Chair Tenders

Chair Tenders

Municipality Of Claveria, Masbate Tender

Healthcare and Medicine
Corrigendum : Tender Amount Updated
Philippines
Details: Description Item No. Quantity Unit Description 1 20.00 Bottles 0.3% Na Chloride 2 5,000.00 Tablet Albendazole 400mg/tab 3 2.00 Pieces Adjustable Cervical Collar Neck Brace Traction Device Breathable Neck Support (adult) 4 2.00 Pieces Adjustable Cervical Collar Neck Brace Traction Device Breathable Neck Support (pedia) 5 2.00 Pieces Adjustable Retractable Tourniquet 6 200.00 Tablets Aluminum Hydroxide 200mg+magnesium Hydroxide 200mg/tab (maalox) 7 300.00 Bottles Ambroxol Hcl 30mg/5ml 8 250.00 Bottles Ambroxol Hcl 6mg/ml (drops) 9 1.00 Unit Ambubag (adult) 10 1.00 Unit Ambubag (infant) 11 1.00 Unit Ambubag (pedia) 12 1.00 Unit Ambulance Strecher Convertible Chair Type 13 6,000.00 Tablets Amlodipine 10mg/tab 14 5,339.00 Tablet Amlodipine 5mg/tab 15 100.00 Bottles Amoxicillin 100mg/ml, Drops 16 300.00 Bottle Amoxicillin 100mg/ml,drops,10ml/bot 17 150.00 Bottle Amoxicillin 125mg/5ml,susp.60ml/bot 18 100.00 Bottles Amoxicillin 250mg/5ml 19 300.00 Bottle Amoxicillin 250mg/5ml,sups. 60ml/bot 20 2,420.00 Capsules Amoxicillin 250mg/cap 21 3,900.00 Capsule Amoxicillin 500mg/cap 22 2,000.00 Tablet Ascorbic Acid 500mg/tab 23 20.00 Boxes Ascorbic Acid 500mgf/tab 24 250.00 Bottles Ascorbic Acid, Drops 15ml 25 350.00 Bottles Ascorbic Acid, Syrup 60ml 26 3.00 Pieces Asepto Irrigation Bulb Syringe 27 1.00 Gallon Betadine Soln. 28 500.00 Tablet Betahistine 16mg/tab 29 200.00 Tube Betamethasone Cream 0.1% 5g 30 20.00 Tubes Betamethasone Ointment 5g 31 4.00 Units Bp Apparatus With Stetoscope (baxtel) 32 100.00 Bottle Carbocisteine 250/5ml 33 2,200.00 Capsules Carbocisteine 500mg/cap 34 200.00 Bottle Cefalexin 100mg/ml Drops 35 250.00 Bottle Cefalexin 250m/5ml Susp. 36 500.00 Capsule Cefalexin 250mg/cap 37 5,300.00 Capsules Cefalexin 500mg/cap 38 700.00 Tablets Cefuroxime 500mg/tab 39 1,700.00 Capsules Celecoxib 200mg/cap 40 250.00 Bottle Cetirizine 1mg/ml Syr.60ml 41 50.00 Bottles Cetirizine 5mg/5ml 42 3,000.00 Tablet Cetirizine Tab 10mg 43 2.00 Boxes Chromic 3-0 44 50.00 Bottle Ciprofloxacin 0.3% 5ml Eye Drops 45 500.00 Tablet Ciprofloxacin 500mg/tab 46 100.00 Bottle Clarithromycin 125mg/5ml 47 50.00 Bottle Clarithromycin 250mg/5ml 48 500.00 Tablet Clarithromycin 500mg/tab 49 500.00 Tablet Clonidine 150mcg/tab 50 200.00 Tablets Clonidine 150mcg/tab (catapres) 51 136.00 Tablets Clonidine 75mcg/tab (catapres) 52 550.00 Bottles Cloxacillin 250mg/5ml 53 2,500.00 Capsules Cloxacillin 250mg/cap 54 3,000.00 Capsules Cloxacillin 500mg/cap 55 200.00 Bottle Co-amoxiclav 125mg/5ml 56 200.00 Bottle Co-amoxiclav 250mg/5ml 57 700.00 Tablets Coamoxiclav 625mg/tab 58 100.00 Bottle Cotrimoxazole 200mg/40mg/5ml 59 300.00 Tablet Cotrimoxazole 800mg/160mg/tab 60 2.00 Rolls Cotton Roll 61 3.00 Pieces Cpr Breathing Mask Resuscitator Rescue Emergency First Aid Masks 62 20.00 Bottles D5 Lr 1 Liter 63 250.00 Vial Depo Provera (depot-medroxyprogesterone Acetate)dmpa 150mg/ml,1ml Suspension For Injection Vial 64 100.00 Bottle Diphenhydramine 12.5mg/5ml 65 500.00 Capsule Diphenhydramine 50mg/cap 66 25.00 Ampule Diphenhydramine 50mg/ml For Injection 67 100.00 Soft Gel Diphenhydramine 50mg/tab 68 2.00 Boxes Disposable Gloves (large) Thermometer (ear) 69 4.00 Units Disposable Gloves (large) Thermometer (ear) 70 2.00 Boxes Disposable Gloves (medium) 71 100.00 Pioeces Disposable Syringes 23x5ml (terumo) 72 1.00 Unit Ecg300g Portable 3 Channel Ecg Machine Digital 12 Lead Ekg 73 20.00 Pieces Elastic Bandage 3 Inches 74 20.00 Pieces Elastic Bandage 4 Inches 75 3.00 Pieces Emergency Blanket Thermal Mylar Blanket 76 50.00 Tube Erythromycin Eye Ointment 0.5%,3.5g 77 20.00 Bottles Ethyl Alcohol 70% 500ml 78 26.00 Boxes Face Mask 79 125.00 Bottle Ferous Drops 80 5,000.00 Tablet Ferous Tab 81 5,000.00 Tablet Ferous+foilc Acid 82 200.00 Bottle Ferrous Syrup 83 1.00 Unit Fetal Doppler 84 10.00 Pieces First Aid Latex Tourniquet Rubber Emergency Supplies 85 50.00 Inhaler Fluticasone+salmeterol 500micrograms+ 50micrograms X 60 Doses With Appropriate Accompanying Dispenser 86 20.00 Boxes Gauze 4x4 87 4.00 Units Glucometer 88 100.00 Bottles Guiafenesin+salbutamol 1mg/50mg/5ml Syrup 89 3.00 Pieces Hot Water Bag 500ml 90 50.00 Ampule Hydralazine 20mg/ml,1ml Ampule 91 200.00 Tablet Hydrochlorothiazide 25mg/tab 92 200.00 Tablet Hydrochlorothiazide 50mg/tab 93 10.00 Bottles Hydrogen Peroxide 94 100.00 Tablets Hyoscine (buscopan) 10mg/tab 95 700.00 Tablets Ibuprofen 200mg/tab 96 25.00 Pieces Iv Cannula G20 97 25.00 Pieces Iv Cannula G22 98 25.00 Pieces Iv Infusion Set 99 500.00 Boxes Levonorgestrel Ethinylestradiol 150mcg/130, Mcg Film Coated Tablet + Ferous Fumarate 75mg Film Coated Tablet 100 10.00 Bottles Lidocaine 50ml 101 1.00 Unit Littman Classic Stethoscope 102 50.00 Tablets Loperanide 2mg/tab 103 600.00 Tablet Loratadine 10mg/tab 104 11,000.00 Tablets Losartan 50mg/tab 105 50.00 Vial Magnesium Sulfate 250mg/ml, 20ml Solution For Injection 106 1.00 Unit Medical Oxygen Trank Trolley 107 1,200.00 Capsule Mefanamic Acid 500mg/cap 108 950.00 Capsules Mefenamic Acid 250mg/cap 109 6,000.00 Tablet Metformin 500mg/tab 110 500.00 Tabs Methyldopa 500mg/tab 111 1,000.00 Tablet Metoprolol 50mg/tab 112 100.00 Bottle Metronidazole 125mg/5ml 60ml 113 500.00 Tablet Metronidazole 500mg/tab 114 10.00 Pieces Micropore 1 Inch 115 100.00 Tube Mometasone 1mg/g 5g Cream 116 500.00 Tablet Montelukast 10mg/tab 117 1,000.00 Tablet Montelukast 5mg/tab 118 250.00 Bottles Multivitamins Drops 15ml 119 380.00 Bottles Multivitamins Syrup 60ml 120 20.00 Boxes Multivitamins Tab 121 10,000.00 Tablet Multivitamins+iron Tab 122 20.00 Tubes Mupirocin Cream 2% X 5g 123 100.00 Tube Mupirocin Ointment 2% X 5g 124 600.00 Tablets N-acetylcystein 600mg/tablet 125 2,200.00 Tablets Omeprazole 40mg/tab 126 500.00 Boxes Oral Contraceptive Pills (exluton 500mcg)for Lactating 127 400.00 Sachet Oresol 128 400.00 Pieces Oresol Sachet 129 1.00 Unit Oxygen Tank 50lbs. Witrh Oxygen Regulator 130 40.00 Boxes Oxytocin 131 600.00 Bottles Paracetamol 100mg/ml, Drops 132 450.00 Bottles Paracetamol 250mg/5ml, Syrup 133 500.00 Tablet Paracetamol 300 Mg/tab 134 2,000.00 Tablets Paracetamol 500mg/tab 135 100.00 Bottles Pedialyte Medium 136 100.00 Ampule Phytomenadione (vitamin K1) 10mg/ml Solution For Injection 137 50.00 Bottle Prednisone 10mg/5ml Suspension 60ml 138 500.00 Tablet Prednisone 10mg/tab 139 4.00 Units Pulse Oximeter 140 3,500.00 Capsule Rertinol Palmitate (vitamin A)100,000iu Softgel Capsule 141 2,500.00 Capsule Rertinol Palmitate (vitamin A)200,000iu Softgel Capsule 142 3.00 Pieces Reusable Male Urinal With Cap 143 50.00 Inhaler Salbutamol 100 Micrograms/dose X 200 Doses 144 350.00 Nebule Salbutamol 1mg/ml,2.5ml For Nebuization 145 50.00 Bottle Salbutamol 2mg/5ml 146 300.00 Bottle Salbutamol+guaifenesin 1mg/50mg/5ml 147 1,200.00 Tablets Salbutamol+guaifenesin 2mg/100mg/tab 148 100.00 Nebule Salbutamol+ipratropium 500mcg+2.5mgx2.5ml 149 120.00 Tubes Silaver Sulfadiazine Ointment 1% X 20g 150 1.00 Box Silk 3-0 151 500.00 Tablet Simvastatin 20mg/tab 152 2.00 Pieces Spine Board Straps (spider Straps) 153 3.00 Pieces Stainless Steel Battery Operated Diagnostic Penlight 154 200.00 Pieces Surgical Gloves Size 6.0 155 200.00 Pieces Surgical Gloves Size 7.5 156 1.00 Box Tongue Depressors,sterile 100s 157 500.00 Capsule Tranexamic Acid 500mg/cap 158 25.00 Ampule Tranexamic Acid 500mg/ml Ampule 159 15.00 Pieces Triangular Bandage First Aid Bandage 160 20.00 Boxes Vitamin B 1,6, 12 Tab 161 10,000.00 Tablet Vitamin B1,6,12 Tab 162 1.00 Unit Warsun Candyx Led Headlight 163 1.00 Unit Warsun D6000 High Power Led Flashlight Rechargeable Super Bright 5000 Lumens Handheld Spotlight Searchlight With Usb Output For Emergencies.
Closing Date9 Dec 2024
Tender AmountPHP 2.8 Million (USD 49.1 K)

ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY Tender

Others
Philippines
Details: Description Invitation To Bid Goods And Services Lot 1 - No. 24-002 1. The Iloilo State University Of Fisheries Science And Technology-dingle Campus, Its Bids And Awards Committee Through Its Fund 101 Intends To Apply The Sum Of Five Hundred Eighty Thousand Pesos Only (php 580,000.00)) Being The Approved Budget For The Contract (abc) To Payments Under The Project Supply And Delivery Of Various Semi-expendable Furniture And Fixtures (early Procurement Activty-epa). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. The Iloilo State University Of Fisheries Science And Technology-dingle Campus Now Invites Contractors For The Hereunder Contract: Name Of Contract : Lot 1 - Supply And Delivery Of Various Semi-expendable Furniture And Fixtures (early Procurement Activity - Epa) Location : Iloilo State University Of Fisheries Science And Technology Dingle Campus, Bgy. San Matias, Dingle, Iloilo Contract Price : Php 580,000.00 Contract Duration : 30cd 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedure Using A Non-discretionary “pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Ra 9184, Otherwise Known As “government Procurement Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperative And Partnerships Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Isufst-dingle Campus And Inspect The Bidding Documents At The Address Below From 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From November 18, 2024 December 6, 2024 At The Address Below And Upon Payment Of A Non-refundable Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of One Thousand Pesos Only (php 1,000.00). 6. The Iloilo State College Of Fisheries-dingle Campus Will Hold A Pre-bid Conference On November 26, 2024 At Exactly 9:00 O’clock In The Morning At The Conference Room, 2nd Floor Administration Building Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 9, 2024. All Bids Must Be Accompanied By A Bid Security And Or Bid Securing Declaration In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On December 9, 2024 At Exactly 9:00 O’clock In The Morning At The Conference Room, 2nd Floor Administration Building. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. The Iloilo State University Of Fisheries Science And Technology-dingle Campus Reserves The Right To Reject Any And All Bids Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Incurring Any Liability To The Affected Bidder Or Bidders. 9. For Inquiries And Further Information Please Contact: Bac Head Secretariat Ma. Annalyn D. Soubiron Isufst- Dingle Campus San Matias, Dingle, Iloilo Tel. No. (033) 33-1591/09488865995 Email: Iscofdingle@yahoo.com Dinglebacprocurementoffice@gmail.com (sgd) Dingras E, Balbona, Ddm-lg Chairperson, Bids And Awards Committee Lot 1 - Supply And Delivery Of Various Furniture And Fixtures - Early Procurement Activity (epa) No. Qty. Unit Particular 1. 10 Unit Industrial Fan, 24" Wall Type 2. 500 Pcs Monobloc Chair, Gray, Heavy Duty 3. 2 Unit Rustrum -lectern Glass With School, Logo Dimension: Base Flatform:2.2ftx.61.3inches Height: 3.9ft.x110.3 Inches,top Base Flatform: 61 Inches X 2ft Combination Of Wood And Glass 4. 2 Unit Full Glass Cabinet Swing, Metal Cabinet, With 5 Layer, Adjustable Shelves With Full Glass Swing Door Power Coated Light Gray Dimension: H1859xw900xd400 Invitation To Bid Goods And Services Lot 2 - No. 24-003 1. The Iloilo State University Of Fisheries Science And Technology-dingle Campus, Its Bids And Awards Committee Through Its Fund 101 Intends To Apply The Sum Of Two Hundred Forty-five Thousand Pesos Only (php 245,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Project Supply And Delivery Of Various Office Supplies And Consumables (early Procurement Activity- Epa). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. The Iloilo State University Of Fisheries Science And Technology-dingle Campus Now Invites Contractors For The Hereunder Contract: Name Of Contract : Lot 2 - Supply And Delivery Of Various Office Supplies And Consumables Early Procurement Activity -epa Location : Iloilo State University Of Fisheries Science And Technology Dingle Campus, Bgy. San Matias, Dingle, Iloilo Contract Price : Php 245,000.00 Contract Duration : 30cd 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedure Using A Non-discretionary “pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Ra 9184, Otherwise Known As “government Procurement Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Cooperative And Partnerships Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Isufst-dingle Campus And Inspect The Bidding Documents At The Address Below From 8:00 Am To 5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From November 18, 2024 December 6, 2024 At The Address Below And Upon Payment Of A Non-refundable Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Hundred Pesos Only (php 500.00). 6. The Iloilo State College Of Fisheries-dingle Campus Will Hold A Pre-bid Conference On November 26, 2024 At Exactly 9:00 O’clock In The Morning At The Conference Room, 2nd Floor Administration Building Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before December 9, 2024. All Bids Must Be Accompanied By A Bid Security And Or Bid Securing Declaration In Any Of The Acceptable Forms In The Amount Stated In Itb Clause 18. Bid Opening Shall Be On December 9, 2024 At Exactly 11:00 O’clock In The Morning At The Conference Room, 2nd Floor Administration Building. Bids Will Be Opened In The Presence Of The Bidder’s Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. The Iloilo State University Of Fisheries Science And Technology-dingle Campus Reserves The Right To Reject Any And All Bids Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Incurring Any Liability To The Affected Bidder Or Bidders. 9. For Inquiries And Further Information Please Contact: Bac Head Secretariat Ma. Annalyn D. Soubiron Isufst- Dingle Campus San Matias, Dingle, Iloilo Tel. No. (033) 33-1591/09488865995 Email: Iscofdingle@yahoo.com Dinglebacprocurementoffice@gmail.com (sgd) Dingras E, Balbona, Ddm-lg Chairperson, Bids And Awards Committee Lot 2 - Supply And Delivery Of Various Office Supplies And Materials - Early Procurement Activity (epa) 1. 120 Piece 2 Ring Binder Folder H-9, W-15, Blue 2. 60 Piece Ballpen (black) 3. 60 Piece Ballpen (blue) 4. 50 Piece Battery, Aa 5. 120 Ream Bookpaper (sub. 20, Long) 6. 100 Ream Bookpaper (sub. 20, A4) 7. 20 Ream Bookpaper (sub. 20, Short) 8. 300 Piece Brown Envelope (short) 9. 1 50pcs/ 1box Cd, Rewritable 10. 20 Box Clip (backfold,metal: 19mm) 11. 20 Box Clip (backfold,metal: 25mm) 12. 50 Piece Correction Tape 13. 14 Piece Cutter (big, Heavy Duty) 14. 5 Piece Dater 15. 40 Piece Expanded Envelope, Long, Brown 16. 10 Box Fastener (plastic) 17. 500 Pc File Folder, Long, White 18. 40 Pc Filing Box, Blue 19. 30 Pc Filing Box, Red 20. 40 Bot Glue (all Purpose) 21. 2 Btl Ink, Refill, Canon 71 (pgbk) 22. 2 Cart Ink, Refill, Canon Pixma 741 (color) 23. 5 Bottle Ink, Refill, Canon, 790 (black) 24. 5 Bottle Ink, Refill, Canon, 790 (cyan) 25. 5 Bottle Ink, Refill, Canon, 790 (magenta) 26. 5 Bottle Ink, Refill, Canon, 790 (yellow) 27. 30 Btl Ink, Refill, Epson 003 (black) 28. 20 Btl Ink, Refill, Epson 003 (cyan ) 29. 20 Btl Ink, Refill, Epson 003 (magenta) 30. 20 Btl Ink, Refill, Epson 003 (yellow ) 31. 2 Btl Ink, Refill, Epson T664 (black) 32. 3 Pc Mouse ( Optical, Usb Connection Type ) 33. 10 Pad Note Pad (stick On, 50mm X 76mm ) 2x3 34. 10 Pad Note Pad (stick On, 76mm X 100mm) 3x4 35. 30 Box Paper Clip (32mm Min) 36. 30 Box Paper Clip (50mm Min) 37. 40 Pc Pencil (lead, W/ Eraser) 38. 2 Piece Pencil Sharpener (manual) 39. 10 Piece Plastic Envelope, With Zipper And Handle 40. 500 Piece Pressboard Folder, Long, Green 41. 20 Piece Record Book (300 Leaves) 42. 20 Piece Ring Binder (½") 43. 20 Piece Ring Binder (¾") 44. 20 Piece Ring Binder (1") 45. 5 Piece Ruler (plastic, 12") 46. 5 Pair Scissors, 8"-9" 47. 30 Piece Sign Pen (0.4, Black) 48. 30 Piece Sign Pen (0.4, Blue) 49. 20 Piece Sign Pen Refill, (0.4, Black) 50. 20 Piece Sign Pen Refill, (0.4, Blue) 51. 4 Piece Stamp Pad Felt (60mm X 100mm) 52. 4 Piece Staple Remover (plier-type) 53. 20 Box Staple Wire (#35) 54. 4 Piece Stapler (#35) 55. 30 Pack Sticker Paper 56. 25 Roll Tape (double-sided, 24mm) 57. 3 Roll Tape (duct Tape) 58. 20 Pack Tape (masking, Width:24mm) 59. 10 Roll Tape (masking, Width: 48mm) 60. 2 Roll Tape (packaging, Width: 48mm) 61. 60 Roll Tape (transparent, Width: 24mm) 62. 5 Roll Tape (transparent, Width: 48mm) 63. 30 Pack Vellum Board, Long 64. 30 Piece Whiteboard Pen (black, Refillable) 65. 30 Piece Whiteboard Pen (blue, Refillable)
Closing Date9 Dec 2024
Tender AmountPHP 825 K (USD 13.9 K)

