Cable Tenders
Cable Tenders
City Of Bayawan Tender
Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Tarpaulin Printing 1 4 Lot "labor And Materials ( Tarpaulin Printing ) 4 Sets - 2' X 4' (signage)" Lot No. Iii Sand & Gravel 4 7 Cu.m. Sand, Washed, Mixing/screened 5 8 Cu.m. Gravel, Mixing, Crushed, Screened & Washed, Max. Size 38mm Dia Lot No. V Construction Supplies/materials 16 72 Kg/s Tie Wire, # 16 17 3 Kg/s Nylon, #100 18 5 L.m. Mesh Wire, 3mm Eyehole X 0.90m Width (m) 19 15 Pc/s Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 20 5 Kg/s Nails, Concrete, 75mm 21 6 Kilo/s Nails, Umbrella/roofing, 62mm 22 2 Box/es Nails, Common Wire, 100mm (25kgs/box) 23 1 Box/es Nails, Common Wire, 75mm (25kgs/bx) 24 1 Box/es Nails, Common Wire, 62mm (25kgs/box) 25 1 Box/es Nails, Common Wire, 38mm (25kgs/box) 26 3 Box/es Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) 27 6 Pc/s Drill Bit, Masonry, 1/8" Dia 28 9 Pc/s Drill Bit, 1/8" Dia, For Steel 29 3 Pc/s Drill Bit, 3/16" Dia, For Steel 30 3 Pc/s Drill Bit, 1/4" Dia, For Steel 31 3 Pc/s Drill Bit, 3/8" Dia, For Steel 32 3 Pc/s Drill Bit, Masonry, 3/16" Dia 33 3 Pc/s Drill Bit, Masonry, 1/4" Dia 34 3 Pc/s Drill Bit, Masonry, 3/8" Dia 35 13 Pc/s Cutting Disc, Masonry/concrete, 100mm 36 10 Pc/s Cutting Disc, 100mm Dia, For Metal 38 5 Can/s Silicon Sealant, (300ml/can), For Polycarbonate 39 2 Can/s Sealant, Elastomeric/roof (1 Lit/can) 40 2 Can/s Solvent Cement, Pvc (500 Cc/can) 41 2 Roll/s Sack Cloth, 2.40m Width (100m/roll), Blue 42 10 Can/s Epoxy All Purpose (a And B), 1/4 Lit/can, Non Conductive, All Purpose Adhesive 43 50 Set/s Lag Screw, 6mm Dia. X 32mm With Expansion Shield 44 200 Set/s Bolt, Fine Threaded, 3.5mm X 25mm, With Nut And Washer 45 1 Sheet/s Steel Plate, G.i., Gauge # 16 X 1.2m X 2.4m 46 20 Pc/s Tiles, Granite, Polished, 0.60m X 0.60m, Color: Jet Black 47 65 Pc/s Tiles, Floor, Ceramic, 40cm X 40cm Non Skid 48 14 Pc/s Staircase Nosing, Brass Ochre (2m/length) 49 6 Pack/s Tile Grout (2kg/pk), Light Beige 50 1 Can/s Acrylic Spray Paint, Flat Black(400cc/can) 51 1 Lit/s Paint, Enamel, Quick Dry (lit), Red 52 10 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Marking Yellow Or Equivalent 53 5 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, Black 54 12 Gal/s Paint, Rubberized (gal), Chlorinated, Floor Coating, White Or Equivalent 56 1 Gal/s Paint, Epoxy, Silver Finish With Aluminum With Catalyst 57 15 Gal/s Paint, Epoxy, Enamel, Black (gal) 58 4 Gal/s Enamel Paint, Silver Finish Aluminum (gal) 59 3 Can/s Thinner, Lacquer (3.75lit/can) 60 11 Gal/s Reducer/thinner, Epoxy Paint (gal) 61 8 Gal/s Adcoat Rust Converter And Primer 62 6 Gal/s Liquid Tile Paint, Primer White Acrylic Solvent-based Primer 63 6 Gal/s Liquid Tile, Topcoat Gloss White 64 4 Gal/s Liquid Tile, Top Coat Clear 65 5 Can/s Liquid Tile, Solvent Based-tinting Color Venetial Red, 1/4lit Per Can 66 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Blue, 1/4lit Per Can 67 5 Can/s Liquid Tile, Solvent Based-tinting Color Thalo Green, 1/4lit Per Can 68 5 Can/s Liquid Tile, Solvent Based-tinting Color Hanza Yellow, 1/4lit Per Can 69 5 Can/s Liquid Tile, Solvent Based-tinting Color Lamp Black, 1/4lit Per Can 70 5 Gal/s Liquid Tile, Reducer Clear Liquid 71 10 Gal/s Plexibond, Cementitious Waterproofing System, Acrylic 72 10 Pc/s Sand Paper, #80, 225mm X 275mm 73 10 Pc/s Sand Paper, #100, 225mm X 275mm 74 10 Pc/s Sand Paper, #120, 225mm X 275mm 75 10 Pc/s Sand Paper, # 180, 225mm X 275mm 76 14 Pc/s Paint Roller W/ Handle, 100mm 77 150 Meter/s Service Drop Wire, # 4 Awg (m) 78 5 Pc/s Service Grip, # 2 79 4 Pc/s Service Grip, Dead End Performed Type, Size # 4awg 80 1 Length/s Pipe, Pvc, 40mm Dia X 3m, W/ Entrance Cap, Clip Type 81 70 Meter/s Thw Wire, # 4 (22mm2), Black (m) 82 70 Meter/s Thw Wire, # 4 (22mm2), White (m) 83 40 Meter/s Thw Wire, # 6 (14mm2), Stranded(m), Green 84 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Black 85 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), White 86 1 Roll/s Thw Wire, # 10 (5.5mm2), Stranded (150m/bx), Green 87 6 Roll/box Thw Wire, # 12 (3.5mm2), Stranded (150m/roll/bx), Black 90 1 Length/s Pipe, G.i. 65mm Ø X 6m, Wt=5.20mm , Outside Dia= 73.00, 8.694kg/m, Heavy Gauge 92 1 Pc/s Circuit Breaker, 100a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 93 1 Pc/s Circuit Breaker, 30a, 2 Pole, Bolt-on 94 3 Pc/s Circuit Breaker, 20a, 2 Pole, Bolt-on, Single Phase W/ Casing, Outdoor Type 95 4 Roll/s Royal Cord, # 14 Awg, 2 Wire (75m/roll) 96 7 Length/s Pipe, Pvc, Electrical, 40mm Dia X 3m, Thickwall, Orange 97 200 Length/s Pipe, Pvc, Electrical, 25mm Dia X 3m, Thickwall, Orange 98 150 Length/s Pipe, Pvc, Electrical, 20mm Dia X 3m, Thickwall, Orange 99 3 Pack/s C-clamp/clip, Pvc, 20mm Dia, W/ Concrete Nails (100's/pk) 100 6 Pack/s C-clamp/clip, Pvc, 25mm Dia W/ Concrete Nails (100pcs/pk) 101 3 Pack/s Pipe Connector, Pvc, Electrical, 20mm Dia (100's/pk)) 102 3 Pack/s Pipe Connector, Pvc, Electrical, 25mm Dia (100pcs/pk) 103 10 Pc/s Connector, Split Bolt, # 6 (14mm2), Burndy 104 3 Set/s Magnetic Contactor, 40a 220-240vac Coil W/ Metal. Enclosure 105 2 Pc/s Photo Control (photo Switch), 220v, 6a, Operating Illumination: Turn-on At 31.5 Lux, Turn-off At 125 Lux 106 2 Unit/s Timer, Time Switch, 24hr Back Up 107 50 Roll/s Tape, Electrical, Vinyl, .177mm X 3/4"/19mm X 16m, Flame Retardant, 600v 108 5 Roll/s Tape, Electrical, Rubber, 18mm X 5m, Self Fusing Ethylene Propylene Rubber 109 5 Roll/s Tape, Electrical, Waterproof, 600v 111 29 Set/s Recessed Ground Lamps, Ip67 1w, Ac85-265v Dc 12v (1 Side), Natural White (4000k), 42mm X 70mm 113 8 Set/s Metal Hallide Flood Light Fixture 250w Set With Tubular Metal Hallide Bulb (firefly), Warm White, Model: Flh 121/s/250/fhimh 250dl/t 114 10 Set/s Solar Blinker Arrow Signage Warning Lights, Direction Signs, Size: Length:47"; Height:42", Arrow Sign, Size: Length: 47"; Height:16", Solar Panel Size: 10" X7", Led Color: Red, Ip Grade: Ip54 119 18 Set/s Lamp Post, Steel Tapered, Single Arm,t-6-30' Sb Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish, Amco 120 6 Set/s Lamp Post, Steel Tapered, Double Arm, T-6-30' Db Double Arm, Bracket Type, W/ Base Plate, Anchor Bolt, Nut & Washer, Electroplated Silver Finish 122 32 Pc/s Led Fountain Lights, Rgb With Stainless Steel Toughed Glass Cover, Ac 220; Dc 12-24v Dmx 512 Built In Control With Decoder, 9x3w Led Rgb Color Changing 2700-6500k Ip68 Water Proof Grade Junction Box 124 5 Roll Cable Wire; 5c X 16 Twg/1.025mm Premium Multi-conductor Royal Cable Wire (75m/roll) 126 32 Set/s Fountain Nozzle, 1.0" Dn40 Female Thread Flower Column Style Fountain Nozzle Sprinkler Spray Head, Brass 127 1 Unit/s 37.5 Kva Ditribution Transformer, 7620/13200vy - 240/480 Volts Oisc, W/ 2-2½, Taps Above And N.v., Fuse Link, Fuse Cut-out And Accessories 128 2 Meter/s Fuse, Cut-out, 100a, 25kv, Ab Chance 129 1 Set/s Transformer Cluster Hanger, With Complete Accessories 130 1 Pc/s Clamp, Hot Line, #2 - #4/0 Acsr 131 3 Set/s Pull Box, Metal Enclosure, 900mm X 200mm X 150mm, With Cover 132 50 Pc/s Screw, Lag Screw, 10mm Dia X 50mm, W/ Plain Washer And Expansion Shield 133 200 Pc/s Bolt With Nut And Washer, (fine Thread) 3.5mm Dia X 25mm 134 200 Pc/s Bolt With Nut And Washer, (fine Thread) 4.5mm Dia X 25mm 135 5 Pack/s Ubolt Galvanized/ U Bolt With Nut And Washer Inches For Gi Pipe Screw Depot, 1/4 For 3", 1/4" Dia, 10 Pcs Per Pack 139 30 Gal/s Concrete Epoxy, With Low Viscosity For Construction 140 22 Length/s Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 141 12 Pc/s Tee, Upvc, 20mm Inside Dia, Blue 142 14 Pc/s Elbow, Upvc, 20mm Inside Dia X 90 Deg. Bend, Plain, Blue 143 4 Pc/s Tee Reducer, Upvc,32mm X 20mm Nominal Dia, Blue 144 3 Pc/s Tee, Upvc, 25mm Inside Dia, Plain, Blue 145 4 Pc/s Adaptor, Upvc, Male, 20mm Dia., Nominal Size, Blue 146 8 Pc/s Adaptor, Upvc, Female, 20mm Dia Nominal Size, Blue 147 4 Pc/s Ball Valve, Pvc, 20mm Outside Dia 148 10 Length/s Pipe, Upvc, 32mm Outside Dia, Wt=2.0min, L=3.0m, Blue 149 1 Pc/s Gate Valve, 25mm Dia, Brass/bronze 150 1 Pc/s Check Valve, 25mm Dia, Brass/bronze 151 2 Pc/s Adaptor, Upvc, Male, 25mm Dia., Nominal Size, Blue 152 8 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 153 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 154 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 155 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 156 3 Pc/s Gate Valve, 40mm Dia, Brass/bronze 157 5 Pc/s Check Valve, Horizontal Swing 40mm Dia, Brass/bronze 158 6 Length/s Pipe, Upvc, 50mm Outside Dia, Wt=2.30min, L=3.0m, Blue 159 2 Pc/s Tee, Upvc, 32mm Inside Dia, Blue 160 2 Pc/s Adaptor, Upvc, Female, 50mm Outside Dia., Blue 161 4 Pc/s Elbow, Upvc, 50mm Outside Dia X 90 Deg. Bend, Plain, Blue 162 2 Pc/s Elbow, Upvc, 50mm Outside Dia X 45 Deg. Bend, Plain, Blue 163 4 Length/s Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 164 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 90 Deg. Bend, S-1000, Orange 165 2 Pc/s Elbow, Pvc, 57.15mm Inside Dia X 45deg Bend, S-1000, Orange 166 8 Length/s Pipe, Pvc, 82.55mm Outside Dia X T=3.75mm X L=3.0m, S-1000, Orange 167 2 Pc/s Pvc Tee, Inside Dia: 82.55mm, S-1000, Orange 168 2 Pc/s Floor Drain, 150mm X 150mm Dia, Stainless 169 8 Length/s Pipe, Pvc, 107.10mm Outside Dia X T=3.81mm X L=3.0m, S-1000, Orange 170 2 Pc/s Elbow, Pvc, 107.10mm Inside Dia X 90 Deg. Bend, S-1000, Orange 171 2 Pc/s Pvc Elbow, Inside Dia: 107.10mm X 45 Deg Bend, S-1000, Orange 172 1 Pc/s Gate Valve, 100mm Dia, Brass/bronze 173 1 Pc/s Gate Valve, 80mm Dia, Brass/bronze, Threaded Type 174 3322.536611 Sq.ft. Brass Metal Etching Engraved Marker 175 5 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Brown 176 20 Pc/s Hat, Hard, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 177 20 Pc/s Vest, Reflectorized, Safety, Orange 178 20 Pair/s Raincoat, Jacket W/ Hood & Pants, Size: X-large With Reflectorized Strips 179 15 Pc/s Plastic Road Barriers 180 20 Pc/s Spectacles, Safety Goggles, Clear 181 8 Pair/s Gloves, Welding Leathear Long, 16', Ce Certified En 12477 182 5 Roll/s Caution Tape, Yellow, 3" X 50' 183 5 Roll/s Danger Tape, Red, 3" X 50' 184 15 Pc/s Traffic Cones 28" Tall, 14" X 14" Base With Reflective Collars Lot No. Vi Road Stud Installation 137 1 Set/s Solar Road Stud Installation Machine, Equipped With Running Wheel, Accurate Hole Position With Good Hole Forming Quality, 5.0hp, 220v With 3900w 50/60hz, 570rmp; Height: 800mm; Weight: 200kgs; Pure Copper Self-priming Pump, Manual Electric Starter, Free Adjustment Depth And Bearing Seat Assembly Complete With Coring Bit And Other Accessories ** ** ** Nothing Follows ** ** ** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents December 17, 2024 To January 6, 2025 @ 5:00 Pm Pre-bid Conference December 26, 2024 @ 9:00 Am Deadline/opeing Of Bids January 7, 2025 @ 9:00 Am Post Qualification January 14, 2025 @ 9:00 Am Awarding Of Bids January 21, 2025 @ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman Received By: Name:___________________________ Date:___________________________ Geps Publication : Geps December 17, 2024 Newspaper : None
Closing Date7 Jan 2025
Tender AmountPHP 2.1 Million (USD 37.8 K)
DEPT OF THE ARMY USA Tender
Civil And Construction...+3Civil Works Others, Electrical and Electronics, Electrical Works
United States
