Chair Tenders

Chair Tenders

City Of Bayawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Republic Of The Philippines Province Of Negros Oriental City Of Bayawan Bid No.:itb 24-326 Bids And Awards Committee Date:december 27,2024 Invitation To Bid Sealed Bids For Quotation Of Prices Will Be Received For The Purchase Of The Following Supplies, Materials And Equipment Of The Government To Be Opened On The Date, Place, And Time Stated In Instruction To Bidders. Item No. Item Description Qty. Unit Additional Attribute Unit Cost Total Lot I Feeds 42,930.00 1 Feeds, Grower 50 Kgs/sack 2 Sack 2 Feeds, Finisher 50 Kgs/sack 2 Sack 3 Poultry Feeds Layer Mash, 50 Kgs/sack 18 Sack 4 Feeds , Starter 50 Kgs/sack 2 Sack Lot Ii Drugs And Medicines 3,810.00 5 Multivitamins, + Electrolyte 24 Sachets X 22 Grams Per Box 6 Box Lot Iii Carpentry Tools And Supplies 14,877.50 6 Bronze, Nail # 1 2 Kilo 7 Bronze Nail, # 1 1/2 3..5 Kilo 8 Bronze Nail, # 2 ..50 Kilo 9 Bronze Nail, # 2 1/2 1..50 Kilo 10 Plywood, Marine ,3/4 1 Piece 11 Plywood , Marine ,1/4 2 Piece 12 Plywood, Marine ,3/8 2 Piece Lot. Iv Bolt And Screw 220.00 13 S/s Lag Screw, S/s ,5x16x3 2 Piece 14 Lag Screw , S/s ,5x16x2 1/2 2 Piece Lot. V Electrical Supplies And Materials 158,218.00 15 Electric Iron, Dry And Steam (1200w/ 230v Ac/ 60hz) 2 Unit 16 "electric Oven , (2 Layers) Oven Capacity: 49.0 Liters, Oven Accessories: Oven Net, Oven Tray" 1 Unit 0.00 17 Ice Crusher, Electric, Aluminum, 220v 1 Unit 18 "egg Machine , With 24 Hens *cage - 1 Teir Set Up (12 Heads) - Made Of Hot Dipped Galvanize - 6 Doors Total, 18in Per Door, 4 Heads Per Door - H=5ft- W=4.5ft - L-9ft *ready To Lay Hens - 17 To 19 Weeks White Dekalb - Fully Vaccinated With Booster Shots * Feeders- Blue Pvc Feeders * Drinkers- Double Cup & Double Nipple Drinker" 6 Unit 19 Electric Wire, Duplex, Flat Cord, #12, Duplex, Flat Cord, #12 120 Unit Lot. Vi Farm/garden Tools And Accessories 1,160.00 20 Pail, 12l Capacity, Black 2 Piece 21 Basin Plastic , Plastic ,28 Inches (large) 6 Piece Lot. Vii Lighting And Fixtures And Accessories 624.00 22 Bulb, Led,(5 Watts) 6 Piece Lot. Viii Measuring/observing/testing Devices 15,696.00 23 Weighing Scale, Manual, Flat Form, 10 Kgs. Capacity 9 Unit Lot. Ix Paints, Tools And Supplies 14,574.00 24 Paint Brush, 3in, Pure White Bristle 3 Pieces 25 Lacquer Thinner , 3 Liter/bottle 2 Bottle 26 Epoxy Paint , White 4 Liter/gallon 5 Gallon 27 Marine Epoxy , A/b 4 Liter Per Can 2 Can 28 Marine Epoxy , (a/b) 1 Liter Per Can 2 Can Lot. X Paper Materials And Products 980.00 29 Paper Cups , 10oz 4 Pack 30 Paper Cups , 12oz 4 Pack 31 Paper Cup , 16oz 4 Pack Lot. Xi Power Tools, Equipment And Accessories 135,500.00 32 "marine Engine, Air-cooled Gasoline Engine,(6.5 Hp) Starting System: Recoil System" 2 Unit 33 "marine Engine , Air-cooled Gasoline Engine ,18 Hp Starting System: Recoil System" 1 Unit 34 "marine Engine , Aircooled Gasoline Engine,16 Hp Starting System: Recoil System" 4 Unit 35 Electric Grinder , Wet & Dry,fully Stainless(3hp Grinder Peanut Butter,220v 60hz,heavy Duty) 1 Unit Lot. Xii Appliances 186,618.00 36 Blender , (heavy Duty) 220-240v 3hp/2238 W 1 Unit 37 "chest Freezer, Single Door, 6 Cu. Ft. Solid Top, Grip Handle, Key Lock, Single Wire Basket, Roller Feet, Defrost System: Manual With Warranty" 9 Unit 38 Water Dispenser, Cold (vendo Machine W/coinslot) 220v With Warranty 1 Unit 39 Washing Machine , (twin Tub) 14kgs Capacity With Warranty 2 Unit Lot. Xiii Metal Works & Fabrication 1,199,520.00 40 Fabricated Negokart, With Bmx Bicycle And Accessories (made Up Of G.i Steel Plate, G.i Pipe, Angle Bar. Body Should Bear The Official Seal Of Lgu-bayawan City, Dole And Dilp. Should Also Feature A Tourist Spot Of Bayawan City. 51 Unit Lot. Xiv Other Machinery And Equipment 29,944.00 41 Chainsaw , 36in. Gasoline Engine, 70 Horsepower, Portable 1 Unit Lot. Xv Other Supplies & Materials 506,399.60 42 Frying Wok, Stainless Steel Nonstick, 36cm Diameter,10.5 Cm Depth 51 Piece 43 Glass Show Case, (3 Layers) W-24cm, L-64cm, H-51cm, Thickness Of Glass-0.5cm 52 Unit 44 Steel Basin, Stainless ,45cmx15cm 2 Piece 45 Plastic Jar, With Cover 500ml, For Peanut Butter 100 Piece 46 Chair, Plastic Stool, White 3 Piece 47 Table, Plastic, Monobloc, Square 1 Piece 48 Hanger, Plastic 6 Dozen 49 Clip Hanger, Plastic 12 Pieces 50 Box, For Storage, Plastic, 120l With 2 Clips, Button Wheels For Easy Moving, Clear, Heavy Duty 3 Box 51 Baking Pan, Round, 6 Inches X 3 Inches, Upper Diameter:6 Inches, Bottom Diameter: 5.5 Inches, Height:3 Inches 5 Pieces 52 Glassine Cup, For Cupcake,10cm, 1000pcs/pack 1 Pack 53 Baking Pan, Rectangular, Aluminum 8x12 Inches 6 Pieces 54 Measuring Cup, Plastic, Transparent,up