Cars Tenders

Cars Tenders

Department Of Agriculture Tender

Automobiles and Auto Parts
Corrigendum : Closing Date Modified
Philippines
Closing Date18 Feb 2025
Tender AmountPHP 59.2 K (USD 1 K)
Details: Description Job Order: Labor And Materials For The Periodic Maintenance & Check Up Of Rp Vehicle 010110 (toyota Hiace) With Conduction Sticker No. Aoc-613 Parts, Oil & Lubricants: 0.4 Lot Replace Aircon And Air Filter 1 Pc Element Sub-assy, Air Cleaner Filter (genuine) 1 Pc Element Air Refiner (genuine) 8 Pcs Rags 3 Pcs Gloves 1 Pc Brake Cleaner (genuine) 3 Lot Replace Front Wheel Bearing Lh/rh 2 Pcs Bearing Assy, Fr (genuine) 2.2 Lot Replace Rack End And Tierod 1 Set Sk, Smile560 Hiace (genuine) 0.2 Lot Replace Filler Plug Gasket 1 Pc Plug (genuine) 1 Pc Gasket (genuine) 3 Pcs Tgfs Sn/cf 5w-30 1l (genuine) 2 Pcs X-1rengine Treatment (genuine) 1 Pc Sand Paper #120 50 Ml Cu800 Aerosol Brake Lube Gs (genuine) 1 Pc Silicon Spray (genuine) 1 Pc Toyota Genuine Diesel Engine Flush (genuine) 2 Pcs Dsl Injector Cleaner (genuine) 1 Pc Tgfs Sn/cf-30 4l (genuine) 1 Pc Oil Filter (genuine) 1 Pc Gasket (genuine) 4.2 Lot 360,000 Km Check Up 0.840 Lot Toyota Car Care 1 Lot Toyota Genuine Engine Room Cleaner 1 Lot Toyota Genuine Engine Room Coat 2.918 Lot Perform Wheel Alignment

Fermanagh And Omagh District Council Tender

Services
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United Kingdom
Closing Date21 Jan 2025
Tender AmountGBP 840 K (USD 1 Million)
Details: Title: Tender For Procurement Of Individual Professional Services Panels description: Fermanagh And Omagh District Council Wish To Employ Under The Nec Professional Services Contract Option G The Expertise Of The Following Consultant Disciplines (listed Below), To Be Awarded In Lots (panels) For Each Discipline (11 Lots In Total). The Council Wishes To Appoint Consultants To Each Of The Individual Professional Services Lot Panels For A Period Of Two Years With Options, Entirely At The Discretion Of Fermanagh And Omagh District Council, To Extend For Two Further Periods Each Of Twelve Months. I Each Lot Will Be A Panel Of 3 Consultants, Subject To Sufficient Qualifying Tenders Being Received; Lot 1 - Architectural And Principal Designer (with And Without Project Management) Lot 2 - Civil Engineering And Principal Designer (with And Without Project Management) Lot 3 - Structural Engineering Lot 4 - Mechanical And Electrical Engineering And Principal Designer (with And Without Project Management) Lot 5 - Quantity Surveying Lot 6 - Landscape Architect And Principal Designer (with And Without Project Management) Lot 7 - Conservation Architect And Principal Designer (with And Without Project Management) Lot 8 - Environmental Consultant Lot 9 - Building Surveying And Principal Designer (with And Without Project Management) Lot 10 - Waste Management And Principal Designer (with And Without Project Management) Lot 11 – Electrical Engineer And Principal Designer (with And Without Project Management) The Successful Consultants Will Work On Fermanagh And Omagh District Council Funded And Non-funded Projects Of Varying Construction Works Values. These Projects Will Include But Not Be Limited To Architectural, Building, Civil Engineering, Public Realm, Environmental Improvements, Conservation, Play Areas, Building Maintenance, Car Parks, Building Fit Outs, Water Recreational, Sports Ground Construction And Waste Management.

