Cable Tenders

Cable Tenders

GOVERNOR CELESTINO GALLARES MULTI SPECIALTY MEDICAL CENTER Tender

Healthcare and Medicine
Philippines
Details: Description Gov. Celestino Gallares Multi-specialty Medical Center Invitation To Bid For Supply, Delivery, Installation, Testing And Commissioning Of 2 Lots Various Medical Equipment Batch 3 (re-bid) For Gov. Celestino Gallares Multi-specialty Medical Center 1. The Gov. Celestino Gallares Multi-specialty Medical Center (gcgmsmc), Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Cb:2024-12-0007. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Gcgmsmc, Through The Health Facilities Enhancement Program 2024 Intends To Apply The Sum Of Sixty Million Three Hundred Forty-four Thousand Nine Hundred Seventy-five Pesos Only (php60,344,975.00) Being The Abc To Payments Under The Contract For Each Lot/item.et Al. Lot No. Item/description Quantity Unit Cost Total Cost 1 Infusion & Monitoring System 1 37,344,975.00 37,344,975.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 1 23,000,000.00 23,000,000.00 Grand Total 60,344,975.00 Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. 2. The Gcgmsmc, Now Invites Bids For The Above Procurement Project. Delivery And Installation Of The Goods Is Required Within 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Bidders Should Have Completed, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Gcgmsmc Through Electronic Mail Via Procurement@cpspecialtycenter.org Or Through The Cellular Number 09209437250. 5. A Complete Set Of Bidding Documents May Be Acquired And Downloaded By Interested Bidders From Gcgmsmc Google Drive From (procurement@cpspecialtycenter.org) On December 08, 2024– January 03, 2025 And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Indicated Below In Accordance With The Following Schedule: Lot No. Item/description Total Cost Bidding Documents Fee (in Philippine Peso) 1 Infusion & Monitoring System 37,344,975.00 25,000.00 2 Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device 23,000,000.00 25,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Online Banking Or Online Deposit With The Following Bank Details: Bank Name: Development Bank Of The Philippines Account Name: Gcg Multi-specialty Medical Complex Account Number: 00-0-15490-780-5 "for Bidders Choosing To Pay Via Online Transfer Or Bank Deposit, Please Ensure That Proof Of Your Successful Transaction Is Promptly Sent To The Procurement Email Address: Procurement@cpspecialtycenter.org. In Compliance With Coa Circular Number 2021-014, Clause 5.2, An Acknowledgement Receipt Will Be Issued As Proof Of Verified And Received Payment. Access To Bidding Documents Will Be Granted Only Upon Presentation Of This Acknowledgement Receipt. 6. The Gcgmsmc Will Hold A Pre-bid Conference On The 17th Day Of December 2024 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission On Or Before The 3rd Day Of January 2025 At 0900h At Gcgmsmc Procurement Office Room 3c-w327 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur, Cortes, Bohol. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On The 3rd Day Of January 2025 At 0900h At Room 3c-e310 Located At The 3rd Floor Of Gcgmsmc Building C, Malayo Sur Cortes. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Together With Their Company Id. 10. The Gcgmsmc Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. Submission Of Hardcopies: Bidders Shall Submit Their Original Eligibility And Technical Documents Described In Itb Clause 10 In One Sealed Envelope Marked "original - Technical Component", And The Original Of Their Financial Component In Another Sealed Envelope Marked "original Financial Component", Sealing Them All In An Outer Envelope Marked "original Bid". Each Copy Of The First And Second Envelopes Shall Have 2 Copies And Similarly Sealed Duly Marking The Inner Envelopes As "copy No. 1 Technical Component" And "copy No. 1- Financial Component” And "copy No. 2- Technical Component" And "copy No. 2- Financial Component" And The Outer Envelope As "copy No. 1" And "copy No. 2" Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. Please Take Note That All Notarized Documents Must Be Treated As Original Copies For All The Submitted Documents (original, Copy 1, And Copy 2). It Is Imperative That Each Copy Retains Its Original Notarization To Ensure Legal Validity And Compliance. The Original And The Number Of Copies Of The Bid As Indicated In The Itb Clause 15 Shall Be Typed Or Written In Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. All Envelopes Shall: A. Contain The Name Of The Contract To Be Bid In Capital Letters; B. Bear The Name And Address Of The Bidder In Capital Letters; C. Be Addressed To The Procuring Entity's Bac In Accordance With Itb Clause 1; D. Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1 12. For Further Information, Please Refer To: Mary Grace L. Simbajon Jessa O. Quiñal Procurement Office Procurement Office Malayo Sur, Cortes, Bohol Malayo Sur, Cortes, Bohol Procurement@cpspecialtycenter.org Procurement@cpspecialtycenter.org +639209437250 +639452478632 December 06, 2024 Approved By: (signed) Doreen A. Lugo, Lpt Bac Chairperson Noted By: (signed) Laurence Elliot R. Tirol, Md, Fpcp Medical Center Chief ------------------------------------------------------------------------------------------------------------ Item: 1 Unit: Lot Qty: 1 Unit Cost: 37,344,975.00 Total Cost: 37,344,975.00 Description: Supply, Delivery, Installation, Testing & Commissioning Of Infusion & Monitoring System 150 Pump, Volumetric Infusion 40 Docking Station/s 1 Central Monitoring System 1 Mri-compatible Infusion System 1 Oximetry Monitoring System, Non-invasive Pump, Infusion Volumetric, 150 Units Size Less Than Or Equal To 210 (l) X 140 (w) X 73 (h) Millimeters (mm) Weight Less Than Or Equal To 1700 Grams (g) Screen Must Be At Least Three (3) Inches, Touchscreen, Thin Film Transistor (tft) Color Liquid Crystal Display (lcd), At Least 200 X 400 Pixel/s, Adjustable Brightness Levels Display Must Show The Following Information At Least: Infusion Status With Drug/s Name, Infusion Parameter/s, Real-time In-line Pressure; System Status Information With Infusion Mode, Intravenous Set Brand Or Bed Number, Alarm Symbol/s, Battery Status, Network Status, Relayed Status, And System Time; Must Show Infusion Status Indicator On The Door Accuracy: ≤ ± 4.5% Mode/s: Rate Mode, Dose Mode, Dose Time Mode, Time Mode, Sequential Mode, Intermittent Mode, Loading Dose Mode, Ramp Mode, Micro-infusion Mode And/or Drip Mode Must Support The Following Application/s : Intravenous Drug Infusion, Enteral Nutrition Feeding, And/or Blood Transfusion Flow Rate/s: 0.10-2300 Milliliter/s (ml) Per Hour (hr) And/or 0.10-2000 Ml/hr Increment/s: 0.01 Ml/hr (0.10-99.99 Ml/hr), 0.1 Ml/hr (100-999.9 Ml/hr), 1 Ml/hr (1000-2300 Ml/hr) Preset Time/s: 00:00:01-99:59:59 Preset Volume: 0.10-9999.99 Ml With Increments Of 0.01 Ml Accumulated Volume: 0.00-99999.99 Ml “keep Vein Open”: (kvo): 0.1-5.0 Ml/hr With Increment/s Of 0.01 Ml/hr Purge Rate: 0.1-2300 Ml/hr Bolus Rate: 0.1-2300 Ml/hr, Automatic Or Manual Occlusion Detection: 50-1125 Millimeters Mercury (mmhg) With At Least 15 Selectable Levels Such As 50, 150, 225, 300, 375, 450, 525, 600, 675, 750, 825, 900, 975, 1050, 1125 Mmhg); With Default Of 450 Mmhg; Pre Alarm Pops Up While Pressure Is Increasing; Auto-restart Capability Where On/off And Restart The Infusion When Occlusion Pressure Is Reduced; Pressure Unit/s Available Such