Cable Tenders

Cable Tenders

Government Of Netherlands Tender

Others
Netherlands
Description: Delivering Traction Cable 300/60
Closing DateNA
Tender AmountRefer Documents 

Government Of Netherlands Tender

Netherlands
Description: Regio South - Engine Bbv Trs Southlimburg - And replace Block Cable M-4030 Ors 529863
Closing DateNA
Tender AmountRefer Documents 

SSE Plc Tender

Services
Others
United Kingdom
Description: Scottish Hydro Electric Transmission Plc (“shet”) Is Inviting Interested Parties To Apply To Join The Sub Sea Marine Survey Dynamic Purchasing System (dps) Which Is Being Issued By Shet In Connection With The Dps Procurement Process Conducted In Accordance With The Utilities Contracts (scotland) Regulations 2016 In Relation To Hvdc Projects. Shet Is Seeking To Appoint A Number Of Specialists Subsea Marine Survey Companies To The Dps Who Can Offer Some Or All Of The Required Services & Equipment That Goes Into Subsea Marine Surveying. Project Background "the British Energy Security Strategy Set Out The Government's Ambition To Connect Up To 50gw Of Offshore Generation To The Electricity Network By 2030. In Response To This Ofgem Have Outlined A New Accelerated Strategic Transmission Investment (asti) Framework. This Sets Out A Streamlined Approach To The Regulatory Approval And Funding Process To Facilitate Accelerated Delivery By Transmission Owners. To Support This Ambition Shet Are Proposing To Set Up A Dynamic Purchasing System (dps) For Expected And Future Marine Surveys. The Project Surveys Shet Are Looking To Award Through This Dps Include: 1. Spittal To Peterhead 2gw Hvdc Link - C. 200 Km Offshore Cable Route, Landfall Locations Not Yet Determined 2. Beauly To Arnish 1.8gw Hvdc Link - C. 75 Km Offshore Cable, Landfall Locations Dundonnel, South Of Ullapool And Arnish, Lewis These Survey Scopes Are Planned For Execution In 2023. Offshore Grid - An Offshore Network Of At Least 3 Cable Routes Connecting Offshore Platforms. The Routes For These Are To Be Determined But Provisional Distances Are: 3. Fiddes To An Offshore Platform E1a Location C. 100 Km 4. Offshore Platform E1a To Offshore Platform R4_1 C. 275 Km 5. Offshore Platform R4_1 To Creyke Beck C. 200 Km These Survey Scopes Are Planned For Execution In 2024. Further Survey Scopes Are Expected With A Minimum Of 650km Of Geophysical And Geotechnical Survey Being Planned By Shet In Support Of The Holistic Network Design (hnd). The Lengths And Co-ordinates Will Be Confirmed In Stage 2 Of The Dps Process And Upon The Company Issuing An Rfp/call Off Scope Of Work Documents To All Suppliers Appointed To The Dps. The Dps Process Is To Establish Market Capability To Carry Out The Required Works Within The Time Period Indicated. It Is Shet's Intent To Follow Up Stage 1 Of The Dps Application Process With Stage 2 Which Is A Tendering Process With A View To Award A Marine Seabed Survey Contract For Each Project Based On A Detailed Rfp/call Off Process. The Survey Scope Of Work Covers Geophysical, Geotechnical, Uxo, Topographic And Environmental Sampling & Testing. This Dps Application Sets Out The Information Which Is Required By The Shet Evaluation Team In Order To Assess The Suitability Of Potential Applicants In Terms Of Their: • Knowledge And Past Experience On Similar Projects. • Available Resources And Capabilities. • Organisation, Economic, Legal And Financial Standing; And • Health, Safety And Environment Standards. • Management And Quality Systems.
Closing Date14 Mar 2031
Tender AmountRefer Documents 

