Bridge Tenders

Bridge Tenders

Province Of Sarangani Tender

Healthcare and Medicine
Corrigendum : Tender Amount Updated
Philippines
Details: Description Invitation To Bid Purchase And Delivery Of Seven Hundred (700) Lots Of Comprehensive Hospitalization And Healthcare Services For All Officials And Employees Of The Provincial Government Of Sarangani (pado) 1. The Provincial Government Of Sarangani, Through Its Ab Cy 2024, Intends To Apply The Sum Of Fourteen Million Seven Hundred Thousand Pesos (p14,700,000.00), Inclusive Of All Taxes And Freight Charges, Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Purchase And Delivery Of Seven Hundred (700) Lots Of Comprehensive Hospitalization And Healthcare Services For All Officials And Employees Of The Provincial Government Of Sarangani (pado), Goods-2024-109– (lot Bidding). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of Sarangani Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required And Must Be In Accordance With Section Vi (schedule Of Requirement Of The Bidding Documents). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183 4. Prospective Bidders May Obtain Further Information From The Bac Secretariat And Inspect The Bidding Documents At The Address Given Above During Office Hours From Mondays To Fridays At 9:00 Am To 3:00 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders Starting On November 12, 2024 (tuesday) From The Given Address And Websites Of The Philippine Government Electronic Procurement System (philgeps And Of The Procuring Entity. Pursuant To The Latest Guidelines Issued By The Gppb, The Interested Bidders Shall Pay The Applicable Fee In The Amount Of Twenty-five Thousand Pesos (25,000.00), Which Is Non-refundable. 6. The Provincial Government Of Sarangani Will Hold A Pre-bid Conference On November 19, 2024 (tuesday), 9:00 Am At Bac Conference Room, 2nd Floor, Pgso Bldg., Capitol Complex, Alabel, Sarangani Province. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before December 3, 2024 (tuesday) At 9:00am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 3, 2024 (tuesday), 9:00am At The Given Address Above. 10. The Provincial Government Of Sarangani Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Bids And Awards Committee Secretariat 2nd Floor, Pgso Building, Capitol Complex Alabel, Sarangani Province 9501 E-mail: Bacsecsarangani@gmail.com Telephone Number: (083) 508-3008 Atty. Jenric Y. Garcia Bids And Awards Committee Chairman 1. 700 Lots Healthcare Insurance 250,000.00 Maximum Benefit Limit Per Illness (nationwide Hmo Accreditation) Type Of Plan - Regular Private Room Hospital Based Eligibility - Employees Only 18 To 75 Yrs Old *with Telemedicine Cover For The Immediate Family Member *with Access To Major Hospitals (makati Medical City, St. Luke Medical Center Global And Quezon City, Asian Hospital Medical Center, Cardinal Santos Medical Center, Cebu Doctors Hospital, Chong Hua Hospital & Davao Doctors Hospital > Out Patient Care Unlimited Number Of Consultations During Regular Clinic Hours With Accredited Physicians Or Hospital (covered) Except Prescribed Medicines; X-ray, Laboratory Examinations And Diagnostic Tests Provided By An Accredited Physician (covered); Referrals To Affiliated Specialists (covered); Surgery Not Requiring Confinement Including Cataract Extractions Except Cost Of Lens (covered); Physical Therapy (covered Up To Twelve 12 Sessions); Pre And Post Natal Consultations With Accredited Ob- Gyne (covered); Eye, Ear, Nose And Throat (eent) Treatment/care Prescribed By An Accredited Physician/specialist (covered); Treatment Of Minor Injuries Such As Lacerations, Mild Burns, Sprains And The Like; Electrocauterization Of Skin Lesions Such As Plantar Warts, Flat Warts, Periungual Warts And Molluscum Contagiosum, In Any Part Of The Body Except Genital Warts (up To 2,500.00/ Member/ Year And Condyloma Acuminata Prescribed By An Accredited Physician/specialist; Dressings, Conventional Casts (plaster Of Paris) Treatment Of Minor Injuries Such As Lacerations, Mild Burns, Sprains And The Like; Dressings, Conventional Casts (plaster Of Paris) And Sutures; Minor Surgery Not Requiring Confinement Prescribed By An Accredited Physician/specialist; Eye Laser Therapy Only For Retinal Tear, Retinal Hole, Retinal Detachment And Glaucoma Prescribed By An Accredited Physician/specialist. -dressings, Conventional Casts (plaster Of Paris) And Sutures. -x-ray, Laboratory Examinations, Routine, Diagnostic And Therapeutic Procedures Prescribed By An Accredited Physician/specialist, Provided However That The Cost Of Diagnostic And Therapeutic Procedures Covered Shall Be Limited To A Specific Amount. Minor Surgery Not Requiring Confinement Prescribed By An Accredited Physician/specialist; Eye Laser Therapy Only For Retinal Tear, Retinal Hole, Retinal Detachment And Glaucoma Prescribed By An Accredited Physician/specialist; Sclerotherapy For Varicose Veins (except Medicines And For Cosmetic Purposes) As Prescribed By An Accredited Physician, To Be Availed Through Accredited Vascular Surgeons. Allergy Testing/allergy Screening And Other Related Examinations Prescribed By An Accredited Physician; Speech Therapy (for Stroke Patients Only) And Tuberculin Test In - Patient Care Room & Board Accommodation (subject To The Member's Room & Board Limit; Professional Fee (pf) Of Attending Physician/specialists Must Be Included In The Payment Even If Not Accredited By The Hmo. All Other Items Directly Related In The Medical Management Of The Patient, As Deemed Medically Necessary By The Attending Accredited Physician; "use Of Operating Room, Intensive Care Unit (icu), Isolation Room (if Prescribed By Attending Accredited Physician)& Recovery Room" Attending Physicians, Surgeons, Anesthesiologists & Cardio-pulmonary Clearance Before Surgery & Cardiac Monitoring During Surgery; Room Upgrade In Case Of Room Unavailability (emergency Case Leading To Confinement Covered For The First 24 Hours) Standard Nursing Services, Medicines For In-patient Use, Blood Products Transfusion, Including Blood Screening And Cross Matching, X-ray, Laboratory Examinations, Routine, Diagnostic & Therapeutic Procedures Incidental To Confinement, Dressings, Conventional Casts (plaster Of Paris) & Sutures, Anesthesia And Its Administration, Oxygen And Its Administration And Standard Admission Kit. > Pre-existing Conditions - Dreaded Conditions Covered Up To Mbl, Non-dreaded Conditions Covered Up To Mbl > Emergency Care In Affiliated Hospitals: Doctor Services, X-rays, Laboratory And Diagnostic Examinations And Medical Services Related To The Emergency In Non-affiliated Hospitals -covered, Reimbursable Up To 80% Of The Hospital Bills And Professional Fees Based On Hmo Rates Incurred During The First 24 Hrs Of Treatment Up To Php 30,000.00/availment /member/year; Areas Without Accredited Hospital - Php 30,000.00/availment /member/year Reimbursable 100% Of Hmo's Rate; Emergency Ambulance (affiliated Hospital/clinic To Affiliated Hospital/clinic) Subject To Mbl; Ambulance Service (non- Affiliated Hospital/clinic To Affiliated Hospital/clinic) Reimbursable Up To Php 2,500.00 Per Conduction. > Preventive Care - Diagnostic Assessment And Management (covered); Administration And Immunization, Except Cost Of Vaccines (covered); Counseling On Health Habits, Diet And Exercise (covered); Family Planning Counseling (covered); Record Keeping Of Medical History (covered) > Routine Procedures Blood Chemistry: Fasting Blood Sugar/random Blood Sugar (fbs/rbs); Creatinine; Uric Acid; Lipid Profile; Sgpt; Hba1c; Alkaline Phosphatase(alp) Chest X-ray, Complete Blood Count (cbc) Urinalysis; Thyroid Stimulating Hormone (t4h); Thyroxine (t4) Test; Ultrasonogram: Whole Abdomen Ultrasound; Magnetic Resonance Imaging (mri); > Diagnostic Procedures 12-lead Electrocardiogram (ecg), 24-hour Electroencephalogram (eeg) Monitoring, 24-hour Holter Monitoring, Adrenocortical Function, Anti-nuclear Antibody, C-reactive Colonoscopy Procedure Gastroscopy Procedure Endoscopy Procedure Prostate Specific Antigen (psa) For Male 40 Years Old And Above Protein, Lupus Cell Exam, Arterial Blood Gas, Arthroscopic Procedures, Orthopedic Arthroscopy, Audiograms And Tympanograms, Bone Densitometry Scan (dexascan), Bone Mineral Density Studies, Cardiac Stress Tests (thallium And Dipyridamole Stress Tests) And Computed Tomography (ct) Scans. Therapeutic Procedures Arthrocentesis, Dialysis, Intravenous Chemotherapy, Phlebotomy, Physical Therapy / Occupational Therapy Excluding Subspecialties Such As Cardiac Rehabilitation, Pulmonary Rehabilitation And The Like And Thoracentesis Dental Coverage/ Dental Care Oral Consultation / Examination (covered), Oral Prophylaxis (twice A Year), Simple Tooth Extraction (covered), Temporary Filling (covered), Simple Repair And Adjustment Of Dentures, Recementation Of Jacket Crowns, Bridges, Inlay And Onlay (covered), Palliative Treatment Of Simple Mouth Sores And Blisters (covered), Desensitization Of Hypersensitive Teeth (up To Two (2) Teeth Per Year); Permanent Fillings (up To 2 Teeth Per Year), Gum Treatment For Cases Like Inflammation Or Bleeding (covered); Emergency Dental Treatment (covered) And Oral Incision And Drainage (covered) Other Benefits Glaucoma Findings; "cataract Surgery/ Cataract, Neuro Scan, Epilepsy And Seizure Disorder, Guillain-barre Syndrome, Multiple Sclerosis, Demyelinating Disease, Myasthenia Gravis And Other Autoimmune Neurologic Disease, Parkinson’s Disease, Dementia And Alzheimer’s Disease, Open Heart Surgery And Organ Transplant (except Cost Of Donor's Expenses) Maternity Assistance Pre And Post Natal Consultation Insurance Congenital Disease Covered Up To P60,000.00 Per Member Per Year Subject To Pre-existing Limit; Work Related Cases Based On Conditions Covered By Ecc- Work Related Injuries Are Covered Up To Php60,000.00 Per Year Financial Assistance - Group Life With Add & D Php 50,000.00 Per Member Point Of Service In-patient And Out-patient Reimbursable Up To 100% Hospital Bill And Professional Fee Based On The Actual Cost A. Other Preferences 1.) The Health Care Provider Must Be Accredited To The Five (5) Major Hospitals In General Santos City For The Past (5) Years; 2.) It Must Have An Outstanding Record And Performance In The Hospitals; 3.) Securing Of Letter Of Authority (loa) And Accessibility Of The Liaison Officers Must Be Within The Vicinity Of Every Hospital; 4.) Reimbursements And Other Refunds Must Be Paid Not Less Thirty (30) Days From The Submission Of The Official Receipts; 5.) Numerous Accredited Doctors And Medical Specialization; 6.) 24/7 Customer Service Assistance. Annual Check Up Basic Five (5); Physical Examination, Complete Blood Count, Fecalysis Urinalysis, Chest X-ray (for Members 35 Years Old And Above, Electrocardiogram (ecg), Pap's Smear (for Female Members), Flu Vaccine, Drug Test, Lipid Profile (total Cholesterol, Triglycyrides, Bad Cholesterol (ldl) Good Cholesterol Hdl) Fbs, Uric Acid, Sgpt And Creatinine Diagnostic/therapeutic Modalities - The Following Prescribed Diagnostic Examinations Are Covered Up To Plan Limit For In-patient And Up To Php 25,000.00 Per Member Per Year For Out-patient: Angiography; Pulmonary Perfusion And Ventilation Scan; Examination Involving Use Of Nuclear Technologies/imaging And Radioimmunodiagnosis And Therapy; Electromyography, Nerve Conduction Velocity (emg-ncv) Studies, Electroencephalogram (eeg); 24 Hour Holter Monitoring; 2d Echo/trans-esophageal Echocardiography, Venous/arterial Duplex/doppler Studies, Etc.; Treadmill Stress Test/thallium Stress Test; Myelogram; Imaging Studies Including Computerize Tomography (ct Scan), Magnetic Resonance Imaging (mri) And Neuro Scan; Videogastroscopy And Other Endoscopic Procedures; Connective Tissue Disease Examinations; All Tumor Markers; Ent Procedures; Radiographic Studies Requiring The Use Of Contrast Media; Diagnostic Procedures Requiring Use Of Operating Room. Special Treatment - Chemotherapy -covered Up To Mbl/per Member/per Year; Cobalt Therapy And Other Radiation Therapy- Covered Up To Mbl/member/year; Dialysis -covered Up To Mbl/per Member/year; Diagnostic Treatment Of Slipped Disc, Spondylosis, Scoliosis And Spinal Stenosis – Covered Up To Mbl/member/year ; Latest Modalities Of Treatment - If A Member Opts For The Latest Modalities Of Treatment In Lieu Of Traditional Methods, Hmo Would Only Be Covered Up To The Cost Of The Traditional Method. Notwithstanding The Following Would Only Be Covered Up To Plan Limit Per Year: Laser Surgery And Treatment Except To Correct Error Of Refraction; Lithotripsy; Arthroscopic Knee Surgery; Laparoscopic Cholecystectomy; Endoscopic Sinus Surgery; Laparoscopic Pelvic Operations; Trans-urethral Microwave Therapy Prostate; Cryosurgery; Stereotactic Brain Biopsy; Gamma Knife Surgery; Percutaneous Ultrasonic Nephrolithotomy; Hysteroscopic Myoma Resection; Laparoscopic Adrenalectomy (one Limit Each Per Organ)
Closing Date3 Dec 2024
Tender AmountPHP 14.7 Million (USD 249.3 K)

Offizielle Bezeichnung Tender

Others
Germany
Description: Contract notice – general guideline, standard rule open procedure (construction work) Green Trails, trail construction trail areas 10 Waldeck and 30 Diemelstadt trail construction Waldeck southeast type and scope of work construction work trail area 10 Waldeck lot 1 the Green Trails W ... Moregreen Trails, trail construction trail areas 10 Waldeck and 30 Diemelstadt trail construction Waldeck southeast type and scope of work construction work trail area 10 Waldeck lot 1 the Green Trails Waldeck-Frankenberg association is planning to use the Green Trails to implement a large-scale mountain bike project that is to be located in 14 municipalities in the Waldeck-Frankenberg district. The project comprises the creation of around 200 km of new mountain bike trails in so-called trail areas, which in turn are to be linked by around 200 km of connecting routes on existing paths. The aim is to promote tourism in the region, to create another leisure opportunity for the population and to convey an understanding of mutual coexistence, nature and its creatures. The Green Trails are based on the motto "trails for everyone!" and are not only intended to be built for sporty and experienced mountain bikers, but also to give all interested cyclists the opportunity to ride on trails. The project is sponsored by the Green Trails Association, and the tender is being issued on its behalf by the awarding authority of the Waldeck-Frankenberg district. One trail area of the project is being created in each of the municipalities of Waldeck and Diemelstadt, and the planned routes are being divided into four lots (two per area) for the trail construction. The service advertised here includes lot 1, the construction of three new trails to be built in the Waldeck trail area with a total length of approx. 7.3 km. Two of the trails to be built are downhill, one is uphill. Particularly high demands are placed on the construction and quality of the routes built, so special proof of suitability is required from the bidders. In addition, the bidders must present an explanation of the planned implementation of the routes in a written concept as part of the award procedure. The concept must be submitted together with the offer. The scope of services includes coordinating the exact route, clearing the route, modelling the route including the installation of elements with existing earth material, applying a covering layer and expanding crossroads with wooden fences and hedge structures. The trails are only built in forest areas with different tree populations. Nature conservation and soil and water protection legal framework conditions must be taken into account during construction. Waldeck Nordwest Type and scope of the service Construction work Trail area 10 Waldeck Lot 2 The Green Trails Waldeck-Frankenberg special purpose association is planning to implement a large-scale mountain bike project with the Green Trails, which is to be located in 14 municipalities in the Waldeck-Frankenberg district. The project includes the creation of around 200 km of new mountain bike trails in so-called trail areas, which in turn are to be linked by around 200 km of connecting routes on existing paths. The aim is to promote tourism in the region, to create another leisure opportunity for the population and to convey an understanding of mutual coexistence, nature and its creatures. The Green Trails have the motto "trails for everyone!" and are not only to be built for sporty and experienced mountain bikers, but to give all interested cyclists the opportunity to ride on trails. The project is being run by the Green Trails special purpose association, and the tender is being placed on its behalf by the Waldeck-Frankenberg district's awarding authority. One trail area of the project is being created in each of the municipalities of Waldeck and Diemelstadt, and the planned routes are being divided into four lots (two per area) for trail construction. The service being advertised here includes lot 2, the construction of three new trails to be built in the Waldeck trail area with a total length of around 4.6 km. One of the trails to be built leads downhill, one leads uphill, and one leads both uphill and downhill. Particularly high demands are placed on the construction and quality of the routes built, which is why bidders are required to provide special proof of suitability. In addition, bidders must provide an explanation of the planned implementation of the routes in a written concept as part of the awarding process. The concept must be submitted together with the bid. The scope of services includes coordinating the exact route, clearing the route, modelling the route (including incorporating elements using existing earth, applying a covering layer and expanding crossroads with wooden fences and hedge structures). The trails will only be built in forest areas with a variety of tree populations. Nature conservation, soil and water protection regulations must be taken into account during construction. Diemelstadt Ost Type and scope of service Construction work Trail area 10 Diemelstadt Lot 3 With the Green Trails, the Waldeck-Frankenberg Green Trails association is planning to implement a large-scale mountain bike project that is to be located in 14 municipalities in the Waldeck-Frankenberg district. The project involves the creation of around 200 km of new mountain bike trails in so-called trail areas, which in turn are to be linked by around 200 km of connecting routes on existing paths. The aim is to promote tourism in the region, to create another leisure opportunity for the population and to convey an understanding for mutual coexistence, nature and its creatures. The Green Trails are based on the motto "trails for everyone!" and are not only intended to be built for sporty and experienced mountain bikers, but also to give all interested cyclists the opportunity to ride on trails. The project is sponsored by the Green Trails special purpose association, and the tender is being issued on its behalf by the awarding authority of the Waldeck-Frankenberg district. One trail area of the project is being created in each of the municipalities of Waldeck and Diemelstadt, and the planned routes are being divided into four lots (two per area) for the trail construction. The service advertised here includes, as Lot 3, the construction of two new trails to be built in the Diemelstadt trail area with a total length of approx. 5.6 km. One of the trails to be built is to be built mostly parallel to the slope, the other downhill. Particularly high demands are placed on the construction and quality of the routes built, so tenderers are required to provide special proof of suitability. In addition, as part of the award procedure, tenderers must present an explanation of the planned implementation of the routes in a written concept. The concept must be submitted together with the offer. The scope of services includes coordinating the exact route, clearing the route, modeling the route including installing elements with existing earth material, applying a surface layer, expanding path crossings with wooden fence and hedge structures and erecting wooden walkways and bridges. The trails are only built in forest areas with a variety of tree populations. Environmental protection, soil and water protection regulations must be taken into account during construction. Diemelstadt West Type and scope of work Construction Trail area 10 Diemelstadt Lot 4 The Green Trails Waldeck-Frankenberg special purpose association is planning to use the Green Trails to implement a large-scale mountain bike project that is to be located in 14 municipalities in the Waldeck-Frankenberg district. The project includes the creation of around 200 km of new mountain bike trails in so-called trail areas, which in turn are to be linked by around 200 km of connecting routes on existing paths. The aim is to promote tourism in the region, to create another leisure opportunity for the population and to convey an understanding of mutual coexistence, nature and its creatures. The Green Trails have the motto "trails for everyone!" And are not just intended to be built for sporty and experienced mountain bikers, but to give all interested cyclists the opportunity to ride on trails. The project is sponsored by the Green Trails special purpose association, and the tender is being issued on its behalf by the Waldeck-Frankenberg district's awarding authority. A trail area of the project is being created in each of the municipalities of Waldeck and Diemelstadt, and the planned routes are being divided into four lots (two per area) for trail construction. The service being advertised here includes lot 4, the construction of two new trails to be built in the Diemelstadt trail area with a total length of approx. 4.6 km. Both trails to be built are to be built predominantly parallel to the slope. Particularly high demands are placed on the construction and quality of the routes built, which is why bidders are required to provide special proof of suitability. In addition, bidders must present an explanation of the planned implementation of the routes in a written concept as part of the awarding process. The concept must be submitted together with the offer. The scope of services includes coordinating the exact route, clearing the route, modelling the route including installing elements with existing earth material, applying a covering layer and expanding path crossings with wooden fences and hedge structures. The trails are only built in forest areas with different tree populations. Environmental protection and soil and water protection legal framework conditions must be taken into account during construction.
Closing Date11 Dec 2024
Tender AmountRefer Documents 

