Procurement Of Labor And Materials For The Rehabilitation Of Techno Bazaar At Talisay Campus , Construction Projects ,carlos Hilado Memorial State University
Description
Description Republic Of The Philippines Carlos Hilado Memorial State University Talisay City, Negros Occidental Telefax: (034) 712-8404 / 712-0003 Local 142 Bac.sec@chmsc.edu.ph Request For Quotation Page 1 Of 13 Date: July 13, 2023 Quotation No. 23-316 _______________________ __________________________ Please Quote Your Lowest Price On The Item/s Listed Below, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than ________________ In The Return Envelope Attached Herewith. Dr. Andrew Eusebio S.tan Bac Chairman Note: 1. All Entries Must Be Typewritten 2. Delivery Period Within ______ Calendar Days 3. Warranty Shall Be For A Period Of Six (6) Months For Supplies & Materials, One (1) Year For Equipment, From Date Of Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of ______ Calendar Days 5. G-eps Registration Certificate Shall Be Attached Upon Submission Of The Quotation 6. Bidders Shall Submit Original Brochures Showing Certifications Of The Product Being Offered Item Description Of Works Qty. Unit Material Cost Labor Cost Total Cost No. Unit Cost Material Sub-total Cost Unit Cost Labor Sub-total Cost One (1) Lot Labor And Materials For The Rehabilitation Of Techno Bazaar At Talisay Campus Scope Of Works: 1.0 General Requirements 1.1 Mobilization And Demobilization 1.2 Safety Occupational Hazards & Scaffoldings 1.3 Site Clearing, Cleaning And Hauling 1.4 Excavation Works Including Cutting Of Existing Concrete Sidewalk 1.5 Back-filling And Concreting Of Existing Sidewalk 2.0 Masonry And Concreting Works 2.1 Construction Of Male & Female Toilet 2.2 Construction Of Roof Canopy (sidewalk) 2.3 Pull-out Of Existing Moldings, Plastering And Finishing Of Wall 2.4 Plastering And Finishing Of Wall, Concrete Filling Of Wall (acu Wall & Toilet ) 3.0 Steel Works 3.1 Construction Of Roof Canopy (sidewalk) 3.2 Fabrication And Installation Of Acu Condenser Framing 4.0 Roofing Works 4.1 Construction Of Roof Canopy (sidewalk) 4.2 Pull-out, Rehabilitation And Replacement Of Techno Bazaar Roofing (roof Gutter, Roof Flashing, Longspan Roofing With Complete Hardware And Accessories) 4.3 Rehabilitation Of Polycarbonate Roofing 4.4 Construction Of Male And Female Toilet Roofing 5.0 Ceiling Works 5.1 Installation Of Male And Female Toilet Ceiling 5.2 Pull-out And Replacement Of Existing Ceiling (portion Only) 5.3 Installation Of Fiber Cement Board (portion Only) 5.4 Installation Of Pvc Slat Panels 6.0 Carpentry Works 6.1 Installation Of Overhead Cabinets With Complete Hardwares And Accessories 7.0 Signages Works 7.1 Removal Of Stainless Steel Signage 7.2 Male And Female Sticker Signage 8.0 Mechanical Works 8.1 Relocation Of Floor Mounted Acu And Condenser 8.2 Testing And Commisioning Of Relocated Acu And Condenser 9.0 Electrical Works 9.1 Rehabilitation Of Wirings And Electrical Systems (including Tapping From Existing Power) 9.2 Installation Of Acu Convenience Outlet & Breaker 9.3 Installation Of Lighting Fixtures 9.4 Testing And Commisioning Of All Systems 10.0 Plumbing Works 10.1 Supply And Installation Of Sanitary Pipings And Water Supply