Office Of The President Tender

Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 45 K (USD 776)
Details: Description Title Of The Project: Procurement Of One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Fuji Modern Passenger Elevator Located At Premier Guest House (april To December Of Cy 2025) Under Pr No. 25-01-0140 A) Request For Quotation 1. 1 Lot Monthly Preventive Maintenance Of One (1) Unit Fuji Modern Passenger Elevator Located At Premier Guest House (april To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: Premiere Guest House Brand: Modern Fuji Capacity: 350 Kg (4pax) Number Of Stops/opening: Two (2) Service: Passenger Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Butt On If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is Within The Calendar Year 2025 (unless Renewed Or Extended) Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance And/or Approval Of Visitor Management System (vms). The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service, For The Vms Link, And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Was Unable To Submit By The Contractor Only After The First Pms, The Approved Vms Request May Be Used As Reference For Security Clearance. Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Guard (psg) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) The Following Documentary Requirements Must Be Submitted As Follows (attached To The Quotation Or During The Evaluation Of Quotation/s.): 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above ₱500,000.00) Prior To The Award: 4. Omnibus Sworn Statement (for Abcs Above ₱50,000.00) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certificate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Office Of The President. D) Indicate In Your Quotation The Following 1. Terms Of Payment: 2. Warranty: 3. Place Of Delivery: Amo Warehouse, Op Motorpool Compound, P. Casal St. Quiapo, Manila 4. Delivery Period: 5. Price Validity Period: 6. Stock Availability: 7. Certificate Of Exclusive Distributorship, If Any 8. Specify Brand 9. Tin

Office Of The President Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 33 K (USD 569)
Details: Description Title Of The Project: One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Fujisino Passenger Elevator Located At New Executive Building (october To December Of Cy 2025) A) Request For Quotation 1. One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Fujisino Passenger Elevator Located At New Executive Building (october To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: New Executive Building Brand: Fujisino Capacity: 630 Kgs (6pax) No. Of Stops/opening: Four (4) Service: Passenger Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Butt On If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is Within The Calendar Year 2025 (unless Renewed Or Extended) Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance And/or Approval Of Visitor Management System (vms). The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service, For The Vms Link, And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Was Unable To Submit By The Contractor Only After The First Pms, The Approved Vms Request May Be Used As Reference For Security Clearance. Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Command (psc) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) Attached To The Quotation Or During The Evaluation Of Quotation/s: 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above P500k) Prior To The Award 4. Omnibus Sworn Statement (for Abcs Above P50k) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certificate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Op. • In Case Of A Tie In The Offered Quotations Or When Two Or More Suppliers Have Been Evaluated To Be The Lowest Calculated And Responsive Quotation, The Winning Bidder Shall Be Determined Through The Drawing Of Lots. D) Indicate In Your Quotation The Following 1. Terms Of Payment: Government Terms 2. Price Validity: 3. Warranty: 4. Place Of Delivery: Amo Warehouse, Op Motorpool Compound, P. Casal St. Quiapo, Manila 5. Delivery Period: 6. Stock Availability (if For Goods). 7. Certificate Of Exclusive Distributorship (if Applicable). 8. Specify Brand (if Applicable). 9. Tin (submit Upon Award).

Office Of The President Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 81.9 K (USD 1.4 K)
Details: Description Title Of The Project: Procurement Of One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Kone Passenger Elevator Located At National Maritime Center (april To December Of Cy 2025) Under Pr No. 25-01-0141 A) Request For Quotation 1. 1 Lot Monthly Preventive Maintenance Of One (1) Unit Kone Passenger Elevator Located At National Maritime Center (april To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: National Maritime Center (port Area) Brand: Kone Capacity: 630 Kg (8pax) Number Of Stops/opening: Four (4) Service: Passenger Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Butt On If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is Within The Calendar Year 2025 (unless Renewed Or Extended) Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance And/or Approval Of Visitor Management System (vms). The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service, For The Vms Link, And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Was Unable To Submit By The Contractor Only After The First Pms, The Approved Vms Request May Be Used As Reference For Security Clearance. Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Guard (psg) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) The Following Documentary Requirements Must Be Submitted As Follows (attached To The Quotation Or During The Evaluation Of Quotation/s.): 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above ₱500,000.00) Prior To The Award: 4. Omnibus Sworn Statement (for Abcs Above ₱50,000.00) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certificate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Office Of The President. D) Indicate In Your Quotation The Following 1. Terms Of Payment: 2. Warranty: 3. Place Of Delivery: National Maritime Center Building, South Harbor, Manila 4. Delivery Period: 5. Price Validity Period: 6. Stock Availability: 7. Certificate Of Exclusive Distributorship, If Any 8. Specify Brand 9. Tin

