Cable Tenders

Cable Tenders

Offizielle Bezeichnung Kreisausschuss Des Main Kinzig Kreises Tender

Others
Germany
Description: Restricted tender with public participation competition VOB/A Construction contract according to VOB Cost group 480 Building automation General description The Main-Kinzig district is planning to upgrade the MSR switchgear for the Gelnhausen vocational school property with three components... Additional cost group 480 Building automation General description The Main-Kinzig district is planning to upgrade the MSR switchgear for the Gelnhausen vocational school property with three components, divided into component A (main building), component B (old building) and component C (workshop building). The measure will be carried out in three construction phases, predominantly during the holiday periods. 1. Technical description KG 480 Building and system automation System description Building automation Only BACnet devices (controllers) are used as automation stations. The systems are controlled and regulated via autonomously operating automation stations. The cables and laying systems are installed by the building automation contractor. A new BMS will be set up for the new and existing systems. The technical systems include 10 automation focal points, with: Asp01 to Asp04 A-main building heat supply and air conditioning systems, total data points: 168 pieces. 4x heat distribution, each with 2 regulated heating circuits and 1 unregulated heating circuit. 1x RLT compact unit, internal control, with higher-level Bacnet control via building automation. Asp05 to Asp07 B-old building heat supply and air conditioning systems, total data points: 349 pieces. 3x heat distribution, each with 2 regulated heating circuits and 1 unregulated heating circuit, 1x hot water preparation with fire station. 1x RLT central unit, Ga control. 1x RLT central unit, internal control, with higher-level Bacnet control via building automation. Asp08 to Asp10 C-workshop construction heat supply and air-conditioning systems, total data points: 411 pieces. 1x heat distribution with 4 pieces of regulated heating circuits each. 4x central air-conditioning unit, Ga control. 2x central air-conditioning unit, internal control, with higher-level control Bacnet via building automation.
Closing Soon28 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n711.17|cj8|717-605-1318|taylor.r.arroyo2.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|335931|600|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| the Purpose Of This Amendment Is To Notate The Extension Of The Offer Due Date From 21 Jan 2025 To 04 Feb 2025. All Other Terms And Conditions Remainunchanged. the Purpose Of This Amendment Is To Clarify Required Quote Format Of Ffp (firm-fixed Price) Pricing. All Other Terms And Conditions Remain Unchanged. a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To Taylor.r.arroyo2.civ@us.navy.mil. b. General Requirements: Mil-std Packaging, Government Source Inspection, Fob Source, Cav Reporting. c. This Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. d. Only A Firm-fixed (ffp), Not-to-exceed (nte) Or Estimated (est) Price For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repairof The Item(s). e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Repair Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. g. The Government Is Requesting A Repair Turnaround Time (rtat) Of: ## ______ Days After Receipt Of Asset. Repair Turnaround Time (rtat) Definition: The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The f-condition Asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In this Contract. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. throughput Constraint: Contractor Must Provide A Throughput Constraint For Eachnsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences: _____/month (contractor Is To Fill In #). A Throughput Of "0" (zero) Per Monthreflects No Throughput constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. h. Important Note: reconciliation Price Reduction: any Asset(s) For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late. However, Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If The contractor Does Not Meet The Required Rtat Due To Inexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. In Reference To The Above Important Note, The Contractor Provides The Followingprice Reduction Amount Per Unit/per Month The Contractor Does Not Meet The Rtat: $___________, Up To A Maximum Of: $__________. (vendor Is To Fill In Amount) i. Your Quote Must Include The Following Information For Justification Purposes: - Repair Unit Price ________________ - Total Price________________ - Repair Turnaround Time (rtat) _____________ Days - New Unit Price ______________ note: If You Are Not Quoting The Government's Requested Repair Turnaround Time (rtat) Or Sooner, You Must Provide Your Company's Capacity Constraints Below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br/ber, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. - The T&e Fee (if Asset Is Determined Br/ber) Was Determined Based On: ____________________________________________________________________ ____________________________________________________________________ - Award To Cage:________ - Inspection & Acceptance Cage, If Not The Same As Award To Cage: _________ - Facility/subcontractor Cage (where The Asset Should Be Shipped To), If Not Same As Award To Cage. __________ - Facility/subcontractor Or Packaging Facility Cage (where The Asset Will Be Shipped From), If Not The Same As Award To Cage. ________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________________ (min Of 90 Days Is Requested). - Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Currentboa/idiq, For Example) Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ only A Firm-fixed Price (ffp) For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repair Of The Item(s). please Consider The Following When Providing Price: include Repair Price With All Costs Associated With Receipt And Complete Repairof Material That May Be In Incomplete Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, And Wear Damage. important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In Aprice Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance.price Reductions Made Pursuant To This Section shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Followingprice Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Tow Cable . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Tow Cable Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;3b3g2 K939060001 07mu1 K939060001; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