Department Of Education Division Of Palawan Tender

Others
Philippines
Details: Description Request For Quotation Date: November 15, 2024 Quotation No: 2024-11-131 To All Eligible Suppliers: The Schools Division Of Palawan, Through Its Bids And Awards Committee (bac), Intends To Procure A Procurement Of Hotel Accommodation (full Board) Including The Use Of Venue, Facilities And Amenities For The Conduct Of Division Budget And Financial Budget And Financial Accountability Reports (bfars) Workshop/consolidation For Fy 2024 And Performance Implementation Review For Ius With An Approved Budget For The Contract One Hundred Seventy-two Thousand Eight Hundred Pesos (php 172,800.00) Through Section 52.1(b) (shopping) Of 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Lowest Price Inclusive Of Vat On The Item/s Listed Below, Subject To The Terms And Conditions Of The Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than 09:00 Am Of November 25, 2024. At 3rd Floor Bac Office, Deped Building, Sdo Palawan C/o Rafael G. Manalo, Phd, Bac Chairperson, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. For More Information, Please Contact The Bac At (048) 433-6392. The Prospective Supplier Shall Be Responsible For Verifying The Quoted Items. Rafael G. Manalo, Phd Assistant Schools Division Superintendent Chairperson, Bids And Awards Committee For The Bac Chairperson: (sgd)rodel S. Magnaye Assistant Schools Division Superintendent Co-chairperson, Bids And Awards Committee I. Project:procurement Of Hotel Accommodation (full Board) Including The Use Of Venue, Facilities And Amenities For The Conduct Of Division Budget And Financial Budget And Financial Accountability Reports (bfars) Workshop/consolidation For Fy 2024 And Performance Implementation Review For Ius No. Items And Description Qty. Unit Statement Of Compliance (state “comply Or Not Comply” Unit Price Total Price Procurement Of Hotel Accommodation (full Board) Including The Use Of Venue, Facilities And Amenities For The Conduct Of Division Budget And Financial Budget And Financial Accountability Reports (bfars) Workshop/consolidation For Fy 2024 And Performance Implementation Review For Ius Secondary School Bookkeepers (ius Only) 27 Pax Division Finance Personnel (food Only) 3 Pax Description Of Services: 1.daily Serving Of Breakfast (6:00-8:00 Am) Lunch (12:00-1:00 Pm) And Dinner (5:30-7:00 Pm) (2 Main Dish, 1 Dessert, Soup & Rice) 2.two (2) Snacks (am&pm) @9:00-9:30 And 3:00-3:30 Pm Daily Packed Individually. (snack & Fresh Fruit Juice) 3. Activity Signage At The Lobby 4. Free Flowing Coffee Or Tea And Standby Drinking Water In The Function Hall For The Duration Of The Training-workshop 5. Standby Enough Number Of Food Attendants To Facilitate The Efficient Serving Of Meals And Snacks 6. Free Accommodation, Meals And Snacks For Secretariat/technical Working Group Good For Three (3) Pax 7.free Accommodation For Finance Personnel 3 Pax 8. Accommodation Must Be Single Bed Per Pax, And Maximum Of Three (3) Per Room. 9. One (1) Well-lighted And Air Function Hall With Tables, That Is Comfortable And Can Accommodate 30 Participants During Plenary And Workshop 10. Lcd Projectors, Wide Screen And Sound System For The Plenary Hall. Equipments Should Be In Very Good Condition 11. Free Fast And Efficient Wifi Connection 12.set Of Tables And Chairs Good For Three (3) Persons Outside The Plenary Hall For The Registration Team And Secretariat During The Registration And Duration Of Workshop 13. Functional Microphones (at Least 2 Units) 14. Standby Focal Persons (contact Person) 15. Venue Must Be Located Within Puerto Princesa City Proper 16.certificate Of Authority To Operate In Accommodation With Department Of Tourism (dot) Administrative Order No. 2020-002a, Including Physical Inspection Of Its Premises To Ensure Compliance With Minimum Health Standards 17. Valid Safety Seal From The Department Of Tourism Xxxxxxxxxxxxxxxxxxxxxxxxxx Approved Budget For The Contract (abc) Php 172,800.00 Delivery Period: Total: This Is To Submit Our Price Quotations As Included Above, Subject To The Terms And Conditions Of The Rfq. Supplier’s Company Name: Tin: Address: Telephone: Cp No.: E-mail: Supplier’s Authorized Representative Signature Over Printed Name: Date: I. Terms And Conditions A. Submission Of Requirements 1. Sealed Quotations And Other Requirements Below Shall Be Submitted To The Bids And Awards Committee (bac) Secretariat At 3rd Floor, Deped Building, Schools Division Office Of Palawan, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. 2. Interested Supplier Shall Submit The Following Requirements: A. Duly Signed Request For Quotation. Prices Shall Be Quoted In Philippine Pesos. Statement Of Compliance Must Be Accomplished By The Supplier. B. Documentary Requirements Of The Following: 1. Valid Mayor’s Permit 2. Philgeps Registration Certificate Bidder’s Failure To Submit Such Documents Upon Opening Shall Be Ground For Disqualification. B. Award The Supplier Who Submitted The Lowest Calculated And Responsive Quotation Shall Be Awarded The Purchase Order/contract After Evaluation By The Bac. C. Delivery Of Services 1. Delivery Of Services Shall Be Made On The Schedule Date Upon Receipt Of Purchase Order/contract. 2. Upon Delivery Of The Services, The Supplier Shall Notify The Purchaser And Present The Following Document/s To The Purchaser: A. Original And Copy Of The Supplier’s Statement Of Account. D. Evaluation Of Quotations Quotations Shall Be Compared And Evaluated Based On The Following Criteria: 1. Completeness Of Submission. 2. Compliance With Technical Specifications; And 3. Price E. Instructions 1. The Supplier Shall Be Responsible For All The Services To Be Rendered And Should Be In Accordance With The Schedule And Specifications Stipulated In The Contract/purchase Order. Failure Of The Supplier To Comply With This Provision Shall Be Grounds For Cancellation Of The Contract/purchase Order Issued To The Supplier. 2. Supplier Shall Pick Up The Purchase Order/contract Issued In Its Favor Within Three (3) Calendar Days From Receipt Of Notice To The Effect. A Telephone Call Or Fax Transmission Shall Constitute An Official Notice To The Supplier. Thereafter, If The Purchases Order Remains Unclaimed, The Purchase Order Shall Be Canceled. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Supplier Shall Be Precluded From Proposing Or Submitting Substitute Quotation (s) Or Item (s). 3. A Supplier Who Accepted A Purchase Order/contract But Failed To Deliver The Required Goods/services Within The Time Called For In The Purchase Order/contract Shall Be Disqualified From Participating In Deped Or Any Of Deped Unit’s Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a 9184 And Its Irr-a Against The Supplier. 4. The Supplier Shall Pay All Duties, Excise, And Other Taxes And Revenue Charges. 5. All Transactions Are Subject To Withholding Of Credible Value-added Tax And/or Expanded Value – Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. F. Payment One Hundred Percent (100%) Of The Contract Price Less Government Tax Shall Be Paid To The Supplier After Completion/compliance Of The Services Delivered. Payment Shall Be In The Form Of A Check And Addressed To The Supplier’s Name Firm. After Carefully Reading Your Request For Quotation And Its Terms And Conditions, I/we Quote You On The Item/s At The Price Noted In The Rfq. The Quotation Shall Be Binding Upon Us For Thirty (30) Calendar Days Reckoned From The Last Day Of Submission Indicated In The Submission Requirements. We Shall Accept The Corresponding Award On Purchase Order At Any Time Before The Expiration Of This Period
Closing Soon25 Nov 2024
Tender AmountPHP 172.8 K (USD 2.9 K)

Department Of Education Division Of Palawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Request For Quotation Date: 09-24-2024 Quotation No: 2024-09-095 To All Eligible Suppliers: The Schools Division Of Palawan, Through Its Bids And Awards Committee (bac), Intends To Procure A Procurement Of Hotel Accommodation (fullboard) And The Use Hotel Facilities Amenities For The Conduct Of Capacity Building For School Heads Of Schools Serving Ip Learners With An Abc Of Two Hundred Twenty Four Thousand Pesos ( Php 240,000.00) Through Section 53.9 (negotiated Procurement -small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Lowest Price Inclusive Of Vat On The Item/s Listed Below, Subject To The Terms And Conditions Of The Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than 9:00 Am Of November 25, 2024, At 3rd Floor Bac Office, Deped Building, Sdo Palawan C/o Rafael G. Manalo, Phd, Bac Chairperson, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. For More Information, Please Contact The Bac At (048) 433-6392. The Prospective Supplier Shall Be Responsible For Verifying The Quoted Items. Rafael G. Manalo, Phd Assistant Schools Division Superintendent Chairperson, Bids And Awards Committee For The Bac Chairperson (sgd) Rodel S. Magnaye Assistant Schools Division Superintendent Co-chairperson, Bids And Awards Committee I. Project: Procurement Of Hotel Accommodation ( Full Board) And The Use Of Hotel Amenities For The Conduct Capacity Building For School Heads Of Schools Serving Ip Learners No. Items And Description Qty. Unit Statement Of Compliance (state “comply” Or “not Comply” Unit Price Total Price Procurement Of Hotel Accommodation ( Full Board) And The Use Of Hotel Amenities For The Conduct Of Capacity Building For School Heads Of Schools Serving Ip Learners Lot School Heads Of Schools Serving 80% To 100% Ip Learners 30 Pax Description Of Services: 1. Daily Serving Of Meals- (soup Or Appetizer, 2 Main Dish, Side Dish, Dessert And Beverage). Breakfast (6:00-8:00 Am), Lunch (12:00-1:00 Pm) And Dinner (5:30-7:00 Pm). First Meal Will Be Pm Snacks At 3 Pm Of December 2, 2024 During The Opening Program While The Last Meal Will Be Lunch Of December 6, 2024. 2. Plated Service Snacks (am & Pm) @ 9:00-9:30 Am And 3:00-3:30 Pm) 3. Activity Signage At The Lobby 4. Free Flowing Coffee, Tea Or Milo In Sachet And Standby Drinking Water In The Function Hall. 5. Standby Enough Number Of Food Attendants To Facilitate The Efficient Serving Of Meals And Snacks. 6. Free Accommodation, Meals And Snacks For Secretariats Good For Two (2) Pax. 7. Accommodation Must Be Single Bed Per Pax, And Maximum Of Three (3) Pax Per Room. 8. One (1) Well-lighted And Ventilated Function Hall With Tables, That Is Comfortable And Can Accommodate 30 Participants. 9. One (1) Lcd Projector And Sound System For The Function Hall. Equipment Should Be In Very Good Condition. 10. Four (4) Units Wireless Microphone 11. Free Fast And Efficient Wifi Connection. 12. Set Of Tables And Chairs Good For Three (3) Persons Outside The Plenary Hall For The Registration Team, Secretariat And Medical Team During The Duration Of The Conference. 13. Standby Generator Set In Case Of Brownout 14. Standby Focal Persons (hotel Contact Person) 15. Venue Must Be Located Within Puerto Princesa City 16. Free 4 X 8 Feet Tarpaulin Approved Budget For The Contract (abc) Php 240,000.00 Delivery Period: Dec. 2 To 5,2024 4 Days Total This Is To Submit Our Price Quotations As Included Above, Subject To The Terms And Conditions Of The Rfq. Supplier’s Company Name: Tin: Address: Telephone: Cp No.: E-mail: Supplier’s Authorized Representative Signature Over Printed Name: Date: Ii. Terms And Conditions A. Submission Of Requirements 1. Sealed Quotations And Other Requirements Below Shall Be Submitted To The Bids And Awards Committee (bac) Secretariat At 3rd Floor, Deped Building, Schools Division Office Of Palawan, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. 2. Interested Supplier Shall Submit The Following Requirements: A. Letter Of Intent To Participate In The Said Procurement. B. Duly Signed Request For Quotation. Prices Shall Be Quoted In Philippine Pesos. Statement Of Compliance Must Be Accomplished By The Supplier. C. Documentary Requirements Of The Following: 1. Dti Certificate Of Registration 2. Valid Mayor’s Permit 3. Tax Clearance 4. Bir Certification 5. Philgeps Registration 6. Notarized Omnibus Sworn Statement Bidder’s Failure To Submit Such Documents Upon Opening Shall Be Grounds For Disqualification. B. Award The Supplier Who Submitted The Lowest Calculated And Responsive Quotation Shall Be Awarded The Purchase Order/contract After Evaluation By The Bac. C. Delivery Of Services 1. Delivery Of Services Shall Be Made On The Schedule Date Upon Receipt Of Purchase Order/contract. 2. Upon Delivery Of The Services, The Supplier Shall Notify The Purchaser And Present The Following Document/s To The Purchaser: A. Original And Copy Of The Supplier’s Statement Of Account. D. Evaluation Of Quotations Quotations Shall Be Compared And Evaluated Based On The Following Criteria: 1. Completeness Of Submission. 2. Compliance With Technical Specifications; And 3. Price E. Instructions 1. The Supplier Shall Be Responsible For All The Services To Be Rendered And Should Be In Accordance With The Schedule And Specifications Stipulated In The Contract/purchase Order. Failure Of The Supplier To Comply With This Provision Shall Be Grounds For Cancellation Of The Contract/purchase Order Issued To The Supplier. 2. Supplier Shall Pick Up The Purchase Order/contract Issued In Its Favor Within Three (3) Calendar Days From Receipt Of Notice To The Effect. A Telephone Call Or Fax Transmission Shall Constitute An Official Notice To The Supplier. Thereafter, If The Purchases Order Remains Unclaimed, The Purchase Order Shall Be Canceled. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Supplier Shall Be Precluded From Proposing Or Submitting Substitute Quotation (s) Or Item (s). 3. A Supplier Who Accepted A Purchase Order/contract But Failed To Deliver The Required Goods/services Within The Time Called For In The Purchase Order/contract Shall Be Disqualified From Participating In Deped Or Any Of Deped Unit’s Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a 9184 And Its Irr-a Against The Supplier. 4. The Supplier Shall Pay All Duties, Excise, And Other Taxes And Revenue Charges. 5. All Transactions Are Subject To Withholding Of Credible Value-added Tax And/or Expanded Value – Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. F. Payment One Hundred Percent (100%) Of The Contract Price Less Government Tax Shall Be Paid To The Supplier After Completion/compliance Of The Services Delivered. Payment Shall Be In The Form Of A Check And Addressed To The Supplier’s Name Firm. After Carefully Reading Your Request For Quotation And Its Terms And Conditions, I/we Quote You On The Item/s At The Price Noted In The Rfq. The Quotation Shall Be Binding Upon Us For Thirty (30) Calendar Days Reckoned From The Last Day Of Submission Indicated In The Submission Requirements. We Shall Accept The Corresponding Award On Purchase Order At Any Time Before The Expiration Of This Period
Closing Soon25 Nov 2024
Tender AmountPHP 240 K (USD 4 K)

