Car Tenders
Car Tenders
Municipality Of Sabtang, Batanes Tender
Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Stock No. Unit Of Issue Item Description Quantity 1 Unit Ideapad 3 Slim 15iah8 83er00d6ph Intel 1 Core I5 12450h 8c/12t 12m Cache, 1.5 Up To 4.4ghz Display: 15.6” Fhd 1920x1080 Graphics: Intel Iris Xe Graphics Ram: 16gb Ddr4 Onboard Storage: 512gb M.2 Nvme 4.0 Ssd 2 Boxes 24 Pcs. Plastic Bulldog Clip (38mm) 2 3 Boxes 24 Pcs. Plastic Bulldog Clip (63mm) 2 4 Packs Battery, Dry Cell, C Size 8 5 Packs Battery, Dry Cell, Size Aaa 3 6 Pieces Certificate Holder A4 5 7 Packs Colored Sticky Noted Film (13x44cm) (10x100 Sheetes) 2 8 Unit Digital Voice Recorder Ux560f,recoed In Mp3/lpcm W/ 1 A High Sensitivity S-microphone,up To 4gb Built In Storage Expandable Via Microsd Cards,focus And Wide Microphone Modes To Suit Lectures Or Meetings,direct Usb Built In For Easy Connection To Pc,fm Radio To Listen To Or Record Radio Broadcast 9 Pieces Dish Washing Foam Tough Clean Scrub Sponge 3 10 Pieces Double-sided Tape (1”) 3 11 Pieces Duct Tape 2” 2 12 Pieces Envelope Brown (long) 10 13 Pieces Envelope Brown Short 10 14 Unit Extension Cord Outlet With Individual Switch,heavy Duty 5 Gang 1 15 Pieces Foldable Folder Long 15 16 Pieces Foldable Folder Short 10 17 Pieces Gel Ink Pen 0.5 Mm(2 Sk Blue,2 Violet,2 Glossy Inject 6 Photopaper 260 18 Pack Glossy Inkjet Photopaper 260 1 19 Piece Hdmi Cable (short Chord) 1 20 Piece Heavy Duty Stapler 1 21 Pack Laminating Film 100 Sheets 1 22 Pack Light Color Index Sticker Label Paper Sticky Notes Bookmark 1 Note 240pc (small) 23 Pieces Masking Tape (1 1/2 “) 3 24 Pieces Masking Tape (1”) 3 25 Pieces Masking Tape(2”) 3 26 Piece Mini Puncher 1 27 Pieces Packaging Tape (2”) 10 28 Packs Paper Cups (8oz) 3 29 Box Paper Fastener Short 7cm 1 30 Packs Photo Paper A4 3 31 Pack Printable Magnetic Sheets With Adhesive A4 1 32 Cyl. Refill Ink (epson-l5290) Cyan 5 33 Cyl. Refiil Ink (epson-l5290) Magenta 5 34 Cyl. Refill Ink (epson L55290)yellow 5 35 Cyl. Refill Ink (epson L55290 ) Yellow 5 36 Pieces Scissors Heavy Duty 2 37 Box Standard Staples No.35 6mm 1 38 Pieces Transparent Tape 2” 5 39 Pieces White Board Marker (broad: 1 Blue & 1 Black) 2 40 Pieces White Board Marker Fine (1black;1 Blue) 2 41 Packs Bathroom Tissue (@12 Rolls) 8 42 Bottles Alcohol (spray Type)250 Ml 2 43 Cyl. Air Freshener Scented Gel (sakura & Waterlily)180ml 5 44 Gal. Alcohol With Moisturizer 1 45 Bottles Bleach (1l) 3 46 Bottles Dishwashing Liquid 250ml 10 47 Packs Disposable Plastic Spork 2 48 Piece Dustpan 1 49 Box Facial Tissue 10 50 Bottles Hydrochloric Acid 500 Ml 3 51 Pack Laundry Powdered (1kl) 3 52 Bottles Oil Based Scents Car Hanging Diffuser Car Air Freshener 5 10 Ml (shangri-la Scent)
Closing Date4 Feb 2025
Tender AmountPHP 95.9 K (USD 1.6 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Updated Solicitation Amendment
**note – Clause 52.2347-1 Site Visit Has Been Added.
a Site Visit For The Metal Shed Disposal Is Now Scheduled For Wednesday, January 22, 2025 At 9:00am On Joint Base Pearl Harbor Hickam.
all Interested Parties For The Site Visit Must Email Name And Contact Information To Both The Primary And Secondary Points Of Contact By Friday, January 17, 2025 At 9:00am.
see Attachments Section For Vendor Q&a.
quote Due Date Has Been Changed To 1/29/2025 At 12:00pm.