Closing Date4 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Contact Information|4|n711.17|aad|717-605-1318|taylor.r.arroyo2.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance Of Supplies|26|x||||||||||||x|||||||||||||| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|w25g1u|tbd|n/a|n/a|tbd|||||| note For Contractor/administrative Contracting Officer|3|||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|335931|600|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||| the Purpose Of This Amendment Is To Notate The Extension Of The Offer Due Datefrom 23 Dec 2024 To 28 Jan 2025. All Other Terms And Conditions Remainunchanged. a. Electronic Submission Of Any Quotes, Representations, And Any Necessary Certifications Shall Be Accomplished Via An Email Directed To ____________.civ@us.navy.mil. b. General Requirements: Mil-std Packaging, Government Source Inspection, Fob Source, Cav Reporting. c. This Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. Verify Nomenclature, Part Number, And Nsn Prior To Responding. d. Only A Firm-fixed (ffp), Not-to-exceed (nte) Or Estimated (est) Price For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repairof The Item(s). e. Must Adhere To Iuid Requirements Of Dfars 252.211-7003 f. The Ultimate Awardee Of The Proposed Contract Action Must Be An Authorized Repair Source. Award Of The Proposed Contract Action Will Not Be Delayed While An Unauthorized Source Seeks To Obtain Authorization. g. The Government Is Requesting A Repair Turnaround Time (rtat) Of: ## ______ Days After Receipt Of Asset. Repair Turnaround Time (rtat) Definition: The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The f-condition Asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The fifth Regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In this Contract. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. Throughput Constraint: Contractor Must Provide A Throughput Constraint For Eac H Nsn(s). Total Assets To Be Repaired Monthly After Initial Delivery Commences: _____/month (contractor Is To Fill In #). A Throughput Of "0" (zero) Per Month Reflects No throughput Constraint. induction Expiration Date: 365 Days After Contract Award Date. Any Asset Received After This Date In Days Is Not Authorized For Repair Without Bi-lateral Agreement Between The Contractor And Navsup Wss Contracting Officer. h. Important Note: reconciliation Price Reduction: Any Asset(s) For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late. However, Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If The contractor Does Not Meet The Required Rtat Due To Inexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A "reconciliation Modification" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit/per Month The Contractor Does Not Meet Thertat: $___________, Up To A Maximum Of: $__________. (vendor Is To Fill In Amount) i. Your Quote Must Include The Following Information For Justification Purposes: - Repair Unit Price ________________ - Total Price________________ - Repair Turnaround Time (rtat) _____________ Days - New Unit Price ______________ note: If You Are Not Quoting The Government's Requested Repair Turnaround Time(rtat) Or Sooner, You Must Provide Your Company's Capacity Constraints Below: ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ - T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br/ber, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to Exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. - The T&e Fee (if Asset Is Determined Br/ber) Was Determined Based On: ____________________________________________________________________ ____________________________________________________________________ - The T&e Fee (if Asset Is Determined Br/ber) Was Determined Based On: ____________________________________________________________________ ____________________________________________________________________ - Award To Cage:________ - Inspection & Acceptance Cage, If Not The Same As Award To Cage: _________ - Facility/subcontractor Cage (where The Asset Should Be Shipped To), If Not Same As Award To Cage. __________ - Facility/subcontractor Or Packaging Facility Cage (where The Asset Will Be Shipped From), If Not The Same As Award To Cage. ________ - Cost Breakdown Requested, Including Profit Rate (if Feasible). - Quote Expiration Date _______________________ (min Of 90 Days Is Requested). - Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s)listed In The Schedule. only A Firm-fixed Price (ffp) For The Repair Of The Subject Item(s) Will Be Accepted. Quotes Limited To Test And Evaluation (t&e) Will Not Be Accepted. The Quoted Price Must Be For The Repair Of The Item(s). please Consider The Following When Providing Price: include Repair Price With All Costs Associated With Receipt And Complete Repair Of Material That May Be In Incomplete Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, And Wear Damage. evaluation Factors: evaluation Utilizing Simplified Acquisition Procedures the Government Will Issue An Order Resulting From This Request For Quotation To The Responsible Offeror Whose Quotation Results In The Best Value To The Government, Considering Both Price And A Non-price Factors. The Following Factors Will Be Used To Evaluate quotations: 1) Price. 2) Past Performance. The Offeror's Past Performance On Related Contracts Will Be Evaluated To Determine, As Appropriate, Successful Performance Of Contract Requirements, Quality And Timeliness Of Delivery Of Goods And Services, Cost Management, Communications between Contracting Parties, Proactive Management, And Customer Satisfaction. 3) Supplier Performance Risk As Described In Dfars 252.204-7024. (end Of Provision) quotes Shall Be Received No Later Than The Date Specified In The Solicitation In Order To Be Considered. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Cable Assy, Test . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 3. Requirements 3.1 Cage Code/reference Number Items - The Cable Assy, Test Repaired Under This Contract/purchase Order Shall Meet The Operational And Functional Requirements As Represented By The Cage Code(s) And Reference Number(s) Listed Below. All Repair Work Shall Be performed In Accordance With The Contractors Repair/overhaul Standard Practices, Manuals And Directives Including But Not Limited To Drawings, Technical Orders, Manufacturing Operations, Tooling Instructions, Approved Repair Standards And Any Other Contractor or Government Approved Documents Developed To Provide Technical Repair Procedures. cage___ref. No. ;94756 10706-707-11; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-130, Rev N, 16 Nov 2012; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Navicp-mech Contracting Officer Has Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Explaining The Reason Therefor. If Finished Detail Drawings Are Not Available, Shop Drawings In The Form Used By The Manufacturer Will Be Acceptable For Government evaluation. When Notifying The Procurement Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change Only - If The Manufacturer's Part Number Indicated Thereon Has Changed, But The Parts Are Identical In All Respects, Supply The Item And Advise Navicp-mech Immediately Of The New Part Number. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.4 Inspection/testing Repaired Items - The Contractor Shall Perform All Inspection And Testing Requirements As Specified In The Original Manufacturer's Specifications And Drawings. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.