Kl rwerk Wansdorf GmbH ber P2m Berlin GmbH Tender

Civil And Construction...+1Others
Germany
Details: At the Wansdorf sewage treatment plant, parts of the coating on digester sludge tanks 1 and 2, the mixed sludge tank and the operating bridges are being renewed. Tanks and operating bridges made of reinforced concrete. Tank dimensions: diameter: 10.5 m (inside), height: 5.8 m (inside), wall thickness: 0.4 m. The measure essentially includes: - dismantling the existing GRP cover, - dismantling and disposal of access hatches, - cleaning the surfaces of the fittings and the walls/bridge/floor, - draining the water sludge mixture incl. Fibrous materials using a suction truck, - loosening and removing solid deposits, - disposal of sand, fibrous materials and residual materials after temporary storage at the sludge storage area including proof of disposal, - removal and disposal of GRP coating 2 x 35 + 60 m2, - sandblasting concrete 130 m2, - renovation of damaged areas in concrete, - roughening existing coating 80 m2, - application of an alkali-resistant, environmentally friendly, crack-bridging, hand-laid, glass fiber reinforced, multi-layer epoxy resin coating Permacor 175 m2, - force-fitting filling of cracks (epoxy resin injection), - closing ceiling recess in reinforced concrete ceiling, - construction of pump sump for sludge hall.
Closing Date20 Dec 2024
Tender AmountRefer Documents 

MH Projektentwicklungsgesellschaft MbH Tender

Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Germany
Details: New primary school building Karl-Liebknecht-Strasse 2c The project involves the construction of a new primary school. The client is the city of Ludwigsfelde. The building consists of a three-storey structure with three wings for classrooms and social rooms, a cafeteria/auditorium and a day-care area. The building does not have a basement. The load-bearing components are made of reinforced concrete with wall panels and columns. The horizontal floors are built from reinforced concrete ceilings and beams. A reinforced concrete foundation slab is planned as a "hybrid floor slab" with a support grid made of elastically supported beams. Building characteristics: Number of full floors: 3 Gross volume Bri: 45,212 M3 Gross floor area Bgr: 9,107 M2 Roof shape: Flat roof Height of roof above ground level: 14.27 M Height of last ceiling above ground level: 9.24 M Max. building dimensions: 78.46 MX 74.78 M Lot 11 - Interior plastering work - Approx. 1,365m² Cleaning of wall surfaces, priming - Approx. 750m Cleaning of reveal surfaces, priming - Approx. 1,000m² Protection by masking - Approx. 300m² Bonding bridge on smooth surfaces - Approx. 300m² Full coverage spray plaster - Approx. 1,365m² Wall plaster, Pii, Q2 - Approx. 750m Reveal plaster, Pii, up to 25cm, Va - Approx. 1,480m Plaster finishing profile - Approx. 300m² joint filling, Ft ceiling panels - Approx. 1,200m plaster connection strip inside (Apu strip) - Approx. 900m corner protection angle, galvanized, interior plaster
Closing Date2 Dec 2024
Tender AmountRefer Documents 

Amt Plessa Tender

Others
Germany
Details: Ex-ante publication on the Brandenburg procurement marketplace in accordance with Vv No. 3.3 to Section 55 Lho Brandenburg. After the deadline has expired (until November 26, 2024), we intend to award the services listed below in a restricted tender without competition. If you are interested in carrying out the contract, we would like to ask you to express your interest by submitting an expression of interest within the corresponding deadline to the email address Janin.petschke@plessa.de. In this expression of interest, we expect the following information in advance: A) Presentation of your company, B) List of the average annual total turnover for the last 3 financial years C) Declaration of liability insurance, coverage of at least EUR 1 million for personal injury and EUR 1 million for property and financial damage. Alternatively, a confirmation from an insurance company can be submitted stating that such liability insurance will be taken out in the event of an order. The declaration or evidence must not have been issued before June 1, 2024. D) Evidence of 3 references for comparable services in the last 5 completed financial years, stating the project name, period, scope, client, contact person and telephone number, E) List of services to be awarded to subcontractors, F) Number of average workforce employed in the last 3 completed financial years, broken down by professional group, G) List of technical personnel intended for management and supervision. H) Self-declaration of reasons for exclusion in accordance with Sections 123 and 124 Gwb using form 4.1 and Section 19 Para. 3 Milog, Section 21 Para. 1 Aeentg and Section 21 Schwarbg, is requested by the awarding authority separately for each member of bidding consortiums. Description of services: The Sra-03 bridge is to be demolished and replaced by a new replacement structure. The bridge can currently only be used by bicycle traffic. In the future, it will also only be used by bicycle traffic, including restricted access by the Plessa district's building yard (vehicles up to 7.5 tonnes). For this reason, the options available for the replacement building must be checked during the planning phase. The client provides surveying data and the results of investigations into the subsoil and the analysis of the material of the existing structure. The planning services put out to tender will be remunerated in accordance with Hoai 2021. The rough cost estimate for the replacement building Sra-03 over the Great Schradener Binnengraben near Schraden, which was made as part of preliminary planning, resulted in costs totalling EUR 185,000 gross. The total fee is assessed, which is the sum of all price components (special services and ancillary costs). The evaluation sum determined in this way forms the basis for the award. The contract is awarded in stages, divided into individual service phases. With the conclusion of the restricted tender, Lph 1-4 for the measure replacement new construction Sra-03 over the large Schradener Binnengraben near Schraden will be contractually commissioned, as well as the structural planning for Lph 2-4. There is no legal entitlement to the transfer of all planned service phases. There is also no legal entitlement to further commissioning after the first service phases have been completed. Lot 1: - Planning services for civil engineering structures based on the Hoai (part 3 paragraph 3) §41 ff. in conjunction with appendix 12, service phases (lph) 1-9 - Planning services for structural structures based on the Hoai (part 4 paragraph 1) §49 ff. in conjunction with appendix 14, service phases (lph) 2-6 - Consulting services for funding - Special services for civil engineering structures, service phase 8
Closing Date22 Nov 2024
Tender AmountRefer Documents 

LAWOG Gemeinn Landeswohnungsgen F R O F R Den Verein Sch Lerheim Der HTBLA Hallstatt Tender

Austria
Austria-linz: Electrical Wiring And Fitting Work
Closing Date22 Dec 2024
Tender AmountRefer Documents 

Potsdam Institut F R Klimafolgenforschung E V Tender

Electronics Equipment...+1Electrical and Electronics
Germany
Details: Conversion and renewal of the audio-video technology in the two conference rooms "Main Dome and West Dome" of the Potsdam Institute for Climate Impact Research (PIK) in building A31 Telegrafenberg, 14473 Potsdam. The solution offered includes the delivery, assembly, commissioning and programming of all media technology devices including brackets and connection services. The main dome with a floor area of approx. 80 square meters is furnished with conference tables in an oval U-arrangement for 22 participants. At the open end there is a large-format display and next to it a lectern for the speaker. The central media technology is installed in a cabinet below the display. The cabling between the lectern and the central media technology takes place via a cable duct on the ceiling of the floor below the conference room. The following basic functionalities are to be created: - Video signal transmission via IP (video-over-IP) - Audio signal transmission via IP (audio-over-IP) - Renewal of the display - Addition of a second, smaller display to show, for example, the participants in a video conference - Wireless video feed - Fixed camera technology (3 cameras) including automatic (sound-controlled) switching between the cameras and panning/tilting to the speaker - USB interface for an additional presentation PC for hybrid events - High-quality, ergonomic lectern - Renewal of the wireless microphone technology - Addition of a wired conference system - Renewal of the sound system - Media control processor for operating the media technology via touch panel and controlling the lighting system - Addition of cabling including connections The west dome with a floor space of approx. 40 square meters is equipped with a V-shaped video conference table for max. 9 participants. At the open end there is a monitor cart with two displays as well as a camera and video conference codec. The cabling to the conference table is currently being done on the fly and is to be renewed and covered with a cable bridge. The room is used for both video conferences and meetings with presentations. The following basic functions are to be created: - Renewal of the video conference system. Pik already uses Logitech Rally systems. The new system should correspond exactly to the existing systems in terms of operation and function. - Renewal of the media furniture - Renewal of the displays - Connection panel on the conference table for presentations on the displays and during video conferences - Additional cabling including connections - Addition of a media control for switching on/off and source switching
Closing Soon29 Nov 2024
Tender AmountRefer Documents 

