Camera Tenders

Camera Tenders

Cebu Technological University Tender

Telecommunication Services
Philippines
Details: Description Wireless Conferencing System With Receiver And Intelligent Video Bar The Wireless Conferencing System With Receiver And Intelligent Video Bar Must Be Able To Connect To Different Types Of Devices Like Laptops, Smartphones, And Tablet Devices. The Wireless Presentation And Collaboration Device Must Have The Following Specifications: Communications: • Ethernet: 100/1000 Mbps, Auto-switching, Autonegotiating, Autodiscovery, Full/half Duplex, Tcp/ip, Udp/ip, Dhcp, Ssl, Tls5, Ssh, Sftp (ssh File Transfer Protocol), Ieee 802.1x, Active Directory Authentication, Https Web Browser Setup And Xio Cloud Service, 802.3af Compliant • Wi-fi: Dual-band 802.11a/b/g/n/ac/ax (2.4 Ghz & 5 Ghz); Up To 70 Ft (23 M) Range At 80 Mbps, Subject To Site-specific Conditions. • The Bluetooth® Communications Must At Least Be At Version 5.0 • Usb Host: Usb 2.0 For Connecting A Usb Conferencing Peripheral; Usb 3.0 For Connecting A Usb Conferencing Peripheral • Usb Device: Usb 3.0 For Computer Console (installer Setup And Firmware Update) • Rs-232: 2-way Display Device Control Up To 115.2k Baud With Hardware And Software Handshaking • Ir/serial: 1-way Display Device Control Via Infrared Up To 1.1 Mhz Or Serial Ttl/rs-232 (0-5v) Up To 19.2k Baud • Hdmi Input: Hdcp 1.4, Edid; Supports Management Of Hdcp And Edid • Hdmi Output: Hdcp 2.2, Edid, Cec; Supports Management Of Hdcp And Edid Software: • Os Support: Apple® Ios®, Android™, Windows 10, Windows 11, Macos®, Chrome Os™ • Video Frame Rate: Up To 30 Fps, Audio Supported • Output Resolutions: 640x480@60hz, 800x600@60hz, 1024x768@60hz, 1280x720@50hz (720p50), 1280x720@60hz (720p60), 1280x800@60hz, 1366x768@60hz, 1440x900@60hz, 1600x900@60hz, 1600x1200@60hz, 1680x1050@60hz, 1920x1080@50hz (1080p50), 1920x1080@60hz (1080p60) • Bitrate Peak: 0.25 To 8.5 Mbps, Variable Depending On Content Complexity • Bitrate Average: 1.4 Mbps Typical Audio Format: Stereo Wireless Conferencing: • Os Support (application): Windows 10, Windows 11 • Os Support (connect Adaptor): Windows 10, Windows 11, Macos 11 Or Later • Must Support The Following Conferencing Services: Microsoft Teams Software; Zoom Software • Must At Least Be Compatible With The Following Conferencing Peripheral Brands: All-in-one Systems Kits/soundbars (brands: Logitech, Cisco, Crestron, Owl Bar, Poly Studio, Panasonic, Jabra, Bose, Biamp, Sennheiser, Neat Bar); Microphones/speakerphones/speakers (brands: Jabra, Crestron, Shure, Poly); Cameras (brands: Logitech, Jabra, Aver, Crestron, Huddly, Clearone); Audio Dsps Microphone/speakers (brand: Shure, Biamp, Q-sys); Usb Converters (brands: Dante Avio, Crestron) Video: • Input Signal Types: Hdmi (dvi & Dual-mode Displayport™ Compatible); Simultaneous Display Of Up To Four Sources • Maximum Input Resolutions: Hdmi Input: 1920x1080@60hz (hd 1080p60); • Airmedia Presentation: 1920x1080@30hz (1080p30); Airmedia Connect • Adapter: 3840x2160@30hz (4k30) • Output Signal Types: Hdmi (dvi Compatible) • Hdmi Output Resolutions: 1280x720@50hz (720p50), 1280x720@60hz (720p60), 1280x800@60hz, 1366x768@60hz, 1440x900@60hz, 1600x900@60hz, 1600x1200@60hz, 1680x1050@60hz,1920x1080@50hz (1080p50), 1920x1080@60hz (1080p60), 3840x2160@30hz (2160p30), 3840x2160@50hz (2160p50), 3840x2160@60hz (2160p60) Background & Logo File Support: Jpeg, Png Audio: • Input Signal Types: Hdmi (dual-mode Displayport™ Compatible) • Output Signal Type: Hdmi • Input/output Format: 2 Channel Lpcm Connectors: • Ant-a & Ant-b: (2) Sma Connectors For External Wi-fi Antennas; Wi-fi Antennas Included With 6.56 Ft (2m) Cables • Ir: (1) 2-pin 3.5 Mm Detachable Terminal Block; Ir/serial Output Port For Display Device Control; Ir Output Up To 1.1 Mhz; 1-way Serial Ttl/rs-232 (0-5v) Up To 19200 Baud • Com: (1) 5-pin 3.5 Mm Detachable Terminal Block; Bidirectional Rs-232 Port For Display Device Control; Up To 115.2k Baud, Hardware And Software Handshaking Support • Audio Out: (1) 5-pin 3.5 Mm Detachable Terminal Block; Balanced/unbalanced Stereo Line-level Audio Output; Maximum Output Level: 4 Vrms Balanced, 2 Vrms Unbalanced; Output Impedance: 200 Ohms Balanced, 100 Ohms Unbalanced • Microsd: For Caching Digital Signage Content • Hdmi Input: (1) Hdmi Type A Connector; Hdmi Digital Video/audio Input; (dvi & Dual-mode Displayport Compatible) • Hdmi Output: (1) Hdmi Type A Connector; Hdmi Digital Video/audio Output (dvi Compatible) • Usb: (2) Usb Type A Connectors; Usb 2.0 Host Port For Usb Conferencing Peripheral; Usb 3.0 Host Port For Usb Conferencing Peripheral; (1) Usb Type B Connector; Usb 3.0 Device Port For Computer Console • Lan Poe+: (1) 8-pin Rj-45 Connector; 100base-tx/1000base-t Ethernet Port And Poe+ Class 4 • Lan Aux: (1) 8-pin Rj-45 Connector; 100base-tx/1000base-t Ethernet Port; Connects To A Secondary, Guest-only Network Controls And Indicators: • Power: (1) Green Led, Indicates Operating Power Supplied Via The Local Power Pack Or Poe+ • Reset: (1) Recessed Push Button For Hardware Reset • Setup: (1) Recessed Push Button For Onscreen Ip Address Display And For Pairing The Device To An Am-tx3-100; (1) Red/white Led, Indicates Pairing Status • Online: (1) Green Led, Indicates Control System Connection • Hdmi In/out: (2) Green Leds, Indicate Hdmi Signal Presence At The Hdmi Input/output • Microsd: (1) Microsd Slot • Lan Poe+: (2) Leds, Green Led Indicates Ethernet Link Status, Amber Led Indicates Ethernet Activity • Lan Aux: (2) Leds, Green Led Indicates Ethernet Link Status, Amber Led Indicates Ethernet Activity Compliance: Intertek® Listed For Us & Canada, Ce, Ic, Fcc Part 15 Class B Digital Device The Intelligent Video Bar Must Have The Following Specifications: Speakers: • Woofers: (2) 2 In. (50 Mm) Woofers • Tweeters: (2) 2 X 3/4 In. (50 X 20 Mm) Tweeters • Frequency Response: 80 Hz To 20 Khz Microphones: • Microphone: (8) Microphone Beamforming Array • Pickup Range: Suitable For Rooms Up To 15 X 15 Ft (4.5 X 4.5 M) • Sensitivity: -37 Dbfs • Frequency Response: 100 Hz To 8 Khz Video: • Cameras: (3) Cameras • Resolution: 3840 X 1080 @ 30 Fps; 13 Megapixels • Field Of View: 180º Horizontal, 54º Vertical • Zoom: 6x Lossless Digital Zoom; Automatically Adjusts The Field Of View To Frame All Participants Indicators: • Status Bar: (1) Multicolor Led Indicates Connection Status, In-call Mute/unmute, Room Capacity Status, Remote Control Pairing, And Firmware Update Status Connectors: • Power: (1) Ac Power Connector, Female; For Included Ac Power Pack • Auxin: (1) 3.5 Mm Aux Port; For Future Use • Usb C: (1) Usb-c Connector, Female; Connects To Conferencing System, Room Controller, Or Laptop • Ethernet: (1) Rj-45 Connector, Female; Not Used In Crestron Flex Systems • The Enclosure Must Have The Following Features: Black Speaker And Camera Housing, Rear Air Vents, Integrated Adjustable Mounting Bracket • Can Be Wall Mounted Using Integrated Mounting Bracket; Optional Table Mount Or Vesa® Compliant Screen Mount Software Certification: Microsoft Teams Rooms And Zoom Rooms
Closing Soon28 Jan 2025
Tender AmountPHP 500 K (USD 8.5 K)