Province Of Ifugao Tender

Others
Philippines
Details: Description Republic Of The Philippines Cordillera Administrative Region Provincial Local Government Unit Of Ifugao Bids And Awards Committee On Goods Request For Price Quotation Pr No: 7295 Date: November 12, 2024 Office: Pswdo Rfq No.: Bac Canvass (please Fill Up This Part) ( Mandatory) Company/ Business Name: Address; Business/mayor's Permit No. Tin: Philgeps Registration Number(required): The Provincial Local Government Unit Of Ifugao, Through Its Bids And Awards Committee (bac), Intends To Procure Board & Lodging (packaged Deal), In Accordance With Section 53.9 (negotiated Procurement-small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations Of Public Act. No. 9184 Please Quote Your Best Offer For The Item/s Described Herein,subject To The Terms And Conditions Provided On The Last Page Of The Rfq. Submit Your Quotation Using This Form, Duly Signed By You Or Your Duly Authorized Representative On Or Before November 21, 2024 At 1:00 Pm Based On The Bac- Wall Clock. Late Submission Will Not Be Accepted. The Following Documents Are Required To Be Submitted During The Post-evaluation And Qualification Of Your Offered Bid. Failure To Submit/ Comply With The Said Documents Will Be A Ground For Disqualification. Document Remarks Copy Of 2024 Mayor's Permit Or Business Permit 1. No Need To Submit If A Copy Of The 2024 Mayors Permit Was Already Submitted At The Bac Office. Notarized Omnibus Sworn Statement (gppb-prescribed Form)(for Above 50k Abc) 1. Forms Are Available At The Bac Office. Annual Income Tax Return (for Above 500k Abc) 1. 2023 Annual Income Tax Return. 2. No Need To Submit If A Copy Of The 2022 Annual Income Tax Return Was Already Submitted At The Bac Office. Special Power Of Attorney (spa Or Secretary's Certificate) 1. To Be Submitted If The Person Is An Authorized Representative. 2. Should Be Duly Notarized. 3. To Be Presented To The Bac-secretariat Upon Submission Of The Rfq. Original Brochure With Complete Specifications 1. For Office Equipments, Information Technology (it)equipments, Agricultural And Medical Equipments, Motor Cycles, Industrial Equipments And All Other Equipments That Has Technical Specifications. For Any Clarification, You May Contact Us At Telephone No. 09539316730 Or Email Address At Bacgoodsifugao13@gmail.com. Carmelita B. Buyuccan Bac- Chairperson Page 1 Instructions: 1. Accomplish This Rfq Correctly And Accurately. 2. Do Not Alter The Contents Of This Form In Any Way. 3. All Technical Specifications Are Mandatory. Failure To Comply With Any Of The Mandatory Requirements Will Disqualify Your Quotation. 4. Quotations May Also Be Submitted Through Electronic Mail At Bacgoodsifugao13@gmail.com. 5. For Quotations Submitted Via Electronic Mail, The Date And Time Of Receipt Indicated In The Email Shall Be Used. 6. Submit The Complete Rfq Form From Page 1 Up To The Terms And Conditions. 7. Fill Up Completely All Necessary Information & Affix Signature Over Printed Name On The Place As Designated. 8. Failure To Follow These Instructions Will Disqualify Your Entire Quotation. After Having Carefully Read And Accepted The Terms And Conditions, I/we Submit Our Quotation/s For The Item/s As Follows: Item Purchasers Specifications Unit Of Qty Supplier's Supplier's Total Cost Brand Offered No. Issue Unit Cost 1 Package Deal (board & Lodging) Covers 35 - Dormitory Type, Aircondition Room, Hot Shower With Tv - Function Hall With Microphones, Sound System And Chairs With Capacity Of 35 Pax Day 1 Pm Snack: Spaghetti With Psecial Drinl Dinner: Rice, Grilled Chicken With Sidedish And Dessert Day 2 Breakfast: Rice, Fried Bangus With Egg Am Snack: Pancit With Special Drink - Lunch: Rice, Pork Menudo With Side Dish And Dessert **** Nothing Follows **** - Bidder's Grand Total: - Grand Total: 52,500.00 - Purpose: Meals And Ssnacks To Be Serve During The Training On Bookkeeping Among Ifsca Officers On December 9-10, 2024 At Solano Nueva Vizcaya. Signature Over Printed Name Of Bidder Position/designation Date Canvassed By: Helen Cacliong Signature Over Printed Name Canvasser Position/designation Date Page 2 Terms And Conditions: 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Price Quotation/s Must Be Valid For A Period Of Ninety (90) Calendar Days From The Date Of Submission. 3. Price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. One Project Having Several Items, Which Shall Be Awarded As One Contract. 6. Award Of Contract Shall Be Made To The Lowest Quotation ( For Goods And Infrastructure) Or, The Highest-rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 7. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 8. The Item/s Shall Be Delivered According To The Requirements Specified In The Technical Specifications. 9. The Bids And Awards Committee Of Ifugao Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity With The Technical Specifications. 10. In Case Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated And Responsive Quotation, The Bac- Ifugao Shall Adopt And Employ "draw Lots" Or "similar Method Of Chance" As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 11.delivery Period Should Be Within Ten (10) Days Upon Receipt Of Purchase Order (p.o). 12. Payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents,ie, Order Slip And/or Billing Statement, By The Supplier, Contractor, Or Consultant. Our Government Servicing Bank, I.e., The Land Bank Of The Philippines, Shall Credit The Amount Due To The Identified Bank Account Of The Supplier, Contractor,or Consultant Not Earlier Than Twenty-four (24) Hours, But Not Later Than Forty-eight (48) Hours, Upon Receipt Of Our Advice. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contactor, Or Consultant. 13. Liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Plgu-ifugao May Rescind Or Terminate The Contact Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 14. Warranty Under Section 62 Of Ra 9184 And Its Updated 2016 Revised Implementing Rules And Regulation. 62.1 For The Procurement Of Goods, In Order To Assure That Manufacturing Defects Shall Be Corrected By Supplier, A Warranty Security Shall Be Required From The Contract Awardee For A Minimum Period Of Three (3) Months, In The Case Of Expendable Supplies, Or A Minimum Period Of One (1) Year, In The Case Of Non-expendable Supplies, After Acceptance By The Procuring Entity Of The Delivered Supplies. The Obligation For The Warranty Shall Be Covered By Either Retention Money In An Amount Equivalent To One Percent (1%) Or A Special Bank Guarantee Equivalent To One Percent (1%) Of The Total Contract Price. The Said Amounts Shall Only Be Released After The Lapse Of The Warranty Period Or, In The Case Of Expandable Supplies, After Consumption Thereof: Provided, However, That The Supplies Delivered Are Free From Patent And Latent Defects And All The Conditions Imposed Under The Contract Have Been Fully Met. Signature Over Printed Name Of Bidder Position/ Designation Mobile Number/s Email Address/es Page 3
Closing Soon21 Nov 2024
Tender AmountPHP 52.5 K (USD 891)

Department Of Education Division Of Palawan Tender

Philippines
Details: Description Request For Quotation Date: November 18, 2024 Quotation No: 2024-11-135 To All Eligible Suppliers: The Schools Division Of Palawan, Through Its Bids And Awards Committee (bac), Intends To Procure A Procurement Of Hotel Accommodation (full Board) And The Use Of Amenities For The Conduct Of Division Capacity Building For Teachers And School Heads On Tracking Of Early Language Literacy And Umeracy Assessment (ellna) Results Cum Development Of Learning Activity Sheets For Grade 3 Learners With An Approved Budget For The Contract Five Hundred Nineteen Thousand Six Hundred Pesos (php 519,600.00) Through Section 53.9 (negotiated Procurement -small Value Procurement) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Lowest Price Inclusive Of Vat On The Item/s Listed Below, Subject To The Terms And Conditions Of The Rfq, And Submit Your Quotation Duly Signed By Your Representative Not Later Than 9:00 Am Of November 25, 2024, At 3rd Floor Bac Office, Deped Building, Sdo Palawan C/o Rafael G. Manalo, Phd, Bac Chairperson, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. For More Information, Please Contact The Bac At (048) 433-6392. The Prospective Supplier Shall Be Responsible For Verifying The Quoted Items. (sgd) Rafael G. Manalo, Phd Assistant Schools Division Superintendent Chairperson, Bids And Awards Committee I. Magbabasang Palaweño – Elln Support Fund No. Items And Description Qty. Unit Statement Of Compliance (state “comply” Or “not Comply” Unit Price Total Price Procurement Of Hotel Accommodation (full Board) And The Use Of Amenities For The Conduct Of Division Capacity Building For Teachers And School Heads On Tracking Of Early Language Literacy And Umeracy Assessment (ellna) Results Cum Development Of Learning Activity Sheets For Grade 3 Learners District Crla/rma/phil-iri Coordinators, School Heads, Public Schools District Supervisor 80 Pax Education Program Supervisors, Division English Coordinator 11 Pax Free Of Charge Technical Working Work/secretariat, Eps (proponent) Cid 5 Pax Description Of Services: 1. One Spacious Function Hall That Can Accommodate A Group Of 96 Participants With Complete Audio-video Resources, Podium, National Flag, Strong Internet Connection With High Upload And Download Rate, And Extension Wires For Gadgets Charging. Round/working Table For 8-10 Pax Per Table. 2. Daily Serving Of Meals (breakfast, Lunch, And Dinner) And Snacks (am And Pm)- Daily Meals Must Have Two Main Dishes, Rice, Soup/appetizer, Side Dish/vegetables, Dessert, And Drinks. (see Attached Menu). 3. First Meal To Be Served Is Dinner Of December 15,2024, While The Last Meal Is Pm Snacks Of December 18,2024 4. Accommodation Can Cater To A Maximum Of Three (3) Persons Per Room With Separate Beds. 5. Free Accommodation (two Rooms), Meals And Snacks For Five (5) Pmt/secretariat, Program Proponent, Cid Chief For The Whole Duration Of The Activity 6. A Projector With A White Screen Will Be Inside The Function Room For The Whole Duration Of The Activity. 7. Free-flowing Coffee And Herbal Tea, As Well As Drinking Water For The Entire Duration Of The Activity. 8. Accessible And Clean Comfort Room. 9. A Standby Focal Person Who Will Monitor The Hotel Facilities And Services And The Functionality Of The Equipment. 10. Standby Generator Set In Case Of Power Interruption. 11. Function Rooms And Accommodation Rooms Must Be Within The Hotel Premises. 12. The Venue Must Be Within Puerto Princesa Proper 13. Free Tarpaulin With Layout For The Stage Backdrop And In Front Of The Venue With 8 X 10 Ft Size. 14. Set Of Tables And Chairs For Secretariat, Medical, And Pmt And 3 Tables For Printers Inside The Hall During The Duration Of The Workshop. Approved Budget For The Contract (abc) Php 519,600.00 Delivery Period: Three (3) Days Total This Is To Submit Our Price Quotations As Included Above, Subject To The Terms And Conditions Of The Rfq. Supplier’s Company Name: Tin: Address: Telephone: Cp No.: E-mail: Supplier’s Authorized Representative Signature Over Printed Name: Date: Ii. Terms And Conditions A. Submission Of Requirements 1. Sealed Quotations And Other Requirements Below Shall Be Submitted To The Bids And Awards Committee (bac) Secretariat At 3rd Floor, Deped Building, Schools Division Office Of Palawan, Gov. Salvador P. Socrates Gov’t Center, Bancao-bancao, Puerto Princesa City. 2. Interested Supplier Shall Submit The Following Requirements: A. Letter Of Intent To Participate In The Said Procurement. B. Duly Signed Request For Quotation. Prices Shall Be Quoted In Philippine Pesos. Statement Of Compliance Must Be Accomplished By The Supplier. C. Documentary Requirements Of The Following: 1. Dti Certificate Of Registration 2. Valid Mayor’s Permit 3. Tax Clearance 4. Bir Certification 5. Philgeps Registration 6. Notarized Omnibus Sworn Statement Bidder’s Failure To Submit Such Documents Upon Opening Shall Be Ground For Disqualification. B. Award The Supplier Who Submitted The Lowest Calculated And Responsive Quotation Shall Be Awarded The Purchase Order/contract After Evaluation By The Bac. C. Delivery Of Services 1. Delivery Of Services Shall Be Made On The Schedule Date Upon Receipt Of Purchase Order/contract. 2. Upon Delivery Of The Services, The Supplier Shall Notify The Purchaser And Present The Following Document/s To The Purchaser: A. Original And Copy Of The Supplier’s Statement Of Account. D. Evaluation Of Quotations Quotations Shall Be Compared And Evaluated Based On The Following Criteria: 1. Completeness Of Submission. 2. Compliance With Technical Specifications; And 3. Price E. Instructions 1. The Supplier Shall Be Responsible For All The Services To Be Rendered And Should Be In Accordance With The Schedule And Specifications Stipulated In The Contract/purchase Order. Failure Of The Supplier To Comply With This Provision Shall Be Grounds For Cancellation Of The Contract/purchase Order Issued To The Supplier. 2. Supplier Shall Pick Up The Purchase Order/contract Issued In Its Favor Within Three (3) Calendar Days From Receipt Of Notice To The Effect. A Telephone Call Or Fax Transmission Shall Constitute An Official Notice To The Supplier. Thereafter, If The Purchases Order Remains Unclaimed, The Purchase Order Shall Be Canceled. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirements, All Defaulting Supplier Shall Be Precluded From Proposing Or Submitting Substitute Quotation (s) Or Item (s). 3. A Supplier Who Accepted A Purchase Order/contract But Failed To Deliver The Required Goods/services Within The Time Called For In The Purchase Order/contract Shall Be Disqualified From Participating In Deped Or Any Of Deped Unit’s Future Procurement Activities. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a 9184 And Its Irr-a Against The Supplier. 4. The Supplier Shall Pay All Duties, Excise, And Other Taxes And Revenue Charges. 5. All Transactions Are Subject To Withholding Of Credible Value-added Tax And/or Expanded Value – Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. F. Payment One Hundred Percent (100%) Of The Contract Price Less Government Tax Shall Be Paid To The Supplier After Completion/compliance Of The Services Delivered. Payment Shall Be In The Form Of A Check And Addressed To The Supplier’s Name Firm. After Carefully Reading Your Request For Quotation And Its Terms And Conditions, I/we Quote You On The Item/s At The Price Noted In The Rfq. The Quotation Shall Be Binding Upon Us For Thirty (30) Calendar Days Reckoned From The Last Day Of Submission Indicated In The Submission Requirements. We Shall Accept The Corresponding Award On Purchase Order At Any Time Before The Expiration Of This Period
Closing Soon25 Nov 2024
Tender AmountPHP 519.6 K (USD 8.8 K)

Province Of Iloilo Tender

Others
Philippines
Details: Description Republic Of The Philippines Province Of Iloilo Bids And Awards Committee Request For Quotation Quotation No. Gov-24-1917-np(sv) Reference Pr No. Gov-24-1917 November 19, 2024 ________________________________ ______________________________ ______________________________ (supplier's Name And Office Address) The Iloilo Provincial Government, Through Its Bids And Awards Committee (bac), Hereby Invites All Interested Supplier/distributor To Quote Their Lowest Price On The Item/s Listed Below Subject To The Terms And Conditions Stated Herein, Stating The Shortest Time Of Delivery, And Submit The Same Duly Signed By Their Authorized Representatives Not Later Than November 25, 2024, At 9:00 A.m. At The Bids And Awards Committee-secretariat, 5th Floor, Iloilo Provincial Capitol, Iloilo City After Payment Of The Rfq Form In The Amount Of Five Hundred Pesos (₱500.00). Atty. Dennis T. Ventilacion Chairperson, Bac Approved Budget For The Contract: ₱184,000.00 Place Of Delivery: Hotel Within Iloilo City Date Of Delivery: As Per The Scheduled Date Of Activity. X Complete Bid Partial Bid Item No. Quantity Unit Of Issue Description Estimated Unit Cost Brand Unit Cost Total Cost 1 1 Job Food Catering And Accommodation Services For The Conduct Of Road Safety Summit 2024 For 230 Pax @ Php 800.00 /pax With 1 Lunch And 2 Snacks Venue: Any Hotel Within Iloilo City Date: Not Later Than December 31, 2024 184,000.00 Menu Am Snack: Pancit Molo With Bread, Juice Lunch: Tinola Soup, Chicken Curry, Grilled Pork Belly, Ginataang Puso Ng Saging, Steamed Rice, Soda, Mango Tapioca Pm Snack: Pinoy Clubhouse Sandwich, Juice Terms And Conditions: 1. Assisted Buffet With Tables And Chairs Set-up 2. The Use Of Low-density Plastics And Styrofoam As A Food Container Or Wrapper Shall Not Be Allowed Except As First Packaging; 3. Caterers Are Required To Use Table Napkins, Banana Leaves And Other Biodegradable/ Organic Materials To Wrap/package The Food Items; 4. Refillable Water Containers Shall Be Provided Instead Of Individual Bottled Water 5. Caterers Are Required To Provide Glass, Paper, Or Reusable Cups For Drinking Coffee And Other Beverages; 6. Use Of Plastic Straws And Plastic Stirrers Is Strictly Prohibited Kindly Indicate The Delivery Period And Bid Amount In Words And Figures In The Space Provided Below. Non-compliance Shall Be A Ground For Disqualification. Total Bid Amount In Figures: ₱_________________ Statement Of Delivery Period: __________________________________________________ Bid Amount In Words: ____________________________________________________________ Kindly Indicate The Rfq Number And Date Of Opening Of Bids On The Outside Of The Envelope And Submit This Quotation With The Following Requirements: 1. Mayor's/business Permit; 2. Philgeps Registration Number For The Alternative Methods Of Procurement Under Section 50, Section 52.1 (b), Section 53.3, Section 53.6, Section 53.7, Section 53.9, Section 53.10, And Section 53.11 Of The Revised Irr Of R.a. No. 9184; 3. Income/business Tax Return For The Procurement Projects With Abc Above ₱500,000.00; 4. Notarized Omnibus Sworn Statement Specifying The Rfq Number For Procurement Projects With Abc Above ₱50,000.00; 5. Dti/sec/cda Registration Certificate; 6. Notarized Authority Of The Signatory, If Representative (spa Of Proprietor For Single Proprietorship/secretary Certificate For Corporation); 7. Technical Specifications In The Prescribed Form (for Non-expendables/non-consumables) 8. Schedule Of Requirements/delivery Period In The Prescribed Form; 9. After-sales Service/parts (for Goods Requiring Maintenance Service/parts); 10. Manpower Requirements (for The Procurement Of Projects With Labor Component); 11. Financial Proposal In The Prescribed Form; 12. Active Email Address Or Working Fax Number. Absence Of Both Is A Ground For The Rating Of Its Bid As "failed" Or "disqualified." 13. For Easy Validation During The Post-qualification In The Procurement Of Drugs And Medicines, Bidders Are Encouraged To Submit The Following: A. License To Operate From The Food And Drug Administration (fda); B. Certificate Of Product Registration From The Fda; C. Certificate Of Good Manufacturing Practice From The Fda; D. Batch Release Certificate From The Fda; E. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Products /items; And F. For The Procurement Of Regulated Drugs, The Applicable Type Of S-license S-1, S-3 (retailer) S-4 (wholesaler) S-5c (manufacturer) S-5d (bulk Depot/storage) S-5e S-5i (importer) 14. For The Procurement Of Infrastructure Projects, Bidders Must Submit A Valid Philippine Contractors Accreditation Board (pcab) License And Indicate Compliance With The Manpower Requirements. Province Of Iloilo Bids And Awards Committee Request For Price Quotation No. Gov-24-1917-np(sv) Reference Pr No. Gov-24-1917 Terms And Conditions: 1. All Entries Must Be Filled-up, Written, Or Printed Legibly. Failure To Use This Form Will Result To Disqualification Of Your Bid. 2. Delivery Period: As Per The Scheduled Date Of Activity. 3. Bids And Bid Securities Shall Be Valid For One Hundred Twenty (120) Calendar Daysfrom The Date Of The Opening Of Bids. 4. Bids Exceeding From The Approved Budget For The Contract (abc) Shall Be Disqualified. 5. The Participating Bidder/supplier Or An Authorized Representative Must Indicate An Email Address Or Working Fax Number. Notice To The Bidder Through Either Of These Means (email/working Fax Number) Is Considered Sufficient Notice. 6. The Supplier/awardee(s) Must Conform To The Notice Of Award Within Three (3) Calendar Days From Notice Of Such Award And Enter Into Contract With The Procuring Entity Within Ten (10) Calendar Days From Receipt By The Winning Bidder Of The Notice Of Award. Otherwise, The Award Shall Be Forfeited Or Cancelled. 7. The Awardee Shall Be Responsible For The Source(s) Of His Supplies, Materials, Equipment And Shall Make Deliveries In Accordance With The Schedule, Quality And Specifications Of Award And Purchase Order. Failure Of The Awardee To Comply With The Same Shall Be Ground For The Cancellation Of The Award And Purchase Order Issued To The Awardee. 8. All Deliveries By Suppliers Shall Be Subject To Inspection And Acceptance By The Representative Of The General Services Office And End User. 9. Rejected Deliveries Shall Be Construed As Non-delivery Of The Product(s)/item(s) So Ordered And Shall Be Subject To Liquidated Damages, Subject To The Terms And Conditions Prescribed Under Paragraph 10 Hereof. 10. Supplier Shall Guarantee His Deliveries To Be Free From Defects. Any Defective Item(s)/product(s) Therefore That May Be Discovered By The End-user Within The Warranty Period After Acceptance Of The Same Shall Be Replaced By The Supplier Within Seven (7) Calendar Days Upon Receipt Of A Written Notice To That Effect. 11. Performance Security Or Warranty Security, As The Case May Be, Shall Be Required From The Winning Bidder In Accordance With The Provisions Of R.a. No. 9184 And Its Revised Implementing Rules And Regulations. 12. When An Occurrence Of A Tie Among Bidders Takes Place, I.e., Two Or More Of The Bidders Are Determined And Declared As The Lowest Calculated And Responsive Bidder (lcrb), The Winning Bidder Shall Be Determined By Draw Lots Upon Notice To The Bidders Concerned And/or Their Authorized Representatives In Accordance With The Relevant Circulars Issued By The Government Procurement Policy Board (gppb). 13. The Supplier Must Indicate Its Complete Business/mailing Address. Otherwise, The Lack Thereof Is A Ground For Disqualification. 14. All Offers/quotations Must Be Properly Sealed And Marked In Envelopes. Unsealed Or Unmarked Envelopes Shall Be Rejected. 15. The Printed Name And Signature Of The Bidder/supplier Or Of Its Authorized Representative Must Be Legible And Verifiable And Must Indicate His/her Position. Non-compliance Is A Ground For Disqualification. 16. Bidders Shall Prepare An Original Of The Documentary Requirements For Negotiated Procurement. In Addition, Bidders Shall Submit Separate Copies Thereof (copy 1, Copy 2) And Each Set Of Documents Must Clearly Indicate Whether The Same Is Original, Copy 1, Or Copy 2. Non-compliance Shall Be A Ground For Declaration Of Failure/disqualification. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail.
Closing Soon25 Nov 2024
Tender AmountPHP 184 K (USD 3.1 K)

