Cable Tenders

Cable Tenders

Municipality Of Santa Barbara, Pangasinan Tender

Others...+2Electrical and Electronics, Solar Installation and Products
Philippines
Details: Description Request For Quotation Date: _________________________ Quotation No. Rfq 2025-09 Company Name : __________________________ Address : __________________________ Please Quote Your Lowest Price On The Item/s Listed Below, Subject To The General Conditions On The Last Page, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than The Closing Date. Engineering Office End User Note: 1. All Entries Must Be Typewritten 2. Delivery Period Within ____________________ Calendar Days 3. Warranty Shall Be For A Period Of Six (6) Months For Suppliers & Materials, One (1) Year For Equipment, From Date Of Acceptance By The Procuring Entity 4. Price Validity Shall Be For A Period Of __________________________calendar Days 5. Phil-geps Registration Number ________________________________ 6. Bidders Shall Submit Original Brochures Showing Certification Of The Product Being Offered 7. Approved Budget For The Contract (abc) P 184,424.00 Item No. Item Description Qty. Unit Unit Price Total Price 1 Stranded Wire #10 2 Box 2 30amp Crk Breaker Weather Proof 4 Sets 3 2 Gang Switch 4 Sets 4 Amco Box 4 Pcs 5 Pvc Clamp 1/2 30 Pcs 6 Plastic Moulding 3/4 8 Pcs 7 Electrical Tape 4 Pcs 8 Tox With Screw 60 Pairs 9 Flexible Hose 1/2 3 Rolls 10 Cable Tie 2 Packs 1 G.i Wire 1 Kg 12 Flourescent (led) 18watts 10 Sets 13 Flood Light 200 Watts 10 Pcs 14 Solar Light (100 Watts) 10 Sets Brand And Model: ______________________________ Delivery Period : _______________________________ Warranty : __________________________________ Price Validity : _________________________________ After Having Carefully Read And Accepted Your General Conditions, I/we Quote You On The Item At Prices Noted Above. __________________________________ Printed Name Signature __________________________________
Closing Date28 Jan 2025
Tender AmountPHP 184.4 K (USD 3.1 K)

Indian Air Force - IAF Tender

Goods
Electronics Equipment...+1Electrical and Electronics
GEM
India
Description: CATEGORY: Outer Smooth Clear Lens , IClear Lens , Yellow Lens_L , Yellow Lens_R , Gasket for Base Plate , PRISM, FOR RCL _CL_ FOR CENTRELINE LIGHTS , PRISM PAD FOR CENTRELINE LIGHTS , INTERFERENCE COLOUR FILTER 47, 5X26, 5X1MM RED FOR CENTRELINE LIGHTS , O-RING GASKET 145, 64 X3, 53 SILICON FOR CENTRELINE LIGHTS , O-RING GASKET 160,0X3 ,0MM SILICON FOR CENTRELINE LIGHTS , TOP COVER NO TOE-IN FOR TOUCHDOWN ZONE LIGHTS , O-RING GASKET 145,64 X 3,53 SILICON FOR TOUCHDOWN ZONE LIGHTS , O-RING 160,0X3 ,0MM SILICON FOR TOUCHDOWN ZONE LIGHTS , Spreader Lens Clear for Approach Fitting , Spreader Lens Green for Threshold Fitting , Spreader Lens Red for Stopway End Fitting , Lamp Holder Suitable for Bi- Pin Halogen Lamp , INTERFERENCE COLOUR FILTER 50,5X18X2 MM RED FOR STOPBAR LIGHT , O-RING gasket 145,64 X 3,53 SILICON FOR STOPBAR LIGHT , UPPER BREAKABLE COUPLING , LOWER BREAKABLE COUPLING , Lamp , LED Module , Frangible Coupling , Base Plate , CONSTANT CURRENT REGULATOR 10 KVA , CONSTANT CURRENT REGULATOR 25 KVA , 300W 6.6_6.6A ISOLATING TRANSFORMER , LED Driver PCB , Lamp 45 W, 6.6A Halogen , 200W 6.6A Bi-Pin Halogen Lamp , Lamp 36W , BLUE LENS , IDM8000 MUC CARD FOR CCR , T3 VOLTAGE TRANSFORMER FOR 4 KVA CCR , T3 VOLTAGE TRANSFORMER FOR 20 KVA CCR , T3 VOLTAGE TRANSFORMER FOR 25 KVA CCR , O RING GASKET 259.3 X 5.7 FOR 12 INCH SHALLOW BASE FOR RUNWAY EDGE INSET , GASKET FOR PRISM FOR THRESHOLD GREEN LIGHT , O-RING GASKET 219.3X 5.7 VITON FOR THRESHOLD GREEN LIGHT , REFLECTOR LAMP 105W_6.6A FOR APPROACH INSET LIGHT , PAPI Tl Kit incldng Clinometer Spnr of corrct size Aln key Algnmnt Tl and Lftng Hook , Male_Female Receptable Plugs for Primary cables , OUTPUT VOLTAGE TRANSFORMER , MIMIC PANEL , DIODE BYV6C , ISOLATORSWITCH , CIRCUIT BREAKER , MEDIUM POWER NPN SILICON HIGH CURRENT TRANSISTOR , POWER MASFET , VARISTOR V20K275 , RIU OPS , ESSENTIAL-6 PCB PATCH PANNEL UNSCREENED 24 RJ45 CAT6 REAR CONNECT BLACK , CONNECTION INTERFACE ASSEMBLY , MOTOR STARTING , COOLING FAN
Closing Date15 Jan 2025
Tender AmountRefer Documents 