National Library Of The Philippines Tender

Publishing and Printing
Philippines
Details: Description The National Library Of The Philippines (nlp), Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Working Days. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A.bidding Is Restricted To Filipino Citizens/sole Proprietorship, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From Nlp Bids And Awards Committee (bac) Secretariat Email Address And Inspect The Bidding Documents Posted At The Philippine Government Electronic Procurement System (philgeps) Or In Our Official Website Web.nlp.gov.ph. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 13, 2024 Through Email And Website(s) Below. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Through Electronic Means Or By Presenting The Official Receipt In Person. 6. The Nlp Will Hold A Pre-bid Conference On November 21, 2024 At 01:00 Pm Through Video Conferencing Via Zoom Which Shall Be Open To All Prospective Bidders. Send Interest To Bac@nlp.gov.ph With Subject: Request To Join The Pre-bid Conference Of Public Bidding No. 24-20. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Below On Or Before December 05, 2024 At 3:00 Pm. Usb Flash Drive Containing The Soft Copy Of The Technical (in Pdf) And Financial (in Word Or Excel) Requirements Must Be Included In The Original Copy Of The Technical Documents. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On December 05, 2024 At 03:01 Pm At The 6th Floor Function Room, Nlp Building. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Nlp Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Maureen M. Terrenal Marie Joy H. Bestoir Eleanor C. Siyang Jonathan F. Santos Bac Secretariat National Library Of The Philippines Tel. No.: (02) 5314-2100loc. 406 / 412 Email: Bac@nlp.gov.ph Website: Web.nlp.gov.ph 12. You May Visit The Following Websites: For Downloading Of Bidding Document: Web.nlp.gov.ph / Www.philgeps.gov.ph Sgd. Maricel M. Ureña Bac, Chairperson Item No. Lot 1 Academic And Trade Ebooks 1 100 Herbs To Grow : A Comprehensive Guide To The Best Culinary And Medicinal Herbs, Mcvicar, Jekka;don, Monty, 9781837830480, 2024 2 3d Printing : Polymer, Metal And Gel Based Additive Manufacturing, Singh, Rupinder;kumar, Ranvijay;kumar, Vinay;davim, J. Paulo, 9783111081632, 2024 3 50 Strategies For Supporting Multilingual Learners , Manning, Mandy, 9798765946244 9798765946251 , 4 A Concepts-based Introduction To Financial Accounting, Kolitz, D., 9781485132783, 2023 5 A Straight Talking Introduction To Emotional Wellbeing : From Mental Illness To Mad Studies, Beresford, Peter, 9781915220363, 2023 6 Acknowledging, Supporting And Empowering Workplace Bullying Victims : A Proactive Approach For Human Resource Managers, Yarbrough, Jillian Williamson, 9783031410307, 2023 7 Adult Physical Conditions : Intervention Strategies For Occupational Therapy Assistants, Second Edition, Mahle, Amy J.;ward, Amber L., 9781719644365, 2022 8 Advanced Introduction To Digital Society, Castells, Manuel., 9781803921129, 2024 9 Aerial Warfare, Ledwidge, 9780198804314, 2020) 10 Ai For Absolute Beginners: A Clear Guide To Tomorrow, Theobald, Oliver, 9781835886533, 2024 11 An Introduction To Interaction : Understanding Talk In The Workplace And Everyday Life, Garcia, Angela Cora, 9781350199941, 2023 12 An Introduction To South Asian Politics, Devotta, Neil, 9780429582479, 2024 13 An Introduction To Taxation, Butler, Eamonn, 9780255368384, 2024 14 An Introduction To The Effects Of Mass Media, Haney, Roger, 9781527575745, 2024 15 Ancient Philosophy, Julia Annas, 9780198805885, 2023) 16 Arbitration, Schultz, Grant, 9780198738749, 2021) 17 Aromatherapy : A Clinical Guide To Essential Oils For Holistic Healing (a Beginner's Guide To Making And Using Essential Oils At Home For Skincare), Hickman, Thomas, 9781777427696, 2024 18 Artisan Air-dry Clay : The Beginner's Guide To Easy, Inexpensive & Stylish No-kiln Pottery, Hostasova, Radka, 9781644032527, 2022 19 Asean Post-2025 : Reimagining The Asean Economic Community, Tijaja, Julia;tay, Simon;basu Das, Sanchita, 9789815203400, 2024 20 Assessment As Information Practice : Evaluating Collections And Services, Haddow, Gaby;white, Hollie, 9781000510515, 2021 21 Atheism, Baggini, 9780198856795, 2021) 22 Autoimmune Disorders : Adjuvants And Other Risk Factors In Pathogenesis, Watad, Abdulla;bragazzi, Nicola Luigi;shoenfeld, Yehuda, 9781119858423, 2024 23 Bacteria, Amyes, 9780192895240, 2022) 24 Be A Polymer Clay Pro! : 15 Projects & 20+ Skill-building Techniques, Tomlinson, Lauren, 9781644032473, 2023 25 Biodiversity Conservation, Macdonald, 9780199592272, 2023) 26 Blasphemy, Sherwood, 9780198797579, 2021) 27 Borders, Alexander C. Diener And Joshua Hagen, 9780197549605, 2024) 28 Bosses, Coworkers, And Building Great Work Relationships (hbr Work Smart Series), Review, Harvard Business;goldstein, Eliana;gallo, Amy;wilding, Melody;rogelberg, Steven G., 9781647827120, 2024 29 Botany : An Introduction To Plants And Their Adaptations, Pandey, Santosh, 9781779560490, 2024 30 Bullying In Schools : Measures For Prevention, Intervention And Aftercare, Böhmer, Matthias;steffgen, Georges, 9783658435769, 2024 31 Chatgpt For Social Media Managers : Boost Engagement And Streamline Content Creation With Ai-powered Tools (2024 Guide), Wagner, Malcolm, 9783689441555, 2024 32 Chatgpt Simplified Unleash Creativity And Save Time In Your Daily Life (2024 Edition) : Learn How To Extract The Most Value Out Of Ai., Ruffilo, Nick, 9798869100603, 2024 33 City Planning, Abbott, 9780190944346, 2020) 34 Climate Change, Maslin, 9780198867869, 2021) 35 Cognitive Behavioural Therapy, Mcmanus, 9780198755272, 2022) 36 Community Based Tourism, Juyal, Deepak, 9781779561268, 2024 37 Community Studies : An Introduction To The Sociology Of The Local Community, Bell, Colin;newby, Howard, 9781000463828, 2023 38 Complete Copyright For K-12 Librarians And Educators, Second Edition, Russell, Carrie, 9780838939574, 2023 39 Consuming Digital Disinformation : How Filipinos Engage With Racist And Historically Distorted Online Political Content, Jason Vincent A Cabanes;fernando A Santiago;beng, Ooi Kee, 9789815104530, 2023 40 Contesting The Philippines, Rood, Steven;taylor, Veronica L, 9789815104929, 2024 41 Corporate Psychology And Its Impact On Diversity, Equity, And Inclusion, Al A'ali, Ebtihaj Ahmed;masmoudi, Meryem;alsaffar, Gardenia, 9781668490167, 2023 42 Creative Puzzles To Ignite Your Mind, Gupta, Shyam Sunder, 9789811965654, 2023 43 Critical Thinking : An Introduction To Reasoning Well, Watson, Jamie Carlin;arp, Robert;king, Skyler, 9781350232952, 2024 44 Cultural Management : A Research Overview, Bilton, Chris, 9781000878417, 2023 45 Curating Community Collections : A Holistic Approach To Diverse Collection Development, Schreiber, Mary;bartlett, Wendy K., 9781440880995, 2024 46 Customer Xperience Leadership : A Blueprint To Maximize Performance, Goldschmidt, Nadav, 9789811264092, 2024 47 Cyber Safety For Everyone : A Comprehensive Guide To Online Safety, 3rd Edition, Teens, Jaago, 9789355516350, 2024 48 Data Analysis With Python : Introducing Numpy, Pandas, Matplotlib, And Essential Elements Of Python Programming, Dixit, Rituraj, 9789355511034, 2022 49 Deeply Responsible Business : A Global History Of Values-driven Leadership, Jones, Geoffrey, 9780674292994, 2023 50 Dementia, Taylor, 9780198825784, 2020) 51 Democracy, Naomi Zack, 9780192845061, 2023) 52 Digital Factory : A Digital Compass For Smart Manufacturing, Kozamernik, Luka, 9783031510717, 2024 53 Digital Marketing For Rural Small Businesses : A Comprehensive Guide To Getting Found On The Internet, Treadway, Chad J, 9798988528920, 2023 54 Digitalization In Practice : Intersections, Implications And Interventions, Perriam, Jessamy;meldgaard Kjær, Katrine, 9783110787641, 2024 55 Displaying Organisation: How To Successfully Manage A Museum Exhibition, Goddard, Rhiannon, 9781783305315, 2023 56 Dynasty, Duindam, 9780198809081, 2019) 57 Education, Thomas, 9780198859086, 2021) 58 Entrepreneurship Made Easy : Kingdom Entrepreneurship Nexus, Appiah, Rev. Michael, 9781684867769, 2024 59 Ethics In Online Ai-based Systems : Risks And Opportunities In Current Technological Trends, Caballé, Santi;casas-roma, Joan;conesa, Jordi, 9780443188503, 2024 60 Evangelicalism, Stackhouse Jr., 9780190079680, 2022) 61 Exiting Violence : The Role Of Religion, Tonelli, Debora;mannion, Gerard Michael J., 9783110796827, 2024 62 Experience, Opportunity, And Developing Your Career (hbr Work Smart Series), Review, Harvard Business;aboubaker, Mimi;malhotra, Ruchika T.;chamorro-premuzic, Tomas;riegel, Deborah Grayson, 9781647827069, 2024 63 Fatty Liver Disease Diet : A Beginner's Step-by-step Guide With Recipes And A Meal Plan, Ackerberg, Bruce, 9798869331854, 2024 64 Food And Beverage Service, Cajiao, Israel Tinoco, 9781779561473, 2024 65 Forensic Science, Fraser, 9780198834410, 2020) 66 From Dream To Reality : How To Make A Living As A Freelance Writer, Kwak, Jessie L., 9781648412806, 2023 67 From Paper To Practice : Utilizing The Asean Guide On Artificial Intelligence (ai) Governance And Ethics, Fong, Kristina, 9789815203684, 2024 68 Front Office Management, Cajiao, Israel Tinoco, 9781779561305, 2024 69 Future Farming: Advancing Agriculture With Artificial Intelligence, Shukla, Praveen Kumar;bera, Tushar Kanti, 9789815124729, 2023 70 Games, Changes, And Fears : The Philippines From Duterte To Marcos Jr., Arugay, Aries;encinas-franco, Jean, 9789815203189, 2024 71 Geometry, Dunajski, 9780199683680, 2022) 72 Geophysical And Climate Hazards, Bill Mcguire, 9780192874535, 2024) 73 Giftedness And Talent : What Educators And Psychologists Need To Know, Preckel, Franzis;vock, Miriam;olszewski-kubilius, Paula, 9781616766276, 2024 74 Globalization, Manfred Steger, 9780192886194, 2023) 75 Greenhouse Gardening For Beginners : Your Ultimate Guide To Creating A Flourishing Greenhouse Garden (2024), Butler, Raven, 9783988316967, 2023 76 Habeas Corpus, Tyler, 9780190918989, 2021) 77 Handbook On The Politics And Governance Of Big Data And Artificial Intelligence, Zwitter, Andrej;gstrein, Oskar J., , 2023 78 Hbr Guide To Unlocking Creativity, Review, Harvard Business, 9781647825072, 2023 79 Health Care Of The Elderly : Essays In Old Age Medicine, Psychiatry And Services, Arie, Tom, 9781000580952, 2024 80 Healthy Eating For Older Adults, Plaven, Jeremy, 9798891137677, 2024 81 Higher Education And Sdg17 : Partnerships For The Goals, Cabrera, Ángel;cutright, Drew, 9781804557044, 2023 82 Horror, Darryl, 9780198755562, 2021) 83 Housekeeping Management, Juyal, Deepak, 9781779561312, 2024 84 How Public Libraries Build Sustainable Communities In The 21st Century, Williams-cockfield, Kaurri C.;mehra, Bharat, 9781803824376, 2023 85 Human Resource Management, Wilkinson, 9780198714736, 2022) 86 Hydroponics Garden : Cultivating Abundance With Hydroponic Gardening (2024 Guide For Beginners), Barlow, Rolf, 9783988318497, 2024 87 I, Human : Ai, Automation, And The Quest To Reclaim What Makes Us Unique, Chamorro-premuzic, Tomas, 9781647820565, 2023 88 Improving Library Systems With Ai : Applications, Approaches, And Bibliometric Insights, Senthilkumar, K. R.;jagajeevan, R., 9798369355961, 2024 89 Inclusion (hbr Emotional Intelligence Series), Review, Harvard Business;washington, Ella F.;dobson-smith, Dds;rezvani, Selena;gordon, Stacey A., 9781647824839, 2023 90 Infectious Disease 2ed, Marta Wayne, Benjamin Bolker, 9780192858511, 2023) 91 Information For Sustainable Development : Technology, People And Society, Chowdhury, G. G.;chowdhury, Sudatta, 9781783306688, 2024 92 Information Literacy And The Digitalisation Of The Workplace, Widen, Gunilla;teixeira, Jose, 9781783305803, 2024 93 Information, Cyber And Space Domain And Its Application In Future Land Warfare, Mallick, Pk, 9789391490645, 2023 94 Intelligence, Deary, 9780198796206, 2020) 95 Interviewing Users : How To Uncover Compelling Insights, Portigal, Steve;burge, Jamika D., 9781959029823, 2023 96 Introduction To A Social Worker, The National Institute For Social Work Training, The National, 9781000438048, 2023 97 Introduction To Algorithms: A Comprehensive Guide For Beginners, Llc, Cuantum Technologies, 9781836203865, 2024 98 Introduction To Chemistry, Motola, Martin, 9781779561879, 2024 99 Introduction To Communication Studies, Lubinga, E., 9781485130147, 2023 100 Introduction To Datafication : Implement Datafication Using Ai And Ml Algorithms, Goniwada, Shivakumar R., 9781484294963, 2023 101 Introduction To Game Programming Using Processing : For Designers, Artists, Players, Non-tech People And Everybody Else, Cermak-sassenrath, Daniel, 9781040021842, 2024 102 Introduction To Governance, Government And Public Administration, Franklin, Aimee L.;raadschelders, Jos C. N., 9783031326899, 2023 103 Introduction To Key Principles Of Aquaculture, Bruno Augusto Amato Borges, 9781779560131, 2024 104 Introduction To Motivational Interviewing For Mental Health Clinicians : A Practical Guide To Empowering Change In Mental Health Care, Townsend, Philip Jericho, 9781923238077, 2024 105 Introduction To Neurolinguistics, Kulkarni, Prafull Dhondopant, 9781774696224, 2023 106 Introduction To Philosophy, Heidegger, Martin;mcneill, William, 9780253069214, 2024 107 Introduction To Physics, Vsemirnova, Ekaterina, 9781779561893, 2024 108 Introduction To Statistics, Ngetich, Allan, 9781779561640, 2024 109 Key Concepts In Hotel Management, Raga, Jennifer, 9781774696347, 2023 110 Key Concepts In Library Science, Gaurav, Kumar, 9781774696354, 2023 111 Key Concepts In Tourism, Raga, Jennifer, 9781774696378, 2023 112 Leading Together : Academic Library Consortia And Advocacy, Herold, Irene M.h., 9780838938881, 2021 113 Learn To Watercolor : The Essential Techniques In 10 Projects, Linden, Sarah Van Der, 9781644032824, 2022 114 Let's Roll : A Guide To Setting Up Tabletop Role-playing Games In Your School Or Public Library, Maxwell, Lucas, 9781783306152, 2023 115 Librarian's Guide To Games And Gamers : From Collection Development To Advisory Services, Goodridge, Michelle;rohweder, Matthew J., 9798216110958, 2021 116 Library 2035 : Imagining The Next Generation Of Libraries, Hirsh, Sandra, 9781538180419, 2024 117 Live The Life You Love : Empowering Women Through Franchise Ownership, Schaeffer, Linda, 9781950336814, 2024 118 Machine Learning With Python : Unlocking Ai Potential With Python And Machine Learning, Theobald, Oliver, 9781835462072, 2024 119 Making A Difference : Instructional Leadership That Drives Self-reflection And Values The Expertise Of Teachers, Mette, Ian M.;cormier, Dwayne Ray;oliveras, Yanira, 9781475872279, 2023 120 Managing Grey Literature : Technical Services Perspectives, Leonard, Michelle;thomas, Susan E., 9780838938218, 2022 121 Marine Biology, Mladenov, 9780198841715, 2020) 122 Marketing, Le Meunier-fitzhugh, 9780198827337, 2021) 123 Men's Sexual Health In Early Modern England, , 9789048537761, 2024 124 Mentoring For Speech And Language Therapists : Unlocking Professional Development Throughout Your Career, Heritage, Mary, 9781040031124, 2024 125 Metastatic Bone Disease : An Integrated Approach To Patient Care, Randall, R. Lor, 9783031520013, 2024 126 Military Strategy, Antulio J. Echevarria Ii, 9780197760154, 2024) 127 Museums In Motion : An Introduction To The Histories, Functions, And Aspirations Of Museums, Decker, Juilee, 9781538155745, 2024 128 Nelson Mandela, Elleke Boehmer, 9780192893444, 2023) 129 Nuclear Weapons, Siracusa, 9780198860532, 2020) 130 Open Access Literature In Libraries : Principles And Practices, Brunsting, Karen;harrington, Caitlin;scott, Rachel E., 9780838936757, 2022 131 Openai Api Cookbook: Build Intelligent Applications Including Chatbots, Virtual Assistants, And Content Generators, Habib, Henry;mckay, Sam;siegel, Paul, 9781805125730, 2024 132 Ortho Notes: Clinical Examination Pocket Guide, 5th Edition, Gulick, Dawn, 9781719650779, 2023 133 Pandemics, Mcmillen, Christian W., 9780197762004, 2024) 134 Particle Physics, Frank Close, 9780192873750, 2023) 135 Philosophical Method, Williamson, 9780198810001, 2020) 136 Philosophy Of Mind, Montero, 9780198809074, 2022) 137 Plague, Slack, 9780198871118, 2021) 138 Planetary Systems, Pierrehumbert, 9780198841128, 2021) 139 Poststructuralism, Belsey, 9780198859963, 2022) 140 Probabilistic Indexing For Information Search And Retrieval In Large Collections Of Handwritten Text Images, Toselli, Alejandro Héctor;puigcerver, Joan;vidal, Enrique, 9783031553899, 2024 141 Project Based Problem Solving And Decision Making : A Guide For Project Managers, Kerzner, Harold, 9781394207848, 2023 142 Public Administration : The Basics, Schiavo-campo, Salvatore, 9781000820591, 2023 143 Qualitative Research Approaches For Psychotherapy : Reflexivity, Methodology, And Criticality, Tudor, Keith;wyatt, Jonathan, 9781000895322, 2023 144 Reference And Information Services : An Introduction, Fifth Edition, Cassell, Kay Ann;hiremath, Uma, 