Cable Tenders
Cable Tenders
Cern Tender
Electrical Cables And Wires...+1Electrical and Electronics
United Kingdom
Description: Project Title:supply Of Braiding Of Woven Mineral Insulation Over Cern Superconducting Cables
Closing Date5 Jul 2025
Tender AmountGBP 750 K (USD 926.4 K)
Cern Tender
Electrical Cables And Wires...+1Electrical and Electronics
United Kingdom
Description: Project Title:supply Of Braiding Of Woven Mineral Insulation Over Cern Superconducting Cables
Closing Date4 Jul 2025
Tender AmountGBP 750 K (USD 926.4 K)
Cern Tender
Electrical Cables And Wires...+1Electrical and Electronics
United Kingdom
Description: Project Title:supply Of Braiding Of Woven Mineral Insulation Over Cern Superconducting Cables
Closing Date4 Jul 2025
Tender AmountGBP 750 K (USD 926.4 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Electrical Cables And Wires...+1Electrical and Electronics
Corrigendum : Closing Date Modified
United States
Details: Introduction: The Department Of Veterans Affairs (va), Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Anticipates Soliciting Proposals And Subsequently Awarding A Single Firm-fixed-price Contract For The Construction Of The Electronic Health Record Modernization (ehrm) Infrastructure Upgrades At The Loch Raven (vamc) Located At 3901 The Alameda, Baltimore, Md 21218. Project Description: The Loch Raven Vamc Is Seeking A General Contractor To Facilitate A Construction Project To Upgrade The Ehrm Infrastructure Within 5 (five) Buildings Amongst The Loch Raven Campus. The General Contractor (gc) Will Be Responsible For All Facets Of Construction Management And Construction Work And The Management Of Subcontractors To Facilitate A Construction Project To Upgrade The Facility Infrastructure To Support The New Ehrma System In Accordance With Va Oehrm Site Infrastructure Requirements As Per The Construction Documents. Work Will Include But Is Not Limited To The Following: Project Building Locations For Work Include But Not Limited To Buildings 1,2,5,7, And 14. Construct New Telecommunication Room (tr) Additions At Buildings 1 And 5. The Scope Of This Project Includes But Not Limited To The Following Infrastructure Improvements: Period Of Performance Is Approximately 540 Calendar Days From The Issuance Of The Notice To Proceed. All Parties To Attend A Mockup Transition Prior To Activation Of New Tr Room(s) And Renovation Of Existing Server Room To A Computer Room. Creation, Expansion, And Renovation Of New Trs In All Occupied Buildings As Listed In Drawing. Installation Of Telecommunication Enclosures In Utility Buildings. Includes But Is Not Limited To Hazardous Material Removal, Demolition (including Significant Rework Of Existing Plumbing), Physical Security Upgrades, Mechanical Equipment, Electrical Panels, Fire Suppression Changes, New Construction, And Finishes. Gc Is Responsible For Off Hour Work To Bring Online Each Tr Room Per Va Activation Schedule Estimated To Be 1 (one) Tr Room Per Evening Over A 60 (sixty) Workday Period. Gc Is Responsible For Providing Telecommunication Technicians And Materials To Provide The Connection From The Punch Down Panel To The Switch. This Work Will Be Overseen And Coordinated With The Va Oit. Telecommunication Technicians Must Also Complete The Work Area Outlets Dedicated To Each Tr Room Within The Same Modification Of Existing Server Room To A Computer Room (basement Of Building 01) Including But Not Limited To Demolition, Site Prep, Foundations, New Construction, Finishes, Physical Security Upgrades, Emergency Generator, Transformers, Fire Protection And Suppression System. Communication Infrastructure (new Data Outlets, Patch Panes, Upgrade To Cat 6a Cable(s), Ups, Electrical Panel Additions), Physical Security Upgrades, Upgrade Fiber Infrastructure Backbone Campus Wide Within Buildings And Between Buildings. Every Data Outlet, Building Management System Network Outlet, Centrix/real Time Location System Outlets, Wireless Access Point, Device That Accesses The Network Will Be Refed To New Tr Room(s) And With Category 6a Cable(s) In Organize Cable Management System. Small Renovations As Noted On The Drawings To Replace Required Services Displaced By New Trs Which Include Bathrooms And Break Room(s). Remove All Abandoned Components And Systems Found Or Made By This Work. Repair All Areas Demolished Or Damaged By This Work Including Every Data Outlet Location, Thru Wall Conduits, Etc. Abandoned Tr Rooms, Abandoned Server And Telephone Rooms Will Be Renovated For Usage As Shown On