Southern Railway - SR Tender

Auction
Scraps
Ireps
India
Description: P.l. No. 98414501 Condemned And Unserviceable Ferrous Cabinets / Frames / Panels With Non-ferrous Attachments Scrap Consisting Of Power Supply Unit, 4/2 Junction Box Without Batteries, 6 Pin Emergency Jocket , Sm's Slide 2 And 12 Way,charger 230v/24v 40amps , Multi Lamp Route Indicator , Ofc Charger,single Phase Starter , Cls Panels, Hub , Surge Monitor,alarm Iti ,voice Multiplex ,test Panel ,cpu Cards , Mux , Precooling Box, Control Gearbox, Ei Charger Box , Metal Detector, Wall Mountable Fms, Control And Relay Panel, Db Box For Fuse And Mcb,lt Switch Board, Screw Jack 25 Ton Panel Board , Traction Transformer Relay Panel ,contol & Relay Panel For 25 Kv Shunt Capacitor Bank , Signal Post Telephone , Rc Panel , Capacitor Bank Panel , Announciator, Smps Charger ,power Control Panel Released From Ac Coaches,rectifiers Without Precooling Transformer , Smps Based Power Plant , Change Over Reset Box ,talkback Master , Fm Tokenless Receiver And Transmitter , Digital Axle Counter , System Service Power Controls , Single Section Digital Axle Counter ,sms Alert System , Mrrms Antenna Assembly , Lcr Rwb Amplifier ,dc-dc Converter , Earth Leakage Detector, , Add On Box, Lc Gate Panel ,sm Slide ,transiiter & Receiver, Vr Box For Ssdac/hassdac , Data Logger , Ips Panel , Ips Asm Panel , Remote Terminal Unit , Control And Relay Panel For 25 Kva Shunt , Transformer Control Panel , Printer Cover Boxes And Relay Racks With Components And Attachments Such As Contactors / Cables Of Copper / Aluminium /cards / Bus Bars / Pcbs / Mcbs / Contacts / Cooling Fans / Terminals / Fuse Units / Jacks / Displays / Lamps / Transformers / Chokes / Switches / Sockets / Meters / Heat Sinks / Connectors / Locks, Plastic And Other Attachments Etc. And Scraps Of Equipments / Devices / Accessories / Machines Such As Tokenless Box Instruments (push Button) Without Relays , Automatic Ticket Vending Machines Without Monitor And Thin Clients ,tokenless Block Instruments (f.m.handle Type), Fm Diode Block Instruments And Other Similar Scraps Of Sorts And Sizes, Intact / Dismantled Condition, Full / Broken / Part, With Ferrous / Copper / Brass /silver / Aluminum / Wood / Other Attachments. Detached Doors & Frames Also Included In Lot. As Is Where Is Condition. Segregation Not Permitted. Cssd/goc Electronic Weigh Bridge To Be Used For Weighment. Note:-1) Material To Be Cleared /delivered As The Following Sequence I.e. First Ssg A) Road Leading From Ssg To Canteen West Of Section No.4. B) Between Tree No.10 And 11. C) Near Tree No 8. 2) Loading By Crane Is Permitted.
Closing Date28 Jan 2025
Tender AmountRefer Documents 

BARANGAY TULAY NA LUPA Tender

Publishing and Printing
Philippines
Details: Description 30 Reams Bond Paper Long (gsm 80) 30 Reams Bond Paper A4 (gsm 80) 2 Sets Ink Brother (black, Yellow, Blue & Red) "664" 1 Sets Ink Canon (black, Yellow, Blue & Red) 2 Sets Ink Epson L3210 (black, Yellow, Blue & Red) 2 Sets Ink Epson L4260 (black, Yellow, Blue & Red) 15 Pcs. Record Book (500 Pages) 1 Reams Folder Long 1 Box Ballpen (hbw Atech 0.7mm) Black 100 Pcs/box 6 Pcs. Pentouch (6 Black, 3 Red- Broad) 6 Pcs. Double Sided Tape 6 Pcs. Stabilo 3 Pcs. Elmer's Glue Big 12 Pcs. Correction Tape 1 Pcs. Columnar (24 Column) 2 Boxes Plastic Clip (small) 2 Boxes Plastic Clip (big) 25 Reams Special Paper A4 (gsm 80) 25 Reams Special Paper Long (gsm 80) 100 Pcs. Brown Envelope (long) 4 Pcs. Ballpen (may Tali) 2 Pcs. Stapler (big) 1 Pcs. Stapler (small) 1 Box Staple Wire (big) 10 Boxes Staple Wire (small) 2 Pcs. Hdmi Cable 2 Pcs. Ink Pad (blue For Thumbmark) 1 Tin Chlorine 12 Pcs. Floor Mat 4 Pcs. Spinning Map 5 Kgs. Power Soap 12 Bottles Dishwashing Liquid 10 Pcs. Walis Tambo 10 Pcs. Dust Fan 3 Bottles Zonrox (big) 2 Pcs. Scissor (big) 6 Pcs. Clear Tape (1 Inch) 6 Pcs. Double Sided Tape (i Inch) 6 Pcs. Documents File (maroon) Long
Closing Date23 Jan 2025
Tender AmountPHP 58.9 K (USD 1 K)

Agusan Del Norte Tender

Electronics Equipment...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Department Of Education Caraga Administrative Region Division Of Agusan Del Norte Butuan City Request For Quotation The Department Of Education, Division Of Agusan Del Norte Through Its Bids And Awards Committee (bac) Invites Philgeps Registered Suppliers To Apply For The Procurement Of Audio Visual Equipments For Osds-administrative Related Activities With The Sum Of One Hundred Eight Thousand Seven Hundred Fifty Pesos Only And 0.00 Centavos (php 108,750.00) The Approved Budget Of The Contract (abc). With The Specifications / Special Indications As Follows: >>1 Unit Quality And Powerful Pro Sound Audio Speaker *dual Mic And Guitar Inputs *multi-speaker Connection *ai Sound Boost *chargeable Up To 18 Hours Of Playtime >>1 Unit Speaker Heavy Duty Steel For Full Support *sturdy And Durable Speaker Stand/tripod With Safety Locking Pin And Adjustment *adjustable Height And Tripod Legs >>1set Wireless Microphone (2pcs) >>1unit Android Smart Tv 75” >>1unit Heavy Duty Steel Tv Stand And Movable >>1unit Hdmi Cable(10m) **for The Complete Details Of The Procurement Please Refer / Confirm With Deped Division Of Agusan Del Norte Or See The Attached Specifications Stated In This Posting For Details. The Department Of Education, Division Of Agusan Del Norte Through Its Bids And Awards Committee (bac), Now Invites Bids/quotations For The Above-mentioned Project. Bids Received That Exceed The Total Abc Shall Be Rejected At Bid Opening. Bidder May Bid For One Or All Items. Late Bids Shall Be Rejected. Open Competitive Bidding Will Be Conducted Using The Non-discretionary Pass/fail Criterion, Evaluation And Post Qualification Procedures In The Implementing Rules And Regulations (irr) Of Ra 9184. Hector Dn. Macalalag, Phd, Ceso Vi Bac Chairperson / Asst. Schools Division Superintendent
Closing Date21 Jan 2025
Tender AmountPHP 108.7 K (USD 1.8 K)