Eskom Holdings SOC Ltd Tender

Civil And Construction...+2Others, Civil Works Others
South Africa
Details: Details Tender Number Mwp2950ntcsa Department Eskom Tender Type Request For Bid(open-tender) Province Gauteng Date Published 13 December 2024 Closing Date 19 February 2025 10 00 Place Where Goods, Works Or Services Are Required Germiston--germiston- Special Conditions None Enquiries Contact Person Nozipho Sibanyoni Email Sibanyns@ntcsa.co.za Telephone Number 011-800-3415 Fax Number N/a Briefing Session Is There A Briefing Session? Yes Is It Compulsory? No Briefing Date And Time 29 January 2025 10 00 Briefing Venue N/a Tender Documents Technical Evaluation Criteria Technical Cutting Torch.docx Technical Evaluation Criteria Technical Chainsaws=4.docx 240-68099512 Form A_cat 4_ Rev 9 Supply And Delivery Production Equipment.pdf 240-105658000 Supplier Quality Management Specification.pdf Ntcsa Invitation_to_tender_(itt)_production Equipment For Ls.pdf Technical Evaluation Criteria Technical Portable Spotlight.docx Technical Evaluation Criteria Technical Camera.docx Technical Evaluation Criteria Technical Angle Grinder.docx Technical Evaluation Criteria Refrigerator.docx Technical Evaluation Criteria Technical A-frame Ladder.docx Technical Evaluation Criteria Technical Projector.docx Technical Evaluation Criteria Technical Webbing Sling 2.docx Annexure B Eskom Acknowledgement Form For Ohs Legal And Other Requirements.pdf Ohs Tender Evaluation Template Low Risk Work.pdf Technical Evaluation Criteria Technical Oven Microwave.docx 240-12~1.pdf Technical Evaluation Criteria Insulated Telescopic Link Stick.docx Technical Evaluation Criteria Tx Line Earthing Leads.docx Technical Evaluation Criteria Technical Pole Saws Pruner. .docx Technical Evaluation Criteria Tool Bucket.docx Technical Evaluation Criteria Technical Webbing Sling 1 .docx Technical Evaluation Criteria Mechanical Toolboxes (004).docx Technical Evaluation Criteria Dynamometer Cap.docx Technical Evaluation Criteria Technical Chainsaws=3.docx Technical Evaluation Criteria Technical Compact High-pressure Cleaner.docx Sdl Production Equipment Lines And Serv.pdf Technical Evaluation Criteria Technical Hot Stick Tester.docx Technical Evaluation Criteria Technical Megger.docx Technical Evaluation Criteria Operating Head Chance.docx Technical Evaluation Criteria Technical Drill Machine.docx Technical Evaluation Criteria Technical Insulated Telescopic Measuring Stick.docx Technical Evaluation Criteria Technical Brush Cutter.docx Technical Evaluation Criteria Technical Aluminium Snatch Blocks .docx Technical Evaluation Criteria Technical Petrol Blower.docx Technical Evaluation Criteria Cordless Impact Wrench.pdf Technical Evaluation Criteria Technical Pvc Snatch Blocks .docx Technical Evaluation Criteria Technical Air Tyre Compressor.docx Technical Evaluation Criteria Technical Swage Bolt Hydraulic Machine.docx 240-126469599_method Statement Template Final 18 Oct2021.pdf Technical Evaluation Criteria Technical Trolley Jack.docx Technical Evaluation Criteria Technical Chainsaws=1.docx Technical Evaluation Criteria Technical Vacuum Cleaner.docx Technical Evaluation Criteria Technical Extension Ladder.docx Technical Evaluation Criteria Technical Chainsaws=2.docx
Closing Date19 Feb 2025
Tender AmountRefer Documents 

Engineering Services Central Region Tender

Civil And Construction...+2Bridge Construction, Road Construction
Canada
Details: 2024-y-0446 Ca Services For Construction Contract 2024-2014. This High Complexity Assignment Is For Hwy 403 Eastbound And Westbound Lanes For 10.5km Including Interchange Ramps At Winston Churchill Blvd, Erin Mills Parkway, Mavis Road And Hurontario Street; All Located In Mississauga.this Section Of Freeway Is High Trafficked, High Volume Urban Section With Aadt Of Nearly 200,000 Vehicles. The Scope Includes Pavement Rehabilitation, Structural Box Culvert Rehabilitation (7) By Concrete Patch Repairs To Barrel And Walls/roof, Non-structural Drainage Culvert (4) Replacement At Interchange Ramps, Electrical Retroffiting For Exisitng High Mast Illumination Poles To Led Type Luminaires, Replacement Of Underpass And Conventional Ramp Luminaires To Led Type, Atms Camera Site And Access Pad Modifications And Bridge Rehabilitation At Glen Erin Drive. Bridge Rehabilitation Scope Includes Removing And Replacing Expansion Joint Assemblies And Bridge Barrier Wall, Modification And Widening Of Exisitng Structural Sidewalks For Multi-use Path Conversion, Bridge Deck And Substructure Concrete Patch Repairs To Deteriorated Areas And Deck Waterproofing Membrane Replacement. Illumination Hydro Cable Relocation And Protection Of Exisitng Plant During Bridge Rehabilitation Is Also Included. Hwy 403 Mainline Pavement Rehabilitation Generally Consist Of Mill/remove 90mm Pavement And Hot Mix Paving Of 140mm (2 Underlayers Of Binder Course Plus Surface Course Sma Mix) For Effective Profile Grade Raise Of 50mm.this Grade Raise Is To Be Matched To Exisitng Edge Of Shoulder Features Such As Median Concrete Barrier And Guiderail Where Exisitng. Mill/pave Work Is Required To Maintain Positive Drainage Of All Lanes/shoulders At All Times. Interchange Ramps Generally Include Resurfacing By Hot Mix Paving. Mavis Road Within Cah Limits Include 90mm Pavement Removal And Hot Mix Paving. Nits Detection Installation At Signalized Intersection Is Also In The Scope At 2 Interchanges. The Pavement Rehabilitation Work Is To Occure During Evening/night Time/weekend Shifts And Off-peak Times As Permitted By Lane Closure Time Windows Specified. Bridge Rehabilitation At Glen Erin Dr Is Scoped In 3 Total Traffic Stages Thereby Maintaining One Lane Of Traffic In Each Direction In Each Of The Stages. Road Occupancy Permits Or Permission To Enter May Be Required For Box Culvert Access Off Of Municipal Roads/side Streets Outside Of Mto Right-of-way. Structural Culverts Are: Glen Erin Brook Culvert, Cooksville Creek Culverts At Hurontario Street, East Of Mavis Road And Central Parkway, Chappell Creek Culvert, Mary Fix Creek Culvert And Wolfdale Creek Culvert. The Project Is Classified As Group C Under Provincial Class Environmental Assessment With Environmental Screening Document Prepared And Included For Ca Services. Major Stakeholders Requiring Routine Liaison And Communication Are City, Region, Transit Agencies, Emergency Services,utility Owners Etc. 4 Structural Culverts Have In-water Work Timing Window Permitted From July 1 To March 31 Due To Direct Or Indirect Fisheries Habitat.
Closing Soon31 Jan 2025
Tender AmountRefer Documents 