To 1l Capacity 1 Piece 55 Baking Liner, Parchment Paper, 20mtrs., 20m X 30mm Per Box 5 Box 56 Cupcake Molder, Carbon Steel 12 Holes Tray 3 Set 57 Trapal, , 6 Feet Height,0.4mm Thick 18 Meter 58 Brass Pipe, 3/4 Inches,male 25 Unit 59 Ball Joint, 3/4 X 1, For Pump Boat 1 Piece 60 Stainless Shaft, 3/4x5ft 2 Piece 61 Stainless Shaft, 5/8 X 7ft W/ Thread 1 Piece 62 Stainless Propeller 3/4 X 5ft 2 Unit 63 Stainless Propeller 5/8in X 7 1 Piece 64 G.i Pipe, # 1-5-40 20ft./length 1 Length 65 Stand Belt, S/s,3/8x2.5 2 Piece 66 Stand Belt, S/s ,3/8x3 2 Piece 67 P.e Hose , 1 1/2 4 Meter 68 Rope, #20 1..5 Roll 69 Rubber Float , Round (patao) 360 Pieces 70 Cooler Box, Styro, 12kls Capacity 6 Piece 71 Cooler, Plastic With Cover (40kgs. Capacity) 2 Piece 72 Battery, 12 Volts 22 Plates 1 Unit 73 Battery , 12 Volts 17 Plates 3 Unit 74 Iron Board, Foldable, Ironing Board Cover With Foam, 36in Board Length. 2 Piece 75 Stove, Single Burner (stainless Steel Body, Automatic Ignition Flame Controller, Gas Type: Lpg) 51 Unit 76 Stove, Single Burner With Gas Tank 7kgs. 1 Set 77 Aluminum Wok/cawa, Big Size, Diameter 56.5 Cm, Height 19cm 1 Piece 78 Fishing Hook, #58 2 Pack 79 Fishing Hook, #59 4 Pack 80 Fishing Hook, #60 4 Pack 81 Lead Sinker, No. 2 25 Kilo 82 Nylone , Monoline,#45 1 Kilo 83 Nylone , Monoline,#40 1 Kilo 84 Nylone , Monoline ,#30 1 Kilo 85 Nylon , Monoline,#25 1 Kilo 86 Nylone , Monoline,#20 1 Kilo 87 Nylon , Monoline,#15 5 Kilo 88 Nylone , Monoline.#12 1 Kilo 89 Nylone , Monoline,#10 10 Kilo 90 Fishing Net , (pamu) #8 4 Meter 91 Fishing Net , #10 1,500 Meter 92 Fishing Net , #9 1,400 Meter 93 Pamo Net , 210x2x9x100m 3 Roll 94 Pamo Net , 210x2x8x100m 3 Roll 95 Hand Mixer , (electric Cake Batter) 3 Kls. Capacity Single Whisk. 1 Unit 96 Plastic Sando Bag (xl) 50 Pieces Per Pack, (xl) 50 Pieces Per Pack 55 Pack 97 Sando Ecobag, Large, 50 Pieces/pack 55 Pack 98 Brass Pipe, 5/8" X 4 Feet 1 Piece 99 Sand Paper,#120 4 Pack 100 Sando Ecobag, Extra Large, 50 Pieces/pack 10 Pack 101 Cross Joint, 3/4 Ft. X 5/8 Inches, 3/4 Ft. X 5/8 Inches 2 Piece 102 Rudder Assembly Stainless 5/8 Inches X 3 Feet, 5/8 Inches X 3 Feet 2 Piece 103 Rudder Assembly Stainless 5/8 Inches X 3.5 Feet, 5/8 Inches X 3.5 Feet 1 Piece Lot. Xvi Cleaning Equipment And Supplies 223,426.00 104 Bleaching Liquid, 250ml Per Bottle 408 Bottle 105 Bleaching Liquid, 5l Per Bottle 4 Bottle 106 Bleaching Liquid, 3.785l Per Bottle 10 Bottle 107 Bleaching Liquid, Color Safe 3.6l 10 Bottle 108 Body Soap, Pure White With Germ Shield, 60g 408 Piece 109 Body Soap, Fresh Green With Germ Shield, 60g 408 Piece 110 Detergent Bar, 360g 20 Piece 111 Detergent Bar, White, 400g 408 Piece 112 Detergent Powder, Calamansi (single), 57gx6 Sachet 510 Pack 113 Detergent Powder , (whitener) 2 Kilo Per Pack 10 Piece 114 Detergent Powder , (twin Pack) Sunrise Fresh 70g X 6 Sachet 408 Pack 115 Detergent Powder , (all Colors) 2 Kilo Per Pack 10 Pack 116 Fabric Conditioner, Antibac, Sachet, 25ml X 6 340 Pack 117 Fabric Conditioner , Sunrise Fresh, (1l) 10 Piece 118 Hair Conditioner, Standout Straight Sachet, 12ml X 6 170 Pack 119 Hair Conditioner, Damage Control 11ml X 6sachet 170 Pack 120 Hair Shampoo & Conditioner , Complete Repair Avocado Oil & Honey For Damage Hair, 15ml X 6 Sachet 408 Pack 121 Hair Shampoo, Smooth & Manageable 15ml X 12s 408 Pack 122 Sanitary Napkin, Non-wings 8pcs/pack 204 Pack 123 Sanitary Napkin, W/wings 8pcs/pack 170 Pack 124 Toothpaste Cool Menthol Fresh Twin Sachet, 20g, Cool Menthol Fresh Twin Sachet, 20g 408 Piece Lot. Xvii Commercial Lumber 11,254.00 125 Lumber, Gemillina,1x2x18 15 Piece 126 Lumber, Gemillina,2x8x8 1 Piece 127 Good Lumber, 1x2x10 9 Piece 128 Good Lumber, 1x12x16 3 Piece 129 Good Lumber, 1x2x18 3 Piece 130 Good Lumber, 2x2x10 9 Piece 131 Good Lumber, 2x2x8 3 Piece 132 Good Lumber, 2x4x8 2 Piece ***nothing Follows*** Grand Total 2,545,751.10 Place Of Delivery: Fob Bayawan, City Warehouse Form And Amount Of Bid Security: I Hereby Certify That The Above Articles Are Equally Carried In Stock By Me In Quantities Above Stated Except Those Marked "none". Terms And Conditions Specified In The Annex Of This Form Are Herein Accepted. The Quantity Shown And Prices As Quoted Are Hereby Offered. ___________________________ Name Of Business/company Address/contact Number Evaluation: Bids And Awards Committee _________ Virginia D. Sadiasa, Chairman Wilfredo C. Tuale, Member _________ Saturnino T. Dayanan, Vice-chairman Corazon P. Lirazan,member ________ Ernesto N. Dinopol,jr.,member _________ Nefredo Camillo A. Villarubia,member Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors/contractors To Bid For The Hereunder Projects: Itb No. Pr No. Project Name Total Abc Of Project Source Of Funds Itb 24-326 300-24-12-011 Delivery Of Other Supplies And Materials For Integrated Livelihood Project.