Department Of Energy Tender

Machinery and Tools
United States
Details: Slac National Accelerator Laboratory Is Operated By Stanford University For The Department Of Energy. As A Management And Operating Contractor, Subcontracts Awarded By The Laboratory Are Not Federal Procurements, And Are Not Directly Subject To The Federal Acquisition Regulations In 48 Cfr. Nonetheless, Certain Federal Laws, Executive Orders, And Regulations May Affect Our Doe Approved Purchasing System, As Required By Statute, Regulation, Or Contract Terms And Conditions. slac Has A Requirement For A U.s. Domestic End Item Source Of The Following: turbo Pump For Single Particle Imaging Chamber qty: 1 - Inlet Port Flange Vg250/iso250f Icf305 (dn250cf) qty: 1 - Minimum Pumping Speed N2 2650 L/s qty: 1 - Power Cable 5m Ring Terminal the Award Will Be Made Based Upon The Attached Lowest Price Technically Acceptable Method. marking Of Proprietary/confidential Information. Offerors Shall Properly Mark And Identify With A Restrictive Legend Or Information Markings On Pages Of The Proposal That Contain Proprietary/confidential Information. for Offeror To Be Eligible For A Subcontract Award With The University And The U.s. Department Of Energy (doe), Offeror Shall Be Registered With The System For Award Management (sam). Entities May Register At No Cost Directly At The Sam Website: Https://www.sam.gov. the Resulting Purchase Order Shall Be Performed In Accordance With Slac National Accelerator Laboratory's Terms And Conditions For Fixed Price Commercial Supplies And Services Dated August 2023. note: The Following Documents Are Attached In This Solicitation. buy American Act Certificate, Dated 08/29/2023 reps And Certs Rider-september 2022 terms & Conditions For Fixed Price Commercial Supplies And Services, August 2023 please Provide Quoted Price, Delivery, Technical Compliance Statement And Certification To The Attention Of Bernadette Espiritu, Espiritu@slac.stanford.edu. payment Terms: Net 30 Days freight Terms: Fob Destination Prepaid And Add
Closing Soon30 Jan 2025
Tender AmountRefer Documents 