Municipality Of San Rafael, Iloilo Tender

Electrical and Electronics...+1Solar Installation and Products
Philippines
Details: Description I. System Devices And Peripherals… 1 127 Pcs "550w Monocrystalline Solar Panel Nominal Max. Power (pmax): 550w Opt. Operating Voltage (vmp): 41.09v Opt. Operating Current (imp): 13.63a Open Circuit Voltage (voc): 49.82v Short Circuit Current (isc): 14.21a Module Efficiency Up To: 21.68% " 2 2 Units 50kw Three Phase Grid Tie Inverter Max. Pv Input Voltage (v): 800 V Max.ac Output Apparent Power(kva):50 Rated Ac Output Active Power (kw): 50 Rated Ac Output Current (a): 131.3/125.4 Frequency Range: 50/45-55, 60/55-65hz Max. Efficiency: 98.3 % Protection Class: Ip65 Ii. Supply Of Roughing-ins Materials Mounting System 3 85 Pcs Railings (6.1meters) 4 350 Pcs Mid Clamp 5 58 Pcs Emp Clamp 6 50 Pcs End Clamp 7 800 Pcs L-feet 8 50 Pcs Mc4 Connector 9 65 Pcs Splice Connector 10 5 Pcs Fence Steel Matting Iii. Other Rough-ins Materials 11 1 Set Net Limiter Device 12 1 Lot Ac Circuit Breakers 13 1 Lot Dc Circuit Breakers 14 20 Pcs Cutting Disc For Metals 15 7 Pcs 6mm Concrete Drill Bit For Sds 16 1 Set Tox, Expansion And Screws 17 1 Lot Enclosures With Breaker Rail Or With Copper Bus Bar 18 4 Rolls Solar Pv Cable (4mm2) 19 450 Meters Thhn Pure Copper Power Cable 100mm2 20 40 Length Aluminum Cable Duct Organizer (3.75inches*1.75inches) 21 1 Lot Liquid Tight Connector 22 50 Pcs Cable Gland Connector 23 1 Roll Liquid Tight Flexible Hose (3/4") 24 2 Rolls Hdpe Hose (3/4") Conduits With Clips 25 1 Unit "wireless Dual Band Router Data Rate: 5 Ghz: 867 Mbps; 2.4 Ghz:300mbps Antenna: Four 5-dbi Amplified Antennas Wireless Standard: Ieee 802.11/a/n/ac Wave 2 @ 5 Ghz; Ieee 802.11b/g/n @ 2.4 Ghz Working Frequency Band: 2.4 Ghz, 5 Ghz (with Ntc Radio Communications Equipment And Wdn Dealers Permit And With Iso Certificate Of Brand Manufacturer And Certificate Of Platinum Dealer Partner) " 26 2 Unit "2 Mp Fixed Mini Bullet Network Camera High Quality Imaging With 2 Mp Resolution Excellent Low-light Performance Efficient H.265+ Compression Technology Water And Dust Resistant (ip67) 24/7 Colorful Imaging With Iso Certificate Of Brand Manufacturer And Certificate Of Platinum Dealer Partner With Office Or Store Within Province Of Iloilo With Valid Mayors Permit, Dti/sec, For Fast After Sales Service "
Closing Soon27 Jan 2025
Tender AmountPHP 4.7 Million (USD 81.4 K)