Details: Hannibal 4 Corners Hydraulic System . The U.s. Army Corps Of Engineers, Pittsburgh District, Has A Project That Involves The Replacement Of The Central Hydraulic System For The Main And Auxiliary Lock Chambers At Hannibal Locks And Dam, Ohio River, Ohio. The Contract Will Include A New Modified Four Corner Hydraulic System For Each Lock Chamber Consisting Of Hydraulic Power Units (hpus) For The Miter Gates And Culvert Filling/emptying Valves. The New Hpus Shall Be Located In New Precast Buildings At The Following Locations: ? Two (2) Hpus On The River Wall; One Upstream And One Downstream For Operation Of The Main Chamber Culvert Valves And Miter Gates.? Two (2) Hpus On The Middle Wall; One Upstream And One Downstream For Operation Of Main Chamber Culvert Valves And Miter Gates. In Addition, The Two Hpus On The Middle Wall Are For Operation Of The Auxiliary Chamber Miter Gates. The Modified Four-corner System Reduces The Number Of Hpus On The Middle Wall From Four To Two.? Two (2) Hpus On The Land Wall; One Upstream And One Downstream For Operation Of The Auxiliary Chamber Culvert Valves And Miter Gates. The Contract Specifically Includes: A. Installation Of New Power, Control, And Fiber Optic Cables For The Six (6) Hpus. Includes Modifying The Existing Control Stations In Each Control Shelter For The Addition Of The New Hpus And Miter Gate Controls. B. Furnishing And Installation Of Six (6) Hpus, Fourteen (14) Manifold Blocks, Stainless Steel Hydraulic Piping, And Hydraulic Oil.c. Furnishing And Installation Of Six (6) Precast Buildings Which Includes Raised Concrete Pads, Power Distribution Equipment, Associated Electronics And Hardware, And New Utility Trench Covers In Various Areas Of The Lock.d. Furnishing And Installation Of New Motor Control Center (mcc) Distribution Equipment.e. Demolition And Disposal Of Existing Central Hydraulic System Located In The Middle Wall Operations Building. This Includes All Motors, Pumps, Reservoir, Filters, Associated Piping, And Proper Disposal Of Hydraulic Oil.f. Demolition And Removal Of All Existing Central Hydraulic Oil Lines On The River, Middle, And Land Walls. This Includes All Lines For Pressure And Return To Each Miter Gate And Culvert Valve Cylinder. Removal And Proper Disposal Of Hydraulic Oil And Components Will Be Required. Removal And Proper Disposal Of Electrical Equipment Will Be Required. Ferrous And All Other Construction Waste Material Will Be Disposed Of At Commercially Permitted Facilities Licensed To Accept Waste Or Recyclable Materials As Applicable. Construction Work Will Occur In Close Proximity To Waterway Traffic And Operating Lock And Dam Gates. The Existing Lock Chambers And Dams Are Currently Operated And Staffed By Government Personnel 24 Hours A Day 365 Days Of The Year. Lock Closures For Installation And Testing Of New Equipment Will Be Required To Be Minimal And At The Approval Of Government.the Work Shall Be Completed Within 365 Calendar Days After Written Notice To Proceed. Disclosure Of Magnitude Of Construction (far 36.204 And Dfars 236.204)between $10,000,000.00 To $25,000,000.00the Acquisition Will Be Procured As Full And Open Competition. The Resulting Award Will Be For One (1) Firm-fixed-price (ffp) Contract. All Responsible Bidders Are Encouraged To Participate. The Invitation For Bid (ifb) Will Be Issued On Or About 3 January 2024, Online Through Procurement Integrated Enterprise Environment (piee) Which Posts The Opportunity To Sam.gov; Therefore, Requests For Hardcopies Of The Solicitation Will Not Be Honored.the North American Industrial Classification System (naics) Code For This Acquisition Is 237990 ? Other Heavy And Civil Engineering Constructionthe Small Business Size Standard For This Naics Code Is $45,000,000.00.in Order To Submit A Bid On This Project, Your Company Must-1) be Registered In System For Award Management (sam) And Maintain An Active Registration Status. 2) be Registered In The Procurement Integrated Enterprise Environment (piee) For The Solicitation Module With The Proposal Manager Manger Role. System For Award Management (sam) Registrationregistering In Sam.gov Includes Both Entity Validation And Entity Registration.to Register In Sam:a. navigate To Sam.govb. select Sign-in (top Right)c. select Create An Account Then Follow The Instructions. D. after Account Is Set-up, Select Sign In.e. under The Entity Management Widget, Select Get Started Button. F. select Register Entity. As Part Of Entity Registration, A Unique Entity Id Will Be Assigned.for Additional Information On Samto Register Your Entity (company), Please Visit Https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here You Will Find The Following, get Started With Your Registration check Registration Status ? Active, Inactive, Pending update Your Registration become An Entity Administrator validate Your Entity *access User Guides *by Selecting This Option, You Can Obtain A Quick Start Guide For Contract Registrations.also, Here You Will Find In Addition To The User Guides - Faqs, Videos, And Definitions.please Noteit Is Mandatory That All Companies Be Registered In Sam In Order To Receive Federal Contracts.there Is No Charge To Register Or Maintain Your Company (entity) Registration.login.gov Manages Usernames And Passwords For Sam.gov. *important* Registration Informationregistration Can Take At Least Ten (10) Business Days To Be Active In Sam.gov.registration Must Be In Active Status Upon Offer Submission And Remain Active During Award Period.registration Must Be Renewed Every 365 Days To Remain Active.the Federal Service Desk (fsd) For Sam Questions, May Be Contacted. Phone Number: 866-606-8220hours Of Operation: Monday-friday 8 A.m. To 8 P.m. Etprocurement Integrated Enterprise Environment (piee) Solicitation Module Registrationto Register For Piee Follow The Below Instructions. Register In Piee:a. Navigate To Https://piee.eb.mil/b. Select Register [top Right]c. Select Vendord. Create A User Id And Password And Follow The Prompts [next]e. Create Security Questions [next]f. Complete Your User Profile Information [next]g. Complete Your Supervisor Or Approving Official Information [next]h. Complete Rolesi. Step 1. Select Sol-solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill In Your Location Code (cage Code) [next]i. Provide A Justification For Your Registration [next]j. Follow The Remaining Prompts To Submit Your Registrationthe Procurement Integrated Enterprise Environment (piee) Help Desk May Be Reached By Calling Telephone Number 866-618-5988 For Assistance.
Closing Date2 Jan 2025
Tender AmountRefer Documents
PUBLIC BUILDINGS SERVICE USA Tender
Civil And Construction...+1Building Construction
United States
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii.
general Statement Of Work Summary:
the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300
ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown
central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass
curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The
illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton
construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia
award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent
entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public
and Created A Strong Sense Of Entry For Pjkk.
on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January
24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is
probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel
installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over
a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see
volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire
damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion
includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United
states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point
locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere
to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While
also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And
smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also
include Solutions For The Following Known Building Maintenance Issues:
1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created
issues For Regular Maintenance And Care.
2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult
to Replace.
in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The
entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard
are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental
appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response
to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol.
the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden
courthouses.
initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s.
courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To
analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The
countermeasures For The Pjkk Courthouse In Honolulu, Hi:
1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And
ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala
moana Boulevard, Excluding Ground Level Windows Along The United States
marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard:
● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced
entry Resistance Per Astm F3038 Or Dept Of State (dos)
sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The
standard That Shall Apply.
● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing
system
● Contractor Is Responsible To Field Verify And Measure Each Opening.
2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design
drawings For Specific Locations):
● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule
doors Shall Be Equipped With Hardware And Controls To Engage
electro-magnetic And/or Electro-mechanical Remote Locks.
● Remote Locks Shall Give The Ability For The Court Security Officers And The
usms To Lock All Doors Immediately In Case Of An Emergency.
● Remote Lock Override Control Shall Run To The Main Usms / Cso Control
room
the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And
doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler
designed Pjkk Entry Pavilion.
the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry
resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm
standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration,
however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension)
of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And
the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered
acceptable. Support Documentation Shall Be Provided Prior To Installation.
the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure,
build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points,
the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door
upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical,
electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure.
the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And
construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00
am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To
maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m.
weekdays.
the Project Delivery Method Is Design-build (db).
the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required
to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening
project.
design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii
licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design
development, Construction Documents, Basis Of Design Documents, Site Investigation, Site
measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination,
contract Administration, Contract Close-out, Record Drawings And As-builts.
construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of
security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project
schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall,
mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples,
submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure,
protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary
barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes,
file And Record Management, And All Other Work To Meet The Contract Requirements.