Board Of Investments Makati City Metro Manila Tender

Software and IT Solutions
Philippines
Details: Description 1. About The Procuring Entity The Board Of Investments (boi) Is An Attached Agency Of The Department Of Trade And Industry (dti) That Is The National Government Entity Responsible For The Promotion Of Investments For Both Foreign And Domestic, In Accordance With Executive Order No. 226, Also Known As The Omnibus Investments Code Of 1987, And The Recently Approved R.a. 11534 Or The Create Law. The Boi Seeks To Attract Quality Investments That Will Encourage Technological Innovations And Provide Support For Industries To Seize The Opportunities And Challenges Of Global Competition And Demands. The Agency Envisions Itself As A Global Industry Promotion Agency By 2022 Guided By The Core Values Of Integrity, Excellence, Teamwork And Passion For Knowledge. Its Mission Is To Provide Investors With Opportunities For Investments, Comprehensive Business Support Services And Fair Predictable And Consistent Industry Policies. The Current State Of The Economy Due To The On-going Pandemic Makes It More Imperative For Boi To Continuously Aim For Work Excellence, As It Is An Agency, Which Is At The Forefront Of Enticing Investments Into The Country. 2. Project Overview/objectives In Order To Effectively Fulfill The Mandate And Facilitate The Delivery Of Boi’s Core And Support Functions, A 24/7 Maintenance Operations Of The Boi Server Room At The 5th Floor That Hosts Various Application Servers And Other Communication And Network Equipment Is Needed. The Boi Server Room Caters To The Boi Local Area Network (lan). To Upgrade And Have An Existing Boi Server Room With A Fully Functional Data Center, The Boi Is Requesting To Transfer Or Create A Data Center At The Fourth Floor (4/f) Of Industry And Investments Building, 385 Sen. Gil J. Puyat Ave, Makati City. This Is To Ensure Compliance With Industry Standards For It Infrastructure And Data Protection. It Will Also Serve As The Host Of Voice, Video, And Data Requirements Of Boi. Generally, The Data Center Will Include The Following Infrastructure Components: Electrical And Civil Works Component • Site Preparation (civil, Mechanical, And Electrical Works) • Supply And Installation Of New Data Center Build-ups Such As New Static Flooring, Drywall, It Monitoring Room, Electrical Power And Lighting, Temperature, Humidity Monitoring Solution, Acoustic Ceiling, And Drip Pan For Potential Water Leak. • Provisioning Of A Monitoring Room Inside The Proposed Data Center • Installation Of New Server Rack Cabinets Complete With Their Accessories. • Transferring Of Existing Servers, Ups, And Other Data Center Components From The 5th Floor To The New Data Center, Including Mounting, Harnessing, Terminating, And End-to-end Tagging. • Transfer And Installation Of Electrical Works Of Existing 2x 20kva Ups Including Panel Boards And Electrical Wires For Its Distribution • Supply And Installation Of Electrical Works For Precision Air Conditioning Unit (pacu) • Supply And Installation Of A Stand-alone Door Access System Including Biometric Device, And Door Lock Accessories For Physical Security Of A New Data Center. • Supply And Installation Of A New 50kva Powered Diesel Generator Set Including An Isolated Dry Type Of Step-up Transformer • Supply And Installation Of New Automatic Transfer Switch (ats) And Other Components • Supply And Installation Of Temperature, Humidity Control System, And Water Leak Detection System • Supply And Installation Of Communication Grounding And Bonding System. • Supply And Installation Of Roughing-in Materials • Submission Of Test Results, As-built Plan, And Documentation • Cleaning And Retouching Of All Affected Areas Including Necessary Rectifications Network Component • Supply, Installation, And Configuration Of Core Switches • Supply, Installation, And Configuration Of Server Farm Switches • Supply, Installation, And Configuration Of Access Switches • Supply, Installation, And Configuration Of Wireless Access Points • Structured Cabling (horizontal And Vertical) • Provisioning Of Intermediate Distribution Frames (idfs) Cabinets And Other Network Components (2nd, 3rd, 4th Floors) • Supply, Installation, And Configuration Of Servers And Server Rack And Accessories • Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables • Documentation O Cabling Plan For Structured Cabling And Data Center O Final Cabling Plan As-built Plan With Line Diagram O Final Network/structured Cabling Diagram O Network Vlan Configuration O Softcopy And Hardcopy Of Core, Server Farm, Access Switch, Wlc Running Configuration • Certification Training On Installed Network Switches, Aps, And Other Components. Objectives Of The Project: • To Protect And Secure The Agency's Existing Ict Investments (firewalls, Routers Switches, Servers, Etc.); • To Ensure A Dependable, Secured, And Efficient Ict Support Services (internet, Intranet, Database And Printer Sharing, Etc.); And • To Create An Industry-standard Datacenter For Effective Management Of Network Resources. 3. Deliverables No Particulars Qty Unit 1 Datacenter Civil And Architectural Works 1 Lot 2 Electrical Works, Segregated Power Source Dedicated To Data Center Equipment’s, And Idf Deployed At 1st Floor, 3rd Floor, And 5th Floor 1 Lot 3 Transfer 2x 20kva Ups And Other It Components From The Old Data Center To The New Data Center (servers, Isp, Etc.) 1 Lot 4 Generator Set, 50kva 1 Unit 5 Automatic Transfer System (ats) 1 Unit 6 Precision Air-conditioning Units 2 Units 7 Data Rack 42u (mdf) 2 Units 8 Data Rack 24u (idf) 3 Units 9 Temperature And Humidity Monitoring System 1 Lot 10 Water Leak Detection System 1 Lot 11 Datacenter Access Control System (biometrics, Magnetic Door Lock, Etc.) 1 Lot 12 Structured Cabling 1 Lot 13 Fiber Optic Backbone 1 Lot 14 Core Switch 2 Units 15 Server Farm Switch 2 Units 16 Access Switch 4 Units 17 Access Points 63 Units 18 Transceivers (for Inter-network Link Of Devices) 32 Units 19 End-to-end Tagging And Labeling Of All Utp Copper And Fiber Cables 1 Lot 20 Softcopy And Hardcopy (hardbound) Documentation (as-built, Test Plan, Ip Address Assignment, Vlan Assignment, User’s Manual, Administrators Manual, Etc.) 1 Lot 4. Technical Requirements 4.1 The Bidder Shall Comply With The Following Minimum Specifications For The Physical Data Center And Network Components Of The Project: Item Description Bidder’s Statement Of Compliance Item No 1 Site Preparation (civil, Mechanical, And Electrical Works) • Electrical Wirings With Grounding • Service Entrances For Utilities • Ceiling Installation • Installation Of Industry-grade Data Center Main Door • Installation Of Datacenter Cooling System Item No 2 Laying Of New Electrical Power Lines Distributions/ups Transfer • Provision Of Main Distribution Panel Board (mdp) Main 125a/3p/400vac • Provisioning, Installation, And Configuration Of Dedicated Ats • Provisioning, Installation, And Configuration Of Dedicated Generator Set (at Least 50kva, 129 Amp, Three Phase Dual Voltage, 220-240v Output, At Least 60hz Frequency) • Excavation/backfilling From The Building To The Powerhouse For The Encasement Of The Feeder Line For Power, Ats, And Genset • Transfer And Re-termination Of Electrical Requirements For 2 Units 20kva Ups • Transfer Of Other It Assets From The Old Data Center To The New Data Center • Provisioning Of Electrical Distribution From Data Center Power To Mdfs Located Per Floor • Lighting Fixtures For Datacenter • Testing Of Electrical Equipment Item No 3 Tracing, Tagging, Relocation, And Transfer Of Boi Fas-itd It Equipment (servers, Switches, Routers, Etc.) From 5th Floor To 4th Floor • Tracing Of Backbone To Core Switch Connection • Tracing Of Connection Between Devices Inside The Datacenter • Tagging Of Copper And Fiber Optics Wire Inside The Datacenter • Cable Management • Vertical And Horizontal Cabling From Datacenter To Mdfs And Mdfs To End-nodes Item No 4 Provisioning Of Two (2) 42u Regular Server Racks • 42u With Roof, Side Panel, Castors, Feet, And Brackets • Adjustable Shelf • Vertical Cable Manager • At Least 1 Rack Mountable Kvm (keyboard, Video, Monitor) • Power Rail/strip Options Item No 5 Provisioning Of Three (3) 24u Server Racks To Be Deployed At Mdfs • 24u With Roof, Side Panel, Castors, Feet, And Brackets • Heavy-duty Steel Construction • Door Locks • Anti-tamper Sensors • Network Management Card, Remote Monitoring Capabilities, Snmp Support • With Power Distribution Units (pdu), And Ups Compatibility • Cable Manager Item No 6 Physical Security (door Access, Biometrics, Temperature Monitoring) • Provisioning