Catering Tenders
Catering Tenders
Establishments And Organizations Of Higher Education, Research And Innovation Tender
Food Products
Corrigendum : Closing Date Modified
France
Details: This Framework Agreement and the Subsequent Contracts Which Are Concluded on Its Basis Concern the Supply of New Office (Lot No. 1) and Additional Reception Products (excluding Products Ordered by Services Dedicated to Collective Catering) (Lot No. 2). This Procedure Is Passed in a Joint Ordering Group and Carried Out by Aix-Marseille University (Coordinator of the Award Phase).
Closing Date24 Jan 2025
Tender AmountRefer Documents
National Council For Hotel Management And Catering Technology - NCHMCT Tender
Services
GEM
India
Purchaser Name: National Council For Hotel Management And Catering Technology | CATEGORY: Facility Management Services - LumpSum Based -
Hospitality; Electrician cum Lift Operator; Consumables to
be provided by buyer
Closing Soon10 Jan 2025
Tender AmountINR 191 K (USD 2.2 K)
National Council For Hotel Management And Catering Technology - NCHMCT Tender
Goods
Electrical Works...+1Electrical and Electronics
GEM
India
Purchaser Name: National Council For Hotel Management And Catering Technology | CATEGORY: G.I. DUCTING HOT AIR AND FRESH AIR SYSTEM , S.S. HOOD
WITH S.S. BAFFLE FILTER , AXIAL FLOW FANS , REPAIRING,
SERVICING AND PAINTING , ITEM
Closing Soon10 Jan 2025
Tender AmountRefer Documents
National Council For Hotel Management And Catering Technology - NCHMCT Tender
Services
Other Consultancy Services...+1Consultancy Services
GEM
Corrigendum : Closing Date Modified
India
Purchaser Name: National Council For Hotel Management And Catering Technology | CATEGORY: Event or Seminar or Workshop or Exhibition or Expo
Management Service - National; Theme Based Events;
Conceptualization and Planning; Buyer premise; Full day
Closing Soon15 Jan 2025
Tender AmountINR 1.7 Million (USD 19.7 K)
Bukidnon State University Tender
Philippines
Details: Description 33379 Gallon Alcohol - 99.9% Pure Ipa Isopropyl Alcohol (iupac Name Propan-2-ol; Also Called Isopropyl, Isopropanol, Or 2-propanol) Is A Colorless, Flammable Chemical Compound With A Strong Odor. It Is Miscible In All Proportions With Water And Many Organic Liquids And Has A Good Solvent Power For Many Organic Substances. All Purpose, Used For: -cleaning Electronics -resin 3d Printing -alcohol Inks -and More. Warning: Flammable; Place In A Safe Area And Use Responsibly. Not For Use Directly On The Skin. 5 800.00 4,000.00 33380 Set Arduino Uno R3 - Development Board Compatible With Arduino Atmega328p Theuno R3 Development Board Is One Of The Most Popular Among The Arduino Family, Based On The Atmel Atmega328 Microcontroller. It Offers A Versatile Platform For Various Electronics And Robotics Applications, Ranging From Basic To Advanced Projects. Performancedescription Microcontroller:atmega328 Operatingvoltage: 5v Inputvoltage (recommended): 7-9v Digital I/o Pins: 14 (of Which 6 Provide Pwm Output) Analog Input Pins: 6 Dccurrent Per I/o Pin: 40 Ma Dccurrent For 3.3v Pin: 50 Ma Flashmemory: 32 Kb (atmega328) Of Which 0.5 Kb Is Used By The Bootloader Sram: 2 Kb (atmega328) Eeprom: 1 Kb (atmega328) Clock Speed: 16 Mhz Programming Interface: Usb Via Arduino Ide Software 10 500.00 5,000.00 Compatibility:arduino Ide Compatible, Easy To Program And Use For Beginners And Advanced Users Alike Design Specification Board Type: Arduino Uno R3 Usbinterface: Type B Usb Port For Programming And Power Supply Formfactor: Standard Arduino Uno Shape And Size Poweroptions: Can Be Powered Via Usb Or External Power Supply (7-12v Dc) Headers: Straight Pin Header Variant Available, Compatible With Breadboards And Prototyping Shields Key Features Versatilemicrocontroller: Atmega328 Microcontroller Offering A Good Balance Of Performance And Features Broadrange Of I/o Pins: 14 Digital I/o Pins, 6 Pwm Outputs, And 6 Analog Inputs For Diverse Project Needs Easy Programming: Usb Interface For Programming And Power, Compatible With The Arduino Ide Expandability: Compatible With A Wide Range Of Arduino Shields And Modules For Added Functionality Wideapplication: Suitable For Various Applications In Electronics, Robotics, And Automation 33383 Set Battery - Rechargeable Lithium Battery, 3.7v; 69800 Mah, 2pcs/set 3.7v18650 69800mah Li-ion Rechargeable Battery Features: Rechargeable Battery. Recharging/discharging Protection Circuit. Nomemory Effect. Lowreccuring Operation Cost. Safe And Environmental Friendly. Short-circuit And Over-current Protection. 6 160.00 960.00 Description: Keep In A Dry And Cool Place. Charges Up To 1500 Times For An Economical And Responsible Way To Keep Your Battery-powered Devices Working Specifications: Color: Black & Green Size: 66*18mm Capacity: 69800mah Voltage: 3.7v Battery Type: Li-ion Warning: The Voltage Of Full Charge And Cut Off Discharge Is 4.2v And 2.75v. Don't Heat, Incinerate Or Reverse Polarity. 33451 Set Multi-function Portable Solor Panel Station Generator, 500w Capacity Productoverview: Portable Power Solutions 2578model - Use Of Electrical Appliances Below 150w (lead Acid Battery) 2 22,000.00 44,000.00 This Portable Power Unit Is Designed For Electrical Appliances Requiring Up To 150w Of Continuous Power, Offering A Reliable Power Source For Small Devices. Specifications: Battery:maintenance-free Lead Acid Battery Battery Capacity: 144wh, 12000mah Lithium-ion Battery Acoutput: Pure Sine Wave Output Continuous Power Output: 150w Outputvoltage: 220v Input(adapter): Dc 12v/3a Usboutput: 2 X Usb 5v/2.4a Operating Temperature: -10°c To 40°c Lifecycle: >800 Cycles Dimensions(l X W X H): 225 X 130 X 175 Mm Netweight: Approximately 4.25 Kg 2579model - Use Of Electrical Appliances Below 300w (lithium Battery) Thismodel Is Suitable For Devices Up To 300w, Equipped With A Powerful Inverter And Various Output Options. Specifications: Battery: Lithium-ion, 12.8v/80000mah Inverter: Built-in 300w, Ac Peak Power Output 600w Waveform: Pure Sine Wave Acoutput: 1 Universal Ac Output (110v/220v) Dcoutput: 3 X Dc 12v Output Usboutput: 2 X Usb 5v/2.4a Display: Lcd (voltage, State Of Charge, State Of Discharge) Ledlight Modes: 100% Luminance, 50% Luminance, Flashing, Off Loadcapacity: 3 X 12v Led Light, Fan, Tv, Drone, Computer, Etc. Switching Function: Independent Ac And Dc Output Switching Dimensions(l X W X H): 211 X 160 X 196 Mm 2580model - Use Of Electrical Appliances Below 500w (lithium Battery) Designed For More Power-hungry Devices, This Unit Supports Up To 500w Of Continuous Power. Specifications: Battery: Lithium-ion, 12.8v 460.8wh Inverter: Built-in 500w Waveform: Pure Sine Wave Acoutput: 1 Universal Ac Output (110v/220v) Dcoutput: 3 X Dc 12v Output Usboutput: 2 X Usb 5v/2.4a Display: Lcd (voltage, State Of Charge, State Of Discharge) Ledlight Modes: 100% Luminance, 50% Luminance, Flashing, Off Loadcapacity: 3 X 12v Led Light, Fan, Tv, Drone, Computer, Etc. Switching Function: Independent Ac And Dc Output Switching Dimensions(l X W X H): 265 X 175 X 225 Mm 2581model - Use Of Electrical Appliances Below 500w (lead Acid Battery) This Heavy-duty Model Is Ideal For Larger Applications, Offering Robust Power From A Lead Acid Battery. Specifications: Rated Power: 500w Battery: Lead Acid, 12v 50ah Output:ac 220v/110v ±15%, Dc 12v, 5v Waveform:modified Sine Wave Grossweight: 17 Kg Dimensions(l X W X H): 420 X 265 X 325 Mm Package Includes: Accharger Carignition Cable 2 X 12v 5w Bulbs Usermanual Qualified Certificate Key Features Across Models: Pure Sine Wave Output: Ensures Compatibility And Safety For Sensitive Electronics. Multipleoutputs: Ac, Dc, And Usb Outputs For Versatile Usage. Lcddisplay: Provides Real-time Status Information (on Applicable Models). Ledlighting: Integrated Led Lights With Multiple Modes For Additional Utility. Independent Switching: Separate Control For Ac And Dc Outputs. Portabledesign: Compact And Lightweight For Easy Transportation And Use In Various Environments. These Portable Power Units Are Designed To Provide Reliable And Flexible Power Solutions For A Range Of Applications, From Small Electronic Devices To Larger Household Appliances. 33465 Set Resistor - Assorted Ranges From 1 Ohms To 1 Mega Ohms, 600pcs/box Description: This Assorted Resistor Kit Offers A Comprehensive Range Of Resistors, Covering Values From 1 Ohm To 1 Mega Ohm, Providing Flexibility For Various Electronic 60 150.00 9,000.00 Projects And Applications. With 600 Pieces Neatly Organized In A Box, It's An Essential Component For Hobbyists, Students, And Professionals Alike. Each Resistor Is Labeled Clearly, Ensuring Easy Identification And Selection During Usage. Key Features: Widerange: Encompasses Resistance Values From 1 Ohm To 1 Mega Ohm, Catering To Diverse Project Requirements. Comprehensiveassortment: Contains 600 Resistors In Total, Providing An Extensive Selection For Various Electronic Applications. 33468 Pcs Soldering Iron Stand Holder Generic High Temperature Resistance Metalmaterial Soldering Iron Stand For 936 Soldering Station 907 Soldering Handle 900m Series Full High-temperature Iron Frame, Superior Quality, Durable And Steady. Solidmetal Chassis Plate Distribution Cleaning Sponge. Soldering Iron Must Be Used. No Soldering Iron Included No Sponge Included Black Color Available Specifications: Type: Telescopic Iron Frame Material:metal Size: 16cm X 7cm X 7.5cm Weight: 223g 20 80.00 1,600.00 33469 Roll Soldering Lead - Quick Melt, 5 Meters/roll High-quality Solder Wire Designed For Precision Soldering In Electronics And Electrical Applications. It Features A 60/40 Tin-lead Alloy With A Rosin Core For Excellent Solderability And Insulation Resistance. The Quick Melt Property Ensures Efficient Soldering, Making It Suitable For Both Advanced Users And Professional Settings. Performancedescription Composition: 60% Tin (sn) And 40% Lead (pb). 20 100.00 2,000.00 Wirediameter: 0.8 Mm. Melting Point: Approximately 210°c (410°f). Spooldimensions: Approx. 55 X 55 Mm (2.17'' X 2.17''). Weight:approximately 250 To 280 G Per Spool Material Composition: 60/40 Tin-lead Alloy With Water-soluble Rosin Core. Key Features High-quality Solder: Ensures Reliable And Strong Solder Joints. Good Solderability: Excellent Flow And Wetting Properties. Non-corrosive:does Not Corrode The Components Or Pcb. Minimal Spattering: Reduces Cleanup And Improves Safety During Soldering. Versatileuse: Suitable For A Wide Range Of Electronics And Electrical Applications, Including Circuit Boards And Electronic Devices. 33470 Can Soldering Rosin Paste - Stainless Steel, 20g/can Specialized Flux And Solder Paste Designed For Soldering Stainless Steel And Nickel Sheets. It Facilitates Strong, Reliable Joints By Promoting Excellent Wetting And Adhesion Properties Essential For These Materials. This Paste Is Particularly Useful In Applications Where Traditional Soldering Techniques Might Not Perform Well Due To The Nature Of Stainless Steel. Performancedescription Weight: 20g. Material Composition: Contains Finely Powdered Solder Alloy And Flux. Suitablemetals: Stainless Steel, Nickel, And Other Hard-to-solder Metals. Melting Point: Varies Depending On The Specific Alloy Composition But Typically Around 220°c To 260°c (428°f To 500°f). Flux Type: Acid-based Flux To Ensure Proper Cleaning And Bonding Of Stainless Steel Surfaces. 20 200.00 4,000.00 Key Features: Idealfor Electronics Repair: A Great Soldering Tool For Smartphone Repairs, Pcbs, Bgas, And Electronic Parts. Mild Ph: Non-corrosive To Ics Or Pcbs, Ensuring No Damage During Soldering. Transparent Residue: Leaves Behind A Residue That Is Transparent, Eliminating The Need For Post-soldering Washing. Highermelting Point: Melts At A Slightly Higher Temperature Than Standard Soldering Tin, Providing Robust And Durable Joints. 33472 Pack Thermal Transfer Paper - A4z Paper, 100pcs/pack Designated As Special A4z Yellow Paper, Is Specifically Designed For Producing Printed Circuit Boards (pcbs). This Paper Facilitates The Transfer Of Printed Circuit Patterns Onto Copper-clad Boards Using A Laser Printer And A Heat Press Method. The Yellow A4z Paper Ensures High Precision And Excellent Adhesion Of The Toner To The Copper Surface, Which Is Essential For Creating Accurate And Reliable Pcb Designs. Sheet Size: A4 Color; Yellow Material Composition: Specially Formulated Cellulosebased Paper With A Heat-activated Adhesive Coating. 15 650.00 9,750.00
Closing Soon17 Jan 2025
Tender AmountPHP 45 (USD 1)
DEPT OF THE ARMY USA Tender
Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Services Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Written Solicitation Will Not Be Issued.