Cooperative Development Authority Tender

Software and IT Solutions
Philippines
Details: Description Purpose: For The Official Use Of Cda Head Office - Ictd 1. Project Overview 1.1. The Cooperative Development Authority (cda) Seeks To Develop A Mobile Application For Its E-commerce Platform, Coopbiz.ph, To Improve User Experience And Expand Its Reach. The Mobile App Will Be Developed Using Hybrid App Development Or Cross-platform Frameworks Such As React Native, Flutter, Or Ionic. The Objective Is To Provide Users With A Seamless, Responsive, And Engaging Platform That Can Be Downloaded From The Google Play Store And Apple App Store While Maintaining A Single, Integrated Backend Database For Both The Web And Mobile Versions Of The Platform. 2. Objectives 2.1. Develop A Mobile Application That Is Accessible On Both Ios And Android Platforms Via The Respective App Stores. 2.2. Ensure The App Offers A User-friendly And Engaging Experience And With Visuals That Are Appealing. 2.3. Integrate The App With The Existing Coopbiz.ph Systems To Enable Real-time Data Access And Synchronization. 2.4. Implement Offline Functionality And Push Notifications. 2.5. Optimize The App For High Performance And Security Across Devices. 3. Scope Of Work 3.1. The Selected Contractor Will Be Responsible For The Following: 3.1.1. Project Planning And Management (in Coordination With Cda): 3.1.1.1. Define The Project Timeline, Milestones, And Deliverables. 3.1.1.2. Establish Communication Protocols For Regular Updates And Reporting. 3.1.1.3. Align Planning And Management With The Cooperative Development Authority’s Deadlines And Goals. 3.1.2. Design And Development: 3.1.2.1. Ui/ux Design: 3.1.2.1.1. Create A Responsive And Intuitive User Interface. 3.1.2.1.2. Ensure Design Consistency With Coopbiz.ph Branding. 3.1.3. Development: 3.1.3.1. Utilize Cross-platform Frameworks Like React Native, Flutter, Or Ionic To Develop The App For Both Android And Ios. 3.1.3.2. Ensure That The App Can Be Deployed On Google Play Store And Apple App Store. 3.1.3.3. Integrate Native Device Features Such As Push Notifications, Gps, And Camera Functionality Using Appropriate Plugins. 3.1.4. Integration: 3.1.4.1. Integrate The App With The Existing Coopbiz.ph Backend Systems (e.g., Product Database, User Authentication, And Payment Gateways). 3.1.4.2. Ensure Real-time Data Synchronization Between The App And Backend Systems To Maintain Consistency Across Platforms. 3.1.5. Testing And Quality Assurance: 3.1.5.1. Conduct Comprehensive Testing To Identify And Resolve Any Bugs Or Performance Issues. 3.1.5.2. Ensure That The App Complies With All Functional And Non-functional Requirements. 3.1.5.3. Perform User Acceptance Testing (uat) With Stakeholders From Coopbiz.ph. 3.1.6. Deployment: 3.1.6.1. Submit The App To Both Google Play Store And Apple App Store, Ensuring Compliance With All Store Guidelines. 3.1.6.2. Provide Assistance During The App Store Submission Process. 3.1.7. Maintenance And Support: 3.1.7.1. Offer Post-launch Support To Address Any Issues Or Bugs. 3.1.7.2. Provide Continuous Maintenance Services To Keep The App Updated And Aligned With Coopbiz.ph Requirements And Platform Updates. 4. Functional Requirements 4.1. Mobile Application Accessibility: The App Must Be Accessible On Both Ios And Android Platforms Via Their Respective App Stores. 4.2. Responsive Ui/ux Design: The App Should Have A User-friendly Interface Consistent With Coopbiz.ph Branding. 4.3. Real-time Data Access: Integration With Coopbiz.ph Systems To Enable Real-time Data Access For Users. 4.4. Offline Functionality: Implement Offline Capabilities Through The Use Of Native Plugins. 4.5. Push Notifications: The App Must Support Push Notifications To Notify Users Of Updates And Promotions. 4.6. Cross-platform Compatibility: Ensure That The App Functions Seamlessly Across Both Android And Ios Devices. 4.7. Native Features Integration: Integrate Features Like Gps, Camera, And Push Notifications Using Appropriate Plugins. 4.8. User Authentication: Provide Secure Login And Registration Functionalities. 4.9. In-app Purchases And Payments: Integrate Payment Gateways To Support Online Transactions. 4.10. Real-time Synchronization: Maintain Real-time Synchronization Of Data Between The App And Coopbiz.ph’s Backend Systems. 4.11. App Installation: The App Should Be Downloadable From Both Google Play Store And Apple App Store. 5. Non-functional Requirements 5.1. Performance Optimization: Ensure Fast Load Times And Smooth Navigation. 5.2. Security: Implement Robust Security Measures To Protect User Data And System Integrity. 5.3. Scalability: The App Should Be Scalable To Accommodate Future Growth And Additional Features. 5.4. App Store Compliance: Ensure The App Meets The Requirements For Both Google Play Store And Apple App Store Submissions. 5.5. Maintainability: Provide Well-documented Code To Facilitate Future Updates And Maintenance. 5.6. Reliability: Ensure High Availability And Minimal Downtime. 5.7. Accessibility: Ensure The App Is Accessible For Users With Disabilities, Adhering To Accessibility Standards. 5.8. Post-launch Support: Provide A Structured Support Plan For Handling Updates And Issues After Launch. 6. Deliverables 6.1. Project Plan With Detailed Timelines And Milestones. 6.2. Design Mockups And Wireframes. 6.3. Fully Developed Mobile App With Source Code. 6.4. Documentation Of App Architecture, Code, And Integration Points. 6.5. Testing And Qa Reports. 6.6. App Deployment And Store Submission (for Both Google Play And Apple App Stores). 6.7. Maintenance And Support Plan. 7. Technical Requirements 7.1. For Hybrid Apps: 7.1.1. Use Frameworks Like React Native, Flutter, Or Ionic For Development. 7.1.2. Ensure Compatibility With The Latest Versions Of Ios And Android. 7.1.3. Provide Access To Native Device Features (e.g., Camera, Gps, Push Notifications) Through Appropriate Plugins. 7.1.4. Integrate With Existing Coopbiz.ph Apis For Real-time Data Access And Synchronization. 8. Timeline 8.1. The Contractor Must Submit A Detailed Timeline, Including The Following Phases (in Coordination With Cda): 8.1.1. Project Kickoff: To Be Determined With Cda. 8.1.2. Design Phase: Timeline To Be Agreed By Both Parties. 8.1.3. Development Phase: To Be Planned With Cda Input. 8.1.4. Testing And Qa: Managed By The Contractor. 8.1.5. Deployment: App Submission According To The Agreed-upon Schedule. 9. Budget And Funding 9.1. Approved Budget For The Contract (abc): Eight Hundred Thousand Pesos (php 800,000.00), Inclusive Of Vat, Funded Through The Cda Ictd Mooe Fund For 2025. 10. Evaluation Criteria 10.1. Experience In Developing Hybrid Apps Or Cross-platform Frameworks. 10.2. Understanding Of Coopbiz.ph Requirements And Objectives. 10.3. Quality Of Portfolio And Client References. 10.4. Proposed Timeline And Budget. 10.5. Technical Proficiency In Modern Development Practices. 11. Eligibility Of The Contractor 11.1. Must Be A Philgeps Registered 11.2. In The It Business For At Least 3 Years. 11.3. Minimum 3 Years Of Experience With Government Projects. 11.4. Project Experience In Mobile App Development. 12. Pre-termination Of Contract 12.1. The Contractor Shall Be Liable For Additional Liquidated Damages Equivalent To 1% Of The Contract Price In Case Of Pre-termination. 12.2. The Dbm Reserves The Right To Blacklist The Contractor In Case Of Pre-termination. 13. Warranties Of The Contractor 13.1. The Contractor Warrants Strict Conformity To The Terms And Conditions Of This Tor. 13.2. The Contractor Shall Secure And Maintain All Necessary Registrations, Licenses, And Permits. 13.3. No Assignment, Transfer, Pledge, Or Sub-contracting Of Any Part Or Interest Is Allowed. 14. Terms Of Payment 14.1. The Payment For The Development Of The Mobile Application Will Be Structured In Tranches Based On The Completion Of Specific Project Milestones. This Approach Ensures That Payments Are Made Progressively As The Project Advances, Aligning Financial Disbursements With Deliverables: 14.1.1. Tranche Payment Schedule: 14.1.1.1. Tranche 1: Project Kickoff And Planning 14.1.1.1.1. Amount: 20% Of The Total Contract Value 14.1.1.1.2. Conditions: Payment Will Be Made Upon The Signing Of The Contract And The Submission Of The Finalized Project Plan, Including Timelines And Milestones. 14.1.1.2. Tranche 2: Completion Of Design Phase 14.1.1.2.1. Amount: 30% Of The Total Contract Value 14.1.1.2.2. Conditions: Payment Will Be Made Upon The Approval Of Design Mockups And Wireframes By Cda. 14.1.1.3. Tranche 3: Completion Of Development Phase 14.1.1.3.1. Amount: 30% Of The Total Contract Value 14.1.1.3.2. Conditions: Payment Will Be Made Upon The Successful Completion Of The Development Phase, Including The Delivery Of The Fully Developed Mobile App And Source Code. 14.1.1.4. Tranche 4: Testing And Quality Assurance 14.1.1.4.1. Amount: 10% Of The Total Contract Value 14.1.1.4.2. Conditions: Payment Will Be Made Upon The Completion Of Comprehensive Testing And The Submission Of Testing And Qa Reports. 14.1.1.5. Tranche 5: Deployment And Final Acceptance 14.1.1.5.1. Amount: 10% Of The Total Contract Value 14.1.1.5.2. Conditions: Payment Will Be Made Upon Successful Deployment Of The App To Both Google Play Store And Apple App Store, And After Receiving The Certificate Of Acceptance From Cda. 14.2. Payment Will Be Made Upon Provision Of Licenses, Subject To Required Final Withholding Vat (5%) And Expanded Withholding Tax (2%). 14.3. Payment Shall Be Processed Within A Reasonable Time Upon Submission Of Documentary Requirements, Including Sales Invoice/billings And Certificate Of Acceptance Issued By Cda Ictd. 14.4. No Advance Payment Will Be Made As Per Section 88 Of Pd 1445. 15. Delivery Period 15.1. The Service Provider Must Deliver All The Required Services And Infrastructure Within 90 Days Upon Receipt Of The Notice To Proceed (ntp)
Closing Soon30 Jan 2025
Tender AmountPHP 800 K (USD 13.6 K)