Province Of Iloilo Tender

Food Products
Philippines
Details: Description Republic Of The Philippines Province Of Iloilo Bids And Awards Committee Request For Quotation Quotation No. Ppd-24-1915-np(sv) Reference Pr No. Ppd-24-1915 November 19, 2024 ________________________________ ______________________________ ______________________________ (supplier's Name And Office Address) The Iloilo Provincial Government, Through Its Bids And Awards Committee (bac), Hereby Invites All Interested Supplier/distributor To Quote Their Lowest Price On The Item/s Listed Below Subject To The Terms And Conditions Stated Herein, Stating The Shortest Time Of Delivery, And Submit The Same Duly Signed By Their Authorized Representatives Not Later Than November 25, 2024, At 9:00 A.m. At The Bids And Awards Committee-secretariat, 5th Floor, Iloilo Provincial Capitol, Iloilo City After Payment Of The Rfq Form In The Amount Of Five Hundred Pesos (₱500.00). Atty. Dennis T. Ventilacion Chairperson, Bac Approved Budget For The Contract: ₱96,000.00 Place Of Delivery: Casa Real, Old Provincial Capitol, Iloilo City Date Of Delivery: As Per The Scheduled Date Of Activity. X Complete Bid Partial Bid Item No. Quantity Unit Of Issue Description Estimated Unit Cost Brand Unit Cost Total Cost 1 1 Job Food Catering Services For The Conduct Of Non-government Organizatons (ngos) People’s Oragnization (pos)-ngos- Pos Week For 150 Pax @ Php 640.00/pax Date: Not Later Than December 31, 2024 Venue: Hotel Within Iloilo City 96,000.00 Am Snacks: Sotanghon Guisado With Bread, Soda Lunch: Crab And Corn Soup, Baby Back Ribs, Buttered Mixed Vegetable, Buttered Chicken, Beef Bakareta, Rice, Soda, Fruit Salad Pm Snacks: Ham And Egg Sandwich, Soda Terms And Conditions: 1. Assisted Buffet With Tables And Chairs Set-up 2. The Use Of Low-density Plastics And Styrofoam As A Food Container Or Wrapper Shall Not Be Allowed Except As First Packaging; 3. Caterers Are Required To Use Table Napkins, Banana Leaves And Other Biodegradable/ Organic Materials To Wrap/package The Food Items; 4. Refillable Water Containers Shall Be Provided Instead Of Individual Bottled Water 5. Caterers Are Required To Provide Glass, Paper, Or Reusable Cups For Drinking Coffee And Other Beverages; 6. Use Of Plastic Straws And Plastic Stirrers Is Strictly Prohibited Kindly Indicate The Delivery Period And Bid Amount In Words And Figures In The Space Provided Below. Non-compliance Shall Be A Ground For Disqualification. Total Bid Amount In Figures: ₱_________________ Statement Of Delivery Period: __________________________________________________ Bid Amount In Words: ____________________________________________________________ Kindly Indicate The Rfq Number And Date Of Opening Of Bids On The Outside Of The Envelope And Submit This Quotation With The Following Requirements: 1. Mayor's/business Permit; 2. Philgeps Registration Number For The Alternative Methods Of Procurement Under Section 50, Section 52.1 (b), Section 53.3, Section 53.6, Section 53.7, Section 53.9, Section 53.10, And Section 53.11 Of The Revised Irr Of R.a. No. 9184; 3. Income/business Tax Return For The Procurement Projects With Abc Above ₱500,000.00; 4. Notarized Omnibus Sworn Statement Specifying The Rfq Number For Procurement Projects With Abc Above ₱50,000.00; 5. Dti/sec/cda Registration Certificate; 6. Notarized Authority Of The Signatory, If Representative (spa Of Proprietor For Single Proprietorship/secretary Certificate For Corporation); 7. Technical Specifications In The Prescribed Form (for Non-expendables/non-consumables) 8. Schedule Of Requirements/delivery Period In The Prescribed Form; 9. After-sales Service/parts (for Goods Requiring Maintenance Service/parts); 10. Manpower Requirements (for The Procurement Of Projects With Labor Component); 11. Financial Proposal In The Prescribed Form; 12. Active Email Address Or Working Fax Number. Absence Of Both Is A Ground For The Rating Of Its Bid As "failed" Or "disqualified." 13. For Easy Validation During The Post-qualification In The Procurement Of Drugs And Medicines, Bidders Are Encouraged To Submit The Following: A. License To Operate From The Food And Drug Administration (fda); B. Certificate Of Product Registration From The Fda; C. Certificate Of Good Manufacturing Practice From The Fda; D. Batch Release Certificate From The Fda; E. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Products /items; And F. For The Procurement Of Regulated Drugs, The Applicable Type Of S-license S-1, S-3 (retailer) S-4 (wholesaler) S-5c (manufacturer) S-5d (bulk Depot/storage) S-5e S-5i (importer) 14. For The Procurement Of Infrastructure Projects, Bidders Must Submit A Valid Philippine Contractors Accreditation Board (pcab) License And Indicate Compliance With The Manpower Requirements. Province Of Iloilo Bids And Awards Committee Request For Price Quotation No. Ppd-24-1915-np(sv) Reference Pr No. Ppd-24-1915 Terms And Conditions: 1. All Entries Must Be Filled-up, Written, Or Printed Legibly. Failure To Use This Form Will Result To Disqualification Of Your Bid. 2. Delivery Period: As Per The Scheduled Date Of Activity. 3. Bids And Bid Securities Shall Be Valid For One Hundred Twenty (120) Calendar Daysfrom The Date Of The Opening Of Bids. 4. Bids Exceeding From The Approved Budget For The Contract (abc) Shall Be Disqualified. 5. The Participating Bidder/supplier Or An Authorized Representative Must Indicate An Email Address Or Working Fax Number. Notice To The Bidder Through Either Of These Means (email/working Fax Number) Is Considered Sufficient Notice. 6. The Supplier/awardee(s) Must Conform To The Notice Of Award Within Three (3) Calendar Days From Notice Of Such Award And Enter Into Contract With The Procuring Entity Within Ten (10) Calendar Days From Receipt By The Winning Bidder Of The Notice Of Award. Otherwise, The Award Shall Be Forfeited Or Cancelled. 7. The Awardee Shall Be Responsible For The Source(s) Of His Supplies, Materials, Equipment And Shall Make Deliveries In Accordance With The Schedule, Quality And Specifications Of Award And Purchase Order. Failure Of The Awardee To Comply With The Same Shall Be Ground For The Cancellation Of The Award And Purchase Order Issued To The Awardee. 8. All Deliveries By Suppliers Shall Be Subject To Inspection And Acceptance By The Representative Of The General Services Office And End User. 9. Rejected Deliveries Shall Be Construed As Non-delivery Of The Product(s)/item(s) So Ordered And Shall Be Subject To Liquidated Damages, Subject To The Terms And Conditions Prescribed Under Paragraph 10 Hereof. 10. Supplier Shall Guarantee His Deliveries To Be Free From Defects. Any Defective Item(s)/product(s) Therefore That May Be Discovered By The End-user Within The Warranty Period After Acceptance Of The Same Shall Be Replaced By The Supplier Within Seven (7) Calendar Days Upon Receipt Of A Written Notice To That Effect. 11. Performance Security Or Warranty Security, As The Case May Be, Shall Be Required From The Winning Bidder In Accordance With The Provisions Of R.a. No. 9184 And Its Revised Implementing Rules And Regulations. 12. When An Occurrence Of A Tie Among Bidders Takes Place, I.e., Two Or More Of The Bidders Are Determined And Declared As The Lowest Calculated And Responsive Bidder (lcrb), The Winning Bidder Shall Be Determined By Draw Lots Upon Notice To The Bidders Concerned And/or Their Authorized Representatives In Accordance With The Relevant Circulars Issued By The Government Procurement Policy Board (gppb). 13. The Supplier Must Indicate Its Complete Business/mailing Address. Otherwise, The Lack Thereof Is A Ground For Disqualification. 14. All Offers/quotations Must Be Properly Sealed And Marked In Envelopes. Unsealed Or Unmarked Envelopes Shall Be Rejected. 15. The Printed Name And Signature Of The Bidder/supplier Or Of Its Authorized Representative Must Be Legible And Verifiable And Must Indicate His/her Position. Non-compliance Is A Ground For Disqualification. 16. Bidders Shall Prepare An Original Of The Documentary Requirements For Negotiated Procurement. In Addition, Bidders Shall Submit Separate Copies Thereof (copy 1, Copy 2) And Each Set Of Documents Must Clearly Indicate Whether The Same Is Original, Copy 1, Or Copy 2. Non-compliance Shall Be A Ground For Declaration Of Failure/disqualification. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail.
Closing Soon25 Nov 2024
Tender AmountPHP 96 K (USD 1.6 K)

City Government Iligan Tender

Civil And Construction...+1Building Construction
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through Gen Fund-20% / Dev. Fund, Intend To Apply The Sum Of P 3,864,056.67 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Repair / Renovation Of Tourism Building (bahay Salakot), Buhanginan Hills, Brgy. Pala-o, Iligan City With Project No. Cb(b)-24-139 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Repair / Renovation Of Tourism Building (bahay Salakot), Buhanginan Hills, Brgy. Pala-o, Iligan City General Requirements •installation Of Project Billboard •occupational Safety And Health Program •mobilization And Demobilization •provision Of Field Office For The Engineer - Standard Engineer Field Camp, Office Table And Chair - Computer For Field Engineer Removal Of Structures And Obstruction •demolition Of Concrete Slab For Excavation Of Septic Tank •demolition Of Existing Chs Walls At Main Office (for W-04 •demolition Of Existing Drywall Partitions At Office •chipping Of Existing Toilet Tiles •removal Of Existing Windows And Doors •dismantling Of Existing Plumbing Appliances And Fixtures •demolition Of Kitchen Counter At Basement Earthworks •excavation Work For Septic Tank •gravel Bedding For Septic Tank •backfilling Of Common Soil Using Excavated Soil Must Be Compacted Layer By Layer Concrete Work, Formwork & Scaffolding •septic Tank •kitchen Sink Countertop Masonry Works •4” Reinforced Chs Wall @ Main Office •4” Reinforced Chs Wall @ Main Office Cr •4” Reinforced Chs Wall @ Basement Cr •4” Reinforced Chs Wall For Septic Tank Plastering Works •plaster-topping @ Priv. Rm & Printing Rm. •plaster Chs Wall On Both Sides @ Main Office •plaster Chs Wall On Both Sides @ Main Office Cr •plaster Chs Wall On Both Sides @ Basement Cr •plaster Chs Wall On One Side For Septic Tank Steel Reinforcements •10mm Dia. Rebars For Septic Tank's Masonry & Concrete Works •10mm Dia. Rebars For Additional Chs Walls Architectural Works •installation Of Wallpaper In Antique Gray Brick For Accent Wall •installation Of Solihiya Screen In Wood Framing •fabrication Of “viva Turismo Lligan” Acrylic Logo •installation Of Skirting Board/ Based Board Painting Works •semi-gloss Interior Paint Finish •flat Latex Paint- Primer For Ceiling Board •flat Latex Paint- Off-white Ceiling Finish @ Office •semi-gloss Paint- Off-white Ceiling Finish @ Both Toilet Ceiling Works •6mm Gypsum Board On Double Furring Framing @ 2nf Floor And Basement Toilet •9mm Gypsum Board On Double Furring Framing @ Main Office Built-ins And Cabinets •fabricate 1.475m X 2.4m- 3 Layers Shelves With 2 Door Cabinet And Drawers •fabricate 1.25m X 2.675m Overhead Shelf •fabricate 0.4 X 0.4 X 2.65m Ficem Board Plant Box •fabricate 0.5m X 0.5m X 1.2m Lavatory Counter Cabinet With Ceramic Tile Countertop •fabricate 1.45m X 1.05m 2 Layer Overhead Document Shelf Fabricate 0.6m X 1.45m Built-in Table Waterproofing •cementitious Waterproofing @ Toilet- Walls (5.13 Sqm) •cementitious Waterproofing @ Toilet- Flooring (5.42 Sqm) Tile Works •detachable Green Carpet (8.15 Sqm) •30cm X 60cm Non-slip Floor Tiles @ 2f Toilet •60cm X 60cm Non-slip Floor Tiles @ Basement Toilet •parquet Tiles- For The Demolished Walls •60cm X 60cm Dark Gray Carpet Tiles •300mm X 300mm Ceramic Wall Tiles @ 2f Toilet •200mm X 600mm Ceramic Wall Tiles @ Basement Toilet Electrical Works •installation Of Conduits , Junction Box , Utility Box •installation Of New Electrical Wire , Switches , Aircon Outlet •lnstallation Of Lighting Fixture According The Electrical Plan . Wood Balustrades And Handrail •top Railing: 75x25mm Solid Wood In Wood Stained Finish •balusters: 75x75mm Solid Wood In Wood Stained Finish Plumbing Works •installation Of Pvc Pipes ( Soil And Waste ) And G.i. Pipes For Water •installation Of Water Closets, Lavatory And Faucets •installation Of Kitchen Sink At Pantry Doors And Windows •remove And Replace Existing Doors, See Plan For Details •remove And Replace Existing Windows, See Plan For Details I.general Requirements A . Project Billboard (q = 1.00 Lot) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2"x3"x 14" Coco Lumber, 2"x3"x10" Coco Lumber, 2"x2"x8" Coco Lumber, Assorted Sizes C.w. Nails. B. Occupational Safety And Health Program (q = 1.00 Lot) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. C.mobilization / Demobilization (q = 1.00 Lot) D. Facilities For The Engineer (q = 1.00 Lot) Includes Field Office For The Field Engineer: 4" X 4" Cocolumber, 2" X 4" Cocolumber, 2" X 3" Cocolumber, 2" X 2" Cocolumber, 1/4" Thk. Ord. Plywood, Ga 300 X 10' Corr.g.i. Sheet, Portland Cement, Washed Sand, Washed Gravel,4" Chb 700 Psi, 10mm Dsb, No. 16 G.i. Tie Wire, Assorted Sizes C.w. Nails, Empty Drum/ Fixtures, Monobloc Chairs, Office Table. Ii.removal Of Structures And Obstruction (q = 1.00 Lot) Includes Demolition Of Existing Chb Walls At Main Office (for W-04), Demolition Of Existing Drywall Partitions At Office, Chipping Of Existing Toilet Tiles, Removal Of Existing Windows And Doors, Dismantling Of Existing Plumbing Appliances And Fixtures, Demolition Of Kitchen Counter At Basement. Iii. Earthworks (q = 7.56 Cu.m.) Includes Excavation Works For Additional Septic Tank, Washed Gravel. Iv.concrete Works And Formworks (q = 2.02 Cu.m.) Includes Portland Cement, Washed Sand, Washed Gravel, Marine Plywood 12mm Thk. X 4' X 8', 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. V.masonry Works (q = 48.54 Sq.m) Includes 4" Chb 350psi, Portland Cement, Washed Sand. Vi.plastering Works (q = 82.80 Sq.m) Includes Portland Cement, Washed Sand. Vii. Steel Reinforcements (q = 1.00 Lot) Includes 10mm Dia X 6m Rebar, No. 16 G.i. Tie Wire. Viii. Wood Balustrades And Handrail (q = 1.00 Lot) Includes Top Railing: 75x25mm Solid Wood In Wood Stained Finish, Balusters: 75x75mm Solid Wood In Wood Stained Finish, Paint Varnish, Paint Brush 2-1/2",assorted Sizes C.w. Nails. Ix.doors And Windows (q = 1.00 Lot) Includes D1- 3.2m X2.8m Brown Powder Coated Aluminum Framing W/ 10mm Clear Fixed Glass And Sliding Door With Complete Accessories; D2- 3.35m X2.55m Brown Powder Coated Aluminum Framing W/ 10mm Clear Fixed Glass And Sliding Door With Complete Accessories; D3- 0.7m X 2.1m Hollow Pvc Door With Door Jamb And Complete Accessories; D4- 0.8m X 2.1m Hollow Core Hdf Door With Door Jamb And Complete Accessories; D5- 0.7m X 2.4m Pocket Door: Solid Wood Door With 2mm X 5mm Grooves And Complete Accessories; D6- 0.7m X 2.1m Hollow Pvc Door With Door Jamb And Complete Accessories; W1- 2.345 X 1.2m Sliding Glass Window W/ Wooden Louver Casement Window: Sliding Window : 1x1" Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass; Window Shutters: 4-panel Wooden Louvered Window Shutters, 2x2" Wood Framing; W2- 1.2m X 0.6m Black Powder Coated Aluminum Frame W/ 10mm Clear Glass Awning Window; W3- 0.7m X 2.1m Brown Powder Coated Aluminum Frame W/ 10mm Clear Glass Fixed Window; W4- 2.32m X 0.5m Louver Window : Brown Powder Coated Aluminum Frame W/ 5mm Clear Glass Blades; W5- 0.6m X 0.5m Black Powder Coated Aluminum Frame W/ 10mm Clear Glass Awning Window; W6- 4.7m X 1.27m Sliding Glass Window Casement Window X " Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass; W7- 0.845m X 1.27m Fixed Glass Window Casement Window Sliding Window: 1x1" Brown Powder Coated Aluminum Frame, 2x2" Aluminum Mullions, 0.5x0.5" Aluminum Window Grilles, 6mm Clear Tempered Glass X.architectural Works (q = 1.00 Lot) Includes Wallpaper In Antique Gray Brick 15cm X 60cm, Wood Glue, M X 2.8m Solihiya Screen Partition In 2"x2" Wood Framing, M X 2.8m Solihiya Screen Partition In 2"x2" Wood Framing, 4.4m X 0.4m Solihiya Screen Partition In 2"xl" Wood Framing, "viva Turismo Ligan" Acylic Logo, Skirting Board/ Based Boardlin. X 4in. X8ft. Xi.painting Works (q = 209.8225 Sq.m) Includes Permacoat Flat Latex, Masonry Putty, Paint Brush 2-1/ 2 ",brush Roller (152mm), Sand Paper, Assorted Sizes, Tape Fiberglass Mesh (48mm X 30m), Gypsum Putty (5kg/gal), 2" X 3" X 8' Coco Lumber, 2" X 2" X 8' Coco Lumber, Assorted Sizes C.w. Nails. Xii.ceiling Works (q = 90.41 Sq.m) Includes 6mm Thick Gypsum Board 4'x8'; 9mm Thick Gypsum Board 4'x8'; Double Furring, 0.50mm Thk. X 19 X 50 X 19 X 5.00m; Channel Clip; Wall Angle 25 X 25 X 0.4 Mm (3m); Blind Rivets, 1000pcs/box; Riveter. Xiii.built-ins And Cabinets (q = 1.00 Lot) Includes 1.475m X 2.4m- 3 Layers Shelves With 2 Door Cabinet And Drawers, 1.25m X 2.675m Overhead Shelf, 0.4 X 0.4 X 2.65m Ficem Board Plant Box, 0.5m X 0.5m X 1.2m Lavatory Counter Cabinet With Ceramic Tile Countertop, 1.45m X 1.05m 2 Layer Overhead Document Shelf, 0.6m X 1.45m Built-in Table. Xiv.waterproofing (q = 10.55 Sq.m) Includes Portland Cement, Washed Sand, Wire Mesh 3.5mm X 1x1" X 6x20ft, Waterproofing Membrane (4 Kg). Xv.tile Works ( Q = 65.69 Sq.m) Includes Detachable Green Carpet, 300mm X 600mm Ceramic Floor Tiles (non-skid) @ 2f Toilet, 300mm X 300mm Ceramic Wall Tiles @ 2f Toilet, 600mm X 600mm Ceramic Floor Tiles (non-skid) @ Basement Toilet, 200mm X 600mm Ceramic Wall Tiles @ Basement Toilet, Tile Grout (2kg), Tile Adhessive 25kg (heavy Duty), Portland Cement, Washed Sand, Diamond Cutter Wheel, Parquet Tiles- For The Demolished Walls, 0.6m X 2.05m Kitchen Counter In Synthetic Marble Countertop Finish, 60cm X 60cm Dark Gray Carpet Tiles. Xvi.electrical Works ( Q = 1.00 Lot) Includes Electric Wire ,3.5mm2 Thhn Stranded Copper Wire; Electric Wire, 8.0mm2 Thhn Stranded Copper Wire; Electric Wire , 38.0mm2 Thhn Stranded Copper Wire; Switch , 1gang Switch W/led Set 10a 220v; Switch , 2 Gang Switch W/led Set 10a 220v; Switch , 3 Gang Switch W/led Set 10a 220v; Led Downllight 15w; Led Downlight 7w; 10w Rectangular Led Pendant Light Warm Light 1 X 4'; 3w Wall Mounted Led Light Daylight; Duplex Convenience Outlet; Gfci 20a 2 Gang Gfci Safety Outlet; Electrical Tape 3/4" X20yds; Solvent Cement 100cc; Pvc Conduit,15mm X3 Meters; Pvc Conduit Coupling (15mm)dia.; Pvc 90deg Elbow (15mm); Pvc Clamp (15mm) 100pc/pack; Junction Box, Pvc Octagonal W/ Cover 2"x4" Depth Type; Utility Box 2"x3" Depth Type W/ Cover; Circuit Breaker, 15at/50 Af, 2pcb, 230vac Bolt-on Type; Circuit Breaker 20at/50af, 2pcb, 230vac Bolt On Type; Circuit Breaker Soat/soaf, 2pcb, 230vac Bolt On Type; Circuit Breaker 125at/50af, 2pcb, 230vac Bolt On Type Tqd; Panelboard 8 Branches Bolt On Type 2 Pole With Tqd Main Breaker; Enclosure For Main Circuit Breaker 125at Tqd; Service Entrance Cap 25mm Dia. Emt; Emt Clamp (25mm); Tox With Screw Size 10; Emt Connector Set Screw Type 25mm; Emt Elbow 25mm; Cable Tie Black Nylon 100pc/pack; Secondary Rack 2 Pole Insulator; Grounding Rod 5/8" X4.75 Ft. With Clamp. Xvii . Plumbing Works ( Q = 1.00 Lot) Includes Two-piece Water Closet Close Coupled; Wall Hung Lavatory 450x400x140mm; Vessel Type Lavatory 450x400x140mm; Stainless Steel Sink 86x50cm , Heavy Duty; Bidet Spray, Hose & Hook Set Abs Material Chrome Plated 1.2m Hose Length, Heavy Duty;tissue Holder, Heavy Duty; Faucet Lavatory, Heavy Duty; Faucet Kitchen, Heavy Duty; Wall Faucet, Heavy Duty; Floor Strainer 100x150x2.7mm; 7.5 Pm Grease Trap And Accessories; Vanity Mirror For 2nd Floor Toilet; 4" Dia. Pvc Wye; 4" Dia. Pvc Clean Out; 4" Dia. Pvc Elbow, 1/8 Bend; 4" Dia. X 10' Pvc Pipe, S-1000; 2" Dia. Pvc P-trap; 2" Dia. Pvc Wye; 2" Dia. Pvc Tee; 2" Dia. Pvc Clean Out; 2" Dia. Pvc Elbow, 1/8 Bend; 2" Dia. X 10' Pvc Pipe, S-1000; 3 Way Angle Valve; Pvc Cement, 400cc; 1" Dia. G.i. Elbow; 1" Dia. G.i. Tee; " Dia. G.i. Coupling; 1" Dia. G.i. Caps, Banded; 1" Dia. X 20' G.i. Pipe; Teflon Tape (big). Approved Budget For The Contract (abc): P 3,864,056.67 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within One Hundred (100) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Office Of The Bids And Awards Committee, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: November 19 – December 10, 2024 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: November 26, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4. Opening Of Bids: December 10, 2024 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, 2nd Floor, City Hall Main Building, Buhanginan Hills, Pala-o, Iligan City. The Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: November 19, 2024 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 24-139 (ceo-infra)
Closing Date10 Dec 2024
Tender AmountPHP 3.8 Million (USD 65.5 K)