System (male & Female Toilet) 10.2 Supply And Delivery Of Plumbing Fixtures 11.0 Tiling Works 11.1 Installation Of Floor And Wall Tiles (male & Female Toilet) 12.0 Painting Works 12.1 Surface Preparation, Sanding, Patching, Repainting And Exterior And Interior Walls And Etc. 12.2 Surface Preparation, Patching, Painting Of Roof Canopy (sidewalk) Steel Truss, Rafter, Steel Framing, Pedestal And Etc. 12.3 Surface Preparation, Patching, Painting Of Plycarbonate Roofing, Steel Truss, Rafter, Steel Framing, And Etc. 12.4 Surface Preparation, Patching, And Painting Of Overhead Cabinets 12.5 Surface Preparation, Patching, And Painting Of Ceiling 12.6 Surface Preparation, Sanding And Repainting Of Landbank Atm Wall ( Wall Art Painting) 13.0 Doors & Windows 13.1 Pull-out Of Existing Fixed Window For The Consturuction Of Male And Female Toilet 13.2 Supply, Delivery And Installation Of 2 Units Jalouplas Window 13.3 Supply, Delivery And Installation Of 2 Units Pvc Door 13.4 Supply, Delivery And Installation Of Window Blinds (see Actual Dimension) 14.0 Miscellaneous Works Bill Of Quantities 1.0 General Requirements 1.1 Mobilization And Demobilization 1.00 Lot 1.2 Safety Occupational Hazards & Scaffoldings 1.00 Lot 1.3 Site Clearing,cleaning And Hauling 1.00 Lot 1.4 Excavation Works Including Cutting Of Existing Concrete Sidewalk 1.00 Lot 1.5 Back-filling And Concreting Of Existing Sidewalk 1.00 Lot Sub-total, 1.0 (general Requirements) 2.0 Masonry And Concreting Works 2.1 Construction Of Male & Female Toilet 2.1.1 4" Thick Concrete Hollow Blocks 265 Pcs 2.1.2 40 Kg Cement 12 Bags 2.1.3 Mixing Sand 1 Cu.m. 2.1.4 #16 G.i. Tie Wires 1 Kg 2.1.5 10mmø Deformed Bars 8 Lengths 2.1.6 1/2 X 4' X 8' Ordinary Plywood 1 Sheet 2.1.7 2" X 2" X 8' Good Lumber 2 Pcs 2.1.8 Assorted Nails 1 Lot 2.1.9 Installation Of Scaffoldings 1 Lot Column, Footing And Wall Footing 2.1.10 40 Kg Cement 6 Bags 2.1.11 Mixing Sand 0.3 Cu.m. 2.1.12 3/4" Gravel 0.5 Cu.m. 2.1.13 10mmø Deformed Bars 6 Lengths 2.1.14 12mmø Deformed Bars 7 Lengths 2.1.15 #16 G.i. Tie Wires 2.5 Kg Floor Slab 2.1.16 40 Kg Cement 4 Bags 2.1.17 Mixing Sand 0.2 Cu.m. 2.1.18 3/4" Gravel 0.4 Cu.m. 2.1.19 10mmø Deformed Bars 4 Lengths 2.1.20 #16 G.i. Tie Wires 0.5 Kg Plastering Works 16mm Thick 2- Face Of Wall 2.1.21 40 Kg Cement 13 Bags 2.1.22 Fine Sand 0.7 Cu.m. 2.2 Construction Of Roof Canopy (sidewalk) 2.2.1 Portland Cement 8 Bags 2.2.2 Mixing Sand 0.5 Cu.m. 2.2.3 3/4 Gravel 1 Cu.m. 2.2.4 16mm Ø X 6m Deformed Bars 6 Lghts 2.2.5 10mm Ø X 6m Deformed Bars 5 Lghts 2.2.6 3/4" X 12" Threaded Anchor Bolt W/ Nut And Washer 8 Pcs 2.2.7 G.i. Tire Wire 3 Kg 2.2.8 4" Cutting Disc 1 Box 2.2.9 Hacksaw Blade 2 Pcs 2.2.10 1/2 X 4' X 8' Ordinary Plywood 2 Sheet 2.2.11 2" X 2" X 8' Good Lumber 10 Pcs 2.2.12 Assorted Nails 1 Lot 2.3 Pull-out Of Existing Mouldings, Plastering And Finishing Of Wall 1 Lot 2.4 Labor For Chipping Of Wall And Flooring For The Installation Of Split Type Acu, Floor Tiles And Gates (portion Only) 10.00 Area Sub-total, 2.0 (masonry & Concreting Works) 3.0 Steel Works 3.1 Construction Of Roof Canopy 3.1.1 C - Channel Bar 150mm X 50mm X 3mm 2 Lengths 3.1.2 C - Channel Bar 100mm X 50mm X 3mm 3 Lengths 3.1.3 19mm X 300mm X 300mm Base Plate 2 Pcs 3.1.4 6mm X 100mm X 