9780838936443, 2023 145 Region, Nation And Homeland : Valorization And Adaptation In The Moro And Cordillera Resistance Discourses, Coronel Ferrer, Miriam, 9789814843720, 2020 146 Religion, Tweed, 9780190064679, 2020) 147 Rethinking Conflict Resolution And Management, Zartman, I. W.;vuković, Sinisa, 9781800376991, 2023 148 Revolutions, Jack A. Goldstone, 9780197666302, 2023) 149 Robotic Vision And Virtual Interfacing : Seeing, Sensing, Shaping, Eldridge, Luci;trivedi, Nina, 9781399523448, 2024 150 Security After The Unthinkable: Terror And Disenchantment In Norway, Burgess, J. Peter, 9781526166357, 2024 151 Serving Patrons With Disabilities : Perspectives And Insights From People With Disabilities, Laskin, Kodi, 9780838939550, 2023 152 Simple Book Repair Techniques, Conn, Donia, 9781538167458, 2024 153 Small Scale Businesses In The Hospitality Sector : The Forgotten Many And The Post-covid Era, Raga, Jennifer, 9781774692066, 2022 154 So, I'm Autistic : An Introduction To Autism For Young Adults And Late Teens, O'brien, Sarah, 9781839972270, 2023 155 Social And Medical Problems Of The Elderly : Fourth Edition, Hazell, Kenneth, 9781040007747, 2024 156 Social Anxiety : Hidden Fears And Shame In Teens And Adults, , 9781615375493, 2025 157 Social Media And Youth Mental Health, , 9781615375028, 2025 158 Sports Skill Analysis, Li, Weidong;dai, Boyi;zhu, Qin, 9781003849582, 2024 159 Stardom, Film Couples And Love Teams In 1970s Philippine Cinema, Sebastiampillai, Chrishandra, 9781399521017, 2024 160 Station : A Journey Through 20th And 21st Century Railway Architecture And Design, Beanland, Christopher, 9781849949521, 2024 161 Stem Cells, Slack, 9780198869290, 2021) 162 Suburbs, Carl Abbot, 9780197599242, 2023) 163 Superstition, Vyse, 9780198819257, 2020) 164 Supporting People To Live Well With Dementia : A Guide For Library Services, Mcnicol, Sarah, 9781783306008, 2023 165 Sustainability Beyond 2030 : Trajectories And Priorities For Our Sustainable Future, Tavanti, Marco;sfeir-younis, Alfredo, 9781040116630, 2024 166 Sustainable Communities For A Healthy Planet, Zywert, Katharine, 9781487550455, 2024 167 Sustainable Farming : Nurturing The Earth For Future Generations, Kushwaha, Saket, 9781779560506, 2024 168 Technical Program Manager’s Handbook : Empowering Managers To Efficiently Manage Technical Projects And Build A Successful Career Path, Teter, Joshua Alan, 9781804613160, 2022 169 The Application Of The Dragon. Storytelling To Job Success : How Employers Attract Good Employees And Applicants Can Use Hr Marketing And Recruiting Knowledge In Interview And Selection, Janson, Simone, 9783965960299, 2024 170 The Art Of Peace Formation: Arts-based Social Movements, Opportunities And Blockages, Birte Vogel,stefanie Kappler,oliver P. Richmond, 9781399519557, 2024 171 The Bible, Riches, 9780198863335, 2021) 172 The Big Source Book Of Free And Low-cost Library Programming : 300+ Resources, Ideas, And Tools, Kroski, Ellyssa, 9780838939697, 2024 173 The Big Sourcebook Of Free And Low-cost Library Programming : 300+ Resources, Ideas, And Tools, Kroski, Ellyssa, 9780838939697, 2024 174 The Collector And The Collected : Decolonizing Area Studies Librarianship, Pappas, Erin;arays, Anna;browndorf, Megan, 9781634001632, 2020 175 The Complete Herbal Handbook : 160 Herbal Remedies For Mental And Emotional Well-being, Shamar, Ranvir Rohan, 9781923238459, 2024 176 The Confident Warrior : How To Cultivate Confidence In Everyday Life, Then Use It!, B Dibacco, Kevin, 9781963239447, 2024 177 The Future Of Cropping Systems, Daniels, Julia E., 9798891130722, 2023 178 The Future Of Smart Agriculture, Mohapatra, Hitesh, 9798891133655, 2023 179 The Hbr Work Smart Collection (4 Books), Review, Harvard Business;glass, Russell;david, Susan;gallo, Amy;zheng, Lily, 9798892790659, 2024 180 The History Of Emotions, Dixon, 9780198818298, 2023) 181 The History Of Political Thought, Whatmore, 9780198853725, 2021) 182 The Microstress Effect : How Little Things Pile Up And Create Big Problems--and What To Do About It, Cross, Rob;dillon, Karen, 9781647823986, 2023 183 The Oxford Handbook Of Arts And Cultural Management, Jung, Yuha;vakharia, Neville;vecco, Marilena, 9780197621639, 2024 184 The Period Literacy Handbook, Hussain, Anne, 9781739010416, 2024 185 The Spanish Pacific, 1521-1815 : A Reader Of Primary Sources, Lee, Christina;padrón, Ricardo, 9789048552276, 2020 186 Transforming Society : A Comprehensive Introduction To Understanding Trauma, Adversity, And Becoming A Trauma-informed Organisation, Brighouse, Little, 9781803818313, 2024 187 Understanding Blindness : An Integrative Approach, Hollins, Mark, 9781000549423, 2023 188 Unleash Your Inner Bad Bitch : A Guide For Using Project Management Skills Into Work Life Management Queendom, Bond Dba Pmp, Syreeta S., 9798885043946, 2024 189 Urban Pest Management : An Environmental Perspective, Dhang, Partho, 9781800622944, 2023 190 Using Graphic Novels In The Stem Classroom, Boerman-cornell, William;ho, Josha;klanderman, David;klanderman, Sarah, 9781350279216, 2023 191 Violence, Dwyer, 9780198831730, 2022) 192 Viruses, Dorothy H. Crawford, 9780192865069, 2022) 193 Volcanoes, Branney & Zalasiewicz, 9780199582204, 2020) 194 War And Religion, Mitchell & Rey, 9780198803218, 2021) 195 Waste Problems And Management In Developing Countries, Sebastiampillai, Chrishandra, 9781779560407, 2024 196 Where It Hurts : An Introduction To Sociology For Health Workers, Russell, Cherry;schofield, Toni, 9781040050422, 2024 197 World Mythology, David Leeming, 9780197548264, 2022) 198 World Religions In Seven Sentences : A Small Introduction To A Vast Topic, Groothuis, Douglas, 9781514005835, 2023 199 Writing: Step-by-step | 6 Manuscripts In 1 Book, Including : How To Write A Novel, How To Write A Screenplay, Outlining, Story Structure, Plotting And Character Development, Marsh, Sandy, 9798330222537, 2024 200 You Can't Make A Tomelette Without Breaking Some Greggs : Toxic Management Lessons From "succession" (and What To Do Instead), Review, Harvard Business;gallo, Amy, 9781647826451, 2023 Additional Specifications: 1. Upon Purchase, The Nlp Should Own These Titles In Perpetuity (perpetual Access). 2. These Materials Should Be Purchased With No Annual Fee, No Maintenance Fee, No Hosting Fee, And No Support Fee. 3. Provide 24/7 Unlimited Access /user Using Ip/username And Password Authentication To Nlp 4. Provide Free Training And Seminars, Monthly Usage Statistics (to Be Submitted By Email Before The 5th Day Of The Succeeding Month, Manila Time), Administrator And Technical Support For Online Database Related Concerns. 5. The Vendor Will Provide Continuous Support To Nlp Promoting The Ebooks. 6. Must Provide Technically Feasible, Functional And Reliable Database System With 95% Uptime 7. These Titles Should Be Accessed In One Platform Only Or In Platforms With Existing Nlp Ebook Collection. 8. Must Provide Marc Records And A Pdf Copy Of The Material. 9. Submit A Soft Copy Of Technical And Financial Requirements Onto Usb Flash Drive Or Cd Or Dvd. Use The Attached Excel Template In Providing The Metadata. 10. Bundled With Minimum Of 42 Desktops With Estimated Amount Of P30,000.00 Per Unit - Intel Core I5 10th Gen Gigabyte H410 - 8gb Ram Ddr4 - Itb Hdd - Neutron Case - 19” Monitor Led - W/ Keyboard And Mouse - 240gb Ssd Sata - H510m Motherboard 11. The Vendor Will Agree: A. To Include In The Nlp Eportal Without Violating Any Law. B. To The Provision Of Url Reference C. To Allow To Nlp To Post The Remote Access Account In The Nlp Eportal. If Url Reference Is Not Available. Nlp Is Not Liable For Any Misuse Of The Remote Access Account. Item No. Lot 2 Ebook Titles Supporting Sdgs 1 A Practical Approach To Special Education Administration: Creating Positive Outcomes For Students With Different Abilities / James B. Earley/robert J. Mcardle / 2023 / 9781071877081 2 Accelerating Economic Growth: Lessons From 200,000 Years Of Technological Progress And Human Development / Jakub Growiec / 2022 / 9783031071959 3 Access To Justice In Rural Communities: Global Perspectives / Daniel Newman And Faith Gordon / 2023 / 9781509951673 4 Adhd: Your Questions Answered / Sarah Boslaugh / 2024 / 9798765110454 5 Architecture And Climate Change: 20 Interviews On The Future Of Building / Hofmeister, Sandra / 2024 / 9783955536299 6 Asean Post-2025: Reimagining The Asean Economic Community / Tay, Simon / Das, Sanchita Basu / Tijaja, Julia / 2024 / 9789815203400 7 Bridging Research And Library Practice: Global Perspectives On Education And Training / Matusiak, Krystyna K. / Bright, Kawanna M. / Schachter, Debbie / 2024 / 9783110772593 8 Building Better - Less - Different: Clean Energy Transition And Digital Transformation: Fundamentals - Case Studies - Strategies / Hebel, Dirk E. / Heisel, Felix / 2024 / 9783035627176 9 Children During Conflicts: Living In A Conflict Zone / Linda Barghoorn / 2024 / 9781039816077 10 Communities: Keywords In Teacher Education / Kenneth M. Zeichner / 2023 / 9781350173378 11 Contemporary World Issues: Food Insecurity / William D. Schanbacher/whitney Fung Uy / 2023 / 9781440878404 12 Contemporary World Issues: Global Terrorism / Steven Childs / 2023 / 9781440878268 13 Coping: Gender Dysphoria / Rose Mccarthy / 2024 / 9781499474237 14 Curating Community Collections: A Holistic Approach To Diverse Collection Development / Mary Schreiber And Wendy K. Bartlett / 2024 / 9798216171256 15 Current Controversies: Sustainable Consumption / Bridey Heing / 2022 / 9781534507838 16 Developing Quality Pshe In Secondary Schools And Colleges / Sophie-lauren Mcphee And Victoria-marie Pugh / 2023 / 9781350336995 17 Dismantling Global White Privilege: Equity For A Post-western World / Chandran Nair / 2022 / 9781523000029 18 Economic Growth And Development Potential / Crup/liu / 2023 / 9789814986502 19 Epidemics And Pandemics: Your Questions Answered / Charles Vidich / 2024 / 9798765110492 20 Exploring Social Injustice: Climate And Environmental Injustice / Gail Terp / 2023 / 9781678203955 21 Fighting Global Poverty: Economic Policy Strategies For Developing Countries / Basil Oberholzer / 2022 / 9783658366315 22 Food Shortage Crisis: Origins And Global Impact / Dawn M. Drake / 2024 / 9798216171577 23 Get Informed - Stay Informed: Housing And Homelessness / Natalie Hyde / 2022 / 9781427150950 24 Global Action For School Libraries: Models Of Inquiry / Schultz-jones, Barbara / Oberg, Dianne / 2022 / 9783110772586 25 Grassroots Approaches To Education For Sustainable Development: A Comparative Study Of The Usa And India / Radhika Iyengar And Pooja Iyengar / 2023 / 9781350320093 26 Health Reference Series: Dental Care And Oral Health Sourcebook, 7th Ed. / James Chambers / 2023 / 9780780820692 27 Health Reference Series: Global Public Health And Disease Control Sourcebook / Kevin Hayes / 2022 / 9780780819658 28 Healthy Oceans: Why They Matter / Andrea C. Nakaya / 2023 / 9781678203412 29 Healthy Relationships: Your Questions Answered / Charles A. Mckay / 2023 / 9798216183952 30 Healthy Skin: Your Questions Answered / Shayan Waseh / 2024 / 9798765110478 31 Healthy Sleep: Your Questions Answered / John T. Peachey And Diane C. Zelman / 2023 / 9798216171720 32 Healthy Technology Use: Your Questions Answered / Bernadette H. Schell / 2024 / 9798765110386 33 How Can I Help? What Individuals Can Do About Climate Change / Stuart A. Kallen / 2025 / 9781678208035 34 Human Rights At Risk: Gender Violence / Philip Wolny / 2025 / 9781678209278 35 Information Services For A Sustainable Society: Current Developments In An Era Of Information Disorder / Chisita, Collence Takaingenhamo / Fombad, Madeleine C. / Minishi-majanja, Mabel K. / Onyancha, Omwoyo Bosire / 2023 / 9783110772753 36 Issues In Action: Immigration, Refugees, And The Fight For A Better Life / Elliott Smith / 2022 / 9781728430676 37 Justice Matters / Gloria Ladson-billings / 2023 / 9781350268852 38 Latinx Queer Psychology: Contributions To The Study Of Lgbtiq+, Sexual And Gender Diversity Issues / Reynel Alexander Chaparro/marco Aurelio Maximo Prado / 2022 / 9783030822507 39 Men's Health And Wellbeing / Sanchia S. Goonewardene/oliver Brunckhorst/david Albala / 2022 / 9783030847524 40 Microbial Organic Acids Production: Utilizing Waste Feedstocks / Kumar, Vikas / Kumar, Amit / 2024 / 9783110792584 41 Microbiome Modification: The Superorganism For Good Health / Worby, Patricia / 2024 / 9781501518980 42 Parenting Trans And Non-binary Children: Exploring Practices Of Love, Support, And Everyday Advocacy / Magdalena Mikulak / 2022 / 9783031098642 43 Practical Innovation In Government, How Front-line Leaders Are Transforming Public-sector Organizations / Alan G Robinson/dean M Schroeder / 2022 / 9781523001804 44 Prevention In Mental Health: From Risk Management To Early Intervention / Marco Colizzi/mirella Ruggeri / 2022 / 9783030979065 45 Protecting Our Planet: Climate Change / Carla Mooney / 2025 / 9798384911364 46 Protecting Our Planet: Marine Conservation / Carol Hand / 2025 / 9798384911395 47 Quality: Keywords In Teacher Education / Clare Brooks / 2023 / 9781350286009 48 Reclaiming Your Community: You Don't Have To Move Out Of Your Neighborhood To Live In A Better One / Majora Carter / 2022 / 9781523000319 49 Six Steps To A Strong School Culture: A Leadership Cycle For Educational Success / Samuel Nix / 2024 / 9781960574534 50 Skilled And Vocational Trades: Become A Home Health Aide / Philip Wolny / 2024 / 9781678206857 51 Soldiers In Peacemaking: The Role Of The Military At The End Of War, 1800-present / Beatrice De Graaf, Frédéric Dessberg And Thomas Vaisset / 2023 / 9781350350502 52 Staying Healthy With Kidney Disease: A Complete Guide For Patients / Stephen Z. Fadem / 2022 / 9783030935283 53 Sustainable Agriculture: Nanotechnology And Biotechnology For Crop Production And Protection / Rajput, Vishnu D. / Singh, Abhishek / Ghazaryan, Karen / Minkina, Tatiana M. / Al-tawaha, Abdel Rahman M. / 2024 / 9783111234694 54 The Anatomy Of Peace: Resolving The Heart Of Conflict, 4th Ed. / The Arbinger Institute / 2022 / 9781523001156 55 The Dynamics Of Conflict-related Sexual And Gender-based Violence: Comparing Impact Across Global Regions / Davies, Sara E. / True, Jacqui / Riveros Morales, Yolanda / Banfield, Rachel / Oo, Phyu Phyu / Osei-tutu, Joana / 2024 / 9783111320861 56 The Ethics Of Water: From Commodification To Common Ownership / Cameron Fioret / 2023 / 9781350348837 57 The Sage Encyclopedia Of Filipina/x/o American Studies, 2 Vols. / Kevin Leo Yabut Nadal/allyson Tintiangco-cubales/ejr David / 2022 / 9781071828977 58 The World Of Work To 2030: A Practical Guide To Future-proofing Your Business And Your Career / Russell Beck / 2024 / 9781399412704 59 Thinking Critically: Climate Change / Carla Mooney / 2023 / 9781678204594 60 Treatments For Anxiety: Fact Versus Fiction / Myrna Chandler Goldstein And Mark A. Goldstein, Md / 2024 / 9798765111819 61 Uncertainty-driven Innovation: Managing The New Product Development Processes In An Unpredictable Environment / Giacomo Marzi / 2022 / 9783030995348 62 What Gender Should Be / Matthew J. Cull / 2024 / 9781350329010 63 Women And Society Around The World: Women And Politics - Global Lives In Focus / Malliga Och / 2023 / 9781440871917 64 Women And Society Around The World: Women And Sexuality / Kelly Campbell/m. L. Parker / 2023 / 9781440873058 Additional Specifications: 1. Upon Purchase, The Nlp Should Own These Titles In Perpetuity (perpetual Access). 2. These Materials Should Be Purchased With No Annual Fee, No Maintenance Fee, No Hosting Fee, And No Support Fee. 3. Provide 24/7 Unlimited Access /user Using Ip/username And Password Authentication To Nlp 4. Provide Free Training And Seminars, Monthly Usage Statistics (to Be Submitted By Email Before The 5th Day Of The Succeeding Month, Manila Time), Administrator And Technical Support For Online Database Related Concerns. 5. The Vendor Will Provide Continuous Support To Nlp Promoting The Ebooks. 6. Must Provide Technically Feasible, Functional And Reliable Database System With 95% Uptime 7. These Titles Should Be Accessed In One Platform Only Or In Platforms With Existing Nlp Ebook Collection. 8. Must Provide Marc Records And A Pdf Copy Of The Material. 9. Submit A Soft Copy Of Technical And Financial Requirements Onto Usb Flash Drive Or Cd Or Dvd. Use The Attached Excel Template In Providing The Metadata. 10. Bundled With Minimum Of 14 Desktops With Estimated Amount Of P30,000.00 Per Unit - Intel Core I5 10th Gen Gigabyte H410 - 8gb Ram Ddr4 - Itb Hdd - Neutron Case - 19” Monitor Led - W/ Keyboard And Mouse - 240gb Ssd Sata - H510m Motherboard 11. The Vendor Will Agree: A. To Include In The Nlp Eportal Without Violating Any Law. B. To The Provision Of Url Reference C. To Allow To Nlp To Post The Remote Access Account In The Nlp Eportal. If Url Reference Is Not Available. Nlp Is Not Liable For Any Misuse Of The Remote Access Account.
Closing Date5 Dec 2024
Tender AmountPHP 4 Million (USD 67.8 K)