Closing Soon28 Jan 2025
Tender AmountRefer Documents 

G Teborgs Stad, Stadsmilj F Rvaltningen, G Teborg Tender

Civil And Construction...+1Civil Works Others
Sweden
Details: The procurement concerns the supply of overhead contact wire and support cable intended for maintenance work on the tram line in Gothenburg. Delivery will take place at two...
Closing Date24 Feb 2025
Tender AmountNA 

Municipality Of Asturias, Cebu Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Item No. Description/article Quantity Unit I. Concrete Works A. Footing Portland Cement 55 Bags Gravel 6 Cu.m. Sand 3 Cu.m. B. Pedestal Portland Cement 30 Bags Gravel 3 Cu.m. Sand 2 Cu.m. C. Flooring Portland Cement 380 Gravel 44 Sand 22 Ii. Rebar Works Footing, Pedestal Corr. Bars 10mmø X 6m 70 Lngths Corr. Bars 16mm Ø X 6m 80 Lngths G.i Tie Wire # 16 33 Kls Iii. Form Works Ordinary Plywood 1/2 X 4 X 8 12 Shts Coco Lumber 2 X 2 X 8 40 Pcs Coco Lumber 2 X 4 X 10 35 Pcs Cw Nails # 4 15 Kls Cw Nails # 2 1/2 9 Kls Cw Nails # 1 1/2 6 Kls Iv. Structural (column & Trusses) B.i Pipe 6" Ø X 6.0m X Sch 40 20 Lngths B.i Pipe 2" Ø X 6.0m X Sch 40 55 Lngths B.i Pipe 1 1/2"ø X 6.0m X Sch 400 35 Lngths 16mm X 600 Mm Base Plate 10 Pcs 25mm Ø X 600mm Anchor Bolt 60 Pcs W/ Nut & Washer V. Built-up Girt & Strut B.i Pipe 2" Ø X 6.0m X Sch 40 55 Lngths B.i Pipe 1 1/2" Ø X 6.0m X Sch 40 45 Lngths Vii. Roofing Materials 0.4mm X 1.22m Color Roofing R-type White 674 Lm 0.4mm X 2.44m Spanish Flashing Gutter 25 Lngths 0.4mm X 2.44m Metal Fascia 25 Lngths C-purlins 1.2mm X .05m X .075m X 6m 140 Lngths 16mm Ø X 6.0m Plain Round Bar 35 Lngths Turn Buckle 16mmø 36 Pcs 0.4mm X 2.44m End Flushing 17 Pcs 3/16 X 1 1/2" X 1 1/2" X 60 Angle Bar 25 Lngths 3/16 X 1" X 6.0 Angle Bar 25 Lngths 12mmø X 6m Corr Bar Sag Rod 40 Lngths 2 1/2" Teckscrew 5,500 Pcs Vii. Electrical Works Metal Halide 400 Watts (fire Fly) 8 Pc Thhn Wire # 10/7 5 Box Circuit Breaker 60 Amps. 1 Pc Circuit Breaker 20 Amps. 3 Pc Panel Board 4 Holes (bolt-on) 1 Set Cable Tie 12" 5 Pack Pvc Pipe 1"ø (orange) 30 Lngth Junction Box 4" X 4" 10 Pc Electrical Tape 3m Big 10 Roll Sub-total Viii. Miscellaneous Materials Red Oxide Primer 25 Gals Paint Thinner 13 Gals Paint Brush # 4 15 Pcs Paint Brush # 2 8 Pcs Lpg Small 7 Tank Oxygen 23 Tank Welding Rod 230 Kls Sealant 20 Tubes Blind Rivets 5/32 8 Boxes Drill Bit 5/32 20 Pcs
Closing Date5 Feb 2025
Tender AmountPHP 1.8 Million (USD 31.5 K)

City Of Pagadian Tender

Automobiles and Auto Parts
Philippines
Details: Description Bids And Awards Committee Request For Quotation The City Government Of Pagadian, Through Its Bids And Awards Committee (bac), Invites Suppliers/manufacturers/distributors To Apply For Eligibility And If Found Eligible, To Bid For The Hereunder Supplies/goods Charged To 8751-200-5-02-13-060-01/2saip24-1000rf-2n (repair & Maintenance Expenses), Pagadian City, As Described Below: Goods-2025-01-71 Procurement Of Spareparts & Accessories For The Repair & Maintenance Of Motor Vehicle. Item No. Qty Unit Of Issue Description Approved Budget For The Contract (abc) Unit Cost ₱ Total Cost ₱ 1 1 Pc Bore Kit Assembly 2,228.00 2,228.00 2 1 Set Connecting Rod Kit 2,178.00 2,178.00 3 2 Pcs Side Bearing 371.00 742.00 4 1 Pc Bore Gasket 99.00 99.00 5 2 Pcs Valve Seal 173.00 346.00 6 1 Pc Crankcase Gasket 314.00 314.00 7 18 Liters Engine Oil 496.00 8,928.00 8 16 Pcs Tire With Tube 250 X 17 1,770.00 28,320.00 9 5 Pc Battery 12v 2,100.00 10,500.00 10 5 Pc Sparkplug 297.00 1,485.00 11 10 Set Sprocket & Chain 2,138.00 21,380.00 12 2 Set Front Shock 2,814.00 5,628.00 13 2 Pcs Brake Shoe Rear & Front 405.00 810.00 14 2 Pcs Oil Filter Bao2x 322.00 644.00 15 1 Set Clutch Lining 470.00 470.00 16 1 Set Overhauling Gasket 396.00 396.00 17 1 Pc Bore Kit Xrm125 3,465.00 3,465.00 18 1 Liter Engine Oil 10w-40 561.00 561.00 19 1 Pc Oil Seal 990.00 990.00 20 1 Pc Brake Pad 99.00 99.00 21 2 Pcs Brake Shoe 264.00 528.00 22 1 Pc Battery Bao2x 4,290.00 4,290.00 23 1 Set Side Mirror 908.00 908.00 24 1 Set Pipe Muffler Assy 2,731.00 2,731.00 25 1 Set Rear Shock 2,228.00 2,228.00 26 1 Set Tire With Tube (rear) 3,511.00 3,511.00 27 2 Pc Brake Pad Hd 267.00 534.00 28 2 Sets Tire With Tube 2,228.00 4,456.00 29 1 Pc Clutch Cable 198.00 198.00 30 2 Pcs Brake Shoe Bao2x 479.00 958.00 Grand Total ₱ 109,925.00 " Quotation Forms Are Now Available At The Bac Secretariat And Upon Payment Of A Non-refundable Amount At 100.00 Per Set To The City Treasurer's Office-cashier. Quotations Are Evaluated On Lot Basis. Price Quotation Is Valid For 30 Calendar Days After Bid Opening." Submit Your Quotation Forms In A Sealed Envelope Per Project To The Bids And Awards Committee /secretariat On Or Before January 30,2025, 2:00 P.m. At The City General Services Office, City Hall, Pagadian City. The Bids And Awards Committee (bac) Reserves The Right To Reject Any And/ Or All Quotation Or Part Thereof, To Waive Formality Therein And/or To Accept The Quotations As May Be Considered Most Advantageous To The City Government Of Pagadian. Ms. Jenny Rose Z. Egama Bac Chairperson Date Of Publication: January 22, 2025 To January 30, 2025