Natural Resources Canada Tender

Real Estate Service
Canada
Details: Trade Agreement: Canadian Free Trade Agreement (cfta) Tendering Procedures: The Bidder Must Supply Canadian Goods And/or Services Competitive Procurement Strategy: Subsequent/follow-on Contracts Comprehensive Land Claim Agreement: No Nature Of Requirements: Request For Supply Arrangement (rfsa) For Office Relocation And Related Services. En578-212910/b Jiang, Kevin Telephone No. (343) 550-1630 Nature Of Requirement: The Purpose Of This Rfsa Is To Issue Supply Arrangements For Office Relocation And Related Services Located In The National Capital Region (ncr) On Behalf Of Any Government Department, Agency Or Crown Corporation Listed In Schedules I, I.1, Ii, Iii, Of The Financial Administration Act, R.s., 1985, C. F-11, On An "as And When Requested" Basis. The Requirement Is To Provide Office Relocation, Warehousing And Related Services, Which Will Include, But Not Be Limited To, The Moving Of Full Offices Suites, Office Equipment, Furniture, Computers, Workstation Systems, Files And Records, Filing Cabinets, Computer Hardware, And Other Various Government Office Related Facilities Like Boardrooms And Kitchens; Also Include Packing, Crating, Disassembling, Loading, Transporting, Unloading, Unpacking, Uncrating, Assembling And Cleanup At The End Of Each Move. Disassembling Or Assembling, Disconnecting And Reconnecting Computer Workstation Systems And Other Computer-related Systems Are Excluded From This Requirement. Here Are Some Examples Of Components Associated With The Above Systems: Monitor, Laptop, Computer Tower, Keyboard, Mouse, Desktop Printer, Network Cable, Phone, All Wires & Power Cords, Power Bars. The Supply Arrangement Has No Defined End-date And Will Remain Valid Until Such Time As Canada No Longer Considers It To Be Advantageous To Use It. The Requirement Is Solely Limited To Canadian Goods And/or Services. There Is A Security Requirement Associated With This Requirement. Delivery Date: Above-mentioned The Crown Retains The Right To Negotiate With Suppliers On Any Procurement. Documents May Be Submitted In Either Official Language Of Canada.
Closing Date1 Mar 2035
Tender AmountRefer Documents 

Clemson University Tender

Telecommunication Services
United States
Description: Twisted Pair And Optical Fiber Cabling
Closing Date21 Feb 2028
Tender AmountRefer Documents 

Oil India Limited - OIL Tender

Civil And Construction...+1Civil Works Others
India
Description: Cgi1435p23 | Tender Document Laying Of Overhead Ofc Cable Across Digaru, Tihu | Tender Document Laying Of Overhead Ofc Cable Across Digaru, Tihu
Closing DateNA
Tender AmountRefer Documents 

West Bengal State Electricity Distribution Company Limited - WBSEDCL Tender

Civil And Construction...+1Civil Works Others
India
Description: Slope Correction Of Existing Cable Trenches And Drains, Renovation Of Switchyard, Existing Crb And Other Allied Civil Works At Kandi 33/11 Kv Sub Station Under Kandi Division, Dist- Murshidabad.
Closing DateNA
Tender AmountINR 1.6 Million (USD 19.2 K)

Clemson University Tender

Telecommunication Services
United States
Description: Twisted Pair And Optical Fiber Cabling
Closing Date20 Feb 2028
Tender AmountRefer Documents 