Commission On Population And Development Tender

Philippines
Details: Description Project Reference No._2025-01-14 Name Of The Project: Purchase Of Laptop And Printer Location Of The Project Baguio City Date: January 20, 2025 Rfq No.: 2025-01-08 Business Name: ______________________________ Address / Contact Number: _______________________________ Please Quote Your Lowest Price On The Item/s Listed Below, Subject To The General Conditions On The Last Page, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than ____________________ Thru Email Address At Rodolfallen.bakidol@cpd.gov.ph Or Actual Submission Of Bid/quotations At Cpd Official Address Hazel G. Bandas Chair, Bids And Awards Committee Note: 1. Bidders Shall Accomplish The Request For Quotation Form Indicating The Quoted Price For Each Item As The Basis For Evaluation Of Bids 2. Additional Requirement May Be Requested After Determination Of Qualified And Responsive Bidders 3. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Signed Or Initialled By The Bidder. 4. Delivery Period Within (7) Calendar Days 5. Warranty Shall Be For A Period Of Six (6) Months For Supplies & Materials, One (1) Year For Equipment, From Date Of Acceptance By The Procuring Entity Item No. Item & Description Qty Unit Unit Cost Total Quoted Price Purchase Of Laptop And Printer 1 Ink Tank Printer (all0in One: Print, Scan, Copy) 1 Unit Type: Ink Tank Printer (all-in-one: Print, Scan, Copy) Print Technology: Inkjet (micro Piezo) Print Resolution: Black: Up To 5760 X 1440 Dpi Optimized Color: Up To 5760 X 1440 Dpi Optimized Print Speed: Black: 10 Ipm (images Per Minute) Color: 5 Ipm Connectivity: Usb 2.0 (no Wireless Support) Paper Handling: Input Capacity: 100 Sheets (a4 Plain Paper) Output Capacity: 30 Sheets (a4 Plain Paper) Supported Paper Sizes: A4, A5, A6, B5, C6, Dl Envelope, Legal Size Scanner: Flatbed Color Scanner With An Optical Resolution Of 600 X 1200 Dpi Copy: Flatbed, With The Same Resolution As Scanning Ink System: Integrated Ink Tank System With Refillable Ink Tanks 2 Purchase Of Laptop 1 Unit High Performance Processor: 10 Cores/16 Threads , Frequency: 2.4 Ghz Up To 4.6 Ghz, Base Clock 100mhz Operating System: Windows 11 Home With Bundled Ms Office Home 2021 Graphics: 6gb Gddr6 Memory: 16gb Ddr5ram Display: 15.6" Fhd (1920x1080, 144hz Refresh Rate Storage: 512gb Ssd Battery: Integrated 60wh Audio: 2x, Array Mic Camera: Hd 720p With E-camera Shutter Weight: 2.38kg Keyboard: 1.5mm Key Travel, White Backlight Accessories: Charger, Mouse And Laptop Bag Please Attach Quotation With The Ff: 1. Mayor’s/business Permit/bir 2303 2. Philgeps Certification/registration Number (snap Shot Of Certificate) 3. Accomplished Rfq (signed By The Authorized Representative) 4. Pcab License (applicable For Infrastructure) 5. Curriculum Vitae (cv) [applicable For Consultancy] Note: Additional Requirement May Be Requested After Determination Of Qualified And Responsive Bidders (omnibus Sworn Statement-oss) Abc: ₱ 60,000.00 Total: After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. ________________________________________________ Printed Name / Signature ________________________________________________ Tel. No. / Mobile No./ E-mail Address Date: __________________________ Tin: _____________________ Vat:_____ Non-vat:_____ Corporation:______ Individual Terms And Conditions 1. All Prices Quoted Herein Are Valid. Binding And Effective At Least Within Thirty (30) Calendar Days From Date Of Quotation. 2. Awardee Shall Be Responsible For The Source(s) Of His Supplies/materials/equipment Shall Make Deliveries In Accordance With Schedule, Quality And Specifications Of The Award And Purchase Order. Failure By The Awardee To Comply With The Same Shall Be Ground For Cancellation Of The Award And Purchase Order Issued To That Awardee And For Re-awarding The Item(s) To The Alternate Awardee. 3. Awardee Shall Pick Up Purchase Order(s) Issued In His Favor Within Three (3) Days After Receipt Of Notice To That Effect. A Telephone Call Or Fax Transmission Shall Constitute An Official Notice To The Awardee. Thereafter, If The Purchase Order(s) Shall Be Sent By Messengerial Service To The Awardee At The Latter’s Expense. To Avoid Delay In The Delivery Of The Requesting Agency’s Requirement, All Defaulting Awardees Shall Be Precluded From Proposing Or Submitting A Substitute Sample. 4. Subject To The Provisions Of The Preceding Paragraph, Where Awardee Has Accepted A Purchase Order But Fails To Deliver The Required Product(s) Within The Time Called For In The Same Order, He Shall Be Extended A Maximum Of Fifteen (15) Calendar Days Under Liquidated Damages To Make Good His Delivery. Thereafter Is Awardee Has Not Completed Delivery Within The Extended Period, He Subject Purchase Order Shall Be Cancelled And He Award For The Undelivered Balance Withdrawn From That Awardee. The Procurement Service Shall Then Purchase The Required Item(s) From Such Other Source(s) As It May Determine, With The Difference In Price To Be Charged Against The Defaulting Awardee. Refusal By The Defaulting Awardee To Shoulder The Price Difference Shall Be Ground For His Disqualification From Future Bids Of The Same Or All Items, Without Prejudice To He Imposition Of Other Sanctions As Prescribed Under Ra 9184 And Its Irr-a. 5. All Deliveries By Suppliers Shall Be Subject To Inspection And Acceptance By The Commission On Population (popcom). All Necessary Laboratory Tests Undertaken By Popcom On The Item(s) Shall Be For The Account Of The Supplier. 6. Rejected Deliveries Shall Be Construed As Non-delivery Of Product(s)/item(s) So Ordered And Shall Be Subject To Liquidated Damages, Subject To The Terms And Conditions Prescribed Under Paragraph 4 Hereof. 7. Supplier Shall Guarantee His Deliveries To Be Free From Defects. Any Defective Item(s) / Product(s), Therefore That May Be Discovered By The Commission On Population Within Three (3) Months After Acceptance Of The Same, Shall Be Replaced By The Supplier With Seven (7) Calendar Days Upon Receipt Of A Written Notice To That Affect. 8. A Penalty Of One-tenth Of One Percent (0.001) Of The Total Value Of The Product(s)/good(s) Purchased Shall Be Deducted For Each Day Of Delay In The Delivery Of The Product(s)/goods Ordered. 9. All Duties, Excise And Other Taxes And Revenue Charges, If Any, Shall Be For The Supplier’s Account. 10. As A Pre-condition To Payment, Importation Documents Specifically Showing The Condition And Serial Numbers Of The Imported Equipment Purchased Should Be Submitted By The Supplier To The Commission On Population. 11. All Transactions Are Subject To Withholding Of Creditable Value Added Tax (vat) Per Revenue Regulation No. 10-93.
Closing Soon30 Jan 2025
Tender AmountPHP 60 K (USD 1 K)