Of A Solid Door And Tempered Glass Around The Proposed Data Center (1/2, Frameless Door) • Door Access Control Should Conform To Iso-27001 Standards • Magnetic Lock • Biometrics Based Access Control • Access Logs Should Be Maintained For A Minimum Of One Year Or Longer As Specified By The Site Security Policy. • Secured Doors Must Fail Open In A Fire Emergency. Item No 7 Transfer Of Network Backbone Connection From 5th Floor To 4th Floor • Tracing And Tagging Of Backbone Connection From Mdf To Idf • Looping Of Excess Fiber Cable • Re-termination Of Fiber Cable If Necessary Item No 8 Monitoring Room Inside The Proposed Data Center • Provisioning Of Additional Room Inside The Data Center To Serve As A Monitoring Room Item No 9 Anti-static Flooring • Not Generate Static • Groundable After Installation • Have Permanent Static-resistant Properties That Can Provide Protection Amidst Changing Temperatures, Humidity Levels, And Foot Traffic Item No 10 Precision Air Conditioning Unit (pacu) - 2 Units • Shall Have A Nominal Capacity Of Up To Ten (10) Kw • Shall Be Free Blow Type With Plenum And Directional Air Flow Louver Grille • Panels Shall Have A Solid And Rigid Double Skin Insulated • Shall Have A Minimum Net Sensible Capacity Of Ten (10) Kw • Shall Have A Minimum Net Total Capacity Of Eleven (11) Kw • Shall Have A Built-in Touch Screen Display That Provides Informative And User-friendly Interface For Easy Navigation • Shall Have A Built-in Auto Sequencing (1unit Operational And 1unit Back-up, Every 3 Days Sequence Of Operation) • Shall Be Single Circuit Dx Type, Freon R410a • Shall Have Electronic Expansion Valve • Shall Be 380vac,3ph, 6ohz • Shall Recommend Placement Of Air Conditioner Units And Limitations To Be Observed Item No 11 Temperature And Humidity Sensor, And Water Leak Detection System • Base Unit: Sensor Gateway For Up To 4 External Probes • Poe Switch 8 Ports • Sensor Hub • Temperature And Humidity Sensor • Water Leak Sensor Probe • Extension Cable For Water & Flooding Sensor Item No 12 General Requirements Mobilization And Demobilization Labor, Installation, Engineering, And Project Supervision Testing And Commissioning As-built Plans And Documentation (inclusive Of Signed And Sealed) 4.2 Supply, Delivery, Installation, Configuration, And Commissioning Of Network Equipment. Qty Specifications Bidder’s Statement Of Compliance 2 Layer 3 Data Switch To Act As Enterprise Core Layer Switch Features 1. High Performance And Throughput • High Port Density (24-48 Ports) • At Least 960 Gbps Switching Capacity • High Forwarding Rate • Line-rate Packet Processing With Minimal Latency • Non-blocking Architecture With Wire-speed Performance Across All Ports 2. Advanced Switching Capabilities • Layer 2 And Layer 3 Switching Capabilities • Support For Multiple Switching Fabrics • Advanced Qos (quality Of Service) Mechanisms • Support For Vlan Segmentation And Routing 5 High Redundancy And Reliability • Dual Power Supplies • Hot-swappable Components • Redundant Supervisor Engines • Support For Virtual Chassis Technologies • Comprehensive Fault Tolerance Mechanisms 6 Security Characteristics • Advanced Access Control Lists (acls) • Port Security Features • Dhcp Snooping • Dynamic Arp Inspection • Ieee 802.1x Authentication • Integrated Threat Management 7 Routing Protocol Support • Bgp • Ospf • Is-is • Mpls • Multi-protocol Routing Capabilities 8 Management And Monitoring • Snmp Support • Comprehensive Network Monitoring Tools • Remote Management Interfaces • Detailed Logging And Diagnostic Capabilities • Advanced Technological Support 9 Hardware-based Packet Forwarding • Support For Software-defined Networking (sdn) • Ipv6 Compatibility • Mpls And Vpn Support 10 Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 2 Layer 3 Data Switch To Act As Server Farm Switch Features: 1. High-performance Specifications • High Port Density (24-48 Ports) • Wire-speed Performance • Low Latency Switching • Gigabit Ethernet Support • At Least 960 Gbps Switching Capacity 2. Advanced Connectivity Features • Support For Multiple Interface Types • Layer 2/layer 3 Capabilities • Fabric Connection Technologies • Vm-aware Networking 3. Redundancy And Reliability • Hot-swappable Components • Dual Power Supplies • Redundant Supervisor Engines • Non-stop Forwarding (nsf) • Stateful Failover Capabilities 4. Performance Security Features • Hardware-based Acls • Port Security • Advanced Threat Protection • Ieee 802.1x Authentication • Micro-segmentation Support 5. Management Capabilities • Advanced Monitoring Tools • Snmp Support • Comprehensive Logging • Remote Management Interfaces • Network Telemetry 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 4 Layer 3 Data Switch To Act As Access Layer Switch 1. Port Density And Connectivity • Minimum Of 48 Ports • Support For 1g/10g Interfaces • Rj45 And Sfp/sfp+ Port Options • High-density Connectivity • Poe/poe+ Support (up To 30/60 Watts) 2. Performance Characteristics • Low Latency Switching • Wire-speed Performance • Minimum 80-160 Gbps Switching Capacity • Packet Forwarding Rate: 100-240 Mpps 3. Advanced Switching Capabilities • Layer 2/layer 3 Functionality • Vlan Segmentation • Spanning Tree Protocol (stp/rstp) • Link Aggregation (lacp) • Quality Of Service (qos) Support 4. Security Features • Port Security • 802.1x Authentication • Dynamic Arp Inspection • Dhcp Snooping • Mac Address Filtering • Private Vlans • Storm Control 5. Management Capabilities • Snmp Support • Cli Access • Web-based Management • Remote Monitoring • Syslog Integration • Fast Convergence Protocols • Redundant Power Supplies 6. Supports Cloud Management With Wired Assurance: • Provides Operational Visibility Into The Wired Experience With Service-level Expectations (sles) For The Proposed Switch. • Simplified Onboarding And Provisioning With Single-click Activation Which Adds True Plug-and-play Capabilities To The Cloud-ready, Zero-touch Provisioning (ztp)-enabled Switch. • Configuration Models Use Global Templates For Bulk Rollouts While Retaining The Flexibility To Apply Custom Site- Or Switch Specific Attributes. • Device, Port, And Interface Profiles Allows For The Manual Provisioning Of Colored Ports Or Auto-provisioning Of Colorless Ports. • Open Apis Support Third-party Integrations Such As Servicenow And Splunk To Automate Troubleshooting, Ticketing, And More. • Wired Service Level Expectation (sles) Allow To Set, Monitor, And Measure Wired User Experiences Such As Throughput, Successful Connections, And Switch Health With Pre- And Post-connection Performance Metrics. • Ai-driven Switch Insights Reveal Switch Performance, Including Detailed Device-level Metrics Such As Cpu And Memory Utilization. • Features Virtual Network Assistant. 63 Wireless Access Points 1. Performance Characteristics • Dual-band (2.4 Ghz And 5 Ghz) • Wi-fi 6 (802.11ax) Support • Maximum Theoretical Throughput: 5.4 Gbps • Concurrent Dual-band Operation 2. Coverage And Capacity • Recommended Coverage: 150-200 Users Per Ap • Indoor Enterprise-grade Performance • Suitable For Open Offices, Conference Rooms, And Collaborative Spaces 3. Technical Specifications • 4x4:4 Mu-mimo Technology • Beamforming Support • Maximum Concurrent Clients: 512 • Transmit Power: Up To 25 Dbm 4. Advanced Features • Ai-driven Wireless Optimization • Automated Channel And Power Management • Location Services • Cloud-managed Platform 5. Security Capabilities • Wpa3 Support • 802.1x Authentication • Rogue Ap Detection • Integrated Security Fabric • Advanced Threat Protection 6. Artificial Intelligence • The Wireless Solution Must Include Virtual Network Assistant That Supports Natural Language Processing (nlp) Capabilities For Daily Operation. • Api Integration With Generic Ai Such As Google, Alexa And Siri Is Not Considered As Virtual Network Assistant Feature. • The Virtual Network Assistant Must Provide A Conversational Interactive Interface. • The Virtual Network Assistant Must Provide A Single-page Event And Data Correlation View To Eliminate The Need To Pull Up Multiple Dashboards Or Memorize Cli Commands. The Virtual Network Assistant Must Support Multi-vendor Switch Insights: • Switch-ap Affinity To Show How Many Aps Are Connected To A Switch, Reducing Impact Outages • Poe Compliance To Help Manage And Balance The Power Draw Of Connected Devices • Inactive Or Missing Wired Vlans That Are Misconfigured On Switch Ports Where Aps Are Connected But Clients Are Getting Blocked • Version Compliance For Switches Running Dissimilar Hardware • Switch Uptime To Monitor When Switches Are Online Or Offline • The