the Solicitation Is Being Issued As A Request For Quote; The Solicitation Number Is W912sv-24-q-0001. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular Fac 2024-02.
the Massachusetts Army National Guard (marng) Has A Requirement To Establish Multiple Blanket Purchase Agreements (bpa) For Yellow Ribbon Event Services. The Yellow Ribbon Reintegration Program Is A Congressionally Mandated Initiative Established Under The National Defense Authorization Act (section 582 Of Public Law 110-183). It Requires Information Events And Activities For All Deploying Units. Various Units In The Deployment Cycle Will Participate In These Events, Which May Be Combined Based On Necessity. It Is Essential That Each Event Is Tailored To Accommodate The Size And Needs Of Both The Deploying Group And Their Families.
a Bpa Is An Agreement, Not A Contract Or Purchase Order. The Bpa Master Agreements Shall Set Forth The Terms And Conditions Prior To An Actual Purchase. The Government Is Not Obligated To Purchase Any Definite Amount Under This Bpa. If A Need Arises, An Authorized Representative Of The Government May Issue An Order Following The Procedures Outlined In The Bpa. If The Bpa Holder Accepts The Order, Then A Binding Contract Between The Government And Bpa Holder Will Exist For That Specific Order.
this Requirement Is Issued Under A Total Small Business Set-aside Using Simplified Acquisition Procedures Iaw Federal Acquisition Regulation (far) Part 13.5 Under Naics Code 722310 Food Service Contractors. The Small Business Size Standard Is $47,000,000. Interested Vendors Must Add The Applicable Naics To Their System For Award Management (sam) Representations And Certifications Prior To Submitting Their Responses.
description Of Requirement:
1. The Contractor Shall Deliver Meals And Food Items As Further Described In Attachment – Performance Work Statement (pws).
2. Additional Terms And Conditions Are Contained In The Following Documents:
a) Blanket Purchase Agreement Terms And Conditions; W912sv24q0001 Yellow Ribbon Master Bpa
b) Attached Provisions And Clauses Incorporated By Reference Or By Full Text Below
3. Contract Line Item Numbers (clin) Will Be Dependent On Individual Calls And/or Orders Issued Under The Resultant Bpa. Delivery Quantities, Locations, And Types Will Vary According To Need And Will Be Determined For Each Order Or Call Placed Under A Master Blanket Purchase Agreement. Clin Format Should Be As Follows:
clin No Item Qty Price
clin 0001 Meeting Space
clin 0002 Av Equipment
clin 0003 Catered Meals
4. The Government Intends To Award Up To Approximately Ten (10) Bpas To Responsible Vendors That Demonstrate A Capability To Provide Event Services Under The Conditions And Safety Requirements As Described In The Pd. The Government Reserves The Right To Award Additional Bpas Beyond The Estimated Number, Or Award No Bpas, From This Combined Synopsis/solicitation As Determined To Be In The Government's Best Interest. Bpas Do Not Obligate Any Funds And Are Not Binding Contracts. The Government Will Be Obligated Only To The Extent That Authorized Bpa Calls Or Orders Are Made Under These Agreements.
5. Bpas Will Be Evaluated Annually And Are Anticipated To Remain In Place For Five (5) Years. The Total Maximum Order Limit For All Master Bpas (combined) Awarded Under This Solicitation Is $865,390.00. Individual Orders Or Calls Will Not Exceed $250,000. The Establishment Of A Bpa Does Not Imply Any Agreement On The Part Of The Government To Place Future Calls Or Orders With The Bpa Holder. The Government Makes No Representation As To The Number Or Dollar Amount Of Orders That May Be Placed.
6. Calls/orders Will Be Competed Among Master Bpa Holders For The Applicable Request For Quotes Via Oral Solicitation Or By E-mail. Failure To Submit A Complete And Timely Response To A Request For Quote (rfq) May Result In It Being Determined Non-responsive.
a) The Government Reserves The Right To Set Aside Any Call/order To Any Specific Socioeconomic Category Of Small Business Bpa Holder(s) (i.e., 8(a), Hubzone, Sdvosb, Or Wosb, Etc. Concerns).
b) The Government Reserves The Right, At The Government's Discretion, To Directly Award A Call Or Issue An Order To Any Bpa Holder That Has Not Yet Received A Call/order Under Their Master Bpa Or Where A Justification Is Made For Exception To Fair Opportunity.
c) The Government Reserves The Right To Not Request Quotes From Any Bpa Holder Due To Lack Of Satisfactory Performance Or A Documented History Of Poor-quality Items On Prior Bpa Orders/calls.
submission Requirements:
1. The Government Will Evaluate All Responses In Accordance With The Submission Requirements And Evaluation Criteria Described Herein. Responses Should Be Prepared Simply And Provide A Concise Description Of Capabilities To Satisfactorily Perform All Requirements. Responses To This Announcement Shall Include:
a) Capability Statement Showing How The Vendor Can Meet All Requirements Of This Solicitation. Including Cage Code, Duns Number, Tin, Business Size And Type (i.e., Small, Small And Disadvantaged, 8(a) Certified, Woman-owned Small, Hub Zone Certified Small, Or Service-disabled Veteran-owned Small Business) For The Applicable Naics Code, And Point Of Contact Information. The Letter Shall Also Include Acknowledgement Of Amendments, If Any, To This Solicitation.
b) Current Price List(s) For Event Space And Prepared Foods That May Be Selected By The Government To Meet The Requirements Of The Pws. Please Note That The Massachusetts National Guard Is Exempt From Tax, Therefore Rates Should Not Include Tax.
c) Quality Control Outline Iaw Pd Section 8(a). Iaw Pd Paragraph 8(a), Responses To This Solicitation Shall Include A Synopsis Of The Quality Control Plan. Plans Must Be In Accordance With The Requirements Defined In The Qasp.
2. The Responses To This Combined Synopsis/solicitation Shall Be Submitted Via E-mail Only. Ensure That The E-mail Is Clearly Marked To Indicate Its Contents, The Solicitation Number, And The Identity Of The Firm Submitting. Responses May Be Submitted In Word Or Pdf Format Only. Do Not Include Links To Websites In Lieu Of Incorporating Information Into Your Response.
3. As Prescribed In Dfars 252.204-7007, Interested Parties Must Be Registered With System For Award Management (sam) Under The Naics 722310. Representations And Certifications Must Also Be On Record. These Registrations Can Be Done Through The System For Award Management (sam) At Https://sam.gov/sam/
solicitation Evaluation Criteria:
contractors Shall Be Evaluated And Selected For A Bpa Master Agreement Based Upon The Following Factors: Price And Past Performance
basis For Agreement: Price Only
the Following Be Added "the Government Will Evaluate The Price List Provided And Will Calculate The Median And Average Price Of Meals. From There The Responsible Vendors Will Be Ranked From Lowest Price To Highest Price And The Lowest 10 Quotes Will Receive A Bpa. If There Are Quotes That Total The Same Price The Government May Award More Than 10 Bpa's As Seen Fit.
bpas Will Be Established With Responsible Vendors That Can Successfully Meet The Submission Requirements Stated Above. The Government Intends To Evaluate Responses And Award Bpas Without Discussions. The Government Reserves The Right To Conduct Discussions If The Contracting Officer Later Determines Them To Be Necessary. Iaw Far 13.106-2(b)(3), Formal Evaluation Plans And Establishing A Competitive Range, Conducting Discussions, And Scoring Quotations Or Offers Are Not Required.
note: The Government Will Not Award To Third Party Entities.
submission Of Responses:
offerors Shall Provide:
a Quote In Accordance With The Clins Contained In Section 3 Above.
past Performance Information Shall Be Limited To One Page Of Comparable Hospitality Or Booking Agent Federal Contracts.
responses Shall Be Submitted Electronically To Melissa Melcher Via Melissa.l.melcher2.civ@army.mil And Lars Bernard Via Jeffrey.l.bernard6.civ@army.mil. All Responses Shall Be Submitted By The Time Indicated On This Notice.