Closing Soon30 Jan 2025
Tender AmountPHP 109.9 K (USD 1.8 K)

MINDORO STATE UNIVERSITY Tender

Machinery and Tools
Philippines
Details: Description Please Quote Your Lowest Price On The Items / Listed Below, Subject To The General Condition On The Last Page, Stating The Shortest Time Of Delivery And Submit Your Quotation Duly Signed By Your Representative Not Later Than ________________ In The Address Stated In The Last Page. Ciedelle Piol-salazar, Ph.d. Bac Chairperson Note: 1. All Entries Must Be Typewritten. 2. Delivery Period Within ___ Calendar Days. 3. Warranty Shall Be For A Period Of Six (6) Months For Supplies And Materials, One (1) Year For Equipment, From Date Of Acceptance By The Procuring Entity. 4. Price Validity Shall Be A Period Of 30 Calendar Days. 5. G-eps Registration Certificate Shall Be Attached Upon Submission Of The Quotation. 6. Bidders Shall Submit Original Brochures Showing Certification Of The Product Being Offered (optional). 7. Mode Of Delivery: [ ] Pick-up (schedule) [ ] Door To Door Delivery Item No. Unit Item And Description Qty. Unit Price Total Amount Lot 1 Stage Site Decoration Materials 1 Yard Alpha Geena (black) Spongee 450 2 Lot Flower (assorted Mums & Gerbares) 1 Inclusions: With Arrangement/set-up Tupiari And Podium 3 Pc Textile Thread (avocado Green-big) 1 4 Yard Silk Screen 2 5 Bottles Textile Paint (white) 5 6 Bottles Textile Lacquer Thinner 1 7 Yard Green Film For Silk Screen 1 8 Roll Silk Ribbon (2.5" Maroon Or Green) 5 9 Roll Exhibit Carpet (2m By 50m) 1 10 Lot Plate Engrave 1 11 Pcs Acrylic Sheet Frame (8"x11") 10 12 Pcs Stainless Steel (shovel-small) 2 13 Pc Stainless Steel (shovel-medium) 1 14 Pcs Acrylic Sheet (8"x5") 10 15 Packs Vellum Board Brown (200gsm) 8 16 Packs Sticker Paper 6 17 Pcs Glue 2 18 Lot Transparent Printing 1 19 Gallon Clear Gloss Lacquer 1 20 Gallon Lacquer Thinner V-50 1 21 Gallon Oil Wood Stain Walnut 1 22 Pc Cutter Board (size A3) 1 23 Panel Ramit Fabric 2 24 Pcs Minsu Wooden Logo 92.75mm By 4" Dia) 20 25 Pcs Mini-shovel 100 Sub-total Lot1 Lot 2 Stage Fabrication Materials 1 Box Welding Rod E6013 (5kg) 5 2 Box Cutting Disc 4 3 Kg Cwn No. 4 3 4 Kg Cwn No. 3 3 5 Pcs Shovel 10 6 Pcs Shovel Stand 10 7 Pcs Marine Plywood (4'x8'x3/4") 10 8 Pcs Marine Plywood (4'x8'x1/4") 8 9 Pcs S4s (1"x2"x10') 15 10 Pcs Threaded Pvc Pipe #4 1 11 Pcs Threaded Pvc Pipe #2 1 12 Pcs Threaded Pvc Plug #4 2 13 Pcs Threaded Pvc Plug #2 2 14 Gallon Epoxy Primer Gray 1 15 Gallon Automotive Thinner (acrylic) 1 16 Ltr Automotive Paint (acrylic-gold) 3 17 Ltr Urethane Top Coat 2 18 Pcs Pulley 1 19 Pcs Paint Brush 2" 3 20 Kg Tie Wire No. 16 4 21 Pcs Masonry Drill Bit (3/8) 2 22 Box Tox And Screw 3/8 By 3/4 1 23 Packs Cable Tie (long) 5 24 Roll Nylon Rope #14 9200m) 1 Sub-total Lot 2 Xvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvxvx
Closing Soon27 Jan 2025
Tender AmountPHP 107.9 K (USD 1.8 K)

Rizal Medical Center Tender

Telecommunication Services
Philippines
Details: Description Bids And Awards Committee Request For Quotation Rfq No. 2025-025 The Rizal Medical Center (rizal Med) Through Its Bids And Awards Committee (bac), Hereby Invites All Interested Suppliers Or Distributors Registered With The Philippine Government Electronic Procurement System (philgeps), To Submit Their Quotation On The Project Listed Below, Subject To The General Conditions Stated Herein, And Submit Not Later Than January 28, 2025. Name Of Project: Procurement Of One (1) Lot Rental Of Trunked Radio Communication System With One (1) Year Subscription Mode Of Procurement: Negotiated Procurement Sec. 53.9 – Small Value Procurement Approved Budget For The Contract: Two Hundred Fourteen Thousand Four Hundred Forty Pesos (php214,440.00) Item No. Item/description 1. One (1) Lot Rental Of Trunked Radio Communication System With One (1) Year Subscription -one Year Subscription Fee (tax Inclusive) -compatible With Doh-hemb Central Channel -unlimited Radio Calls -wide Area Coverage-within Metro Manila One (1) Base Radio: Digital Mobile/base Trunked Radio Complete With The Whip Antenna, Microphone, Mounting Hardware And Dc Cable-php2,750.00/ Unit For 12 Months Nine (9) Units Portable Radio: Digital Handheld Trunked Radio, Full-keypad, Complete With Flexible Standard Antenna, High-capacity Li-on Battery, 220v Charger And Belt Clip-php15,120.00/unit For 12 Months Certificate: Certificate Of Radio Registration Shall Be Issued. Training: The Supplier Shall Provide Free Training On Proper Use Of Radios To The Designated Users. I. General Requirements: 1. Original Signed Price