City Of Koronadal Water District Tender
City Of Koronadal Water District Tender
Costs
Summary
Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System , Automation Equipment ,city Of Koronadal Water District
Description
Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Contact
Tender Id
b411209f-6a02-37c7-afb9-53ad9c1d12e4Tender No
11610870Tender Authority
City Of Koronadal Water District ViewPurchaser Address
-Website
http://notices.ps-philgeps.gov.ph