Closing Date3 Jan 2025
Tender AmountRefer Documents
Nueva Ecija University Of Science And Technology - NEUST Tender
Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid The Nueva Ecija University Of Science And Technology (neust) Through The Bids And Awards Committee (bac), Hereby Invites All Interested Entities Registered With The Philippine Government Electronic Procurement System (philgeps) To Bid For The Hereunder Project, Subject To The General Conditions Stated Herein. Name Of Project: Upgrading Of Programmable Logic Controller (plc) System In The Mechatronics Laboratory Location: College Of Industrial Technology, Neust Gen. Tinio (st.) Campus, Cabanatuan City Approved Budget For The Contract: Php6,419,764.00 Contract Duration: 120 Calendar Days Source Of Fund: Income Cost Of Bidding Documents: Php10,000.00 Project Description: 1lot Item No. Description Qty Unit 1 Programmable Logic Controller For Mechatronics Training System Training Device For The A4 Mounting Frame Or As A Desktop Device With Modern, Industrially Used Programmable Logic Controller And System Interfaces For A Mechatronics Station. It Ensures Highest Performance And User-friendliness For Medium And High-end Applications Of Machine And Plant Automation. Benefits • Stable, Powder-coated, Sheet-steel Mounting System • Suitable For One Mechatronics Station And Suitable As A Tabletop Unit • Mounting Rail For 19" Module Is Attached To The Mounting System • Equipped With 4 Mm Safety Sockets • Integrated Power Supply Further Information The Stable Powder-coated Sheet Steel Support System Contains A 19" Module System Plug Syslink (9 Te), With 2x Syslink Plug-in Connection For Mechatronics Station And Control Panel, Each With 8 Digital Inputs And 8 Digital Outputs And 1x D-sub 15-pin Plug-in Connection With 4 Analog Inputs And 2 Analog Outputs, Emergency Stop Bridge For Connecting A Safety Circuit To Switch Off 8 Digital Outputs. Technical Data: - Dimensions (w X H): 305 Mm X 297 Mm (size 1) - Integrated Power Pack: 100 ... 240 V Ac ±10%; Necessary Accessories: Iec Cables 5 Units 2 Programmable Logic Controller For Electro-pneumatics Training Device For Er Recording Frame (pneumatic/hydraulic) For Solutions In Discrete And Stand-alone Automation Applications Of The Lower Power Range. Further Information The Modular Small Controller Can Be Used For Solutions In Discrete And Stand-alone Automation Applications In The Lower Performance Range. Technical Details: • Digital Inputs On 4 Mm Safety Sockets And Switches/buttons For Signal Simulation • Digital Outputs On 4 Mm Safety Sockets • Analog Inputs And Outputs On 4 Mm Safety Sockets • Simulation Module With 2x Syslink Connector For Control Panel With Digital Inputs And Outputs And D-sub 15-pin Connector With Analog Inputs And Outputs; 4 Mm Safety Sockets For Emergency Stop Bridge To Connect A Safety Circuit For Digital Outputs The Carrier System Consists Of A Lightweight Injection-moulded Housing, Suitable For An Er Mounting Frame Size 2, Dimensions (w X H X D): 364 Mm X 170 Mm X Approx. 80 Mm. The Unit Is Delivered Fully Assembled. Special Licensing Rules Apply To Schools And Training Centers In The Commercial Sector. 6 Units 3 Electro-pneumatics Simulator Software Simulation Software For Pneumatics Is An Application For Creating And Simulating Pneumatic And Electropneumatic Circuits. Valuable Technical Skills Are Learned By Designing Circuits And Simulating Them Interactively. Learning Goals • Creation Of Circuit Diagrams • Identifying And Preventing Errors • Optimization Of Solution Circuit Diagrams Through Interactive Simulations • Understanding Solution Development • Observing Effects Through Real-time Simulations Benefits • Convenient Creation Of Circuit Diagrams And Their Interactive Simulation • Content Tailored To Festo Didactic Learning Systems • Can Be Used Online And Offline • Learning The Effects Of Changes In A Technical Setup And Observing Their Immediate Consequences Through Real-time Simulation • Extensive Library Of Pneumatic, Hydraulic, Electrical Engineering, Electronic And Digital Components. • Further Information Simulation Software For Pneumatics Makes It Possible To Create (electro-)pneumatic Circuits And Simulate Them Interactively. State Changes And Switching Processes Are Calculated Realistically, And Interactive Interventions Can Be Made By Actuating Switches Or Switching Valves. Signals Can Also Be Transmitted Via Connected Hardware Or From Other Programs. In Addition To Real Measuring Devices, Fluidsim 6 Offers Virtual Measuring Devices. Circuits Can Be Constructed From A Library Of Various Electropneumatic Components. In Addition, Grafcet Diagrams Can Be Created And Included In The Simulation If Desired. Simulation Software For Pneumatics Covers The Following Topics: • Pneumatics/electropneumatics • Closed-loop Pneumatics • Vacuum Technology • Electrical Controllers • Digital Technology • Grafcet 6 Units Warranty: • One (1) Year Against Factory Defects Must Include: • On-site Installation And Testing • Three (3) Days Rigid Training For Faculty And Laboratory Technicians • Must Provide Official Partner Or Authorization To Bid From Manufacturer • Iso 9001:2015 Quality Management System Certification From The Manufacturer • Iso 14001: 2015 Environmental Management Certificate From The Manufacturer The Summary Of The Bidding Activities Is As Follows: Activities Schedule 1. Advertisement December 11-18, 2024 2. Issuance Of Bid Documents December 19, 2024 To January 3, 2025 3. Pre-bid Conference December 19, 2024, 2:30pm (via Zoom) 4. Deadline For Submission Of Bids (manual Submission) January 3, 2025, Until 5:00pm Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City 5. Opening Of Bids (face To Face) January 6, 2025, 9:00am Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City General Conditions: All Particulars To The Eligibility Statement And Screening, Bid Security, Performance Security, Pre-bidding Conference, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Business Organizations With At Least Sixty Percent (60%) Interest Or Ownership Of At Least 60% Of The Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Business Organizations Of A Country Where The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 19, 2024 To January 3, 2025 Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Pay The Applicable Fee For The Bidding Documents Not Later Than The Deadline For Submission Of Bids. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before January 3, 2025, Until 5:00pm. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In The Pbd. Late Bids Shall Not Be Accepted. On The Last Day For The Submission Of Bids And No Prospective Bidder/s Submitted Its Bid Documents Or Only One (1) Bid Was Submitted For The Above-mentioned Project, The Same Is Deemed Extended Until January 10, 2025, 5:00 Pm. This Is To Protect The Interest Of The University And Full Opportunity For A Competitive Bidding May Be Achieved. The University Likewise Reserves The Right To Cause Extension Or Postponement Of The Filing Of Bids Should Similar Situation Arises. Bid Opening Shall Be On January 6, 2025, 9:00 Am At The Bac Conference Room, Gen. Tinio (st.) Campus, Cabanatuan City Unless Extended. Bids Will Be Opened In The Presence Of The Bidder Or His/her/its Duly Authorized Representative/s. Failure To Attend During The Opening Of Bids Shall Be Considered A Waiver On The Part Of The Bidder Who Likewise Waives His/her/its Right To Raise Questions During The Bidding Procedures. The Nueva Ecija University Of Science And Technology Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For More Information Concerning This Bidding, Please Contact The Following: Engr. Joel G. De Mesa Head, Bac Secretariat For Goods And Services Neust Gen. Tinio St., Cabanatuan City Email Address: Neust.bacsec@gmail.com Approved By: Dr. Honorato P. Panahon (sgd.) Bac Chairperson
Closing Date6 Jan 2025
Tender AmountPHP 6.4 Million (USD 110.6 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
small Business Program Representations (feb 2024)|4|||x||
annual Representations And Certifications (may 2024)|13|334515|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Purpose Of This Amendment Is To Extend The Due Date To 06 Jan 2025. All Other Terms And Conditions Remain The Same.
the Purpose Of This Amendment Is To Change The Procurement From A Restricted Environment To A Sbsa. The Solicitation Point Of Contact Is Hereby Changed To Carly Gassert, Carly.a.gassert.civ@us.navy.mil. Revised Irpod And Drawing Documents Are Available At The Bpmi
Site. Vendor Review Of The Irpod Is Mandatory. The Due Date Is Hereby Extended To 06 Dec 2024. All Other Terms And Conditions Remain The Same.
unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At:
https://logistics.unnpp.gov
this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website.
a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You.
to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code.
in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation.
section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement.
\
all Drawings Required For Procurement Of 109022gp8, Probe & Cable Assembly Havebeen Identified And A New Irpod Has Been Created To Include These Drawings. Pd Has Been Revalidated And New Irpod And All Drawings Are Now Available In E-commerce.
unless Otherwise Specified, Pricing For This Request For Quote Is Valid For 60 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via E-mail Or Neco Please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such Ase-mail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At:
https://logistics.unnpp.gov
this Website Requires A Password And Pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website.
a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawingswill Not Be Mailed To You.
to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code.
in Order For Your Offer To Be Considered, You Must Submit Your Quote Prior To The Closing Date/time Listed On This Solicitation.
section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents:
1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided.
2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s)
Which Are Part Of The Total Requirement Of The Contract/purchase
Order.
block C: Is The Category Of Data Required, Tdp Is Defined
In Mil-t-31000. Tm Is Defined In Part 1x, Section B
Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's
Included In Our Solicitations Meet The Requirement Of Tdp As
Navsup-wss Does Not Regularly Purchase Only Technical Manuals
Without Purchasing Hardware And Related Tdp Software. Therefore,
Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item
Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number,
Invitation For Bid Number Or Another Number For Tracking And
Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The
Individual Who Prepared The Dd Form 1423 And Included The
Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content
And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If
The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual
Technical Manual Contract Requirements Number. In The Event
The Dd Form 1423 Is Requiring A Technical Manual The Numbered
Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement
Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval,
Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And
Acceptance Of The Deliverable Item. The Definition Of The
Codes Is As Follows:
Dd Form 250 Code Inspection Acceptance
Ss (1) (2)
Dd (3) (4)
Sd (1) (4)
Ds (3) (5)
Lt (6) (7)
No (8) (8)
Xx (9) (9)
(1) Inspection At Source.
(2) Acceptance At Source.
(3) No Inspection Performed At Source. Final Inspection
Performance At Destination.
(4) Acceptance At Destination.
(5) Acceptance At Source. Acceptance Based On Written
Approval From The Contract Officer.
(6) Letter Of Transmittal Only. Lt Should Not Be Used When
Inspection Is Required. The Data Is Sent By The
Contractor Directly To The Personnel Listed In Block 14
Of The Dd Form 1423. Lt Is Used When The Contracting
Agency Does Not Desire To Have A Dd Form 250 For Each
And Every Piece Of Data Developed By The Contractor.
The Only Other Authorized Use Of Lt Is The Special
Case Where The Contracting Agency Does Not Desire To
Have Separate Dd Forms 250 But Desires To Have A
Government Quality Assurance Representative Perform
Inspection. The Government Quality Assurance
Representative Shall Be Listed On The Distribution
In Block 14 And Requested To Provide Comments Via
The Quality Assurance Letter Of Inspection.
Use Of The Symbol Lt Is Not Authorized For Data Comprising
Final Delivery Of Technical Data Package Of For Technical
Manuals. (lt May, However, Be Used For Delivery Of
Preliminary Tdp's Or Tm's).
(7) As Specified In Block 8 Of The Dd Form 1423.
(8) No Inspection Or Acceptance Required. No Dd Form 250 Or
Letter Of Transmittal Required.
Use Of The Symbol No Is Not Authorized For Data Comprising
Technical Data Packages Or For Technical Manuals.
(9) Inspection And Acceptance Requirements Specified Elsewhere
In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring
Specific Advanced Written Approval Prior To Distribution Of
The Final Data Item Will Be Identified By Placing An "a"
In This Field. This Data Item Requires Submission Of A
Preliminary Draft Prior To Publication Of A Final Document.