Department Of Agriculture Tender

Automobiles and Auto Parts
Philippines
Details: Description Invitation To Rebid For The Procurement Of Supply And Delivery Of 1 Unit Vehicle (passenger Van) 1. The Department Of Agriculture-western Visayas, Through The General Appropriations Act Of 2025 Intends To Apply The Sum Three Million Seven Hundred Thousand Pesos (php3,700,000.00) Being The Abc To Payments Under The Contract For Procurement Of Supply And Delivery Of 1 Unit Vehicle (passenger Van)/ib No. 2025-011 (amv). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture-western Visayas Now Invites Bids For The Procurement Of Supply And Delivery Of 1 Unit Vehicle (passenger Van) With The Following Specifications: A. Prime Mover: 1. Engine Type: 4-cylinder, 16-valve Dohc, Minimum 2. Engine Displacement: 2,700 Cc, Minimum 3. Fuel Ignition/fuel: Diesel 4. Fuel Tank Capacity: 70 Liters, Minimum B. Performance/classification: 1. Steering System: Power Steering 2. Transmission System: 6 Speed-automatic, Minimum 3. Brake System: Disc Brake 4. Emission Rating: Euro Iv C. Body: 1. Dimension Of The Body: • Length: 5,300 Mm, Minimum • Width: 1,900 Mm, Minimum • Height: 1,900 Mm, Minimum 2. Ground Clearance: 175 Mm, Minimum 3. Suspension (front/rear): Strut/coil Spring 4. Tires/wheels Size: 17” (minimum) Alloy 5. No. Of Wheels: 4-wheeler With One (1) Spare Tire (must Be Manufactured Not Earlier Than December 2023) 6. Seating Capacity: 10 Seaters (minimum) With Leather Seat Cover 7. Color: White D. Additional Features And Accessories: 1. With Srs Airbags 2. With Free Gas, Floor Matting, Tint, Rain Visor, Panoramic View Dash Camera (front) And Panoramic View Reverse Camera 3. With Set Of Standard Tools For Maintenance 4. With Early Warning Device (2 Pieces) 5. Provided With Da-western Visayas Logo E. Additional Requirements 1. With Official Brochure And Technical Specifications Issued By The Manufacturer Of The Brand 2. The Units Must Be Manufactured Not Earlier Than Year 2023 3. With Service Center In Region 6 4. With Three (3) Years Lto Registration 5. With One (1) Year Comprehensive Insurance 6. Warranty: • Chassis: Three (3) Years Unlimited Milage • Body: One (1) Year Only • Engine: Three (3) Years 7. With Free Periodic Maintenance Service (pms) At 7,500 Km Travel Distance 8. With Certificate Of Conformity Issued By Denr-emb For The Offered Vehicle Type/model 9. With Owner’s Manual And Warranty And Maintenance Booklet To Be Submitted During Delivery Delivery Of The Goods Is Required Within 60 Calendar Days From Receipt Of Notice To Proceed And To Be Delivered At Iloilo City. Bidders Should Have Completed, Within Three (3) Years (2021-present) From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. The Prospective Bidder Must Be Registered In The Philgeps. 4. Prospective Bidders May Obtain Further Information From Department Of Agriculture - Visayas And Inspect The Bidding Documents At The Address Given Below During Office Hours, 8:00 A.m. To 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 8, 2025 – January 28, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (php5,000.00).the Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees To Be Presented In Person. 6. The Department Of Agriculture-western Visayas Will Hold A Pre-bid Conference At 9:30 A.m. On January 16, 2025 At The Rcpc Library, Rcpc Building, Da Wesviarc Compound, Brgy. Buntatala, Jaro, Iloilo City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 9:30 A.m. On January 28, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Securing Declaration Or Bid Security In The Amount Of Any Of The Acceptable Forms And In The Amount Of Php74,000.00 (if The Bid Security Is In The Form Of Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit) Or Php185,000.00 (if The Bid Security Is In The Form Of Surety Bond). In Lieu Of A Bid Security, The Bidder May Submit A Duly Notarized Bid Securing Declaration That Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Required Performance Security Within 10 Calendar Days From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event That It Violates Any Of The Conditions Stated Therein As Required In The Guidelines Issued By The Gppb. 9. Bid Opening Shall Be At 9:30 A.m. On January 28, 2025 At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture-western Visayas Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. The Department Of Agriculture-western Visayas Does Not Condone Any Forms Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation. 12. For Further Information, Please Refer To: Zarlina B. Cuello Bac Chairperson Da-wesviarc Compound Brgy. Buntatala, Jaro, Iloilo City Tel. No. (033) 320-23-73 Www.westernvisayas.da.gov.ph Procurement@wv.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Philgeps January 8, 2025 Zarlina B. Cuello Bac Chairperson
Closing Soon28 Jan 2025
Tender AmountPHP 3.7 Million (USD 63 K)