Office Of The President Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 107.1 K (USD 1.8 K)
Details: Description Title Of The Project: Procurement Of One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Schindler Passenger Elevator Located At Malacañan Palace (april To December Of Cy 2025) Under Pr No. 25-01-0143 A) Request For Quotation 1. 1 Lot Monthly Preventive Maintenance Of One (1) Unit Schindler Passenger Elevator Located At Malacañan Palace (april To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: Malacañan Palace Brand: Schindler Capacity: 1000 Kg (13pax) Number Of Stops/opening: Three (3) Service: Passenger Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Butt On If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is Within The Calendar Year 2025 (unless Renewed Or Extended) Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance And/or Approval Of Visitor Management System (vms). The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service, For The Vms Link, And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Was Unable To Submit By The Contractor Only After The First Pms, The Approved Vms Request May Be Used As Reference For Security Clearance. Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Guard (psg) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) The Following Documentary Requirements Must Be Submitted As Follows (attached To The Quotation Or During The Evaluation Of Quotation/s.): 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above ₱500,000.00) Prior To The Award: 4. Omnibus Sworn Statement (for Abcs Above ₱50,000.00) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certificate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Office Of The President. D) Indicate In Your Quotation The Following 1. Terms Of Payment: 2. Warranty: 3. Place Of Delivery: Amo Warehouse, Op Motorpool Compound, P. Casal St. Quiapo, Manila 4. Delivery Period: 5. Price Validity Period: 6. Stock Availability: 7. Certificate Of Exclusive Distributorship, If Any 8. Specify Brand 9. Tin

Office Of The President Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 116.2 K (USD 2 K)
Details: Description Title Of The Project: Procurement Of One (1) Lot Monthly Preventive Maintenance Of One (1) Unit Wells Passenger Elevator Located At Malacañan Palace (april To December Of Cy 2025) Under Pr No. 25-01-0144 A) Request For Quotation 1. 1 Lot Monthly Preventive Maintenance Of One (1) Unit Wells Passenger Elevator Located At Malacañan Palace (april To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: Malacañan Palace Brand: Wells Capacity: 800 Kg (10pax) Number Of Stops/opening: Three (3) Service: Passenger Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Butt On If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is Within The Calendar Year 2025 (unless Renewed Or Extended) Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance And/or Approval Of Visitor Management System (vms). The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service, For The Vms Link, And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Was Unable To Submit By The Contractor Only After The First Pms, The Approved Vms Request May Be Used As Reference For Security Clearance. Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Guard (psg) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) The Following Documentary Requirements Must Be Submitted As Follows (attached To The Quotation Or During The Evaluation Of Quotation/s.): 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above ₱500,000.00) Prior To The Award: 4. Omnibus Sworn Statement (for Abcs Above ₱50,000.00) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certificate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Office Of The President. D) Indicate In Your Quotation The Following 1. Terms Of Payment: 2. Warranty: 3. Place Of Delivery: Amo Warehouse, Op Motorpool Compound, P. Casal St. Quiapo, Manila 4. Delivery Period: 5. Price Validity Period: 6. Stock Availability: 7. Certificate Of Exclusive Distributorship, If Any 8. Specify Brand 9. Tin