When A Preliminary Draft Is Required, Block 16 Of The Dd
Form 1423 Will Show Length Of Time Required For Government
Approval/disapproval And Subsequent Turn-around Time For The
Contractor To Resubmit The Data After Government
Approval/disapproval Has Been Issued. Block 16 Will Also
Indicate The Extent Of The Approval Requirements, E.g.,
Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The
Government Can Circulate The Deliverable Item. The Definition
Of Codes A, B, C, D, E, Or F Is As Follows:
A. Distribution Of The Item Is Unrestricted.
B. Distribution Of The Item Is Limited To Agencies Only.
C. Distribution Of The Item Is Limited To Contractors With
A Cage Code And Have A Dd Form 2345 On File With The
Dla Logistics Information Services (dlis) Battle Creek,
Mich. Or Government Activities.
D. Distribution Of The Item Is Limited To Dod Activities
And Dod Contractors Only.
E. Distribution Of The Item Is Limited To Dod Components
Only.
F. Distribution Of The Item Is Restricted From Foreign
Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To
Be Delivered To The Government. The Abbreviations And
Their Meaning.
Annly Annually
Asgen As Generated
Asreq As Required
Bi-mo Every Two Months
Bi-we Every Two Weeks
Daily Daily
Dfdel Deferred Delivery
Mthly Monthly
One/r One Time With Revisions
Qrtly Quarterly
Semia Every Six Months
Wekly Weekly
Xtime Number Of Times To Be Submitted
(1time, 2times...9times)
Use Of These Codes Requires Further Explanation In Block 16
To Provide The Contractor With Guidance Necessary To Accurately
Price The Deliverable Data Item.
Other Abbreviations Not Appearing On The Above List May On
Occasion Be Used In Block 10 Of The Dd Form 1423. When Other
Abbreviations Are Used They Will Be Fully Explained In Block 16
Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day
Format, The Deliverable Item Is To Be Received By The
Requiring Office Cited In Block 6 Of The Dd Form 1423
For An Item With A Block 10 Entry Indication A Single
Delivery. If The Item Is To Be Submitted Multiple
Times, The Number Stated Is The Number Of Calendar Days
After The Frequency Cited In Block 10 The Item Is To Be
Received By The Requiring Office Cited In Block 6 Of The
Dd Form 1423. On Occasion The Deliverable Item Will Be
Required To Be Submitted Prior To The End Of The Frequency
Cited In Block 6. In That Event The Requirement Will Be
Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To
The Requiring Office (block 4) Expressed In
Year/month/day Format. The Abbreviations And Their
Meaning Are As Follows:
Asgen As Generated
Asreq As Required
Dac Days After Contract Date
Dfdel Deferred Delivery
Eoc End Of Contract
Eom End Of Month
Eoq End Of Quarter
Specific Instructions For These Requirements Will Be Provided In
Block 16. If The Deliverable Item Is Constrained By A Specific
Event Or Milestone The Constraint Will Be Fully Explained In Block 16
Of The Dd Form 1423. "as Generated", "as Required", And "deferred
Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After
The Initial Submission. Subsequent Submission Is Only Used To
Indicate The Specific Time Period. The Data Is Required When
Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is
Required. This Does Not Apply To Resubmission Of A Deliverable
Item That Has Been Reviewed By The Requiring Office And Determined
To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To
Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full
Name, Address (including Code) Will Be Specified. That Specific
Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To
Be Submitted. When Final "repro" Copies Are To Be Submitted
Block 16 Will Clarify The Type Of Repro Copies Required.
(e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required
By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information
Blocks 1 Through 15. This Block Is Also The Only Area Used To
Tailor The Document Listed In Block 4. Only Deletions To The
Minimum Requirements Stated In The Document In Block 4 Are
Allowed. Block 16 May Also Be Used To Specify The Medium For
Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The
Appropriate Price Group. The Price Groups Are Defined As Follows:
A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This
Type Of Data To Perform The Rest Of The Contract. Price
Would Be Based On Identifiable Direct Costs, Overhead, General
And Administrative (g&a) And Profit.
B. Group Ii - Data Essential To Contract Performance Which Must Be
Reworked Or Amended To Conform To Government Requirements.
The Price For Data In This Group Would Be Based On The Direct
Cost To Convert The Original Data To Meet Government Needs And
To Deliver It, Plus Allocable Overhead, G&a And Profit.
C. Group Iii - Data Which The Contractor Must Develop For His Own
Use And Which Requires No Substantial Change To Conform To
Government Requirements Regarding Depth Of Content, Format,
Frequency Of Submittal, Preparation, And Quality Of Data. Only
The Costs Of Reproducing, Handling And Delivery, Plus Overhead,
G&a And Profit, Are Considered In Pricing Data In This Group.
D. Group Iv - Data Which The Contractor Has Developed As Part
Of His Commercial Business. Not Much Of This Data Is Required
And The Cost Is Insignificant. The Item Should Normally
Be Coded "no Charge." An Example Is A Brochure Or Brief Manual
Developed For Commercial Application Which Will Be Acquired
In Small Quantities, And The Added Cost Is Too Small To Justify
The Expense Of Computing The Charge That Otherwise Would Go
With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total
Price Which Is Estimated To Be Attributable To The Production
Or Development For The Government Of That Item Of Data. The
Entry "n/c" For "no Charge" Is Acceptable.
the Packaging Label Shall Be Marked With The Nomenclature As Cited On Irpod.
date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev).
Closing Date6 Jan 2025
Tender AmountRefer Documents
City Of Koronadal Water District Tender
Others...+1Electrical and Electronics
Philippines
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
Municipality Of Mercedes, Camarines Norte Tender
Solar Installation and Products...+1Electrical and Electronics
Philippines
Details: Description Republic Of The Philippines Province Of Camarines Norte Municipality Of Mercedes Bids And Awards Committee Bids And Awards Committee Office, Lgu - Mercedes, Camarines Norte Invitation To Bid For Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte. The Local Government Unit Of Mercedes, Camarines Norte, Through The Trust Fund Intends To Apply The Sum Of Two Million Seven Hundred Twenty-five Thousand Two Hundred Sixty-six Pesos Only (php2,725,266.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte - Identification Number 401-24-11-1495/1496/1497/1498/1499. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Local Government Unit Of Mercedes, Camarines Norte, Now Invites Bids For The Purchase Of Various Supplies/materials And Equipment, Livelihood Program: Providing Resources For Opportunities And Prosperity Through Empowerment In Lgu-mercedes, Camarines Norte As Follows: Item No. Qty Unit Description Lot 1 - Hardware Tools 1 1 Unit Air Compressor Machine, Motor: 1/2 Hp; No. Of Cylinder: 2; Phase: 1; Pressure: 85 Psi; Capacity 46 Liters; Approximate Dimension: 95-100cm (l) X 31-35cm (w) X 64-70cm (h); Weight: 47kg; Inflation Time: 53min; Air Displacement: 208l/min 2 1 Unit Air Spray Gun, Standard Nozzle:1.4mm, Pattern Width:180-250mm, Paint Capacity:600cc, Suitable For Finishing Coat, Optional Nozzle:1.3-2.5mm, Operating Pressure:2-3.5bar Air Cons:4.2-7.1cfm(119-200l/min)" 3 11 Set Angle Grinder Cutting Disk, 10 Pcs.per Set; Dimensions: Approx. 105mm (4") X 1.2mm (3/64"') X 16mm (5/8") 4 11 Unit Angle Grinder, Rated Input Power: 730w; Wheel Diameter: 4"; Rated Voltage: 220v; Frequency: 60hz; No Load Speed: 12,000 Rpm; Weight: Approximately 1.6kg; Grinding Spindle Thread: M10; Disc Diameter: 100mm X 1 X 16mm, Dimension: 298mm (l), 77mm (w), 102mm (h) 5 7 Pc Chipping Hammer, Item Weight: atleast 13.8 Ounces; Product Dimensions: 11" (l) X 1" (w) X 7.5" (h); Material:, Genuine Leather Grip And Forged Steel 6 3 Set Circular Saw With Diamond Blade, 1400w, 185 Mm Blade, Spindle Lock With 24t Diamond Blade 7 3 Pc Claw Hammer, Head Weight: 16oz; Overall Weight: 17oz-23oz; Forged Steel Head; Smooth Face; Fiberglass Handle With Rubber Cushion; Overall Length: 12-14" 8 3 Pc Concrete Chisel, 10'' Forged Steel Chisel 9 3 Pc Crow Bar, 36" Long; Length Tolerance: +- 1/8; Forged Steel Carbon 10 1 Pc Electric Planer; Voltage: 220-240v; Input Power: 1050w; No Load Speed: 1600rpm; Planing Width And Depth: 82x3mm; Heavy Duty Aluminum Base; 11 1 Pc Framing Hammer, Handle Material: Alloy Steel; Item Dimensions: Approximately 16-17" (l) X 5.75-6" (w) X 1.5-2" (h); Item Weight: Atleast 1.4 Pounds 12 1 Unit Gasoline Marine 7hp Speed Type, Single Cylinder; 4 Stroke, Forced Air Cooling; Ohv Displacement (cc): 196 Compression Ratio: 8.5:1 Bore X Stroke (mm): 68x54 Min. Fuel Consumption;395/(kw.h) Valve Clearance: Input Valve: 0.10-0.15mm Idle Speed (rpm): 1400+-140 Max A.c. Output/rpm:3.8/3600 Noise Level:70db (a) Ignition System: Transistorize Magento Ignition Max Torque (n.m/rpm): 10.7/300 Starting System: Recoil Start (recoil Start/electric Starting) 13 10 Pc Hacksaw With Blade, Adjustable Aluminun Alloy Frame With Soft-grip Handle, 90" Adjustable Bladec Angle, 12 Inches (+/- 1/4") Bi-metal Hacksaw Blade, 24 Tpi 14 10 Unit Heavy Duty Corded Drill, Rated Input Power: 750w; Chuck Capacity: Upto 13mm; Drill Capacity: Metal (16mm), Wood (25mm), Masonry (12mm); Dimension: 268mm (l) X 69mm (w) X 192mm (h); Weight W/out Cable: Approximately 1.6-1.8 Kg; Spindle Collar Diameter Of 43 Mm 15 1 Pc Level, Box Beam Style, Material: Alluminum; Dimension: Approximately 24-24.5" (l) X 2-2.6" (w) X 1.2-1.5" (h); Weight: Atleast 0.8 Pounds 16 3 Pc Mashing Hammer, 3 Lb With Fiberglass Handle, Forged Steel Head 17 3 Pc Masonry Hammer, 800g Solid Rubber Head, Fiberglass Core And Bi-material Slip-resistant Handle, 18 3 Pc Masonry Hand Saw, 15" 380mm Carbon Steel 19 3 Pc Masonry Square, 24"x 16"aluminum, 1/8 '' Thick 20 3 Pc Mason's Level, 60cm Aluminum Reinforced Frame 21 3 Tube Mason's Line, #18 Braided Nylon, 500 Ft, 170 Lb Test 22 10 Set Metal Drill Bit Set, Material: High Speed Steel; 19pcs Per Set (1mm,1.5mm,2mm,2.5mm,3mm,3.5mm,4mm,4.5mm,5mm,5.5mm,6mm,6.5mm,7mm,7.5mm,8mm,8.5mm,9mm,9.5mm,10mm); Point Angle:118degree C; Standards: Din 338; Bit Geometry: Standard Twist Bit 23 8 Pc Meter Tape With Magnetic Hook, Blade Material: Nylon Coated Blade; Dimensions: 16ft (l) X 25mm (w) 24 7 Pc Mig Welding Pliers, Overall Length: Atleast 210mm; Material: High Carbon Steel; Handle Material: Thermoplastic Rubber 25 1 Unit Portable Hand Drill, Power Sourced: Battery Powered - 2pc 21 Volt 1500mah Lithium-ion Batteries; Maximum Rotational Speed: 1500 Rpm; Voltage: 21v; Amperage: 1.5 Amps; Chuck Size: 0.38"; Bit Heads Diameters: From 0.8mm - 10mm; Product Dimensions: 9.6" (l) X 2.1" (w) X 7.5" (h); Material: plastic, Rubber, Metal; Item Dimensions: Approx. 