As, Millimeters Mercury (mmhg), Kilo Pascal/s (kpa), Bar, And/or Pounds Per Square Inch (psi) Air Bubble Detection, With At Least Six (6) Level/s, 15, 50, 100, 250, 500, 800 Microliter/s; Air Accumulation 0.1-1.0 Ml Per 15 Minutes Dose Rate Unit/s Must Include The Following: Ng/kg/min, Ng/kg/hr, Ng/kg/24h; Ug/kg/min, Ug/kg/h, Ug/kg/24h, Mg/kg/min, Mg/kg/h, Mg/kg/24h; Mu/kg/min, Mu/kg/h, Mu/kg/24h; U/kg/min, U/kg/h,u/kg/24h; Ku/kg/min, Ku/kg/h, Ku/kg/24h; Eu/kg/min, Eu/kg/h, Eu/kg/24h; Mmol/kg/min,mmol/kg/h, Mmol/kg/24h; Mol/kg/min, Mol/kg/h, Mol/kg/24h; Mcal/kg/min, Mcal/kg/h, Mcal/kg/24h; Cal/kg/min, Cal/kg/h, Cal/kg/24h; Kcal/kg/min, Kcal/kg/h, Kcal/kg/24h; Meq/kg/min, Meq/kg/h, Meq/kg/24h; Auto Lock Time: 1-5 Minute/s Range With On/off Switch Drug Library Up To 5000 Drug/s, 30 Categories, Support For Color-coding History Log Up To 3500 Event/s Volume Collection Available In At Least 4 Method/s Including, 24 Hour Total, Current Total, Period, Timing Volume, Support History Rate Review Dose Error Reduction System Available Definition Of Dose Limit/s Automatic Alarm/s When Reaching Dose Limit/s Intravenous (iv) Administration Set Must Be Able To Accept Universal Iv Set/s Alarm/s Audible And Visual Alarm/s; Sound Volume Adjustable At Least Eight (8) Level/s 2 Level/s: High: Air In Line, Accumulated Air, Empty, Drop Error, Upstream Occlusion, Downstream Occlusion, Infusion Set Disengaged, No Infusion Tube, Infusion Set Error, No Drop Sensor, Battery Depleted, Volume To Be Infused (vtbi) Complete, Kvo Finish, Relay Invalid And/or System Error Low: Kvo Running, Battery In Use, Battery Error, Cms/egw Disconnected, Standby Time Expired, Dock Connection Interrupted, System Time Error, Relay Invalid Soon, Time Near End, Reminder And/or Low Battery Reminder: 1-5 Minute/s, On/off Switchable Connectivity Communication Wired And Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, Calibration Date Import/export; Multifunction Connector: Rs232, Nurse Call Connector, Dc Adapter Integration: Connect With Infusion Central Station, Connect With Central Monitoring System Battery Operating Time: More Than Or Equal To Five (5) Hour/s At 25 Ml/hr Charging Time: Less Than Or Equal To Five (5) Hour/s To Full Capacity Power Supply Voltage 100-240 Volt/s, Frequency 50-60 Hertz, (hz), Current 0.5-0.21 Ampere/s (a) Work Environment Level Of Resistance To Water And Dust At Least Ingress Protection Rating 33 (ip33) Classification Type Cf, Class 1, Ip33 Docking Station, 40 Units Size: Atleast270 (l) X 170 (w) X 390 (h) Millimeters (mm) Weight: Less Than Or Equal To 3900 Grams Display Screen At Least Three (3) Inches Organic Light Emitting Diode (oled) At Least 265 X 64 Pixels Resolution Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For 24 Hours; Must Be Able To Connect Via Hl7 Protocol And Integrate With Hospital Information System/s And/or Electronic Medical Record/s Via Wired Or Wireless Protocol; Usb Support For Drug Library Importation, Patient Information Loading, Patient Data Export, History Record And/or Barcode Reader Connection Multifunctional Connector Rs232 And/or Nurse Call Connector Integration Capability To Synergise/connect With Patient Monitor, Connect With Infusion Central Station, And/or Connect With Central Monitoring System Night Mode Capability With On/off, Start Time, End Time And Sound Volume Adjustable History Record Up To 2500 Mounting Type For Horizontal And Vertical Pole Clamp: Horizontal Diameter Range 10 To 25 Mm; Vertical Diameter Range 15 To 40 Mm; One Pole Clamp Per Shelf Module Programmable Mode: Support Automatic Multi-channel Relay Maintenance: Support 2 To 24 Pumps Tool Free Assembly, Support Batch Calibration, Drug Library Import, And Software Upgrade/s Classification: Type Cf, Class 1, Ip33 Power Supply Battery: Lithium-ion 2500mah Operating Time Of At Least 2 Hours Charging Time At Most 6 Hours Ac Power: 100 To 240 V, 50 To 60 Hertz, 8 To 3.4 A Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, System Error : Low: Slave Controller Abnormal, Battery In Use, Low Battery, Battery Error, Local Area Network (lan) Internet Protocol (ip) Address Conflict, Wireless Lan Ip Address Conflict, Cms, Egw Disconnect Central Monitoring System System Component/s: Central Station System Center Which Connects Bedside Device/s Hardware: Display/s At Least 24 Inch Tft Lcd Screen/s Medical Grade, At Least Dicom 14, At Least Ip54 Rating Iec 60601, Touch Screen; Must Include Printer/s, Keyboard/s, Mouse/s And Speaker/s Main System Software Specification/s: Number Of Device Up To 64 Patient Monitor/s And Infusion Pump/s Per Station Alarm: Category: Physiological Alarm, Technical Alarm And System Prompt Remote Control: Alarm Switch, Alarm Limits, Alarm Priority, Alarm Pause And Alarm Reset Alarm Analysis: Support Alarm Statistics Trend Review: At Least 240 Hours; Full Disclosure At Least 240 Hours; Data Interface Connection Interface Integrated Egateway Or Standalone Egateway Mri Compatible Infusion System, 1 Unit Size Less Than Or Equal To 560 (l) X 540 (w) X 1540 (h) Mm Including Trolley, Excluding Iv Pole Weight Less Than Or Equal To 50 Kilograms Without Pump/s Display Screen At Least 3 Inches, Oled, 256 X 64 Pixels, Showing The Following Information: Bed Number, Patient Name, Battery Status, Network Status, Total Volume For The Past 24 Hours Infusion Of The Pump; Compatible Pumps At Least 4 Infusion Or Syringe Pumps Mri Scanner Compatibility For Both 1.5 And/or 3.0 Tesla Model/s Alarm/s Audible And Visual Alarm/s 2 Level/s: High: Battery Depleted, Magnet Indicator Battery Depleted, System Error : Low: Low Battery, Magnet Indicator, Battery Low, Battery Error, Lan Ip Address Conflict, Wlan Ip Address Conflict, Network Disconnected Magnet Indicator: Magnetic Field To Be Used In Magnetic Fields Up To 20 Mt; < 20 Mt Green; 20-40 Mt Yellow; > 40 Mt Red; Connectivity Communication Wired Or Wireless Usb Support Drug Library Import, Patient Data Import/export, History Record Export, System Upgrade Integration: Synergy With Patient Monitor, Connect With Infusion Central Station, Connect With Central Monitoring System Material: Ingress Protection Level Ip33 Safety Standards En 60601-1:2006 / A1:2013; En 60601-1-2:2015; En 60601-1-8:2007/a11:2017; F2025-15; F2182-19; F2213-17; F2503-20; Classification Type Cf Class Power Supply Battery: Lithium-ion At Least 3400mah; Ac Power: 100 To 240 V, 50 To 60 Hertz Dock: Operating Time At Least 10 Hours; Charging Time At Most 6 Hours Magnet Indicator: Operating Time Of At Least 720 Hours; Recharging Time At Most 8 Hours Oximetry Monitoring And Connectivity System, 1 Unit Expandable Patient Monitoring And Connectivity Hub That Integrates An Array Of Technologies, Devices, And Systems To Provide Multimodal Monitoring And Connectivity Solutions In A Single Clinician-centric Platform Regional Oximetry, Non-invasive Pulse Oximetry Display Resolution At Least 1280 X 800 Pixels, At Least 10 Inches Diagonal Size, Multi-touch Touchscreen; Customizable Multiple Screen Views To Feature The Most Applicable Data; Can Display Tissue Oxygen Saturation Of Specific Area; Can Display The Difference Between Current Rso2 And User Defined Baseline; Can Display The Difference Between Rso2 And Spo2; Pulse Rate; Perfusion Index; Pleat Variability Index; High-resolution Plethysmograph Waveform And/or Can Display Spectrogram Representing Activity For Both Sides Of The Brain; Must Have Ports Or Docks That Are Compatible To Plug And Play Modules For The Measurement Of Brain Function Monitoring, Regional Oximetry, And Non-invasive Pulse Oximetry Battery Capacity Is At Least Four Hours Module/s: Cerebral Oximetry At Least One, Pulse Co-oximetry At Least One Can Be Used As Bedside, Handheld And/or Transport Monitor Configurable Parameter And Alarm Settings By Patient Population Audible And Visual Alarms For Quick Identification Of Alarming Parameters With Redundant Speaker System. Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Vendor Must Respond With Technical Support Staff, Either Remotely 2 Hours Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And/or End-user. Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal/manufacturer May Preferably Have An Existing / Active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances. -------------------------------------------------------------------------------------------------------------------- Item: 2 Unit: Lot Qty: 1 Unit Cost: 23,000,000.00 Total Cost: 23,000,000.00 Description: Advanced Perfusion System, Cardiopulmonary Bypass Pump + In-line Blood Gas Monitoring Device Heart & Lung Machine With Integrated Centrifugal Pump Built In Centrifugal Pump With The Following Specifications: Controls And Monitor Must Be Mounted To The Machine Drive Unit Must Allow For Interchangeable Components (must Have Flexible Drive Unit For Better Handling) Remote Control Display Panel Must Include The Centrifugal Status And Alarms Flow Sensor Must Be Non-invasive Type One (1) Integrated Centrifugal Pump Plus Either (a) Three (3) Singular Large Pumps + Two (2) Single Small Roller Pump Or (b) A Total Of Five (5) Roller Pumps With Flat Screen Monitor For Heart & Lung Machine Functionality Display Roller Pump Must Have Tubing Clamp Assembly Must Be A Rotatable Pump Head. With Hand Crank Intended For Manual Use In The Event Of Power Failure For Both Roller And Centrifugal Pump With Complete Safety Mechanism Device. Dual Pressure Module Sensor With Two (2) Cable Pressure Intended For Arterial Cardioplegia Digital Pressure Monitoring And Two (2) Manometer For Manual Monitoring. One (1) Temperature Module With At Least Two (2) Channels Level Sensor And Air Bubbles Sensor Intended For Adult And Pedia Circuits That Will Trigger The Machine To Temporarily Stop Avoiding Air Introduction To Patient With Mechanical Gas Blender For Oxygen And Compressed Air With Hose And Accessory Connectors Inclusion Of Vacuum Regulator Device Halogen Or Led Console Lamp With Flexible Arms Back-up Battery Which Can Provide Power For At Least 1 Hour Must Provide At Least Six (6) Pieces Of Tubing Clamp With Guard Can Be Powered By 230v ±10, 60hz With Four Heavy Duty Rolling Wheels And Non-scratching With Lock System Included In-line Blood Gas Monitoring Device The Machine Must Be Capable Of A Continuous Determination Of The Following Tests While On Cardiopulmonary Bypass (cpb): Blood Gas (ph, Pco2, Po2, Hco3, Be, So2) Electrolytes & Hematology (k+, Hgb, Hct) Patient Temperature Oxygen Deliver (do2) Inclusion Of Battery Pack To Ensure Uninterrupted Operation. Capable Of Displaying Alert/alarm Indicator When Parameters Fall Outside The Normal Values Must Be Lcd Or Led Screen Machine Must Be Portable And Fit With The Provided Pole Clamps/bracket For Monitoring In The Heart Lung Machine Cable Head Sensor For Testing Must Be Capable For Arterial Or Venous Sampling Monitoring Must Include Printer For Documentation Of Displayed Values 60 Hertz Machine Electrical Requirement Heater Cooler Machine, At Least Two (2) Unit/s Must Have At Least Two (2) Independent Circuits Intended Either For: A. Oxygenator Heat Exchangers And B. Patient Blankets One (1) Pair Of Hose With Corresponding Connectors For Each Independent Circuit Per Unit Can Be Powered By 230v ±10, 60hz Particulars Vendor Shall Warrant That The Product Supplied Shall Equal The Published Specifications. Vendor Shall Provide No Less Than Five (5) Years Warranty On The System/equipment For Spare Parts And Service Upon Acceptance By End User/s. Vendor Agrees To Provide Free Of Charge All Parts And Labour Necessary To Repair The System During The Period Covered By The Warranty And Replacement Of Any Item/s And/or Part/s Found To Be Defective In Material Or Workmanship Under Normal Use. Vendor Must Conduct Quarterly Preventive Maintenance Program Or Frequently As Recommended By Principal / Manufacturer. Vendor Agrees To Add Equipment Down-time (in Number Of Days) To Total Warranty Period. Must Provide Back-up Immediately Upon Notification Where Applicable. Vendor Must Respond With Technical Support Staff, Either Remotely (2 Hours) Or In-person Where Applicable, Within At Least Twenty-four (24) Hours Upon Notification Of End-user; And Must Perform Corrective Maintenance Within A Maximum Of Fourteen (14) Days Upon Notification Of End-user; System/equipment Shall Be Delivered With At Least One (1) Copy Of All Service Manuals And At Least One (1) Copy Of All User Manuals. System/equipment Shall Be Delivered Complete With All Cabling, Connectors, Junction Boxes, Mounting Hardware, And All Other Accessories Necessary For Full Operation Of The System/equipment, Where Applicable. Vendor Must Certify That All Products Quoted Must Be In Current Production And Publicly Available As Of The Date Of This Tender. Unproven Future Products And Model/s Nearing And/or At The End-of-cycle Shall Not Be Accepted. All Desired Features Listed Must Be In Current Production, Installed And In Use At The Time Of Quote/bid; Any And All Software Necessary To Technically Support The System Shall Be Included Any And All Components Not Manufactured By The Vendor/primary Manufacturer Shall Be Listed As Such With Name/address/contact Information Of The Manufacturer Supplied Devices Must Meet All Currently Applicable Safety Standards, Local And International Where Applicable. Vendor Shall Confirm And Certify In Writing That Parts And Labor Will Be Available For The Quoted System For Not Less Than Five (5) Years After The Warranty Period Vendor Shall Agree To Provide Factory Or Principal Manufacturer Training And/or Certification For At Least One (1) In-house Biomedical Technologist Or Engineer And Other Technical Staff (end-user/s); Vendor May Include Post-warranty Comprehensive Preventive Maintenance Program Proposal For The Next 3-4 Years And Must Also Indicate Cost Estimates For Major Spare Part/s Vendor To Shoulder Any Expenses Related To Delivery, Installation, Commissioning, Permit/s, Training And Other Sundries Necessary For The Complete Installation Of The Equipment Vendor Must Have Available Technical Staff And/or Office/s Within The Region Principal’s/ Manufacturer Products May Preferably Have An Existing/active Quality Management System Certification E.g. Iso 13485 And/or Iso 9001 Principal’s / Manufacturer’s Products Must Have Been Present In The Local Market For The Past Ten (10) Years, May Provide Certification Where Applicable Progress Billing And Payment May Be Availed By The Winning Bidder As Follows, Otherwise, Full Payment Is Due At The Completion Of The Project And Requirements: 15% Upon Delivery At Site; 30% Upon Complete Installation, And 55% Upon Completion Of Project And/or Acceptance Of End-user. Completion Period For Delivery Must Not Exceed 120 Calendar Days And Succeeding Installation Must Not Exceed 120 Calendar Days. Any Deviation From This Limit Requires Prior Approval By The Head Of The Procuring Entity (hope) And Only Applies During Extenuating Circumstances.