(ccmdo) 2,545,751.10 Trust Fund Lot No. Description Of Lot Total Abc Of Lot Bid Security Cash/mc/bank Gurantee (2% Of Abc) I Feeds 42,930.00 856.60 Ii Drugs And Medicines 3,810.00 76.2 Iii Carpentry Tools And Supplies 14,877.00 297.54 Iv Bolt And Screw 220.00 4.40 V Electrical Supplies And Materials 158,218.00 3,164.36 Vi Farm/garden Tools And Accessories 1,160.00 23.20 Vii Lighting And Fixtures And Accessories 624.00 12.48 Viii Measuring/observing/testing Devices 15,696.00 313.92 Ix Paints, Tools And Supplies 14,574.00 291.48 X Paper Materials And Products 980.00 19.6 Xi Power Tools, Equipment And Accessories 135,500.00 2,710.00 Xii Appliances 186,618.00 3,732.36 Xiii Metal Works & Fabrication 1,199,520.00 23,990.40 Xiv Other Machinery And Equipment 29,944.00 598.88 Xv Other Supplies & Materials 506,399.60 10,127.992 Xvi Cleaning Equipment And Supplies 223,426.00 4.468.52 Xvii Commercial Lumber 11,254.00 225.08 Bid Documents Shall Be Available At The Bac Office, New Bayawan City Hall, Negosyo Center, Lgu Bayawan City Upon Ss Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00. Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Post- Qualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed Below, As Follows: Activities Schedule Issuance Of Bid Documents December 27, 2024 To January 15, 2025 @ 5:00 P.m. Pre-bid Conference January 7, 2025 @ 9:00 A.m. Deadline/opening Of Bids January 16, 2025 @ 9:00 A.m. Approved: Virginia D. Sadiasa Bac Chairman Geps Publication : December 27, 2024 Newspaper : None
Closing Date16 Jan 2025
Tender AmountPHP 2.5 Million (USD 43.5 K)

DEPT OF THE NAVY USA Tender

Software and IT Solutions
United States
Details: 1. Synopsis this Is A Sources Sought Announcement In Accordance With Far 15.201 And In Anticipation Of A Potential Future Procurement. This Is Not A Request For Proposal (rfp). No Solicitation Exists At This Time. The Government Is Not Obligated And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Notice. the Naval Sea Systems Command (navsea) Is Conducting Market Research To Assess Industry Capability To Support The U.s. Navy In Continued Fielding And Maintenance Of The Total Ship Computing Environment Infrastructure (tscei) And The Zumwalt Combat System (zcs) Total Ship Computing Environment (tsce) Core Software. Tscei Hardware And Tsce Core Software Is The Heart Of Zcs. The Government Is Seeking Responses From Sources With The Facilities And Proficiency Required To Execute Any Of The Capabilities Listed In Enclosure 1. 2. Response Requirements responses Shall Be Limited To A Total Of 10 Pages, 1-inch Margins, Single-sided, 10-point Times New Roman Font Or Larger. Figures/graphs/tables Can Be Included Within The Page Limit With 8-point Font Or Larger Text. Responses Shall Be Submitted In Microsoft Word Or Adobe Acrobat Portable Document Format (pdf) And Reference: N00024-25-r-5507 – Sources Sought Navy Tscei. Each Page Must Be Counted Except For The Following: cover Page company Information size Status interested Parties Shall Submit One White Paper Including The Company Name, Telephone Number, Mailing Address, Duns Number, Cage Code And E-mail Address Of One Point Of Contact. provide Number Of Employees Employed By Company’s Business Unit Considering This Opportunity, And The Geographic Locations. identify Contracts Within The Last Five (5) Years With Similar Scope And Provide Brief Overview Of Company Responsibilities And Magnitude Of Its Role. if A Small Business, Identify Type Of Small Business (e.g. 8(a), Hubzone, Service-disabled Veteran-owned, Economically Disadvantaged Women-owned, Or Women-owned). industry Shall Address Whether They Have A Minimum Secret Level Facility Security Clearance. the White Paper Should Demonstrate The Company's Capabilities And Experience To Design, Build, Integrate, Test, And/or Produce Applicable Combat System Elements And/or Subsystems To Support The Tscei. Failure To Provide A Response Does Not Preclude Participation In Any Possible Future Rfp, If Issued. a.) Introduction — Provide A Brief Company Introduction And Relevant Details Of The Company/organization, Including Any Potential Teaming Approach. Additionally, Interested Parties Shall Identify If Their Company Has The Capability To Be A Prime Contractor Or If It Is Only Interested In Subcontracting Opportunities. b.) Capabilities — Succinctly Address The Contractor’s Ability To Manage The Types And Magnitude Of Tasking, Technical Ability To Perform The Task, And The Capacity To Conduct The Requirements Of The Task. c.) Experience —this