Office Of The President Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date3 Mar 2025
Tender AmountPHP 198 K (USD 3.4 K)
Details: Description Title Of The Project: One (1) Lot Monthly Preventive Maintenance Of Two (2) Units Fujisino Passenger Elevator Located At Mabini Hall (april To December Of Cy 2025) A) Request For Quotation 1. One (1) Lot Monthly Preventive Maintenance Of Two (2) Units Fujisino Passenger Elevator Located At Mabini Hall (april To December Of Cy 2025) I. Purpose The Scope Of The Monthly Preventive Maintenance Covers The Necessary Equipment/ Accessories/ Materials Needed In Order To Execute The Scope Of Works Indicated On Item Iv. Ii. Description Of Elevator Location Of Elevator: Mabini Hall Brand: Fujisino Capacity: 1000 Kg (13pax) No. Of Stops/opening: Four (4) Service: Passenger Location Of Elevator: Mabini Hall Iii. Requirements To Ensure Attainment Of The Project Objectives, The Following Are The Contractor's Minimum Qualification: A. The Contractor Must Be An Authorized Service Provider Of The Indicated Brand Of Elevator And Must Provide Certificate Or Equivalent Document From The Manufacturer. Iv. Scope Of Works 1. Mobilization Of All The Technical Engineers, Technicians, Labors, Tools And Equipment, Materials Consumables, Including Additional Electrical Wires And Cables To Be Used During The Preventive Maintenance Service. 2. Check And Cleaning Of All Areas Of The Machine Room, Traction Motor, Wire Rope, Elevator Pit And Elevator Car. 3. General Inspection And Diagnosis Of All The Electrical Controls And All Elevator Pc Boards In Operation Of The Elevator. 4. Check And Correct Door System And The Hall Call Button Of The Elevator. 5. Check All Switches, Limit Switches And Alarms Of The Elevator If All Working. 6. Commissioning Of The Entire Elevator System And Check If The Program Will Work In Its Normal Operation. 7. Checking And Correcting All The Cables, Wirings, Controls, Elevator Car And Other Component Of The Elevator. 8. Check The Alignment Of All Elevator In Normal Operation After All The Checking And Adjustments. 9. Test And Run The Elevator Doors And Adjust It To Make It Smooth In Opening And Closing. 10. Demobilization 11. Turn-over Of The Elevator To Authorized Representative. 12. Submit Elevator Monthly Maintenance/service Report Including Recommendation/s (if Any): 12.1 Machine Room: 12.1.1 Check-up, Monitor & Observe Motor Running. 12.1.2 Check-up, Monitor & Observe Feedback Rotary Encoder Against Vibration. 12.1.3 Check-up The Condition Of Main Drive Secondary Sheave Pulleys, Bearing & Oil Rings. 12.1.4 Check-up, Monitor & Observe Braking System, Break Oil, Pads And Lining. 12.1.5 Check-up And Test Governor Safety Function (calibrate If Necessary). 12.1.6 Check-up Oil Gauge Machine (use Oil-type Only). 12.1.7 Check-up Machine Room Bed/base Bolts And Nuts If Properly Tightened. 12.1.8 Clearing Of Machine Room. 12.2 Control Panel: 12.2.1 Check-up Electrical And Electronic Components For Possible Overheating And Defects Such As Magnetic Contactors, Transformer, Breakers, Fuses, Main Board, Inverter And Etc. 12.2.2 Check-up And Monitor The Exhaust Fan For Ventilation If Functional (temperature Must Be Less Than 45 Deg.) 12.2.3 Check-up Wires, Bolts, Nuts, And Other Terminal Fixtures. 12.2.4 Check-up And Test Emergency Communication System Such As Intercom, Alarm Indicators And Ups If Functional. 12.3 Hoist Way/shaft Components: 12.3.1 Lubricate Alignment And Calibrate Door Mechanisms Rollers, Guide Shoes, Counterweight, Cables, Interlocks, Safety Switches And Other Door Related Components. 12.3.2 Check-up, Monitor And Adjust Leveling In Every Landing Floor (leveling Error Must Not Exceed 5mm). 12.3.3 Check-up And Monitor Entrance Sill To Sill Allowable Clearance. 12.3.4 Check-up And Monitor The Condition Of Wire Ropes, Degree Of Tightness And Tension. 