Philippine Merchant Marine Academy Tender

Others
Philippines
Details: Description Quantity Unit Item Description 1 Lot Procurement Of Integrated Full Mission Bridge And Engine Room Simulator With Desktop Station Full Mission Bridge Simulator (fmbs) And Mini Bridge Stations’ Features And Applications, Major Components, Bridge Simulator Performance Standards And Hardware 1. Major Components The Full Mission Bridge Simulators That Can Be Integrated With Engine Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Bridge Station With 270° Horizontal Display (class A Configuration); B. Seven (7) Mini Bridge Stations With 120° Horizontal Display (class B Configuration); C. One (1) Server Station; D. One (1) Instructor Station; E. One (1) Simulator Scenario Development Station; And F. One (1) Briefing/ Debriefing Station. 2. Features And Applications 2.1 The Bridge Simulator Should Provide A Realistic, Ship-like Environment Based On Real Hardware Consoles And High-quality Visualization. The Systems Include Major Components Such As Conning, Radar/ Arpa And Ecdis, Gmdss, Navigation Equipment, Bearing Finder, Steering Control Console, Engine Control, Auto Pilot System, Overhead Display, Etc. 2.2 The Bridge Simulator Product Shall Be Certified And Compliant As Class A (full Mission), B (multi-task), C (limited Task), And D (cloud-based Distant Learning) Type-approved Maritime Simulator System By An Internationally Recognized Classification Society. The Compliance With Classification Shall Be Reflected In The Certificate Of The Product. 2.3 The Simulator Can Be Utilized To A Variety Of Navigation Techniques Under Different Environmental Conditions, Serving A Wide Range Of Purposes As Follows: 1. Control Of The Ship While Navigating In The Operational And Emergency Modes In Various Weather Conditions With The Possibility Of Setting Wind And Current Parameters; 2. Analysis Of The Above-water Situation In Day And Night Conditions; In Poor Visibility By Visible Navigation Lights And Information Received From Radar/ Arpa; 3. Use Of The Electronic Chart-based Navigational Information System (ecdis); 4. Practical Use Of Radio Equipment And Global Maritime Distress And Safety System (gmdss) Facilities; 5. Application Of The International Regulations For Preventing Collisions At Sea; 6. Ship Control During Anchoring And Mooring; 7. Ship Control During Towing Operations; 8. Ship Control During Maneuvers "man Overboard"; 9. Rational Methods Of Ship Control In Case Of Main Engines (me) And Ship And Navigation Equipment Failures During Movement; 10. Eye Survey Of Above-water And Radar Situation, Determination Of Vessel Movement Elements; 11. Navigational Situation Assessment By Visual Observation During Daytime, By Lights At Night Time And By Observation Of Transmission Of Echo Signals On Ppi Simulators In Conditions Of Limited Visibility; 12. Visual Determination Of Vessel Movement Patterns, Maneuvering Capabilities And Dimensions; 13. Selection And Execution Of Collision Avoidance Maneuvers In Open Sea, During Night And In Limited Visibility Conditions Using Radar/arpa; 14. Evaluation Of Accuracy Of Primary And Secondary Information Received From Arpa, Consideration Of Factors Affecting Accuracy Of Arpa And Delay In Formation Of Secondary Radar Information; 15. Orientation Of Ships In Complex Navigation Conditions In Daytime And Nighttime And In Conditions Of Limited Visibility; 16. Use Of Ecdis For Preliminary And Executive Plotting, Practicing Correct Response To Emergency Signals Produced By Ecdis, Solution Of Chart-metric Tasks And Ensuring Safety Of Navigation With The Use Of Information Received From Ecdis; 17. Use Of Basic Capabilities Of Marine Mobile Service And Marine Mobile Satellite Service. 2.4 The Bridge Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate. · Table A-ii/1.1 - Plan And Conduct A Passage And Determine Position. • Table A-ii/1.2 - Maintain A Safe Navigational Watch. • Table A-ii/1.3 - Use Of Radar And Arpa To Maintain Safety Of Navigation. § Table A-ii/1.4 - Use Of Ecdis To Maintain The Safety Of Navigation. • Table A-ii/1.5 - Respond To Emergencies. • Table A-ii/1.6 - Respond To A Distress Signal At Sea. • Table A-ii/1.8 - Transmit And Receive Information By Visual Signaling. • Table A-ii/1.9 - Manoeuvre The Ship. • Table A-ii/2.1 - Plan A Voyage And Conduct Navigation. • Table A-ii/2.2 - Determine Position And The Accuracy Of Resultant Position Fix By Any Means. • Table A-ii/2.3 - Determine And Allow For Compass Errors. • Table A-ii/2.4 - Co-ordinate Search And Rescue Operations. • Table A-ii/2.5 - Establish Watchkeeping Arrangements And Procedures. • Table A-ii/2.6 - Maintain Safe Navigation Through The Use Of Information From Navigation Equipment And Systems To Assist Command Decision-making. • Table A-ii/2.7 - Maintain The Safety Of Navigation Through The Use Of Ecdis And Associated Navigation Systems To Assist Command Decision Making. • Table A-ii/2.10 - Maneuver And Handle A Ship In All Conditions. • Table A-ii/2.11 - Operate Remote Controls Of Propulsion Plant And Engineering Systems And Services. • Table A-ii/3.1 - Plan And Conduct A Coastal Passage And Determine Position. • Table A-ii/3.2 - Maintain A Safe Navigational Watch. • Table A-ii/3.3 - Respond To Emergencies. • Table A-ii/3.4 - Respond To A Distress Signal At Sea. • Table A-ii/3.5 - Manoeuvre The Ship And Operate Small Ship Power Plants. • Table A-ii/4.1 - Steer The Ship And Also Comply With Helm Orders In The English Language. • Table A-ii/4.2 - Keep A Proper Look-out By Sight And Hearing. § Table A-ii/5.2 - Contribute To Berthing, Anchoring And Other Mooring Operations. • Table A-v/4-1.1 - Contribute To Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-1.2 - Monitor And Ensure Compliance With Legislative Requirements. • Table A-v/4-1.3 - Apply Safe Working Practices, Respond To Emergencies. • Table A-v/4-1.4 - Ensure Compliance With Pollution-prevention Requirements And Prevent Environmental Hazards. • Table A-v/4-2.1 - Plan And Conduct A Voyage In Polar Waters. • Table A-v/4-2.2 - Manage The Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-2.3 - Maintain Safety Of The Ship's Crew And Passengers And The Operational Condition Of Life- Saving, Firefighting And Other Safety Systems. 2.5 The Bridge Simulator Shall Allow For Training And Certification Of Watch Officers, Chief Officers, Captains, And Pilots Serving On Commercial And Fishing Vessels Of 500 Gross Tonnage Or More In Accordance With The Requirements Of The Imo Stcw Convention And Model Courses: · 1.07 – Radar Navigation, Radar Plotting And Use Of Arpa; · 1.08 – Radar, Arpa, Bridge Teamwork And Search & Rescue; · 1.22 – Ship Simulator And Bridge Teamwork; · 1.27 – Operational Use Of Electronic Chart Display And Information System (ecdis); · 1.32 – Operational Use Of Integrated Bridge System; · 1.34 – Operational Use Of Ais; · 2.02 – Maritime Sar Coordinator; · 3.11 – Marine Accident And Incident Investigation With Compendium; · 3.19 – Ship Security Officer; · 3.23 – Actions To Be Taken To Prevent Acts Of Piracy And Armed Robbery; · 7.01 – Master And Chief Mate; · 7.03 – Officer In Charge Of Navigational Watch; · 7.05 – Officer In Charge Of Navigational Watch Of Fishing Vessel; · 1.25 – General Operator’s Certificate For The Gmdss; · 1.26 – Restricted Operator’s Certificate For The Gmdss. 2.6 The Bridge Simulator Shall Have All The Ownship Models, Target Ship Models , Objects And Exercise Areas Available In The Database Of The Simulator Product. It Shall Also Include Polar Areas, The Existing Models And Areas In Current Simulator, Naval And Coast Guard Ship Models, Ship Models Ready For Integration With Engine Simulators And Ship/engine Models Using Future Fuels. 2.7 The Simulator Shall Have Intercom Installed In The Instructor Station And All Bridge Stations. 2.8 The Simulator Shall Have An Evaluation And Assessment Method Designed For The Evaluation And Assessment Of A Range Of Predefined Assessment Parameters From The Following Categories: • Planning And Conducting A Passage And Determine Position; • Maintain Safe Navigational Watch; • Using Radar And Arpa To Maintain Navigational Safety; • Ability To Operate And Analyze Information Obtained From Arpa; • Respond To Emergencies; • Use Imo Standard Marine Communication Phrases And Use English Inwriting And Speaking; • Transmit And Receive Information Using Visual Signals; • Maneuver The Ship; • Colreg. 2.9 The Simulator Shall Have The Ability To Set Up A Scoring And Grading System To Evaluate The Operator’s Performance. The Program Allows The Instructor To Monitor The Results Of The Bridge Team / Operator Workstation Performance. 2.10 The Simulator Shall Be Capable Of Simulating Ship Operation In Polar Waters Or Ice Navigation According To The Polar Code And Shall Have The Following Training Capabilities: - Ice Management Of Offshore Installations In An Arctic Environment, - Use Of Radar Data And Ice Charts In Ecdis While Navigating In Ice Conditions, - Following Of Icebreakers, - Offshore Loading Operations To Include Mooring To Single Point Mooring And Floating Production Storage And Offloading Equipment In Ice Conditions, And - Navigation In Shattered Ice, Along Hard Ice Edges, Bumping Against Ice Edges, In Open Pack Ice, In Ice Holes, And Spots Of Ice-free Water. 2.11 The Ice Navigation Environment Shall Have The Following Characteristics: - Capable Of Ice Accumulation On Ship Superstructure, - Ship’s Tracks On Ice Fields Re-freeze As Programmed By The User, - Ice Mounds And Channels Can Be Added By The User, - Characteristics Of Ice Resistance Are Based On The Type Of Ice, Thickness, And Accumulation, - Capable Of Traversing Large Ice Areas, And - Realistic Representation Of Iceberg Objects. 3. Bridge Simulator Performance Standards 3.1 Physical Realism The Bridge Simulator Stations Shall Have The Following Physical Realism: A. The Equipment, Consoles, And Workstations Shall Be Installed, Mounted, And Arranged In A Manner That Mimics An Actual Bridge Of A Ship. B. The Workstations Shall Have Standard Rubber Mat Flooring. The Simulator Shall Have The Following Equipment: C. Controls Of Propulsion Plant Operations, Including Engine Telegraph, Pitch-control And Thrusters. There Shall Be Indicators For Shaft(s) Revolutions And Pitch Of Propeller(s). There Shall Be Controls For At Least One Propeller And One Bow Thruster. D. Controls Of Propulsion Plant For Mooring Operations. By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Operation Of Such Controls. E. Controls Of Auxiliary Machinery. There Shall Be Controls For At Least Two Auxiliary Engines, Including Electric Power Supply Control. F. Steering Console, Including Equipment For Hand Steering And Automatic Steering With Controls For Switchover. There Shall Be Indicators Of Rudder Angle And Rate Of Turn. G. Steering Compass And Bearing Compass (or Repeater) With An Accuracy Of At Least 1 Degree. H. At Least One Radar/arpa Display/unit (automatic Radar Plotting Aid). It Shall Be Possible To Simulate Both A 10 Cm (s-band) And A 3 Cm (x-band) Radars. The Radar Shall Be Capable To Operate In The Stabilised Relative-motion Mode And Sea- And Ground-stabilised True-motion Modes (see Stcw Section A-1/12.4.1 And 1/12.5 And Paragraph 2 Of Section B-i/12). I. Communication Equipment Per Gmdss (global Maritime Distress Safety System) Framework, Covering At Least The Requirements For The Relevant Area. J. The Simulator Shall Include A Communications System That Will Allow For Internal Ship Communications To Be Conducted. K. Ecdis (electronic Chart Display And Information System) Displaying Selected Information From A System Electronic Navigational Chart (senc) With Positional Information From Navigation Sensors Like Ais And Radar To Assist The Mariner In Route Planning And Route Monitoring, And By Displaying Additional Navigation-related Information. (see Stcw Section B-i/12). L. Gps (global Positioning System), Echo-sounder And Speed Log Showing Speed Through The Water (1 Axis) For Ships Below 50,000 Grt And In Addition Speed And Distance Over Ground In Forward And Athwart Ship Direction For Ships Above 50,000 Grt. M. Instrument (anemometer) For Indication Of Relative Wind- Direction And Force. N. Ship Sound Signal Control Panel According To Colreg. O. Instrument For Indication Of Navigational Lights. P. Function For Transmitting Visual Signals (morse Light). Q. Control System For General Alarm And Fire Detection/alarm And Other Alarms. R. Ais (automatic Identification System). S. Ship-borne Meteorological Instrument. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: T. Controls For Propulsion Plant Operations, Including Engine Telegraph, Pitch Control, And Thrusters. There Shall Be Indicators For Shaft Revolutions And Pitch Of Propeller. There Shall Be Controls For At Least One Propeller And One Bow Thruster. U. Two Speed And Distance Measuring Devices. Each Device Should Operate On A Different Principle, And At Least One Device Should Be Capable Of Being Operated In Both The Sea And The Ground Stabilized Mode. V. Searchlight Controllable From Conning Positions. W. Manually Operated Flashing Red Light Visible From Astern To Indicate When The Ship Is Stopped. X. Vdr (voyage Data Recorder) Or Capability For Vessel History Track And Learner Actions Log From The Instructor And The Assessor Position. Y. Equipment Capable Of Receiving Ice, Icing Warnings, And Weather Information Charts. Z. Anchoring And Towing Arrangements. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Aa. Workstation For Navigating, Maneuvering And Monitoring Consisting Of: · Radar/arpa · Ecdis · Conning Display · Binoculars Control · Autopilot Control · Observer Position/ Visual Control · Information On Position-fixing Systems · Information On Ship Automatic Identification System (ais) · Heading Control System · Flags, Daytime Shapes And Sound Signals · Control For The Main Engine Including Emergency Stop · Control For The Main Rudder Using Helm · Controls For Thruster · Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Internal Communication Equipment · Public Address System · Vhf With Channel Selector · Remote Control For Searchlight · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Illumination Of Equipment And Displays In The Surrounding Darkness · Sound Reception System · Acknowledgment Of The Watch Alarm · Controls For Console Lighting · Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light Bb. Workstation For Manual Steering (wheelhouse) Consisting Of: · Steering Wheel · Rudder Pump Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn Cc. Workstation For Planning And Documentation Consisting Of: · Ecdis Including Navigation Planning Station · Route Planning Devices · Chart Table · Paper Charts · Plotting Aids Dd. Workstation For Communications Consisting Of: · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer Ee. All Systems Related To The Integrated Bridge System Shall Include Failure Control(s) And Method(s) To Train And Assess The Learner In The Use Of Advanced Equipment, Technology And Enable Familiarization And Training To Understand The Limitations Of Automatic Systems. 3.2 Behavioral Realism The Bridge Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulation Of Ownship Shall Be Based On A Mathematical Model With 6 Degrees Of Freedom. B. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Open Water Conditions, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. C. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Restricted Waterways, Including Shallow Water And Bank Effects, Interaction With Other Ships And Direct, Counter And Sheer Currents. D. The Simulator Shall Include Mathematical Models Of Different The Types Of Ownships. E. The Simulator Shall Include Tug Models That Can Realistically Simulate Tug Assistance During Maneuvering And Escort Operations. It Shall Be Possible To Simulate Pull, Push, Reposition Towing And Escorting. F. The Simulator Shall Include Exercise Areas Including Correct Data For Landmass, Depth, Buoys, Tidal Streams And Visual As Appropriate To The Nautical Chart And Publication Used For The Relevant Training Objectives. G. The Radar Simulation Equipment Shall Be Capable Of Model Weather, Tidal Streams, Current, Shadow Sectors, Spurious And False Echoes And Other Propagation Effects, And Generate Coastlines, Navigational Buoys And Search And Rescue Transponders. H. The Arpa Simulation Equipment Shall Incorporate The Facilities For: - Manual And Automatic Target Acquisition - Fast Track Information - Use Of Exclusion Areas - Vector/graphic Time-scale And Data Display - Trial Maneuvers. I. The Ecdis Simulation Equipment Shall Incorporate The Facilities For: - Integration With Other Navigation Systems - Own Position - Sea Area Display - Mode And Orientation - Chart Data Displayed - Route Monitoring - User-created Information Layers - Contacts (when Interfaced With Ais And/or Radar Tracking) - Radar Overlay Functions. J. The Simulator Shall Provide An Own Ship Engine Sound, Reflecting The Power Output. K. The Simulator Shall Provide Capabilities For Realistically Conduct Anchoring Operations. L. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Interaction With Applicable Anchor And Chain Dimensions With Different Bottom Holding Grounds, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. M. The Simulator Shall Provide Capabilities For Realistically Simulate The Function Of Mooring And Tug Lines And How Each Line Functions As Part Of An Overall System Taking Into Account The Capacities, Safe Working Loads, And Breaking Strengths Of Mooring Equipment Including Mooring Wires, Synthetic And Fiber Lines, Winches, Anchor Windlasses, Capstans, Bitts, Chocks And Bollards. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: N. The Own Ship Model Shall Realistically Simulate Hydrodynamics In Interaction With Solid Ice Edge. O. The Own Ship Model Shall Realistically Simulate Hydrodynamics And Ice Pressure In Interaction With Solid And Packed Ice. Ship Motion In Solid Ice Should Affect At Least Ship Speed And Turning Radius. P. The Own Ship Model Shall Realistically Simulate The Effects Of Reduced Stability As A Consequence Of Ice Accretion. Q. It Shall Be Possible To Simulate The Effect Of The Following Ice Conditions With Variations: - Ice Type - Ice Concentration - Ice Thickness. R. It Shall Be Possible To Realistically Simulate The Towing Of Ownship – Ownship, And Own Ship Target Ship And Target Ownship. It Shall Be Possible To Introduce Different Towing Gear Like Rope Or Steel Wire With Different Strength And Elasticity, Forward, Stern And Side Towing. S. It Shall Be Possible To Realistically Simulate The Interaction Between The Ships Propeller Wash And The Ice. T. It Shall Be Possible To Realistically Simulate Ice Drift. U. The Simulator Shall Be Equipped With Iceberg Targets Of At Least Six Different Sizes Including Realistic Underwater Bodies Which Interacts With The Sea Bottom. The Icebergs Should Be Visible On The Ship's Radar. V. Motion Through Ice Hummocks Should Be Simulated Realistically Considering Ship Icebreaking Capabilities And Affect Ship's Speed, Roll And Pitch. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation System: W. The Integrated Navigation System Should Combine Process And Evaluate Data From All Sensors In Use. The Integrity Of Data From Different Sensors Should Be Evaluated Prior To Distribution. X. The Integrated Navigation System Shall Ensure That The Different Types Of Information Are Distributed To The Relevant Parts Of The System, Applying A Consistent Common Reference System For All Types Of Information. Y. The Integrated Navigation System Shall Provide Information On Position, Speed, Heading, And Time. Z. The Integrated Navigation System Shall Be Able To Automatically, Continually And Graphically Indicate The Ship's Position, Speed And Heading And, Where Available, Depth In Relation To The Planned Route As Well As To Known And Detected Hazards. Aa. The Integrated Navigation System Shall, In Addition, Provide Means To Automatically Control Heading, Track Or Speed, And Monitor The Performance And Status Of These Controls. Bb. Alarms Shall Be Displayed So That The Alarm Reason And The Resulting Functional Restrictions Can Be Easily Understood. 3.3 Operating Environment The Bridge Simulator Shall Exhibit The Following Operating Environment: A. The Simulator Shall Be Able To Present Different Types Of Target Ships, Each Equipped With A Mathematical Model, Which Accounts For Motion, Drift And Steering Angles According To Forces Induced By Current, Wind Or Wave. B. The Targets Shall Be Equipped With Navigational And Signal-lights, Shapes, And Sound Signals, According To Rules Of The Road. The Signals Shall Be Individually Controlled By The Instructor, And The Sound Signals Shall Be Directional And Fade With Range. Each Ship Shall Have An Aspect Recognizable At A Distance Of 6 Nautical Miles In Clear Weather. A Ship Underway Shall Provide Relevant Bow- And Stern Wave. C. The Simulator Shall Be Equipped With Targets Enabling Search And Rescuing Persons From The Sea, Assisting A Ship In Distress And Responding To Emergencies Which Arise In Port. Such Targets Shall At Least Be: · Rocket Parachute Flares · Hand Flares · Buoyant Smoke Signals · Sart (search And Rescue Transponder) · Satellite Epirb (emergency Position Indicating Radio Beacon) · Lifeboat · Life Raft · Rescue Helicopter · Rescue Aircraft · People In Water. D. The Simulator Shall Be Able To Present At Least 20 Target Ships At The Same Time, Where The Instructor Shall Be Able To Programme Voyage Routes For Each Target Ship Individually. (see Stcw Section A-1/12.4.3) E. The Simulator Shall Provide A Realistic Visual Scenario By Day, Dusk Or By Night, Including Variable Meteorological Visibility, Changing In Time. It Shall Be Possible To Create A Range Of Visual Conditions, From Dense Fog To Clear Conditions. F. The Visual System And/or A Motion Platform Shall Replicate Movements Of Own Ship According To 6 Degrees Of Freedom. G. The Projection Of The View Shall Be Placed At Such A Distance And In Such A Manner From The Bridge Windows That Accurate Visual Bearings May Be Taken To Objects In The Scene. It Shall Be Possible To Use Binocular Systems For Observations. H. The Visual System Shall Present The Outside World By A View Around The Horizon (360°). The Horizontal Field Of View May Be Obtained By A View Of 270° And Where The Rest Of The Horizon May Be Panned (to Move The “camera”). (applicable Only To Full Mission Bridge Station With 270° Horizontal Display) I. The Visual System Shall Present The Outside World By A View Of At Least 120° Horizontal Field Of View. In Addition, At Least The Horizon From 120° Port To 120° Starboard Shall Be Able To Be Visualised By Any Method. (applicable Only To Mini Bridge Station With 120° Horizontal Display). J. The Visual System Shall Present A Vertical View From The Workstations For Navigation, Traffic Surveillance And Manoeuvring Enabling The Navigator To Detect And Monitor Objects Visually On The Sea Surface Up To The Horizon Within The Required Horizontal Field Of View When The Ship Is Pitching And Rolling. In Addition, By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Mooring Operations. K. The Visual System Shall Present All Navigational Marks According To Charts Used. L. The Visual System Shall Show Objects With Sufficient Realism (detailed Enough To Be Recognized As In Real Life). M. The Visual System Shall Show Mooring And Towing Lines With Sufficient Realism In Accordance With The Forces Effecting The Tension. N. The Visual System Shall Provide A Realistic Set Of Bow Wave, Sea Spray And Wakes In Accordance With Ships Power Output, Speed And Weather Conditions. O. The Visual System Shall Provide A Realistic Set Of Flue Gas Emission And Waving Flag Effect In Accordance With Ships Power Output, Speed And Weather Conditions. P. The Simulator Shall Be Capable Of Providing Environmental Sound According To Conditions Simulated. Q. The Navigated Waters Shall Include A Current Pattern, Changeable In Time, According To The Charts Used. Tidal Waters Shall Be Reflected. R. The Simulation Shall Include The Depth According To Charts Used, Reflecting Water Level According To Tidal Water Situation. S. The Simulator Shall Provide At Least Two Different Wave Spectra, Variable In Direction Height And Period. T. The Visual System Shall Provide A Realistic Set Of Wind Waves Including White Caps According To The Beaufort Wind Force Scale. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: U. The Visual System Shall Be Capable Of Showing Concentrations Of Solid And Broken Ice Of Different Thickness. V. The Visual System Shall Be Capable Of Showing The Result Of Icebreaking Including Opening, Twin Breaking And Compacting Channel. W. The Visual System Shall Be Capable Of Showing The Effects Of Searchlight. X. The Visual System Shall Be Capable Of Showing The Effects Of The Ice Accretion To The Own Ship Model. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Y. There Shall Be A Field Of View Around The Vessel Of 360° Obtained By An Observer Moving Within The Confines Of The Wheelhouse Or May Be Panned (to Move The Camera). 4. Hardware Requirements 1 Set 4.1 Full Mission Bridge Simulator (horizon Field View Of 270 Degrees) A. Steel Fabrication Of Main Bridge Consoles Consisting Of: I. Conning/maneuvering Console Ii. Radar Console Iii. Ecdis Console Iv. Bearing Console V. Navigation Aid Equipment Console Vi. Gmdss Console Vii. Steering Stand/console Viii. Chart Table Ix. Overhead Panel X. Gyro Repeater With Pelorus Stand Xi. Binoculars Xii. The Console Must Made Of Steel W/ Handrails B. Visual Specification (minimum Requirements) I. 9x 70” Visual Screens Led Backlit 1. Pc Visual Channel 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Hdmi Cable 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator C. 1x Conning Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) 8. Instrument Adds On Conning Console. D. 2x Ecdis Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) E. 2x Radar / Arpa Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) F. Binocular And Instrument (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2. Ssd 4. Rtx 4070 Or Higher 5. Keyboard/mouse 6. 2x 24" Monitor 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 8. Console Made Of Steel (tct 0.8 Mm To 2 Mm) G. Overhead Panel Display 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. At Least 1width And 0.4height 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator H. Radar/arpa I. Radar/arpa Keyboard (1 Set) Specifications: 1. Usb Interface 2. Console Mount Type I. Handset I. Handset Includes: 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box J. 1x Chart Table Console 1300mm X 1312mm (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Parallel Ruler Iii. 1x One-hand Compass Divider Steel Iv. 10x Plotting Triangle With Handle V. 1x Deck Log Book Vi. 1x Night Order Book Vii. 1x Bell Book Viii. 1x Chronometer Ix. Admiralty Paper Charts Related To Installed Maps In Simulator K. Gyro Repeater With Pelorus Stand 1. Bearing Repeater Compass 2. Pelorus Stand 3. Power: 24vd 4. Signal: Rs422 Nmea L. Weather Instruments 1. 1x Ships Clock 2. 1x Aneroid Barometer 3. 1x Hygrometer. M. Speaker With Subwoofer I. Channel Sound System Specification: 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 450watts Speaker With Subwoofer 4. Port: Mini Jack 7 Sets 4.2 Mini Bridge Simulator (horizon Field View Of 120 Degrees) A. Consoles Made In Formica Laminated Board Fabrication Of Main Bridge Consoles Consisting Of: I. Conning Console Ii. Radar Console Iii. Ecdis Console Iv. Maneuvering Console V. Chart Table With Gooseneck Dimming Light B. Mini Bridge Desktop Station (bridge Image Generator Computer For Visual, Conning, Radar, Maneuvering And Overhead Display) I. 3x 45” 4k Display For Visual (minimum Requirements) Ii. 1x Computer (minimum Requirements) 1. 256 M.2 Ssd 2. Rtx 4070 Or Higher 3. 1 X Keyboard/mouse 4. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iii. 1 X Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Keyboard/mouse 5. 24” Monitor 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iv. 1 X Overhead Panel Display V. 1 X Speakers (minimum Requirements) 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 150 Watts Speaker With Subwoofer 4. Port: Mini Jack Vi. 1 X Goose Neck Microphone Vii. 1 X Set Desktop Instrument Console Including: 1. Steering System / Autopilot / Nfu 2. Steering Wheel Viii. Dual Telegraph 1. 1 X Console Tables 2. 1 X Handheld Uhf Equipment 3. 1 X Console Made In Formica Laminated Board (tct 3/4 Inches) Ix. Chart Table And Plotting Aids (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 1x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator X. 1x Parallel Ruler Xi. 1x One-hand Compass Divider Steel Xii. 1x Plotting Triangle With Handle Xiii. 1x Chart Table At Least 1000mm X 700mm Xiv. 1x Deck Log Book Xv. 1x Night Order Book Xvi. 1x Bell Book Xvii. 1x Chronometer 1 Set 4.3 Bridge Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Handset 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box Iii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iv. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel V. 1x Drone View Monitor W/ Smart Tv 55” Tv Led (environment View Of Instructor) Vi. 1x Smart Tv 55” Tv Led For Cctv Vii. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Viii. Instructor Station Table Specification: Ix. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard X. Intercom Telephone / Public Announcement System Xi. 9x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Xii. 1x Ergodynamic Chair Xiii. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Bridge Simulator Scenario Development Station B. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations. I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Iii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Bridge Simulator The Full Mission Bridge Simulator Shall Have The Following Software And Controls For The Following Workstations: A. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Ecdis Slave Software · One (1) Conning Display Software · One (1) Radar/arpa 3cm · One (1) Radar/arpa 10cm · Nine (9) Realistic Visualization Software With 270° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · Two (2) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Gyro Repeater/pelorus Stand That Can Display Magnetic And Gyro Compass · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light B. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) – Track Control/auto Navigation C. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer · Weather Facsimile D. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.2 Mini Bridge Simulator The Mini Bridge Simulators Shall Have Each Of The Following Software And Controls For The Following Workstations: E. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Conning Display Software · One (1) Radar/arpa Interchangeable To 3cm & 10cm · Three (3) Realistic Visualization Software With 120° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · One (1) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Vdr Remote Alarm Panel · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light F. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) G. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer H. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.3 Instructor Station 1. The Instructor Workstation Is An Integral Part Of The Simulator And Is Designed To Control The Training Complex, Design (develop) Exercises, Perform Exercises In Real Time, Control Exercise Performance By Trainees, Change Environmental Conditions And Sailing Circumstances, As Well As Enter Own Ship Failure Variables, Document, And Archive The Position And Activity Of The Ship Involved In The Exercise. The Instructor Station Software Should Contain Navigation Areas As Well As Sub-tasks For Each Area, Allowing The Control Of All Active Vessels And Target Ships. 2. Navigation Instructor Software Includes: · Navigation Instructor · Evaluation And Assessment · Tug And Mooring · Radar/arpa · Electronic Navigational Chart: · Bird Eye Of Instructor · Debriefing System 3. Simulator Session(s) Control: • Exercise(s) Start, Pause, Re-start After The Pause, Stop On Bridge(s); • Setting The Initial Position For Own Ships; • Entering Faults Of Navigation Systems, Steering Gear, Propulsion Plant, Fire And General Alarm; • Ability To Set Faults Of Navigational Equipment; • Pulling Apart Ships That Have Collided Or Run Aground; • Control Of Target Vessels, Hoisting Flags Of The International Code Of Signals, Turning Their Sound Signals On And Turning Their Lights On/off; 4. The Software Modules Should Provide A Possibility To Flexibly Configure The Required Bridge Configuration. General: · An Integrated Application For Exercise Editing, Conducting And Debriefing; · Highly Accurate Data Representation Based On Vector Diagrams (ability To Automatically Load All Diagrams Related To The Selected Game Area); · Tools For Creating Exercises And Automatic Competency Assessment Scenarios; · Displaying Of The Actual Ship Contours; · Display Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamps; · Using The Mouse Wheel For Chart Scaling; · Control Of Simulator Session(s); · Continuous Automatic Recording Of Data During Exercise (main, Audio And Video Log Files); · Real Time, Slow Time, And Fast Time Modes; · Ability To Display And Print A New Pilot Card And A Table Of Maneuvering Characteristics Of The Ship; · Setting Parameters And Faults Of Navigation Equipment: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; · Setting Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases (ecdis); · Working With Measuring Tools: - Ability To Set Erbl; - Ability To Attach, Move Or Delete Erbl During An Exercise; 9. Ability To Attach Sart To The Life Raft; 5. Ability To Move Own Ship During Exercise Without Grounding Or Collision; 6. Ability To Apply Virtual Tug Force To 8 Points Of The Vessel’s Hull In Any Direction; 7. Display Of Actual Ship's Contours; 8. Continuous Display Of Parameters Of Vessel Movement And Environment Conditions: Course And Speed Of The Vessel, Course Over The Ground, Transversal Component Of Speed On The Bow And On The Stern, Gyro Heading, Rate Of Turn, Speed And Direction Of The Current And Wind, Height And Direction Of A Wave, Depth; 9. Independent Instructor Control For Wind And Swell Components Of The Wave; 10. Ability To Set Sea State Spectrum: · Pierson-moskowitz; · Phillips; · Ittc (international Towing Tank Conference); · Jonswap (joint North Sea Wave Project); · User. 11. Ability To Exclude Hydrodynamic Interaction With Mooring Walls In The Required Area; 12. Ability To Create A Template Containing A Set Of Objects (ships), Save And Use This Template In Other Exercises; 13. Ability To Save Environment Settings As A Template And Load A Previously Saved Template In Any Exercise And Area; 14. Mooring Operations: · Ability To Set The Rope Material; · Ability To Set The Initial State Of The Mooring Winch (render, Slack Away, Stop); · Ability To Set Mooring Winch Parameters (speed, Pulling Force, Holding Force); · Ability To Operate The Mooring Winch At The Instructor Workplace. 