Quotation 2. Certified True Copy Of The Following: A) Philgeps Certificate/registration No. B) Mayor’s/business Permit 3. Duly Notarized Omnibus Sworn Statement Together With Original Notarized Secretary’s Certificate Or Original Special Power Of Attorney 4. Documentary Requirements Must Be Submitted To The Bac Secretariat Not Later Than The Deadline. Ii. General Conditions: • All Quotations Shall Be Considered Fixed Price, And Not Subject To Price Escalation During Contract Implementation. • Supplier/contractor/ Service Provider Is Entitled To One (1) Quotation Only; Otherwise All Quotations Made Shall Automatically Be Rejected. Iii. Terms Of Payment • Payment Shall Be Based On Actual Deliveries Made By The Supplier/contractor/ Service Provider. • The Terms Of Payment Shall Not Be Later Than Sixty (60) Days After Submission Of Sales Invoice And Complete Supporting Documents By The Supplier/contractor. • Pursuant To Circular Letter No. 2013-16 Of Department Of Budget And Management Dated December 23, 2013, The Supplier/contractor Is Encouraged To Open An Account With The Land Bank Of The Philippines (lbp), The Government Servicing Bank Of The Procuring Entity, To Facilitate Settlement Of Account Payables Due To The Supplier/contractor. All Charges Incurred For Payment Through Bank Transfer With Other Banks Shall Be For The Account Of The Supplier/contractor. Iv. Delivery Term • Delivery Term Shall Be For One (1) Year (january To December 2025). For Further Inquiries, You May Contact The Bac Secretariat At Mobile No. 0917 104-6556. The Quotation And Requirements Must Be Submitted/delivered To The Following Address: Edwin E. Alcazar, Llb,mgm Head, Bac Secretariat Rizal Medical Center Pasig Blvd., Pasig City 1600 Mobile No. 0917 104-6556 The Rizal Med Reserves The Right To Reject Any Or All Quotations/bids, To Waive Any Minor Defects Therein, To Annul The Bidding Process, To Reject All Quotations/bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder(s), And To Accept Only The Offer That Is Most Advantageous To The Government. The Rizal Med Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expenses Incurred In The Preparation Of Their Quotation/bid. Very Truly Yours, (sgd.)santiago G. Cabangon, Cpa, Mba Chairperson, Bids And Awards Committee
Closing Soon28 Jan 2025
Tender AmountPHP 214.4 K (USD 3.6 K)

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Description: This Is A Request For Information (rfi) Only. There Is No Solicitation Package Available. the Naval Air Warfare Center, Aircraft Division (nawcad) Lakehurst, Nj Is Issuing This Request For Information Notice To Conduct Market Research To Identify Potential Sources And Request Information For A Potential Procurement Of Rack Mounted Analog Discrete Input Measurement Instruments For The Engine Test Instrumentation Replacement System (etirs). The Instrumentation Must Meet Various Functions, And Each Instrument Can Fulfill One Or Multiple Functional Requirements. this Is A Request For Information Only – Not A Request For Proposal. This Rfi Is Issued For The Purpose Of Determining Market Interest, Feasibility, And Capability Of Sources And Does Not Constitute A Request For Proposal Or Commitment By The Government. this Rfi Is Issued Sole For The Market Research Information And Planning Purposes And Does Not Constitute A Solicitation.  information Herein Is Based On The Best Information Available At The Time Of Publication, Is Subject To Revision, And Is Not Binding Upon The Government.  no Reimbursement Will Be Made Of Any Costs To Provide Information In Response To This Rfi Or Any Follow-up Information Requests. this Rfi Is A Market Research Tool Being Used To Determine Potential And Eligible Vendors Capable Of Meeting The Requirements Described Herein Prior To Determining The Method Of Acquisition And Issuance Of A Request For Proposal. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract.  navair Is Requesting Information On The Industry’s Capability Of Manufacturing Commercial Off The Shelf (cots) Or Modified Cots (mcots) Rack Mounted Torque Meter Runout Instruments That Meet Or Exceed The Requirements Below. the Rack Mounted Torque Meter Runout Instruments Shall Meet Or Exceed The Performance/environmental Requirements Shown In The Following Functional Breakdown: instrumentation Performance Requirements torque Meter Runout Requirements ** Refer To The Tables In The Attached Instrumentation Characteristics Excel File For All Performance Requirements. The Performance Specification Is Export-controlled. In Order To Receive A Copy Of The Performance Specification Interested Respondents Must Be U. S. Dod Contractors. Interested Respondents Must Provide The Contracting Office Point Of Contact Identified Below With A Copy Of Their Current, Approved Form Dd2345, 'militarily Critical Technical