Department Of Environment And Natural Resources - DENR Tender

Aerospace and Defence
Philippines
Details: Description Lot I Procurement Of Technical And Scientific Equipment No. Unit Item Description Qty. 1 Unit Drone 18 Accessories And Program Specifications: Aircraft Weight (with Propellers, Without Accessories): 915 G Max Takeoff Weight: 1,050 G Dimensions: Folded (without Propellers) 221x96.3x90.3 Mm (lxwxh), Unfolded (without Propellers): 347.5x283x107.7 Mm (lxwxh) Diagonal Distance: 380.1 Mm Max Ascent Speed: 6 M/s (normal Mode), 8 M/s (sport Mode) Max Descent Speed: 6 M/s (normal Mode), 6 M/s (sport Mode) Max Flight Speed (at Sea Level, No Wind): 15 M/s (normal Mode), 21 M/s (sport Mode) Max Wind Speed Resistance: 12 M/s Max Take-off Altitude Above Sea Level: 6000 M (without Payload) Max Flight Time (no Wind): 45 Mins. Max Hover Time (no Wind): 38 Mins. Max Tilt Angle: 30" (normal Mode), 35" (sport Mode) Max Angular Velocity: 200°/s Operating Temperature Range: -10° To 40° C (14° To 104° F) Beacon: Built Into The Aircraft Wide Camera Sensor: 4/3 Cmos, Effective Pixels: 20mp Lens: Fov: 84°, Format Equivalent: 24 Mm, Aperture: F/2.8-f/11, Focus: 1 M To ∞ (with Autofocus) Iso Range: 100-6400 Shutter Speed: Electronic Shutter: 8-1/8000 S, Mechanical Shutter: 8-1/2000 S Max Image Size: 5280x3956 Still Photography Modes: Single: 20 Mp, Timed: 20 Mp, Jpeg: 0.7/1/2/3/5/7/10/15/20/30/60 S, Jpeg+raw: 3/5/7/10/15/20/30/60 S, Smart Low-light Shooting: 20 Mp, Panaroma: 20 Mp (raw Image): 100 Mp (stitchted Image) Video Resolution: H.264, 4k: 3840x2160@30fps, Fhd: 1920x1080@30fps Bitrate: 4k: 130 Mbps, Fhd: 70 Mbps Supported File Formats: Exfat Photo Format: Jpeg/dng (raw) Video Format: Mp4 (mpeg-4 Avc/h.264) Tele Camera Sensor: 1/2" Cmos, Effective Pixels: 12 Mp Lens: Fov: 15°, Format Equivalent: 162 Mm, Aperture: F/4.4, Focus: 3 M To ∞ Iso Range: 100-6400 Shutter Speed: Electronic Shutter: 8-1/8000 S Max Image Size: 4000x3000 Still Photography Modes: Single: 12 Mp, Timed: 12 Mp, Jpeg: 0.7/1/2/3/5/7/10/15/20/30/60 S, Smart Low-light Shooting: 12 Mp Video Resolution: H.264, 4k: 3840x2160@30fps, Fhd: 1920x1080@30fps Bitrate: 4k: 130 Mbps, Fhd: 70 Mbps Photo Format: Jpeg Video Format: Mp4 (mpeg-4 Avc/h.264) Digital Zoom: 8x (56x Hybrid Zoom) Gimbal Stabilization: 3-axis (tilt, Roll, Pan) Mechanical Range: Tilt: -135° To 100°, Roll: -45° To 45°, Pan: -27° To 27° Controllable Range: Tilt: -90° To 35° Max Control Speed (tilt): 100°/s Angular Vibration Range: ±0.007° Sensing Type: Omnidirectional Binocular Vision System, Supplemented With An Infrared Sensor At The Bottom Of The Aircraft. Forward: Measurement Range: 0.5-20 M, Detection Range: 0.5-200 M, Effective Sensing Speed: Flight Speed ≤15 M/s, Fov: Horizontal 90°, Vertical 103° Backward: Measurement Range: 0.5-16 M, Effective Sensing Speed: Flight Speed ≤12 M/s, Fov: Horizontal 90°, Vertical 103° Lateral: Measurement Range: 0.5-25 M, Effective Sensing Speed: Flight Speed ≤15 M/s, Fov: Horizontal 90°, Vertical 85° Upward: Measurement Range: 0.2-10 M, Effective Sensing Speed: Flight Speed ≤6 M/s, Fov: Front And Back 100", Left And Right 90° Downward: Measurement Range: 0.3-18 M, Effective Sensing Speed: Flight Speed ≤6 M/s, Fov: Front And Back 130°, Left And Right 160° Operating Environment: Forward, Backward, Lateral, And Upward: Surface With A Clear Pattern And Adequate Lighting (lux >15), Downward: Diffuse Reflective Surface With Diffuse Reflectivity >20% (e.g Wall, Trees, People) And Adequate Lighting (lux >15) Video Transmission Video Transmission System,: Enterprise Transmission Live View Quality: Remote Controller: 1080p/30fps Operating Frequency: 2.400-2.4835 Ghz, 5.725-5.850 Ghz Max Transmission Distance (unobstructed, Free Of Interference): 15 Km (fcc), 8 Km (ce/srrc/mic) Max Transmission Distance (obstructed): Strong Interference (dense Buildings, Residential Areas, Etc.): 1.5-3 Km (fcc/ce/srrc/mic) Meduim Interference (suburban Areas, City Parks, Etc) 3-9 Km (fcc), 3-6 Km (ce/srrc/mic), Low Interference (open Spaces, Remote Areas, Etc.): 9-15 Km (fcc), 6-8 Km (ce/srrc/mic) Max Download Speed: 15 Mb/s Latency (depending On Environmental Conditions And Mobile Device: Approx. 200 Ms Antenna: 4 Antennas, 2t4r Battery Capacity: 5000 Mah Standard Voltage: 15.4 V Max Charging Voltage: 17.6 V Type: Lipo 4s Chemical System: Licoo2 Energy: 77 Wh Weight: 335.5 G Charging Temperature: 5° To 40° C (41° To 104° F) Charger Input: 100-240 V Ac, 50-60 Hz, 2.5 A Output Power: 100 W Output: Max, 100 W (total), When Both Ports Are Used, The Maximum Output Of One Of The Ports Is 82 W. The Charger Will Dynamically Allocate The Output Power Of The Two Ports According To The Load Power. One (1) Set Of Battery Kit Inclusion: Three Batteries And One Battery Charging Hub (100w)
Closing Date17 Feb 2025
Tender AmountPHP 8.1 Million (USD 138.1 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
Corrigendum : Closing Date Modified
United States
Details: Government Responses To Offeror Questions 2 non-site-specific Responses: q: Current Annual Spend? a: The Government Will Not Disclose This Information At This Time. q: Any Current Issues We Can Address? a: There Are No Additional Known Issues Regarding This Solicitation Other Than Items Listed In The Statement Of Work And Related Solicitation Sections. q: Is There Any Contractor Currently Performing This Service? a: Yes, There Currently Is A Contractor Preforming These Services q: If Yes, Would You Kindly Provide Us With The Contract Number? a: The Current Contract Number Is: 36c25220c0129 This Contract Is Inclusive Of Both The Milwaukee And Madison Sites. please Confirm Whether An Amendment Will Be Issued To Reflect The Updated Wage Determination. Aligning With The Most Current Standards Will Help Avoid Any Inadvertent Discrepancies In Pricing. a: Yes, The Most Recent Determinations Dated 12/23/2024, Shall Be Used And Are Attached To This Amendment. wage Determination No. 2015-4899 For Milwaukee, Has Since Been Updated To Revision No. 26, Dated December 23, 2024 wage Determination No. 2015-4897 For Madison, Has Since Been Updated To Revision No. 27, Dated December 23, 2024. milwaukee Site Specific Responses: q: In Lot 1, When We Move Vehicles At Closing, Is There A Section Of Lot 1 That Can Be Segregated (not Available To Self-parked Vehicles) Once We Park Valeted Vehicles? If Not, Should A Valeted Vehicle Become Damaged By Others While In Lot 1, Are There Cameras That Can Identify The Vehicle Responsible For The Incident, So The Valet Service Provided Is Not Responsible For That Damage? a: There Is No Designated Parking In Lot 1 For Valet. Based On The Current Sow, Valet Contractor Shall Move Vehicles At The End Of The Day To Lot 1, If There Is A Disabled Parking Identification Placard Or Plate. This Is To Assist The Veterans That Have Difficulties Getting To Their Vehicles. Cameras Are Installed For Exterior Lots. However, It Is Not A Guarantee The Cameras Will Capture Specific Locations Of Any One Incident. q: Is The Milwaukee Valet Booth Owned By The Va Or Current Contractor? Will It Remain For The New Contractor? a: Booth Is Owned By The Va. Unsure At This Time The Shed Will Stay Long Term Or May Have To Move Inside The East Entrance As The Normal Routine In The Past. As A Reminder, Attendants Shall Lock And Secure All Valet-parked Vehicles And Ensure All Car Keys Are Stored In An Appropriately Secured Valet Booth. The Valet Booth Shall Be Provided By The Contractor That Will Be In The Current Va Own Shed And Or Available If The Shed Is Removed To Have A Secured Booth, Container For The Keys. q: What Time Does The Valet Stop Accepting Vehicles? a: Hours Of Operations At The Milwaukee Vamc Are 7:00 Am To 5:00 Pm Monday Through Friday, Excluding Federal Holidays Listed In Section 3.2. If The President Of The United States Declares Any Other Day A Holiday Or By Executive Action Closes Any Facility, The Cor Shall Determine If Valet Services Shall Be Needed. Valet Should Be Available Within The Time Frame To Accept Vehicles And Drop Off Vehicles. q: Is There A Location To Secure Equipment After Closing? a: Please See Contractor Shall Furnish All Required Supplies, Materials, Signage, And Any Necessary Equipment Required To Perform The Services Defined Herein As Follows. All Equipment Except For Signage Should Be Stored In The Required Lock Cabinet That Is In The Contract. Currently The Va Owned Shed Is Also Locked, And Government Keys Provided. However, If The Shed Is Removed, The Contract Will Cover The Equipment To Be Secured In Their Cabinet. If You Wish To Secure Signage Daily The Va Owned Shed Is Provided. If Shed Is Removed, We Will Need To Look At Options To Secure Contractors Signage If Requested. q: Are There Any Upcoming Traffic Or Parking Concerns? a: More Employees Will Be Working Onsite And Less Telework That Should Not Affect The Number Of Cars Being Parked By The Valet. Also, There Is 10-year Plan Of Road Construction In The Surrounding Area, However These Items Should Not Affect The Valet, Other Than The Potential For More Traffic In The Area. q: Please Provide Actual Current Hourly And/or Daily Vehicle Parked Counts. a: Daily Counts: December 2nd 142, 3rd 175, 4th 151, 5th 172, 6th 115, 9th 145, 10th, 181, 11th 163, 12th, 130, 13th 129, 16th 149, 17th 159, 18th 145, 19th 110, 20th 89, 23rd 105, 24th 9, 26th 35, 27th 54, 30th 99, 31st 87, January 2nd 120, 3rd 93, 6th 134, 7th 182, 10th 111. madison Site Specific Responses: q: Please Provide A Map Of The Campus That Shows The Location Of The Parking Garage. a: Map Attached As Va Madison Site Plan.pdf. The Parking Garage Is Identified As Parking Ramp Bldg #15 On The Map. q: Could The Valet Parking Level Be On The Top Floor Of The Garage? a: No. Valet Parking Is Designated On The Northern Section Of The 2nd Level. q: What Time Does The Valet Stop Accepting Vehicles? a: Hours Of Operation Are 7:00am To 5:00pm. The Valet Should Accept Vehicles During The Hours Of Operation. q: Is There A Location To Secure Equipment After Closing? a: At Present The Contractor Furnished Secure Cabinet/valet Booth Is Kept In The Main Entrance Vestibule After Hours. For An Additional Level Of Security, The Cabinet Can Be Pulled Into The Main Entrance Area. q: Please Provide Actual Current Hourly And/or Daily Vehicle Parked Counts. a: Daily Vehicle Counts Attached As 2024 Valet Daily Vehicle Totals.pdf.
Closing Soon27 Jan 2025
Tender AmountRefer Documents 