15. Anchor Operations: · Ability To Set User Ground Type With Required Anchor Holding Force Coefficients; · Display Of Anchor Position On The Instructor's Chart On The Ground. 16. Control Of Navigational Lights And Shapes: · Ability To Control The Navigational Lights; · Ability To Switch On/off Deck Lights On Target Ships. 17. Loading/discharging Of Own Ship During Exercises; 18. Weather Conditions Manager: · Ability To Set Predefined Weather Conditions By Beaufort Number (wind, Wave, Whitecaps And Foam, 3d Clouds, Cloud Layer, Visibility) On The Fly; · Ability To Set Customized Weather Conditions; · Visual Effects: Rain And Snow (low, Medium, High), Lightning, Reflection, Translucency, Sea With White Caps, Foam, Splashes, Bow-wave; · Separate Settings For Wind Wave And Swell; · Manual Control Of Wind Direction And Strength; · Adjustment Of Atmospheric Parameters – Temperature, Humidity, Pressure; · Ability To Use Thunderstorm, Precipitation; · Automatic Calculation Of The Position Of The Sun, Moon, Major Stars (up To 100) And Constellations, The Angle And Phase Of The Moon; · Ability To Set Wave Spectrum Type: Pierson-moskowitz; Jonswap (joint North Sea Wave Project); Phillips; User-defined; · Ability To Use Thunderstorm, Precipitation. 19. Rcc, Ship And Coast Stating Assignment; 20. Log Module With Possibility To Print Out And Create Archives; 21. Window For Listening/monitoring Of The Radiotelephone Traffic Including Possibilities To Interfere With Radiotelephone Traffic; 22. Ability To Introduce Background Noise From A List And Instrument Faults To The Trainee Stations. 23. Ability To Change Names, Call Signs, Mmsi, Telex Numbers And Inmarsat Mobile Numbers Of All Emulated Ship Stations And Coast Station According To The Needs Of Different Exercises; 24. Electronic Chart With Vessel Position Indication And The Ability To Change Position, Course And Speed; 25. Ability To Display And Instantly Change Trainee Station Positions On The Electronic Map For Search And Rescue (sar) Exercises; 26. Full Monitoring Of Any Trainee Workstation – The Ability To Monitor The Status Of Each Gmdss Unit And Listen To The Radio Traffic Of Each Trainee Station; 27. Connection To An External Printer; 28. Connection To An Active Speaker For Simultaneous Viewing Of Channels; 29. Providing Functions Of A Coast Telex Or Telephone Subscriber, Coast Radio Station And Rcc Operator From The Log Window; 30. Status Window For All Instruments At Any Workstation; 31. Ability To Log Communication And Trainee Actions For Playback And Later Review; 32. Database Of Coastal Stations, Navtex And Msi Stations And Inmarsat Shore-based Stations Plotted On The Chart; 33. Information About The Gmdss Sea Areas On The Chart; 34. Approximate Estimation Of Radio Wave Propagation In The Selected Frequency Range; 35. Evaluation And Assessment Module; 36. Navtex Functionality: · Ability To Send Navtex Messages On Behalf Of A Navtex Station; · Ability To Edit And Use The Navtex Station Used-defined List; · Ability To Save And Use Navtex Message Templates. 37. “intercom” Panel. To Monitor Intercom Communication, Execute Voice Messages From The Instructor's Side. 38. Vhf Radio Station Module. To Monitor Vhf Communication, Send Voice Messages From The Instructor’s Side, Play Pre-recorded *.wav Files. 39. Coastal Radio Station Module. Screen Layout: 40. Use Of The Mouse Wheel For Chart Centering And Scaling; 41. On-screen Display Of Mooring Walls And Piers; 42. On-screen Display Of Actual Contours Of Any Ship; 43. On-screen Display Of The Object’s Route Line And Its Actual Track; 44. On-screen Display Of The True And Relative Speed Vectors; 45. Selectable Display Mode: True Motion, Relative Motion, Course Up Or North Up; 46. Display Of Prompt And Other Information In The Status Bar: · Bearing And Distance From The Current Cursor On-chart Position To The Reference Point; · Coordinates Of The Current Cursor On-chart Position; · Depth In The Current Cursor Position; · Current Exercise Time (absolute And Relative). 47. Displaying Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamp; 48. Displaying Of Walls And Piers; 49. Use Of A Mouse Wheel For Chart Centering And Scaling; 50. User Configurable Workplace; 51. Different Panels For The Control And Monitoring Of The Exercise Fulfillment: · Reports Panel – To Form And Print Exercise Fulfillment Reports; · Ship Info Panel – To Display Courses, Longitudinal And Transverse Speeds, Rates Of Turn For All The Ships Involved In The Exercise. · Evaluation And Assessment Module Panel; · Target Panel – To Control Vessel Target And Flight And Sar Objects; · Objects Panel – To Promptly Select An Object On The Chart From The List Of All The Objects Available In The Exercise; · Flags Panel – To Hoist/lower Ics Flag Signals On Any Of The Ships, Including Ability To Set And Keep Flag Templates · Events Panel – For The Automatic Recording Of Any Important Events Related To The Incorrect Trainee Actions; · Flash Light Panel – To Send Light Signals From Target Vessels, Including Automated Translation Into Morse Code; · Magnetic Deviation Panel – To Configure The Magnetic Deviation Panel For The Vessels, Participating In The Exercise, Save The Panel And Apply Desired Template To Any Own Vessel, Print The Magnetic Deviation Table; · Procedural Alarms Panel – For Defining User Set Of Alarm For Dedicated Vessels. 52. Setting Navigational Equipment Parameters And Faults: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; 53. Setting The Exercise Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases; 54. Observing Own Ships And Targets On The Chart: Ship Info Panel, Cpatcpa Panel, Events Panel; 55. Control Of Own Ships And Targets On The Chart: Direct Control Of Steering And Propulsion Systems, Autopilot, Mooring Lines, Anchors; 56. Setting Faults Of Navigational Equipment, Steering And Propulsion System, Fire And General Alarms; 57. Continuous Data Logging During Exercises; 58. Playback Of Recorded Exercises In Real And Fast-time Modes; 59. Performing Preliminary Exercises On The Map To Check Their Suitability For Training On The Simulator; 60. Distress Signals (flare, Smoke Signals, Dye Markers); 61. Adding New Target Ships; 62. Changing Weather Conditions; 63. Moving Buoys, Turning Off Lights On Them And Hiding Them On Both The Visualization System And Radar; 64. Control Of Automatic Tugboats On Commands From The Bridge Or From The Instructor; 65. Generating And Printing Exercise Reports 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section A 5.5.3) B. Full Mission Engine Room Simulator (fmers) And Mini Er Stations’ Features And Applications, Major Components And Engine Room Simulator Performance Standards 1. Major Components The Full Mission Engine Simulators That Can Be Integrated With Bridge Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Engine Room Station (class A Configuration) B. Ten (10) Mini Engine Room Stations (class B Configuration) C. One (1) Server Station D. One (1) Instructor Station E. One (1) Simulator Scenario Development Station F. One (1) Briefing/ Debriefing Station 2. Features And Applications 2.1 The Man Electronic Engine Model Simulates A Suez Max Crude Oil Carrier With A Man Slow Speed Turbo Charged Diesel Engine As Propulsion Unit Modeled With Fixed Propeller. The Main Engine Models Respond Dynamically To Variations In Operation And Conditions Of The Ship Model, And The Ship Models Have Mutual Responses To The Main Engine Models. The Model Is Based On Real Engine Data That Makes The Dynamic Behavior Of The Simulator Close To Real Engine Response. In Addition To The Man Engine, The Vessel Has An Electrical Power Plant Including Three 1125 Kva Diesel Generators And One 250 Kva Emergency Generator. The Steam Plant Includes Two D-type Steam Boilers, Based On Alfa Laval And One Composite Boiler (aalborg), 3 Cargo Turbines, Condensing And Feed Water Systems. Control Room Operator Station, Bridge And Steering Panels Are Included. The System Shall Also Be Connected To The High Voltage Engine Simulator. 2.2 The Simulator Models Complies With The Requirements In The Stcw Convention, Regulation 1/12 And Fulfill The Standards Of An Internationally Recognized Classification Society For Maritime Simulator Systems. 2.3 The Engine Model Main Specifications High Fidelity Engine Room Systems Include: - Sea & Lt/ht Fresh Water Systems, Incl. Fw Generator - Electrical Power Plant, Incl. Diesel Generators And Power Management - Start & Service Air Compressors, Incl. Compressor Intermediate Coolers And Emergency Compressor - Integrated Automation System, Incl. Vessel Performance Monitor - Steam Plant Incl. D-type Oil Fired Boilers And Combined Exhaust/oil Fired Boiler - Diesel/heavy Fuel/oil Systems, Incl. Hfo, Lshfo And Mdo Tanks, Separators, Viscometers - Lubricating Oil Systems, Incl. Separator - Stern Tube Systems - Steering Gear - Main Engine Control System (man) - Main Engine Remote Control System (ac 600) - Main Engine Maneuvering System - Main Engine Hydraulic Oil System - Main Engine Hydraulic Cylinder Units System - Cylinder Indication Diagrams - Air Ventilation System - Bilge Wells & Bilge Separator - Sewage Treatment Plant - Incinerator Plant - Inert Gas System - Ballast System - Refrigeration System - Ship Loading System - Fire Detection System - Fire Fighting System - Remote Co2 Release, Emergency Stops And Quick Release Valves - Emission Control System (water Scrubbing And Me Low Nox Mode) 2.4 The Engine Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate: · Table A-iii/1.1 – Maintain Safe Engineering Watch · Table A-iii/1.3 – Used Of Internal Communication Systems · Table A-iii/1.4 – Operate Main And Auxiliary Machinery And Associated Controls · Table A-iii/1.5 – Operate Fuel, Lubrication, Ballast And Other Pumping Systems And Associated Control Systems · Table A-iii/1.6 – Operate Electrical, Electronic And Control Systems · Table A-iii/1.7 – Maintenance And Repair Of Electrical And Electronic Equipment · Table A-iii/1.11 – Maintain Seaworthiness Of The Ship 2.5 Interface To Engine Room High Voltage System - The Engine Room Model Will Be Interfaced To A Corresponding High Voltage Simulator And Gas Turbine Installed In The Academy. 3. Engine Room Simulator Performance Standards 3.1 Physical Realism The Engine Simulator Stations Shall Have The Following Physical Realism: A. Equipment And Consoles Shall Be Installed, Mounted, And Arranged In A Ship-like Manner B. The Control Room Consoles Shall Include Control And Monitoring Of The Main Engine, Auxiliary Engines And Electrical Power Generation, Steam Boiler, Pump, Compressors And All Other Alarms. C. The Remote Monitoring And Control Systems Shall Be In Compliance With The Functional Requirements Of The Classification Societies For Periodically Unattended Machinery Spaces. D. The Main Engine Remote Control Console Shall Include Command Functions And Status Indication Normally Found On Board Ships. E. The Electric Power Generation Shall Be Under Automatic Or Manual Control. Such System Should Be Able To Constantly Monitor Demand And Supply. When Deviation From Pre-set Limits Arises, The System Should Be Able To Act In Order To Normalize The Situation. The System Shall Also Perform Continuous Control Of The Frequency And Load Sharing. F. The Electric Power Supply System Shall Be Operated Either From The Switchboard Or The Power Management System. - Remote Start/stop Of Auxiliary Diesel Generators - Operation For Shaft Generator - Connect/ Disconnect Of All Generators - Automatic And Priority Selection - Non-essential Systems Trip - Constant Frequency Mode - Different Control Modes Of Load Sharing G. The Main Switchboard Shall Be A Full Scale Model Of A Typical Switchboard, And Comprise The Necessary Controls And Indicators Usually Available Of Real Generators. H. The Remote Control And Automation System Must Include Control Of The Following Equipment: - Me Lubricating Oil Pumps - Me Fresh Water Cooling Pumps - Me Sea Water Cooling Pumps - Me Auxiliary Blowers - Fuel Oil System And Pumps - Air Compressors - Steering Gear Pumps - Fire Pump Each Of The Above Individual Units Shall Allow Manual Start And Stop From The Control Room Consoles. It Shall Also Be Possible To Use Automatic Start And Stop Where Applicable. I. The Alarm Monitoring System Shall Consist Of A Typical Shipboard Alarm System. J. An Alarm Shall Be Announced By Sound And By Flashing Light In The Control Room. K. A Printer Or A Computer In The Engine Room Control Shall Be Used As An Alarm Log And Event Log. L. “dead Man Alarm System” The Simulator Shall Have The Following Additional Requirements For Low Speed Engine: M. The Simulated Engine Room Shall As A Minimum Reflect Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Low Speed Engine: - Main Engine Including Turbocharger System - 2 Auxiliary Diesel Generators - Lubrication Oil Separator - Steering Gear System - Fire Pump - Shaft Generator - Cooling Water System Including Freshwater Generation System - Turbo Generator - Fuel Oil Bunkering System - Fuel Oil Settling And Service Systems - 2 Heavy Fuel Oil Separators - 1 Diesel Oil Separator - Steam Generation Plant Including Exhaust And Oil-fired Boilers - Diesel Oil And Heavy Fuel Oil Supply To Main And Auxiliary Engines - Main Engine Operation From Engine Room, Engine Control Room And Bridge - Turbocharger System - Air Ventilation System For Engine And Control Room - Bilge Water System Including Oily Water Treatment Systems - Stern Tube System - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall Have The Following Additional Requirements For Medium And High Speed Engine: N. The Simulated Engine Room Shall Consist Of Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Medium And High Speed Engine: - One Or More Main Engines - Main Sw System - 2 Auxiliary Engines - Fuel Oil Tanks - Fuel Oil Separator - Lubrication Oil Separator - Main Engine(s), Including: • Fresh Water System • Lubrication System • Turbocharger System • Me Sw System - Reduction Gear System - Controllable Propeller Pitch Were Applicable - Steam Generation System As Applicable - Freshwater Generator - Bilge Wells And Bilge Separation System - 2 Air Compressors - Steering Gear System - Fire Pump - Electrical Power Plant - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall At Least Have The Following Additional Requirements For Machinery Spaces: O. The Simulated Machinery Spaces Shall At Least Include One Dedicated Room For This Purpose. P. At Least The Following Main Components Of The Machinery Spaces Shall Be Graphically Presented Or Represented By Mock-ups Or In Realistic Visualization (to Illustrate Physical Presence) In The Simulated Machinery Spaces: - Main Engine - Auxiliary Diesel Generators - Steam Boiler - Fire Pump Q. The Facilities For Local Operation In The Simulated Machinery Spaces Shall Consist Of Local Operating Stations For Each System. Each Station Shall Be Furnished With Start/stop (open/closed) Buttons And Status Lights, Various Numbers Of Pressure -, Temperature Indicators, Etc. The Local Operating Stations Shall At Least Give Means To Operate The Following: - Main Engine (me) - Me Lubricating Oil Systems Including Separator - Me Fresh Water Cooling System - Me Sea Water Cooling System - Me Auxiliary Blowers - 2 Auxiliary Diesel Generators - Steam Boiler - Fuel Oil System (diesel And Heavy Fuel Oil) Including Separator - 2 Air Compressors - Steering Gear System - Bilge Water System - Fire Pump R. All Valves Typically Associated With The Operation Of Above Machinery May Be Operated At The Computer Screen In A 3d Visual Form Or Mouse Operated By The Candidate. S. Internal Communication System. 