9.6" (l) X 2.1" (w) X 7.5" (h); Item Weight: Atleast 2.5 Pounds; Item Torque: 330 Inch Pounds; Inclusions: 1x21 Volt Inspiritech Cordless Power Drill, 2x Rechargeable Battery, 1x English User Manual, 10x Self-drilling Drywall Anchors,10x Screwdriver Bits, 2x Double Ended Bits, 3x Drilling Bits, 1x Magnetic Extension Socket Bit Holder, 10x Anchors With Screws,1x One-hour Fast Charger, 1x Flexible Extension Shaft, 1x Carrying Bag 26 7 Unit Portable Welding Machine, Input Voltage: 220-240; Frequency: 50-60hz; Output Current: 10-220a; Led Display; No-load Voltage: 85v; Max. Output Current: 220a; Diameter Of Electrode: 1.6-3.2mm; Inclusions: 1 Pc Electrode Holder, 1 Pc Earth Clamp With Cable, 27 3 Pc Pull-push Rule, Blade Length 8m/26ft, Blade Width 1", High Impact Abs Case With Durable Rubber, Corrosion Resistant Tru-zero End 28 3 Pc Putty Knife, 3" Stainless Steel With Rubber Handle 29 1 Pc Roofing Hammer: Item Weight: 1.25 Pounds; Product Dimensions: Approx. 13.7" (l) X 6.75" (w) X 1.5" (h) 30 1 Unit Sander, Item Dimensions: Approx 11.63" (l) X 5.63" (w) X 6.19" (h); Voltage: 110 Volts; Power Source: Corded Electric; Amperage Capacity: 8.8 Amps; Variable Speed Control Dial (690 -1,440 Ft./min.); Grit Number: 80; Item Weight: Atleast 9.5 Pounds; Included Components: belt Sander, 1 Belt, Dust Bag 31 3 Pc Shovel, Rectangular End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 32 3 Pc Shovel, Round End, Tempered Steel Blade (0.8mm Gauge Orv Higher), 17-23 Cm Blade Tip Width,22-28cm Blade Tip Lenght, All Metal Handle, Overall Lenght 100cm-115 Cm 33 1 Pc Speed Square, Material: Cast Aluminum; Size: About 18x18x2cm/7.09x7.09x0.79"; Weight: About 130g; Triangle-shaped 34 3 Pc Spirit Level Bar, Aluminum Frame With Magnet, Size 12" (+-1/8"), With 3 Vials (horizontal, Vertical And 45 Degrees) 35 3 Pc Steel Float/plastering Trowel, Thickness 0.7 Mm, Surface Measurement 280mm X 125 Mm(+/- 1mm), High Carbon Steel, Soliod Forged Steel With Plastic Handle 36 1 Pc Trim Hammer, Handle Material: Wood; Head Material: Alloy Steel; Item Dimensions Approximately: 14-15" (l) X 5-6"(w) X 1-2" (h); Item Weight: Atleast 594 Grams 37 3 Pc Trowel, 280x120mm Stainless Plastering Trowel With Plastic Handle 38 1 Pc Utility Knife, Handle Material: Aluminum; Material: Aluminum Alloy; Weight: 120g/pcs; Blade Size: 19mm (w) X 61mm (h) X 0.6mm (t); Blade Material: Steel; Thickness: Atleast 0.6mm 39 7 Pc Welding Helmet, Auto Darkening Helmet, Power Supply: Battery And Solar Powered; Light Shade: Din9-1;, Dark Shade: Din4; Switching Time: 1/25000s; Delay Time: 0.1-0.8s; Sensitivity Adjustment: Stepless Control; Operation Temperature: -5 Degrees- 55 Degrees; Active Viewing Area: 93mmx43mm; Active Viewing Area Size: (+/- 10mm); Item Weight: Atleast 1.85 Pounds; Package Dimensions: approximately 12-12.4" (l) X 9-9.61" (w) X 7-7.68" (h) 40 7 Set Welding Magnets, 6 Pcs/set, Overall Length: Atleast (3"); Hold Capacity: Up To 25lbs; Arrow Design Supports Angle: 45°, 90°, And 135°; Item Weight: 295g; Package Dimensions: 4.88 X 4.72 X 3.98 Inches; material: Steel; Magnets Size: Approximately - Top (1-1.4cm), Bottom (6.5-7cm), Side (7-7.5cm) Thickness (1-1.3cm) 41 1 Set Wood Chisel; 4-piece Set (6mm; 12mm; 19m; 25mm); Tempered Chrome Carbon Steel Blade; Hardened Shank; Rust-resistant, Lacquered Coated Blade; Bi-material Handle 42 3 Pc Wooden Float, 18"x 32", Multi-layered Lot 2 - Food Preparation 1 1 Unit 3 In 1 Burger Griller With Deep Fryer And Steamer, Gas Type; Made Of Stainless Steel And Polished Metal Griddle Plate; Dimensions: Burger Griddle - 18" (l) X 12" (w); Deep Fryer - 8" (l) X 12" (w), Capacity: 2.5 L; Steamer: 11" (l) X 12" (w) 2 6 Unit Barbeque Grill With Sauce Holder And Top Grill, Material: Stainless Steel, Dimension(lwh): 24 In X 12 In X 30 In (3.5 In Grill Pan's Depth) 3 33 Pc Basin; Stainless; Diameter: 22"; Base: 16"; Depth: 7"; Thickness: 1cm 4 47 Pc Beach Umbrella; Round-shaped; Material: Poly Canvass; Diameter: 40""; Pole Stand Length: At Least 45""; Pole Material: Stainless Steel Chrome" 5 6 Pc Boiler Caldero; Big Size & Heavy Duty; Size: Diameter 48cm; Height: 42cm; Makapal, Material: Aluminum 6 6 Pc Boning Knife, 27.3cm, Blade Length:14.6cm, Blade Thickness: 4mm, Wood Handle 7 32 Pc Butcher's Knife; Materials: Stainless; Wood Handle; Size: About 10" 8 29 Pc Caldero With Double Handle; Aluminum Material; Diameter: 46cm; Height: 37cm; With Double Handle; Capacity 5kilos/20l(volume Capacity) 9 48 Set Casserole Set, Stainless Steel, 28, 30 And 32cm Diameter; 16, 18, 20cm Height 10 50 Pc Chef's Knife; About 10 3/4" Long; Material: Stainless Steel; Blade: Full Tang; Riveted Handle 11 56 Pc Chest Cooler, Item Package Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h), Package Weight: 5.76kg, Inside Dimensions: 24.95" (l) X 14.58" (w) X 14.77" (h), Material: plastic, Chamber Depth: 24.95", Capacity: 52l, Color: Any Color 12 51 Pc Chopping Board; Thick Wood; 12"x12" 13 6 Pc Cleaver Knife, 11" Stainless Steel, Weight: 310-340g, Blade Size: 6.5 Inches 14 48 Pc Colander; Stainless Steel; 11"diameter; With Stainless Base And Handle 15 6 Unit Digital Weighing Scale ,30kg Capacity,stainless Tray Size: 35x23cm For 30kg Capacity Weighing Scale, Dual - Display : Weight, Unit Price, Amount, High Light Led Display, Rechargeable Battery, Power Supply: Ac/dc Charger (included) 16 47 Unit Double Burner Gas Stove; Stainless Top And Front; Automatic Ignition; Reversible Trivet; Double Detachable Top Burner; Removable Drip Pan; Dimension: 700mm(l) X 390mm(w) X 140mm(h) 17 7 Unit Double Ring Burner; Heavy-duty Cast Iron; Includes Pol Regulator And 1-metre Hose 16750 Btu Brass Valve With Individual Gas Control Minimal Assembly Required Weight; 3.9kg, Material;cast Iron, Dimensions: (lwh) 36cm X 20cm X 9cm, Fuel Type: Lpg Tank Cylinder With Content And Accessories 18 2 Pc Egg Ring, Stainless Steel, 8.5cm Diameter, 1.5cm Height 19 4 Box Face Masks; 3 Ply Non-woven Disposable Earloop Mask; Quantity: 50pcs/box 20 30 Pc Fish Drying Rack, 4-layer, 45x45x66cm, Foldable 21 6 Pc Fish Scaler, 20cm Stainless Steel 22 6 Pc Fish Scraping Tool, 20cm Stainless Steel 23 54 Unit Food Shelve, 2 Layers: Glass Thickness: 3/16 And 1/4, (w-14" X H-17" X L-30"); Adjustable Layer, Material: Glass & Aluminum With Sliding Door, Offer: Screen Sliding Door To Prevent Moisture 24 204 Pc Food Tray With Glass And Stainless Lid/cover, Stainless Body, Rubberized Stand 32x28x10cm 25 12 Pc Food Tray, Flat, Stainless, 60x40x2cm, Depth: 2cm 26 2 Unit Freezer Chest Type, Gross / Net Volume 10.6 Cu.ft. (10 Liters) / 10.1 Cu.ft. (286 Liters), Functionality 3-in-1 Function – Chilling | Freezing | Fast Freezing, Defrosting System: Manual Defrost, Evaporator:aluminum Defrost,led: 6 Led’s, P:2w, Lamp Life: Min. 50,000 Hours, Weight 40 Kg, Dimensions L 63 X W 111.4 X H 84.7 (cm), Key Features: Inverter Compressor, Sliding Glass Door, Embossed Door & Cabinet, Recessed Side Handle (left & Right), Led Light, Removable Gasket , 1x Basket Wire Shelf, 4x Roller Wheel 27 5 Pc Fruit Crate Plastic 21 X 15 X 12 Inches, Heavy Duty Plastic Material, Color : Black 28 37 Pc Frying Pan 14" In Diameter, Cast Iron 29 4 Unit Gas Range, Approx. 55-70cm (l) X 50-60cm (w) X 86-93cm (h); 4-gas Burner; 62l Gas Oven; Button Ignition; Top Glass Lid; Net Weight: Maximum Of 28kg; Pan Support: Light Cast Iron Pan Support 30 1 Box Gloves; 100pcs; Food Grade; Size: Medium(7.5cm); Thermoplastic Elastomer(tpe) Material 31 23 Pc Hairnet With Cap; White; Nylon; Washable 32 1 Unit Industrial Oven Stainless Steel, With Wall Insulator To Minimize Penetration Of Heat To The Walls, With Temperature Gauge, Approx. Outer Dimension: 46.5 X 23.5 X 30 Inches; Oven Stand/rack Is Made Of Metal With Rollers And Braking Systems; Stainless Steel Front Panel, With See Thru Glass; About 4 Inch Thickness Of Walls With 2 Trays Per Deck - 4 Trays Capacity; Gas Type 33 35 Pc Kawa 62 Cm Diameter 18 Cm Height, Aluminum With 2 Aluminum Handles 34 12 Pc Kitchen Apron, Waterproof; Stain Resistant Leather Apron 35 6 Pc Kitchen Scissors, Material: Stainless Steel And Plastic Silicone, Size: 22.5x7.3x1.2cm 36 3 Pc Long Handle Stainless Steel Soup Spoon; Color: Silver; Caliber Length; Approx. 12cm.14cm.16cm.18cm, Handle Length; Approx.45cm(17.72inches) 37 6 Pc Long Wooden Ladle; 14" Stainless Steel 38 58 Set Lpg Tank, 11kg Cylinder With Gas Regulator, 1.8m Hose & Steel Hose Clamp 39 9 Set Measuring Cup (set For Liquid), 1 Measuring Cup With Red Graphics; Made Of Nonporous Glass That Won't Warp, Stain, Or Absorb Odors; Glass Is Preheated Oven, Microwave, Fridge, Freezer & Dishwasher Safe; Dimension: Approx. 