Municipality of Monchengladbach Tender

Others
Corrigendum : Closing Date Modified
Germany
Description: To tender 'delivery from Nyyy 5x10mm2 lighting cable'
Closing Date25 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (mar 2022)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance Of Supplies|26||||||||||||||||||||||||||| wide Area Workflow Payment Instructions (dec 2018)|16|x|n/a|x|x|x|x|x|x|n/a|n/a|x|||||| note For Contractor/administrative Contracting Officer|3|||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (mar 2022))|3|||| alternate A, Annual Representations And Certifications (nov 2020)|13|x|x|x|||x|||||||| annual Representations And Certifications (may 2022)|13|335931|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| solicitation Extended To 08 Nov 2024. tdp Updated From Version 08 To 09. \ solicitation Due Date Extended From 12 Jul 2024 To 09 Aug 2024. closing Date Updated To 12 Jul 2024. tdp Updated From Version 004 To 008. \ solicitation Has Been Extended Until 02 Oct 2023. \ the New Closing Date Is 14 Apr 2023. all Other Terms And Conditions Remain Unchanged. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To This Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent by Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. in Accordance With Dfar 217.7301, Contractors Shall Identify Their Sources Ofsupply In Contracts For Supplies. If The Item Currently Being Procured Is Anon-value Added Item, Please Provide: actual Manufacturer: cage Code: address: delivery Lead Time: __________________________ If Incremental Deliveries Are Possible, Please Provide A Proposed Schedule To Include Specific Delivery Times For All Units. offer Valid For ___________________ Days. please Provide Email Address For Follow-up Communications_______________________________________. packaging Location If Different Than Offeror: name/cage ___________________________________________ address______________________________________________ notice To Contractor's Providing Surplus Material: a Surplus Material Certificate And Label Must Accompany Your Quotation Forsurplus/new Surplus/new Manufactured Surplus Material. All Surplus Materialmust Have Traceability Back To A Government Contract In Order To Be Consideredfor Award. Without This Information we Are Unable To Determine When Thegovernment Purchased And Inspected The Item And Therefore, We Cannot Be Assured Of Technical Acceptability. if Submitting Your Quotation Via Edi, A Faxed Or Email Copy Of The Surpluscertificate, Along With A Photo Of The Box And Label Must Be Sent To The Buyerasap. this Order Requires A Higher Level Inspection. the Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Cable Assembly,spec . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=5528057 |53711| B|fn |d|0001 | B|49998|0071625 drawing Data=5528057 |53711| B|fn |d|0001.a | B|49998|0042635 drawing Data=5528057 |53711| B|fn |d|0002 | B|49998|0053766 drawing Data=5528057 |53711| B|fn |d|0003 | A|49998|0053226 drawing Data=5528057 |53711| B|fn |d|0004 | A|49998|0059384 drawing Data=5528057 |53711| B|fn |d|0005 | B|49998|0065143 drawing Data=5528057 |53711| B|fn |d|0006 | A|49998|0067078 drawing Data=5528057 |53711| B|fn |d|0007 | A|49998|0068659 drawing Data=5528057 |53711| B|fn |d|0008 | A|49998|0062753 drawing Data=5528057 |53711| B|fn |d|0009 | A|49998|0066033 drawing Data=5528057 |53711| B|fn |d|0010 | A|49998|0056562 drawing Data=5528064 |53711| F|fn |d|0001 | F|49998|0464685 drawing Data=5528078 |53711| A|fn |d|0001 | A|49998|0708104 drawing Data=5729368 |53711| A|fn |d|0001 | A|49998|1062944 drawing Data=5729369 |53711| D|fn |d|0001 | D|49998|1159285 drawing Data=6508778 |53711| -|fn |d|0001 | -|49998|0028270 drawing Data=6508778 |53711| -|fn |d|0002 | -|49998|0028129 drawing Data=6508778 |53711| -|fn |d|0003 | -|49998|0034340 drawing Data=6508778 |53711| -|fn |d|0004 | -|49998|0033944 drawing Data=6508778 |53711| -|fn |d|0005 | -|49998|0026629 drawing Data=6508778 |53711| -|fn |d|0006 | -|49998|0031100 drawing Data=6508778 |53711| -|fn |d|0007 | -|49998|0046816 drawing Data=6508778 |53711| -|fn |d|0008 | -|49998|0026858 drawing Data=6508778 |53711| -|fn |d|0009 | -|49998|0044827 drawing Data=6508778 |53711| -|fn |d|0010 | -|49998|0032579 drawing Data=6508778 |53711| -|fn |d|0011 | -|49998|0017131 drawing Data=6558469 |53711| A|fn |d|0001 | A|49998|0075958 drawing Data=6558469 |53711| A|fn |d|0002 | A|49998|0027600 drawing Data=6558469 |53711| A|fn |d|0003 | A|49998|0027967 drawing Data=6558469 |53711| A|fn |d|0004 | -|49998|0037286 drawing Data=6558469 |53711| A|fn |d|0005 | -|49998|0026860 drawing Data=6558469 |53711| A|fn |d|0006 | -|49998|0030151 drawing Data=6558469 |53711| A|fn |d|0007 | -|49998|0030792 drawing Data=6558469 |53711| A|fn |d|0008 | -|49998|0025170 drawing Data=6558469 |53711| A|fn |d|0009 | -|49998|0013331 drawing Data=6558469 |53711| A|fn |d|0010 | -|49998|0024209 drawing Data=6558469 |53711| A|fn |d|0011 | -|49998|0036595 drawing Data=6558469 |53711| A|fn |d|0012 | -|49998|0025370 drawing Data=6558469 |53711| A|fn |d|0013 | -|49998|0032965 drawing Data=6558469 |53711| A|fn |d|0014 | -|49998|0030380 drawing Data=6558469 |53711| A|fn |d|0015 | -|49998|0036739 drawing Data=6558469 |53711| A|fn |d|0016 | -|49998|0042970 drawing Data=6558469 |53711| A|fn |d|0017 | -|49998|0017818 drawing Data=6558470 |53711| C|fn |d|0001 | C|49998|0035025 drawing Data=6558470 |53711| C|fn |d|0002 | -|49998|0029996 drawing Data=6558470 |53711| C|fn |d|0003 | C|49998|0034644 drawing Data=6558470 |53711| C|fn |d|0004 | -|49998|0041706 drawing Data=6558470 |53711| C|fn |d|0005 | -|49998|0036653 drawing Data=6558470 |53711| C|fn |d|0006 | -|49998|0039603 drawing Data=6558470 |53711| C|fn |d|0007 | -|49998|0034924 drawing Data=6558470 |53711| C|fn |d|0008 | C|49998|0051086 drawing Data=6558470 |53711| C|fn |d|0009 | -|49998|0032561 drawing Data=6558470 |53711| C|fn |d|0010 | -|49998|0033082 drawing Data=6558470 |53711| C|fn |d|0011 | -|49998|0044437 drawing Data=6558470 |53711| C|fn |d|0012 | -|49998|0044251 drawing Data=6558470 |53711| C|fn |d|0013 | -|49998|0032637 drawing Data=6558473 |53711| B|fn |d|0001 | B|49998|0035340 drawing Data=6558473 |53711| B|fn |d|0002 | B|49998|0029379 drawing Data=6558473 |53711| B|fn |d|0003 | B|49998|0024615 drawing Data=6558473 |53711| B|fn |d|0004 | B|49998|0023042 drawing Data=6558473 |53711| B|fn |d|0005 | B|49998|0035875 drawing Data=6558473 |53711| B|fn |d|0006 | A|49998|0032127 drawing Data=6558473 |53711| B|fn |d|0007 | B|49998|0027171 drawing Data=6558473 |53711| B|fn |d|0008 | A|49998|0024993 drawing Data=6558473 |53711| B|fn |d|0009 | A|49998|0027469 drawing Data=6558473 |53711| B|fn |d|0010 | A|49998|0014471 drawing Data=6558473 |53711| B|fn |d|0011 | A|49998|0018132 drawing Data=6558473 |53711| B|fn |d|0012 | A|49998|0019938 drawing Data=6558473 |53711| B|fn |d|0013 | A|49998|0018572 drawing Data=6558473 |53711| B|fn |d|0014 | A|49998|0023193 drawing Data=6558473 |53711| B|fn |d|0015 | A|49998|0017395 drawing Data=6558473 |53711| B|fn |d|0016 | A|49998|0022631 drawing Data=6558473 |53711| B|fn |d|0017 | A|49998|0022149 drawing Data=6558473 |53711| B|fn |d|0018 | A|49998|0020428 drawing Data=6558473 |53711| B|fn |d|0019 | A|49998|0023889 drawing Data=6558473 |53711| B|fn |d|0020 | A|49998|0031194 drawing Data=6558473 |53711| B|fn |d|0021 | A|49998|0020346 drawing Data=6558473 |53711| B|fn |d|0022 | B|49998|0027943 drawing Data=6558473 |53711| B|fn |d|0023 | A|49998|0023265 drawing Data=6558473 |53711| B|fn |d|0024 | A|49998|0014431 drawing Data=6558473 |53711| B|fn |d|0025 | B|49998|0027285 drawing Data=6558473 |53711| B|fn |d|0026 | A|49998|0014911 drawing Data=6558473 |53711| B|fn |d|0027 | A|49998|0030913 drawing Data=6558473 |53711| B|fn |d|0028 | A|49998|0039059 drawing Data=6558473 |53711| B|fn |d|0029 | A|49998|0019344 drawing Data=6558473 |53711| B|fn |d|0030 | A|49998|0039257 drawing Data=6558473 |53711| B|fn |d|0031 | A|49998|0027947 drawing Data=6558473 |53711| B|fn |d|0032 | A|49998|0029227 drawing Data=6813109 |53711| B|fn |d|0001 | B|49998|0168135 drawing Data=6813116 |53711| A|fn |d|0001 | A|49998|0216245 drawing Data=6964418 |53711| H|fn |d|0001 | H|49998|0863115 drawing Data=6964587 |53711| B| |d|0001 | B|49998|0029788 drawing Data=6964587 |53711| B|fn |d|0001 | B|49998|0055208 drawing Data=6964587 |53711| B|fn |d|0002 | B|49998|0033903 drawing Data=6964587 |53711| B|pl |d|0001 | B|49998|0036252 drawing Data=6964860 |53711| -|doc|d|0001 | -|49998|2290566 document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=iso9001 | | | |010417|a| | | document Ref Data=mil-std-973 | | | |950113|a| |03| 3. Requirements 3.1 Cage Code/reference Number Items - The Cable Assembly,spec Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;53711 6964587; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-129; . 3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001. 4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To mil-i-45208 Are Granted Permission To Utilize This If Desired.; 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
Closing Date14 Feb 2025
Tender AmountRefer Documents 
5481-5490 of 5541 active Tenders