**responses Will Only Be Accepted Electronically Via The E-mail Addresses Provided Above. It Is The Vendors' Responsibility To Confirm That Their Responses Have Been Received.
questions:
questions Regarding This Acquisition May Be Addressed To Melissa Melcher And Lars Bernard At The Above Listed Email Addresses.
questions Must Be Received No Later Than Five (5) Business Days Prior To Date For Receipt Of Responses.
ng Agency Protest Program Is Intended To Encourage Interested Parties To Seek Resolution Of Their Concerns With The National Guard (ng) As An Alternative Dispute Resolution Forum, Rather Than Filing A Protest With The Government Accountability Office (gao) Or Other External Forum.
contract Award Or Performance Is Suspended During The Protest To The Same Extent, And Within The Same Time Periods As If Filed At The Gao. The Ng Protest Decision Goal Is To Resolve Protests Within 35 Calendar Days From Filing. An Agency Protest May Be Filed With Either The Contracting Officer Or The Ng Agency's Protest Decision Authority, But Not Both, In Accordance With Ng Protest Procedures.
to Be Timely, The Protests Must Be Filed With The Periods Specified In Far 33.103. To File A Protest Under The Ng Agency Protest Program, The Protest Must Request Resolution Under That Program And Be Sent To The Address Below:
national Guard Bureau
office Of The Director Of Acquisitions/ Head Of Contracting Activity
attn: Ngb-aq-0
111 S. George Mason Dr.
arlington, Va 22204
email: Ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil
all Other Agency-level Protests Should Be Sent To The Contracting Officer For Resolution At The Address In The Solicitation. See Far Clause 52.233-2.
ng Public-facing, General Protest Information Is Found At:
https://www.nationalguard.mil/leadership/joint-staff/special-staff/director-of-acquisitions/
directorate Of Acquisitions Information For The Contracting Enterprise Is Found At Https://gko.portal.ng.mil/ngb/staff/d01/d01/oi/protests%20and%20complaints/forms/allltems.asp
Closing Soon10 Jan 2025
Tender AmountRefer Documents
EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Tender
Others
United States
Description: 12/31/2024-the Purpose Of This Amendment A0001 Are As Follows: Attach Questions And Answers For Rfq #45310025q0011- Excel Conference; Revision Of Sample Of Lodging Nights (2025 & 2026); And Added Language To The Clin 0005 - Audio/visual (a/v) Requirements (rental) , A/v For Breakout Rooms , "the Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Projector Screen...." See Attachment Sf30_amendment_45310025q0011_a0001_rfq Excel Conference_jdaiisigned
______________________________________
statement Of Work (sow)
examining Conflicts In Employment Laws (excel) Training Conference Fy 2025 & Fy 2026
the U.s. Equal Employment Opportunity Commission (eeoc), Revolving Fund Division, Eeoc Training Institute (hereinafter Referred To As The Institute) Has A Requirement For A Contractor To Provide A Full-service Training Facility To Include Lodging, Meeting And Exhibitor Space, Food And Beverage Service, Audio/visual Equipment, Limited Audio/visual Support Services And Business Center Support To Conduct The Annual Examining Conflicts In Employment Laws (excel) Training Conference (hereinafter Referred To As The Conference). This Annual Conference Provides Training To Federal Agencies And Private Employers On The Laws Enforced By The Eeoc. The Institute Anticipates A Minimum Of 600 Registrants With A Maximum Of 1,000 Registrants, Plus An Additional 100 Attendees Consisting Of Other Staff, Presenters, And Exhibitors Who Provide Support For The Conference.
the Excel Training Conference Will Be Held For Four (4) Days. The Preferred Schedule Is Pre- Conference Registration Will Be Held On Sunday And The Pre-conference Sessions On Monday. Full Conference Registration Will Be Held On Sunday And Monday. Pre-conference Sessions Will Be Held On Monday (day 1) From 8:00am – 5:00pm. The Full Conference Will Be Held From Tuesday (day 2) At 8:00am, Ending On Thursday (day 4) At 5:00pm. The Plenary Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4).
breakout Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4) After The Plenary Sessions Until 5:00pm. Food And Beverage Service Is Required For Continental Breakfast And For A Light Lunch For Three (3) Days, Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). The Institute Also Requires Morning And Afternoon Breaks Each Day (tuesday-thursday), And A Conference Reception On One Day During The Conference (the Exact Date And Time Will Be Determined Later By The Institute). The Institute May Offer Six (6) Pre- Conference And Post-conference Workshops For Up To 300 People Outside Of The Tuesday - Thursday Conference.
requirments For Location And Dates
the Contract Must Be Able To Provide A Facility For The Entire Scope Of The Contract. The Eeoc Will Only Accept Quotations For Following Dates And Locations.
the Preferred Dates And Locations For The 2025 Excel Training Conference In Each Fiscal Year As Follows:
the Preferred Dates And Location For The 2025 Excel Training Conference Are:
location:
atlanta, Georgia
dates:
july 12 - July 17, 2025
august 9 - August 15, 2025
august 16 - August 21, 2025
august 23 - August 28, 2025
august 30 - September 4, 2025
the Preferred Dates And Locations For The 2026 Excel Training Conference Are:
locations:
detroit, Michigan (1st Preference)
minneapolis, Minnesota (2nd Preference)
chicago, Illinois (3rd Preference)
denver, Colorado (4th Preference)
phoenix, Arizona (5th Preference)
san Diego, California (6th Preference)
palm Springs, California (7th Preference)
dates:
june 6 - June 11, 2026
june 13 - June 18, 2026
june 20 - June 25, 2026
june 27 - July 2, 2026
july 11 - July 16, 2026
july 18 - July 23, 2026
august 22 – August 27
august 29 - September 3, 2026
the Pre-conference And Full Conference Will Be Held From 8:00am – 5:00pm. We Will Require The Use Of The Registration Area For The Pre-conference And Assembling Of Materials One Day Prior To The Pre-conference From The Hours Of 8:00am – 5:00pm.
please Indicate Availability For Each Date In The Technical Portion Of The Quotation. No Other Dates Or Combination Of Dates Will Be Considered By The Government.
the Government Contemplates The Award Of A Firm-fixed Price (ffp) Contract.
the Following Requirements For The Training Facility Are Specified In Terms Of Minimum Requirements. The Contractor Must Meet The Following Minimum Requirements:
the Quotation Package Shall Include The Following Line Items In A Written Quotation:
schedule Of Supplies And Services Fy 2025:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $ , Total For Clin 0001 $ .
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ ,
$ , Total For Clin 0002 $ .
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $ .
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ , Per Person Per Day, Total For Clin 0004 $ .
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $ .
total Price For Clins 0001 Through 0005: $ . Fy 2026:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $, Total For Clin 0001 $
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ , Total For Clin 0002 $
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ Per Person Per Day, Total For Clin 0004 $
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $
total Price For Clins 0001 Through 0005: $ .
a Contract Will Be Awarded To The Responsible Quoter Whose Quotation Represents The Best Value To The Government. The Quoter Must Be Registered In The System For Award Management (sam) Database At The Time The Quotation Is Submitted. Registration Is Free And Can Be Completed On-line Http://www.sam.gov. Each Quotation Must Clearly Indicate The Capability Of The Quoter To Meet The Requirements Specified In This Combined Synopsis/solicitation.
conference General Requirements
the Contractor Shall Be A High Quality “full-service” Provider With A Past Performance History That Includes A Minimum Of 3 Years Of Experience As A Primary Contractor With A Professional Staff To Execute The Requirements Specified In This Statement Of Work. All Staff Provided By The Contractor Shall Be Either Direct Employees Of The Contractor Or Employees Of An Approved Subcontractor. The Primary Contractor Shall Have Full Responsibility For The Contractor And Subcontractor Staff And Shall Make Direct Contact With The Contracting Officer’s Representative (cor) To Ensure That All Arrangements Are Mutually Understood Concerning Any Logical And/or Financial Arrangements That May Impact The Eeoc.
the Contractor Shall Provide Meeting Space, Food And Beverage And Lodging To Serve 600 To 1,000 Registrants And To Provide Business Services.
the Contractor Shall Provide Professional Staff To Organize, Coordinate, And Handle Any Last- Minute Requests, As Well As Execute All Logistical Requirements As Specified In This Sow. The Contractor Shall Make Direct Contact With The Host To Ensure That All Arrangements Are Mutually Understood Concerning Arrival Times, Accommodations, Official Functions, Financial Arrangements, And Any Other Special Information That May Impact This Event. The Contractor Or Their Approved Subcontractors Shall Coordinate And Implement All Logistical Arrangements For This Event.
logistical Support May Include, But Is Not Limited To, Coordination Of Meeting Accommodations, Customer Service Or Front Desk Information Service, Conference Rooms, Meal Arrangement/catering, Dedicated Internet, And Audio/visual Equipment.
americans With Disabilities Act (ada) Requirements
all Facilities, Including Restrooms, Recreational Areas, Dining Space, Registration Area, Meeting Space, Hotel Rooms, Exhibitor Space, Office Space, And Audio/visual Equipment Must Meet Ada Requirements For Accessibility. Accommodations For Individuals With Disabilities May Include, But Are Not Limited To Accessible Hotel Rooms, Parking Spaces, Elevators, And Sound Systems, Wide Aisles, And Wheelchair Ramps. Eeoc Will Perform Site Visits Prior To The Award Of The Contract. The Site Visit Will Include An Ada Assessment Of The Property By The Disability Business And Technical Assistance Centers (dbtac) Prior To Award Of The Contract.
clin 0001 – Lodging Requirements
the Contractor Shall Provide A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Working The Event. Space Must Be Available Friday Prior To The Conference Through Friday After The Conference. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. The Contractor Will Be Paid For A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Directly Under This Contract.
the Contractor Shall Provide A Room Block For Up To 2000 Hotel Room Nights For Registrants And Exhibitors. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. These Individuals Will Be Responsible For Direct Payment To The Contractor.
the Institute Will Manage The Hotel Room Block And Will Turn Back Any Unused Rooms To The Contractor, Without Penalty, By A Cutoff Date To Be Determined Upon Award Of The Contract. The Institute Will Provide The Contractor With A List Of Registrants, Exhibitors, Speakers And Eeoc Staff.
the Institute Requires The Contractor To Block Up To 400 Room Nights At Or Below The
federal Government Per Diem Rate For Lodging During The Week Before And After The Conference For Seminar Registrants And Other Conference Personnel. These Individuals Are Responsible For Paying The Contractor Directly For Lodging Costs. All Room Nights Booked By The Institute Or Conference Registrants Will Be Credited To The Conference’s Sole Account.
clin 0002 – Conference Meeting, Exhibitor And Office Space Requirements
all Meeting Space Must Be Set Up In Classroom Style With 6' Tables, No More Than 2 People Per Table, Or Round Tables With No More Than 10 People Per Table, Mints, One (1) Pitcher Of Water And
a Glasses Per Person At The Table Or Set Up Using Classroom Style. A Podium And Two (2) Tables Located In The Front Of The Classroom Are Required For The Presenters. Rooms Must Have Additional Space To Accommodate A/v Equipment.