Drawings. Install Diversified Path To Datacenter For Wide Area Network (wan). Site Wide Excavation And Preparation For Large Duct Banks. Coordination With Other Underground Utilities Including Water, Sewer, Electrical, And Steam. Site Work (demolition, Excavation, Road Patching, Sanitary And Water Line Replacement, Etc.). Hazardous Material Abatement. Switch Gear. Administrative: The Solicitation Will Be Issued As A Request For Proposal (rfp) Conducted In Accordance With Far Parts 15, 19 And 36 And Will Be Evaluated In Accordance With The Lowest Price Technically Acceptable (lpta) Procedures Listed In The Solicitation. The Solicitation Will Be Advertised As A Total Service-disabled Veteran-owned Small Business (sdvosb) Set-aside. Offers Received From Other Than Sdvosb Concerns Will Not Be Considered. The Applicable North American Industry Classification System (naics) Code Is 236220 With A Size Standard Of $45 Million. The Solicitation Is Anticipated To Be Issued In August 2024.the Period Of Performance Is Approximately 540 Calendar Days From The Issuance Of The Notice To Proceed. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $10,000,000 And $20,000,000. This Notice Is Not A Request For Competitive Offers. All Questions Must Be Submitted In Writing To The Issuing Office Via Email To: Melissa.waddell@va.gov. Telephone Calls Will Not Be Accepted.
Closing Soon3 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance Of Supplies|26|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|combo Receiving Report And Invoice|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|335931|600||||||||||||
type Of Contract (apr 1984)|1|ffp|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
the Purpose Of This Amendment Is To Increase Qty From 9 Ea To 13 Ea.
no Other Changes Are Made At This Time.
\
the Purpose Of This Amendment Is To Exend Proposal Due Date To 19 Feb 2025.
all Other Terms And Conditions Remain Unchanged.
\
the Purpose Of This Amendment Is To Extend Proposal Due Date To 20 Dec 2024.
no Other Changes Are Made At This Time.
\
please Provide Price As Firm-fixed Price With All Costs Associated With Production Or Procurement Of New Units.
please Note, The Quote Must Agree To Government Source Inspection (gsi) And Commercial Asset Visibility (cav) Reporting.
any Proposal From An Other-than-small Business With A Value Over $750,000.00 Must Include A Subcontracting Plan To Be Approved Prior To Being Considered Responsive.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes A Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
poc: Amber Wale
poc Tel: (717-605-2541)
poc Email: Amber.l.wale.civ@us.navy.mil
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Tow Cable,littoral .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order,
however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
document Ref Data=mil-std-129 | | |r |190927|a| |03|
document Ref Data=iso9001 | | | |010417|a| | |
3. Requirements
3.1 Cage Code/reference Number Items - The Tow Cable,littoral Furnished Under This
contract/purchase Order Shall Be The Design Represented By Cage Code(s)
reference Number(s). Cage _______ Ref. No.
;3b3g2 K939060500;
3.2 Marking - This Item Shall Be Physically Identified In Accordance
with ;mil-std-129; .
3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Spcc Contracting Officer Has Been Notified And
approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The
substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Or A Detailed Description Of The Change, Explaining The Reason Therefore. If Finished Detail Drawings Are Not Available, Shop Drawings Inthe Form Used By The Manufacturer
will Be Acceptable For Government Evaluation. When Notifying The Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements:
code 1: Part Number Change/minor Design Change - If The Manufacturer's Part Number Or Item Design Indicated Thereon Has Changed, But Form, Fit And Function Of The Item Is Not Affected Thereby, And The Design Change Meets The Criteria For Minor, By Not
effecting Form, Fit, Function, Reliability Or Safety , Supply The Item And Advise Spcc Immediately Of The New Part Number, Furnishing A Detail Drawing And/or A Detailed Description Of The Change, As Applicable.
code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts.
code 3: Part Not Furnished Separately - Use Assembly.
code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable.
code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace
New.
code 6: Part Redesigned - Parts Not Interchangeable.