Closing Date3 Jan 2025
Tender AmountPHP 60.3 Million (USD 1 Million)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Electrical Generators And Transformers...+1Electrical and Electronics
United States
Details: This Sources Sought/market Survey Notice Is Being Conducted By Aleda E. Lutz Va Medical Center, 1500 Weiss Street, Saginaw Mi, 48602 To Identify All Sources That Are Capable Of Providing Maintenance Service For Emergency Generator For The Period Of April 5, 2025 April 4, 2026 At The Discretion Of The Government In Strict Accordance With All Schedules, Specifications, Terms, Conditions And Provisions Of This Contract. general Information visit #1 Furnish All Tools, Labor, Materials, Parts, And Laboratory Services To Perform The Following Specified Maintenance On The Five Generators Listed At The End Of This Document: all Maintenance, Service, Operational Checks, And Parts Shall Be Performed And Supplied Per The Manufacturer S Recommendations By Manufacturer Certified Technicians. contractor Shall Provide All Fluid Analysis Reports And Within 7 10 Days After Completion Of Maintenance. contractor Performance Shall Be Monitored Through Service Reports That Shall Be Submitted After Each Repair Has Been Conducted.â  Field Service Reports Must Be Submitted Within 7-10 Days And Will Be Reviewed For Accuracy And Timely Submission. contractor Shall Perform Services Within 60 Days Of Award. maintenance Checks: radiator Core For Air Flow antifreeze Protection coolant Level coolant Inhibitor Strength (add Conditioner If Required To Update Strength) radiator Cap And Seal coolant Leaks lube Oil Level fan Belt Tension condition Of All Hoses hose Clamps condition Of Flex Fuel Lines day Tank Float Controls, Solenoid, And Main Fuel Pump Operation fuel System For Leaks cranking Voltage Drop battery Electrolyte Level battery Voltage battery Charger Rate battery Cables And Connections flex Exhaust Couplings Rain Flashing turbo Wheel For Bearing Wear terminal Strip Connections loose Relays In Control Panel jacket Water Heater Operation governor Oil Level governor Linkage remote Governor Control Operation air Gap On Generator collector Rings And Brushes oil And Dirt Buildup In Generator system For Loose Bolts, Etc. crank Termination Time engine Instruments abnormal Noise Or Vibration exhaust Characteristics Louver Operation crankcase Blow By voltage And Frequency all Switches In Correct Position drain Water And Sediment From Day Tank lubricate Generator Bearing clean Engine Crankcase Breather lubricate Fan Pulley clean Primary Filter drain Exhaust Moisture Traps inspect The Turbocharger For End Play And Leaks maintenance Services: note: All Filters Shall Be Oem change Air Cleaner Elements, Check Seals, Air Cleaner Indicators And Air Induction System take Oil Sample And Perform Infrared Analysis (performed By A Fluid Analysis Lab) take Fuel And Coolant Samples And Perform Analysis (performed By A Fluid Analysis Lab) change Lube Oil And Filters, Lube Oil Is To Be Replaced With Fully-synthetic Oil In Accordance With Manufacturers Recommendations change Fuel Filters oil, Fuel, And Coolant Samples Taken Will Be Delivered To The Testing Laboratory In A Reasonable Time As To Not Compromise The Samples. Care Will Be Taken As To Storing The Samples As Recommended By The Testing Laboratory Until They Are Delivered. operational Checks: recheck Oil Level While Running recheck All Fluid Systems For Leaks used Oil Transportation And Recycling: transportation And Recycling Of Used Oil Shall Be Performed In Accordance With Federal, State And Local Regulations Including: michigan Natural Resources And Environmental Protection Act 451, Of 1994 As Amended, Part 121 Liquid Industrial By-product. prior To Transporting Used Oil From The Property, The Transporter Must Provide A Shipping Document Describing The Materials In Accordance With Above Regulation For Certification By The Detroit Vamc Gems Program Manager Or Designee. The Contractor Shall Arrange For The Designated Recycling Facility To Notify The Cor, In Writing, That The Shipment(s) Arrived At Its Destination Within 7 Days Of The Date The Shipment Left The Facility. michigan Hazardous Material Transportation Act 138. prior To Transporting Used Oil From The Property, The Contractor Shall Provide A Copy Of The Act 138 Transporter S Permit And Registration To The Cor For The Approval Of The Gems Program Manager. During Transport, The Transporter Must Also Be Able To Produce A Copy Of The Act 138 Permit And Registration, Either Via Electronic Record Or Hard Copy, To Deq Staff Or A Peace Officer When Requested. generator #1 cummins/onan Model: Dfeb-4955010 Sn: B010204440 kw: 400 Pf: .8 Volt: 120/208 Amp: 1387 generator #2 mtu Onsite Energy Model: 400pxc6dt3 Sn: 331914-1-1-0411 kw: 400 Pf: .8 Volt: 120/208 Amp: 1387 generator #3 cummins/onan Model: 350 Dfcc Sn: G920477586 kw: 350 Pf: .8 Volt: 277/480 Amp: 526 generator #6 mtu Onsite Energy Mod: 750rxc6dt2(g05) Sn: Wa-572596-0410 kw: 750 Pf: .8 Volt: 277/480 Amp: 1127 generator #7 mtu Onsite Energy Mod: Ds00500d6srah1583 Sn: 331787-1-1-0411 kw: 500 Pf: .8 Volt: 277/480 Amp: 751 If This Is A Service Your Business Can Provide, Respond To This Sources Sought By Friday, January 3, 2025; 3:00 P.m. Eastern Time. Responses Should Include: (1) Business Name And Address (2) Point Of Contact Name, Phone Number, And E-mail Address (3) Sam Uei And Naics Code (4) Business Size Small Or Large (5) Type Of Business Service Disabled Veteran Owned, Veteran Owned, 8a, Hubzone, Women-owned Etc. (6) Applicable Gsa/fss Contract Number (if Applies). All Businesses Eligible To Provide This Service Are Encouraged To Reply As This Information May Be Used To Determine Potential Set-asides For The Above Noted Service. E-mail Responses To: Ariel Bautista-lagares, At Ariel.bautista-lagares@va.gov (note: This Is Not A Request For Quote Or An Announcement Of A Solicitation.)
Closing Date3 Jan 2025
Tender AmountRefer Documents 

MUNICIPALITY OF DOLNI LANOV Tender

Others
Czech Republic
Details: The subject of the public contract is construction work and related supplies and services consisting in the reconstruction of the existing bridge structure, which transfers local traffic over the bed of a watercourse with a permanent flow (malé Elbe – Vodní Linie Idvt: 10100231). The existing bridge shows a number of faults that need to be resolved as soon as possible. A separate diagnostic construction and technical survey was prepared for the bridge structure, including recommendations for further management of the bridge structure. For this reason, the contracting authority decided to carry out the reconstruction of the existing bridge structure within the given scope, while retaining the existing horizontal supporting structure. The necessary modification of the local traffic on both bridgeheads is also being addressed as part of the reconstruction. The reconstruction requires the lateral relocation of the cable line.