plenary Room: A Plenary Room That Can Accommodate A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff In Classroom Style Seating Or Can Accommodate Up To 1,000 Registrants And 100 Presenters/staff Using Round Tables That Seat 10 People And 2 To 4 Comfortable Chairs For The Eeoc’s Chair And Keynote Speakers (large/high Back Chairs) Is Required On Tuesday (day 2) From 8:00am To 12:00pm, On Wednesday (day 3), And On Thursday (day 4) From 8:00am To 10:00am. The Plenary Room Must Have Additional Space To Accommodate A Raised Platform That Is Ada Accessible. This Includes A Platform Which Is No More Than 24” High And Is Wheelchair Accessible On At Least One Side. If A Wheelchair Ramp Is Used, The Ramp Must Have Railings On Both Sides And The Rise Over Run Cannot Be More Than 8.3%. The A/v Requirements Will Be Discussed Below.
dining Space (ballroom): A Dining Space Area Within A Separate Ballroom Or Event Space That Can Accommodate Speakers As Well As A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff. Exhibitor Floor Room Are Not Acceptable Unless Approved. The Ballroom Will Be Set Up In Banquet Rounds Of Ten (10) With An Appropriately Sized Riser To Hold A Podium With Podium Microphone. This Space Is Required On Tuesday (day 2) - Thursday (day 4) From 12:00pm To 1:30pm. Please See The Internet And A/v Sections For Additional Specific Requirements. The Plenary Room And Dining Space (ballroom) Functions Cannot Be Held In The Same Room.
breakout Session Rooms: The Breakout Session Rooms Are Required For Monday (day 1), Pre- Conference From 8:00am - 5:00pm Is Six (6) Breakout Rooms As Follows: Four (4) Rooms To Accommodate Up To 100 Registrants, And Two (2) Rooms To Accommodate Up To 75 Registrants. On Tuesday (day 2) From 1:30pm - 5:00pm, On Wednesday (day 3), And On Thursday (day 4) From 10:30am - 5:00pm, The Following Breakout Rooms For The Full Conference Are Required: Two (2) Rooms To Accommodate Up To 300 Registrants; Two (2) Rooms To Accommodate Up To 200 Registrants, And Five (5) Rooms To Accommodate Up To 150 Registrants, And One (1) Room To Accommodate 75 People. The Plenary Session Room Can Also Serve As A Breakout Session Room If Space Is Configured With Air Walls And The Necessary A/v Equipment Is Functional To Accommodate The Full Agenda.
speaker-ready Room
the Speaker Ready Room Will Be Used By Institute Speakers To Prepare For Their Respective Presentations From 8:00am-5:00pm On Monday – Thursday. The Room Should Be Equipped With
2 Small Tables With Chairs, Lounge Chairs, And Comfortable Seating. The Area Should Be Stocked With Coffee, Tea, And Water Pitchers With Glasses. In Addition, The Speaker Ready Room Should Have A Small Refrigerator And Microwave For Use By The Speakers.
exhibitor Space
exhibitors Will Be At The Excel Training Conference. Exhibitor Space For Up To 20 Exhibitors Is Required For Monday – Thursday In A Foyer Area Near The Plenary Session, Registration Area Or Dining Space (ballroom) That Accommodate The Am/pm Break Services. Ten (10) Exhibitor Spaces Shall Be Equipped With Two (2) 6’ Tables, Two (2) Chairs And Ten (10) Exhibitor Spaces Shall Be Equipped With One (1) 6’ Table, Two (2) Chairs. The Contractor Will Furnish Tablecloth And Drape For The Front Of The Tables And A Wastebasket Per Exhibitor. The Exhibitors Will Be Responsible For All Additional Equipment And Booth Requirements And Will Work Directly With The Hotel.
pre-function Room
the Pre-function Room Will Be Used To Assemble Up To Ten (10) Pallets Of Conference Materials And Supplies. This Room Needs To Be Available From 8:00am On The Friday Before The Start Of The Conference Through Friday At 5:00pm The Day After The Conference Ends. The Room Needs To Be Equipped With Carts To Transport Completed Conference Materials To The Registration Areas For The Conference. The Contractor Also Needs To Provide A Secured Office That Can Be Used To Store Laptops, A/v Equipment, And Conference Materials During The Same Time. Only Eeoc Staff Should Have Access To The Secured Office. The Pre-function Room And Secured Office Shall Be Adjoining And Shall Have At Least Eight (8) Tables, Twenty (20) Chairs, Wastebaskets, And Water Pitchers With Glasses.
registration And Office Areas
the Contractor Needs To Provide Two (2) Registration Areas. One Registration Area Must Be Available From Sunday Afternoon 12:00pm – 6:00pm To Accommodate Pre-conference Registration And From Monday 7:30am – Thursday 6:00pm To Accommodate Registrants, And The Other Registration Area Is Needed From Tuesday – Thursday 7:30am – 6:00pm To Register Staff, Presenters And Exhibitors. Each Area Shall Have Six (6) Tables With Four (4) Chairs Per Table.
directional Signage Will Be Provided By The Contractor To The Registration Area.
clin 0003 – Business Center Requirements
the Contractor Must Be Able To Handle Mailing, Copying, And Faxing Limited Course Materials On- Site. The Institute Typically Receives Four (4) Pallets Of Course Materials, 25 To 30 Packages And A/v Equipment, And Sends Out 50 Packages At The Completion Of The Conference. Contractor Must Provide A List Of All Business Center Charges To Include Labor Charges.
clin 0004 – Food And Beverage Requirements
the Contractor Shall Provide A Copy Of The Final Price List As Submitted In Response To The Solicitation Food And Beverages For The Conference As Follows: Continental Breakfast, Light Lunch, Breaks (am And Pm) On Tuesday (day Two), Wednesday (day Three) And Thursday (day Four) And One (1) Evening Reception. Pricing For Food And
beverage Shall Include The Price For The Item, Plus The Gratuity (service Charge), And A Statement From The Contractor Indicating Whether, And Under What Conditions The U.s. Government Is Exempt From State Tax.
tuesday Evening Kick-off Reception: The Food At The Reception Will Consist Of Hors D’oeuvres, Carving Stations, And Finger Foods. The Space Designated For The Reception Must Accommodate Approximately 800 People With Social Seating Available Throughout The Area And The Duration Of The Reception Will Be Approximately 1 Hour, From 5:30pm - 6:30pm. A Cash Bar Will Be Available For All Drinks.
continental Breakfast Is Served For 1 Hour From 7:00am - 8:00am Tuesday Through Thursday. The Contractor Must Provide Table Rounds To Accommodate Up To 1,000 People On Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). A Typical Continental Breakfast Shall Consist Of Juice, Fruit, Yogurt, Assorted Breakfast Pastries, Protein, Bagels, Or Croissants, Regular And Decaffeinated Coffee, Tea Bags And Hot Water For Tea, Iced Tea, And Large Containers Of Water.
lunch Is Served For 1½ Hours From 12:00pm – 1:30pm. The Contractor Must Provide Table Rounds For Ten (10) And Accommodate 1,000 People. The Dining Space Can Be Used For Breakout Room And/or Meeting Space. A Light Lunch Is Provided On Tuesday (day 2), Wednesday (day 3) And Thursday (day 4). This Can Be Plated, Buffet Or Salad Bar Type Lunch Which Provides A Protein- Based Entrée, A Fruit Or Vegetable, Dessert, Lemonade And Iced Tea. The Entrée Must Not Include Pork, Beef Or Shellfish.
30-minute Am And Pm Breaks Is Required For A Maximum Of 1,000 People. The Am Break Menu Shall Consist Of The Following Beverages (regular And Decaf Coffee, Hot And Iced Tea, And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Pm Break Menu Shall Consist Of The Following Beverages And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Am And Pm Breaks Are Scheduled For 30 Minutes Each, Tuesday (day 2) - Thursday (day 4).
the Institute Will Pay The Contractor For Meals, Breaks, And Reception Based On The Actual Number Of Meals Served.
clin 0005 – Audio/visual (a/v) Requirements (rental)
a/v For Plenary Sessions: The Contractor Shall Provide The Following Items To Support The Plenary Session: Lcd Projectors, Projection Screens, Scan Converters, Video Cameras, A/v Mixers, A/v Drops, Vcr -1, Vgada And Voa Splitter, Cables To Run Two Projectors And Laptops Provided By The Institute, Projection Carts, Pipe And Drape, Stage Wash, Lighting, Podium With Wired Microphones, Wired Table Microphones W/stands, Wireless Floor Microphones W/stands. The Institute Requires Internet Access In Plenary Sessions And All Breakout Sessions. The Contractor Must Provide Internet Service In The Plenary Room. The Contractor Must Setup, Breakdown And Provide Technical Support Of The A/v Equipment During The Plenary Sessions.
a/v For Breakout Rooms: The Institute Will Provide All Laptops And In-focus Projectors Used In The Breakout Rooms. The Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Flip Chart/ Paper And Markers, Gender Adapters, Electronic Signage Or Tripods Outside Breakout Sessions, And Projection Cart With A/v Connection. The Institute Requires Internet Access Throughout The Entire Breakout Rooms. The Contractor Must
provide Projected Cost For The Internet Service In The Breakout Rooms.
registration Area: The Institute Requires An Internet Connection Which Will Be Used With A Hub Throughout The Conference To Include Registration, A/v Connection, And Phone For Local Calls Within The Conference Space. In Addition, The Institute Requires A Multifunction-colored Printer To Be Used Through The Conference To Include Registration.
common Registration Area: The Institute Requires An Internet Connection Near Registration To Be Used With A Hub For The Completion Of Conference Evaluations. This Will Be Set Up To Support At Least (6) To (8) Laptops Which Will Be Provided By The Institute.
reporting Requirements
pre-conference Reporting: The Contractor Will Provide The Institute’s Contracting Officer’s Representative (cor) With An Electronic List Of All Hotel Confirmation Numbers For All Participants, Staff And Presenters On A Weekly Basis Starting Eight (8) Weeks Prior To The Conference. The Institute Cor Will Manage The Conference Room Block Up To 15 Calendar Days Prior To The Conference. From Fourteen (14) Calendar Days Before The Conference Through The Duration Of The Conference, The Contractor Will Manage The Conference Room Block.
during The Conference Requirements
a Pre-conference Meeting Will Be Conducted With The Contractor And Key Institute Staff Within Five (5) Business Days Prior To The Conference.
daily Event Meeting Will Be Conducted With The Contractor And Key Institute Staff Daily As Agreed.
signature Authority: All On-site Charges Must Be Approved And Signed Only By The Institute’s Cor And/or The Eeoc Contracting Officer.
daily Reconciliation: The Contractor Shall Provide A Daily Reconciliation List To The Institute Cor By 9:00am The Following Business Day After The Charges Are Incurred. These Charges Include Lodging Paid By Eeoc, Food And Beverage, A/v Equipment And Labor, And Business Center.
post-conference: The Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After The Completion Of The Conference. A Detailed Report Should Be Submitted With The Invoice And Should Consist Of A Detailed Banquet/event Order (beo) Form. The Beo Must Provide The Following Information: Room Usage By Date; Detailed Lodging Charges For All Registrants, Staff And Presenters For The Conference; Detailed Breakdown, By Day, For All Food And Beverage Charges; A Detailed Breakdown By Day And Room Number, For All A/v Equipment Rental Charges And A/v Support Charges; All Business Center Cost; And All Miscellaneous Costs To Include But Not Limited To Internet Connections, Re-keying Charges, Electrical Hook-ups, Etc.