3.2 Behavioral Realism The Engine Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulator Models Shall Be Able To Replicate The Dynamic Behaviour Of The Machinery Systems And All Its Visual Parameters As Well As The Interactions Between The Sub-systems. B. The Simulator Models Shall Simulate The Engine Room Components With Their Procedures, As Well As Modelled Controller Systems (sensors, Controllers, Actuators, And Valves) Connected To The Processes. C. When Simulating Real Equipment The Behaviour Of Such Simulated Equipment Should Behave As Identical Aw Possible As The Original. Critical Parameters Of The Behaviour Shall Be Documented D. The Simulator Model Shall Make Applicable Controllers Available And Adjustable With Regards To Pid (proportional-integral-derivative Controller) Parameters. E. The Simulator Model Shall Provide Facilities To Allow The Injection And Resetting Of Malfunctions At Appropriate Times During Operation As Necessary. F. It Shall Be Possible To Simulate Change In Seawater Temperature And Demonstrate How This Affects The Complete Simulation Model. G. It Shall Be Possible To Simulate A Change In Air Temperature And Demonstrate How This Affects The Complete Simulation Model. H. The Simulator Shall Have All Heat Exchangers Available And Adjustable With Regards To Their Parameters (heat-transfer Factor, Heat Dissipation Are Etc.) I. The Simulator Shall Make All Pumps Available And Adjustable With Regards To Their Parameters (pump Capacity, Wear, Etc.) J. It Shall Be Possible To Demonstrate Systematically The Tests That Are Made On The Ums (unmanned Machinery Space) Alarm System. K. It Shall Be Possible To Simulate Auto Slow-down And Emergency Shut Down L. It Shall Be Possible To Simulate Safe Methods To Test Inert Gas Generator (ig) Alarms And Control. M. It Shall Be Possible To Simulate Testing Of The 24v D.c. Power Supply To The Navigation, Communication And Engine Room Control Console In Event Of Power Failure. N. It Shall Be Possible To Simulate Safe Method Of Testing The Insulation For Rotor And Stator. O. It Shall Be Possible To Simulate Of Reading A Power Factor Meter With Reference To Four Segments P. It Shall Be Possible To Simulate Testing Of The Devices And Relays Provided For Generator Protection Q. It Shall Be Possible To Simulate Tests Related To Avr (automatic Voltage Regulator) R. It Shall Be Possible To Simulate Methods Of Cooling And Checking Of Air Gap S. It Shall Be Possible To Simulate The Precautionary Measures When Megger Testing The Rotor Of A Brushless Generator T. It Shall Be Possible To Simulate Routine Tests On An Emergency Generator U. It Shall Be Possible To Simulate How A Generator Circuit Breaker Ocr (over Current Relay) Is Set And Tested. V. It Shall Be Possible To Simulate The Process Of Connecting A Shaft Generator On Load And Specific Conditions For Taking Off Load. W. It Shall Be Possible To Simulate The Procedure For Megger Testing A High Voltage System X. It Shall Be Possible To Simulate The Maintenance And Checks Carried Out On An Acb (air Circuit Breaker) Y. It Shall Be Possible To Simulate Recovery From “dead Ship” Condition. Z. It Shall Be Possible To Simulate Methods Test The “preferential Tripping Sequence” Aa. It Shall Be Possible To Simulate Methods To Tests Auto “cut In” Of Stand Fault Bb. It Shall Be Possible To Simulate Methods Of Diagnosing Single Phasing Fault. Cc. It Shall Be Possible To Simulate Operation And Maintenance Of Variable Speed Motor Starters. Dd. It Shall Be Possible To Simulate Operational Test Methods Of Oily Water Separator Monitors Ee. It Shall Be Possible To Simulate Test Methods For Level Alarms And Function Tests Of Bilge Pumping Arrangement Ff. It Shall Be Possible To Simulate The Functional Tests Of Odmcs (oil Discharge Monitoring And Control System) And Odme (oil Discharge Monitoring Equipment) System Gg. It Shall Be Possible To Simulate The Function Test Of Ows (oily Water Separator) And Ppm (parts Per Million) Unit. 3.3 Operating Environment The Engine Simulator Stations Shall Have The Following Operating Environment: A. It Shall Be To Adjust The Noise Level In The Simulated Machinery Spaces Infinite From No Added Noise Up To Minimum 100 Db(a). The Noise Shall Have A Frequency Distribution Typical For Machinery Spaces. Headset Is Provided For Each Workstation. B. It Shall Be Possible To Simulate The Sea Water Temperature At Least Infinite Between +1ºc And +30 ºc C. An Alarm Can Be Heard Through Headset Of A Candidate And By Flashing Light In The Machinery Spaces 4. Hardware Requirements 1 Set 4.1 Full Mission Engine Room Simulator A. Engine Control Room Consoles I. Ecr Pump Compressor And Power Management Console 1. 1 X Console 2. 1 X Computer 3. 2 X 24 Touch Monitors Ii. Ecr2 Alarm, Monitoring And Remote-control Console: 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Iii. Ecr3 Main Engine Remote Control And Indication Console 1. 2 X Console 2. 1 X Computer 3. 3 X 24” Touch Monitors 4. 1 X Speed Set Lever For Main Engine Remote Control And 5. Indication Console 6. Dead Man Alarm (dma) 7. Engineers Reset 8. Included Power Relay To Which Illumination In Engine Control Room And Engine Room Can Be Connected, Causing Lights In The Rooms To Go Out During A Blackout To Increase Realism. Iv. Simulated Cctv Touch Monitor 1. 1 X Computer 2. 1 X 24 Monitor V. Internal Telephone At The Following Locations 1. Instructors Station 2. Engine Control Room 3. Engine Room 4. Emergency Generator Room Vi. Main Switchboard 1. 14 X Touch Screen Monitors 2. 7 X Computers 3. 1 Set Of Speakers 4. Installed In A Switchboard Manner Vii. Engine Room Equipment 1. 4 Dome Type Virtual Walkthrough 2. 4 X High Resolution Short Throw Projector 3. 4 X Computer With Graphics Card 4. 4 X Controller Viii. Local Operating Station Console 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Ix. Engine Room Sound 1. 1 X Sub Woofer 2. 4 X Satellite Speaker X. Alarm Horn And Lamp 1. 1 X Column With Lights And Sirens Xi. Emergency Generator Room 1. 1 X Dome Type Virtual Walkthrough 2. 1 X High Resolution Short Throw Projector 3. 1 X Computer With Graphics Card 4. 1 X Controller 5. With Sound System B. All Computers Must Be The Latest Generation This Includes Processors, Memory, Graphics Card And Storage. I. Monitors: Full Hd Resolution Ii. Storage: Solid-state Drive (ssd) Iii. Processor Generation: Must Be From The Latest Generation Of Processors Iv. Graphics: Integrated Graphics Dedicated Gpu If Needed. C. Touchscreens For Durability, Responsiveness, And Multi-touch Support. D. Each Computer Must Be Paired With A Ups Unit Rated For At Least 1.5 Kva And Automatic Voltage Regulation To Handle Voltage Fluctuations. E. The Engine Control Console Must Be Made From Steel W/ Handrails 10 Sets 4.2 Mini Engine Room Simulator A. 1x Computer Specification (minimum Requirement) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 256 M.2. Ssd 4. Video Card 5. Keyboard/mouse 6. 2x At Least 24" Monitor (touchscreen) 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm C. 1x Chairs 1 Set 4.3 Engine Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 3x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iii. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel Iv. 1x Smart Tv 55” Tv Led For Cctv V. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Vi. Instructor Station Table Specification: Vii. 11x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Viii. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Ix. 1x Ergodynamic Chair X. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Engine Simulator Scenario Development Station A. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 1. 1x Computer (minimum Requirements) 2. 2x 24” Monitor 3. Intel Core I5 Processor 4. 16 Gb Ram 5. 256 M.2 Ssd 6. Rtx 4070 Or Higher 7. Keyboard/mouse 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm I. Material: Formica Matt Laminate On Chipboard Ii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Engine Room Simulator 5.2 Mini Engine Room Simulator 5.3 Instructor Station 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section B 5.5.3) 1 Set C. Briefing/ Debriefing Station For Bridge And Engine A. 2x Computer (minimum Requirements) 1. 1 X Pc 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 500gb Ssd 5. Low Profile Video Card 6. 1x Keyboard/mouse 7. 1x Ups 1kva 8. 1x W/ Computer Table Size: At Least L 1700 X W 700 X H 750 Mm 9. Briefing And Debriefing Rooms With Playback Capability (playing Of Recorded Exercise And Assessment In Simulator B. 50x Chairs C. 1x Solid Round Table (at Least 6100 X 1220 Mm) (for Bridge Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) D. 1x Solid Round Table (at Least 4880 X 1220 Mm) (for Engine Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) E. 1x Smart Tv At Least 70" 4k 1. Wall Mounted. 2. 2x Hdmi 10meters F. 4x Bridge And 4x Engine) Hardware For Virtual Bridge Familiarization (minimum Requirements) 1. Display: A. Type: Lcd B. Resolution: 2064 X 2208 Per Eye C. Refresh Rate: 120 Hz D. Field Of View: E. Horizontal: 97 Degrees F. Vertical: 93 Degrees 2. Processor: A. Chipset: Qualcomm Snapdragon Xr2 Gen 2 3. Ram: 12gb 4. Storage: A. Options: 128gb, 256gb, And 512gb Variants 5. Audio: 6. Hand Tracking: Improved Hand Tracking Capability 7. Controllers: A. Type: Meta Touch Pro Controllers B. Features: Haptic Feedback, Improved Ergonomics, Rechargeable Batteries 8. Battery: A. Headset: Approximately 2-3 Hours Of Active Use B. Charging: Usb-c Fast Charging 9. Connectivity: A. Wireless: Wi-fi 6e Support B. Bluetooth: 5.2 10. Inclusions: A. Headset B. Touch Pro Controllers (pair) C. Charging Cable (usb-c) D. Power Adapter W/ Extra 1 Battery Each E. Controller Lanyards F. Glasses Spacer Ii. Add On’s: 1. 2x Strap With Battery 2. 8x Silicone Cover Face Cover 3. 4x Silicone Protective Case 4. 8x Silicone Case For Controller 5. 3 Row Vr Storage Cabinet With Lock G. The Virtual Reality Bridge Must Be Complete With Hotspots, Identification Tags And Descriptions. It Shall Also Be Available On An Offline System, Navigable. H. Playback Capability With The Following Functions: · Loading A Previously Created Exercise On A Chart Or In Engine Room; · Playing The Exercise To Explain The Task; · Uploading A Sample Log Of The Same Exercise To Explain The Correct Actions. I. Virtual Bridge Familiarization W/ Virtual Reality Device The Vr System Aims To Simulate The Overhauling Process, Enabling Immersive, Hands-on Learning And Pre-assessment Without Direct Physical Intervention On The Engine. This Approach Will Enhance Technical Skills, Reduce Risk, And Improve Efficiency In Real-world Engine Maintenance And Overhauling. The Supplier Shall Provide A Virtual Bridge And Engine With The Use Of Virtual Reality Providing The Following Visualizations: 1. Bridge Wing Equipment 2. Speaker Mic 3. Rate Of Turn 4. Engine Rpm 5. Quick Release Lifebouy 6. Remote Panel 7. Gyro Compass Repeater 8. Fire Box 9. Hatch For Maintenance 10. Thermometer Ii. Main Bridge 1. Epirb 2. Sart 3. Clear View Screen 4. Location Of Fire Extinguishers 5. Pantry With Equipment 6. Pilot Chair 7. Smoke Detectors 8. Damage Control Plans 9. Radar 1 And 2 And 3 10. Gps With Other Equipment 11. Helm Wheel 12. Indicator Control 13. Deck Light Control 14. Admiralty And Other Maritime Publications 15. Fireplan 16. Rudder Angle Indicator 17. Voice Recorder 18. Whistle Horn 19. Water Tight Door Indicators 20. Window Wipers 21. Pa Systems 22. Cargo Hold Fan Control 23. Smoke Alarm System 24. Fire Alarm System 25. General Alarm System 26. Vhf System 27. Log Books And Other Documentation 28. Ecdis Voyage Planner 29. Pressure Recorder 30. Portable Uhfs 31. Lifejackets, Rocket Flare, And Rocket Line 32. Location Of Immersion Suits 33. Barometer 34. Utc Clock 35. Radio Room Configuration 36. Posters 37. Charts 38. Compass Deck / Monkey Island 39. Radar Equipment 40. Antennas 41. Anemometer 42. And Other Equipment On The Monkey Bridge Iii. The Me-b Main Engine Vr Overhauling System Cover The Following Features Full-scale, Interactive Models Allowing For A Detailed Exploration Of All Engine Components, Including: Iv. Connection Rod & Crosshead Assembly V. Stuffing Box Assembly Vi. Piston Assembly Vii. Cylinder Liner Assembly Viii. Cylinder Cover Assembly Ix. Exhaust Valve Assembly X. The Vr Simulation Guides Users Through Disassembling, Inspecting, And Reassembling The Exhaust Valve, Focusing On Critical Tasks Like Checking Valve Seats, Spindle Condition, And Wear On Sealing Surfaces. Users Can Also Simulate Tasks Such As Lapping The Valve, Inspecting Hydraulic Actuators, And Ensuring Proper Seating Of The Valve During Reassembly. 1 Set D. Server Station For Bridge And Engine A. 2x Set Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 4x 500 Ssd 4. Keyboard/mouse 5. License Operating System B. 1x Nas And Exercise Server 1. 4 Bay Nas Disk Station Quadcore Processor 2. 4x 4 Tb Hdd C. 1x Server Rack 1. Server Rack At Least 32u 2. W/ Fan D. 1x Ups 1. 5kva (5kw) 2. Sealed Lead-acid (sla) Or Lithium-ion 3. Output Voltage: 230v Ac 4. Surge Protection 5. Stabilizes Incoming Voltage Without Switching To Battery Mode 25 Sets E. Cloud Simulator-ready Computers A. Laptop 1. 13th Gen Intel Core I5-1335u 2. 16 Gb, 2 X 8 Gb, Ddr4. 2666 Mhz 3. 512 Gb, M2, Pcie Nvme, Ssd 4. Intel Iris Xe Graphics 5. Windows 11 Pro License 6. Wi-fi 6 Wireless Lan And Bluetooth 7. Keyboard With Numeric Keypad 8. 15.6", Fhd 1920x1080, 120hz, Wva, Non-touch, Anti-glare, 250 Nit, Narrow Border, Led-backlit 9. Ports: Usb 2.0, Headset Jack, Power Jack,hdmi 1.4, Usb 3.2 Gen 1 Type-a, Usb 3.2 Gen 1 Type-c™ 10. Power Adapter: 220v Ac Input, 65w 11. Accessories: Wireless Mouse 1 Set F. Network And Cctv A. 1 X High Speed Router For Remote Support B. Network Switch 1. Network Switch Specifications Manage: 2. 4x 24 Ports 10/100/1000mbps Rj45 Ports 3. 1x 8 Ports 10/100/1000mbps Rj45 Ports C. Set Cctv Monitoring 1. 1x Nvr At Least 32 Channel 2. 20x 6 Mp Fixed Dome Network Camera With Mic 3. 3x 6tb Storage (design For Cctv) D. Network Requirements: I. 72x Lan Port Ii. 1x Lot: Of Upvc, Conduit, Pull Box, Fittings, Hanger, And Support And Other Materials If Needed. Including Utp Cat6 Shielded Pure Copper, Fiber Optic Cable, Patch Panels. Iii. Installation, Engineering Labor For Entire Project. Iv. Cable Laying, Labeling, Harnessing V. Mobilization And Di-mobilization Vi. All Cabling Will Be Endpoint At Server Room (back Of Full Mission Bridge Simulator) E. Structured Cabling Systems Standard I. Stations Must Include Lan Outlets And Patch Cords. Ii. Backbone Cabling Will Be Using The Cable Tray For Lan Distribution. Iii. Lan Outlets Must Have Network Labeling Iv. Patch Panels Are Required G. Civil Works A. Program Of Work Separate Documents (attached) Part Ii. Other General Requirements 1 Ea. Project Billboard/signboard 1 L.s Occupational Safety And Health Program 1 L.s Mobilization/demobilization Part Iii. Civil, Mechanical, Electrical, & Sanitary/plumbing Works Part A. Earthworks 1 L.s Removal Of Structures And Obstruction Part C. Finishings And Other Civil Works 179.71 M² Wall, Metal Frame, Fiber Cement Board 6mm 37.92 M² Tempered Glass Door, 12mm, Reflective 23.04 M² Aluminum Glass Window 4.05 M² Doors, Solid Panel 406.28 M² Acoustical Ceiling Panel 745.2 M² Painting Works, Masonry/concrete 4.05 M² Painting Works, Wood 48.38 M² 150mm Chb Nonload Bearing(including Reinforcing Steel) 48.38 M² Plain Cement Plaster Finish 116 M² Floor Tiles, Imo Rubber, On Finish Floor 211.6 M² Floor Tiles, Imo Rubber, On Raised Floor System Part D. Electrical 1 L.s Panelboard With Main And Branch Breakers 1 L.s Wires And Wiring Devices 1 L.s Lighting Fixtures And Lamps 1 L.s Conduit, Boxes, And Fittings 1 L.s Pole Mounted Power Transformer (oisc) 1 L.s Network Cabling Part E. Mechanical 1 L.s. Door Access And Card Reader System Part F. Simulator Equipment 1 L.s Airconditioning, Package/split Type H. Terms And Conditions 1. A 3-year Warranty For The Computer Hardware And Console Peripherals 2. All Workstations Shall Have Imo Standard Rubber Mat Flooring. 3. The Software Comes With A 3-year Warranty Inclusive Of New Updates. 4. The Project Will Be Implemented Within 150 Cd. Liquidating Damages Will Be Applicable For Any Delays. 5. A Comprehensive Guide Will Be Provided, Offering Detailed Instructions On System Operation And Maintenance Activities, Facilitating Ease Of Use And System Upkeep. 6. Onsite Training Sessions Will Be Conducted By Certified Instructors And Technical Experts, Facilitating Smooth Knowledge Transfer And Ensuring Proficient System Operation. Certificates Will Be Provided Upon Completion Of Training Sessions. 7. Structured Cabling Standards To Establish A Reliable And Efficient Network Infrastructure. 8. The Simulator Manufacturer Should Be An Iso 9001:2015 And Iso 14001:2015 Certified Business. 9. The Simulator Should Be Certified By An Internationally Recognized Classification Society And May Also Be Certified By National Authorities. 10. The Software Must Be Perpetual License. 11. The Supplier Shall Conduct An Annual Face-to-face Maintenance Session To Ensure The System's Optimal Functionality And Performance. 12. The Supplier Must Resolve Any Software Or Hardware Issues Within 2 To 5 Cd Of Their Occurrence To Minimize Downtime And Disruptions. 13. All Hardware Installations Must Adhere To Software Specifications To Guarantee Seamless Integration And Operation. 14. The Computer Hardware Supplied Must Be Sourced From Proven Technology Hardware Companies, Quality And Performance Standards To Ensure Optimal Functionality And Compatibility With The Software. 15. Bidders Are Required To Offer Continuous Retraining Sessions Free Of Charge During The Warranty Period To Ensure Users' Proficiency With The System. 16. Bidders Should Provide Manufacturer Authorization Or Exclusivity Certificate To Ensure The Authenticity And Legality Of The Supplied Products. 17. The Bidder Is Responsible For Performing A Thorough Site Inspection, And A Site Inspection Certificate Issued By The Agency Shall Be Submitted As Part Of The Eligibility Requirements. 18. The Bridge Simulator Shall Be Integrated With The Engine Simulator Ensuring Compatibility And Functionality. 19. All Simulator Stations Can Connect And Enable Them To Interact With Each Other In A Coordinated Scenario. 20. The Simulator Scenario Development Station Shall Be Capable Same As An Instructor Station Capable Of Deploying Scenarios To Other Stations. 21. All Other Simulator Specifications And Capabilities Not Indicated Herein, The Simulator Shall Comply With The Simulator Performance Standards As Required In Maritime Industry Authority (marina) Evaluation Instrument For Full Mission Bridge And Engine Simulator. 22. The Bidders Should Provide A Breakdown Of The Unit Prices Of The Major Components In The Original Of Duly Signed And Accomplished Price Schedule(s) Under Financial Component Envelope Upon Bid Submission. Furthermore, They Should Provide A More Detailed Breakdown As A Condition For Issuance Of Notice To Proceed. ~~~~nothing Follows~~~~
Closing Date9 Dec 2024
Tender AmountPHP 79.9 Million (USD 1.3 Million)
2111-2120 of 2142 active Tenders