150mm Gusset Plate 6 Pcs 3.1.5 19mm X 250mm X 250mm Steel Plate 2 Pcs 3.1.6 C-purlins 2" X 4" X 1.2mm 8 Lengths 3.1.7 10mm Ø X 6m Deformed Bars 5 Lengths 3.1.8 Welding Rod 2 Kgs 3.1.9 Steel Cutting Disc 4" Ø 4 Pcs 3.1.10 Grinding Stone 4" Ø 3 Pcs 3.2 Fabrication And Installation Of Acu Condenser Framing 1 Lot Sub-total, 3.0 (steel Works) 4.0 Roofing Works 4.1 Construction Of Roof Canopy 4.1.1 Pre - Formed, Pre - Painted G.i. Long Span Roofing In Dark Gray (spanish Style) 0.4mm X 1.05m X 2m 11 Sht 4.1.2 Pre - Formed, Pre - Painted 0.4mm G.i. Fascia Board In Dark Gray Color 13 Ln.m 4.1.3 Pre - Formed, Pre - Painted 0.4mm G.i. Flashing In Dark Gray Color 11 Ln.m 4.1.4 1/8" X 1" X 1" Angle Bar 6 Lght 4.1.5 2 1/2" Full Thread Tekscrew 160 Pcs 4.1.6 1/8" X 3/4" Blind Rivets 2 Boxes 4.1.7 Elastomeric Sealant 2 Gal 4.1.8 Welding Rod 2 Kgs 4.2 Pull-out, Rehabilitation And Replacement Of Techno Bazaar Roofing (roof Gutter, Roof Flashing And Longspan Roofing With Complete Hardware And Accessories 4.2.1 Pre - Formed, Pre - Painted G.i. Long Span Roofing In Dark Gray (spanish Style) 0.4mm X 1.05m X 9.7m 10 Sht 4.2.2 Pre - Formed, Pre - Painted 0.4mm G.i. Fascia Board In Dark Gray Color 11 Ln.m 4.2.3 Pre - Formed, Pre - Painted 0.4mm G.i. Flashing In Dark Gray Color 32 Ln.m 4.2.4 1/8" X 1" X 1" Angle Bar 6 Lght 4.2.5 2 1/2" Full Thread Tekscrew 600 Pcs 4.2.6 1/8" X 3/4" Blind Rivets 2 Boxes 4.2.7 Elastomeric Sealant 2 Gal 4.2.8 5mm Foam Insulation, Double (50m X 1m) 3 Roll 4.2.9 C-purlins 2" X 6" X 1.2mm 4 Lengths 4.2.10 C-purlins 2" X 3" X 1mm 5 Lengths 4.2.11 1/4" Thick Fiber Cement Board 3 Pcs 4.2.12 Labor For Pull-out Of Existing Roofing And Accessories 1 Lot 4.3 Rehabilitation Of Polycarbonate Roofing 4.3.1 Corrugated Polycarbonate 8mm X W 3ft X H8ft, Bronze 8 Sht 4.3.2 2 1/2" Full Thread Tekscrew 90 Pcs 4.3.3 Clear Elastomeric Sealant 2 Gal 4.3.4 2" X 4" Steel Tubular 3 Lengths 4.4 Construction Of Male And Female Toilet Roofing 4.4.1 Pre - Formed, Pre - Painted G.i. Long Span Roofing In Dark Gray (spanish Style) 0.4mm X 1.05m X 2.4m 3 Sht 4.4.2 Pre - Formed, Pre - Painted 0.4mm G.i. Fascia Board In Dark Gray Color 4 Ln.m 4.4.3 Pre - Formed, Pre - Painted 0.4mm G.i. Flashing In Dark Gray Color 6 Ln.m 4.4.4 1/8" X 1" X 1" Angle Bar 3 Lengths 4.4.5 2 1/2" Full Thread Tekscrew 25 Pcs 4.4.6 1/8" X 3/4" Blind Rivets 1 Boxes 4.4.7 Elastomeric Sealant 2 Gal 4.4.8 C-purlins 2" X 3" X 1mm 3 Lengths 4.4.9 C-purlins 2" X 4" X 1.2mm 2 Lengths Sub-total, 4.0 (roofing Works) 5.0 Ceiling Works 5.1 Pull-out And Replacement Of Techno Bazaar Ceiling(portion Only) 1 Lot 5.2 1/4" Thick Fiber Cement Board 5 Pcs 5.3 1/8" X 3/4" Blind Rivets 1 Boxes 5.4 Pvc Wood Slat Panel 0.25m X 2.95 120 Pcs 5.5 Pvc Panel Corner Edge Trim 13 Length 5.6 Pvc Panel Connector 15 Length 5.7 Black Screw 1/8 X 1" 2 Boxes Sub-total, 5.0 (ceiling Works) 6.0 Carpentry Works 6.1 Installation Of Overhead Cabinets With Complete Hardwares And Accessories 1 Lot Sub-total, 6.0 (carpentry Works) 7.0 Signages Works 7.1 Removal Of Stainless Steel Signage 1 Lot 7.2 Male And Female Sticker Signage 1 Lot Sub-total, 7.0 (signages Works) 8.0 Mechanical Works 8.1 Relocation Of Floor Mounted Acu And Condenser (including Testing And Commissioning) 1 Lot Sub-total, 