----------
pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (phnsy & Imf) Is A Us Navy Regional Industrial Center That Maintains, Overhauls And Repairs Various Vessels Of The Us Navy. Its Industrial Operations Provide The Us Naval Forces With A Wide Range Of Services And Resources Located On The Island Of Oahu, Hawaii, With Direct And Indirect Support To Submarines, Surface Vessels And Shore Based Activities In The Pacific.
phnsy & Imf Seeks A Contractor That Is Qualified To Perform The Dismantling And Packaging Of A 20’ X 26’ X 11’4” High Metal Storage Shed. The Schedule Of The Dismantling And Packaging Of The Metal Shed Shall Be Determined By The Government Representative And Coordinated With The Contractor. Additional Details And Specifications Can Be Found In The Attached Performance Work Statement (pws).
the Period Of Performance For This Service Is 3/3/2025 To 3/28/2025.
the Applicable North American Industry Classification System (naics) Code Assigned To This Procurement Is 238910; The Size Standard For This Naics Is $19 Million. Product Service Code Is P500 Salvage – Demolition Of Structures / Facilities (other Than Buildings).
please Note The Following:
the Solicitation Number For This Requirement Is N32253-25-q-0008.
quotes Are Due No Later Than Wednesday, 1/29/2025 At 12:00 Pm Hst.
quotes Must Be Sent Via Email To Both The Primary And Secondary Points Of Contact.
all Firms Or Individuals Responding Must Be Registered With The System For Award Management (sam) (https://www.sam.gov) By The Award Date. The Solicitation Document And Incorporated Provisions And Clauses Will Be Those In Effect Through Federal Acquisition Circular (fac) 2025-02, Dfars 12/18/2024, And Nmcars 18-22.
in Order To Evaluate Technical Capability, The Offeror Is Required To Submit A Detailed Written Technical Proposal (not To Exceed 3 Pages) That Clearly Demonstrates Thorough Knowledge And Understanding Of, And Approach To, Accomplishing Each Paragraph Listed In The Pws And Solicitation Requirements. Non-conformance Will Deem An Offeror Ineligible.
all Quotation Submissions Need To Include Completion Of Far 52.204-24, 52.204-26, And 52.212-3.
the Offeror Shall Submit All Pages Of The Sf 1449 With Blocks 17a.and 30a.-30c. (sf 1449 Page 1) And Clin Information (0001- Sf 1449 Pages 3) Completed…submission Of A Signed Offer To The Government Constitutes Agreement And Acceptance Of The Solicited Terms And Conditions.
the Government May Revise The Solicitation At Any Time By Means Of An Amendment. It Is An Offeror’s Responsibility To Ensure It Is Accessing The Government Point Of Entry (gpe) Website, Https://sam.gov/, To View Potential Amendments And Procurement Notifications For This Solicitation.
submit An Itemized Breakdown Of Price Quote That Clearly And Concisely Describes And Defines The Contractor’s Response To The Requirements Contained In The Solicitation. If Required, Travel Costs Including Airfare, Lodging, Rental Car, Per Diem, Shall Be Included. Travel Shall Be In Accordance With Current Department Of Defense (dod) Joint Travel Regulations And Federal Acquisition Regulations (far) 31.204-46. Travel Receipts Shall Be, Provided Upon Request.
contract Award Will Be In Accordance To 52.212-2 As Stated In The Solicitation.
all Questions Regarding Solicitation N32253-25-q-0008 Shall Be Submitted In Writing Via Email To The Listed Pocs. Questions Are Due 1/23/2025 11:00am Hst.