Virtual Network Assistant Must Be Able To Provide Corrective Action Suggestions To Resolve Failures. • The Virtual Network Assistant Must Support Proactive Rma For Unhealthy Access Points. • The Virtual Network Assistant Must Support External Event Triggers Such As Automatic Creation Of A Ticket To External Support Systems With Email Alerts And Webhooks 1 Web-based Controller And Cloud Platform Management 1. Management Capabilities • Identity And Access Management • Centralized Cloud-based Management • Single-pane-of-glass Dashboard • Automatic Firmware Updates • Zero-touch Provisioning • Global Configuration Management 2. Ai-powered Analytics • Proactive Client Experience Monitoring • Automated Troubleshooting • Machine Learning-based Insights • Performance Prediction • Anomaly Detection 3. Security Features • Integrated Security Management • Automatic Threat Detection • Rogue Ap Identification • Compliance Reporting • Role-based Access Control 4. Key Functionalities • Network Configuration • Client Location Services • Performance Analytics • Detailed Reporting And Visualization 5. Access Methods • Web Browser Interface • Mobile Application • Continuous Monitoring And Optimization 1 Lot Structured Cabling • Cat6 Utp Cable • Information Outlet • Faceplate • Patch Panel 5. Scope Of Work Bidders Shall Comply With The Following: • Bidders Shall Be Allowed To Visit The Actual Site For The Preparation Of The Plans Prior To The Submission Of Their Proposal. Bidder Shall Submit An Architectural And Electrical Layout/design Based On User Requirements Together With Their Technical Bid Proposal. • Supply, Delivery, And Installation Of Complete Site Preparation Labor And Materials Including Other Peripherals Needed To Complete The Site Without Additional Cost To Procuring Entity. Bidder Shall Submit A Complete Bill Of Materials For The Site Preparation Component. • Transfer Of Existing Network Components, Servers, And Other It Peripherals From Current Location To New Data Centers • Supply And Installation Of Data Centers Power Distribution And Pacu Power Supply. • Supply, Delivery, And Installation Of Complete Fire Suppression System Including Hangers, Support, And Other Peripherals That May Be Needed To Complete System Without Additional Cost To Procuring Entity. • Supply, Delivery, And Installation Of Complete Security Door Access Input And Output Cables Including Rough-ins, Hangers, Supports, And Other Peripherals That May Be Needed To Complete The System Without Additional Cost To Procuring Entity. Registration Of Personnel To The Door Access System Shall Be Scheduled To Avoid Disruption Of Work. • Provisioning Of Vertical And Horizontal Cabling • Testing Of Each System Shall Be Done Accordingly And Will Be Certified As Completed After Performing And Passing The Functionality Test And The User Acceptance Test. 6. Product Support Requirement 6.1 24x7 Remote Support Through Phone And Email; And Services Assistance Thru Email, Phone, And Web-chat With A Response Time Of Not More Than An Hour Upon Receipt Of The Request From Boi. 6.2 Provision Of 24x7 On-site And On-call Services. 6.3 Provide Comprehensive Service Level Agreement 7. Bidders Eligibility And Project Team Requirements 7.1 A Philippine Contractor Accreditation Board License. At Least With Category A Level; With Classifications In Communication Facilities, Mechanical Works, Electrical Works, And Air-conditioning Works 7.2 The Contractor Must Have At Least One (1) Employed Electronics/electrical Engineer Fully Certified. A Copy Of The Certification Shall Be Provided. A Certified Engineer Must Be Employed By The Bidder For At Least Three (3) Years. 7.3 An Employed Certified Data Center Specialist Personnel; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.4 An Employed Safety Officer With A Construction Occupational Safety And Health Certificate; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years. 7.5 An Employed Certified Associate In Project Management; The Personnel Should Have Been Employed For A Minimum Of Three (3) Years 7.6 The Bidder Must Have Completed At Least One (1) Similar Project In The Supply, Delivery, Installation, Testing, And Commissioning Of A Datacenter Within The Last 10 Years. This Should Be Supported By A Certificate Of Completion And Acceptance By The Client. 7.7 Bidder Should Provide A Certificate That Has 24x7 Technical Support Capabilities. Bidder Should Identify The Person Responsible For Restoring Service Due To Outages And Provide His Contact Details I.e. Contact Person, Position, Contact Numbers, And Email Address. 7.8 Contractors Must Have Philippine Contractors Accreditation Board (pcab) Licenses Required By Republic Act 4566 To Perform Telecommunications /communications Installations. 7.9 A Member Of The Safety Organization Of The Philippines 7.10 A Certificate To Show The Company Is Registered With The National Privacy Commission 7.11 All Prospective Bidders Must Be Authorized Resellers Of All Equipment To Be Supported By A Certificate Issued By The Manufacturer/distributor Of Equipment/materials. 7.12 All Prospective Bidders Shall Submit The Original Copy Of The Design Proposal, Brochures, And Other Publications That Support Compliance To The Requirements. 7.13 Proposed Work Plan And Detailed Implementation Schedule For The Project Covering The Whole Period. Prospective Bidders Are Required To Conduct Site Inspections. This Is To Ensure The Reliability, Security, And Efficiency Of The Required Services That The Contractor Shall Perform. The Timeframe Should Be Specified For Each Activity To Be Done And Shall Include Gantt Chart Summary. 7.14 The Contractor Shall Be Held Solely Responsible For Any Property Or Personal Damages Or Claims, Including Damage To Existing Structures, Systems, Equipment, And/or Site Caused By The Contractor Shall Repair Or Replace It To Its Original Condition At No Additional Cost To The Office. 7.15 The Contractor Shall Be Responsible And Accountable For The Removal And Proper Disposal Of Material And Waste Generated By This Project. Debris, Surplus Materials, Equipment, Etc. Shall Be Removed Daily. 7.16 All Prospective Bidders Shall Submit Original Copy Of Design Proposal, Brochures And Other Publications That Supports Compliance To The Requirements. 8. Project Team Requirements/composition Team Composition And Qualifications The Winning Bidder Shall Assemble A Comprehensive Project Team With The Following Mandatory Positions And Qualifications: Project Management Team 8.1 Project Manager O Minimum Of 10 Years Of Experience In Large-scale It Infrastructure Projects O Proven Track Record In Data Center And Network Refresh Initiatives O Relevant Pmp (project Management Professional) Or Equivalent Certification O Demonstrated Experience In Managing Complex Technological Transformations 8.2 Deputy Project Manager O Minimum Of 7 Years Of Experience In It Infrastructure Projects O Strong Technical Background In Data Center And Network Technologies 8.3 Network Infrastructure Lead O Minimum Of 8 Years Of Specialized Experience In Enterprise Network Design O Advanced Certifications (ccie, Ccnp, Or Equivalent) O Expertise In Modern Network Technologies, Including Sdn, Cloud Integration, And Cybersecurity 8.4 Data Center Infrastructure Specialist O Minimum Of 8 Years Of Experience In Data Center Infrastructure Design And Implementation O Expert In Cooling, Power Management, And Physical Infrastructure Design O Certifications In Data Center Design And Management Support And Implementation Team 1. Senior Systems Engineers (minimum 2) O Each With At Least 6 Years Of Experience In Enterprise System Integration O Comprehensive Knowledge Of Server, Storage, And Virtualization Technologies 2. Network Engineers (minimum 2) O Each With At Least 5 Years Of Experience In Enterprise Network Implementation O Expertise In Network Configuration, Optimization, And Security Additional Team Requirements • The Winning Bidder Must Provide Detailed Cvs And Certifications For Each Key Team Member • Any Changes To The Proposed Team Composition Must Be Pre-approved By The Board Of Investments • The Team Must Demonstrate Collective Experience In Similar Large-scale Infrastructure Projects • All Team Members Must Be Available For The Full Duration Of The Project • The Bidder Must Have A Clear Succession And Backup Plan For Critical Roles The Board Of Investments Reserves The Right To Request Changes To The Team Composition If It Does Not Meet The Project's Critical Requirements. 9. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The All Equipment To Ensure Their Conformity To The Project Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Vii (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Bidder To The Authorized Inspectors At No Charge To The Procuring Entity. 10. Warranty 10.1 The Bidder Shall Provide A Preventive Maintenance Program During The Warranty Period For All The Delivered Equipment And System. 10.2 The Bidder Shall Provide Quarterly Preventive Maintenance On The Pacu, Fire Suppression, Power Distribution Units, And Door Access System During The Warranty Period. 10.3 The Bidder Shall Provide Not Less Than 4 Hours Of Response Time After Receiving Calls From The Client During The Warranty Period. 10.3 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 11. License And Subscription Renewal Provision The Board Of Investments Maintains Absolute And Unconditional Rights To Renew Or Extend All Software Subscriptions, Licenses, And Service Entitlements Beyond The Initial Warranty Or Contract Period. Upon The Expiration Of Any Initial Warranty Or Support Period, We Reserve The Comprehensive Right To Renew Existing Software Licenses, Extend Service Subscriptions, Continue Maintenance And Support Contracts, And Maintain Full Access To All Software And Platform Entitlements. The Successful Bidder Must Provide Comprehensive Documentation Of All Existing Licenses And Subscriptions. This Includes Delivering Complete Credentials, Access Keys, And Licensing Information To Facilitate Seamless Transitions And Ensure Our Continued Operational Effectiveness. We Require Full Disclosure Of Licensing Terms, Clear Renewal Pathways, And Complete Transparency In All Licensing Models. 12. Delivery The Delivery And Commissioning Of All Items For The Data Center Shall Not Exceed 120 Calendar Days Upon Issuance Of The Corresponding Notice To Proceed (ntp). The Commissioning And Initial Testing Shall Be Conducted Within 2-3 Calendar Days After Each Component Is Completed And Witnessed By The End User. After Completion Of The Data Centers, The Bac-twg Together With End User Shall Conduct Functionality Tests. These Will Ensure That All Of The Project's Specifications And Requirements Are Met Must Provide In Hard And Soft Copies Detailed Project Documentation Of The Following: A. Project Implementation Plan With Timetable, B. Installation And Configuration Manual, C. Incident And Problem Escalation Procedure With A List Of Designated Technical Support Engineers, D. Sla (service Level Agreement) E. User Acceptance Test Plan, 13. Training And Technology Transfer A. The Contractor Must Provide Training For At Least Five (5) It Personnel For The Network Equipment/switches, And Troubleshooting For The Structured Cabling And Management Of The Data Center For At Least Three (3) Days Per Module. B. To Ensure That Proper Maintenance And Sustainment Appropriate Training Shall Be Conducted By The Contractor As Essential Part Of Technology Transfer To Prepare And Equip Boi And Its Personnel In The Overall Operations And Maintenance Of Its Network Infrastructure And It Facility. C. The Contractor Shall Submit A Program Of Instruction (poi) Detailing All The Training Activities To Be Conducted For Review, Evaluation, And Approval Of Boi. Hands-on Training Shall Form Part Of The Training Program. D. Operation And Training Manuals Shall Be Provided To Each Participant. E. The Training Shall Be Conducted And Completed Before The Issuance Of The Certificate Of Project Completion And Acceptance. F. All Expenses Related To Training (e.g. Venue, Meals, Equipment, Certificate.) Shall Be Borne By The Contractor. G. Certificate Of Training/s Shall Be Given By The Contractor To All Participants. 14. Liability Of The Bidder The Bidder’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 15. Incidental Services 1. Spare Parts The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. In The Event Of Termination Of Production Of The Spare Parts/expiration Of Software Licenses O Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; O Following Such Termination Of Production, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested; O The Bidder Shall Carry Provide The List Of Vendor Of Consumable Spare Parts Or Components For The Equipment. 16. Institutional Requirements Equipment And Asset Ownership All Equipment, Hardware, Software, Infrastructure Components, And Other Tangible And Intangible Assets Procured, Installed, Or Developed During The Data Center Rehabilitation And Network Refresh Project Shall Become The Sole And Exclusive Property Of The Board Of Investments (boi). The Contractor Is Prohibited From Removing Any Delivered Items From The Project Site After Installation Or Project Completion. Specific Provisions Include: • Full Ownership To All Project-related Assets Shall Immediately Transfer To Boi Upon Delivery Or Installation • The Contractor Shall Provide All Necessary Documentation To Formally Transfer Ownership, Including But Not Limited To Equipment Lists, Serial Numbers, Warranty Information, And Certificates Of Ownership • Any Attempt To Remove Or Retain Project-related Items Without Authorization Will Be Considered A Material Breach Of Contract The Contractor Shall Submit Project Implementation And Management Plan (pimp) Within Ten (10) Calendar Days Upon Receipt Of Notice To Proceed For The Implementation Of The Proposed Solution, Which Is Subject To Review And Approval By The Boi. The Pimp Shall Include But Not Be Limited To The Following: • Scope Of Work • Project Organization • Implementation Methodology • Project Timeline • Communication And Deployment Strategy The Contractor Shall Provide Complete Documentation, One (1) Soft Copy And Three (3) Printed Copies, For Every Deliverable And At Every End Of Each Development Stage And Milestone Which Must Be Submitted To The Boi For Approval. Boi Shall Own Any And All Documents And Shall Reserve The Right To Reproduce At No Additional Cost. The Documentation Must Be Written In English With Concise And High-quality Presentation To Include But Not Limited To The Following: 1. Technical Manuals: • As Built Document • Infrastructure Diagrams And Topology • Troubleshooting And Installation Guides • Single Line Diagram • System/operation Manual 2. Operations And Maintenance Manuals 17. Intellectual Property Rights The Bidder Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 18. Approved Budget Cost The Board Of Investments Intends To Apply The Sum Of Thirty-one Million Pesos (31,000,000.00) Being The Approved Budget For The Contract (abc) For The Completion Of The Relocation And Transfer Of The Board Of Investments’ Datacenter And It Related Infrastructure From 5th Floor To 4th Floor To Be A High-performing And Scalable It Infrastructure. Bids Received In Excess Of The Abc Shall Be Automatically Disqualified At The Opening Of The Financial Proposals. Prices Are In Php And Are Vat-inclusive. 19. Source Of Funds The Budget Authorized For Procurement Of Service For The Relocation And Transfer Of Boi Datacenter From 5th Floor To 4th Floor Shall Be Sourced From The 2025 Capital Outlay (co) And Maintenance And Other Operating. Expenses (mooe), Pursuant To The Philippine General Appropriation Act Of 2025. 20. Payment 10% Project Mobilization: Covers Initial Costs, Including Project Planning And Resource Allocation, And To Submit The Project Implementation Plan 25% Network And Datacenter Infrastructure Facility Civil Works All Materials, Equipment, And Labor Necessary For The Construction Of The It Infrastructure Facility Including All Civil Works, Walls, Doors, Partitions, Flooring, Security Access Pass, Air-conditioning Unit And Other Accessories/appurtenances As Specified And As Shown In The Drawings. 25% Delivery Of Equipment And Materials, Structured Cabling, Fixing, Installation Of Cables, Conduit, Outlets Racks Ladders, And Other Components (active Components) All Materials Are To Be Used In The Installation And Cabling. Installed Cables, Conduit, And Components And Tested And Working Cable Lines. 30% Upon Submission Of Certification Of 100% Completion Of Project And Passing Of The Functionality Test To Be Administered By The Bac-twg And Witnessed By The Bac 5% Training Of Personnel For The Completed Network And It Infrastructure Facility. 5% Retention Fee 100% 21. Penalty In Case There Is A Delay In The Delivery And Installation Of The Software Where Boi Is Not At Fault, The Contracted Service Provider Shall Be Subject To Sanctions As Specified In The Contract To Be Signed By Both Parties Based On The Applicable Provisions Of The Procurement Law.
Closing Date15 Jan 2025
Tender AmountPHP 31 Million (USD 530.7 K)