CAWIT ELEMENTARY SCHOOL ZAMBOANGA CITY Tender

Security and Emergency Services
Philippines
Details: Description 2025-01-038 Daytime Security Guard (feb To Dec 2025) The Role Is To: 1. Patrolling Routine Patrols: Guards Regularly Patrol Premises To Monitor For Suspicious Activities Or Security Breaches, Either On Foot Or By Vehicle. Monitoring Perimeter: They Check The Perimeter Of A Building Or Site To Ensure Fences, Gates, And Other Barriers Are Intact And Secure. Surveillance: Using Security Cameras Or Other Monitoring Systems To Keep An Eye On Critical Areas. 2. Access Control Managing Entry Points: Security Guards Control Access To Buildings Or Restricted Areas, Checking Identification, Verifying Credentials, And Ensuring Only Authorized Individuals Can Enter. Visitor Screening: They May Sign In Visitors, Issue Temporary Badges, And Ensure That All Visitors Follow Security Protocols. 3. Surveillance Monitoring Cctv Monitoring: Guards Monitor Security Cameras To Detect Any Unusual Behavior Or Potential Threats. Responding To Alarms: They Are Responsible For Investigating Alarms And Taking Appropriate Action, Such As Contacting Authorities If Necessary. 4. Responding To Incidents Emergencies: In Case Of Incidents Such As Fires, Medical Emergencies, Or Break-ins, Security Guards Are Trained To Respond Quickly, Initiate Emergency Protocols, And Alert Emergency Services. Conflict Resolution: They May Intervene In Disputes Or Conflicts On The Premises And Ensure Situations Are Handled Calmly And Safely. 5. Report Writing Incident Reports: Security Guards Are Required To Document Any Incidents, Including Criminal Activities, Accidents, Or Safety Hazards. These Reports Serve As Evidence And May Be Used For Legal Purposes. Log Maintenance: Guards Keep Logs Of Their Daily Activities, Patrol Routes, And Any Significant Occurrences During Their Shifts. 6. Enforcing Rules And Regulations Policies And Procedures: They Enforce Building Policies, Safety Rules, And Any Other Regulations Specific To The Premises They Are Assigned To. Preventing Trespassing: Guards Ensure That Unauthorized Individuals Do Not Trespass On The Premises And Take Appropriate Action If They Do. 7. Customer Service Assisting The Public: Security Guards Often Act As The First Point Of Contact For Customers, Visitors, Or Employees, Offering Assistance Or Information When Needed. 8. Providing Directions: Guards Can Help With Wayfinding Or Address Concerns, Contributing To A Positive Environment. 9. Preventive Measures Deterring Criminal Activity: Their Visible Presence Helps Prevent Crimes Like Theft, Vandalism, Or Trespassing. Inspection Of Deliveries: In Some Cases, Security Guards Inspect Deliveries To Prevent Unauthorized Materials From Entering The Premises. 10. Coordination With Law Enforcement Reporting Suspicious Activity: If A Security Guard Observes Potential Criminal Behavior, They Report It To Law Enforcement And Assist In Investigations. Assist Police Or Emergency Services: During Criminal Activities Or Emergencies, Security Guards Work Alongside The Police Or Other Emergency Responders. 10. Health And Safety First Aid: Many Security Guards Are Trained In Basic First Aid And Cpr To Assist In Medical Emergencies. Safety Protocols: Guards Ensure That Safety Measures, Such As Fire Drills Or Evacuation Plans, Are Properly Carried Out. Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Important Notice To The Bidder: -prospective Bidder May Obtain Further Information By Visiting Cawit Elementary School At Zone 4, Cawit, Zamboanga City During Office Hours 8:00 Am To 5:00 Pm. Contact The Bac Secretariat @09976993710 Or Email Jesicasiayuen.chong@deped.gov.ph For The Issuance Of The Signed Quotation. Bidders May Also Download The Quotation And Canvasser's Form On The Philgeps Website. -fill Up And Sign The Quotations And Canvasser's Form To Be Submitted Together With The Copies Of The Philgeps Certificate Of Registration And Mayor's Permit In A Sealed Envelope Indicating The Company's Name, Pr Number, And Address To The Bac Chairperson. The Deadline Of The Submission Of The Quotation Will Be On January 30, 2025 On Or Before 8:30 Am And Must Marked Received With Time And Date To Be Dropped In The Drop Box Located At Cawit Elementary School Building 1 Room 1.
Closing Soon30 Jan 2025
Tender AmountPHP 183.3 K (USD 3.1 K)
1551-1560 of 1628 active Tenders