general Requirements
transportation: The Contractor Shall Provide A Price List Of All Local Transportation Options To And From The Airport And Rail Station, If Applicable. The Contractor Shall Indicate In Its Quotation Whether It Provides Free Or Low-cost Shuttle Services. The Contractor Shall List All Facility Parking Discounts And Cost Options. The Contractor Shall Provide A List Of All Local Restaurants Located Within A Ten (10) Minute Walk From The Contractor’s Facility.
security: The Contractor Should Identify If They Have Paid Security Within The Facility And Provide A List Of Additional Security Measures Taken By The Contractor To Provide For The Safety Of Conference Registrants, Staff, Presenters And Equipment.
list Of Deliverables
logistical Support Plan: Within Seven (7) Business Days Of The Contract Award, The Contractor Shall Comprise A Detailed Logistical Support Plan For Provision Of All Required Support. The Plan Will Include A Proposed Budget And Detailed Schedule As Applicable. The Eeoc Shall Review The Logistical Support Plan And Provide Acceptance And/or Comments To The Contractor. The Contractor Shall Be Available To Eeoc For Weekly Status Reports To Facilitate The Coordination Of Evolving Operational And Logistical Issues Regarding The Tasks Outlined In The Sow.
account Reconciliation: Eeoc Requests That The Hotel Bill Be Prepared In A Logical And Chronological Sequence And That Backup Data Accompany The Bill. The Contractor Shall Complete Its Accounting Of The Conference Within Five (5) Days Of The Conclusion Of The Conference.
invoicing: The Contractor Shall Invoice The Eeoc At The Agreed Upon Rates For Lodging, Conference Space, Rental Of Audio/visual Equipment And Technical Support, Food And Beverage Service, And Business Center Services. Charges For Food And Beverage Service Shall Be Reflected On The Invoice As The Cost Incurred Per Person.
the Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After Completion Of The Conference To The Cor And The Cor Shall Be Provided At Least Five Business Days To Review The Invoice Charges And Services Provided For Acceptance.
contract Administration
contracting Officer’s Representative (cor) – Tbd Method Of Payment
pursuant To Far Clause 52.232-33 Entitled, “payment By Electronic Funds Transfer – System For Award Management (oct 2018)”, The Government Intends To Make A Payment Via Electronic Funds Transfer Using Information Provided In The System For Award Management (sam) Database.
cancellation
should Eeoc Elect To Cancel This Contract, Eeoc Will Provide A Written Notification To The
contractor No Later Than Sixty (60) Calendar Days Prior To The Scheduled Event. By Receipt Of This Cancellation Notice, The Contractor Agrees To Release Eeoc From Any Cancellation Penalties Or Charges. If There Is A Cancellation Within Sixty (60) Calendar Days Of The Scheduled Event Date, Paragraph (l) Termination For The Government’s Convenience Or (m) Termination For Cause Of Far Clause 52.212-4, Contract Terms And Conditions – Commercial Products And Commercial Services Will Govern.
submission Of Quotation: All Interested Parties Shall Submit With Their Quotation A Detailed Breakdown Of All Costs To Include Conference Space, Rental Of Audiovisual Equipment And Technical Support, Food And Beverage Service, Business Services, And Any Other Miscellaneous Services And Equipment Which Are Necessary For The Success Of The Conference.
quotations Shall Be Submitted In Three (3) Separate Volumes As Follows: Volume 1 - Technical Capability; Volume 2 - Past Performance; And Volume 3 - Price. Pricing Must Be Submitted Using The Line-item Structure In The Above Schedule Of Supplies And Services Of This Rfq. A Separate Attachment May Be Included In Volume 3 For Pricing Information On Menu Items, Transportation, Parking, Applicable Tax Rates, And Sleeping Room Rates. Your Quotation In Response To Solicitation Number 45310025q0011 Is Due January 15, 2025, At 10:00 A.m. Et (washington, D.c. Local Time). Quotations Will Be Accepted Via E-mail. One (1) Electronic Copy Of The Quotation May Be Submitted Via E-mail, Addressed To John.adams@eeoc.gov And R.rashelle.anderson@eeoc.gov.
questions: Questions Regarding This Request For Quotation Should Be Submitted To John Adams, Contract Specialist Via E-mail At John.adams@eeoc.gov And Gov Contracting Officer At R.rashelle.anderson@eeoc.gov Telephone Inquiries Or Responses Are Not Acceptable. The Deadline For Submission Of Questions Regarding Solicitation Number 45310025q0011 Is Due December 20, 2024, 10:00 A.m. Et (washington, D.c. Local Time). Any Questions Received After The Above- Mentioned Date And Time Will Not Be Considered. The Government Will Not Reimburse Interested Parties For Any Cost Associated With Responding To This Business Opportunity. All Responsible Sources May Submit A Quotation Which Shall Be Considered By The Agency. The Anticipated Contract Award Date Is On Or Before March 18, 2025.
basis For Award: The Government Intends To Award A Firm Fixed-price Contract To The Responsible Quoter Whose Quotation Is Responsive To The Solicitation And Is Determined To Be The Best Value To The Government, Using The Tradeoff Approach. Selection Of The Best Value To The Government Will Be Achieved Through A Process Of Evaluating The Strengths And Weaknesses Of Each Quoter’s Quotation Against The Below Described Evaluation Criteria. In Determining The Best Value To The Government, The Technical Capability And Past Performance Evaluation Criteria, When Combined, Are More Important Than The Evaluated Price. The Government Is More Concerned About Obtaining A Superior Technical Capability Quotation Than Making An Award At The Lowest Evaluated Price. However, The Government Will Not Make An Award At A Price Premium It Considers Disproportionate To The Benefits Associated With The Evaluated Superiority Of One Technical And Management Quotation Over Another. Thus, To The Extent That Quoter’s Technical And Past Performance Quotations Are Evaluated As Close Or Similar In Merit, The Evaluated Price Is More Likely To Be A Determining Factor.
evaluation Factors For Award: The Following Factors Shall Be Used To Evaluate Quotations. These Factors Are Listed In Their Relative Order Of Importance: Technical Capability, Past Performance, And Price.
factor I – Technical Capability:
contract Requirements: Quotations Will Be Evaluated On The Quoter’s Ability To Provide All The Contract Requirements Relating To Lodging, Meeting Space, Food And Beverage, Av Support And Equipment, Business Center, And Comply With The Reporting Requirements. Quotations Must Address The Quoter’s Ability To Comply With The Americans With Disability Act (ada) As It Relates To Lodging And Meeting Space. Quotations Will Be Evaluated On The Quality Of The Customer Services Provided And The Quality Of The Facilities Reflected In Maintenance And Upkeep Of The Facilities.
location: Quotations Will Be Evaluated On The Ability Of Quoter To Provide A Centrally Located Facility With Inexpensive Transportation Options To And From The Airport. Additionally, Restaurants Must Be Within A Short Walking Distance Of (ten (10) Minutes Or Less) Of The Proposed Facility.
quotations Must Address Safety And Security Issues Both Within The Hotel Complex And The Surrounding Area.
availability Of Dates: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Services On The Dates Requested. Additional Consideration Will Be Given To Quotations Which Demonstrate Availability Of Facilities On The Preferred Dates In Order Of Preference (i.e., 1st Choice Date, 2nd Choice Date, 3rd Choice Date, Etc.)
factor Ii – Past Performance:
the Quoter Must Provide References For A Minimum Of Three (3) Government Or Non-government Contracts Which Provide The Same Or Similar Services; Contracts Must Have Been Awarded Within The Past (3) Years. The Information For Each Reference Shall Include The Following:
name And Address Of Government Agency And Other Non-government Client;
name, Title, Email And Telephone Number Of Contracting Officer Or Other Point Of Contact;
name, Title, Email, And Telephone Number Of Client’s Program Manager, If Applicable;
contract Number, Period Of Performance, And Total Dollar Value Of Contract; And
description Of Services Provided.
list Any Problems Encountered On Each Contract And The Quoter’s Corrective Actions. Eeoc Will Evaluate Past Performance Based On Timeliness, Customer Service And Corrective Actions Taken (if Necessary).
a Quoter Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Will Not Be Evaluated Favorably Or Unfavorably On Past Performance.
factor Iii – Price:
the Price Quotation Will Be Evaluated Against The Independent Government Price Estimate. Evaluations Of Quotations Will Consider The Following Pricing Information: Pricing Provided For All Line Items Listed In The Schedule Of Supplies And Services Of This Rfq In The Units And Format Provided.
site Visits: The Eeoc Will Conduct A Site Visit Of All Quoters Who Are Rated To Be Technically Acceptable. The Site Visit Will Review And Evaluate The Same Technical Items Identified In The Technical Capabilities Portion Of The Technical Evaluation Factor.
supplemental Agreements
if Any Hotel Submitting A Quotation Has Any Supplemental Agreements, Those Agreements Must Be Submitted With Their Quotation. If The Hotel Requires Signature Of A Supplemental Agreement That Was Not Submitted With The Quotation, The Quotation Will Be Rejected.
notice: The Government Intends To Evaluate Quotations And Make Award Without Discussions (except Clarifications As Described In Far 15.306(a)). Therefore, The Quoter’s Initial Quote Should Contain The Vendor’s Best Terms From A Price And Technical Standpoint. The Government Reserves The Right To Conduct Discussions If The Contracting Officer Later Determines Them To Be Necessary.
period Of Performance
the Base Period Is From The Date Of The Award Through The Execution Of The Fy 2025 Excel Training Conference.
the Eeoc Is An Agency Of The U.s. Government. Contracts With The Eeoc Are Governed By The Federal Acquisition Regulation (far). To The Extent That Any Provision Of This Agreement Conflicts With The Far, The Far Must Control.
applicable Provisions And Clauses: The Provisions At 52.212-1, Instructions To Offerors - Commercial Products And Commercial Services Applies To This Acquisition. The Vendor Shall Include A Completed Copy Of The Provisions At 52.212-3, Offeror Representations And Certifications - Commercial Products And Commercial Services, With Your Quote.
the Contracting Officer Has Determined That Paragraph 52.212-3(k)(2) Which Pertains To Exemption From The Application Of The Service Contract Labor Standards Applies. The Clause 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services And Clause And 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Order-commercial Products And Commercial Services Are Incorporated By Reference.
clause 52.203-6 Restrictions On Subcontractor Sales To The Government Alternate I, Clause 52.203-17 Contractor Employee Whistleblower Rights
clause 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements, Clause 52.204-10 Reporting Executive Compensation And First –tier Subcontract Awards, Clause 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities,
clause 52.204-12 Unique Entity Identifier Maintenance
clause 52.204-13 System For Award Management Maintenance
clause 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment,
clause 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment,
clause 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations,
clause 52.217-9 Option To Extend The Term Of The Contract, (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days Prior To The Contract Expiration Date, Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 60 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause. (c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 36 Months.