8.0 (mechanical Works) 9.0 Electrical Works 9.1 Rehabilitation Of Wirings And Electrical Systems (including Tapping From Existing Power) 1 Lot 9.2 Installation Of Acu Convenience Outlet & Breaker 2 Lot 9.3 Led Lighiting Pinlights Fixture With 10watts Daylight Bulb 30 Pcs 9.4 Miscellaneous And Accessories 1 Lot Sub-total, 9.0 (electrical Works) 10.0 Plumbing 10.1 Supply And Installation Of Sanitary Pipe And Water Supply System (male & Female Toilet) 1 Lot 10.2 Water Closet With Complete Accessories & Fittings 2 Sets 10.3 Wall Hung Lavatory With Faucet & Complete Fittings 2 Sets 10.4 Bidet Spray 2 Sets 10.5 Stainless Steel Floor Drain 4" Ø 2 Sets Sub-total, 10.0 (plumbing Works) 11.0 Tiling Works 11.1 60 Cm X 60cm Ceramic Floor Tiles (semi-polished) 9 Pcs 11.2 0.60m × 0.60m Ceramic Wall Tiles (glossy) 52 Pcs 11.3 40 Kg Cement 2 Bags 11.4 Tile Adhesive 3 Bags 11.5 Tile Grout 2 Kgs 11.6 4"ø Diamond Cutting Disc 2 Pcs Sub-total, 11.0 (tiling Works) 12.0 Painting Works 12.1 Surface Preparation, Sanding And Repainting Of Landbank Atm Wall ( Wall Art Painting) 15 Sq.m 12.2 Skim Coat Powder 6 Bags 12.3 Masonry Putty 6 Bags 12.4 Latex Flat White Paint 5 Gal 12.5 Semigloss Latex Paint (gray Stone) Or Equivalent 3 Gal 12.6 Semigloss Latex Paint (gemstone Green) Or Equivalent 5 Gal 12.7 Semigloss Latex Paint (winter Morning) Or Equivalent 8 Gal 12.8 Semigloss Latex Paint (tulle White) Or Equivalent 15 Gal 12.9 Lacquer Thinner 4 Gal 12.10 Body Filler 2 Gal 12.11 Red Metal Primer 2 Gal 12.12 Epoxy Primer (gray) 2 Gal 12.13 Gray Enamel 3 Gal 12.14 Black Enamel 2 Gal 12.15 Perforated Tape 1" 3 Roll 12.16 Roller 9" 3 Pcs 12.17 Baby Roller 3 Pcs 12.18 Paint Brush 2" 2 Pcs 12.19 Paint Tray 3 Pcs 12.20 Sand Paper #120 25 Pcs 12.21 Sand Paper #60 30 Ft 12.22 Masking Tape 20 Pcs 12.23 Waste Cotton 5 Kg Sub-total, 12.0 (painting Works) 13.0 Doors & Window Blinds 13.1 Pull-out Of Existing Fixed Window For The Construction Of Male And Female Toilet 1.00 Lot 13.2 Supply, Delivery And Installation Of 2 Units Jalouplas Window 2.00 Unit 13.3 Supply, Delivery And Installation Of 2 Units Pvc Door 2.00 Unit 13.4 Supply, Delivery And Installation Of Window Blinds In Extension Area (see Actual Dimension) 30.00 Sq.m Sub-total, 13.0 (doors & Window Blinds Works) 14.0 Miscellaneous Works 14.1 For All Other Items That Are Not Included On Listed Bill Of Quantities In Your Bid But Tare Deemed Necessary For The Completion Of The Works And The Delivery Of The Project And In Full Compliance With All The Requirements Of The Occupancy Permit. Sub-total, 14.0 (miscellaneous Works) Project Duration: 45 Calendar Days Note: Attach Certificate Of Site Inspection A. Total Direct Cost B. Consumables: C. Supervision And Administration: D. Total Indirect Cost (b+c): E. Total Cost (a+d) F. Vat (12% Of Item E): Grand Total Of Project Cost: *************nothing Follows************ Total Abc = Php 895,000.00 Procurement Of Labor And Materials For The Rehabilitation Of Techno Bazaar At Talisay Campus -j. Alvaran Pr# 23-368-0711 07-11-23 Income 230-164-23-06 07-06-23
Contact
Tender Id
f8b44c22-f957-3d65-ba43-0b5d9e88e4c0Tender No
9946830Tender Authority
CARLOS HILADO MEMORIAL STATE UNIVERSITY ViewPurchaser Address
-Website
http://notices.philgeps.gov.ph