Offizielle Bezeichnung Magistrat Der Stadt Diemelstadt Tender

Others
Germany
Description: Public tender Vob/a Redesign of the Kallental sewage treatment plant and supply line to the Marsberg-Mitte sewage treatment plant. Structural part sewerage system approx. 25 m DN 150: PP-MD sewer approx. 195 m DN 200: PP-MD sewer approx. 11 m DN 200: PEHD sewer approx. 2 m DN 300: PP-MD sewer approx. 90 m DN 600: SB sewer approx. 13 ... More. Construction part Sewerage Approx. 25 M DN 150: PP-MD sewer Approx. 195 M DN 200: PP-MD sewer Approx. 11 M DN 200: PEHD sewer Approx. 2 M DN 300: PP-MD sewer Approx. 90 M DN 600: SB sewer Approx. 13 M DN 600: PEHD sewer Approx. 6 shaft structures, DN 1000 Approx. 2 shaft structures, DN 1200 Approx. 1 plug-in gate, DN 200 Approx. 1 plug-in gate, DN 600 Approx. 1 spindle gate, DN 600 Water pipe Approx. 10 M DN 50: PEHD pipe Approx. 40 M DN 80: PEHD pipe Fittings: Approx. 2 pieces Underground hydrant, Dn 80 Approx. 1 Kos slide valve, Dn 80 Cable conduits Approx. 195 M Dn 100: PEHD pipes Construction of the building including earthworks 1 rain overflow basin, round basin, V=460 M³, prefabricated construction 1 measuring/throttle shaft, prefabricated construction, Lxwxh = 4.25x2.00x2.35 M Il 1 bedload station/debris trap, prefabricated construction, Lxwxh = 2.70x1.80x2.50 M Il 1 rain retention basin construction in earthworks (in existing sewage pond) Conversion work on existing building Basin overflow: - Removal of old equipment Sand and floating material trap: - Removal of old equipment - Installation of filling concrete and manufacture of clinker channel Operating/screening building - Removal of door and installation of roller shutter system - Adjustments to floor coverings after screen installation Surface work Approx. 45 m³ topsoil supply Approx. 75 m³ frost protection material/fss Approx. 260 m³ water-bound surface incl. fss Approx. 105 m² paving 10/20/10 cm Approx. 155 m deep curbstones 8/25/100 cm Approx. 50 m deep curbstones 10/30/100 cm
Closing Date28 Jan 2025
Tender AmountRefer Documents 

Larvik Kommune Tender

Works
Civil And Construction...+1Road Construction
Norway
Details: Title: 24/1283 - 01691 Steinsholt-kvelde Ra - G1 - Phase 1 description: Larvik Municipality Shall Procure Assistance For The Development Of A New Access Road And Ground Works For The New Treatment Facility In Kvelde, Located Approx. 200 M Into Svartangveien (county Road 3046), From Lågendalsveien (county Road 40). The Access Road Is Designed To Be Approx. 380 Metres Long With A Rise To The Site Of The New Treatment Facility. There Are Challenges With Ground Conditions In The Area, So Parts Of The Access Road Must Be Stabilised. Conduits Shall Be Laid For Cables From An Already Reduced Network Station Located West Of The Access Road To The Area, Conduits Also From Barriers, And To Light Masts Along The Access Road To The Treatment Facility. Parts Of The Access Road Have Been Cleared Of Forest, Some Forest Remains. The Site Of The Treatment Facility Has An Area Of 14,710 M2, It Shall Be Secured In Excess Of The Building Pit Treatment Facility With Fixed Installations.
Closing Date17 Jan 2025
Tender AmountNOK 58 Million (USD 5.1 Million)

City Of Tangub Tender

Others
Corrigendum : Closing Date Modified
Philippines
Details: Description 6 Units Laptop With Complete Accessories Core I7-12th Gen, Nvidia Rtx 300ti, 16gb Ram, 512gb Ssd, 1tb Hdd 8 Sets Computer Desktop With Printer & Complete Accessories Specifications: Core I7-10700 F Processor, 16gb Ddr4, 1tb Hdd + 256gb Ssd, 22-inch Display Monitor, Nvidia Geforce Gtx 1650 4gb Gddrs, Windows 11 With Avr, Keyboard, Mouse & Ups 4 In 1 Printer, Legal & A4 Paper Size: Maximum Print Resolution: Up To 5760 Dpi X 1440 Dpi, Maximum Draft Print Speed:33ppm Black, 15ppm Color, (draft, A4/letter) Minimum Ink Droplet Size: 3 Picoliters With Variable Ink 2 Units Printer A3 Size With Complete Accessories Specifications: A3 Wi-fi Duplex All In One Tank Printer Inkjet Printer, Display Type: Colour Lcd, Print Speed (black & White): 33ppm, Print Speed: 15ppm, Dimension (wxhxd): 375x347x237mm), Weight: 5 Kgs. 1 Unit Tablet With Complete Accessories Specifications: Height:182.53mm, Width: 271.25mm, Display: 12.2” Processor: Klrin T91, Octo-core, Os Harmonyos 4.2, Memory: Ram 12gb Rom-512gb, Type C Support Usb 3.1 Gen 1* With Glide Keyboard, Charger Adaptor, Usb Type C Cable & Pen 1 Unit Scanner With Complete Accessories Specifications: Document Scanners Scan At Speeds Up To 85ppm/170ipm (one-pass Duplex), Scan Up To A3, Scan From 27gsm, 1.44” Colour Lcd, Paper Protection Function
Closing Date28 Jan 2025
Tender AmountPHP 1.5 Million (USD 25.7 K)
7181-7190 of 7588 archived Tenders