7.13" (l) X 6.75" (w) X 4.38" (h); Measuring Capacity: 500ml 40 9 Set Measuring Cups (set For Dry), Smithcraft Stainless Steel Measuring Cups Set Have 8 Cups.the Sizes Are: 1 Cup (240ml), 3/4 Cup (180ml), 2/3 Cup (160ml), 1/2 Cup (120ml), 1/3 Cup (80ml), 1/4 Cup (60ml), 1/8 Cup (30ml), 1/16 Cup (15ml),1 Locking Ring. 41 6 Unit Mini Electric Fan 7.5" - With Base 10'' 69hz 20w (for Bbq), Non-adjustable Height; Any Color; Electric Powered Fan; 3 Blade 42 21 Pc Mixing Bowl Medium, Approx. Diameter: 28cm, Height:11.2cm; Material: Stainless; Capacity: Atleast 4l 43 200 Pc Monoblock Chair Front:monoblock Chair, Front Legs Distance: 355mm Width Seat, With Backrest, Color: Beige, Seat Width :375 Mm, Deapth: 330 Mm, Side Legs Distance Left: 378 Mm, Side Legs Distance Right 378 Mm, Back Legs Distance: 210 Mm, Back Rest Height:779 Mm, Set Back Height: 405 Mm, Seat Height: 376 Mm, Gross Weight: 2.25 Kgs 44 54 Pc Monoblock Table, 36x36 Inches, H- 28 Inches, Color: Beige, Atleast 3mm Thick 45 2 Pc Non-slip Rectangular Chopping Board; Materials:polypropylene Plastic; Approx Length: 40cm; Width: 25cm; Thickness: 0.5cm; Color : White 46 45 Pc Palamigan Container W/ Gripo 15l, Dimension: 31.8x23.8x48.5cm, Material: High Quality Durable Plastic 47 1 Unit Pressure Cooker 50 Liters Capacity, Aluminum Alloy Material, Pressure: 90kpa, Dimension: 44cm Diameter X 47cm Height 48 40 Pc Round Glass Jars With Lid, 220ml 49 41 Pc Sandok, Stainless Steel, 24.7" Length, With Wooden Handle 50 33 Pc Sandok, Stainless Steel, Length: 14" 51 39 Pc Shansi, Stainless Steel, Length: 14" 52 9 Pc Stainless Steel Dough Cutter Scraper Baking Smoother Cake , Approx. Size: 14-15cm (l) X 11.5-12cm (w) And 22cm (h); Material: Stainless Steel 53 41 Pc Stainless Steel Food Tong 14" Length 54 5 Unit Steamer; Aluminum; About 16"/42cm Diameter; 3 Layers With Cover; With Handle Per Layer 55 3 Unit Vacuum Sealer Machine, 220v, 90w, Sealing Width: 270mm, Power Supply: Ac100-240v/50-60hz, Temperature Control Range: 170-210 Celsius, Abs Material, Size: 370*75*50 (mm) 56 15 Pack Vacuum Sealer Storage Pouches | Bpa Free, Commercial Grade For Food Storage & Sous Vides, Size: 17 X 25cm Material: Plastic, 100pcs/pack 57 27 Pc Water Jug/dispenser With Faucet, 5 Gallons, 20 Liters, Color: Blue, Durable And High Quality Plastic Material 58 7 Unit Weighing Scale; Analog; 20kg Capacity; Approx. Dimensions: 6-7" (l); 8-9" (w); 10-11" (h); Dual Unit (kg And Pounds) 59 2 Pc Wide Mouth Funnel, Stainless Steel, Top Opening: At Least 17 X 5.5 X 6cm, Bottom Opening: At Least 13 X 3.7 X 4cm 60 8 Pc Wire Whisk, Large, Stainless, Approx. 14-15" (l) Lot 3 - Fabrication Of Food Cart 1 7 Unit Bicycle With Sidecar: Bicycle Specifications: Bmx Type Bike (frame 1//2 Gi Hd, Rim Set Front X 10 G Wide Jap Hub, Rim Set Rear X 10g Wide Jap Hub, Tire 20 X 2.125 Jumbo, Tube 20 X 2.125, Handle Bar Painted Black, Fork Ex-900 Landing Gear Cp, Head Parts Nikyo/whw, H-post Bmx Ord.m, H-grip Ord. Opc Parts Neco Bearing Type, Opc Plate 36t, Chain Cp Bmx, Freewheel 24t, Pedal Opc Bearing Type, Seat Clamp/s-pin/ S-post P, Saddle With Spring, Footbreak With Spring "full Size" Frame, 175-180mm Cranks Side Car With Provision Of Umbrella And 2 Chest Coolers (52l Capacity) - Dimensions: 25.8" (l) X 16.2" (w) X 15.7" (h) Materials: 1/2 J1 Pipe 540, 316 X 1 Flat Square Bar, J1 Pipe De Una 520, 1/4 X 2 Flat Bar, 6203 Gi Set, Tire 20 X 2.125 Jumbo, Note: With Dole, Dilp Logo Fully Painted In A Galvanized Sheet Iron Attached On The Front Of The Sidecar With Approx. 15.7 Inches(h)x15.7 Inches(l) Fully Painted Color: Any Color 2 1 Unit Motorcycle Sidecar (for Fruits And Vegetable Vending): Metal Body, Dimensions L-4ft W-2ft H-2ft, With 17inch Side Wheel 3 11 Unit Negocart With Bicycle Roofing Materials: Bolt & Nut W/ Washer 3/16 X 1 Polycarbonate 6mm X 1.2 X 1.70 Welding Rod Body Materials:tubular 1 X 1 X 1.5;flat Bar 1/8 X 1;flat Bar 2' X 3/8 X 1;plain G.i.;sheet 4' X 8' #26;cylindrical Hinge 1/2" ᴓ;blind Rivets 1/8 X 1/2;cylindrical 1/2;cabinet Handle;cabinet Lock;round Bar 8mm ᴓ;transparents Barrier 1/4 X 4' X 8';welding Rod;stainless Sheet 4' X 8';plain Round Bar 16mm ᴓ: Bicycle Specs: Bmx Type Bike Frame, Front And Rear Free Wheel Hub For Rim Set Single Speed (wheel Set), Tire Size (20"x2.125 Jumbo), Interior Tube (20"x2.125), Bmx Handle Bar, Bmx Fork, Head Parts (h Post, Handle Grip), Chain (single Speed), Pedal (bearing Type), Seat Clamp, Saddle With Spring, Foot Brake (clamp W/ Spring), Crank Pedals (175mm-180mm Cranks) Note: With Dole, Dilp Logo And Tourism Spot At The Front And Side Of Cart, Logo Material: Weather Proof Sticker, Sizes Of Sticker: H-60cm X W-130cm (for Front Of Cart) And H-60cm X W:75cm (for Side Of Cart) Or H-23.6" X W-51" And H-23.6" X W-29.5" Fully Painted Color: Light Blue Lot 4 - Grooming Tools 1 1 Pc All Purpose Comb, 7inch, Plastic Material 2 3 Pc Barber Apron, With Two Pockets, Waterproof, Material: Fiber Size: Approximately 89x69cm - 35x27.2 Inches 3 1 Pc Barber Cape, 140cmx100cm Silk, Waterproof 4 1 Unit Barber Chair, Reclining, Modern Style, Chair Back Height: High-back; Upholstery: Faux Leather; Material: Stainless Steel; Dimension: 21"x22.5"x38" 5 1 Unit Clipper, Cordless, Includes 3 Metal Clip Attachment Comb Cutting Guides, 1/16", 1/8",3/16, 6.25 Inches And Weighs 13 Oz, Equipped With A 2191 Adjustable 0000 Blade 6 2 Unit Curling Iron, 38.5cm, Tourmaline Ceramic, 25-39w, 360 Degree Rotatable 7 2 Set Eyebrow Grooming Kit, 6pcs (2 Eyebrow Razor, 1 Facial Razor, 1 Brush, 1 Scissors, 1 Tweezer) 8 1 Pc Fade Brush, Material: Plastic & Nylon, (hxw) 12.3 X 2.3 Cm, Weight: 0.015 Kg 9 2 Unit Flat Iron, Ceramic Wide Plate, 100-240v Dual Votage, 40-59w, 27.8cm Long 10 2 Unit Hair Blower, 2 Speed - 3 Heat Settings, 2400w, Removable Filter Cover, Cool Shut Function, Dimension: 21.5x8.5x26.5cm 11 1 Set Hair Clips, Plastic, Size: Approximately 7.8cm 12 2 Set Hair Dying Tool Set, (5-pc) Small Brush - 19.5cmx4.5cm, Big Brush - 20.5x6cm, Secondary Comb - 19x5.5cm, Small Bowl - 13x4.5cm, 1 Pair Of Earmuffs 8x4.5cm 13 3 Pc Hair Shear, 6.9 Inch Stainless 14 10 Pc Hair Towel Turban, 49x18cm Microfiber 15 2 Set Make Up Brush Kit, 12 Pcs With Box 16 2 Set Make Up Kit, 35pcs (1 Eyeshadow, 1 Concealer, 4 Osmetic Brush, 3 Lipgloss, 1 Eyebrow Pencil, 1 Pressed Powder, 4 Lipstick, 4 Face Makeup, 1 Lip Balm, 1 12.5cmx19cm Makeup Bag, 1 Eyebrow Cream, 1 Primer, 1 Powder Puff, 1 Mascara) 17 2 Pc Makeup Kit Organizer, 50cmx39.5cmx21.5cm, Black,046 Glittery, Checkered 18 1 Pc Mirror, Double Sided Folding Mirror, (wxh) 24x 37cm, Weight: 0.532 Kg 19 1 Pc Neck Duster, Weight : 100g , Size : 18x7x7cm 20 1 Roll Neck Strips, (28cmx6.5cm) Self Adhesive, Material: Paper 21 4 Set Plastic Hair Roller, 25mm Assorted, 10-pc Large 22 3 Pc Pomade, 80g, Water-based 23 1 Pack Razor Blades, Durable, Stainless, 100 Pcs, (lxwxh) 14x10x1 24 1 Set Shaver, Abs Material,110-220v, Power: 3w, Size: 16.6x5.8cm, Battery Capacity: 600mah 25 2 Pc Shaving Gel, 195g With Aloe 26 2 Pc Talc Powder, 500g 27 1 Set Trimmer, Rechargable, 2 Blades, Power: 50-60 Hz, Voltage:100-240v, Dimension: 11.5x6.5x3cm 28 4 Pc Wide-tooth Comb, 16cm Plastic, Durable 29 1 Pc Wide-tooth Comb, Size: Approximately 21.5x5 Cm, Plastic Material Lot 5 - Sewing 1 7 Set Ball Point Pins, 250 Pcs Per Box With 8 Colors; Durable 2 8 Unit Bobbin Case, Diameter: 20.3mm Width: 11.7mm 3 8 Pc Bobbin, Diameter: 20.3mm Width: 11.7mm 4 4 Set Dressmaker's Shears, Material: Stainless Steel; Item Dimensions: Approximately 0.8" (l) X 3.9" (w) X 10" (h); Blade Length: 8"; Item Weight: Approximately 8.8 Ounces 5 1 Pc Edging/ Overlock Sewing Machine, Metal Material; Overlocker; 1 Stitch; Dimension(lxwxh) 12x13x14 6 3 Pc Electric High Speed Sewing Machine, Power: 90w; Rated Voltage: 220v; Gross Weight: About 7kg; Max Sewing Speed: 1,100 Stiches/min; Materials: Stainless Steel Needle Plate, Metal Frame; Dimensions: Approximately 44cm (l) X 16cm (w) X 28cm (h); Voltage: 220v, Secondary Lifting Height Or Presser Foot: 14mm; Needle Pitch: From 0-4.5mm, Needle Width: From 0-7.0mm 7 4 Pc Flat Iron, 1200w; Stainless Steel Sole Plate; Power Light Indicator; With Steaming/spray Function 8 4 Set French Curve, Dimension(21.65x0.39x7.09); 4.6 Ounce; Made Of Aluminum Or Plastic 9 4 Pc L-square, Material: Stainless; Item Weight: 0.32oz; Product Dimensions: Approx. 14" (l) X 24" (w) 10 1 Pc Manual Sewing Machine With Motor And Foot Controller, Metal Material, Heavy Duty, 9kg Weight, 1 Stitch Dimensions, (lxwxh) 12x13x14 11 4 Unit Meter Stick, Yellow Color; Wood Type 12 4 Pc Needle Threader, Metal Material; Oval Shape; 1 Inch Size 13 31 Pack Sewing Machine Needle, Flat Needles 10pcs/pack 14 11 Pc Sewing Threads 12pcs/box, Material: Cotton; Package Dimensions: Approx. 5.71" (l) X 3.74" (w) X 2.36" (h); Thread Size: Approx. 56mm (h) X 22mm (w); 550 Yards Each Roll 15 25 Pc Tailor’s Chalk, Square Shape; Orange Color;fades Or Brushes Away Easily 16 4 Pc Tape Measure, Material: Durable Soft Plastic; Color: Blue; Measurements: Inches (can Measure Upto 60") And Centimetres (can Measure Upto 150cm) Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 2. Delivery Of The Goods Is Required Ninety (90) Calendar Days Delivery Period And Upon Receipt Of Notice To Proceed And Purchase. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Local Government Unit Of Mercedes, Camarines Norte-bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Office Hours - 8:00 Am-12:00 To 1:00 Pm-5:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 14, 2024 Until 8:30 Am Of January 6, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos Only Php5,000.00. 6. The Local Government Unit Of Mercedes, Camarines Norte Will Hold A Pre-bid Conference On December 23, 2024 9:00am At Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through (i) Manual Submission At The Office Address Indicated Below, On Or Before 8:30am January 6, 2025. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 9:00 Am Of January 6, 2025 At The Bids And Awards Committee Office- Second Floor Jpl Sports Complex - Municipal Compound, Eco Avenue Street, Barangay 5, Mercedes, Camarines Norte. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. 10. The Local Government Unit Of Mercedes, Camarines Norte, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Macario B. Totanes Municipal Planning And Development Office Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0998-576-8321 Arsenia M. Ordiales Bac Secretariat Bids And Awards Committee Office 2nd Floor Jpl Sports Complex, Lgu Mercedes Municipal Compound, Barangay 5, Mercedes, Camarines Norte 0908-896-9684 Email Address: Lgubac.mercedes@yahoo.com 12. You May Visit The Website: For Downloading Of Bidding Documents: Www.mercedes.gov.ph December 13, 2024 ________________________________ Macario B. Totanes Bac Chairman
Closing Date6 Jan 2025
Tender AmountPHP 2.7 Million (USD 46.9 K)
City Of Canlaon Tender
Civil And Construction...+2Building Construction, Construction Material
Philippines