Closing Date7 Jan 2025
Tender AmountCZK 6.7 Million (USD 275.4 K)

City Of Bayawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Tarpaulin Printing 1 4 Lot "labor And Materials ( Tarpaulin Printing ) 4 Sets - 2' X 4' (signage)" Lot No. Iii Sand & Gravel 4 7 Cu.m. Sand, Washed, Mixing/screened 5 8 Cu.m. Gravel, Mixing, Crushed, Screened & Washed, Max. Size 38mm Dia Lot No. V Construction Supplies/materials 16 72 Kg/s Tie Wire, # 16 17 3 Kg/s Nylon, #100 18 5 L.m. Mesh Wire, 3mm Eyehole X 0.90m Width (m) 19 15 Pc/s Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 20 5 Kg/s Nails, Concrete, 75mm 21 6 Kilo/s Nails, Umbrella/roofing, 62mm 22 2 Box/es Nails, Common Wire, 100mm (25kgs/box) 23 1 Box/es Nails, Common Wire, 75mm (25kgs/bx) 24 1 Box/es Nails, Common Wire, 62mm (25kgs/box) 25 1 Box/es Nails, Common Wire, 38mm (25kgs/box) 26 3 Box/es Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 27 6 Pc/s Drill Bit, Masonry, 1/8" Dia 28 9 Pc/s Drill Bit, 1/8" Dia, For Steel 29 3 Pc/s Drill Bit, 3/16" Dia, For Steel 30 3 Pc/s Drill Bit, 1/4" Dia, For Steel 31 3 Pc/s Drill Bit, 3/8" Dia, For Steel 32 3 Pc/s Drill Bit, Masonry, 3/16" Dia 33 3 Pc/s Drill Bit, Masonry, 1/4" Dia 34 3 Pc/s Drill Bit, Masonry, 3/8" Dia 35 13 Pc/s Cutting Disc, Masonry/concrete, 100mm 36 10 Pc/s Cutting Disc, 100mm Dia, For Metal 38 5 Can/s Silicon Sealant, (300ml/can), For Polycarbonate 39 2 Can/s Sealant, Elastomeric/roof (1 Lit/can) 40 2 Can/s Solvent Cement, Pvc (500 Cc/can) 41 2 Roll/s Sack Cloth, 2.40m Width (100m/roll), Blue 42 10 Can/s Epoxy All Purpose (a And B), 1/4 Lit/can, Non Conductive, All Purpose Adhesive 43 50 Set/s Lag Screw, 6mm Dia. X 32mm With Expansion Shield 44 200 Set/s Bolt, Fine Threaded, 3.5mm X 25mm, With Nut And Washer 45 1 Sheet/s Steel Plate, G.i., Gauge # 16 X 1.2m X 2.4m 46 20 Pc/s Tiles, Granite, Polished, 0.60m X 0.60m, Color: Jet Black 47 65 Pc/s Tiles, Floor, Ceramic, 40cm X 40cm Non Skid 48 14 Pc/s Staircase Nosing, Brass Ochre (2m/length) 49 6 Pack/s Tile Grout (2kg/pk), Light Beige 50 1 Can/s Acrylic Spray Paint, Flat Black(400cc/can) 51 1 Lit/s Paint, Enamel, Quick Dry (lit), Red 52 10 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Marking Yellow Or Equivalent 53 5 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Black 54 12 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, White Or Equivalent 56 1 Gal/s Paint, Epoxy, Silver Finish With Aluminum With Catalyst 57 15 Gal/s Paint, Epoxy, Enamel, Black (gal) 58 4 Gal/s Enamel Paint, Silver Finish Aluminum (gal) 59 3 Can/s Thinner, Lacquer (3.75lit/can) 60 11 Gal/s Reducer/thinner, Epoxy Paint (gal) 61 8 Gal/s Adcoat Rust Converter And Primer 62 6 Gal/s Liquid Tile Paint, Primer White Acrylic Solvent-based Primer 63 6 Gal/s Liquid Tile, Topcoat Gloss White 64 4 Gal/s Liquid Tile, Top Coat Clear 65 5 Can/s Liquid Tile, Solvent Based-tinting Color Venetial Red, 1/4lit Per Can 66 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Blue, 1/4lit Per Can 67 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Green, 1/4lit Per Can 68 5 Can/s Liquid Tile, Solvent Based-tinting Color Hanza Yellow, 1/4lit Per Can 69 5 Can/s Liquid Tile, Solvent Based-tinting Color Lamp Black, 1/4lit Per Can 70 5 Gal/s Liquid Tile, Reducer Clear Liquid 71 10 Gal/s Plexibond, Cementitious Waterproofing System, Acrylic 72 10 Pc/s Sand Paper, #80, 225mm X 275mm 73 10 Pc/s Sand Paper, #100, 225mm X 275mm 74 10 Pc/s Sand Paper, #120, 225mm X 275mm 75 10 Pc/s Sand Paper, # 180, 225mm X 275mm 76 14 Pc/s Paint Roller W/ Handle, 100mm 77 150 Meter/s Service Drop Wire, # 4 Awg (m) 78 5 Pc/s Service Grip, # 2 79 4 Pc/s Service Grip, Dead End Performed Type, Size # 4awg 80 1 Length/s Pipe, Pvc, 40mm Dia X 3m, W/ Entrance Cap, Clip Type 81 70 Meter/s Thw Wire, # 4 (22mm2), Black (m) 82 70 Meter/s Thw Wire, # 4 (22mm2), White (m) 83 40 Meter/s Thw Wire, # 6 (14mm2), Stranded(m), Green 84 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Black 85 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), White 86 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Green 87 6 Roll/box Thw Wire, # 12 (3.5mm2), Stranded (150m/roll/bx), Black 90 1 Length/s Pipe, G.i. 65mm Ø X 6m, Wt=5.20mm , Outside Dia= 73.00, 8.694kg/m, Heavy Gauge 92 1 Pc/s Circuit Breaker, 100a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 93 1 Pc/s Circuit Breaker, 30a, 2 Pole, Bolt-on 94 3 Pc/s Circuit Breaker, 20a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 95 4 Roll/s Royal Cord, # 14 Awg, 2 Wire (75m/roll) 96 7 Length/s Pipe, Pvc, Electrical, 40mm Dia X 3m, Thickwall, Orange 97 200 Length/s Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 98 150 Length/s Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 99 3 Pack/s C-clamp/clip, Pvc, 20mm Dia, W/ Concrete Nails (100's/pk) 100 6 Pack/s C-clamp/clip, Pvc, 25mm Dia W/ Concrete Nails (100pcs/pk) 101 3 Pack/s Pipe Connector, Pvc, Electrical, 20mm Dia (100's/pk)) 102 3 Pack/s Pipe Connector, Pvc, Electrical, 25mm Dia (100pcs/pk) 103 10 Pc/s Connector, Split Bolt, # 6 (14mm2), Burndy 104 3 Set/s Magnetic Contactor, 40a 220-240vac Coil W/ Metal. Enclosure 105 2 Pc/s Photo Control (photo Switch), 220v, 6a, Operating Illumination: Turn-on At 31.5 Lux, Turn-off At 125 Lux 106 2 Unit/s Timer, Time Switch, 24hr Back Up 107 50 Roll/s Tape, Electrical, Vinyl, .177mm X 3/4"/19mm X 16m, Flame Retardant, 600v 108 5 Roll/s Tape, Electrical, Rubber, 18mm X 5m, Self Fusing Ethylene Propylene Rubber 109 5 Roll/s Tape, Electrical, Waterproof, 600v 111 29 Set/s Recessed Ground Lamps, Ip67 1w, Ac85-265v Dc 12v (1 Side), Natural White (4000k), 42mm X 70mm 113 8 Set/s Metal Hallide Flood Light Fixture 250w Set With Tubular Metal Hallide Bulb (firefly), Warm White, Model: Flh 121/s/250/fhimh 250dl/t 114 10 Set/s Solar Blinker Arrow Signage Warning Lights, Direction Signs, Size: Length:47"; Height:42", Arrow Sign, Size: Length: 47"; Height:16", Solar Panel Size: 10" X7", Led Color: Red, Ip Grade: Ip54 119 18 Set/s Lamp Post, Steel Tapered, Single Arm,t-6-30' Sb Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish, Amco 120 6 Set/s Lamp Post, Steel Tapered, Double Arm, T-6-30' Db Double Arm, Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish 122 32 Pc/s Led Fountain Lights, Rgb With Stainless Steel Toughed Glass Cover, Ac 220; Dc 12-24v Dmx 512 Built In Control With Decoder, 9x3w Led Rgb Color Changing 2700-6500k Ip68 Water Proof Grade Junction Box 124 5 Roll Cable Wire; 5c X 16 Twg/1.025mm Premium Multi-conductor Royal Cable Wire (75m/roll) 126 32 Set/s Fountain Nozzle, 1.0" Dn40 Female Thread Flower Column Style Fountain Nozzle Sprinkler Spray Head, Brass 127 1 Unit/s 37.5 Kva Ditribution Transformer, 7620/13200vy - 240/480 Volts Oisc, W/ 2-2½, Taps Above And N.v., Fuse Link, Fuse Cut-out And Accessories 128 2 Meter/s Fuse, Cut-out, 100a, 25kv, Ab Chance 129 1 Set/s Transformer Cluster Hanger, With Complete Accessories 130 1 Pc/s Clamp, Hot Line, #2 - #4/0 Acsr 131 3 Set/s Pull Box, Metal Enclosure, 900mm X 200mm X 150mm, With Cover 132 50 Pc/s Screw, Lag Screw, 10mm Dia X 50mm, W/ Plain Washer And Expansion Shield 133 200 Pc/s Bolt With Nut And Washer, (fine Thread) 3.5mm Dia X 25mm 134 200 Pc/s Bolt With Nut And Washer, (fine Thread) 4.5mm Dia X 25mm 135 5 Pack/s Ubolt Galvanized/ U Bolt With Nut And Washer Inches For Gi Pipe Screw Depot, 1/4 For 3", 1/4" Dia, 10 Pcs Per Pack 139 30 Gal/s Concrete Epoxy, With Low Viscosity For Construction 140 22 Length/s Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 141 12 Pc/s Tee, Upvc, 20mm Inside Dia, Blue 142 14 Pc/s Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, Plain, Blue 143 4 Pc/s Tee Reducer, Upvc,32mm X 20mm Nominal Dia, Blue 144 3 Pc/s Tee, Upvc, 25mm Inside Dia, Plain, Blue 145 4 Pc/s Adaptor, Upvc, Male, 20mm Dia., Nominal Size, Blue 146 8 Pc/s Adaptor, Upvc, Female, 20mm Dia Nominal Size, Blue 147 4 Pc/s Ball Valve, Pvc, 20mm Outside Dia 148 10 Length/s Pipe, Upvc, 32mm Outside Dia, Wt=2.0min, L=3.0m, Blue 149 1 Pc/s Gate Valve, 25mm Dia, Brass/bronze 150 1 Pc/s Check Valve, 25mm Dia, Brass/bronze 151 2 Pc/s Adaptor, Upvc, Male, 25mm Dia., Nominal Size, Blue 152 8 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 153 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 154 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 155 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 156 3 Pc/s Gate Valve, 40mm Dia, Brass/bronze 157 5 Pc/s Check Valve, Horizontal Swing 40mm Dia, Brass/bronze 158 6 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 159 2 Pc/s Tee, Upvc, 32mm Inside Dia, Blue 160 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 161 4 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 162 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 163 4 Length/s Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 164 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 90 