(end Of Clause)
clause 52.222-3 Convict Labor,
clause 52.222-19 Child Labor – Cooperation With Authorities And Remedies, Clause 52.222-21, Prohibition Of Segregated Facilities
clause 52.222-26, Equal Opportunity,
clause 52.222-35 Equal Opportunity For Veterans,
clause 52.222-36 Equal Opportunity For Workers With Disabilities, Clause 52.222-37 Employment Reports On Veterans,
clause 52.222-40 Notification Of Employee Rights Under The National Labor Relations Acts,
clause 52.222-41 Service Contact Labor Standards, Clause 52.222-50 Combating Trafficking In Persons,
clause 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving,
clause 52.225-13 Restrictions On Certain Foreign Purchases, Clause 52.232-1 Payments
clause 52.232-33, Payment By Electronic Funds Transfer – System For Award Management Clause 52.232-40, Providing Accelerated Payments To Small Business Subcontractors, Clause 52.233-3 Protest After Award,
clause 52.233-4 Applicable Law For Breach Of Contract Claim, And
clause 52.222-53 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements.
to Obtain The Above Provision/clauses In Full Text, Please Visit Https://www.acquisition.gov/far
see Attachment- Custom Clause For Electronic Invoicing
Closing Soon15 Jan 2025
Tender AmountRefer Documents
Board Of Investments Makati City Metro Manila Tender
Software and IT Solutions
Philippines
Details: Description 1. About The Procuring Entity The Board Of Investments (boi) Is An Attached Agency Of The Department Of Trade And Industry (dti) That Is The National Government Entity Responsible For The Promotion Of Investments For Both Foreign And Domestic, In Accordance With Executive Order No. 226, Also Known As The Omnibus Investments Code Of 1987, And The Recently Approved R.a. 11534 Or The Create Law. The Boi Seeks To Attract Quality Investments That Will Encourage Technological Innovations And Provide Support For Industries To Seize The Opportunities And Challenges Of Global Competition And Demands. The Agency Envisions Itself As A Global Industry Promotion Agency By 2022 Guided By The Core Values Of Integrity, Excellence, Teamwork And Passion For Knowledge. Its Mission Is To Provide Investors With Opportunities For Investments, Comprehensive Business Support Services And Fair Predictable And Consistent Industry Policies. The Current State Of The Economy Due To The On-going Pandemic Makes It More Imperative For Boi To Continuously Aim For Work Excellence, As It Is An Agency, Which Is At The Forefront Of Enticing Investments Into The Country. 2. Project Overview/objectives In Order To Effectively Fulfill The Mandate And Facilitate The Delivery Of Boi’s Core And Support Functions, A 24/7 Maintenance Operations Of The Boi Server Room At The 5th Floor That Hosts Various Application Servers And Other Communication And Network Equipment Is Needed. The Boi Server Room Caters To The Boi Local Area Network (lan). To Upgrade And Have An Existing Boi Server Room With A Fully Functional Data Center, The Boi Is Requesting To Transfer Or Create A Data Center At The Fourth Floor (4/f) Of Industry And Investments Building, 385 Sen. Gil J. Puyat Ave, Makati City. This Is To Ensure Compliance With Industry Standards For It Infrastructure And Data Protection. It Will Also Serve As The Host Of Voice, Video, And Data Requirements Of Boi. Generally, The Data Center Will Include The Following Infrastructure Components: Electrical And Civil Works Component • Site Preparation (civil, Mechanical, And Electrical Works) • Supply And Installation Of New Data Center Build-ups Such As New Static Flooring, Drywall, It Monitoring Room, Electrical Power And Lighting, Temperature, Humidity Monitoring Solution, Acoustic Ceiling, And Drip Pan For Potential Water Leak. • Provisioning Of A Monitoring Room Inside The Proposed Data Center • Installation Of New Server Rack Cabinets Complete With Their Accessories. • Transferring Of Existing Servers, Ups, And Other Data Center Components From The 5th Floor To The New Data Center, Including Mounting, Harnessing, Terminating, And End-to-end Tagging. • Transfer And Installation Of Electrical Works Of Existing 2x 20kva Ups Including Panel Boards And Electrical Wires For Its Distribution • Supply And Installation Of Electrical Works For Precision Air Conditioning Unit (pacu) • Supply And Installation Of A Stand-alone Door Access System Including Biometric Device, And Door Lock Accessories For Physical Security Of A New Data Center. • Supply And Installation Of A New 50kva Powered Diesel Generator Set Including An Isolated Dry Type Of Step-up Transformer • Supply And Installation Of New Automatic Transfer Switch (ats) And Other Components • Supply And Installation Of Temperature, Humidity Control System, And Water Leak Detection System • Supply And Installation Of Communication Grounding And Bonding System. • Supply And Installation Of Roughing-in Materials • Submission Of Test Results, As-built Plan, And Documentation • Cleaning And Retouching Of All Affected Areas Including Necessary Rectifications Network Component • Supply, Installation, And Configuration Of Core Switches • Supply, Installation, And Configuration Of Server Farm Switches • Supply, Installation, And Configuration Of Access Switches • Supply, Installation, And Configuration Of Wireless Access Points • Structured Cabling (horizontal And Vertical) • Provisioning Of Intermediate Distribution Frames (idfs) Cabinets And Other Network Components (2nd, 3rd, 4th Floors) • Supply, Installation, And Configuration Of Servers And Server Rack And Accessories • Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables • Documentation O Cabling Plan For Structured Cabling And Data Center O Final Cabling Plan As-built Plan With Line Diagram O Final Network/structured Cabling Diagram O Network Vlan Configuration O Softcopy And Hardcopy Of Core, Server Farm, Access Switch, Wlc Running Configuration • Certification Training On Installed Network Switches, Aps, And Other Components. Objectives Of The Project: • To Protect And Secure The Agency's Existing Ict Investments (firewalls, Routers Switches, Servers, Etc.); • To Ensure A Dependable, Secured, And Efficient Ict Support Services (internet, Intranet, Database And Printer Sharing, Etc.); And • To Create An Industry-standard Datacenter For Effective Management Of Network Resources. 3. Deliverables No Particulars Qty Unit 1 Datacenter Civil And Architectural Works 1 Lot 2 Electrical Works, Segregated Power Source Dedicated To Data Center Equipment’s, And Idf Deployed At 1st Floor, 3rd Floor, And 5th Floor 1 Lot 3 Transfer 2x 20kva Ups And Other It Components From The Old Data Center To The New Data Center (servers, Isp, Etc.) 1 Lot 4 Generator Set, 50kva 1 Unit 5 Automatic Transfer System (ats) 1 Unit 6 Precision Air-conditioning Units 2 Units 7 Data Rack 42u (mdf) 2 Units 8 Data Rack 24u (idf) 3 Units 9 Temperature And Humidity Monitoring System 1 Lot 10 Water Leak Detection System 1 Lot 11 Datacenter Access Control System (biometrics, Magnetic Door Lock, Etc.) 1 Lot 12 Structured Cabling 1 Lot 13 Fiber Optic Backbone 1 Lot 14 Core Switch 2 Units 15 Server Farm Switch 2 Units 16 Access Switch 4 Units 17 Access Points 63 Units 18 Transceivers (for Inter-network Link Of Devices) 32 Units 19 End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables 1 Lot 20 Softcopy And Hardcopy (hardbound) Documentation (as-built, Test Plan, Ip Address Assignment, Vlan Assignment, User’s Manual, Administrators Manual, Etc.) 1 Lot 4. Technical Requirements 4.1 The Bidder Shall Comply With The Following Minimum Specifications For The Physical Data Center And Network Components Of The Project: Item Description Bidder’s Statement Of Compliance Item No 1 Site Preparation (civil, Mechanical, And Electrical Works) • Electrical Wirings With Grounding • Service Entrances For Utilities • Ceiling Installation • Installation Of Industry-grade Data Center Main Door • Installation Of Datacenter Cooling System Item No 2 Laying Of New Electrical Power Lines Distributions/ups Transfer • Provision Of Main Distribution Panel Board (mdp) Main 125a/3p/400vac • Provisioning, Installation, And Configuration Of Dedicated Ats • Provisioning, Installation, And Configuration Of Dedicated Generator Set (at Least 50kva, 129 Amp, Three Phase Dual Voltage, 220-240v Output, At Least 60hz Frequency) • Excavation/backfilling From The Building To The Powerhouse For The Encasement Of The Feeder Line For Power, Ats, And Genset • Transfer And Re-termination Of Electrical Requirements For 2 Units 20kva Ups • Transfer Of Other It Assets From The Old Data Center To The New Data Center • Provisioning Of Electrical Distribution From Data Center Power To Mdfs Located Per Floor • Lighting Fixtures For Datacenter • Testing Of Electrical Equipment Item No 3 Tracing, Tagging, Relocation, And Transfer Of Boi Fas-itd It Equipment (servers, Switches, Routers, Etc.) From 5th Floor To 4th Floor • Tracing Of Backbone To Core Switch Connection • Tracing Of Connection Between Devices Inside The Datacenter • Tagging Of Copper And Fiber Optics Wire Inside The Datacenter • Cable Management • Vertical And Horizontal Cabling From Datacenter To Mdfs And Mdfs To End-nodes Item No 4 Provisioning Of Two (2) 42u Regular Server Racks • 42u With Roof, Side Panel, Castors, Feet, And Brackets • Adjustable Shelf • Vertical Cable Manager • At Least 1 Rack Mountable Kvm (keyboard, Video, Monitor) • Power Rail/strip Options Item No 5 Provisioning Of Three (3) 24u Server Racks To Be Deployed At Mdfs • 24u With Roof, Side Panel, Castors, Feet, And Brackets • Heavy-duty Steel Construction • Door Locks • Anti-tamper Sensors • Network Management Card, Remote Monitoring Capabilities, Snmp Support • With Power Distribution Units (pdu), And Ups Compatibility • Cable Manager Item No 6 Physical Security (door Access, Biometrics, Temperature Monitoring) • Provisioning Of A Solid Door And Tempered Glass Around The Proposed Data Center (1/2, Frameless Door) • Door Access Control Should Conform To Iso-27001 Standards • Magnetic Lock • Biometrics Based Access Control • Access Logs Should Be Maintained For A Minimum Of One Year Or Longer As Specified By The Site Security Policy. • Secured Doors Must Fail Open In A Fire Emergency. Item No 7 Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • Tracing And Tagging Of Backbone Connection From Mdf To Idf • Looping Of Excess Fiber Cable • Re-termination Of Fiber Cable If Necessary Item No 8 Monitoring Room Inside The Proposed Data Center • Provisioning Of Additional Room Inside The Data Center To Serve As A Monitoring Room Item No 9 Anti-static Flooring • Not Generate Static • Groundable After Installation • Have Permanent Static-resistant Properties That Can Provide Protection Amidst Changing Temperatures, Humidity Levels, And Foot Traffic Item No 10 Precision Air Conditioning Unit (pacu) - 2 Units • Shall Have A Nominal Capacity Of Up To Ten (10) Kw • Shall Be Free Blow Type With Plenum And Directional Air Flow Louver Grille • Panels Shall Have A Solid And Rigid Double Skin Insulated • Shall Have A Minimum Net Sensible Capacity Of Ten (10) Kw • Shall Have A Minimum Net Total Capacity Of Eleven (11) Kw • Shall Have A Built-in Touch Screen Display That Provides Informative And User-friendly Interface For Easy Navigation • Shall Have A Built-in Auto Sequencing (1unit Operational And 1unit Back-up, Every 3 Days Sequence Of Operation) • Shall Be Single Circuit Dx Type, Freon R410a • Shall Have Electronic Expansion Valve • Shall