12.3.5 Check-up And Monitor Compensating Chain Against Vibration While Elevator Is In Motion. 12.3.6 Check-up And Test Top And Bottom Limit And Terminal Switches If All Functional. 12.3.7 Check-up And Monitor Hoist Way Wiring Cable Tray/raceway Holders And Fixtures. 12.4 Elevator Car (top & Inside) 12.4.1 Check-up And Monitor Leveling Sensors Response If Acceptable. 12.4.2 Check-up And Monitor Car Door System, Door Motor, Drives And Other Related Parameters. 12.4.3 Check-up And Test Landing Gong Overload Alarms And Emergency Stop Button If All Functional. 12.4.4 Check-up And Monitor Light Curtain Sensors Response Time If Acceptable. 12.4.5 Cleaning Of Car Top. 12.5 Elevator Pit 12.5.1 Check-up And Monitor Spring Buffer Switch, E-top Switch And Governor Switch If All Activated. 12.5.2 Cleaning Of Pit. 12.6 Others 12.6.1 Observe Elevator Running Parameters, Accelerations, Deceleration High Speed Running. 12.6.2 Observe Elevator Door Opening And Closing Delay If Acceptable. 12.6.3 Observe Hall And Car Buttons And Digital Indicators If All Functional. 12.6.4 Check-up And Test Safety And Emergency Switch If Activated (by Pass Is Not Allowed). V. Support Services The Contractor Should Be Able To Send Certified Service Engineers Or Qualified Technicians During Emergency Call In Case Of Breakdown, Disorderly Operation, Or Malfunctioning Of The Equipment And To Provide 24/7 Response Center Service. The Contractor Shall Cover The Labor Of Replacement Of Available Material, Components, And Parts Not Covered In The Purchase Order (po) However Provided By The End-user. In Case Of Entrapment, The Contractor Should Be Able To Respond And Take Action In No More Than Half An Hour After Receiving The Report. Vi. Safety And Health The Contractor Shall Be Responsible For: A. Compliance With All Applicable Safety And Health Regulations For Basic Ppes Under Dole-osh; B. Taking Care Of The Safety And Health Of All Contractor’s Personnel On The Site; C. Using Reasonable Efforts To Keep The Site And Works Clear Of Unnecessary Obstruction So As To Avoid Accident And Damage To Property; D. The Technician Of The Contractor Shall Submit Themselves To All Health Protocols As May Be Prescribed By Op/presidential Security Command (psc). Vii. Maintenance Schedule The Duration Of The Monthly Preventive Maintenance Is From April To December Of The Calendar Year 2025 Will Take Effect Upon The Receipt Of The Po And The Release Of The Psc Clearance. The Preventive Maintenance Schedule Is To Be Agreed Upon By The End-user And Coordinated For Information With The Contract Implementer By The Contractor. Viii. Security Clearance The Contractor Upon Acceptance Of Po, Must Coordinate With The Engineering Office Within Five (5) Working Days For The Schedule Of The Preventive Maintenance Service And For The Submission Of The Following Documentary Requirements: A. Letter Of Request For Access Addressed To The Head Of The Eo Indicating The Date And Time Of Scheduled Preventive Maintenance And List Of Personnel And Vehicle. (recommended To Be Accomplished Monthly At Least Three (3) Working Days Before The Scheduled Preventive Maintenance); B. Company Ids Of The Listed Personnel (clear Photocopy); C. Or/cr Of Service Vehicle/s (clear Photocopies); And D. Driver’s License Of The Driver/s Of The Service Vehicle/s (clear Photocopies) Each Personnel Of The Contractor Must Send A Visitor Request Every Service Day Through The Vms Link To Be Approved By The End-user. In The Case Wherein The Documentary Requirements Were Unable To Submit By The Contractor, The Approved Vms Request/s May Be Used As Reference For Security Clearance. (applicable Only After The First Pms) Ix. Contract Renewal/extension/amendment Considering That The Preventive Maintenance Service Is Procured Repeatedly In The Last Three (3) Years