Data Agreement'. Once Received And Current Jcp Certification Verified By Navair, The Draft Performance Specification Will Be Transmitted To You From Navair Via The Dod Safe System, To The Data Custodian You Have Identified On The Dd Form 2345. Contractors Must Request The Draft Performance Specification In Writing From Mr. Terrence Shearer, Terrence.d.shearer.civ@us.navy.mil. acquisition Instrumentation Environmental Requirements the System’s Equipment Design, Located Outside The Instrument And Control Room (i&c Cab), Shall Meet Class 1 Environmental Requirements As Defined In Table 2 Of Mil-prf-28800. the System’s Equipment, Within The Instrument And Control Room (i&c Cab) Boundary, Design Shall Meet The Temperature And Humidity Requirements Of Class 4 Equipment In Section 3.9.2 Of Mil-prf-28800. the System Shall Be Fully Operational During The Expected Shipboard Deck Environmental Vibration Levels As Described Per Mil-std-167-1a, Type 1 - Environmental Vibration. the System’s Equipment Design Shall Comply With The Requirement Matrix For Navy Surface Ships And Navy Ground In Table 5 Of Mil-std-461 Or Equivalent. cs115 (conducted Susceptibility, Bulk Cable Injection, Impulse Excitation) And Cs118 (personnel Borne Electrostatic Discharge) Are Specified As Applicable. navair Is Requesting The Following Information From Industry Vendors To Demonstrate How They Can Meet The Requirements Listed Above: vendor Capability. vendor Capacity. documentation Demonstrating That The Vendor Is Capable Of Manufacturing Cots And/or Modified Cots Rack Mounted Torque Meter Runout Instruments. Documentation Demonstrating That The Vendor Is Capable To Sustain The Product. any Information On Past Performance Of Similar Efforts. a Technical Data Sheet Describing The Electrical And Performance Characteristics Of The Instruments. the Vendors May Also Respond With A Presentation Of 5 Slides Or Less With A Specific Focus On Explanation Of Data Sheets And Instrument Performance In Relation To Gfi Requirements. navair Is Requesting The Following Information From Industry Vendors To Comprehend The Logistics Impacts Associated To Each Instrument: how Long Will The Product Be Supported For Procurement And Repair? does The Product Require Calibration? if So, Does The Product Require Additional Equipment/tools To Calibrate? all Interested Parties Should Have The Following: a Quality Assurance Program Compliant With Iso9001 Or Equivalent. test Data Demonstrating That The Above Performance And Environmental Requirements Have Been Met With The Proposed Rack Mounted Torque Meter Runout Instruments. acquisition Instrumentation Software Requirements instrumentation Shall Be Able To Be Controlled Through An Application Programming Interface (api) By Software Code Running On The Test Bench. Navair’s Preferred Apis Are Those Standardized Interfaces Defined And Managed By The Interchangeable Virtual Instrument (ivi) Foundation (https://www.ivifoundation.org) Including The Following: vxi Plug & Play standard Commands For Programmable Instrumentation (scpi) virtual Instrument Software Architecture (visa) interchangeable Virtual Instrument (ivi) all Interested Parties Should Respond With Their Compliance With The Above Apis For Each Potential Offering. If A Vendor’s Instrument Is Not Compliant With The Above Apis, They Should State So And, Instead, Provide An Overview Of How To Programmatically Control Their Instrument, Including Any Required Drivers, Applications, Programming Languages, Operating Systems, Or Third-party Tools. in Addition To Expressing Interest And Providing The Requested Information, Include Estimated Price Details. The Government Is Seeking Unit Price And Lead Time For Each Type Of Rack Mounted Data Acquisition Instrument Type. Brochures, Manufacturing Capability And Capacity, And Past Performance Information May Be Included In The Rfi Response. to Assist In Our Market Research And Determination Of Any Applicable Small Business Set-aside For This Effort, If You Are A Small Business Interested In Priming This Effort And Plan To Utilize “similarly Situated Entities” To Meet The Limitations On Subcontracting, Please Identify The Name & Cage Code Of The Specific Firm(s) You Intend To Partner/subcontract With To Meet The Requirements As Well As Their Sb Size Status Under The Naics Code Assigned To This Notice. Information Regarding Any Planned Similarly Situated Entity Should Be Included In Answering Any Questions Outlined In This Rfi In Order To Assist The Government’s Capability Determination.  far 52.219-14 Limitation On Subcontracting Requires A Small Business Prime On A Set-aside To Perform At Least 50% Of The Cost Of Contract Performance.  