Details: Description Republic Of The Philippines City Of Canlaon Office Of The Bids And Awards Committee Invitation To Bid For The Improvement Of Multi-purpose Building Into 2 Stories Building The Local Government Of Canlaon City, Through The Aip 2024 Intends To Apply The Sum One Million, Two Hundred Seventy-six Thousand, One Hundred Fifty-seven (p1,276,157.00) Being The Abc To Payments Under The Contract For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Multi-purpose Building Into 2 Stories Building, Brgy. Linothangan, Canlaon City. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Local Government Of Canlaon City, Now Invites Bids For The Supply And Delivery Of Various Construction Materials For Use In The Improvement Of Multi-purpose Building Into 2 Stories Building, Brgy. Linothangan, Canlaon City. Delivery Of The Goods Is Required 7 Calendar Days After Issuance And Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Ten Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The 2016 Revised Irr Of Ra No. 9184 Interested Bidders May Obtain Information For The City Government Of Canlaon City Thru The Office Of The Bids And Awards Committee And Inspect Bidding Documents During Office Hours (8:00am To 5:00pm), Monday To Friday. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On December 19, 2024 To January 8, 2025 Until 10:00 Am At The Office Of The Bids And Awards Committee, Canlaon City, And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand (p5,000.00) Pesos. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Facsimile. The Local Government Of Canlaon City Will Hold A Pre-bid Conference On December 26, 2024 – 11:00 Am At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City, Which Shall Be Open To Prospective Bidders Bids Must Be Received By The Bac Secretariat Through Manual Submission On Or Before January 8, 2025, 10:00 Am At The Office Of The Bids And Awards Committee, 2nd Floor, City Hall Building, Canlaon City. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On January 8, 2025, 10:00 Am At The At The Office Of The Bids And Awards Committee 2nd Floor, City Hall Building, Canlaon City. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. For The Purpose Of Constituting A Quorum, Either The Physical And Virtual Presence Of The Bac Member Shall Be Considered Pursuant To Gppb Resolution No. 09-2020. The Local Government Unit Of Canlaon Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Alice D. Mcguiggan Bac Secretariat Mobile No. 0917-561-7931 Email Address: Bacofficelgucanlaon@yahoo.com Date Of Posting: December 18, 2024 Zosilito A. Ongco Bac Vice-chairman Republic Of The Philippines City Of Canlaon Bids And Awards Committee Control No.: #1 Bid Form Name Of Project: Improvement Of Multi-purpose Building Into 2 Stories Building Brief Description: Supply And Delivery Of Various Construction Materials Location: Brgy. Linothangan, Canlaon City Bill Of Quantities Stock No. Quantity Unit Of Issue Item Description Unit Cost Unit Cost Total Cost 1. 2 Kgs. 1 1/2" Concrete Nails 126.00 2. 50 Lgth. 1 1/2" X 1/4" (6mm) Angle Bar 1,219.00 3. 50 Pcs. 1" Gypsum Screw 4.00 4. 6 Lgth. 1" X 3/16" (4.5mm) Angle Bar 472.00 5. 2 Pcs. 1/2"ø Gate Valve 383.00 6. 2 Pcs. 1/2"ø Hdpe Coupling 125.00 7. 4 Pcs. 1/2"ø Hdpe Elbow 125.00 8. 30 Mtrs. 1/2"ø Hdpe Pipe 30.00 9. 8 Lgth. 1/2"ø Pvc Blue Pipe 120.00 10. 8 Pcs. 1/2"ø Pvc Blue Tee 20.00 11. 18 Pcs. 1/2"øx90° Bend Pvc Blue Elbow 15.00 12. 8 Pcs. 1/2"øx90° Bend Pvc Blue Elbow With 1 Side Threaded 20.00 13. 2 Shts. 1/4"x 4' X 8' Opw 580.00 14. 25 Shts. 1/4"x4'x8' Fiber Cement Board 908.00 15. 10 Pcs. 1/8" Ø Drill Bit For Steel 115.00 16. 5 Boxes 1/8" Ø X 1/2" Blind Rivets, 1,000 Pcs/box 552.00 17. 350 Lgth. 10mmø X 6.0m Dsb, G-33 239.00 18. 6 Lgth. 10mmø X 6m Plain Round Bar 239.00 19. 20 Lgth. 11mm X 37mm X 11mm X 1.6mm X 5m Carrying Channel 279.00 20. 60 Pcs. 120 Grit Sand Paper 38.00 21. 4 Pcs. 16" X 8' X 0.4mm Pre-painted Fascia Cover, White 467.00 22. 20 Lgth. 17mm X 49mm X 17mm X 0.6mm X 5m Double Furring 217.00 23. 200 Lgth. 17mm X 49mm X 17mm X 0.6mm X 5m Double Furring 217.00 24. 530 Pcs. 2 1/2" Tekscrew 5.00 25. 2 Pcs. 2" Paint Brush 60.00 26. 6 Lgth. 2"ø Pvc Sanitary Pipe S-1000 420.00 27. 5 Pcs. 2"ø Pvc Sanitary Tee 110.00 28. 16 Pcs. 2"øx90° Bend Pvc Elbow 90.00 29. 25 Lgth. 2"x2"x8ftx0.50mm Thk Wall Angle, Woodgrain Design 250.00 30. 8 Lgth. 2"x3"x6m G.i. Square Tube, G-16 931.00 31. 2 Lgth. 2"x4"x6m (4.5mm) Channel Bar 3,510.00 32. 25 Lgth. 2"x4"x6m G.i. C-purlins, G-16 875.00 33. 4 Pcs. 24" X 8' X 0.4mm Pre-painted Fascia Cover, Brown 700.00 34. 12 Pcs. 24" X 8' X 0.4mm Pre-painted Wall Capping 700.00 35. 2 Kgs. 3" Cwn 95.00 36. 3 Lgth. 3" Ø X 6m G.i. Pipe, Sched 40 3,804.00 37. 3100 Pcs. 4" Chb 18.00 38. 2 Kgs. 4" Cwn 90.00 39. 1 Pc. 4" Diamond Cutting Disc, Tatara 800.00 40. 5 Pcs. 4" Grinding Stone 90.00 41. 5 Pcs. 4" Ø Clean Out With Plug 110.00 42. 6 Pcs. 4" Paint Brush 90.00 43. 2 Pcs. 4" Stainless Steel Floor Drain 500.00 44. 25 Pcs. 4"ø Cutting Disc For Steel 129.00 45. 6 Lgth. 4"ø Pvc Sanitary Pipe S-1000 1,127.00 46. 6 Pcs. 4"ø Pvc Sanitary Tee 204.00 47. 2 Pcs. 4"ø Pvc Sanitary Wye 204.00 48. 8 Pcs. 4"øx90° Bend Pvc Elbow 80.00 49. 2 Pcs. 4"x2"ø Pvc Bushing Reducer 50.00 50. 2 Pcs. 4"x2"ø Pvc Sanitary Tee 204.00 51. 4 Pcs. 5" Putty Knife 150.00 52. 5 Pcs. 5/32 Ø Drill Bit For Steel 115.00 53. 2 Boxes 5/32 Ø X 1/2" Blind Rivets, 1000 Pcs 552.00 54. 10 Pcs. 5/32" Ø Drill Bit For Steel 115.00 55. 5 Boxes 5/32" Ø X 3/4" Blind Rivets, 1,000 Pcs/box 552.00 56. 68.80 Lm. 6 Shts - 10.50m X 1092mm X 25mm X 0.50mm Thk. Dn Rib 25 Straight Panel, Brown 600.00 57. 6 Pcs. 7" Paint Roller With Tray 210.00 58. 6 Pcs. 7" Paint Roller With Tray 210.00 59. 60 Pcs. 80 Grit Sand Paper 50.00 60. 20 Pack Abc Tile Grout, 2kg./pack, Grey 165.00 61. 4 Sets Acu Outlet With Ground, 1 Gang 350.00 62. 3 Lgth. Aluminum Stair Nosing Step Trim, Silver 620.00 63. 4 Pcs. Bolt, 1/2"ɸ X 6", B.i., Full Thread With Nut And Washer 85.00 64. 15 Tubes Builders Bond Construction Adhessive, 300ml Cartridge 300.00 65. 24 Gals. Buildrite, Sapal Rtu, Grey 1,840.00 66. 4 Gals. Buildrite, Sapal Rtu, White 1,840.00 67. 100 Pcs Cable Ties, 8 X 300 Mm 12.00 68. 1 Pc. Caulking Gun 320.00 69. 2 Sets Cluster Hanger 2,000.00 70. 15 M. Conductor Wire, 22.0 Mm² Tw, For Grounding 50.00 71. 400 M. Conductor Wire, 3.5mm² Thw, Cu. 52.00 72. 40 M. Conductor Wire, 30.0mm² Thw, Cu. 150.00 73. 100 M. Conductor Wire, 5.5mm² Thw, Cu. 101.00 74. 10 Pcs Conduit Clamp, 40mmɸ Upvc, Orange Color W/ Concrete Nail 6.00 75. 15 Pcs Conduit Elbow, 20mm ɸ Upvc 90 Deg Long Radius, Thick Walled, Orange Color 29.00 76. 10 Pcs Conduit Elbow, 32mm ɸ Upvc 90 Deg Long Radius, Thick Walled, Orange Color 38.00 77. 25 Lgths Conduit Pipe 20mm ɸ X 10' Upvc, Thick Walled, Orange Color 149.50 78. 5 Lgths Conduit Pipe 32mm ɸ X 10' Upvc, Thick Walled, Orange Color 201.50 79. 1 Lngth Conduit Pipe, 40mm ɸ X 3m', Rsc 1,150.00 80. 1 Pc. Connector Ground Rod For ⅝"ɸ, Galv. 102.00 81. 5 Pcs Connector, Compression, Parallel #100 150.00 82. 1 Pc Connector, Hot Line Clamp, 3/0-6 550.00 83. 14 Sets Convenience Outlet, Duplex, Universal, Flush Type 197.00 84. 1 Set Convenience Outlet, Duplex, Universal, Flush Type, Floor Type, Pop-out 3,500.00 85. 4 Cu.m. Crushed Stone, G-¾ 2,378.00 86. 1 Set Cut-out And Arrester Combination, H.d.,100a With Mounting Bracket 9,000.00 87. 2 Sets Duplex Switch, Flush Type 350.00 88. 80 Kgs. E6013 Welding Electrode 175.00 89. 6 Tubes Elasto Seal Pioneer, 300ml 450.00 90. 5 Rolls Electrical Tape, (0.16mm X 19mm X 16yrds), Plastic 75.00 91. 1 Pc Entrance Cap, 40mm ɸ, Rsc 190.00 92. 36 Pcs. Espana Premium 30x60 Rcm Gray 140.00 93. 6 Rolls Fibergalss Mesh Tape 2"x30m 50.00 94. 23 Cu.m. Fined Sand 1,350.00 95. 100 M. Flexible Conduit Pipe, 20mmɸ Upvc, Coilable, Orange Color 25.00 96. 10 M. Flexible Conduit Pipe, 40mm ɸ Upvc, Orange Color, Coilable 113.00 97. 53 Kgs. G.i. Tie Wire G.a. 16 103.00 98. 1 Lngth Ground Rod, ⅝" ɸ X 10' , Galv. Steel 933.00 99. 60 Bags Heavy Duty Tile Adhesive, 25kg./bag 550.00 100. 50 Kgs. Island Patching Compound 50.00 101. 15 Bags Island Super Kinis Skim Coat, 20kg, White 580.00 102. 25 Bags Island Super Kinis Skim Coat, 20kg, White 580.00 103. 48 Pcs. Italgres Premium 60x60 Marble Dk. Brown 250.00 104. 134 Pcs. Italgres Premium 60x60 Terrazo Gray 250.00 105. 40 Pcs. Junction Box, 4" X 4" Upvc, Orange Color W/ Cover And Screws 54.00 106. 1 Assy. Kwh-meter, Socket Connected, Ringless Tupe, Class 200, Fm 1s, 2-wire, Kv2c, 240 With Meter Base 30,000.00 107. 6 Gals. Lacquer Thinner 782.00 108. 30 Pcs Led Bulb (12w) 250.00 109. 2 Pcs Led Wall Mounted Outdoor Lamp, 8w 1,500.00 110. 1 Pc. Lenox Blade 125.00 111. 12 Lgth. Master Tile Trim, 10mm X 2.5m Aluminum, Silver 185.00 112. 24 Gals. Mcs-6101 Cloudy Gray, Semi-gloss 1,050.00 113. 6 Pcs Modern Ceiling/center Lamp, Dimmable Completw With Remote, 30w 3,500.00 114. 27 Lgth. Moulding Polywood 15x70x2400mm, Oakwood Design 450.00 115. 2 Pcs Outdoor Celing Surfaced Lamp For Balcony/terrace 1,500.00 116. 1 Assy. Panel Board, 100at/125af, Bolt-on, 240v, Complete With 2-15at, 2-20at, 5-30at, 10 Holes Bolt-on Branch Circuits 35,000.00 117. 8 Gals. Pioneer Epoxy Primer With Catalyst, Gray 1,500.00 118. 4 Gals. Pioneer Epoxy Primer With Catalyst, White 1,500.00 119. 2 Liters Pioneer Pro Concrete Epoxy A & B 1,800.00 120. 128 Pcs. Platinum Thomson 30x60 Grey 140.00 121. 100 Pcs Polyflex Hose Connector For Flexible Pipe 20mm ɸ 12.00 122. 320 Bags Portland Cement, 40kg/bag, Type I 287.00 123. 29 Gals. Prima Primer 301, White 1,050.00 124. 2 Pcs. Pull Box, 12" X 12" X 6" Depth, Melamine Coated W/ Cover 1,100.00 125. 1 Pc Pvc Pipe Cement, 100cc 100.00 126. 7 Cans Pvc Solvent, 200ml 110.00 127. 1 Gal. Qde, Black 1,251.00 128. 4 Gals. Qde, Dv-470 Silver Aluminum 1,251.00 129. 14 Lm. Rib Type Spandrel, 84 Pcs. 0.15m X 1.10m X 0.40mm Thk., Woodgrain Design 160.00 130. 1 Pc. Rubber Mallet 350.00 131. 6 Gals. Rust Converter 948.00 132. 2 Sets Secondary Rack With Sool Insulator 1-3/4" Dia, Groove, Brown Porcelain Hd 400.00 133. 7 Gals. Semi-gloss Paint, Prima Sg 300sg White 1,050.00 134. 50 M. Service Drop Wire, 22.0mm², Duplex, All Aluminum 48.00 135. 4 Sets Single Pole Switch, Flush Type, Anam Or Equivalent 148.00 136. 1 Pc. Spurtar 6" Stainless Steel Vernier Caliper 2,000.00 137. 5 Pcs Square Box 5x5, Wut-005, 12.5x12.5x5.2 Cm 150.00 138. 2 Pcs. Stainlees Steel Faucet (shark) 500.00 139. 1 Gal. Stickwell Glue 980.00 140. 2 Gals. Super Thoroseal 1,000.00 141. 15 Pcs Surface Mounted Round Downlight Light Fixture, 4'' Dia X 220mm Height, E27 Holder, Black, Recessed Type 350.00 142. 15 Pcs Surface Mounted Round Downlight Light Fixture, 4'' Dia X 220mm Height, E27 Holder, Black, Surfaced Type 350.00 143. 3 Pcs. Terminal Lug, Sa 135, Solderless 196.00 144. 1 Kg Tie Wire #4 Solid 102.00 145. 1 Pc Transformer, Distribution, 7620/240v., 25 Kva Single Phase 130,000.00 146. 2 Sets Triplex Switch, Flush Type 369.00 147. 5 Pcs Utility Box, 2"x 4" Metal, Heavy Duty 65.00 148. 20 Pcs. Utility Box, 2"x 4" Upvc, Orange Color 32.00 149. 3 Cu.m. Washed Sand 1,750.00 150. 2 Units Water Closet & Wall Hung Lavatory W/ Complete Accessories (lafonza Salerno Package "b") 18,000.00 151. 200 Pcs. W-clip / Double Furring Clip 18.00 Total Brand Model:_____________ Delivery Period:______________________ Warranty: After Having Carefully Read & Accepted Your General Conditions. I/we Quote On The Item/s Price/s Noted Above. Total Bid Price (in Words) Bid Security: Amount: Submitted By: Bidder/supplier Date:_________________________