Closing Date29 Jan 2025
Tender AmountRefer Documents
Punjab National Bank - PNB Tender
Auction
Real Estate Service
India
Details: Auction Sale Of Immovable Property - Property Belongs To Mrs. S. Uma Maheswari: Schedule - "a": All That Piece And Parcel Of Land And Building Bearing Plot No. 300 (as Per Layout Sub-division Permission Plan Order No. 261/2011 Dated 20.06.2011, Approved No. Ppa 04707/2015 Dated 28.07.2015, Building Approval No. 00430/2016, Dated 04.02.2016 In Sub Divided Plot No. 300a And Approved Ppa No. 04325/2015 Dated 10.07.2015, Building Approval No. 04470/2015 Dated 15.10.2015 In Sub Divided Plot No. 300b) Measuring An Extent Of 4900 Sq. Ft., In Kubera Nagar Extension Layout South Area, 10th Street, Madipakkam, Chennai 600091, Comprised In Paimash No. 1260, 1261/10 And 1257, S. Nos. 131/3, 132/5, 132/6, 132/7, 132/8 And 136 Previously In Patta No. 5769 And Presently In Patta No. 9108, As Per Patta New S. No. 132/39 New Patta No. 11498, As Per New Patta Survey No. 132/39, Situated At No. 154, Kubera Nagar Extension, Layout South Area, 10th Street, Madipakkam Village, Previously Tambaram Taluk, Now Sholinganallur Taluk, Kancheepuram District And Bounded On The North By: Doctor Parthasarathy Land, South By: 30 Feet Wide Road, East By: Plot No. 301, West By: Plot No. 299, Situated Within The Registration District Of South Chennai And Sub-registration District Of Velachery.
schedule - "b": An Extent Of 500 Sq.ft Of Uds Of Land In Schedule 'a' Property.
schedule - "c": An Extent Of 500 Sq.ft Of Uds Of Land In Schedule A Property, Super Built Up Area Of 1466 Sq.ft Of Residential Floor In First Floor, Bearing Flat No. Bf-2, Including Common Amenities, Common Area Of The Building And One Car Parking. Latitude Longitude: 12.95692, 80.20000
property Id: Punbecb56509214
Closing Date26 Jan 2025
Tender AmountRefer Documents
States Of Jersey Tender
Civil And Construction...+3Civil Works Others, Consultancy Services, Civil And Architectural Services
United Kingdom
Details: For Cost Management Advisory Services To Support The Preconstruction And Construction Phases Of The Development Works On The Site Known As Overdale And Which Is The Proposed Location For The New Acute Hospital. These Development Works Include Six (6) Initial Work Packages To Be Awarded Under Six (6) Separate Nec4 Contracts As Shown Below. This Opportunity Will See The Advisor Appointed Under A Single Nec4 Professional Services Contract (psc) To Assist The Employer And The Project Manager Both In The Tendering And Construction Periods. The Bidders Should Also Note There Are Concurrent Opportunities For A Project Manager And A Site Supervisor Role. The Anticipated Programme For The Works Is: Commencement 17th February 2025 And Completion 31st December 2025 Development Works Package 1 - Nec4(awarded Using The Ecc Option A) - A Contractor Shall Be Appointed To Undertake The Following Works: Design, Supply And Installation Of The Site Hoardings And Gates; The Removal Of Topsoil And Vegetation And Vegetation Along With The Remaining Hard Standings; Principal Contractor For Package 1 Development Works Package 2 - Nec4 (awarded Using The Ecc Option A)- A Contractor Shall Be Appointed To Undertake The Following Works: The Removal Of Utilities And Remaining Live Services, Including The Design And Installation Required For The Re-location Of The 11kv Transformer And Supply Development Works Package 3 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: The Reduced Ground Level Dig (cut And Fill) To The Areas Covered By The Existing Planning Permission P/2021/1670 Development Works Package Contract 4 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Site Accommodation/welfare Facilities Incl. Car Parking And Utilities Development Works Package Contract 5 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Temporary Haul Road Development Works Package Contract 6 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Design And Installation Of The Crane Bases; Demolition Of A Wing Of The Camden Building, Rebuilding Of Gable Wall And Installation Of Kitchen
Closing Date6 Jan 2025
Tender AmountRefer Documents
States Of Jersey Tender
Civil And Construction...+1Civil Works Others
United Kingdom