Deg. Bend, S-1000, Orange 165 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 45deg Bend, S-1000, Orange 166 8 Length/s Pipe, Pvc, 82.55mm Outside Dia X T=3.75mm X L=3.0m, S-1000, Orange 167 2 Pc/s Pvc Tee, Inside Dia: 82.55mm, S-1000, Orange 168 2 Pc/s Floor Drain, 150mm X 150mm Dia, Stainless 169 8 Length/s Pipe, Pvc, 107.10mm Outside Dia X T=3.81mm X L=3.0m, S-1000, Orange 170 2 Pc/s Elbow, Pvc, 107.10mm Inside Dia X 90 Deg. Bend, S-1000, Orange 171 2 Pc/s Pvc Elbow, Inside Dia: 107.10mm X 45 Deg Bend, S-1000, Orange 172 1 Pc/s Gate Valve, 100mm Dia, Brass/bronze 173 1 Pc/s Gate Valve, 80mm Dia, Brass/bronze, Threaded Type 174 3322.536611 Sq.ft. Brass Metal Etching Engraved Marker 175 5 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Brown 176 20 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 177 20 Pc/s Vest, Reflectorized, Safety, Orange 178 20 Pair/s Raincoat, Jacket W/ Hood & Pants, Size: X-large With Reflectorized Strips 179 15 Pc/s Plastic Road Barriers 180 20 Pc/s Spectacles, Safety Goggles, Clear 181 8 Pair/s Gloves, Welding Leathear Long, 16', Ce Certified En 12477 182 5 Roll/s Caution Tape, Yellow, 3" X 50' 183 5 Roll/s Danger Tape, Red, 3" X 50' 184 15 Pc/s Traffic Cones 28" Tall, 14" X 14" Base With Reflective Collars Lot No. Vi Road Stud Installation 137 1 Set/s Solar Road Stud Installation Machine, Equipped With Running Wheel, Accurate Hole Position With Good Hole Forming Quality, 5.0hp, 220v With 3900w 50/60hz, 570rmp; Height: 800mm; Weight: 200kgs; Pure Copper Self-priming Pump, Manual Electric Starter, Free Adjustment Depth And Bearing Seat Assembly Complete With Coring Bit And Other Accessories ** ** ** Nothing Follows ** ** ** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 17, 2024 To January 6, 2025 @ 5:00 Pm Pre-bid Conference December 26, 2024 @ 9:00 Am Deadline/opeing Of Bids January 7, 2025 @ 9:00 Am Post Qualification January 14, 2025 @ 9:00 Am Awarding Of Bids January 21, 2025 @ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman Received By: Name:___________________________ Date:___________________________ Geps Publication : Geps December 17, 2024 Newspaper : None
Closing Date7 Jan 2025
Tender AmountPHP 2.1 Million (USD 37.8 K)

DEPT OF THE ARMY USA Tender

Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
United States
Details: Hannibal 4 Corners Hydraulic System . The U.s. Army Corps Of Engineers, Pittsburgh District, Has A Project That Involves The Replacement Of The Central Hydraulic System For The Main And Auxiliary Lock Chambers At Hannibal Locks And Dam, Ohio River, Ohio. The Contract Will Include A New Modified Four Corner Hydraulic System For Each Lock Chamber Consisting Of Hydraulic Power Units (hpus) For The Miter Gates And Culvert Filling/emptying Valves. The New Hpus Shall Be Located In New Precast Buildings At The Following Locations: ? Two (2) Hpus On The River Wall; One Upstream And One Downstream For Operation Of The Main Chamber Culvert Valves And Miter Gates.? Two (2) Hpus On The Middle Wall; One Upstream And One Downstream For Operation Of Main Chamber Culvert Valves And Miter Gates. In Addition, The Two Hpus On The Middle Wall Are For Operation Of The Auxiliary Chamber Miter Gates. The Modified Four-corner System Reduces The Number Of Hpus On The Middle Wall From Four To Two.? Two (2) Hpus On The Land Wall; One Upstream And One Downstream For Operation Of The Auxiliary Chamber Culvert Valves And Miter Gates. The Contract Specifically Includes: A. Installation Of New Power, Control, And Fiber Optic Cables For The Six (6) Hpus. Includes Modifying The Existing Control Stations In Each Control Shelter For The Addition Of The New Hpus And Miter Gate Controls. B. Furnishing And Installation Of Six (6) Hpus, Fourteen (14) Manifold Blocks, Stainless Steel Hydraulic Piping, And Hydraulic Oil.c. Furnishing And Installation Of Six (6) Precast Buildings Which Includes Raised Concrete Pads, Power Distribution Equipment, Associated Electronics And Hardware, And New Utility Trench Covers In Various Areas Of The Lock.d. Furnishing And Installation Of New Motor Control Center (mcc) Distribution Equipment.e. Demolition And Disposal Of Existing Central Hydraulic System Located In The Middle Wall Operations Building. This Includes All Motors, Pumps, Reservoir, Filters, Associated Piping, And Proper Disposal Of Hydraulic Oil.f. Demolition And Removal Of All Existing Central Hydraulic Oil Lines On The River, Middle, And Land Walls. This Includes All Lines For Pressure And Return To Each Miter Gate And Culvert Valve Cylinder. Removal And Proper Disposal Of Hydraulic Oil And Components Will Be Required. Removal And Proper Disposal Of Electrical Equipment Will Be Required. Ferrous And All Other Construction Waste Material Will Be Disposed Of At Commercially Permitted Facilities Licensed To Accept Waste Or Recyclable Materials As Applicable. Construction Work Will Occur In Close Proximity To Waterway Traffic And Operating Lock And Dam Gates. The Existing Lock Chambers And Dams Are Currently Operated And Staffed By Government Personnel 24 Hours A Day 365 Days Of The Year. Lock Closures For Installation And Testing Of New Equipment Will Be Required To Be Minimal And At The Approval Of Government.the Work Shall Be Completed Within 365 Calendar Days After Written Notice To Proceed. Disclosure Of Magnitude Of Construction (far 36.204 And Dfars 236.204)between $10,000,000.00 To $25,000,000.00the Acquisition Will Be Procured As Full And Open Competition. The Resulting Award Will Be For One (1) Firm-fixed-price (ffp) Contract. All Responsible Bidders Are Encouraged To Participate. The Invitation For Bid (ifb) Will Be Issued On Or About 3 January 2024, Online Through Procurement Integrated Enterprise Environment (piee) Which Posts The Opportunity To Sam.gov; Therefore, Requests For Hardcopies Of The Solicitation Will Not Be Honored.the North American Industrial Classification System (naics) Code For This Acquisition Is 237990 ? Other Heavy And Civil Engineering Constructionthe Small Business Size Standard For This Naics Code Is $45,000,000.00.in Order To Submit A Bid On This Project, Your Company Must-1) be Registered In System For Award Management (sam) And Maintain An Active Registration Status. 2) be Registered In The Procurement Integrated Enterprise Environment (piee) For The Solicitation Module With The Proposal Manager Manger Role. System For Award Management (sam) Registrationregistering In Sam.gov Includes Both Entity Validation And Entity Registration.to Register In Sam:a. navigate To Sam.govb. select Sign-in (top Right)c. select Create An Account Then Follow The Instructions. D. after Account Is Set-up, Select Sign In.e. under The Entity Management Widget, Select Get Started Button. F. select Register Entity. As Part Of Entity Registration, A Unique Entity Id Will Be Assigned.for Additional Information On Samto Register Your Entity (company), Please Visit Https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here You Will Find The Following, get Started With Your Registration check Registration Status ? Active, Inactive, Pending update Your Registration become An Entity Administrator validate Your Entity *access User Guides *by Selecting This Option, You Can Obtain A Quick Start Guide For Contract Registrations.also, Here You Will Find In Addition To The User Guides - Faqs, Videos, And Definitions.please Noteit Is Mandatory That All Companies Be Registered In Sam In Order To Receive Federal Contracts.there Is No Charge To Register Or Maintain Your Company (entity) Registration.login.gov Manages Usernames And Passwords For Sam.gov. *important* Registration Informationregistration Can Take At Least Ten (10) Business Days To Be Active In Sam.gov.registration Must Be In Active Status Upon Offer Submission And Remain Active During Award Period.registration Must Be Renewed Every 365 Days To Remain Active.the Federal Service Desk (fsd) For Sam Questions, May Be Contacted. Phone Number: 866-606-8220hours Of Operation: Monday-friday 8 A.m. To 8 P.m. Etprocurement Integrated Enterprise Environment (piee) Solicitation Module Registrationto Register For Piee Follow The Below Instructions. Register In Piee:a. Navigate To Https://piee.eb.mil/b. Select Register [top Right]c. Select Vendord. Create A User Id And Password And Follow The Prompts [next]e. Create Security Questions [next]f. Complete Your User Profile Information [next]g. Complete Your Supervisor Or Approving Official Information [next]h. Complete Rolesi. Step 1. Select Sol-solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill In Your Location Code (cage Code) [next]i. Provide A Justification For Your Registration [next]j. Follow The Remaining Prompts To Submit Your Registrationthe Procurement Integrated Enterprise Environment (piee) Help Desk May Be Reached By Calling Telephone Number 866-618-5988 For Assistance.