Section Should Include Specific Demonstrated Capabilities, Knowledge, And Experience For Each Capability. Identify Any Demonstrated Expertise And Experience That Can Be Directly Applied To The Development And Evaluation Of Navy Combat System Capabilities. Does Your Company Have A Satisfactory Performance Record For The Type Of Work Required? Please Provide Examples Of Relevant And Recent (within Five Years) Past Performance. d.) Place Of Performance — Provide The Expected Place Of Performance. Identify Existing Facilities For Manufacturing, Assembly, And Component, Subsystem, And System Integration, Qualification, Production, And Testing Required To Support Tscei On Zumwalt Class Destroyers. e.) Barriers To Competition — Identify Any Obstacles To Competition As A Prime And/or Subcontractor For The Proposed Scope For This Tscei Effort. In Addition, The Company May Recommend Solutions Or Mitigation Paths For The Navy To Overcome The Obstacles. 3. Disclaimer this Sources Sought Is Issued Solely For Market Research Purposes. It Does Not Constitute A Rfp Or A Promise To Issue An Rfp In The Future. This Sources Sought Does Not Commit The Government To Solicit Offers Or Award A Contract. The Information Provided In This Sources Sought Is Subject To Change And Is Not Binding On The Government. The Government May Request Further Information Regarding Respondents’ Self-assessed Capabilities And May Request A Presentation And/or A Site Visit. Any Such Requests Would Not Signify Preference Nor Solicitation. Respondents Are Advised That All Costs Associated With Responding To This Sources Sought Will Be Solely At The Interested Parties’ Expense, And The U.s. Government Will Not Pay For Any Information Or Costs Incurred Or Associated With Submitting A Response To This Sources Sought. Information Submitted In Response To This Source Sought Will Become The Property Of The United States Government. Submitters Should Properly Mark Their Responses With The Appropriate Restrictive Markings. Information That Is Proprietary Or Competition Sensitive Will Be Protected From Disclosure Under The Public Records Law Only If Properly Labeled As Such.anticipated Place Of Performance Will Be At The Awarded Contractor's Location. 4. Response Due Date And Government Points Of Contact interested Companies Should Provide A Response On Or Before 3:00 Pm Est, 13 Jan 2025. The Submission Should Include One Electronic (virus Scanned) Copy Sent Via E-mail To The Contracting Officer At William.j.jee.civ@us.navy.mil. Please Include The Source Sought Title In The Subject Of The E-mail. all Information Received That Includes Proprietary Markings Will Be Handled In Accordance With Applicable Statutes And Regulations. An Acknowledgement Of Receipt Will Be Provided For All Responses Received. If You Do Not Receive An Acknowledgement Within Two Working Days, Please Notify The Points Of Contact Listed In This Notice. enclosure (1): a.) Several Assumptions And Constraints Of The Total Ship Computing Environment Infrastructure (tscei) And Total Ship Computing Environment (tsce) Systems Should Be Taken Into Account For Any Responses, Including: tscei Which Includes Core Data Processing And Ship-wide Network Infrastructure Will Be Modernized To Support Infrastructure As A Service (iaas). Tscei Integrates The Ship's Combat System, Sensors, Weapons, Command-and-control Ship Control, And Integrated Communications Functions Into A Cohesive And Unified System. primary Mission Of The Ddg 1000 Class Is Surface Strike. a Technical Data Package (tdp) Is Not Available For Either Tscei Hardware Or Tsce Software At This Time. b.) Specific Elements That Interface With Tscei Include, But Are Not Limited To: mk57 Peripheral Vertical Launching System (vls)​ cooperative Engagement Capability (cec)​ identification Friend Or Foe (iff)​ tomahawk Tactical Weapon Control System (ttwcs)​ evolved Sea Sparrow Missile (essm) All Up Round(aur)​ sps-73/surface Search Radar horizon And Surface Search Phased Array Radars standard Missile Aur Family​ tomahawk Aur​ surface Electronic Warfare Improvement Program(sewip) / Slq-32​ integrated Communications Controller (icc)​ inertial Navigation System (ins) / Wsn-7/9​ engineering Control System (ecs)​ conventional Prompt Strike (cps)​ / Large Missile Vertical Launch System (lmvls) zumwalt Operating Environment Trusted Virtualenvironment (zoetve) global Command And Control System-maritime (gccs-m) common Data Link Management System (cdlms) shipboard Gridlock System With Auto Correlation (sgs/ac) navigation Sensor System Interface (navssi)/ Global Positioning System-based Positioning, Navigation And Timing Services (gpnts) moriah Wind System (mws) mk46 