Small Business Primes May Now Count “first Tier Subcontracted” Work Performed By Similarly Situated Entities As If It Were Performed By The Prime Itself. Please Read The Full Text Of The Clause Deviation (52.219-14 Class Deviation 2020-o0008 Dated 04/03/20 At Https://www.acquisition.gov/browse/index/far).   interested Sources Should Provide Rfi Responses And Related Data To The Pocs Identified Below, No Later Than 30 Days After The Post Date Of This Rfi. All Information Sent Should Reference This Rfi Number On The Subject Response Line Of The Emailed Response As Well As On All Enclosed Documents. Responses Must Include The Company Name, Address, Point Of Contact Name And Email/phone, And Company Size. Proprietary Data Must Be Marked On A Page-by-page Basis And Will Be Kept Confidential And Protected Where So Designated. Failure To Respond To This Rfi Does Not Preclude Participation In Any Future Rfp That May Be Issued. Any Comments Provided May Or May Not Be Included In A Formal Solicitation. Respondents May Provide Information And Rough Orders Of Magnitude (rom) On Any Currently Available Product Or A Company's' Capabilities That Will Meet The Navy's Requirements. responses Must Be Received No Later Than December 16th 2024 By 4pm Est.
Closing Soon30 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: This Is A Request For Information (rfi) Only. There Is No Solicitation Package Available. the Naval Air Warfare Center, Aircraft Division (nawcad) Lakehurst, Nj Is Issuing This Request For Information Notice To Conduct Market Research To Identify Potential Sources And Request Information For A Potential Procurement Of Rack Mounted Analog Discrete Input Measurement Instruments For The Engine Test Instrumentation Replacement System (etirs). The Instrumentation Must Meet Various Functions, And Each Instrument Can Fulfill One Or Multiple Functional Requirements. this Is A Request For Information Only – Not A Request For Proposal. This Rfi Is Issued For The Purpose Of Determining Market Interest, Feasibility, And Capability Of Sources And Does Not Constitute A Request For Proposal Or Commitment By The Government. this Rfi Is Issued Sole For The Market Research Information And Planning Purposes And Does Not Constitute A Solicitation.  information Herein Is Based On The Best Information Available At The Time Of Publication, Is Subject To Revision, And Is Not Binding Upon The Government.  no Reimbursement Will Be Made Of Any Costs To Provide Information In Response To This Rfi Or Any Follow-up Information Requests. this Rfi Is A Market Research Tool Being Used To Determine Potential And Eligible Vendors Capable Of Meeting The Requirements Described Herein Prior To Determining The Method Of Acquisition And Issuance Of A Request For Proposal. In Accordance With Far 15.201(e), Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract.  navair Is Requesting Information On The Industry’s Capability Of Manufacturing Commercial Off The Shelf (cots) Or Modified Cots (mcots) Rack Mounted Dc Power Supply Instruments That Meet Or Exceed The Requirements Below. the Rack Mounted Dc Power Supply Instruments Shall Meet Or Exceed The Performance/environmental Requirements Shown In The Following Functional Breakdown: instrumentation Performance Requirements dc Power Supply Requirements ** Refer To The Tables In The Attached Instrumentation Characteristics Excel File For All Performance Requirements. The Performance Specification Is Export-controlled. In Order To Receive A Copy Of The Performance Specification Interested Respondents Must Be U. S. Dod Contractors. Interested Respondents Must Provide The Contracting Office Point Of Contact Identified Below With A Copy Of Their Current, Approved Form Dd2345, 'militarily Critical Technical Data Agreement'. Once Received And Current Jcp Certification Verified By Navair, The Draft Performance Specification Will Be Transmitted To You From Navair Via The Dod Safe System, To The Data Custodian You Have Identified On The Dd Form 2345. Contractors Must Request The Draft Performance Specification In Writing From Mr. Justin Panecki, Justin.p.panecki2.civ@us.navy.mil. acquisition Instrumentation Environmental Requirements the System’s Equipment Design, Located Outside The Instrument And Control Room (i&c Cab), Shall Meet Class 1 Environmental Requirements As Defined In Table 2 Of Mil-prf-28800. the System’s Equipment, Within The Instrument And Control Room (i&c Cab) Boundary, Design Shall Meet The Temperature And Humidity Requirements Of Class 4 Equipment In Section 3.9.2 Of Mil-prf-28800. the System Shall Be Fully Operational During The Expected Shipboard Deck Environmental Vibration Levels As Described Per Mil-std-167-1a, Type 1 - Environmental Vibration. the System’s Equipment Design Shall Comply With The Requirement Matrix For Navy Surface Ships And Navy Ground In Table 5 Of Mil-std-461 Or Equivalent. cs115 (conducted Susceptibility, Bulk Cable Injection, Impulse