And Deemed Essential To The Day To Day Operations And To Ensure Uninterrupted Operation Of The Equipment, The Contract/po May Be Renewed Or Extended In Accordance With Annex “a” – Guidelines On Renewal Of Regular And Recurring Services Of Government Procurement Policy Board (gppb) Resolution No. 06-2022 Dated 12 September 2022, Under The Following Conditions: 1. Renewal- The Duration Of Each Contract/po Renewal Shall Not Exceed One (1) Year; However, The Total Combined Period Covering The Original Contract/po, Renewal Contract/po, And Contract/po Extension/s, If Applicable, Shall Not Exceed Three (3) Years (section 3.5) ; And 2. Extension- The Duration For Each Contract Extension Shall Not Extend Three (3) Months; However, The Total Combined Period Covering All Contract/po Extension/s Shall Not Exceed Six (6) Months. The Duration Of Contract/po Extension/s Shall Form Part Of The Total Combined Period Of Three (3) Years As Previously Mentioned (section 5.2) 3. Amendment- The Terms And Conditions Of The Contract/po May Be Amended In Accordance To Existing Budgeting, Accounting, And Auditing Rules, Given The Following Instances Stated In Section 6, Appendix 37 Of Ra 9184. A Performance Evaluation Shall Be Conducted By The Op Through The Eo, Which Shall Have Direct Oversight And Supervision Of The Contractor To Ensure That The Services Are Effectively And Efficiently Conducted. Performance Criteria In Accordance With Gppb Resolution No. 06-2022. X. Terms Of Payment The Preventive Maintenance Service Shall Be Paid Monthly Upon The Submission Of The Following Documents To The Contract Implementer: A. Letter Of Request For Payment B. Billing Service Invoice; And C. After Service Report Complete With Findings And Recommendation Duly Signed By Authorized Eo Representative With Attached Pictures. (original Copy To The Contract Implementer And A Copy To The End-user) Delivery Period: Three (3) Working Days Upon The Issuance Of The Presidential Security Command (psc) Clearance. B) Use Company Letterhead For Your Quotation & Address To: The Procurement Management Service Office Of The President M-123 Mabini Hall, J.p. Laurel St., Malacañang Complex, San Miguel, Manila Tel. No. (02) 8249-8310 Local 8238 Email Address: Pmas@op.gov.ph C) Attached To The Quotation Or During The Evaluation Of Quotation/s: 1. Philgeps Registration Certificate 2. Latest/valid Mayor’s/business Permit 3. Latest Income/business (vat Or Percentage) Tax Return (for Abcs Above P500k) Prior To The Award 4. Omnibus Sworn Statement (for Abcs Above P50k) 5. Authority To Transact With The Op A. Special Power Of Attorney For Sole Proprietorships B. Secretary’s Certficatate For Corporations, Partnerships, Or Cooperatives Note: •kindly Attach The Complete Eligibility Documents To Avoid Disqualification. •include The Back Page Of The Mayor’s/business Permit If Available •scan The Documents In A Manner That The Entries Are Legible/readable. •please Use The Rfq Template Provided By The Office Of The President (op). In Case You Submit Your Own Template And There Is Conflict Between The Two (2), The Op Rfq-template Shall Prevail. •collected Personal Information/data Is Processed In Accordance With The Existing Data Privacy Policy Of The Op. • In Case Of A Tie In The Offered Quotations Or When Two Or More Suppliers Have Been Evaluated To Be The Lowest Calculated And Responsive Quotation, The Winning Bidder Shall Be Determined Through The Drawing Of Lots. D) Indicate In Your Quotation The Following 1. Terms Of Payment: Government Terms 2. Price Validity: 3. Warranty: 4. Place Of Delivery: Amo Warehouse, Op Motorpool Compound, P. Casal St. Quiapo, Manila 5. Delivery Period: 6. Stock Availability (if For Goods). 7. Certificate Of Exclusive Distributorship (if Applicable). 8. Specify Brand (if Applicable). 9. Tin (submit Upon Award).

