Building Construction Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Building Construction Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date8 Apr 2025
Closing Soon21 Apr 2025
Tender AmountINR 3,41,72,914 (USD 4,00,228)
Download

AI Insights

Bid Capacity
... View More
The formula for bid capacity is: Assessed Available Bid capacity = (A*N*2-B) where A = Maximum value of civil engineering works executed in any one year during the last five years N = Number of years prescribed for completion of the works for which bids are invited. B = Value of existing commitments and on-going works to be completed during the next period (period of completion of the works for which bids are invited)
Technical Capacity
... View More
The required prior work experience for the bidder includes having experience in works of a similar nature and size for each of the last five years. The total monetary value of construction work performed for each of the last five years should be provided. The bidder should have completed works costing more than 10% of the bid amount. The value of sub-contract should be mentioned. The bidder should also provide information on the value of works remaining to be completed, and the anticipated date of completion. The bidder should have experience in similar works, with a total value of at least 10% of the bid amount. The bidder should provide details of the works, including the value, and percentage of similar works completed. In terms of specific values, the bidder should have experience in similar works, with a value of at least Rs. 1.5 Cr. The bidder should provide information on the qualifications and experience of key personnel, including the project manager. The bidder should provide information on the value of sub-contracts, and the experience of sub-contractors in similar works. The bidder should also provide information on the amount involved in any litigation, and the present status of the litigation. The bidder should have access to or availability of credit facilities, certified by the bankers, with a minimum of 20% of the estimated cost, and should be able to invest a minimum of 25% of the contract value of work during implementation. The annual financial turnover for the last five years is mentioned, with an amount of Rs 5,12,59,371.00. The bidder should have completed works of a certain value, with 50% of the work value being Rs 1,70,86,457.00. Quantities of work completed are also mentioned, including cement concrete, earthwork in excavation, and brick work. The cost of various works is also provided, including electric work, water supply/sanitary works, fire fighting work, and furniture work. Liquid assets and/or availability of credit facilities is Rs 68,34,583.00. The bidder's available bid capacity will be calculated based on the maximum value of civil engineering works executed in any one year during the last five years, and the value of existing commitments and on-going works to be completed during the next few months. The bidder should undertake their own studies and furnish with their bid, a detailed construction planning and methodology supported with layout and necessary drawings and calculations. The bidder should have experience and resources as per the specified requirements, which includes availability for this work of personnel with adequate experience as required. The bidder should provide information on the value of works completed, and the percentage of similar works completed, along with the amount and percentage of works remaining to be completed. The bidder should also provide information on the stipulated period of completion, and the anticipated date of completion. The bidder should provide a statement of compliance, and attach copies of certificates, including a certificate from the Engineer-in-Charge, and a bank certificate. The bank certificate should state that the bidder has access to or availability of credit facilities, with a minimum of 20% of the estimated cost. The bidder should provide an affidavit, and an undertaking, and should authorize the bank to provide information on the bidder's competence and general reputation. The bidder should also provide a copy of the original pre-qualification application, and the letter of pre-qualification, and should update the information, if applicable. The bidder should provide a copy of the letter of association with sub-contractors, if applicable. The bidder should also provide information on the amount involved in any abandoned work, or rescinded contract, during the last five years. The bidder should provide information on the amount involved in any litigation, and the present status of the litigation. The bidder should also provide information on the value of contracts awarded, and the amount involved in any litigation. The bidder should have experience in similar works, with a value of at least 10% of the bid amount, and should provide details of the works, including the value, and percentage of similar works completed. The bidder should provide information on the proposed methodology and program of construction, including equipment planning and deployment, and quality control procedures. The bidder should also provide information on the value of sub-contracts, and the experience of sub-contractors in similar works. The bidder should provide information on the value of works completed, and the percentage of similar works completed, along with the amount and percentage of works remaining to be completed. The bidder should also provide information on the stipulated period of completion, and the anticipated date of completion. The bidder should have experience in similar works, with a value of at least Rs. 1.5 Cr, and should provide details of the works, including the value, and percentage of similar works completed. The bidder should also provide information on the qualifications and experience of key personnel, including the project manager. The bidder should provide information on the proposed methodology and program of construction, including equipment planning and deployment, and quality control procedures.

Costs

  • EMD

    INR 3,42,000 (USD 4,005)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.