Details: For Site Supervisory Services To Support The Preconstruction And Construction Phases Of The Development Works On The Site Known As Overdale And Which Is The Proposed Location For The New Acute Hospital. These Development Works Include Six (6) Initial Work Packages To Be Awarded Under Six (6) Separate Nec4 Contracts As Shown Below. This Opportunity Will See The Advisor Appointed Under A Single Nec4 Psc Form Of Contract To Assist The Employer And The Project Manager With Assuring The Contracts Are Executed In Accordance With The Contract And Quality Standards. The Bidders Should Also Note There Are Concurrent Opportunities For A Project Manager And A Cost Advisor Role. The Anticipated Programme For These Works Is: Commencement 17th February 2025 And Completion 31st December 2025 Development Works Package 1 - Nec4(awarded Using The Ecc Option A Form) - A Contractor Shall Be Appointed To Undertake The Following Works: Design, Supply And Installation Of The Site Hoardings And Gates; The Removal Of Topsoil And Vegetation Along With The Remaining Hard Standings Principal Contractor For Package 1 Development Works Package 2 - Nec4 (awarded Using The Ecc Option A Form)- A Contractor Shall Be Appointed To Undertake The Following Works: The Removal Of Utilities And Remaining Live Services, Including The Design And Installation Required For The Re-location Of The 11kv Transformer And Supply Development Works Package 3 - Nec 4 (awarded Using The Ecc Option A Form) - A Contractor Shall Be Appointed To Undertake The Following Works: The Reduced Ground Level Dig (cut And Fill) To Areas Covered By The Existing Planning Permission P/2021/1670 Development Works Package Contract 4 - Nec4 (awarded Using The Ecc Option A) - A Contractor Shall Be Appointed To Undertake The Following Works: Site Accommodation/welfare Facilities Incl. Car Parking And Utilities Development Works Package Contract 5 - Nec4 (awarded Using The Ecc Option A) - A Contractor Shall Be Appointed To Undertake The Following Works: Temporary Haul Road Development Works Package Contract 6 - Nec4 (awarded Using The Ecc Option A) - A Contractor Shall Be Appointed To Undertake The Following Works: Crane Bases Demolition Of A Wing Of The Camden Building, Rebuilding Of Gable Wall And Installation Of Kitchen
Closing Date6 Jan 2025
Tender AmountRefer Documents
City Of Marikina Tender
Machinery and Tools
Philippines
Details: Description . - Republic Of The Philippines City Of Marikina Sf-good-05 Mkna-gso-25-0078 Revised On: July 28, 2004 Bids And Awards Committee Notice Of Proposed Procurement The City Government Of Marikina, Through Its Bids And Awards Committee (bac), Would Like To Inform The Public Of The Proposed Procurement Thru Alternative Mode Of Procurement In Compliance With Posting Requirement As Prescribed In Section 21.2.1 Of The Irr Of R.a 9184 (1. Section 52.1 (b) Shopping; 2. Section 53.1– Two Failed Biddings; 3. Section 53.9-small Value Procurement) No. Category Reference /purchase Request No. Implementing Office/project/purpose Item/brief Description Approved Budget For The Contract (abc) 1 General Repair And Maintenance Services 100-2502-0166 Gad Office/repair And Maintenance Of Elevator Labor, Adjustment Of Car Door, All Hall Door Elevator Including Trouble Shooting, Testing, Etc.. 118,500.00 Delivery Period/contract Duration: As Schedule – 30 Days (upon Receipt Of Purchase Order/contract) Prospective Suppliers/contractor Should Have Experience In Undertaking A Similar Project Within The Last 2 Years With An Amount Of At Least 50% Of The Proposed Procurement. Complete Sets Of Eligibility Requirements And Documents (requests For Proposal/requests For Quotation) May Be Obtained At The (bac Secretariat) Procurement Section Of The General Services Office (gso), Ground Floor, Marikina City Hall, This City (tel. Nos. 646-16-26, 369-57-09) The Bac Reserves The Right To Accept Or Reject All Quotations/proposals Or Part Thereof, To Waive Formality Therein Or To Accept Such Offer Or To Award Any Work That Is Considered Most Advantageous To The City Government Of Marikina. (sgd.) Ramonito D. Viliran, Md., Mph. Chairman, Bids And Awards Committee * Posted At Philgeps Website – Www.philgeps.gov.ph On Feb. 6-10, 2025. * Posted At Marikina Website- * Http://marikina.gov.ph/transparency-procurement Lungsod Ng May Mabuting Ugali (city Of Good Conduct) Rfq #25-049 Ref #