Gun Weapon System nixie / Slq-25c/e on-board Trainer (obt) / Navy Continuous Training Environment (ncte) electro-optics Surveillance integrated Broadcast System (ibs) satellite Communication (satcom) c.) The Government Is Seeking Input From Industry To Determine If There Are Sources With The Facilities And Proficiency Required To Execute Any Or All Of The Below Capabilities. Providing A Subset Response To The Below Capabilities Is Acceptable: technical Leadership, Including Integration, Coordination, And System Engineering Across The Program For Successful Integration Of All Combat System, Strategic System, Hm&e Control System, And Command, Control, Communication, Computer, Cyber And Intelligence (c5i) System Elements systems Engineering, Including Model-based Systems Engineering, To Support The Zumwalt Class Destroyer Platform Combat System Design, Development And Testing . Engineering Development Efforts Include: requirements Analysis system Architecture subsystem, Component, And Test Requirements Development design Analysis And Design Integration cybersecurity Engineering network Engineering modeling & Simulation system Integration, Verification And Validation Testing To Support Combat System Certification software Development Within A Devsecops Environment, Including Coding, Testing, Integration, Deployment, And Maintenance Of Software Products. Software Development Efforts Include: compute Hardware And Network Switch Obsolescence Management infrastructure As A Service platform As A Service software As A Service continuous Authority To Operate/certificate-to-ship experience With Goals Questions Indicators Metrics (gqim) Approach To Software Sustainment And Development sustainment / Integrated Logistics Support (ils), Including Lifecycle Support Necessary To Maintain Tscei Hardware. Sustainment / Ils Efforts Include: diminishing Manufacturing Sources And Material Shortages (dmsms) Management, Includes Identifying Obsolescence Issues, Implementing Resolutions, Providing Crew And In-service Engineering Agent (isea) Technical Reach Back On Dmsms Issues ils Product Maintenance, Including Interactive Electronic Technical Manuals (ietms)/tech Manuals, Planned Maintenance System (pms) Maintenance Installation Plan (mip)/maintenance Requirement Cards (mrcs), Fleet Introductory Training (fit), Configuration/provisioning Data, Incorporating Baseline Updates Stemming From Engineering Change Proposals (ecps) Or Feedback Report Changes configuration Management repair Support And Services, Including Support As Interim Depot For Repair/replace Of Failed Depot Level Repairable Assets life Cycle Transition Support reliability, Maintainability And Availability (rma)/failure Reporting Analysis And Corrective Action System (fracas) depot Capability participation In Government Chaired Software And Hardware Sustainment/ Improvement/maintenance Process For Configuration Control Boards (ccbs) And Other Related Meetings Including, But Not Limited To Risk Review Boards, Executive Steering Committees, Technical Interchange Meetings, Integrated Product Team Meetings, And In-process Reviews. capability To Maintain/update Software And Hardware Related Documentation, Specifications, And Operational Training Curriculum. capability To Develop, Deliver, And Maintain Technical Data Packages (tdps). capability To Develop And Maintain Zcs Baseline Configuration Definition Documents (cdds). experience With Software Installation Aboard In-service And Shore Installations. technical Team Support To The Fleet Via The Deployment Of Ship Riders. integrated Activation And Testing, Including Test Plan Development, Test Sequencing, And Support. facilities And Manpower To Manufacture, Integrate, Install, And Support Combat System Equipment On The Zumwalt Class. facilities And Manpower To Support Land-based Integration, Testing, And Certification. d.) These Potential Efforts Do Not Reflect Any Endorsement By The Department Of Defense Nor Do They Reflect Any Policy Considerations That May Apply To Any Given Concept (e.g., Basing Arrangements, Treaty Compliance, Etc.). e.) This Sources Sought And Related Information Will Be Available Only Through The Internet At The Sam.gov Website (https://sam.gov/). The Government Will Not Provide Information In Response To Any Written, Telephone, Or Facsimile Requests. f.) Distribution Of All Future Information About This Sources Sought Will Be Through The Sam.gov Website. Interested Parties Are Responsible For Monitoring The Sam.gov Website To Assure They Have The Most Up-to-date Information On This Notice. Please Visit Said Website And Faqs For Information And Assistance Regarding Any Downloading Or Other Issues.
