. Celso S. Bravo Chairperson, Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Wishes To Receive Bids For The Supply And Delivery Of Various Bucor Vehicles 2025 {[insert, If Applicable:] Under A Framework Agreement}, With Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Supply And Delivery Of Various Bucor Vehicles 2025 Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For National Expenditure Program Fy 2025 (capital Outlay) In The Amount Of Seventeen Million Three Hundred Thousand Pesos Only (₱17,300,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.3. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.4. Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address Bac Conference Room Nbp Reservation, Poblacion, Muntinlupa, City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Four (4) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. [include If Framework Agreement Will Be Used:] Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 12.2. [include If Framework Agreement Will Be Used:] For Framework Agreement, The Following Should Also Apply In Addition To Clause 12.1: A. For A Single Year Framework Agreement, The Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. B. For A Multi-year Framework Agreement, The Prices Quoted By The Bidder During Submission Of Eligibility Documents Shall Be The Ceiling And The Price Quoted During Mini-competition Must Not Exceed The Initial Price Offer. The Price Quoted During Call For Mini-competition Shall Be Fixed During The Bidder’s Performance Of That Call-off And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. [include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, Other Than The Grounds For Forfeiture Under The 2016 Revised Irr, The Bid Security May Also Be Forfeited If The Successful Bidder Fails To Sign The Framework Agreement, Or Fails To Furnish The Performance Security Or Performance Securing Declaration. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Posting Of Performance Security Or Performance Securing Declaration, As The Case May Be, By The Winning Bidder Or Compliant Bidders And The Signing Of The Framework Agreement. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, The Submission Of Bids Shall Be For The Initial Evaluation Of Their Technical And Financial Eligibility. Thereafter, Those Declared Eligible During The Said Initial Eligibility Evaluation And Entered Into A Framework Agreement With The Procuring Entity Shall Submit Anew Their Best Financial Offer At The Address And On Or Before The Date And Time Indicated In The Call For Each Mini-competition. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, Determination Of Margin Of Preference Shall Be Conducted Every Call For Mini-competition. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. [include The Following Options If Framework Agreement Will Be Used:] A. In The Case Of Single-year Framework Agreement, The Lowest Calculated Bid Shall Be Determined Outright After The Detailed Evaluation; B. For Multi-year Framework Agreement, The Determination Of The Eligibility And The Compliance Of Bidders With The Technical And Financial Aspects Of The Projects Shall Be Initially Made By The Bac, In Accordance With Item 7.4.2 Of The Guidelines On The Use Of Framework Agreement. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1 – One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, All Bidders Initially Determined To Be Eligible And Financially Compliant Shall Be Subject To Initial Post-qualification. The Bac Shall Then Recommend The Execution Of A Framework Agreement Among All Eligible, Technically And Financially Compliant Bidders And The Procuring Entity And Shall Be Issued By Hope A Notice To Execute Framework Agreement. The Determination Of The Lowest Calculated Bid (lcb) Shall Not Be Performed By The Bac Until A Mini-competition Is Conducted Among The Bidders Who Executed A Framework Agreement. When A Call For Mini-competition Is Made, The Bac Shall Allow The Bidders To Submit Their Best Financial Proposals On Such Pre-scheduled Date, Time And Place To Determine The Bidder With The Lcb. 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, {[include If Framework Agreement Will Be Used:] Or In The Case Of Multi-year Framework Agreement, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant,}the Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. {[include If Framework Agreement Will Be Used:] For Every Mini-competition In Framework Agreement, The Lcb Shall Likewise Submit The Required Documents For Final Post Qualification.} 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. [include The Following Clauses If Framework Agreement Will Be Used:] 21.2. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Framework Agreement Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 21.3. Within Ten (10) Calendar Days From Receipt Of The Notice To Execute Framework Agreement With The Procuring Entity, The Successful Bidder Or Its Duly Authorized Representative Shall Formally Enter Into A Framework Agreement With The Procuring Entity For An Amount Of One Peso To Be Paid To The Procuring Entity As A Consideration For The Option Granted By The Procuring Entity To Procure The Items In The Framework Agreement List When The Need Arises. 21.4. The Procuring Entity Shall Enter Into A Framework Agreement With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 21.5. The Following Documents Shall Form Part Of The Framework Agreement: A. Framework Agreement Form; B. Bidding Documents; C. Call-offs; D. Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; E. Performance Security Or Performance Securing Declaration, As The Case May Be; F. Notice To Execute Framework Agreement; And G. Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Motor Vehicle. B. Completed Within The Last Four (4) Years Equivalent To At Least Fifty Percent (50%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Audited Financial Statement 7. 2 Sets Photo Copy Of Eligibility And Financial Envelope Marked As “copy 1” And “copy 2” 21.2 No Additional Contract Documents. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. [include The Following Clauses If Framework Agreement Will Be Used:] 2.3. For A Single-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier In Its Bid. 2.4. For Multi-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier During Conduct Of Mini-competition. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184.{[include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, The Bidder May Opt To Furnish The Performance Security Or A Performance Securing Declaration As Defined Under The Guidelines On The Use Of Framework Agreement.} 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project {[include If Framework Agreement Will Be Used:] Or Framework Agreement} Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Delivered To Bureau Of Corrections Iwahig Prison And Penal Farm (ippf) Puerto Prinsesa City, Palawan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Acting Director, Directorate For Engineering Services. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Not Applicable 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Goods Shall Be Inspected By The Tiac Technical Inspection And Acceptance Committee. Representative From Supply Division To Be Witnessed By: Coa Representative The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Tiac (technical Inspection And Acceptance Committee). 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. Section Vi. Schedule Of Requirements Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Section Vi. Schedule Of Requirements Supply And Delivery Of Various Bucor Vehicles 2025 The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Prison Van 6 30 Calendar Days 2 Staff Car 2 30 Calendar Days 3 Staff Car 4 30 Calendar Days I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 1 Prison Van Overall Dimensions L X W X H (mm): 4,600 X 1,695 X 1,955 Wheelbase: 2400 Seating Capacity: 3 Engine Type Type: 4ja1 Direct Injection Common Rail Displacement (cc):2499 Maximum Output (ps/rpm): 78 Hp @3900 Rpm Maximum Torque (nm/rpm): 176.5 Nm @ 1800 Rpm Fuel Type: Diesel Fuel Tank Capacity: 50 Liters Transmission: 5-speed Manual Brakes: Front: Ventilated Discs Rear: Drum. Leading & Trailing Tires: 195r 14c 8pr Wheels (size): 14 X 5.5jj (6 Studs) Color: Camouflage Safety And Security Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 2 Staff Car Overall Dimensions L X W X H (mm): 4,735 X 1,830 X 1,795 Seating Capacity:8 Engine Type Type: 4-cylinder, In-line, 16-valve Double Overhead Camshaft (variable Nozzleturbo Charger W/ Intercooler) Engine Displacement (cc): 2755 Maximum Output (ps/rpm) 174 / 3,400 Maximum Torque (nm/rpm): 360 / 1,200 - 3,400 Fuel Type: Diesel 1 Gd - Ftv 6 - Speed At Multi - Reflector Halogen Black+silver Front Grille Function Fabric (black)* With Keyless Entry Eco+power Apple Carplay + Android Auto Safety And Security Driver + Front Passenger + Knee (d) With + Brake Assist + Ebd With Vehicle Stability Control ( Vsc) With Hill-start Assist Control (hsa) With Reverse Camera Other Modification: Color- Black Blinker And Siren Com. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance _________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Staff Car Overall Dimensions L X W X H (mm): 4,395 X 1,730 X 1,690 Wheelbase(mm): 2750 Seating Capacity: 7 Engine Type Type: 4-cylinder, In-line, 16-valve Dohc With Duel Vvt-idisplacement (cc):1329 Maximum Output (ps/rpm) 98/6000 Maximum Torque (nm/rpm): 122/4200 Fuel Type: Gasoline Fuel Tank Capacity: 43l Chassis Drivetrain: Front Wheel Drive Cvt Transmission 1nr-ve Brakes: Front: Disc Rear: Drum Tires: 185/ 65 R15 Alloy 15" Alloy Wheels __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 3 Continuation: Exterior Segment Lcd Mid Headlamps: Split Type Led Rear Combination: Led Lamp 2-tone Interior Function Key Start Digital Aircon Control Back Camera & Sensor 8" Audio Display With Apple Carplay And Android Auto Safety And Security Driver And Front Passenger Airbags Alarm+immobilizer+indicator Back Camera Color: Black Metallic 1 Blinker And Siren Comm. Sys. Basic Tools, Jack And Manual Others: Bucor Logo- Magnetic Type Registration: 3 Years Lto Registration 1 Year Gsis Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Eligibility Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (h) Conformity With The Schedule Of Requirements; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And A. Certificate Of Dealership B. List Of Service Centers Nationwide C. Certificate Of Availability Of Spare Parts D. Brochure And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate/board Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc; Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation At Least Equal To Ten Percent (10%) Of The Abc. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply And Delivery Of Various Bucor Vehicles 2025 Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2025 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Ten (10) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1 Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: A) If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; B) If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Various Bucor Vehicles 2025. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2025 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Various Bucor Vehicles 2025 Bid Form Date: Invitation To Bid No: [insert Reference Number] To: Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of Various Bucor Vehicles 2025 In Conformity With The Said Bidding Documents For The Sum Of ________________________________________₱_________________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 17.1 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And You’re Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Supply And Delivery Of Various Bucor Vehicles 2025 Of The Bureau Of Corrections. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2025. [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of __________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Schedule Of Prices Supply And Delivery Of Various Bucor Vehicles 2025 Quantity Units Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 6 Units Prison Van ₱8,700,000.00 2 Units Staff Car ₱3,600,000.00 4 Units Staff Car ₱5,000,000.00 Total: ₱17,300,000.00 Total Bid Price Inclusive Of Vat In Words [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________________ Sixth Edition July 2020 Bids And Awards Committee 2024
Closing Date20 Jan 2025
Tender AmountPHP 17.3 Million (USD 295.3 K)
9871-9880 of 9989 archived Tenders