Department Of Education Division Of Ilocos Sur Tender

Philippines
Details: Description Invitation To Bid Pb-020-2024 Supply And Delivery Of Technical Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools 1. The Department Of Education, Schools Division Of Ilocos Sur Through The Republic Act No. 11975 – Fy 2024 Gaa (sub-allotment Release Order No. Roi-24-1175) Intends To Apply The Sum Of Two Million Three Hundred Thirty-six Thousand Two Hundred Eighty Pesos (p2,336,280.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Project Supply And Delivery Of Vocational Livelihood (tvl) Equipment Packages For Public Senior High Schools. Bids Received Higher Than The Abc Shall Be Automatically Rejected At Bid Opening. Item No. Project Description Qty. Unit Unit Cost Abc For The Project (in Php) Tvl Tools & Equipment (bread And Pastry Production) 1 Air Compressor With Airbrush Cake Decorating Set (medium) Pc 1 2,414.00 2,414.00 2 Beater (standard) Pc 6 287.00 1,722.00 3 Board, Chopping, 6 Color Rectangular Material: Plastic (polypropylene), Food Grade Board Size: Length: 38 Cm (minimum) Width: 30 Cm (minimum) Thickness: 1.27 Cm (minimum) Color-coded For Use With Different Types Of Food, Blue, Red, Yellow, Green, Brown And White, Preferably Packed In Set Set 6 920.00 5,520.00 4 Boiler, Double (material: Stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Side Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 2 Liters (minimum) Must Be A Set Which Includes One (1) Saucepan, One (1) Boiler, And One (1) Lid With Stainless Steel Handle And Smooth Surfaces With No Sharp Edges) Set 1 1,955.00 1,955.00 5 Bowl, Mixing (6 Pcs/set) Pc 12 2,415.00 28,980.00 6 Cake Pans, Round #4, #6, #8, #10, #12, #14, #16 Pc 6 1,725.00 10,350.00 7 Cake Stand, With Tier (type: Cake Stand With Tier, Food Grade Body Shape: Circular With 3 Tiers Material: Hard Plastic, Polypropylene, 4 Mm Thick The Tier Consists Of The Following Sizes: Tier 1: 18 Cm Diameter (minimum) Tier 2: 25 Cm Diameter (minimum) Tier 3: 30 Cm Diameter (minimum) Column Diameter: 20 To 30 Mm (solid) Distance Between Tiers: 15 Cm Over-all Length: 30 Cm (minimum) Pc 6 1,725.00 10,350.00 8 Cake Turn Table (body Shape: Circular Material: Cast Aluminum Plate. And Cast-iron Base Upper Plate: 30 Cm Diameter (minimum) And 1.4 Cm Thickness (minimum) Base Dimensions: 18 Cm (minimum); 1.4 Cm Thickness (minimum) Total Height: 10 Cm To 15 Cm) Pc 3 1,265.00 3,795.00 9 Coupler (tubular Material: Hard Plastic, Polypropylene, Any Bright Color Height: 3cm (minimum) Top Diameter: 1.27 Cm (minimum) Bottom Diameter: 2.54 Cm (minimum) Preferably With Storage Case) Pc 13 207.00 2,691.00 10 Cup, Measuring (for Solid) The Standard 4 Measuring Cup Sizes Are: 1 Cup, 1/2 Cup, 1/3 Cup And 1/4 Cup Set 12 977.00 11,724.00 11 Cup, Measuring, 250 Ml For Liquid Pc 12 632.00 7,584.00 12 Cup, Measuring, 500ml For Liquid Pc 12 747.00 8,964.00 13 Cutter, Dough (stainless Steel Straight Blade With Stainless Steel Handle Blade Dimension: Length: 15 Cm X Width: 11 Cm X Thickness: 1.2mm(minimum) Handle Dimension: Length: 15 Cm X Diameter: 3 Cm (minimum) Preferably With Packing Case Food Grade And Dishwasher Safe Design Allows Item To Be Hung For Storage) Pc 1 402.00 402.00 14 Cutter, Pie (medium) Pc 6 460.00 2,760.00 15 Flour Sifter, Hand Cranked (standard) Round Shape Material: Stainless Steel Dimension: Diameter: 133.3 Mm (minimum) X Height: 165 Mm (minimum) Thickness: 0.79 Mm (minimum) (body) And Constructed With Stainless Steel Wire Mesh #30 Bottom Volume Markings Should Be Seen Inside And Outside Of The Sifter Capacity: 5 Cups (1.18 Liter) Pc 6 747.00 4,482.00 16 Grater 4 Sided (s) Pc 6 402.00 2,412.00 17 Knife, Kitchen (s) Pc 6 747.00 4,482.00 18 Knife, Pallet (s) Pc 6 573.00 3,438.00 19 Ladle, 3 0z Pc 6 241.00 1,446.00 20 Loaf Pan Big Pc 6 862.00 5,172.00 21 Loaf Pan, Medium Pc 6 517.00 3,102.00 22 Loaf Pan, Small Pc 6 126.00 756.00 23 Muffin Pan, Big Pc 6 448.00 2,688.00 24 Muffin Pan, Medium Pc 6 414.00 2,484.00 25 Muffin Pan, Small Pc 6 322.00 1,932.00 26 Pie Pan, 10 Inches Diameter Pc 6 517.00 3,102.00 27 Pie Pan, # 6, #8, #10 Set 6 1,265.00 7,590.00 28 Pillars, Cake (big) Pc 6 517.00 3,102.00 29 Piping Bag (100 Pcs Per Pack) (m) Pack 25 241.00 6,025.00 30 Rectangular Pan, (7” X 11”) Pc 4 263.00 1,052.00 31 Rolling Pins (3cm X 10 Cm) Pc 12 402.00 4,824.00 32 Rubber Scraper (m) Pc 12 207.00 2,484.00 33 Sauce Pan 22cm Pc 13 632.00 8,216.00 34 Sheet Pan (m) Pc 15 517.00 7,755.00 35 Spoon, Measuring (plastic) ¼ Teaspoon, ½ Teaspoon, 1 Teaspoon, And 1 Tablespoon Set 26 287.00 7,462.00 36 Spoon, Wooden (s) Pc 15 92.00 1,380.00 37 Strainer Stainless (m) Pc 15 212.00 3,180.00 38 Tip, Decorating X 24 (small To Large) Set 23 632.00 14,536.00 39 Weighing Scale, 10 Kgs (digital) Pc 13 2,875.00 37,375.00 40 Weighing Scale,5 Kgs, (digital) Pc 13 1,265.00 16,445.00 41 Wire Whisk, Medium Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Preferably With A Packing Case Pc 13 286.00 3,718.00 Sub Total 259,851.00 Tvl Tools & Equipment (computer System Servicing) 42 Allen Wrench (set Of 10 Pieces: 1.5 Mm, 2 Mm, 2.5 Mm, 3 Mm, 4 Mm, 5 Mm, 5.5 Mm, 6 Mm, 8 Mm, 10 Mm;) Set 50 450.00 22,500.00 43 Anti-static Device (anti-static Wrist Strap) Adjustable And Elastic Wristband With Integrated 1 Mega Ohm Resistor Pc 50 250.00 12,500.00 44 Combination Pliers, 8" Pc 50 350.00 17,500.00 45 Crimping Tool (rj 11/45) Pc 52 450.00 23,400.00 46 Desoldering Pump (plastic Or Aluminum Housing) Pc 52 250.00 13,000.00 47 Electric Drill, Portable (rated Voltage: 220 / 240 Volts, Ac 60 Hz Power In Watts: 550 To 650 Watts) Pc 4 4,000.50 16,002.00 48 External Optical Drive Cd-r Dvd-r (interface: Usb 3.0 Or Better; 2. Compatibility: Windows 2000, Xp, Vista, 7, 8, 10, Apple Mac, Linux Or Better; 3. Read Speed: At Least 8x Dvd, At Least 24x Cd; 4. Write Speed: At Least 4x Dvd, At Least 16x Cd) Pc 6 1,000.00 6,000.00 49 Flash Drive (1tb) Pc 52 850.00 44,200.00 50 Flashlight, Head-mounted (rechargeable) Minimum Of 160 Lumens; Beam Distance: Minimum Of 150 Meters; Includes 220 V Ac Charger/power Adaptor (or Equivalent) Pc 50 550.00 27,500.00 51 Hub / Switch ( Standards And Protocols: Ieee 802.3, Ieee802.3u, Ieee802.3x Csma/cd Interface: 8 10/100mbps Ports, Auto-negotiation, Auto-mdi/mdix External Power Supply Adapter: 100-240vac,50/60hz Fanless Data Rates: 10/100mbps At Half Duplex; 20/200mbps At Full Duplex Led Indicator: Power, 1, 2, 3, 4, 5, 6, 7, 8 Dimensions: 5.3 X 3.1 X 0.9 In. (134.5 X 79 X 22.5mm) (approx.) Pc 42 2,000.00 84,000.00 52 Lan Cable Tester (1. Package Contents: 8-port 10/100mbps Desktop Switch, Power) Pc 50 252.00 12,600.00 53 Long Nose Pliers, 8" Pc 50 200.00 10,000.00 54 Multimeter, Digital (auto Range/data Hold/back Light/ Led Lamp/diode Test/triode Test/continuity/ Overload Protection/low Battery Indication/auto Power Off/short-circuit Protection. Display: True Rms, 6000 Counts, 3 5/6 Digits Overload Display: Display Ol Dc Voltage:600mv/6v/60v/600v(0.5%+3), 1000v (0.5%+3) Ac Voltage:600mv/6v/60v/600v/750v (0.8%+5) Dc Current:600a/6000a/60ma/600ma/10a (1.2%+3) Ac Current:600a/6000a/60ma/600ma/10a (1.5%+3) Resistance:600/6k/60k/600k/(1.0%+3) ,6m/60m (1.5%+3) Capacitance: 10nf/100nf/1000nf/10uf/100uf/1000uf (4.0%+5), 10mf/100mf(5.0%+5 Pc 40 800.00 32,000.00 55 Patch Panel (48 Ports) Cat6 Cable Material: Abs Plastic Application: Utp(unshielded) Certification: Rohs, Iso, Ce Rj45 Connector: Two Rows (1-24 Ports & 25-48 Ports) Transport Package: 1pcs/box Pc 50 2,500.00 125,000.00 56 Pc Video Camera (5.0 Mega Pixel Web Camera, Usb-type; With Microphone For Laptop And Desktop Pc Use; Resolution: At Least 640 X 480; Support Windows Xp/7/8/equivalent Mac Os Or Later Versions) Pc 20 500.00 10,000.00 57 Phillip’s Screwdriver, 8" Insulated Pc 50 250.00 12,500.00 58 Precision Screwdriver Set (1 Set Comes With The Following: 3 X Phillips Tip No. 00, 0, And 1; 6 X Standard Tip No. 1, 1.2, 1.4, 1.8, 2.4, And 3.0; 1 X Awl; 1 X Magnet; Plastic Storage Case;) Set 50 500.00 25,000.00 59 Soldering Iron, 60w Pc 50 250.00 12,500.00 60 Standard Screwdriver (flat), 8” Insulated Pc 50 250.00 12,500.00 61 Uninterruptible Power Supply (ups) Battery (included): Lithium-ion Battery Or Maintenance-free Sealed Lead-acid Battery With Suspended Electrolyte: Leakproof Voltage: Nominal Input Voltage: 230v, 50/60hz Output Power Capacity: 600va (minimum) Pc 40 4,000.00 160,000.00 62 Usb External Hd 1tb Pc 10 3,500.00 35,000.00 63 Wire Stripper (10 Awg To 24 Awg Length: 7 Inches (minimum) Pc 54 250.00 13,500.00 64 Wireless Access Point ( Access Point Dual Band Wi-fi Band / Data Transfer Rate: 867 Mbps At 5 Ghz And 300 Mbps At 2.4ghz Band Operating Modes: Access Point (ap), Bridge, Wireless Client, Repeater Interface: One 10/100m Ethernet Port(rj45), Support Passive Poe Power On/off Button And Reset Button Comes With External Power Supply: 5vdc-12vdc / 0.5a-1.0a Dimensions ( L X W X D ): (76-191 ×47-125 ×30-68mm) Pc 50 1,500.00 75,000.00 Subtotal 802,202.00 Tvl Tools & Equipment (cookery) 65 Apple Corer (material: Stainless Steel Total Length: 18 Cm (minimum) Handle Material: Hard Plastic, Polypropylene Handle Dimension: Length-10 Cm X Diameter-2 Cm (minimum) Blade Size: Length-8cm X Diameter-2 Cm (minimum) Pc 10 444.00 4,440.00 66 Bain Marie, Table ( Type: Bain Marie Table (food Warmer) Body Shape: Rectangular Material: 304 Stainless Steel, 0.8 Mm Thick (minimum) Dimensions: Length-1500 Mm X Width-700mm X Height-800 Mm (minimum) Power Source: Voltage: 220 Volts - 230 Volts, 50 Hz/ 60hz With Royal Cord 1.5 Meter Long With Attachment Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 4 20,700.00 82,800.00 67 Blender, Electric (material Housing: Plastic (polypropylene) Jar Height: 25 Cm To 28 Cm Jar Thickness: 4 Mm To 8 Mm Heat Resistant Glass Jar With Cover Source Voltage: 220volts/ 240volts, 50hz/ 60hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v. Power Wattage: 300 To 700 Watts Blade: Stainless Steel, 3 To 4 Metal Blades) Pc 4 2,875.00 11,500.00 68 Board, Chopping/cutting, Plastic (board Size: Length: 15 Inches (minimum) Width: 12 Inches (minimum) Thickness: 0.5 Inch (minimum) Pc 20 289.00 5,780.00 69 Boiler, Double (stainless Steel Thickness: 1/16 Inch (1.5 Mm) (minimum) Lid Material: Glass Riveted Handle On Both Sides Diameter: 9 1/2 Inches (minimum) Total Height: 9.4 Inches (minimum) Inset Bottom Diameter: 9 Inches (minimum) Inset Top Diameter: 9 Inches (minimum) Capacity: 3 Liters (minimum) Pc 2 2,128.00 4,256.00 70 Braising Pan, Medium Pc 10 1,494.00 14,940.00 71 Can Opener (stainless Steel Dimension: Length-21 Cm X Width 10 Cm X Depth:2.5cm (minimum) Pc 4 242.00 968.00 72 Casserole, Medium Pc 10 702.00 7,020.00 73 Casserole, Small Pc 12 669.00 8,028.00 74 Colander, Medium Pc 10 340.00 3,400.00 75 Colander, Small Pc 10 303.00 3,030.00 76 Cup, Measuring (for Solid) (cup, 1/2 Cup, 1/3 Cup, 1/4 Cup And 1/8 Cup.) Set 10 518.00 5,180.00 77 Dispenser, Paper Towel (abs Plastic Dimensions: Length =260 Mm X Width =100 Mm X Height = 211 Mm (minimum) Capacity: 200 Paper Paper Size: Length-20 Cm X Width- 8 Cm (approximate) Pc 10 403.00 4,030.00 78 Stand Fan, Electric (metal, Plastic Size/diameter: 18 Inches Power Rating: 70 Watts (minimum), 220/240 Vac, 50 / 60 Hz, Single Phase Rotation Angle: 90 Degrees Base: Stable, 16 Inches Diameter (approx.) Pc 5 1,495.00 7,475.00 79 Fire Extinguisher (with Contents) Capacity 5 - 6 Kgs Rechargeable Cylinder Metal Working Pressure Of Cylinder: 400 Psi Pc 1 2,875.00 2,875.00 80 Fish Poacher, Medium (oval Pot For Poaching Material: Stainless Steel, 0.64 Mm Thick Dimensions (l X W X D): 45 Cm X 15 Cm X 12cm (minimum) Handle Material: Stainless Steel Riveted Looped Handles On Both Side, 7 Cm (minimum) Handle Diameter: 8 Mm To 10 Mm) Pc 10 2,076.00 20,760.00 81 Fork, Carving (square Shape Prong Prong Material: High Carbon Stainless Steel Overall Length: 30 Cm (minimum) Blade Dimension: Length- 15 Cm X Width- 0.5 Cm X Thickness- 0.3 Cm (minimum) Number Of Prongs: 2 Prongs Comes With Square - Shaped Prongs And Pointed Tips Abs Plastic Triple-riveted Handle) Pc 10 593.00 5,930.00 82 Fork, Kitchen (body Shape: Standard Material: Stainless Steel Dimension: Length - 32 Cm X Width- 3.5 Cm (minimum) Fork Size: Length: 8 Cm X Width -3.5 Cm (minimum) Handle: Abs Plastic Number Of Tines: 2 Tines With Tapered End Pc 10 248.00 2,480.00 83 Frying Pan, Large Pc 10 438.00 4,380.00 84 Frying Pan, Medium Pc 10 334.00 3,340.00 85 Frying Pan, Small Pc 12 296.00 3,552.00 86 Funnel, S/s, Medium Pc 10 242.00 2,420.00 87 Funnel, S/s, Small Pc 10 207.00 2,070.00 88 Garbage Bin (material: Hard Plastic, Polypropylene Dimension: Diameter-26 Cm X Height-47 Cm (minimum) Capacity: 4 Gallons (minimum) Removable Dome Shape Lid With Spring Return Swivel) Pc 4 863.00 3,452.00 89 Glass Rack (body Shape: Square Material: Polypropylene Plastic Overall Dimensions: Length - 19 1/2 Inches X Width - 19 1/2 Inches X Height - 4 Inches (minimum) Compartments: Full-size 25 Individual Compartment Glass Rack Compartment Dimensions: Length - 3 ½ Inches X Width - 3 1/2 Inches X Height - 4 Inches (minimum) Easy Grip Handles Molded Into All Four Sides Preferably With A Packing Case) Pc 12 817.00 9,804.00 90 Ice Cream Scooper (medium) Pc 2 288.00 576.00 91 Knife, Boning (28 Cm (minimum) Blade: Length-15 Cm X Width- 3 Cm (minimum), Pointed Tip Cutting Edge Angle From Tip To The Heel Is 13 To 14 Degrees Handle Length: 12 Cm (minimum) Handle Material: Hard Plastic Handle With Rivets) Pc 10 564.00 5,640.00 92 Knife, Chef (chef's Knife Body Shape: Flat Materials: Stainless Steel Overall Length: 30 Cm (minimum) Blade Size: Length - 20 Cm X Width-4 Cm (minimum) Blade Thickness: 2.5 Mm (minimum) Pc 10 449.00 4,490.00 93 Knife, Cleaver (forged Stainless Steel Heavy Duty Blade Length: 17 Cm (minimum) Overall Length: 30 Cm (minimum Cutting Edge: Straight Handle Material: Ergonomic Wood Handle With Triple Rivets) Pc 10 552.00 5,520.00 94 Knife, Oyster (stainless Steel Blade Dimension: Length - 7 Cm (minimum) X Width - 2 Cm (minimum) Blade Thickness: 2 Mm (minimum) Handle Material: Smooth Wooded Handle Rounded Handle Size: Length-10 Cm X Diameter- 3.5 Cm (minimum) Total Length (from The Tip Of The Handle Up To Tip Of The Blade) :17 Cm (minimum) Pc 10 547.00 5,470.00 95 Light, Emergency (metal, Anti-rust Coated Duration Time (2 Heads): 5 Hours (minimum) Automatically Light Up During Power Outage Overcharge And Over- Discharge Protection Built - In Ac Charger, Power Cord Plug To Adapt Type A Outlet (or Providing 5a Minimum Plug Adapter Is An Option) Battery Test Switch - External Safety Fuse Head: White Led 1w (minimum) 3.5 " Dome Reflector ) Pc 1 2,013.00 2,013.00 96 Meat Slicer (die Cast Aluminum Alloy And Body Painted Dimensions: Width-40.5 Cm X Depth- 45.7 Cm X Height- 38 Cm (minimum) Stainless Steel Rotary Blade Diameter: 190 Mm (minimum) Power Source: 220 Volts-230 Volts, 60 Hz With Power Cord 1.5 Meter Long With Attachment Of Standard Type A Male Plug Or Provide Plug Adopter 10a/220v) Pc 10 3,220.00 32,200.00 97 Pastry Tube (standard) Pc 10 633.00 6,330.00 98 Peeler, Y-type (stainless Steel Overall Dimensions (l X W X H): 7 Inches X 2 1/4 Inches X 1 Inch (minimum) Blade Material: 304 Stainless Steel, 0.7 Mm Head Dimension: (l X W X H) 2 1/4 Inches X 2 1/4 Inches X 1 Inch (minimum) Pc 10 275.00 2,750.00 99 Pepper And Salt Mill (round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Screw Cap At The Top Of The Mill To Adjust The Thickness Of Peeper Or Spices) Pc 10 1,380.00 13,800.00 100 Piping Bag (transparent Disposable Plastic For Dispensing Ingredients To Pastries Length: 9 Inches Minimum Width: 3 Inches (minimum) Volume: 500 Ml (approximate) Pc 10 242.00 2,420.00 101 Plate Rack (body Shape: Rectangular Material: 304 Stainless Steel Dimension: Length-475 Mm X Width- 290 Mm X Height- 380 Mm (minimum) Pc 12 2,099.00 25,188.00 102 Preparation Table With Sink (stainless Steel, 1 Mm Thick (minimum) Dimensions: L-1200 Mm X W - 700 Mm X H - 850 Mm (minimum) Stainless Steel Tabletop And Stainless Steel Under Shelf Fully Welded Construction Sink: Left Side Single Bowl Sink With Drainer 4 Inches & Faucet Provision Sink Dimension (l X W X D) 400 Mm X 500 Mmx 25 Mm (minimum) Pc 10 4,485.00 44,850.00 103 Pressure Cooker (polished Aluminum Dimension: Diameter: 32 Cm X Height: 25 Cm (minimum) Capacity: 10 Quarts (11.3 Liters) Side Handles For Secure Carrying Equipped With Safety Opening Mechanism, Spring Safety Valve, Rubber Seal Ring) Pc 2 5,520.00 11,040.00 104 Roasting Pan (medium) Pc 10 1,840.00 18,400.00 105 Scissor, Kitchen (body Shape: Ergonomic Blade Material: Stainless Steel, 2 Mm Thick Handle Material Heavy Duty Acrylonitrile Butadiene Styrene (abs) Plastic Overall Length: 20 Cm (minimum) Width: 7.5 Cm (minimum) Pc 10 448.00 4,480.00 106 Siever, Small (stainless Steel Diameter: 20 Cm (minimum) Depth: 7 Cm (minimum) Twin Wire Handle: Length 20 Cm X 5 Mm Diameter (minimum) Fine Mesh: 0.7 Mm (1/32 Inch) (minimum) Pc 10 677.00 6,770.00 107 Skimmer, Fine (stainless Steel, Polished Overall Length: 34 Cm (minimum) Skimmer Head: Diameter -10 Cm X Depth- 4 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle: Length- 12 Cm X Diameter- 2 Cm (minimum) Pc 10 758.00 7,580.00 108 Skimmer, Spider (stainless Steel, Polished Overall Length: 35 Cm (minimum) Skimmer Head Diameter: 15 Cm X Depth 4 Cm(minimum) Handle Length: 12 Cm X 2 Cm Diameter (minimum) Pc 10 472.00 4,720.00 109 Soup Cup Rack (polypropylene Plastic Dimension: Length: 50 Cm X Width: 50 Cm X Height: 10 Cm (minimum) Compartment Length: 11 Cm Compartment Width: 11 Cm Compartment /inside Height: 6.7 Cm) Pc 12 1,553.00 18,636.00 110 Soup Ladle, 12 Oz Pc 10 472.00 4,720.00 111 Soup Ladle, 3 Oz Pc 10 300.00 3,000.00 112 Soup Ladle, 6 Oz Pc 10 403.00 4,030.00 113 Soup Ladle, 8 Oz Pc 10 455.00 4,550.00 114 Spatula (stainless Steel 316 Handle Material: Hardwood (smooth Finish) With Rivets Blade Dimension: Length= 7 .5 Inches X Width-1.5 Inches (minimum) Thickness Of Blade: 1.7 Mm Thick (minimum) Total Length = 12 To 14 Inches) Pc 8 294.00 2,352.00 115 Spoon, Kitchen (stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type) Pc 8 403.00 3,224.00 116 Spoon, Kitchen (slotted) Oval With Slot Material: Stainless Steel, 1.5 Mm Thick Overall Length: 30.5 Cm X Width-7.5 Cm (minimum) Spoon Head Dimension (l X W) 9 Cm X 7.5 Cm (minimum) Handle: Abs Plastic Spoon Head: Oval Type With Slot At Least 6 Rectangular Slots Preferably With A Packing Case Heat Resistant Up To 220 ° C Pc 8 386.00 3,088.00 117 Spoon, Measuring (body Shape: Bowl In Shape Material: Stainless Steel, 0.7 Mm Thick (minimum) The Set Consists Of The Following Sizes: 1 Pc - 1 Tbsp. (15 Ml) 1 Pc - 1/2 Tbsp. (7.5 Ml) 1 Pc - 1 Tsp. (5 Ml) 1 Pc - 1/2 Tsp. (2.5 Ml) Set 8 291.00 2,328.00 118 Spoon, Parisienne Stainless Steel, Polished Overall Length: 240 Mm (minimum) Scoop Diameter: 30 Mm And 24mm (minimum) With Plastic Handle (polypropylene), Size: 130 Mm X Width-20 Mm (minimum) Pc 8 301.00 2,408.00 119 Spoon, Serving (stainless Steel Dimension: Length: 23 Cm X Width: 5 Cm (minimum) Scoop Dimension (l X W X D): 7 Cm X 5 Cm X 0.9 Cm (minimum) Spoon Thickness: 1.6 Mm (minimum) Pc 24 365.00 8,760.00 120 Spoon, Wooden Hardwood Dimensions: Length- 10 Inches X Width- 2 Inches (minimum) Bowl Dimension: Length -3 Inches X Width 2 Inches X Depth -3/4 Inches (minimum) Total Length: 10 Inches (minimum) Pc 8 92.00 736.00 121 Stock Pot, Large (stainless Steel, 0.8 Mm Thick (minimum) Top Diameter: 30 Cm (minimum) Height: 31 Cm (minimum) Capacity: 20 Quarts (22.7 Liters) Oven Safe To 350⁰f And Dishwasher Safe. Pc 5 2,703.00 13,515.00 122 Strainer Chinois, Small Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 21.5 Cm (minimum) Handle Length: 20 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Handle Has Provision For Hanging Preferably With A Packing Case Pc 5 380.00 1,900.00 123 Strainer Chinois, Medium (stainless Steel Strainer Diameter: 14 Cm (minimum) Strainer Depth: 13 Cm (minimum) Handle Length: 15 Cm (minimum) With 1 Mm (approx.) Fine Mesh Handle Has Provision For Hanging Pc 5 420.00 2,100.00 124 Strainer Medium, Fine Stainless Steel Strainer Diameter: 20 Cm (minimum) Strainer Depth: 7 Cm (minimum) Handle Length: 18 Cm (minimum) With 2 Mm. (approx.) Fine Mesh Strainer’s Two Layers Of Tightly Woven Mesh Catches Handle Has Provision For Hanging Pc 8 248.00 1,984.00 125 Strainer Small, Fine Stainless Steel Strainer Diameter: 13 Cm (minimum) Strainer Depth: 5 Cm (minimum) Handle Length: 13 Cm (minimum) With 1 Mm. (approx.) Fine Mesh Pc 8 240.00 1,920.00 126 Tenderizer, Medium Cast Aluminum Overall Length: 26 Cm (minimum) Dual-sided Hammer, Square Head: 6 Cm X 6 Cm (minimum) Ridged Surface With Rows Of Dull, Pyramid-shaped Spikes Weight: 250 Grams To 500 Grams Pc 8 559.00 4,472.00 127 Thermometer, Pocket /pin Tubular Pen Style Digital Thermometer Product Size: 100 Mm X 40 Mm X 14 Mm (minimum) Display Size: 40 Mm X 20 Mm (minimum) Prove Length: 200 Mm (minimum) Measuring Range: -50 °c To 300 °c (-58 ⁰f To 372 ⁰f) Resolution: 0.1 °c / 0.2 °f Pc 10 880.00 8,800.00 128 Tong, 12 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 10 322.00 3,220.00 129 Tong, 8 Inches Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Tongs Lock Closed For Storage Preferably With A Packing Case Pc 10 291.00 2,910.00 130 Tray, Baking, Small Rectangular Material: Stainless Steel Dimension: 20 Cm X 30 Cm X 3.7 Cm (minimum) Body Thickness: 0.7- 1.0 Mm Pc 10 548.00 5,480.00 131 Tray, Utility Rectangular Material: Stainless Steel Dimension: Length- 48 Cm X Width-32 Cm X Height-2.5 Cm (minimum) Reinforced Edges Pc 12 644.00 7,728.00 132 Turner 3" X 6" Pc 10 541.00 5,410.00 133 Utility Cart Plastic, Polypropylene(pp) Dimension: (l X W X H) 84 Cm X 43 Cm X 95 Cm (minimum) Capacity: 330 Lbs (150 Kg) Loads (minimum) Three (3) Shelving With At Least 25 Cm Distance Between Shelves Tub Shelf Measure (l X W X D) 84 Cm X 43 Cm X 7 Cm (minimum) With Four (4) Swivel Caster, 10 Cm Diameter, Two Which Have Locking Brakes Pc 2 14,713.00 29,426.00 134 Weighing Scale, 1 Kg, Digital Engineering Plastic And Stainless-steel Weighing Plate Capacity: 1 Kg Accuracy: 1 Gram Back Light Lcd Display With 15 Mm Minimum High Digits Weighing Units: Gram, Ounce, Pound Size: (l X W X H Mm) 163 Mm X 245 Mm X 79 Mmm (minimum) Pc 6 1,630.00 9,780.00 135 Weighing Scale, 5 Kg Circular Bowl Material: Stainless Steel Bowl And Metal Body (coated) Mechanism Type: Spring Lever Capacity: 5 Kg /11 Lb. Sensitivity/graduated By 10 Gm Measurement Units: Gram/kilogram Manual Setting On Zero, Must Be Accurate And Durable Calibrate The Scale Using The Adjustment Knob Preferably With A Packing Case Pc 10 1,794.00 17,940.00 136 Wire Skimmer, Small Round Material: Stainless Steel, Polished Overall Length: 40 Cm (minimum) Skimmer Head Diameter: 12 Cm (minimum) Diameter Of Holes: 2 Mm (approx.) Handle Has Hole For Hanging Pc 10 408.00 4,080.00 137 Wire Whisk, Heavy Duty: Ballon Material: Heavy Duty Stainless Steel Dimensions (l X W): 31.8 Cm X 7.6 Cm (minimum) Handle Length: 12 Cm (minimum) With Hanging Loop No. Of Wires: 8 Wires Wire Diameter: 2 Mm (minimum) Pc 2 564.00 1,128.00 138 Wire Whisk, Medium Ballon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 25.4 Cm X 7 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 488.00 4,880.00 139 Wire Whisk, Small Balloon Material: Stainless Steel Wire Whisk Medium Dimensions (l X W): 20.3 Cm X 6 Cm (minimum) Handle Length: 10 Cm (minimum) With Hanging Loop No. Of Wires: 6 Wires Wire Diameter: 1.8 Mm (minimum) Pc 10 372.00 3,720.00 140 Wok, Medium: Round Material: Carbon Steel Thickness: 1.8 Mm Thick (minimum) Dimensions (dia. X H): 45 Cm X 14 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 10 Cm (minimum) With Flat Bottom Pc 10 771.00 7,710.00 141 Wok, Small Round Material: Carbon Steel Thickness: 1.5 Mm Thick (minimum) Dimensions (dia. X H): 36 Cm X 10 Cm (minimum) Handle Material: Steel Riveted Convenient Both Side Handle 8 Cm (minimum) With Flat Bottom Pc 10 679.00 6,790.00 142 Working Table Rectangular Material: 304 Stainless Steel, 1.29 Mm Thick (gauge 16) Minimum Length: 1220 Mm (minimum) Width: 700 Mm (minimum) Height: 850 Mm (minimum) Tubular Stainless Steel Legs, 38mm (minimum) With 4 Adjustable Bullet Feet Pc 5 13,628.00 68,140.00 143 Zester Standard Material: Stainless Steel Grating Surface Dimensions (l X W): 20.3 Cm X 4 Cm (minimum) Overall Length: 32.5 Cm (minimum) Handle Material: Plastic (polypropylene) Ergonomic Handle Preferably With A Packing Case Dishwasher Safe Pc 10 397.00 3,970.00 Sub Total 702,982.00 Tvl Tools & Equipment (food And Beverages Services) 144 Chair, Dining Side Chair Body Shape: Square Material : Metal (round Or Square) Dimension: Total Height - 33" X 15" X15" (minimum) Capacity: 150 Kg. Black Colored Powder Coated Frame With Foam On Seat Packed In Carton Box Pc 50 1,955.00 97,750.00 145 Coffee Pot, 2 Pints Round Material: Stainless Steel With Cover Capacity: 2 Pints Outside Diameter: 90 -110 Mm Over-all Height: 200 - 230 Mm Thickness: 0.5 - 1 Mm Pc 4 1,139.00 4,556.00 146 Container, Creamer Porcelain With Spout Body Shape: Circular Material: Porcelain Diameter: 50 - 65 Mm Height: 80 - 105 Mm Color: White Pc 10 288.00 2,880.00 147 Cups And Saucers 5-6 Oz. 1. Material: Porcelain 2. Capacity: 5 Oz./140 Ml 3. Heatproof Up To 300 Deg. C 4. Color: White 5. The Item Must Be Of Good Quality Packed In Carton Box Pc 24 403.00 9,672.00 148 Fork, Cocktail Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Type: Rounded Tip Handle Over-all Length: 110 - 165 Mm Width: 20 - 30 Mm (minimum) Handle Thickness: 2 Mm To 4 Mm Handle Length: 75 - 90 Mm Small, Colo: Silver The Item Must Be Branded And Have Good Quality. Pc 24 173.00 4,152.00 149 Fork, Dessert Fork Body Shape: Fork Shape, Round Tip Material/appearance: Stainless Steel, Highly Polished, With Plain Design, Rounded