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
Corrigendum : Closing Date Modified
United States
Closing Date27 Jan 2025
Tender AmountRefer Documents 
Details: Government Responses To Offeror Questions 2 non-site-specific Responses: q: Current Annual Spend? a: The Government Will Not Disclose This Information At This Time. q: Any Current Issues We Can Address? a: There Are No Additional Known Issues Regarding This Solicitation Other Than Items Listed In The Statement Of Work And Related Solicitation Sections. q: Is There Any Contractor Currently Performing This Service? a: Yes, There Currently Is A Contractor Preforming These Services q: If Yes, Would You Kindly Provide Us With The Contract Number? a: The Current Contract Number Is: 36c25220c0129 This Contract Is Inclusive Of Both The Milwaukee And Madison Sites. please Confirm Whether An Amendment Will Be Issued To Reflect The Updated Wage Determination. Aligning With The Most Current Standards Will Help Avoid Any Inadvertent Discrepancies In Pricing. a: Yes, The Most Recent Determinations Dated 12/23/2024, Shall Be Used And Are Attached To This Amendment. wage Determination No. 2015-4899 For Milwaukee, Has Since Been Updated To Revision No. 26, Dated December 23, 2024 wage Determination No. 2015-4897 For Madison, Has Since Been Updated To Revision No. 27, Dated December 23, 2024. milwaukee Site Specific Responses: q: In Lot 1, When We Move Vehicles At Closing, Is There A Section Of Lot 1 That Can Be Segregated (not Available To Self-parked Vehicles) Once We Park Valeted Vehicles? If Not, Should A Valeted Vehicle Become Damaged By Others While In Lot 1, Are There Cameras That Can Identify The Vehicle Responsible For The Incident, So The Valet Service Provided Is Not Responsible For That Damage? a: There Is No Designated Parking In Lot 1 For Valet. Based On The Current Sow, Valet Contractor Shall Move Vehicles At The End Of The Day To Lot 1, If There Is A Disabled Parking Identification Placard Or Plate. This Is To Assist The Veterans That Have Difficulties Getting To Their Vehicles. Cameras Are Installed For Exterior Lots. However, It Is Not A Guarantee The Cameras Will Capture Specific Locations Of Any One Incident. q: Is The Milwaukee Valet Booth Owned By The Va Or Current Contractor? Will It Remain For The New Contractor? a: Booth Is Owned By The Va. Unsure At This Time The Shed Will Stay Long Term Or May Have To Move Inside The East Entrance As The Normal Routine In The Past. As A Reminder, Attendants Shall Lock And Secure All Valet-parked Vehicles And Ensure All Car Keys Are Stored In An Appropriately Secured Valet Booth. The Valet Booth Shall Be Provided By The Contractor That Will Be In The Current Va Own Shed And Or Available If The Shed Is Removed To Have A Secured Booth, Container For The Keys. q: What Time Does The Valet Stop Accepting Vehicles? a: Hours Of Operations At The Milwaukee Vamc Are 7:00 Am To 5:00 Pm Monday Through Friday, Excluding Federal Holidays Listed In Section 3.2. If The President Of The United States Declares Any Other Day A Holiday Or By Executive Action Closes Any Facility, The Cor Shall Determine If Valet Services Shall Be Needed. Valet Should Be Available Within The Time Frame To Accept Vehicles And Drop Off Vehicles. q: Is There A Location To Secure Equipment After Closing? a: Please See Contractor Shall Furnish All Required Supplies, Materials, Signage, And Any Necessary Equipment Required To Perform The Services Defined Herein As Follows. All Equipment Except For Signage Should Be Stored In The Required Lock Cabinet That Is In The Contract. Currently The Va Owned Shed Is Also Locked, And Government Keys Provided. However, If The Shed Is Removed, The Contract Will Cover The Equipment To Be Secured In Their Cabinet. If You Wish To Secure Signage Daily The Va Owned Shed Is Provided. If Shed Is Removed, We Will Need To Look At Options To Secure Contractors Signage If Requested. q: Are There Any Upcoming Traffic Or Parking Concerns? a: More Employees Will Be Working Onsite And Less Telework That Should Not Affect The Number Of Cars Being Parked By The Valet. Also, There Is 10-year Plan Of Road Construction In The Surrounding Area, However These Items Should Not Affect The Valet, Other Than The Potential For More Traffic In The Area. q: Please Provide Actual Current Hourly And/or Daily Vehicle Parked Counts. a: Daily Counts: December 2nd 142, 3rd 175, 4th 151, 5th 172, 6th 115, 9th 145, 10th, 181, 11th 163, 12th, 130, 13th 129, 16th 149, 17th 159, 18th 145, 19th 110, 20th 89, 23rd 105, 24th 9, 26th 35, 27th 54, 30th 99, 31st 87, January 2nd 120, 3rd 93, 6th 134, 7th 182, 10th 111. madison Site Specific Responses: q: Please Provide A Map Of The Campus That Shows The Location Of The Parking Garage. a: Map Attached As Va Madison Site Plan.pdf. The Parking Garage Is Identified As Parking Ramp Bldg #15 On The Map. q: Could The Valet Parking Level Be On The Top Floor Of The Garage? a: No. Valet Parking Is Designated On The Northern Section Of The 2nd Level. q: What Time Does The Valet Stop Accepting Vehicles? a: Hours Of Operation Are 7:00am To 5:00pm. The Valet Should Accept Vehicles During The Hours Of Operation. q: Is There A Location To Secure Equipment After Closing? a: At Present The Contractor Furnished Secure Cabinet/valet Booth Is Kept In The Main Entrance Vestibule After Hours. For An Additional Level Of Security, The Cabinet Can Be Pulled Into The Main Entrance Area. q: Please Provide Actual Current Hourly And/or Daily Vehicle Parked Counts. a: Daily Vehicle Counts Attached As 2024 Valet Daily Vehicle Totals.pdf.