Be 380vac,3ph, 6ohz • Shall Recommend Placement Of Air Conditioner Units And Limitations To Be Observed Item No 11 Temperature And Humidity Sensor, And Water Leak Detection System • Base Unit: Sensor Gateway For Up To 4 External Probes • Poe Switch 8 Ports • Sensor Hub • Temperature And Humidity Sensor • Water Leak Sensor Probe • Extension Cable For Water & Flooding Sensor Item No 12 General Requirements Mobilization And Demobilization Labor, Installation, Engineering, And Project Supervision Testing And Commissioning As-built Plans And Documentation (inclusive Of Signed And Sealed) 4.2 Supply, Delivery, Installation, Configuration, And Commissioning Of Network Equipment. Qty Specifications Bidder’s Statement Of Compliance 2 Layer 3 Data Switch To Act As Enterprise Core Layer Switch Features 1. High Performance And Throughput • High Port Density (24-48 Ports) • At Least 960 Gbps Switching Capacity • High Forwarding Rate • Line-rate Packet Processing With Minimal Latency • Non-blocking Architecture With Wire-speed Performance Across All Ports 2. Advanced Switching Capabilities • Layer 2 And Layer 3 Switching Capabilities • Support For Multiple Switching Fabrics • Advanced Qos (quality Of Service) Mechanisms • Support For Vlan Segmentation And Routing 5 High Redundancy And Reliability • Dual Power Supplies • Hot-swappable Components • Redundant Supervisor Engines • Support For Virtual Chassis Technologies • Comprehensive Fault Tolerance Mechanisms 6 Security Characteristics • Advanced Access Control Lists (acls) • Port Security Features • Dhcp Snooping • Dynamic Arp Inspection • Ieee 802.1x Authentication • Integrated Threat Management 7 Routing Protocol Support • Bgp • Ospf • Is-is • Mpls • Multi-protocol Routing Capabilities 8 Management And Monitoring • Snmp Support • Comprehensive Network Monitoring Tools • Remote Management Interfaces • Detailed Logging And Diagnostic Capabilities • Advanced Technological Support 9 Hardware-based Packet Forwarding • Support For Software-defined Networking (sdn) • Ipv6 Compatibility • Mpls And Vpn Support 10 Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 2 Layer 3 Data Switch To Act As Server Farm Switch Features: 1. High-performance Specifications • High Port Density (24-48 Ports) • Wire-speed Performance • Low Latency Switching • Gigabit Ethernet Support • At Least 960 Gbps Switching Capacity 2. Advanced Connectivity Features • Support For Multiple Interface Types • Layer 2/layer 3 Capabilities • Fabric Connection Technologies • Vm-aware Networking 3. Redundancy And Reliability • Hot-swappable Components • Dual Power Supplies • Redundant Supervisor Engines • Non-stop Forwarding (nsf) • Stateful Failover Capabilities 4. Performance Security Features • Hardware-based Acls • Port Security • Advanced Threat Protection • Ieee 802.1x Authentication • Micro-segmentation Support 5. Management Capabilities • Advanced Monitoring Tools • Snmp Support • Comprehensive Logging • Remote Management Interfaces • Network Telemetry 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 4 Layer 3 Data Switch To Act As Access Layer Switch 1. Port Density And Connectivity • Minimum Of 48 Ports • Support For 1g/10g Interfaces • Rj45 And Sfp/sfp+ Port Options • High-density Connectivity • Poe/poe+ Support (up To 30/60 Watts) 2. Performance Characteristics • Low Latency Switching • Wire-speed Performance • Minimum 80-160 Gbps Switching Capacity • Packet Forwarding Rate: 100-240 Mpps 3. Advanced Switching Capabilities • Layer 2/layer 3 Functionality • Vlan Segmentation • Spanning Tree Protocol (stp/rstp) • Link Aggregation (lacp) • Quality Of Service (qos) Support 4. Security Features • Port Security • 802.1x Authentication • Dynamic Arp Inspection • Dhcp Snooping • Mac Address Filtering • Private Vlans • Storm Control 5. Management Capabilities • Snmp Support • Cli Access • Web-based Management • Remote Monitoring • Syslog Integration • Fast Convergence Protocols • Redundant Power Supplies 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 63 Wireless Access Points 1. Performance Characteristics • Dual-band (2.4 Ghz And 5 Ghz) • Wi-fi 6 (802.11ax) Support • Maximum Theoretical Throughput: 5.4 Gbps • Concurrent Dual-band Operation 2. Coverage And Capacity • Recommended Coverage: 150-200 Users Per Ap • Indoor Enterprise-grade Performance • Suitable For Open Offices, Conference Rooms, And Collaborative Spaces 3. Technical Specifications • 4x4:4 Mu-mimo Technology • Beamforming Support • Maximum Concurrent Clients: 512 • Transmit Power: Up To 25 Dbm 4. Advanced Features • Ai-driven Wireless Optimization • Automated Channel And Power Management • Location Services • Cloud-managed Platform 5. Security Capabilities • Wpa3 Support • 802.1x Authentication • Rogue Ap Detection • Integrated Security Fabric • Advanced Threat Protection 6. Artificial Intelligence • The Wireless Solution Must Include Virtual Network Assistant That Supports Natural Language Processing (nlp) Capabilities For Daily Operation. • Api Integration With Generic Ai Such As Google, Alexa And Siri Is Not Considered As Virtual Network Assistant Feature. • The Virtual Network Assistant Must Provide A Conversational Interactive Interface. • The Virtual Network Assistant Must Provide A Single-page Event And Data Correlation View To Eliminate The Need To Pull Up Multiple Dashboards Or Memorize Cli Commands. The Virtual Network Assistant Must Support Multi-vendor Switch Insights: • Switch-ap Affinity To Show How Many Aps Are Connected To A Switch, Reducing Impact Outages • Poe Compliance To Help Manage And Balance The Power Draw Of Connected Devices • Inactive Or Missing Wired Vlans That Are Misconfigured On Switch Ports Where Aps Are Connected But Clients Are Getting Blocked • Version Compliance For Switches Running Dissimilar Hardware • Switch Uptime To Monitor When Switches Are Online Or Offline • The Virtual Network Assistant Must Be Able To Provide Corrective Action Suggestions To Resolve Failures. • The Virtual Network Assistant Must Support Proactive Rma For Unhealthy Access Points. • The Virtual Network Assistant Must Support External Event Triggers Such As Automatic Creation Of A Ticket To External Support Systems With Email Alerts And Webhooks 1 Web-based Controller And Cloud Platform Management 1. Management Capabilities • Identity And Access Management • Centralized Cloud-based Management • Single-pane-of-glass Dashboard • Automatic Firmware Updates • Zero-touch Provisioning • Global Configuration Management 2. Ai-powered Analytics • Proactive Client Experience Monitoring • Automated Troubleshooting • Machine Learning-based Insights • Performance Prediction • Anomaly Detection 3. Security Features • Integrated Security Management • Automatic Threat Detection • Rogue Ap Identification • Compliance Reporting • Role-based Access Control 4. Key Functionalities • Network Configuration • Client Location Services • Performance Analytics • Detailed Reporting And Visualization 5. Access Methods • Web Browser Interface • Mobile Application • Continuous Monitoring And Optimization 1 Lot Structured Cabling • Cat6 Utp Cable • Information Outlet • Faceplate • Patch Panel 5. Scope Of Work Bidders Shall Comply With The Following: • Bidders Shall Be Allowed To Visit The Actual Site For The Preparation Of The Plans Prior To The Submission Of Their Proposal. Bidder Shall Submit An Architectural And Electrical Layout/design Based On User Requirements Together With Their Technical Bid Proposal. • Supply, Delivery, And Installation Of Complete Site Preparation Labor And Materials Including Other Peripherals Needed To Complete The Site Without Additional Cost To Procuring Entity. Bidder Shall Submit A Complete Bill Of Materials For The Site Preparation Component. • Transfer Of Existing Network Components, Servers, And Other It Peripherals From Current Location To New Data Centers • Supply And Installation Of Data Centers Power Distribution And Pacu Power Supply. • Supply, Delivery, And Installation Of Complete Fire Suppression System Including Hangers, Support, And Other Peripherals That May Be Needed To Complete System Without Additional Cost To Procuring Entity. • Supply, Delivery, And Installation Of Complete Security Door Access Input And Output Cables Including Rough-ins, Hangers, Supports, And Other Peripherals That May Be Needed To Complete The System Without Additional Cost To Procuring Entity. Registration Of Personnel To The Door Access System Shall Be Scheduled To Avoid Disruption Of Work. • Provisioning Of Vertical And Horizontal Cabling • Testing Of Each System Shall Be Done Accordingly And Will Be Certified As Completed After Performing And Passing The Functionality Test And The User Acceptance Test. 6. Product Support Requirement 6.1 24x7 Remote Support Through Phone And Email; And Services Assistance Thru Email, Phone, And Web-chat With A Response Time Of Not More Than An Hour Upon Receipt Of The Request From Boi. 6.2 Provision Of 24x7 On-site And On-call Services. 6.3 Provide Comprehensive Service Level Agreement 7. Bidders Eligibility And Project Team Requirements 7.1 A Philippine Contractor Accreditation Board License. At Least With Category A Level; With Classifications In Communication Facilities, Mechanical Works, Electrical Works, And Air-conditioning Works 7.2 The Contractor Must Have At Least One (1) Employed Electronics/electrical Engineer Fully Certified. A Copy Of The Certification Shall Be Provided. A Certified Engineer Must Be Employed By The Bidder For At Least Three (3) Years. 7.3 An Employed Certified Data Center Specialist Personnel; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.4 An Employed Safety Officer With A Construction Occupational Safety And Health Certificate; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years. 7.5 An Employed Certified Associate In Project Management; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.6 The Bidder Must Have Completed At Least One (1) Similar Project In The Supply, Delivery, Installation, Testing, And Commissioning Of A Datacenter Within The Last 10 Years. This Should Be Supported By A Certificate Of Completion And Acceptance By The Client. 7.7 Bidder Should Provide A Certificate That Has 24x7 Technical Support Capabilities. Bidder Should Identify The Person Responsible For Restoring Service Due To Outages And Provide His Contact Details I.e. Contact Person, Position, Contact Numbers, And Email Address. 7.8 Contractors Must Have Philippine Contractors Accreditation Board (pcab) Licenses Required By Republic Act 4566 To Perform Telecommunications /communications Installations. 7.9 A Member Of The Safety Organization Of The Philippines 7.10 A Certificate To Show The Company Is Registered With The National Privacy Commission 7.11 All Prospective Bidders Must Be Authorized Resellers Of All Equipment To Be Supported By A Certificate Issued By The Manufacturer/distributor Of Equipment/materials. 7.12 All Prospective Bidders Shall Submit The Original Copy Of The Design Proposal, Brochures, And Other Publications That Support Compliance To The Requirements. 7.13 Proposed Work Plan And Detailed Implementation Schedule For The Project Covering The Whole Period. Prospective Bidders Are Required To Conduct Site Inspections. This Is To Ensure The Reliability, Security, And Efficiency Of The Required Services That The Contractor Shall Perform. The Timeframe Should Be Specified For Each Activity To Be Done And Shall Include Gantt Chart Summary. 