Closing Date13 Jan 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Pre-solicitation Notice Is Not A Request For Proposal. All information Needed To Submit Sf330 Documents Are Contained herein. No Additional Solicitation Package Or Technical information Will Be Issued. project: 544-25-125 Replace Dental Vacuum System work Location: Wm. Jennings Bryan Dorn Va Medical Center, Columbia, Sc 29209 estimated/target Completion Period: 145 Calendar Days After Award. construction Magnitude: Between $100,000 And $250,000. naics: 541330 - Engineering Services small Business Standard: $25.5 Million set-aside: 100% Service-disabled Veteran-owned Small Business (sdvosb) site Visits Will Not Be Arranged During This Phase. the Anticipated Award Date Of The Proposed A-e Contract Is On Or Before September 30, 2025. sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf 330 And Attachments (if Any) No Later Than (nlt) 12:00 Pm (est) January 13, 2025. ***attention*** Acknowledgement E-mails Will Be Sent From The Co Upon Receipt Of A Submission. If An Acknowledgement Is Not Returned, The Firm Should Contact The Co At Christopher.jenkins@va.gov And 478-595-2794. project Overview: the Columbia Va Health Care System Requires A Designed Solution To Repair Or Replace The Dental Vacuum System To Include All Piping, Pumps, Vacuums, Filters, Separators, Valving, Motors, Starters, Controllers, And All Other Necessary Components To Provide A Completely New System. The Current System Is Not Functioning Properly And Believed To Be Caused By The Current Configuration, Component Locations, And Length Of Installed Vacuum Piping. the End Result Of The Contract Is A Complete Set Of Construction Documents To Repair Or Replace The Existing Dental Vacuum System That Are Prepared For Solicitation For Construction. sdvosb Set-aside: this Requirement Is A 100% Set-aside For Service-disabled Veteran-owned Small Businesses Under The Authority Of 38 U.s.c. 8127(d). To Be Eligible For Award The Sdvosb You Must Be Considered Small Under The Relevant Naics Code. Sdvosb Contractors Must Be Verified And Viewable In Sba Vetcert: Https://veterans.certify.sba.gov/ Prior To Submission Of Proposal And Prior To Award Of Contract With Vaar 804.1103-70. Status As A Qualified Sdvosb Concern Is Under The Authority Of 38 Cfr Part 74 In Accordance With The Va Acquisition Regulation (vaar) Part 819. Any Person, Persons, Or Business Entity Suspected Of Misrepresenting Itself For The Purpose Of Securing A Government Contract May Be Criminally Investigated And Prosecuted For Fraud Against The United States Of America. Parties Found Misrepresenting Their Status Also Risk Debarment From Further Government Contracts. Eligibility Determination Is Performed By The Center For Veterans Enterprise (cve). Eligible Sdvosb Concerns Must Also Be Registered At The Following Websites: system For Award Management (sam): Https://www.sam.gov vets-4212 Federal Contractor Reporting Https://www.dol.gov/agencies/vets/programs/vets4212 important Notice: Prior To Submitting A Proposal Under This Sdvosb Set- Aside Solicitation; Offerors Must Apply For And Receive Verification From The Department Of Veteran Affairs Center For Veterans Enterprise (cve) In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership And Control Sufficient To Establish Appropriate Status. All Offerors Are Urged To Contact The Cve And Submit The Aforementioned Required Documents To Obtain Cve Verification Of Their Sdvosb Status If They Have Not Already Done So. for A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Department Of Veteran Affairs (va) Office Of Small & Disadvantaged Business Utilization (osdbu) Sba Vetcert: Https://veterans.certify.sba.gov/ And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualifications. Failure Of A Prospective Sdvosb To Be Verified By The Center For Veterans Enterprise (cve) At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13cfr 125.15 Prior To contract Award. in Order To Assure Compliance With Far Clauses, 52.219-14 Limitations On subcontracting (deviation 2019-01) And Vaar 852.219-10, Va Notice Of Total service-disabled Veteran-owned Small Business Set-aside (jul 2019) (deviation), All Firms Submitting A Sf 330 For This Pre-solicitation Notice Are required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation. far Part 36.6 (brooks Act) Selection Procedures Apply. The A-e Services Listed Herein Is Being Procured In Accordance With The Brooks Act (public Law 92-582) As Implemented In Far 36.6 And Vaar 836.6. Pursuant To Far, The Firm Responding To This Requirement Must Be Permitted, By Law, To Practice The Professions Of Architecture Or Engineering And Meet All Required Qualifications For The State Of Georgia. sf330s Shall Be Organized In The Following Order: cover Sheet (one-page Limit) design Team Background With Locations Of Supporting Offices (one-page Limit) design Team Organizational Structure With Key Discipline Roles (one-page Limit) factor 1 Specialized Experience (one Page Per Project Limit) factor 2 - Professional Qualifications (one Page Per Resume Limit) factor 3 Past Performance Summary Sheet (one-page Limit) factor 4 - Capacity (one-page Limit) factor 5 Knowledge Or Location (one-page Limit) factor 6 Sdvosb Inclusion Statement (one-page Limit) full Cpars/ppqs Documentation For Factor 1 Projects (20-page Limit) additional Information (10-page Limit) sf330s Received Out Of Sequence Will Be Viewed Negatively. sf330 Specific Requirements: all Sf330 Pages Shall Be Pdf Searchable For Items 1 Through 11 And Item 13. Full Cpars And Ppqs May Be Scanned. start Each Factor Response On A New Page. use No Less Than 11-point Font. all Text And Images Containing Text Is Legible When Printed On 8.5 X 11 Paper. The Evaluation Board Will Not Seek Clarification Regarding Illegible Text. primary Selection Criteria (listed In Descending Order Of Importance): factor 1 specialized Experience (sections F, G And H): Specialized Experience And Technical Competence In The Design And Construction Period Services Will