Excitation) And Cs118 (personnel Borne Electrostatic Discharge) Are Specified As Applicable. navair Is Requesting The Following Information From Industry Vendors To Demonstrate How They Can Meet The Requirements Listed Above: vendor Capability. vendor Capacity. documentation Demonstrating That The Vendor Is Capable Of Manufacturing Cots And/or Modified Cots Rack Mounted Dc Power Supply Instruments. Documentation Demonstrating That The Vendor Is Capable To Sustain The Product. any Information On Past Performance Of Similar Efforts. a Technical Data Sheet Describing The Electrical And Performance Characteristics Of The Instruments. the Vendors May Also Respond With A Presentation Of 5 Slides Or Less With A Specific Focus On Explanation Of Data Sheets And Instrument Performance In Relation To Gfi Requirements. navair Is Requesting The Following Information From Industry Vendors To Comprehend The Logistics Impacts Associated To Each Instrument: how Long Will The Product Be Supported For Procurement And Repair? does The Product Require Calibration? if So, Does The Product Require Additional Equipment/tools To Calibrate? all Interested Parties Should Have The Following: a Quality Assurance Program Compliant With Iso9001 Or Equivalent. test Data Demonstrating That The Above Performance And Environmental Requirements Have Been Met With The Proposed Rack Mounted Dc Power Supply Instruments. acquisition Instrumentation Software Requirements instrumentation Shall Be Able To Be Controlled Through An Application Programming Interface (api) By Software Code Running On The Test Bench. Navair’s Preferred Apis Are Those Standardized Interfaces Defined And Managed By The Interchangeable Virtual Instrument (ivi) Foundation (https://www.ivifoundation.org) Including The Following: vxi Plug & Play standard Commands For Programmable Instrumentation (scpi) virtual Instrument Software Architecture (visa) interchangeable Virtual Instrument (ivi) all Interested Parties Should Respond With Their Compliance With The Above Apis For Each Potential Offering. If A Vendor’s Instrument Is Not Compliant With The Above Apis, They Should State So And, Instead, Provide An Overview Of How To Programmatically Control Their Instrument, Including Any Required Drivers, Applications, Programming Languages, Operating Systems, Or Third-party Tools. in Addition To Expressing Interest And Providing The Requested Information, Include Estimated Price Details. The Government Is Seeking Unit Price And Lead Time For Each Type Of Rack Mounted Data Acquisition Instrument Type. Brochures, Manufacturing Capability And Capacity, And Past Performance Information May Be Included In The Rfi Response. to Assist In Our Market Research And Determination Of Any Applicable Small Business Set-aside For This Effort, If You Are A Small Business Interested In Priming This Effort And Plan To Utilize “similarly Situated Entities” To Meet The Limitations On Subcontracting, Please Identify The Name & Cage Code Of The Specific Firm(s) You Intend To Partner/subcontract With To Meet The Requirements As Well As Their Sb Size Status Under The Naics Code Assigned To This Notice. Information Regarding Any Planned Similarly Situated Entity Should Be Included In Answering Any Questions Outlined In This Rfi In Order To Assist The Government’s Capability Determination.  far 52.219-14 Limitation On Subcontracting Requires A Small Business Prime On A Set-aside To Perform At Least 50% Of The Cost Of Contract Performance.  Small Business Primes May Now Count “first Tier Subcontracted” Work Performed By Similarly Situated Entities As If It Were Performed By The Prime Itself. Please Read The Full Text Of The Clause Deviation (52.219-14 Class Deviation 2020-o0008 Dated 04/03/20 At Https://www.acquisition.gov/browse/index/far).   interested Sources Should Provide Rfi Responses And Related Data To The Pocs Identified Below, No Later Than 30 Days After The Post Date Of This Rfi. All Information Sent Should Reference This Rfi Number On The Subject Response Line Of The Emailed Response As Well As On All Enclosed Documents. Responses Must Include The Company Name, Address, Point Of Contact Name And Email/phone, And Company Size. Proprietary Data Must Be Marked On A Page-by-page Basis And Will Be Kept Confidential And Protected Where So Designated. Failure To Respond To This Rfi Does Not Preclude Participation In Any Future Rfp That May Be Issued. Any Comments Provided May Or May Not Be Included In A Formal Solicitation. Respondents May Provide Information And Rough Orders Of Magnitude (rom) On Any Currently Available Product Or A Company's' Capabilities That Will Meet The Navy's Requirements. responses Must Be Received No Later Than December 16th 2024, By 4pm Est.
Closing Soon30 Jan 2025
Tender AmountRefer Documents 
5221-5230 of 5425 active Tenders