7.14 The Contractor Shall Be Held Solely Responsible For Any Property Or Personal Damages Or Claims, Including Damage To Existing Structures, Systems, Equipment, And/or Site Caused By The Contractor Shall Repair Or Replace It To Its Original Condition At No Additional Cost To The Office. 7.15 The Contractor Shall Be Responsible And Accountable For The Removal And Proper Disposal Of Material And Waste Generated By This Project. Debris, Surplus Materials, Equipment, Etc. Shall Be Removed Daily. 7.16 All Prospective Bidders Shall Submit Original Copy Of Design Proposal, Brochures And Other Publications That Supports Compliance To The Requirements. 8. Project Team Requirements/composition Team Composition And Qualifications The Winning Bidder Shall Assemble A Comprehensive Project Team With The Following Mandatory Positions And Qualifications: Project Management Team 8.1 Project Manager O Minimum Of 10 Years Of Experience In Large-scale It Infrastructure Projects O Proven Track Record In Data Center And Network Refresh Initiatives O Relevant Pmp (project Management Professional) Or Equivalent Certification O Demonstrated Experience In Managing Complex Technological Transformations 8.2 Deputy Project Manager O Minimum Of 7 Years Of Experience In It Infrastructure Projects O Strong Technical Background In Data Center And Network Technologies 8.3 Network Infrastructure Lead O Minimum Of 8 Years Of Specialized Experience In Enterprise Network Design O Advanced Certifications (ccie, Ccnp, Or Equivalent) O Expertise In Modern Network Technologies, Including Sdn, Cloud Integration, And Cybersecurity 8.4 Data Center Infrastructure Specialist O Minimum Of 8 Years Of Experience In Data Center Infrastructure Design And Implementation O Expert In Cooling, Power Management, And Physical Infrastructure Design O Certifications In Data Center Design And Management Support And Implementation Team 1. Senior Systems Engineers (minimum 2) O Each With At Least 6 Years Of Experience In Enterprise System Integration O Comprehensive Knowledge Of Server, Storage, And Virtualization Technologies 2. Network Engineers (minimum 2) O Each With At Least 5 Years Of Experience In Enterprise Network Implementation O Expertise In Network Configuration, Optimization, And Security Additional Team Requirements • The Winning Bidder Must Provide Detailed Cvs And Certifications For Each Key Team Member • Any Changes To The Proposed Team Composition Must Be Pre-approved By The Board Of Investments • The Team Must Demonstrate Collective Experience In Similar Large-scale Infrastructure Projects • All Team Members Must Be Available For The Full Duration Of The Project • The Bidder Must Have A Clear Succession And Backup Plan For Critical Roles The Board Of Investments Reserves The Right To Request Changes To The Team Composition If It Does Not Meet The Project's Critical Requirements. 9. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The All Equipment To Ensure Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Bidder To The Authorized Inspectors At No Charge To The Procuring Entity. 10. Warranty 10.1 The Bidder Shall Provide A Preventive Maintenance Program During The Warranty Period For All The Delivered Equipment And System. 10.2 The Bidder Shall Provide Quarterly Preventive Maintenance On The Pacu, Fire Suppression, Power Distribution Units, And Door Access System During The Warranty Period. 10.3 The Bidder Shall Provide Not Less Than 4 Hours Of Response Time After Receiving Calls From The Client During The Warranty Period. 10.3 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 11. License And Subscription Renewal Provision The Board Of Investments Maintains Absolute And Unconditional Rights To Renew Or Extend All Software Subscriptions, Licenses, And Service Entitlements Beyond The Initial Warranty Or Contract Period. Upon The Expiration Of Any Initial Warranty Or Support Period, We Reserve The Comprehensive Right To Renew Existing Software Licenses, Extend Service Subscriptions, Continue Maintenance And Support Contracts, And Maintain Full Access To All Software And Platform Entitlements. The Successful Bidder Must Provide Comprehensive Documentation Of All Existing Licenses And Subscriptions. This Includes Delivering Complete Credentials, Access Keys, And Licensing Information To Facilitate Seamless Transitions And Ensure Our Continued Operational Effectiveness. We Require Full Disclosure Of Licensing Terms, Clear Renewal Pathways, And Complete Transparency In All Licensing Models. 12. Delivery The Delivery And Commissioning Of All Items For The Data Center Shall Not Exceed 120 Calendar Days Upon Issuance Of The Corresponding Notice To Proceed (ntp). The Commissioning And Initial Testing Shall Be Conducted Within 2-3 Calendar Days After Each Component Is Completed And Witnessed By The End User. After Completion Of The Data Centers, The Bac-twg Together With End User Shall Conduct Functionality Tests. These Will Ensure That All Of The Project's Specifications And Requirements Are Met Must Provide In Hard And Soft Copies Detailed Project Documentation Of The Following: A. Project Implementation Plan With Timetable, B. Installation And Configuration Manual, C. Incident And Problem Escalation Procedure With A List Of Designated Technical Support Engineers, D. Sla (service Level Agreement) E. User Acceptance Test Plan, 13. Training And Technology Transfer A. The Contractor Must Provide Training For At Least Five (5) It Personnel For The Network Equipment/switches, And Troubleshooting For The Structured Cabling And Management Of The Data Center For At Least Three (3) Days Per Module. B. To Ensure That Proper Maintenance And Sustainment Appropriate Training Shall Be Conducted By The Contractor As Essential Part Of Technology Transfer To Prepare And Equip Boi And Its Personnel In The Overall Operations And Maintenance Of Its Network Infrastructure And It Facility. C. The Contractor Shall Submit A Program Of Instruction (poi) Detailing All The Training Activities To Be Conducted For Review, Evaluation, And Approval Of Boi. Hands-on Training Shall Form Part Of The Training Program. D. Operation And Training Manuals Shall Be Provided To Each Participant. E. The Training Shall Be Conducted And Completed Before The Issuance Of The Certificate Of Project Completion And Acceptance. F. All Expenses Related To Training (e.g. Venue, Meals, Equipment, Certificate.) Shall Be Borne By The Contractor. G. Certificate Of Training/s Shall Be Given By The Contractor To All Participants. 14. Liability Of The Bidder The Bidder’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 15. Incidental Services 1. Spare Parts The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. In The Event Of Termination Of Production Of The Spare Parts/expiration Of Software Licenses O Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; O Following Such Termination Of Production, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested; O The Bidder Shall Carry Provide The List Of Vendor Of Consumable Spare Parts Or Components For The Equipment. 16. Institutional Requirements Equipment And Asset Ownership All Equipment, Hardware, Software, Infrastructure Components, And Other Tangible And Intangible Assets Procured, Installed, Or Developed During The Data Center Rehabilitation And Network Refresh Project Shall Become The Sole And Exclusive Property Of The Board Of Investments (boi). The Contractor Is Prohibited From Removing Any Delivered Items From The Project Site After Installation Or Project Completion. Specific Provisions Include: • Full Ownership To All Project-related Assets Shall Immediately Transfer To Boi Upon Delivery Or Installation • The Contractor Shall Provide All Necessary Documentation To Formally Transfer Ownership, Including But Not Limited To Equipment Lists, Serial Numbers, Warranty Information, And Certificates Of Ownership • Any Attempt To Remove Or Retain Project-related Items Without Authorization Will Be Considered A Material Breach Of Contract The Contractor Shall Submit Project Implementation And Management Plan (pimp) Within Ten (10) Calendar Days Upon Receipt Of Notice To Proceed For The Implementation Of The Proposed Solution, Which Is Subject To Review And Approval By The Boi. The Pimp Shall Include But Not Be Limited To The Following: • Scope Of Work • Project Organization • Implementation Methodology • Project Timeline • Communication And Deployment Strategy The Contractor Shall Provide Complete Documentation, One (1) Soft Copy And Three (3) Printed Copies, For Every Deliverable And At Every End Of Each Development Stage And Milestone Which Must Be Submitted To The Boi For Approval. Boi Shall Own Any And All Documents And Shall Reserve The Right To Reproduce At No Additional Cost. The Documentation Must Be Written In English With Concise And High-quality Presentation To Include But Not Limited To The Following: 1. Technical Manuals: • As Built Document • Infrastructure Diagrams And Topology • Troubleshooting And Installation Guides • Single Line Diagram • System/operation Manual 2. Operations And Maintenance Manuals 17. Intellectual Property Rights The Bidder Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 18. Approved Budget Cost The Board Of Investments Intends To Apply The Sum Of Thirty-one Million Pesos (31,000,000.00) Being The Approved Budget For The Contract (abc) For The Completion Of The Relocation And Transfer Of The Board Of Investments’ Datacenter And It Related Infrastructure From 5th Floor To 4th Floor To Be A High-performing And Scalable It Infrastructure. Bids Received In Excess Of The Abc Shall Be Automatically Disqualified At The Opening Of The Financial Proposals. Prices Are In Php And Are Vat-inclusive. 19. Source Of Funds The Budget Authorized For Procurement Of Service For The Relocation And Transfer Of Boi Datacenter From 5th Floor To 4th Floor Shall Be Sourced From The 2025 Capital Outlay (co) And Maintenance And Other Operating. Expenses (mooe), Pursuant To The Philippine General Appropriation Act Of 2025. 20. Payment 10% Project Mobilization: Covers Initial Costs, Including Project Planning And Resource Allocation, And To Submit The Project Implementation Plan 25% Network And Datacenter Infrastructure Facility Civil Works All Materials, Equipment, And Labor Necessary For The Construction Of The It Infrastructure Facility Including All Civil Works, Walls, Doors, Partitions, Flooring, Security Access Pass, Air-conditioning Unit And Other Accessories/appurtenances As Specified And As Shown In The Drawings. 25% Delivery Of Equipment And Materials, Structured Cabling, Fixing, Installation Of Cables, Conduit, Outlets Racks Ladders, And Other Components (active Components) All Materials Are To Be Used In The Installation And Cabling. Installed Cables, Conduit, And Components And Tested And Working Cable Lines. 30% Upon Submission Of Certification Of 100% Completion Of Project And Passing Of The Functionality Test To Be Administered By The Bac-twg And Witnessed By The Bac 5% Training Of Personnel For The Completed Network And It Infrastructure Facility. 5% Retention Fee 100% 21. Penalty In Case There Is A Delay In The Delivery And Installation Of The Software Where Boi Is Not At Fault, The Contracted Service Provider Shall Be Subject To Sanctions As Specified In The Contract To Be Signed By Both Parties Based On The Applicable Provisions Of The Procurement Law.
Closing Soon15 Jan 2025
Tender AmountPHP 31 Million (USD 534.1 K)
2641-2650 of 2650 active Tenders