Tip Handle Length: 150 Mm - 175 Mm Width: 20 – 30mm Handle Thickness: 1.5mm - 3 Mm Number Of Tines: 4 Handle: 130 Mm (minimum) Color: Silver Pc 24 173.00 4,152.00 150 Fork, Dinner Fork Body Shape: Fork Shape Material / Appearance: Stainless Steel, Highly Polished, With 4tines Over - All Length: 120 - 175 Mm Thickness Of Handle: 2 - 3 Mm Color: Silver Packed In Plastic Pouch The Item Must Be Of Good Quality Pc 24 196.00 4,704.00 151 Fork, Fish Fork Body Shape: Fork Shape With Round Tip Material / Appearance: Stainless Steel, Highly Polished, With Plain Design Over-all Length: 180 - 215 Mm Fork Width: 1.5 Mm - 3 Mm Fork Thickness: 1 Mm - 2 Mm Number Of Tines: 4 Length Handle: 120 - 130 Mm Handle Thickness: 2 Mm - 3 Mm Color: Silver Packed In Plastic Pouch Pc 24 288.00 6,912.00 152 Fork, Oyster (4 To 5-1/2 Inches In Overall Length.) Pc 24 173.00 4,152.00 153 Glass, Champagne Flute Oyster Fork Body Shape: Fork Shape Material: Stainless Steel, With High Polish Appearance, And With Plain Design Length: 90 - 120 Mm Thickness: 1 Mm - 3 Mm Silver Color With Three Short Wide Curved Tines Pc 24 288.00 6,912.00 154 Glass, Collins Tumbler Body Shape: Round Material: Clear Glass Capacity: 10 Oz To 14 Oz Thickness: 1.5 -3 Mm (minimum) Packed In Carton Box Pc 24 173.00 4,152.00 155 Glass, Juice / Hi- Ball Material: Clear Glass Type: Hi-ball Height: 140 - 160 Mm Bottom Diameter: 50 -70 Mm Top Diameter: 50 - 70 Mm Thickness: 2 - 4 (minimum) Capacity: 8 Oz. To 10 Oz. Dishwasher Safe The Item Must Be Branded And Good Quality Pc 24 518.00 12,432.00 156 Glass, Pilsner (iced Tea Glass) Type: Flared Rim Body Shape: Round Slender Material: Clear Glass Capacity: 20 Oz. To 23 Oz. Over-all Length: 22 -25 Cm Thickness Of Glass: 1 -3 Mm With Flared Rim And Slender Shape Packed In Carton Box The Item Must Have Good Quality Pc 24 288.00 6,912.00 157 Glass, Red Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 Mm - 3 Mm Over - All Length : 200 -220 Mm Capacity: 250 -300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 85 - 90 Mm Base Diameter: 75 - 85 Mm Base Thickness: 2 - 4 Mm Pc 24 403.00 9,672.00 158 Glass, White Wine Balloon Shaped Bowl Material: Crystal Clear Glass Rim Diameter: 55 - 60 Mm Thickness: 1.5 - 3 Mm Over -all Length: 200 -220 Mm Capacity: 270 - 300 Ml Stem Diameter: 6 - 8 Mm Stem Length: 75 - 85 Mm Base Diameter: 70 - 80 Mm Base Thickness: 2 - 5 Mm Pc 24 443.00 10,632.00 159 Gravy Boats Boat Shape With Handle Material: Stainless Steel Capacity: 5 Oz. Appearance: Mirror Polish Finish Size :17cm X 7.3cm X 8.2 Cm / 6.7 X 2.9 X 3.2 Inches (minimum) The Item Must Have Good Quality Pc 4 225.00 900.00 160 Ice Bucket, 2 Liters With Tongs Circular Set Includes: Ice Bucket Material: Stainless Steel Diameter: 140 - 180 Mm Height: 140 - 170 Mm Thickness Of Bucket : 0.7 - 2 Mm Capacity: 2 Liters (minimum) Pc 5 471.00 2,355.00 161 Knife, Butter Stainless Steel W/ Highly Polished Appearance Over-all Length: 140 Mm - 150 Mm Handle Thickness: 3 Mm - 5 Mm With Dull Edge And Rounded Tip Pc 24 127.00 3,048.00 162 Knife, Dinner Flat With Round Tip Material / Appearance: Stainless Steel Blade Highly Polished Handle Material: Stainless Steel Overall Length: 160 - 190 Mm Blade Thickness: 2 - 4 Mm Handle Thickness: 3 - 6 Mm Pc 24 213.00 5,112.00 163 Knife, Fish Flat With Pointed Tip Material / Appearance: Stainless Steel, Highly Polished W/ Plain Design Overall Length: 200 - 220 Mm Width Blade: 20 - 25 Mm Thickness Of Blade: 2 Mm - 4 Mm Thickness Of Handle: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 164 Menu Folder (a4 (297mm X 210 Mm) And A5 (210 Mm X 148 Mm) Pc 5 518.00 2,590.00 165 Napkin Holder Rectangular Material: Stainless Steel With Highly Polished Appearance Dimension: Width: 70 - 90 Mm X Length: 150 - 170 Mm Thickness: 0.7 Mm -2 Mm Packed In Plastic Pouch Pc 6 247.00 1,482.00 166 Order Pads Rectangular Material: 80gsm Offset Paper Each Pad Comes With A 100 Sheets And Corresponding Copy Page Each Pad Has Sequentially Numbered Orders To Make It Easy To Keep Track With 100 Sheets Per Pad And 10 Pads Included Pc 5 58.00 290.00 167 Pepper And Salt Mill: Round Body Material: Wood Size: Diameter: 5 Cm X Height: 20 Cm (minimum) Carved Of Wood With Stainless Steel Grinding Mechanism Color: Natural Pc 20 1,380.00 27,600.00 168 Plate Covers Circular Material: Stainless Steel, Mirror Polished Diameter: 10 1/4 Inches (minimum) Height: 2 7/8 Inches (minimum) Thickness: 1/16 Inch. (minimum) With Handle Pc 8 305.00 2,440.00 169 Plate, Dessert, 7”to 8” Circular Material: Porcelain Supply Must Be A Set, Consisting Of One (1) Of Each: 7 Inches And 8 Inches Plates Color: White Inner Diameter: 145 To 165 Mm Thickness: 3 To 6 Mm Pc 24 207.00 4,968.00 170 Plate, Dinner, 10” Circular Material: Porcelain With No Design Color: White Inner Diameter: 200 Mm - 215 Mm Outer Diameter: 250 - 260 Mm Thickness: 3 Mm - 6 Mm Pc 24 437.00 10,488.00 171 Plate, Fish, 8” To 9” Circular Material: Porcelain With No Design Supply Shall Be A Set Consisting Of: One (1) Each 8 Inches And One (1) Each, 9 Inches Color: White Inner Diameter: 165 Mm - 190 Mm(minimum) Thickness: 3 Mm - 6 Mm Pc 24 207.00 4,968.00 172 Round Table (8's) (54” Or 60”) Pc 10 9,034.00 90,340.00 173 Salad Forks (6” Long) Pc 24 127.00 3,048.00 174 Salad Knife 8” Pc 24 207.00 4,968.00 175 Salad Plates 7” To 8” Pc 24 242.00 5,808.00 176 Salt And Pepper Shakers Square Material: Glass And Aluminum Over-all Height: 75 -90 Mm Length: 50 -60 Mm Width: 50 -60 Mm Pc 4 207.00 828.00 177 Sauce Ladles Circular With Pouring Spout Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -230 Mm Ladle Bowl Length: 60 -65 Mm Long Ladle Bowl Diameter: 65 -70 Mm Depth: 10 -15 Mm Handle Details: 150-155 Mm Long X 20 -30 Mm Wide X 2 - 4 Mm Thick Pc 10 403.00 4,030.00 178 Server, Cake Stainless Steel Blade, Highly Polished Appearance 2. Over-all Length: 220 To 270 Mm 3. Width: 60 - 80 Mm 4. Thickness: 1.5 Mm To 2 Mm 5. Handle: 120 -140 Mm Long, Non-toxic Plastic 6. Shape: Shovel-shaped 7. Color: Silver Pc 10 571.00 5,710.00 179 Service Forks : Fork Shape Material/appearance: Stainless Steel, Highly Polished, W/ Palin Design Over-all Length: 220 Mm - 260 Mm Width: 20 - 25mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm 4 Tines Color: Silver Pc 6 207.00 1,242.00 180 Service Tray: Rectangular Material: Plastic (pp) Size: 14 Inches X 18 Inches X 1 Inch (minimum) Colo: Any Pc 6 518.00 3,108.00 181 Show/service/ Base Plates 11” To 14” Round Material: Porcelain With No Design Supply Must Be A Set Consisting (1) Of Each: - 11 Inches, - 12 Inches, - 13 Inches, And - 14 Inches Plates Color: White Diameter, Inner : 225 Mm - 250 Mm Thickness: 3 Mm - 6 Mm Set 6 1,208.00 7,248.00 182 Side Plates Or Bread Plates 6” Round Material: Porcelain With No Design Color: White Inner Diameter: 95 Mm To 120 Mm Outer Diameter: 145 Mm To 170 Mm Thickness: 3 Mm - 6mm Pc 24 242.00 5,808.00 183 Side Towels Rectangular Material: Oxford Polyester Soft Cloth Over-all Length: 640 - 680 Mm Over-all Width: 420 -460 Mm Color: Plain White Pc 10 349.00 3,490.00 184 Silver Platter Round Material: Stainless Steel Diameter: 300 -330 Mm Thickness: 1 - 2 Mm Pc 10 570.00 5,700.00 185 Soup Bowl Circular Material: Porcelain Capacity: 24 Oz. (minimum) Pc 24 437.00 10,488.00 186 Soup Ladle Circular Material: Stainless Steel, Highly Polished Appearance Over-all Length: 220 -235 Mm Ladle Bowl Details: 60 -65 Mm Long, 60 -75 Mm Diameter, 10 -15 Mm Deep Pc 10 366.00 3,660.00 187 Soup Tureen Round Material: Stainless Steel Capacity: 7 - 11 Quart Size: 60 X 35 X 32 Cm (minimum) Pc 10 695.00 6,950.00 188 Spoon, Dessert Oval Material/appearance: Stainless Steel, Highly Polished With Plain Design Over-all Length: 175 To 190 Mm Thickness: 2 Mm - 3 Mm Shorter Handle: 120 -130 Mm Color: Silver Pc 24 125.00 3,000.00 189 Spoons, Service Oval Material: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 220 Mm - 250 Mm Width: 30 - 38 Mm Handle Thickness: 1.5 Mm - 4 Mm Handle Length - 165 Mm - 185 Mm Color: Silver Pc 6 136.00 816.00 190 Spoons, Soup (cream And Consume) Round Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design, Rounded Tip Handle Over-all Length: 165 Mm - 200 Mm Smaller Oval Shaped Spoon Bowl And Tapers Slightly To The Tip Pc 24 160.00 3,840.00 191 Steak Knife (5”) Pc 24 251.00 6,024.00 192 Sugar Container Round Material: Glass With Brass Lid (or Equivalent) Diameter: 70 -80 Mm Height: 130 -140 Mm Capacity: 12 Oz. Pc 10 288.00 2,880.00 193 Tablecloth, 54 X 54 Inches Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 942.00 9,420.00 194 Tablecloth, 64x64 Inches Rectangular Rectangle Material: Linen Color: Any Color But Not Black Feature: Washable Pc 10 1,208.00 12,080.00 195 Table Napkins, Cloth, 16” X 16” Plain Cloth Body Shape: Square Material: Oxford Polyester Cloth Or Its Equivalent Color: Plain White Pc 60 424.00 25,440.00 196 Table Skirting Cloth Square Material: American Cotton Twill Cloth Color: Any Color Except Black Dimension: 90 Inches X 90 Inches (minimum) Packed In Plastic Pouch Pc 10 2,185.00 21,850.00 197 Table, Square/rectangular (4's Or 6's) Square/rectangle Materia: High Density Polyethylene Tabletop Powder Coated Steel Frame Dimension: 37 - 39 X 37 - 39 Inches Color: White Pc 4 5,382.00 21,528.00 198 Tea Pot, 2 Pints Porcelain Type Body Shape: Round With Handle And Pouring Spout Material: Porcelain Capacity: (2 Pint) Color: White Pc 10 1,139.00 11,390.00 199 Teaspoon Tea Spoon Body Shape: Oval Tip Material/appearance: Stainless Steel, Highly Polished, W/ Plain Design Over-all Length: 120 Mm To 140 Mm Handle Thickness: 2 Mm To 4 Mm Short Handle Length - 100 Mm (minimum) Color: Silver Pc 24 92.00 2,208.00 200 Tong, 8 Inches Standard Material: Stainless Steel Stainless-steel Arms With Soft, Comfortable Grips Nylon Heads Safe For Nonstick Cookware Heat-resistant Up To 400 Degrees Fahrenheit Pc 7 291.00 2,037.00 201 Tooth Pick Holder Round Material: Stainless Steel, Highly Polished In Appearance Diameter: 30 -35 Mm Diameter (minimum) Height: 65 -75 Mm Capacity: 1.24 Oz. (minimum) Packed In Plastic Pouch Pc 10 101.00 1,010.00 202 Tray Stand Rectangular Material: Chrome Plated Metal Folding Tray Stand Length: 470 -490 Mm Width: 400 -440 Mm Height: 770 -790 Mm Pc 5 2,282.00 11,410.00 203 Tray, Bill Folders/ Change Height: 190 - 220 Mm 3. Width: 120 -140 Mm 4. Thickness: 2 Mm To 3 Mm (minimum) 5. Color: Black Pc 5 271.00 1,355.00 204 Tray, Round (bar) Round Material: (pe/abs) Plastic Rubberized Surface, Non-slip/grip Tight Over-all Diameter: 345 -360 Mm (minimum) Thickness: 2 - 4 Mm (minimum) Color: Black Pc 8 443.00 3,544.00 205 Water Goblet Balloon-shaped Bowl Material: Crystal Clear Glass Over-all Length: 200 -220 Mm Capacity: 270 Ml To 300 Ml Rim Diameter - 55 -65 Mm Thickness: 1 Mm To 3 Mm Stem Length : 75 -85 Mm Stem Diameter : 6 -8 Mm Base Thickness : 3 -4 Mm Base Diameter : 7 -80 Mm Pc 24 124.00 2,976.00 206 Water Pitcher Stainless Steel, Highly Polished Appearance Height: 170 Mm To 220 Mm Top Diameter: 110 -120 Mm (approximate) Capacity: 1 - 1.5 Liter With Pour Spout Pc 10 516.00 5,160.00 Sub Total 571,245.00 Total Amount 2,336,280.00 2. The Department Of Education, Schools Division Of Ilocos Sur Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required Within Thirty (30) Calendar Days. Bidders Must Have Completed, Within 10 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criteria As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Deped, Schools Division Of Ilocos Sur, And Inspect The Bidding Documents At The Address Given Below From 8:00 A.m. Until 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 22-december 10, 2024 (until 9:00 A.m.) From The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb Amounting To Five Thousand Pesos (p5,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. 6. The Deped, Schools Division Of Ilocos Sur Will Hold A Pre-bid Conference On November 29, 2024, At 10:00 A.m. At The Schools Division Office, Bantay, Ilocos Sur, And/or Through Videoconferencing/webcasting Via Google Meet Using The Link: Https://meet.google.com/tjb-zntu-yys Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before December 12, 2024, 9:00 A.m. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 12, 2024, At 9:01 A.m. At The Given Address Below And/or Through And/or Virtual. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Deped, Schools Division Of Ilocos Sur Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Before Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: Marillac D. Quinsaat Head – Bac Secretariat Department Of Education, Schools Division Of Ilocos Sur Zone V, Bantay, Ilocos Sur, 2727 Email Address: Ilocos.sur@deped.gov.ph 12. You May Visit The Website/s: For Downloading Of Bidding Documents: Depedilocossur.info Date Of Issue: November 22, 2024 Joye D. Madalipay, Ceso Vi Chairperson, Bids And Awards Committee
Closing Date11 Dec 2024
Tender AmountPHP 2.3 Million (USD 39.6 K)