Closing Date2 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Scraps
United States
Description: Contact Information|4|n743.49|wvm|7176052147|benjamin.t.spangler.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|25|365|0001ab|lot|see Dd1423|0001ac|1|150|||||||||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a |n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.t.spangler.civ@us.navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| first Article Approval--government Testing (sep 1989)|7|1|0001ac|150|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000|30|x|| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| progress Payments (nov 2021)|4||||| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|13|335931|600|||||||||||| cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| type Of Contract (apr 1984)|1|firm Fixed| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x|| evaluation Of First Article Testing|3|x|$42,000|| this Amendment Is Issued To Update Solicitation Clauses. this Requirement Is Not A Small Business Set-aside And Is Full And Open. \ ---this Requirement Is Not A Small Business Set-aside.--- 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already Onfile At Navsup Wss Mechanicsburg. 2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286. 3. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. weld Procedure And Qual Data 120 Days Adc Lt approval Of Weld Procedures And Qual Data 60 Days After Receipt fat Report 150 Days After Approval Of Pr Lt approval Of Fat Report 30 Days After Receipt Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. Final Delivery Of Material Will Be On Or Before 365 Days After Effective Date Of The Resulting Contract. 4. Any Contract Awarded As A Result Of This Solicitation Will Be "dx" Rated Order; "dx" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 5. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2) And Dfars 252.213-7000. 6. If Drawings Are Included In The Solicitation, Access Needs To Be Requested On The Individual Solicitation Page On Contracts Opportunities On The Government's Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. 7. This Solicitation Requires First Article Testing. Far 52.290-4 First Article Approval - Government Testing For More Details. 8. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Or Faxed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=1197258 |53711| C| |d|0001 | C|49998|0876328 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080211|f| |01| document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-dtl-24231 | | |e |130426|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Electrical Hull Fitting And Transmitter Cable Assembly For The An/bst-1 Must Be In Accordance With Naval Ship Engineering Center Drawing 803-1197258, Except As Amplified Or Modified Herein.; 3.2 ;ls2swu-12 Cable Is To Be Used In Lieu Of Ls2swua-12 Cable.; 3.3 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required. 3.4 ;the First Article Test (fat) Sample(s) Must Not Be Delivered Against The Contract Quantity.; 3.5 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;receptacle Body, Item 14; material - ;qq-n-281, Class A; part - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; material - ;qq-n-286, Form 2, Cold Drawn Or Hot Finished, Annealed And Age Hardened And Must Meet The Mechanical Requirements Cited In Note 2.h Of Drawing 803-1197258 Except The Brinell Hardness Minimum Is 250 Instead Of 265 As Listed In Note 2.h; 3.6 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - Quality Conformance/compliance Inspection item - ;each Electrical Hull Fitting Assembly; performance - ;mil-dtl-24231, Table I For Type Iv And Note 22 On Drawing 803-1197258; acceptance - ;mil-dtl-24231; test - ;dye Penetrant Inspection; item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 attribute - Annealing And Age Hardening item - ;hull Fitting Body, Item 2; Body Cover, Item 3; Washer, Item 4; And Nut, Item 5; performance - Qq-n-286 test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Visual And Dye Penetrant Inspection (final Layer) item - Weldments performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.9 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.11 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.13 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.16 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.17 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.17.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.18 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.19 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.19.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.19.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.19.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.19.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.19.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.19.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.19.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.19.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.19.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.19.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.19.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.19.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.20 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1); Unit(s) To ;receiving Officer Portsmouth Naval Shipyard, Building 240, Code 240. (207-438-5445) Kittery, Me 03904-5000; For First Article Tests In Accordance With The ;requirements Of Mil-dtl-24231, Table I For Type Iv And Note 21 On Drawing 803-1197258; . 3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.24.2 Inspection For Completeness And Proper Type. 3.24.3 Verification Of Material Quality Received. 3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.24.6 Identification And Protection From Improper Use Or Disposition. 3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.24.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.28 Material Handling - The Written Material Control Process Must Include The Following: 3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.29 Receiving Inspection - 3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.29.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.30 Discrepancy Reporting - 3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.32 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 22 2009 - Added Evidence Of Dcma Observing Test Plate Welding & Ndt - Mar 18 2008 - Identify Applicable Weld Joints With Weld Procedures - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 12 - Within 120 Days After Contract Award, Submit One Copy Of The Welding Procedure (for Info) With The Qualification Data (for Approval/disapproval). Approval Must Be Obtained Prior To Performing Any Welding. this Review (approval/disapproval) Must Be Within 90 Days From Date Of Receipt. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 12 - See Clause 52.209-3 For Submittal Timeframes.
Closing Date9 Jan 2025
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

Civil And Construction...+1Building Construction
United States
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300 ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January 24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol. the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s. courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala moana Boulevard, Excluding Ground Level Windows Along The United States marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard: ● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced entry Resistance Per Astm F3038 Or Dept Of State (dos) sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The standard That Shall Apply. ● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing system ● Contractor Is Responsible To Field Verify And Measure Each Opening. 2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design drawings For Specific Locations): ● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule doors Shall Be Equipped With Hardware And Controls To Engage electro-magnetic And/or Electro-mechanical Remote Locks. ● Remote Locks Shall Give The Ability For The Court Security Officers And The usms To Lock All Doors Immediately In Case Of An Emergency. ● Remote Lock Override Control Shall Run To The Main Usms / Cso Control room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration, however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension) of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure, build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points, the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical, electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00 am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m. weekdays. the Project Delivery Method Is Design-build (db). the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design development, Construction Documents, Basis Of Design Documents, Site Investigation, Site measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination, contract Administration, Contract Close-out, Record Drawings And As-builts. construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall, mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples, submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure, protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes, file And Record Management, And All Other Work To Meet The Contract Requirements.