3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material
will Be Cause For Rejection.
If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The
contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting
officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part.
The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of
contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are
located So As Not To Constitute A Contamination Hazard.
If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A
polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The
requirements Of This Contract Are Concerned.
These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements.
Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided:
Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A
component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface
ship Atmosphere.
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001.
4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To
mil-i-45208 Are Granted Permission To Utilize Mil-i-45208 If Desired.;
4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During
the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of
this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea
Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical
Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
Closing Date19 Feb 2025
Tender AmountRefer Documents
DEPT OF THE ARMY USA Tender
Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
United States
Details: Am-0007 - Revised Proposal Due Date // Am-0006 - Updated Wage Determination And Revised Proposal Due Date // Am-0005 - Updated Wage Determination And Revised Proposal Due Date // Am-0004 - Updated Specifications/drawings, Updated Wage Determination And Revised Proposal Due Date // Am-0003 - Updated Drawings/specifications And Revised Proposal Due Date // Am-0002 - Updated Drawings/specifications, Revised Div 00 22 00, Updated Wage Determination, And Revised Proposal Due Date // Am-0001 - Updated Drawings And Site Visit Sign-in Sheet // This Project Will Replace End Of Life Cable And Switchgear Considered To Be At The End Of Their Useful Life And Install A Redundant, New Backup Commercial Power Feed Of Same Capacity To The Pl-1, Which Will Improve Resiliency By Creating The Redundancy Mandated By Uptime Institute (uti) Tier Iv Standards In Accordance With (iaw) Paragraph 12 Of Afi 32-1062, Afspc Supplement. This Project Will Also Eliminate Several Existing High Risks, Single Points Of Failure, Any One Of Which May Cause Lengthy Risk To Mission Reliability. Listed Below Are Goals For The Project:1. Install A New External Ato Feed Line For The Replacement And Redundant Feeder Line To Connect To Inside The Pl-1 Area. Will Need To Source Work With Local Power Utility (xcel).2. Replace The Primary Power Feed Line Inside The Pl-1 Area3. Provide New Redundant Power Feed Line To The Pl-1 Area.4. Provide New Ato-type Switchgear Lineups5. Demolish The Existing Igloo Switchgear Area.6. Remove The Existing Primary Power Feed Line Inside The Pl-1 Area
Closing Soon31 Jan 2025
Tender AmountRefer Documents
TenneT TSO Tender
Software and IT Solutions...+2Electrical Cables And Wires, Electrical and Electronics
Netherlands
Description: Market Consultation Cable Monitoring System For 2gw Projects
Closing Date23 Jun 2025
Tender AmountRefer Documents
Delhi Metro Rail Corporation - DMRC Tender
Auction
Scraps
Ireps
Corrigendum : Closing Date Modified
India
Description: Mixed Copper Scrap Items Consisting Of: Copper Jumper Wire 95 Sqm,insulated Copper Wire 25 Kv Cable,discharge Rod,catenary Wire,vrv Coil,electric Blast, Etc. Note:(i) Minimum Quantity To Be Lifted Per Day= 2 Mt. (ii) Total No. Of Days For Lifting Complete Lot= 01.
Closing Soon6 Feb 2025
Tender AmountRefer Documents
Insular Government Council Of The Insular Cable Of Tenerife Tender
Civil And Construction...+1Road Construction
Corrigendum : Tender Amount Updated
Spain
Purchaser Name: Insular Government Council Of The Insular Cable Of Tenerife | “reform of the Workshop Park of the Road and Landscape Service of the Cabildo de Tenerife in La Cuesta”, in the municipality of San Cristóbal de La Laguna.
Closing Date7 May 2025
Tender AmountEUR 1.5 Million (USD 1.5 Million)
Regional Society of Tourist Promotion S.A. CANTUR S.A. Tender
Automobiles and Auto Parts
Spain
Description: Supply and installation of carrier-tractor cables of the Tsf3 Pidruecos chairlift and Calgosa Ii and El Castro ski lifts, in the Alto Campoo ski-mountain resort, in accordance with the provisions of the PPTP so that it can be accepted by Cantur, Sa
Closing Date6 Jan 2026
Tender AmountEUR 199.9 K (USD 208.2 K)
5521-5530 of 5784 active Tenders