Be Required To Perform Throughout The Life Of The Contract. Projects Experience Pertains To The Types, Size, Recency, Cost, And Complexity Of Work Previously Or Currently Being Performed By The Offeror That Is Comparable To The Work Covered By This Solicitation. page Limit One Page Per Project. Five-page Total For Factor 1. Information Provided On Additional Pages Beyond The One Page Per Project Limit Or Beyond The Five-page Total Limit Will Not Be Included With The Review. relevant Project Experience: Submit Five (3) Projects That Meet All Criteria Shown Below. relevant Project Type Design-bid-build Projects Involving Site Investigation, Schematic Design, Design Development, And Construction Documents. Dental Vacuum System Replacements, Renovations Of Dental Clinics That Include New Dental Vacuum Systems, And New Building Construction That Include New Dental Vacuum Systems Are Acceptable Project Types. Masterplan And Rfp Development For Design-build Contracts Will Not Be Viewed As Relevant. relevant Project Size Systems Service Five Dental Chairs Or More. relevant Project Recency Project Construction Must Be Complete Or Substantially Complete Within The Past Five Years Of The Solicitation Due Date. Substantially Complete Is Defined As 80% Or Greater Of The Construction Project Is Complete At The Time Of The Solicitation Due Date. relevant Project Cost - Construction Project Cost Must Be Greater Than $75,000 relevant Project Complexity The Project Narrative Description Must Indicate Experience With All The Following Criteria: designing Main Vacuum Systems That Include Amalgam Separators For Dental Service Lines. designing Infection Control Risk Mitigation Plans designing New Pump/vacuum Drive And Controller System the Relevant Project Criteria Listed Above Is The Minimal Information Required For Acceptable Project Relevance. Additional Value Will Be Considered For Projects Which Convey Expertise With The Following Categories And Will Potentially Increase The Overall Rating For This Factor. Projects That Do Not Convey Additional Value Expertise Will Not Be Considered A Weakness. Additional Value Expertise Includes: experience With The Submitting Firm Serving As The Prime Contractor Leading A Multi-discipline Team Through Investigative, Design, Solicitation, And Construction Period Services. These Services Must Be Documented For Each Project Narrative. designing Hazardous Material Abatement Plans experience With Recent Projects Intended To Support Service Line Dental Service Lines. va Projects Showing Documented Experience With Implementing Va Design Guides And Standards From The Technical Information Library. experience With Recent Projects Located In The Columbia, Sc, South Carolina Midlands Area, Or Adjacent Counties. experience With Recent Projects That Include Implementing Va Cad And Bim Standards. submissions Shall Include No More And No Less Than Three (3) Type Projects Of Recent And Relevant Government And Private Experience Projects Similar In Type, Size, Recency, And Complexity, Cost, And Experience With The Type Of Projects/competence Above. section G Will Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together As A Cohesive Unit On The Provided Relevant Projects. An Acceptable Rating Will Be Given If All Key Disciplines Are Shown, And Each Discipline Participated With At Least One Project Listed On Section G. Proposed Design Team Members That Do Not Have Experience With Any Of The Five Submitted Example Projects As Shown In Section G Will Be Viewed Negatively. factor 2 professional Qualifications (sections C Through E) Necessary For Satisfactory Performance Of Required Service. The Ae Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. The Design Firm And A-e Staff Representing The Project Must Be Licensed To Practice In Any State Of The United States Of America. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered To Sign Drawings In Each Discipline Must But Does Not Have To Be Registered In The State Where The Project Is Located. The Licensed Professional Must Hold Current Licensure For Said Discipline To Practice In Any State Of The United States Of America. Engineer-in -training (eit) Is Not Considered A Professional Licensure. page Limit One Page Limit Per Position Resume 8 Pages Total For Factor 2. Information Provided On Additional Pages Beyond The 8-page Limit Will Not Be Included With The Review. resume Requirements - A Resume For Each Of These Key Positions Must Be Provided Identifying Their Specific Role, Via Section E In The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To, The Lists Of Professionals With Required Licensure And Preferred Licensure Below. An Unacceptable Rating May Be Given If Resumes Are Not Provided For All Roles Listed. positions Requiring Professional Licensure. Not Providing The Professional Licensure Will Be Viewed Negatively And Will Not Be Compliant With The Solicitation. architect mechanical Engineer electrical Engineer fire Protection Engineer plumbing Engineer key Positions With Preferred Qualifications. Design Team Professionals That Have Obtained The Indicated Preferred Licensure May Be Viewed More Favorably. Not Providing The Professional Licensure Will Not Be Viewed Negatively And Will Not Reduce The Overall Rating For This Factor. Higher Value Will Be Given For Professionals With The Preferred Professional Licensure. quality Control Manager - Either Cqm, Cqe, Lean Six Sigma Black Belt, Or Experience With Minimum Five Projects Were Served As Qc Manager. project Manager - Project Management Professional (pmp) Certification Or More Than 10 Years Experience With Managing A/e Design Projects. construction Cost Estimator - Aspe Certified Professional Estimator (cpe) Certification multi-function Roles Are Allowable For The Following Positions And May Be Shown As Multi-role Positions On The Resumes: mechanical And Plumbing Engineering. architect, Seps Manager, Bim Manager, Interior Designer electrical Engineer And Rcdd project Manager And Quality Control Manager include The Home Office Location For Each Key Discipline Identified On Each Respective Resume In Section E Block 15. the Criteria Listed Above Is The Minimal Information Required For Acceptable Professional Qualifications. Additional Value Will Be Considered For Each Key Position And Will Potentially Increase The Overall Rating For This Factor And Shall Not Exceed The Prescribed Page Limit. key Personnel Having Greater Than 10 Years Experience In The Practicing Field. key Personnel With Greater Than Five Years Employment With The Proposed Design Team Firm. va Design And Construction Experience Within The Past Five Years. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 3 past Performance (section H): Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules Along With The Firm S History Of Design Error, Omission, And/or Deficiency Claims. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. However, If The Va Cpars Is Not Included With The Sf330 Submission, Then The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies, Outside Of The Va. for Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submit-ted In The Sf330 A Ppq Must Be Provided Listing Their Specific Role As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. the Government May Also Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted To The Vha Pcac Directly. Any Cpars And Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. page Limit Provide No More Than One Page Total For This Factor For The Summary Page. Full Cpars/ppq Documentation Shall Be Included On Additional Pages With The Sf330 And Will Not Count Towards The Total Page Count. provide A Summary Page That Provides The Factor S Required Information. For Each Of The Five Projects, Provide The Following Information. project Information (each Project For Specialized Experience) past Performance Record Type (ppq Or Cpars) contract Number point Of Contact (name, Phone, Email, Job Title, Poc Role) ae Firm Role With Project (prime Or Subcontractor) category Ratings provide Complete Cpars (or Ppqs If Cpars Is Not Available) For All Sample Projects After The Sf330 Factor 8 Section. the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Locate This Documentation After The Complete Cpars/ppq Documents. Additional Value Documentation Shall Not Exceed Five Pages. letters Of Appreciation Or Accolades From Previous Projects industry Recognition Or Design Awards any Other Information The Design Team Wishes To Include For This Factor So Long As The Five-page Limit Is Not Exceeded. factor 4 capacity (section H): The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector During The Previous Twelve (12) Months And The Full Potential Value Of Projects Forecasted Within The Next Twenty-four (24) Months Any Current Indefinite Delivery Contracts That The Firm Has. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members, Including Sub-consultants. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For All The Va Projects Current And Forecasted. Awarded In The Previous 12 Months. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf330. The Information For This Factor Shall Be Provided In Section H Of The Sf330. page Limit Provide No More Than Two Pages Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. include A Table That Conveys Each Key Discipline, Quantity Of Current Design Project Workload, Quantity Of Current Construction Period Service Workload, Estimated Future Design Load, Estimated Future Construction Workload, Quantity Of Current Idiq Contracts, Total Idiq Contract Capacity, Total Remaining Idiq Capacity, And Percent The Key Discipline Is Available. For Example: key Discipline total # Of Current Design Project Workload # Of Current Construction Project Workload estimated # Of Future Design Project Workload estimated # Of Future Construction Project Workload quantity Of Current Idiq Contracts Involved With total Idiq Capacity All Contracts (millions) total Idiq Remaining Capacity (millions) percent Available capacity architect 6 7 6 7 4 $1m $2m 45% mechanical Engineer 4 8 3 8 2 $1m $1 10% add Disciplines As Required the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Do Not Include Additional Pages In The Additional Information Section. providing A Narrative Conveying The Design Team S Approach On How New Work Will Merge With The Current Workload. provide A Narrative Describing The Process Regarding Replacement Of Key Disciplines Should One Decide To Leave The Design Team. convey How The Design Team Can Maintain Schedule If A Key Discipline Member Is No Longer Available? any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 5 knowledge Of Locality (section H). Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. provide An Individual Narrative Conveying Knowledge Of The Locality For Each Of The Following Categories: local Conditions Or Project Site Features climatic Conditions geologic Features working With And Local Construction Methods working With Local Laws And Regulations the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section. experience With Seismic Designs Applicable To The Columbia, Sc Area. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 6 use Of Service- Disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. Offerors Shall Be Evaluated Based On Their Utilization Plans For Service- Disabled Veteran- Owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Or Other Types Of Small Businesses. Offerors Shall Submit Qualifications For Proposed Consultants Per Other Criteria In This Solicitation. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. provide A Listing Of All Consulting Firms And Business Government Certification(s). Indicate The Anticipated Percentage Of Work The Consulting Firm Will Perform. the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. The Higher Percentage Of Certified Sdvosb Firms Included With The Design Team May Provide Additional Value And Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section.
Closing Date13 Jan 2025
Tender AmountRefer Documents 
2301-2310 of 2303 archived Tenders