Closing Date10 Feb 2025
Tender AmountPHP 118.5 K (USD 2 K)
City Of Marikina Tender
Machinery and Tools
Philippines
Details: Description . - Republic Of The Philippines City Of Marikina Sf-good-05 Mkna-gso-25-0078 Revised On: July 28, 2004 Bids And Awards Committee Notice Of Proposed Procurement The City Government Of Marikina, Through Its Bids And Awards Committee (bac), Would Like To Inform The Public Of The Proposed Procurement Thru Alternative Mode Of Procurement In Compliance With Posting Requirement As Prescribed In Section 21.2.1 Of The Irr Of R.a 9184 (1. Section 52.1 (b) Shopping; 2. Section 53.1– Two Failed Biddings; 3. Section 53.9-small Value Procurement) No. Category Reference /purchase Request No. Implementing Office/project/purpose Item/brief Description Approved Budget For The Contract (abc) 1 General Repair And Maintenance Services 100-2502-0166 Gad Office/repair And Maintenance Of Elevator Labor, Adjustment Of Car Door, All Hall Door Elevator Including Trouble Shooting, Testing, Etc.. 118,500.00 Delivery Period/contract Duration: As Schedule – 30 Days (upon Receipt Of Purchase Order/contract) Prospective Suppliers/contractor Should Have Experience In Undertaking A Similar Project Within The Last 2 Years With An Amount Of At Least 50% Of The Proposed Procurement. Complete Sets Of Eligibility Requirements And Documents (requests For Proposal/requests For Quotation) May Be Obtained At The (bac Secretariat) Procurement Section Of The General Services Office (gso), Ground Floor, Marikina City Hall, This City (tel. Nos. 646-16-26, 369-57-09) The Bac Reserves The Right To Accept Or Reject All Quotations/proposals Or Part Thereof, To Waive Formality Therein Or To Accept Such Offer Or To Award Any Work That Is Considered Most Advantageous To The City Government Of Marikina. (sgd.) Ramonito D. Viliran, Md., Mph. Chairman, Bids And Awards Committee * Posted At Philgeps Website – Www.philgeps.gov.ph On Feb. 6-10, 2025. * Posted At Marikina Website- * Http://marikina.gov.ph/transparency-procurement Lungsod Ng May Mabuting Ugali (city Of Good Conduct) Rfq #25-049 Ref #
Closing Date10 Feb 2025
Tender AmountPHP 52.5 K (USD 905)
States Of Jersey Tender
Civil And Construction...+1Civil Works Others
United Kingdom
Details: For Nec4 Project Management Services To Support The Preconstruction And Construction Phases Of The Development Works On The Site Known As Overdale And Which Is The Proposed Location For The New Acute Hospital. These Development Works Include Six (6) Initial Work Packages To Be Awarded Under Six (6) Separate Nec4 Contracts As Shown Below. This Opportunity Will See The Advisor Appointed Under A Single Nec4 Professional Services Contract (psc) To Assist The Employer And The Supervisor With The Management And Control Of The Ecc Form Of Contract. ?the Bidders Should Also Note There Are Concurrent Opportunities For A Site Supervisor And A Cost Advisor Role. The Anticipated Programme For These Works Is: Commencement 17th February 2025 And Completion 31st December 2025 Development Works Package 1 - Nec4(awarded Using The Ecc Option A Form) - A Contractor Shall Be Appointed To Undertake The Following Works: Design, Supply And Installation Of The Site Hoardings And Gates The Removal Of Topsoil And Vegetation Along With The Remaining Hard Standings; Principal Contractor For Package 1 Development Works Package 2 - Nec4 (awarded Using The Ecc Option A)- A Contractor Shall Be Appointed To Undertake The Following Works: The Removal Of Utilities And Remaining Live Services, Including The Design And Installation Required For The Re-location Of The 11kv Transformer And Supply Development Works Package 3 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: The Reduced Ground Level Dig (cut And Fill) To The Areas Covered By The Existing Planning Permission P/2021/1670 Development Works Package Contract 4 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Site Accommodation/welfare Facilities Incl. Car Parking And Utilities Development Works Package Contract 5 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Temporary Haul Road Development Works Package Contract 6 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Design And Installation Of The Crane Bases; Demolition Of A Wing Of The Camden Building, Rebuilding Of Gable Wall And Installation Of Kitchen