Closing Date8 Jan 2025
Tender AmountPHP 1.2 Million (USD 21.9 K)
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.43|wwv|717-605-3992|noelle.m.smith10.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C & Section E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version (jun 2002)|8|x||x||||||
general Information-fob-destination|1|a|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)||tbd|n00104|tbd|tbd|n50286|tbd|||n/a||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contract|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (jan2023))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (dec 2022))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|334513|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Small Business Set Aside Is Dissolved.
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 8 January 2025.
the Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 06 March 2024
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited Inthe Mail, Transmitted By Facsimile,
Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Here In.
3.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (186 Days)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(b); Applies To This Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-std-1330 | | |e |220516|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-p-24212 | | |c |980421|a| 2| |
document Ref Data=qpl 24212 | | |32 |060308|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
3. Requirements
3.1 ;the Transducer, Motional Must Be Manufactured In Accordance With Specification Mil-p-24212, Type Designation Pgt-gp-4500-g-4, Except As Amplified Or Modified Herein.;
3.1.1 ;each Transducer Must Be Furnished With A Receptacle Having Type Normal Keying In Accordance With Ms3102r14s-5p Vice Ms3102r14s-5px Specified By Mil-p-24212c Section 3.5.14.2.;
3.1.2 ;each Transducer Must Be Furnished With A Protective Plug In Lieu Of Mating Plug Specified By Mil-p-24212c Sections 3.5.14 And 3.5.14.2.;
3.2 Oxygen Cleaning - This Material Must Be Cleaned, Tested, Packaged & Labeled By Trained Personnel And Procedures In Accordance With Mil-std-1330, General.
3.3 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.4 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.4.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.4.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.4.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.4.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s).
3.5 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.6 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.6.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.6.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.6.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Deep Submergence Systems Program (dssp) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco)
prior To Award Of Any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At Navicp-mech May Request The Pco Waive This Requirement.
3.6.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.6.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.7 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved
and Rejected And The Nature Of Corrective Action Taken As Appropriate.
3.7.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.7.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions
provided By The Government Representative.
3.8 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured/performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization Of
the Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being Purchased.
when The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon Receipt Of
this Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract
management Agency (dcma) Office. In The Event That A Local Government Representative Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.9 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.9.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.9.2 Inspection For Completeness And Proper Type.
3.9.3 Verification Of Material Quality Received.
3.9.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.9.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.9.6 Identification And Protection From Improper Use Or Disposition.
3.9.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.9.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.9.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.10 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Dssp Systems, It Is Imperative That Traceability Be Maintained From The Material To All Required Objective Quality Evidence (oqe).
3.10.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified Elsewhere In The Contract/purchase Order.
3.11 Material Traceability - Traceability Markings Must Be Permanently Applied To The Material In Accordance With Mil-std-792 Or To A Tag Affixed To The Material, And Annotated On The Required Oqe. The Traceability Marking May Be Any Vendor Traceability
number/code Which Provides Complete Traceability To The Required Oqe. Traceability Marking/identification May Include Such Items As Nomenclature, Part Number, Technical Description, National Stock Number (nsn), Etc. Traceability Must Be Maintained Through All
process Operations Including Any Subcontracted Operations, To The Finished Component.
3.11.1 When Traceability Markings On The Material Would Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical,
an Appropriate Material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed.
the Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Material Or Loss Of Traceability. The Traceability Marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.11.2 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings On The Material, Purchase Or Work Orders Must Specify A
method And Marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.12 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.12.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.12.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.12.3 All Oqe Required By The Contract And All Data Concerning Material Traceability (oqe To Traceability Marking) Must Be 100% Inspected. The Certification Test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.13 Test Certification - When Test Certifications Are Required Elsewhere In The Contract, Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True"
are Not Acceptable.
3.13.1 If Material Is Received Without The Required Test Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.14 See Cdrl Di-ndti-80603a - Cleaning - Prior To Performing Any Cleaning, The Applicable Cleaning Procedure Must Be Submitted For Review And Approval. If The Contractor's Cleaning Procedure Has Previously Been Approved By Navsea For This Or Other
contracts, A Copy Of The Original Approval Letter Must Be Submitted In Lieu Of The Actual Procedure.
3.14.1 When Cleaning Is Performed By A Subcontractor, The Requirements For Submission Of All Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.15 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address, Phone Number And Date.
2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 012345678 D4) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds. ("n/a" When Not Applicable).
5. Cure Date ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement For Any Hull, Mechanical And Electrical (hm&e) Testing Required That Include The Name Of The Test And That It Was Performed Satisfactorily. If No Hm&e Testing Is Required, The Statement Should Read "hull, Mechanical And Electrical (hm&e) Testing
n/a."
9. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.15.1 For Connectors, Cables, And Junction Boxes Procured To Eb Specs S-5343934-1, S-5343934-2, S-5343934-3, Or Dry Deck Shelter Specification S-5486639-1, The Certificate Of Compliance Must Also Include The Information Below:
11. A Notation That 32 Root Mean Square (rms) Finishes Are In Accordance With The Specifications And Are Free Of Imperfections.
12. Direct Reading Of O-ring Surface Diameters With Specified Standard.
3.15.2 For Self-locking Hex Nuts Procured To Nasm 25027, The Certificate Of Compliance Must Also Include The Information Below:
13. A Statement To The Effect That Qualification Testing In Accordance With Nasm 25027 Paragraph 3.2 Is Satisfactorily Performed.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 14 2008 - Mil-std-1330 Cleaning Procedures Required
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 12 - Within 60 Days After Contract Award And Prior To Performing Any Cleaning, Submit One Copy To The Pco.
note: If This Procedure Has Been Previously Approved By Navsea, Submittal Of The Original Approval Letter In Lieu Of The Procedure Is Acceptable.
the Review (approval/disapproval) Must Be Within 60 Days From Date Of Receipt.
Closing Date8 Jan 2025
Tender AmountRefer Documents
1631-1640 of 1643 archived Tenders