Closing Date3 Jan 2025
Tender AmountRefer Documents 

Nueva Ecija University Of Science And Technology - NEUST Tender

Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid The Nueva Ecija University Of Science And Technology (neust) Through The Bids And Awards Committee (bac), Hereby Invites All Interested Entities Registered With The Philippine Government Electronic Procurement System (philgeps) To Bid For The Hereunder Project, Subject To The General Conditions Stated Herein. Name Of Project: Upgrading Of Programmable Logic Controller (plc) System In The Mechatronics Laboratory Location: College Of Industrial Technology, Neust Gen. Tinio (st.) Campus, Cabanatuan City Approved Budget For The Contract: Php6,419,764.00 Contract Duration: 120 Calendar Days Source Of Fund: Income Cost Of Bidding Documents: Php10,000.00 Project Description: 1lot Item No. Description Qty Unit 1 Programmable Logic Controller For Mechatronics Training System Training Device For The A4 Mounting Frame Or As A Desktop Device With Modern, Industrially Used Programmable Logic Controller And System Interfaces For A Mechatronics Station. It Ensures Highest Performance And User-friendliness For Medium And High-end Applications Of Machine And Plant Automation. Benefits • Stable, Powder-coated, Sheet-steel Mounting System • Suitable For One Mechatronics Station And Suitable As A Tabletop Unit • Mounting Rail For 19" Module Is Attached To The Mounting System • Equipped With 4 Mm Safety Sockets • Integrated Power Supply Further Information The Stable Powder-coated Sheet Steel Support System Contains A 19" Module System Plug Syslink (9 Te), With 2x Syslink Plug-in Connection For Mechatronics Station And Control Panel, Each With 8 Digital Inputs And 8 Digital Outputs And 1x D-sub 15-pin Plug-in Connection With 4 Analog Inputs And 2 Analog Outputs, Emergency Stop Bridge For Connecting A Safety Circuit To Switch Off 8 Digital Outputs. Technical Data: - Dimensions (w X H): 305 Mm X 297 Mm (size 1) - Integrated Power Pack: 100 ... 240 V Ac ±10%; Necessary Accessories: Iec Cables 5 Units 2 Programmable Logic Controller For Electro-pneumatics Training Device For Er Recording Frame (pneumatic/hydraulic) For Solutions In Discrete And Stand-alone Automation Applications Of The Lower Power Range. Further Information The Modular Small Controller Can Be Used For Solutions In Discrete And Stand-alone Automation Applications In The Lower Performance Range. Technical Details: • Digital Inputs On 4 Mm Safety Sockets And Switches/buttons For Signal Simulation • Digital Outputs On 4 Mm Safety Sockets • Analog Inputs And Outputs On 4 Mm Safety Sockets • Simulation Module With 2x Syslink Connector For Control Panel With Digital Inputs And Outputs And D-sub 15-pin Connector With Analog Inputs And Outputs; 4 Mm Safety Sockets For Emergency Stop Bridge To Connect A Safety Circuit For Digital Outputs The Carrier System Consists Of A Lightweight Injection-moulded Housing, Suitable For An Er Mounting Frame Size 2, Dimensions (w X H X D): 364 Mm X 170 Mm X Approx. 80 Mm. The Unit Is Delivered Fully Assembled. Special Licensing Rules Apply To Schools And Training Centers In The Commercial Sector. 6 Units 3 Electro-pneumatics Simulator Software Simulation Software For Pneumatics Is An Application For Creating And Simulating Pneumatic And Electropneumatic Circuits. Valuable Technical Skills Are Learned By Designing Circuits And Simulating Them Interactively. Learning Goals • Creation Of Circuit Diagrams • Identifying And Preventing Errors • Optimization Of Solution Circuit Diagrams Through Interactive Simulations • Understanding Solution Development • Observing Effects Through Real-time Simulations Benefits • Convenient Creation Of Circuit Diagrams And Their Interactive Simulation • Content Tailored To Festo Didactic Learning Systems • Can Be Used Online And Offline • Learning The Effects Of Changes In A Technical Setup And Observing Their Immediate Consequences Through Real-time Simulation • Extensive Library Of Pneumatic, Hydraulic, Electrical Engineering, Electronic And Digital Components. • Further Information Simulation Software For Pneumatics Makes It Possible To Create (electro-)pneumatic Circuits And Simulate Them Interactively. State Changes And Switching Processes Are Calculated Realistically, And Interactive Interventions Can Be Made By Actuating Switches Or Switching Valves. Signals Can Also Be Transmitted Via Connected Hardware Or From Other Programs. In Addition To Real Measuring Devices, Fluidsim 6 Offers Virtual Measuring Devices. Circuits Can Be Constructed From A Library Of Various Electropneumatic Components. In Addition, Grafcet Diagrams Can Be Created And Included In The Simulation If Desired. Simulation Software For Pneumatics Covers The Following Topics: • Pneumatics/electropneumatics • Closed-loop Pneumatics • Vacuum Technology • Electrical Controllers • Digital Technology • Grafcet 6 Units Warranty: • One (1) Year Against Factory Defects Must Include: • On-site Installation And Testing • Three (3) Days Rigid Training For Faculty And Laboratory Technicians • Must Provide Official Partner Or Authorization To Bid From Manufacturer • Iso 9001:2015 Quality Management System Certification From The Manufacturer • Iso 14001: 2015 Environmental Management Certificate From The Manufacturer The Summary Of The Bidding Activities Is As Follows: Activities Schedule 1. Advertisement December 11-18, 2024 2. Issuance Of Bid Documents December 19, 2024 To January 3, 2025 3. Pre-bid Conference December 19, 2024, 2:30pm (via Zoom) 4. Deadline For Submission Of Bids (manual Submission) January 3, 2025, Until 5:00pm Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City 5. Opening Of Bids (face To Face) January 6, 2025, 9:00am Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City General Conditions: All Particulars To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Business Organizations With At Least Sixty Percent (60%) Interest Or Ownership Of At Least 60% Of The Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Business Organizations Of A Country Where The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 19, 2024 To January 3, 2025 Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Pay The Applicable Fee For The Bidding Documents Not Later Than The Deadline For Submission Of Bids. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 3, 2025, Until 5:00pm. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Pbd. Late Bids Shall Not Be Accepted. On The Last Day For The Submission Of Bids And No Prospective Bidder/s Submitted Its Bid Documents Or Only One (1) Bid Was Submitted For The Above-mentioned Project, The Same Is Deemed Extended Until January 10, 2025, 5:00 Pm. This Is To Protect The Interest Of The University And Full Opportunity For A Competitive Bidding May Be Achieved. The University Likewise Reserves The Right To Cause Extension Or Postponement Of The Filing Of Bids Should Similar Situation Arises. Bid Opening Shall Be On January 6, 2025, 9:00 Am At The Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City Unless Extended. Bids Will Be Opened In The Presence Of The Bidder Or His/her/its Duly Authorized Representative/s. Failure To Attend During The Opening Of Bids Shall Be Considered A Waiver On The Part Of The Bidder Who Likewise Waives His/her/its Right To Raise Questions During The Bidding Procedures. The Nueva Ecija University Of Science And Technology Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For More Information Concerning This Bidding, Please Contact The Following: Engr. Joel G. De Mesa Head, Bac Secretariat For Goods And Services Neust Gen. Tinio St., Cabanatuan City Email Address: Neust.bacsec@gmail.com Approved By: Dr. Honorato P. Panahon (sgd.) Bac Chairperson
Closing Date6 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.6 K)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| small Business Program Representations (feb 2024)|4|||x|| annual Representations And Certifications (may 2024)|13|334515|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Purpose Of This Amendment Is To Extend The Due Date To 06 Jan 2025. All Other Terms And Conditions Remain The Same. the Purpose Of This Amendment Is To Change The Procurement From A Restricted Environment To A Sbsa. The Solicitation Point Of Contact Is Hereby Changed To Carly Gassert, Carly.a.gassert.civ@us.navy.mil. Revised Irpod And Drawing Documents Are Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. The Due Date Is Hereby Extended To 06 Dec 2024. All Other Terms And Conditions Remain The Same. unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days. if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At: https://logistics.unnpp.gov this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website. a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You. to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code. in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation. section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement. \ all Drawings Required For Procurement Of 109022gp8, Probe & Cable Assembly Havebeen Identified And A New Irpod Has Been Created To Include These Drawings. Pd Has Been Revalidated And New Irpod And All Drawings Are Now Available In E-commerce. unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days. if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At: https://logistics.unnpp.gov this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website. a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You. to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code. in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation. section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement. \ 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. the Packaging Label Shall Be Marked With The Nomenclature As Cited On Irpod. date Of First Submission=eoc submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock number And Item Nomenclature Specified In The Schedule Of Supply/services. di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev).
Closing Date6 Jan 2025
Tender AmountRefer Documents 

Vorarlberger Krankenhaus Betriebsgesellschaft Mit Beschr Nkter Haftung Tender

Austria
Austria-feldkirch: Construction Work For Buildings Relating To Health
Closing Date5 Jan 2025
Tender AmountRefer Documents 
1901-1910 of 1917 archived Tenders