Bureau Of Agricultural Research Tender

Machinery and Tools
Philippines
Closing Date3 Feb 2025
Tender AmountPHP 134.5 K (USD 2.3 K)
Details: Description 1 Item Car Wash Supplies And Equipment Wet And Dry Vacuum Cleaner Cleaning For Both Wet And Dry Applications. Max Watts: 1600 Watts Voltage: 220v-240v~50/60hz Tank Size: 25l Php8,047.00 1 Item Portable Air Blower Voltage: 220v-240v~50/60hz Input Power: 600w Max Blowing Speed Rate: 0 -3.5m3/min Variable Speed Php1,584.70 1 Item 5 Step Aluminum Ladder Heavy Duty Featherweight Foldable For Easy Storage Slip-proof Vinyl Footing Php3,716.70 2 Item Car Shampoo 20 Liters (container) Ph Neutral – Safe For All Finishes Hi-concentrate Php2,340.00 11 Item Drying Cloth Microfiber Size: 18” X24” Php5,005.00 1 Item Mechanic Repair And Maintenance Tools Click Torque Wrench 18” ½” Drive Torque Range: 42-210 Nm Length: 18” Php3,900.00 1 Item Click Torque Wrench 14” ½” Drive Torque Range: 19-110 Nm Length: 14” Php5,200.00 1 Item Combination Wrench 26 Pcs Set Open Ends And Box Ends Included Sizes: 6,7,8,9,10,11,12,13,14,15,16,17, 18,19,20,21,22,23,24,25,26,27,28,29,30,32mm Drop Forged, Heated Steel Php11,050.00 1 Item Double Ring Box Wrench 12 Pcs Set Box Ends Included Sizes: 6x7, 8x9, 10x11, 12x13, 14x15x 16x17, 18x19, 20x22, 21x23, 24x26, 25x28, 30x32mm Drop Forged, Heated Steel Php7,540.00 1 Item Cordless Impact Wrench 800 Nm 800 Nm Brushless Motor ½” Drive 21 Volts 2x15 Cells (6ah) Battery Tool Case Php5,850.00 1 Item Cordless Impact Wrench 330 Nm 330 Nm Brushless Motor ½” Drive 21 Volts 2x15 Cells (6ah) Battery Tool Case Php3,900.00 1 Item Breaker Bar Wrench 24” ½” Drive Length: 24” Php1,675.70 1 Item Breaker Bar Wrench 15” ½” Drive Length: 15” Php715.00 1 Item Snap Ring Pliers 4 Pcs Set 1x180mm Straight Circlip Pliers, Internal 1x180mm Bent Circlip Pliers, Internal 1x180mm Straight Circlip Pliers, External 1x180mm Bent Circlip Pliers, External Php2,338.70 1 Item Oil Filter Locking Plier Jaw Capacity: 2 1⁄8” - 4 5⁄8” Php845.00 1 Item Impact Driver Kit Set ½” Drive With Included Philips And Slotted Bits Php1,664.00 1 Item Grease Gun Capacity: 400cc Working Pressure: Up To 4500psi Php1,001.00 1 Item 12/24 V Battery Charger Dual Charging Voltage 12v And 24v With Over-load Protection With Fast Charging Mode Php5,185.70 1 Item Booster Cable 600a Minimum Length: 3m Php2,340.00 11 Item Driver And Vehicle Emergency Tool Kit Combination Wrench 10 Pcs Set Included Sizes: (8,9,10,11,12,13,14,17,19, 22mm) Php8,937.50 11 Item Vice Grip, 10” Curved Jaw Size: 10” Php6,134.70 11 Item Adjustable Wrench, 10” Size: 10” Php3,989.70 11 Item Combination Pliers, 8” Size: 8” Php6,134.70 11 Item Slip Joint Pliers, 8” Size: 8” Php1,844.70 11 Item Long Nose Pliers, 8” Size: 8” Php4,647.50 11 Item Screw Driver, Philips, 10” Philips Head Size: 5/16” X 10” Php1,401.40 11 Item Screw Driver, Flat, 10” Flat Head Size: 5/16” X 10” Php1,401.40 11 Item Plastic Tool Box, 16” Size: 16” Php5,133.70 11 Item Car Phone Charger Four (4) Usb Power Adapter Qc 3.0 Fast Charging Ports With Extended Wire Php4,404.40 11 Item Portable Fire Suppresor Type: Abck Weight: 350 G Php10,010.00 11 Item Emergency First Aid Kit Includes: Hydrogen Peroxide 10%, Povidine Iodine, Isopropyl Alcohol, Cotton, Bantam Plastic Strips, Gauze Pads, Gauze Bandages, Paper Tape, Face Masks, Flashlight, Water Disinfectant. Php6,563.70 Total Amount Php134,501.90
7821-7830 of 8443 archived Tenders