Closing Date6 Jan 2025
Tender AmountRefer Documents
States Of Jersey Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United Kingdom
Details: For Cost Management Advisory Services To Support The Preconstruction And Construction Phases Of The Development Works On The Site Known As Overdale And Which Is The Proposed Location For The New Acute Hospital. These Development Works Include Six (6) Initial Work Packages To Be Awarded Under Six (6) Separate Nec4 Contracts As Shown Below. This Opportunity Will See The Advisor Appointed Under A Single Nec4 Professional Services Contract (psc) To Assist The Employer And The Project Manager Both In The Tendering And Construction Periods. The Bidders Should Also Note There Are Concurrent Opportunities For A Project Manager And A Site Supervisor Role. The Anticipated Programme For The Works Is: Commencement 3rd March 2025 And Completion 27th February 2026 Development Works Package 1 - Nec4(awarded Using The Ecc Option A) - A Contractor Shall Be Appointed To Undertake The Following Works: Design, Supply And Installation Of The Site Hoardings And Gates; The Removal Of Topsoil And Vegetation Along With The Remaining Hard Standings; Principal Contractor For Package 1 Development Works Package 2 - Nec4 (awarded Using The Ecc Option A)- A Contractor Shall Be Appointed To Undertake The Following Works: The Removal Of Utilities And Remaining Live Services, Including The Design And Installation Required For The Re-location Of The 11kv Transformer And Supply Development Works Package 3 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: The Reduced Ground Level Dig (cut And Fill) To The Areas Covered By The Existing Planning Permission P/2021/1670 Development Works Package Contract 4 - Nec4 (awarded Using The Ecc Option A)- A Contractor Shall Be Appointed To Undertake The Following Works: Site Accommodation/welfare Facilities Incl. Car Parking And Utilities Development Works Package Contract 5 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Temporary Haul Road Development Works Package Contract 6 - Nec4 (awarded Using The Ecc Option A) – A Contractor Shall Be Appointed To Undertake The Following Works: Design And Installation Of The Crane Bases; Demolition Of A Wing Of The Camden Building, Rebuilding Of Gable Wall And Installation Of Kitchen
Closing Date7 Feb 2025
Tender AmountRefer Documents
Municipality Of Buenavista, Bohol Tender
Furnitures and Fixtures
Philippines
Details: Description Purchase Request Municipality Of Buenavista Lgu Department: Mo Section: Pr: Date: Sa1 No. Qty. Unit Item Description Estimated Unit Cost Estimated Total Cost 40 Pcs Brown Envelope Long 40 Pcs Brown Envelope Short 30 Pcs Plastic Envelope Long 15 Pcs Plastic Envelope Short 60 Pcs White Folder Long 40 Pcs White Folder Short 20 Pcs Dark Green Folder Long 20 Pcs Expanded Folder Long 30 Reams Bond Paper Long 30 Reams Bond Paper Short 3 Packs Photo Paper 3 Packs Board Paper Long 3 Packs Board Paper Short 10 Pcs Record Book 30 Pages 10 Packs White Ordinary Envelope 5 Packs Sticky Note Pad 3 Packs Sticky Note Tab 1 Pad Yellow Pad ¼ Size 1 Pad Yellow Pad ½ Lengthwise 2 Pcs Scotch Tape Big (2 Inches Width) 2 Pcs Scotch Tape Small (1 Inch Width) 1 Pc Scotch Tape Dispenser (1 Inch Width) 5 Pcs Wireless Mouse 3 Pcs Wired Mouse 10 Pcs Pencil 20 Pcs Ballpen Black 20 Pcs Ballpen Blue 5 Pcs Hi-techpoint V10grip Black 1 Pc Permanent Marker Black 3 Pcs Scissor Big 5 Box Paper Clips 10 Pcs Correction Tape 10 Bots Alcohol 70% 4 Bots Air Freshener Spray 4 Bots Sports Car Freshener (assorted Scents) 2 Bots Safeguard Handwash Floral Pink 3 Bots Vs1 Protector (big) 2 Bots Armour All Protectant (big) 3 Bots Chamois Cloth 12 Roll Toilet Paper 4 Pcs Flash Drive 32gb Total: Purpose: Purchase Office Supplies For Mayor’s Office Requested By: Federico G. Pacaldo Jr. Municipal Administrator Approved By: Dave D. Duallo Municipal Mayor
Closing Date27 Jan 2025
Tender AmountPHP 65 K (USD 1.1 K)
4101-4110 of 4384 archived Tenders