BULACAN AGRICULTURAL STATE COLLEGE Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Bulacan Agricultural State College Early Procurement Activity For Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility November, 2024 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Infrastructure Projects (hereinafter Referred To Also As The “works”) Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By All Branches, Agencies, Departments, Bureaus, Offices, Or Instrumentalities Of The Government, Including Government-owned And/or -controlled Corporations, Government Financial Institutions, State Universities And Colleges, Local Government Units, And Autonomous Regional Government. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. The Pbds Are Intended As A Model For Admeasurements (unit Prices Or Unit Rates In A Bill Of Quantities) Types Of Contract, Which Are The Most Common In Works Contracting. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Duration; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Works To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A. All The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Infrastructure Projects. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Project. B. Specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C. This Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bds, General Conditions Of Contract, Special Conditions Of Contract, Specifications, Drawings, And Bill Of Quantities Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D. The Cover Should Be Modified As Required To Identify The Bidding Documents As To The Names Of The Project, Contract, And Procuring Entity, In Addition To Date Of Issue. E. Modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F. For Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 5 Section I. Invitation To Bid 8 Section Ii. Instructions To Bidders 11 1. Scope Of Bid 12 2. Funding Information 12 3. Bidding Requirements 12 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 12 5. Eligible Bidders 13 6. Origin Of Associated Goods 13 7. Subcontracts 13 8. Pre-bid Conference 13 9. Clarification And Amendment Of Bidding Documents 13 10. Documents Comprising The Bid: Eligibility And Technical Components 14 11. Documents Comprising The Bid: Financial Component 14 12. Alternative Bids 14 13. Bid Prices 15 14. Bid And Payment Currencies 15 15. Bid Security 15 16. Sealing And Marking Of Bids 15 17. Deadline For Submission Of Bids 16 18. Opening And Preliminary Examination Of Bids 16 19. Detailed Evaluation And Comparison Of Bids 16 20. Post Qualification 16 21. Signing Of The Contract 16 Section Iii. Bid Data Sheet 17 Section Iv. General Conditions Of Contract 20 1. Scope Of Contract 21 2. Sectional Completion Of Works 21 3. Possession Of Site 21 4. The Contractor’s Obligations 21 5. Performance Security 22 6. Site Investigation Reports 22 7. Warranty 22 8. Liability Of The Contractor 22 9. Termination For Other Causes 22 10. Dayworks 23 11. Program Of Work 23 12. Instructions, Inspections And Audits 23 13. Advance Payment 23 14. Progress Payments 23 15. Operating And Maintenance Manuals 24 Section V. Special Conditions Of Contract 25 Section Vi. Specifications 27 Section Vii. Drawings 37 Section Viii. Bill Of Quantities 58 Section Ix. Checklist Of Technical And Financial Documents 67 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A. The Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B. The Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C. The Deadline For The Submission And Receipt Of Bids; And D. Any Important Bid Evaluation Criteria. The Ib Should Be Incorporated Into The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan, 3010 Invitation To Bid For Early Procurement Activity Construction Of 2-storey Agroforestry Building With Water Catchment Facility] 1. The Bulacan Agricultural State College, Through The General Appropriations Act Of 2025 (gaa) Under The Capital Outlay For The Fy 2025 Intends To Apply The Sum Of Twenty Five Million Pesos (php 25,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For 2024-01-infra: Construction Of 2-storey Agroforestry Building With Water Catchment Facility. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required On Or Before The Two Hundred Seventy (270) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From Bulacan Agricultural State College And Inspect The Bidding Documents At The Address Given Below From From 8:30 Am To 4:30 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 9, 2024 To December 2, 2024 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty Five Thousand Pesos (php 25,000.00). Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6. The Bulacan Agricultural State College Will Hold A Pre-bid Conference On November 18, 2024, 09:00 Am Via Zoom Platform (meeting Id: 828 5597 7530; Passcode: 662401) Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below On Or Before 08:30 Am Of December 2, 2024. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On December 2, 2024, 9:00am At The The Conference Room, Ground Floor, Farmers Training Center, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. Observers Will Be Invited To Attend And Witness The Bid Proceedings. 11. The Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13. You May Visit The Following Websites: Www.basc.edu.ph November 9, 2024 Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1. Scope Of Bid The Procuring Entity, Bulacan Agricultural State College Invites Bids For The Proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility, With Project Identification Number 2024-01-infra. The Procurement Project (proposed Construction Of 2-storey Agroforestry Building With Water Catchment Facility) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For Gaa Fy 2025 In The Amount Of Php25,000,000.00 2.2. The Source Of Funding Is: A. Nga, The National Expenditure Program. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time Via Online Platform As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. A Valid Pcab License Is Required, And In Case Of Joint Ventures, A Valid Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet (bds) The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A. Information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B. Amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: Construction, Renovation, Rehabilitation, Repair Of School, Laboratory And Office Buildings. 7.1 Subcontracting Is Not Allowed. 10.3 Appropriate Pcab License Commensurate To The Project. 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience Civil Engineer/ Architect At Least 5 Years At Least 5 Years Materials Engineer At Least 5 Years At Least 5 Years Foreman At Least 5 Years At Least 5 Years Safety Officer At Least 5 Years At Least 5 Years Skilled Laborer At Least 3 Years At Least 3 Years Laborer - - 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Mini Dump Truck Or Elf Truck 1 Concrete Mixer One Bagger 2 Cut Off/ Bar Cutter - 2 Bar Bender - 2 Concrete Vibrator - 2 Welding Machine Heavy Duty 2 12 Alternative Bids Are Not Allowed. 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Php500,000.0 [two Percent (2%) Of Abc], If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than P1,250,000.00 [ Five Percent (5%) Of Abc] If Bid Security Is In Surety Bond. 19.2 Partial Bids Are Not Allowed. 20 Building Permit, Occupancy Permit, Locational Clearance, Environmental Compliance Certificate, Certification That The Project Site Is Not Within A Geohazard Zone.etc. 21 Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Dole, And (pert/cpm) Or Other Acceptable Tools Of Project Scheduling. Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Contractor, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Works Procured. In Preparing This Section, The Following Aspects Should Be Checked: A. Information That Complements Provisions Of The Gcc Must Be Incorporated. B. Amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 2 The Intended Completion Date Of Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Is Two Hundred Seventy (270) Calendar Days From The Date Of The Receipt Of Notice To Proceed. 4.1 The Schedule Of Delivery Of The Possession Of The Site To The Contractor Is Upon The Receipt Of The Notice To Proceed. 6 The Site Investigation Reports Are: 7.2 In Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. 10 A. Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 7 Calendar Days Of Delivery Of The Notice Of Award. 11.2 The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is 1% Of The Progress Billing. 13 The Amount Of The Advance Payment Is Fifteen Percent (15%) Of The Contract Price To Be Paid Upon Written Request Of The Contractor Reconciling On The Date Of The Notice To Proceed And Upon Submission Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, And Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission. 14 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15.1 The Date By Which “as Built” Drawings Are Required Is Fifteen (15) Calendar Days From Completion Of Project. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 0.1% Of The Final Contract Amount. Section Vi. Specifications Notes On Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Or Conditioning Their Bids. In The Context Of International Competitive Bidding, The Specifications Must Be Drafted To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Economy, Efficiency, And Fairness In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation Facilitated. The Specifications Should Require That All Goods And Materials To Be Incorporated In The Works Be New, Unused, Of The Most Recent Or Current Models, And Incorporate All Recent Improvements In Design And Materials Unless Provided Otherwise In The Contract. Samples Of Specifications From Previous Similar Projects Are Useful In This Respect. The Use Of Metric Units Is Mandatory. Most Specifications Are Normally Written Specially By The Procuring Entity Or Its Representative To Suit The Works At Hand. There Is No Standard Set Of Specifications For Universal Application In All Sectors In All Regions, But There Are Established Principles And Practices, Which Are Reflected In These Pbds. There Are Considerable Advantages In Standardizing General Specifications For Repetitive Works In Recognized Public Sectors, Such As Highways, Ports, Railways, Urban Housing, Irrigation, And Water Supply, In The Same Country Or Region Where Similar Conditions Prevail. The General Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Construction, Although Not Necessarily To Be Used In A Particular Works Contract. Deletions Or Addenda Should Then Adapt The General Specifications To The Particular Works. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Goods, Materials, And Workmanship, Recognized International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Goods, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure Substantially Equal Or Higher Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Scc. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Contract To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished, And Work Performed Or Tested, The Provisions Of The Latest Current Edition Or Revision Of The Relevant Standards And Codes In Effect Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National, Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure A Substantially Equal Or Higher Quality Than The Standards And Codes Specified Will Be Accepted Subject To The Procuring Entity’s Representative’s Prior Review And Written Consent. Differences Between The Standards Specified And The Proposed Alternative Standards Shall Be Fully Described In Writing By The Contractor And Submitted To The Procuring Entity’s Representative At Least Twenty-eight (28) Days Prior To The Date When The Contractor Desires The Procuring Entity’s Representative’s Consent. In The Event The Procuring Entity’s Representative Determines That Such Proposed Deviations Do Not Ensure Substantially Equal Or Higher Quality, The Contractor Shall Comply With The Standards Specified In The Documents. These Notes Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Bidding Documents. Proposed Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Basc Drt Campus Technical Specifications Bulacan Agricultural State College Pinaod, San Ildefonso, Bulacan November 2024  Specifications 1. General Requirements 1.1 These Specifications Are Intended To Cover All Labor And Materials Required For The Complete Construction Of The Proposed Projects As Shown In The Working Drawings As Described Herein. 1.2 Materials And/ Or Work Not Specifically Mentioned In The Specifications, Working Drawings, And Other Contract Documents But Is Implied And Deemed Necessary To Complete The Work Shall Be Supplied By The Contractor And Executed In A Workman-like Manner, Of Appropriate Number, Location, And Size Of The Highest Quality Available Without Extra Cost To The Owner. 1.3 The Owner Reserves The Right To Alter And/or Omit Any Part Of The Plans With The Approval Of The Architect Or Engineer As The Case May Be. Any Extra Charge Must Be Situated To The Architect And/or Project Manager For Approval Before Final Acceptance. 1.4 The Contractor Shall Secure All Permits And Licenses As Required And Also Shall Be Responsable For All The Liabilities, Under Workmen’s Compensation, Sss, Insurance, Etc. 1.5 The Contractor Shall Furnish For Approval Of The Architect/engineer, With Promptness, Samples As Specified Or Required. Works Shall Be In Accordance With The Approved Samples. 1.6 The Contractor Shall Guarantee The Words, Except For Those With Specific Guarantee For A Period Of One (1) Year After Final Acceptance By The Owner. He Shall Repair,replace And Make Good At His Expenses Any And All Defects, Which May Arise During That Term Of Guarantee And Warranty Due To Defective Workmanship And/or Interior Quality Of Materials. 2. Methods Of Construction 2.1 The Construction Shall Be Done In The Manner That Would Cause Least Disturbance To Neighborhood And Occupant Of The Area. The Contractor Will Be Allowed To Work 24 Hours If Necessary To Complete The Work On Time Subject To Approval Of The Owner. 2.2 All Works To Be Done Shall Be Of The Best Quality And Workmanship. 3. Masonry 3.1 Exterior Wall Should Be Chb 5 Inches Wall Bearing With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars. 3.2 Partition Wall Should Be Chb 4 Inches With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meter For Vertical And For Every 3 Layers Of Chb For Horizontal Bars In Rooms,hallway,and Toilet. 3.3 Low Partition Should Be Chb 4 Inches 1.80 Meters High With 10 Mm Diameter Reinforcement Bars Spaced @ 0.80 Meters For Vertical And For Every 3 Layer Of Chb For Horizontal Bars In Toilet Partition/cubicles. 4. Wall Finishes 4.1. Interior Walls Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; Paint Finish (boysen Paint Or Approved Equal) W/ 4” Base Board. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. 4.2. Exterior Wall Finishes Should Be Smooth Plain Cement Plaster; Concrete Neutralizer Treatment; Patching; 2 Coat Paint Finish (boysen Paint Or Approved Equal). 4.3. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) From Finish Floor Line To 1.80 Meter High, For All Toilet And Cubicles 4.4. Provide 40 Cm X 40 Cm Glazed Wall Tiles (eurotiles Or Approved Equal) For Splashboards For Lavatories In Laboratory/ Kitchen. 4.5. Provide 2” Thick Simulated Stone Cladding (asi, Stone Age Or Approved Equal), See Plans And Drawings. 5. Ceiling Finishes 5.1. All Interior Ceiling - 6 Mm Thick Fiber Cement Hardiflex Ceiling Board Riveted On Metal Furring Channels Providing A V-cut In Every Joint; Prevent Rivet Head To Exposed In Ceiling Surface; Patching All Rivets And Joints W/ Skim Coat; 2 Coat Paint Finish Flat Latex Paint (boysen Or Approved Equal). 5.2. Outside Ceiling – 8” X L X 0.4 Mm Thick Spandrel (union Brand Or Approved Equal). 5.3. Provide Eaves Hole For Ventilation (see Plans And Drawings) 5.4. Provide 4” Ceiling Drop If Necessary (see Plans And Drawings). 6. Carpentry Works 6.1. Cabinets Beneath The Lavatory/ Kitchen Counters In 2” X 3” Kd Treated Wood Frame; ¾” Mdf Membrane Press Doors W/ Liston; Paint Finish. 6.2. Provide Concealed Hinges And Handle For Cabinet Doors. 6.3. All Door Jamb Should Be 2’ X 6” Steel, Paint Finish. 7. Doors/hardwares 7.1. 1.0 M X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; Varnish Finish. For Classrooms (see Plans And Drawings). 7.2. 0.9 M X 1.2 M Flush Door W/ Jamb, For Common And Pwd Cr; Varnish Finish 7.3. 0.6 M X 1.60 M Aluminum (analok) Door W/ Handle, Hinges And Locksets For Cubicle In Toilets. 7.4. 0.8m X 2.1 M X 41 Mm Thick Kiln Dry Solid Panel-type Door W/ Simulated Wood Grain Including 50 Mm X 150 Mm Solid Door Jamb W/ Simulated Wood Grain; For Stockroom/electrical Room/beneath The Stairs; Varnish Finish. 7.5. Provide 1 Set Of Door Knob (yale Or Approved Equal) And 4 Pcs Of 3-1/2” Hinges (loose Pin Stanley Or Approved Equal) Each Panel-type Door. 8. Windows 8.1. 2.4 M X 1.2 M And 1.2 M X 1.2m Sliding Window 0.90m From Finísh Floor Line For Classrooms (see Plans And Drawings) 8.2. 0.5 M X 0.5 M And 0.6 M X 1.2 M Aluminum And Glass Awning Window Elevated 1.80m & 1.55m From Finísh Floor Line For Toilets. (see Plans And Drawings) 8.2. 1.2 M X 1.8 M Aluminum And Glass Awning & Fixed Type Window Elevated 0.35m From Finísh Floor Line For Ramps. (see Plans And Drawings) 8.3. All Windows Shall Have Grills Made Of 1” X 1” X 1.2 Mm Thick Galvanize Iron Square Tube Welded Except For Ramp Windows (see Plans And Drawings); Quick Drying Enamel Paint Finish. 8.4. All Aluminum Frames Shall Be Of The Best Quality, Analok Finish Free From Internal Defects. 8.5. All Glass Shall Be ¼” Thick Brown In Color, Unless Specify On Plan. 9. Tile Works 9.1. 60 Cm X 60 Cm Non-skid Tiles, Eurotiles Or Approved Equal, For Flooring At All Floors And 60 Cm X 60 Cm Unglazed For Hallways (submit Sample For Approval). 9.2. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal For Landing,thread,and Riser In All Stairs. (submit Sample For Approval). 9.3. 30 Cm X 30 Cm Unglazed Tiles, Eurotiles Or Approved Equal, For Walls Of Toilets And Cubicles. (submit Sample For Approval). 9.4. 60 Cm X 60 Cm Doublé Polish Glazed Tiles, Eurotiles Or Approved Equal For Countertops For Sink And Lavatories. (submit Sample For Approval). 9.5. Provide Tile Grout For Tile Joints. 9.6. Provide 2 Coats Of Wáter Proofing Before Laying Of Floor Tiles In All Toilets In The Second Floor-fourth Floor. 10. Sanitary Work/ Fittings & Fixtures 10.1. Fittings & Fixtures 10.1.1. Wáter Closet - Closed-coupled Wáter Closet Dual Flush By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.2. Lavatory - Basin-type Counter Lavatory By Pozzi Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval). 10.1.3. Lavatory Faucet - Basin Mixer W/ Complete Accessories By Hcg Or Approved Equal And Hose Bibb For Every Wáter Closet. (submit Sample For Approval). 10.1.4. Urinal - Wash Down/ Gravity-flushing By Hcg Or Approved Equal W/ Complete Fittings And Accessories. (submit Sample For Approval) 10.1.5. Soap Holder – By Pozzi Or Approved Equal. 10.1.6. Tissue Holder – By Pozzi Or Approved Equal. 10.1.7. Floor Drain – 4” X 4” Stainless Steel Floor Drain. 10.2. 25 Mm And 20 Mm Polypropylene Random (ppr) Pipes And Ppr Fittings For Wáter Supply Lines/ Cold Wáter Lines. (as Per Plan). 10.3. 100mm (4”) And 50 Mm (2”) Diameter Unplasticized Polyvinyl Chloride (upvc) Sanitary Pipes And Fittings (neltex Orange Series 1000). (as Per Plan). 10.4. One (1) Septic Tank (as Per Plan) 10.5. Drainage System And Catch Basins (as Per Plan) 10.6. Provide P-trap To All Floor Drains And Sink. 11. Painting Works Materials Brand – Boysen Or Approved Equal. 11.1. For Interior/exterior Concrete Plaster: Pre-treatment : Concrete Neutralizer. Test With Litmus Or Ph Paper First Coat : Water-based Epoxy Primer (for Badly Weathered Concrete Or When Long Lasting Durability Is Desired) Patchwork : Patch-eeze Patching Compound. Note: Patchwork Should Be Followed With One Coat Of Concrete Primer As Primer-surfacer To Reduce Unsightly Uneven Appearance After Topcoat Application. Second Coat : Two (2) Coats Of Semi-gloss Latex. 12.2. For Interior Ceilings: First Coat : Interior Primer And Sealer Patchwork : Skim Coat Second Coat : Two (2) Coats Of Flat Latex 12.3. For Interior Woodworks And Doors: First Coat : Wood Putty Second Coat : Two (2) Coats Of Quick Drying Enamel. 12. Electrical Works 12.1. Wires / Conductors 12.1.1. Power Line - Insulated Copper Wire For 600v Level, Thw For Main Feeder And Tw For Load Side, Sycwin, Philflex Or Approved Equal. 12.2. Conduits 12.2.1. Service Entrance – Rigid Steel Consduit (rsc), Galvanized Iron Schedule 40. 12.2.2. Internal & Embedded – Pvc Pipes By Powerguard Or Approved Equal 12.3. Fixtures & Devices 12.3.1. Utility Box – 2” X 4” Poly Or Approved Equal. 12.3.2. Junction Box – 4” X 4” W/ Cover Poly Or Approved Equal. 12.3.3. Switches – 2” X 4” Switch Set By Panasonic Or Approved Equal (1 Gang/2 Gang/3 Gang) See Plans And Drawings. 12.3.4. Outlets – 2” X 4” Dúplex Convenience Outlet Set By Panasonic Or Approved Equal. 12.3.5. Panel Board – Ga. # 16 Metal Enclosure With Copper Bus Bar, Dead Front, Flush Mounted, Nema Brand Or Approved Equal. 12.3.6. Circuit Breaker – Molded Case Polyester Resin, Bolt Ton Type Thermal Magnetic Type, Common Internal Trip, 250v Ac, 10kaic Mínimum, General Electric Or Approved Equal (ampere Rating As Specified On Plans). 12.3.7. Grounding System – 16 Mm Dia. X 3000mm Hot Dipped Galvanized Steel Ground Rod. 12.4. Lighting Fixtures 12.4.1. Louver 4x20 With 20 Watts Luminaire Led T8 Light W/ Aluminum Reflector (surface Type). 15.4.2. 6” Dia. Receptacle W/ 16 Watts Led Bulb Firefly Or Approved Equal. 13. Concrete Works 14.1. Class A Mixture (1 Part Portland Cement, 2 Part Sand, And 4 Part Gravel) For Slabs In 2nd Floor And Landings, Stairs, Columns, Beams, Lintel Beams, Tie Beams, Column Footings, Wall Footings, Canopy And Septic Tank. 14.2. Class B Mixture (1 Part Portland Cement, 2-1/2 Part Sand, And 5 Part Gravel) For Slabs In Ground Floor And All Other Concrete Not Mention In 14.1. 14.3. Cement Plaster Must Be 1 Part Portland Cement, And 3 Part Sand. 14. Miscellaneous 14.1. Provide ¼” Thick X 4 Ft. High Mirror Glass For Wall Of All Toilets Covering The Entire Length Of Countertops Of Lavatory. 14.2. Provide Peebles Stone Or Waffle Tiles For All Ramp-up And Exterior Steps/stairs Covering The Thread And Riser. 14.3. Stairs And Pwd Ramp-up - Provide 2” Ø X 1.5 Mm Thick Stainless Tube (mirror Type Sus 304) For Stairs Handrail And Main Post; 1-1/2” Ø X 1.5 Mm Thick Stainless Tube For Vertical Members; 1” Ø X 1.5 Mm Thick Stainless Tube For Horizontal Members. Buffing Finish. 14.4. Corridor Railing – Provide 2” Ø Pipe For Handrail; All Joints Must Be Welded Together. Paint Finish. 14.5. Provide 4 Ceiling Fan 16” (asahi Or Approved Equal) Each Classroom. 14.6. Provide 2 Sets Of 4’ X 8’ White Board W/ Aluminum Frame Each Classroom. 14.7. Provide 35 Sets Of Arm Chair (monoblock) Each Classroom. 14.8. Provide Teacher’s Table & Chair Each Classroom. 14.9. Provide Fire Extinguisher 10lbs For Each Classroom. 14.10. Provide Emergency Light For Each Classroom. 14.11. Provide Emergency Fire Alarm For Every Floor. 14.12. Provide Exhaust Fan 12” At Each Toilet. Provide Also Manhole Cover At Each Toilet And Storage Room On Both Floors. 14.13. Provide 4-ibc (intermediate Bulk Container) Tanks For Rainwater Catchment (1000 L Capacity Each), 2- Elevated Wáter Tank (1000 L Capacity Each) (install Horizontal) With Booster Pump 1.5hp. 14.14. Provide Also Pvc Accordion Type Partition At 2ndfloor. 14.15. Provide 10mm Roof Insulation Double-sided At Roofing. 14.16. Provide (2) Sets Of Split Type Airconditioning Unit 2hp – Supply And Install Section Vii. Drawings                                       Section Viii. Bill Of Quantities Notes On The Bill Of Quantities Objectives The Objectives Of The Bill Of Quantities Are: A. To Provide Sufficient Information On The Quantities Of Works To Be Performed To Enable Bids To Be Prepared Efficiently And Accurately; And B. When A Contract Has Been Entered Into, To Provide A Priced Bill Of Quantities For Use In The Periodic Valuation Of Works Executed. In Order To Attain These Objectives, Works Should Be Itemized In The Bill Of Quantities In Sufficient Detail To Distinguish Between The Different Classes Of Works, Or Between Works Of The Same Nature Carried Out In Different Locations Or In Other Circumstances Which May Give Rise To Different Considerations Of Cost. Consistent With These Requirements, The Layout And Content Of The Bill Of Quantities Should Be As Simple And Brief As Possible. Daywork Schedule A Daywork Schedule Should Be Included Only If The Probability Of Unforeseen Work, Outside The Items Included In The Bill Of Quantities, Is High. To Facilitate Checking By The Entity Of The Realism Of Rates Quoted By The Bidders, The Daywork Schedule Should Normally Comprise The Following: A. A List Of The Various Classes Of Labor, Materials, And Constructional Plant For Which Basic Daywork Rates Or Prices Are To Be Inserted By The Bidder, Together With A Statement Of The Conditions Under Which The Contractor Will Be Paid For Work Executed On A Daywork Basis. B. Nominal Quantities For Each Item Of Daywork, To Be Priced By Each Bidder At Daywork Rates As Bid. The Rate To Be Entered By The Bidder Against Each Basic Daywork Item Should Include The Contractor’s Profit, Overheads, Supervision, And Other Charges. Provisional Sums A General Provision For Physical Contingencies (quantity Overruns) May Be Made By Including A Provisional Sum In The Summary Bill Of Quantities. Similarly, A Contingency Allowance For Possible Price Increases Should Be Provided As A Provisional Sum In The Summary Bill Of Quantities. The Inclusion Of Such Provisional Sums Often Facilitates Budgetary Approval By Avoiding The Need To Request Periodic Supplementary Approvals As The Future Need Arises. Where Such Provisional Sums Or Contingency Allowances Are Used, The Scc Should State The Manner In Which They Will Be Used, And Under Whose Authority (usually The Procuring Entity’s Representative’s). The Estimated Cost Of Specialized Work To Be Carried Out, Or Of Special Goods To Be Supplied, By Other Contractors Should Be Indicated In The Relevant Part Of The Bill Of Quantities As A Particular Provisional Sum With An Appropriate Brief Description. A Separate Procurement Procedure Is Normally Carried Out By The Procuring Entity To Select Such Specialized Contractors. To Provide An Element Of Competition Among The Bidders In Respect Of Any Facilities, Amenities, Attendance, Etc., To Be Provided By The Successful Bidder As Prime Contractor For The Use And Convenience Of The Specialist Contractors, Each Related Provisional Sum Should Be Followed By An Item In The Bill Of Quantities Inviting The Bidder To Quote A Sum For Such Amenities, Facilities, Attendance, Etc. Signature Box A Signature Box Shall Be Added At The Bottom Of Each Page Of The Bill Of Quantities Where The Authorized Representative Of The Bidder Shall Affix His Signature. Failure Of The Authorized Representative To Sign Each And Every Page Of The Bill Of Quantities Shall Be A Cause For Rejection Of His Bid. These Notes For Preparing A Bill Of Quantities Are Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Should Not Be Included In The Final Documents. Bill Of Quantities Item Description Unit Qty Unit Cost Amount I. Design And Permit A. Detailed Engineering And Architectural Design Lot 1.00 250,000.00 250,000.00 B. Permits, Insurance And Bonds Lot 1.00 Ii. General Requirements A. Mobilization/demobilization Lot 1.00 B. Temporary Facilities Lot 1.00 C. Safety And Health Requirements Lot 1.00 Ii. Earth Works A. Staking And Layout Lot 1.00 B. Excavation Works Cu.m 242.43 C. Backfilling Works Cu.m 170.90 D. Gravel Bedding Cu.m 35.75 E. Soil Poisoning Lot 1.00 F. Disposal And Hauling Of Materials Lot 1.00 Iii. Structural/civil Works A. Concrete Works Structural Concrete Cu.m 369.38 Reinforcing Steel Including Ties Kgs 38,213.68 Formworks And Scaffoldings Sq.m 2,755.79 B. Roof Framing Works Lot 1.00 Iv. Architectural Works A. Masonry Works Sq.m 1,820.07 B. Ceiling Works Sq.m 650.00 C. Floor Finishes Sq.m 1,073.16 D. Wall Finishes Sq.m 1,820.07 E. Doors And Windows 1000x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 16.00 900x2100 Solid Wood (tanguile) Panel Door With Stainless Steel Kick Plate On 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 2.00 900x2100 Solid Wood (tanguile) Panel Door With 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 4.00 800x1200 Aluminum Panel Door On 50x150mm Steel Jamb; Complete With Hardware And Accessories Latch Lock Sets 14.00 800x2100 Solid Wood (tanguile) Panel Door 50x150mm Steel Jamb; Complete With Hardware And Accessories Keyed Entry Door Knob; Varnish Finish Sets 6.00 2400x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1150x1200 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Sliding Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 16.00 1200x1800 6mm Thk Tempered Glass On Powder Coated Aluminum Frame Fixed & Awning Type Window; Provide With Complete Hardware Accessories Sets 3.00 600x1600 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 4.00 500x500 6mm Clear Ordinary Glasss On Powder Coated Aluminum Framed Awning Type Window With 1"x1" Tubular Spaced @4in Window Grills Steel; Provide With Complete Hardware Accessories Sets 2.00 F. Thermal & Moisture Protection Lot 1.00 G. Railings Lot 1.00 H. Tinsmithry Works Lot 1.00 Including Pe Insulation 10mm X Double Sided I. Miscellaneous Emergency Light. Twinhead Sets 12.00 White Board, 4'x8' With Eraser Sets 16.00 Teacher's Tables, Wooden With Cabinet Sets 8.00 Teacher's Chair Sets 8.00 Student Arm Chair, Plastic Sets 280.00 V. Electrical Works A. Roughing Ins Lot 1.00 B. Wires And Cables Lot 1.00 C. Lighting Fixtures Lot 1.00 D. Wiring Devices Lot 1.00 Vi. Mechanical Works Fire Extinguisher 10lbs Set 8.00 Fire Alarm Set 2.00 Exhaust Fan Set 6.00 Split-type Aircon, 2hp Set 2.00 Ceiling Fan Set 32.00 Consumables Lot 1.00 Folding Partition (pvc Accordion) Lot 1.00 Lavatory Counter Cabinets Lot 1.00 Viii. Plumbing Works A. Plumbing Fixtures Water Closet With Accessories (tank Type) Set 16.00 Urinal (with Privacy Partition) Set 8.00 Bidet Spray Set 16.00 Counter Lavatory With Granite And Accessories Set 18.00 Mirror Set 4.00 Lavatory Faucet Pcs 18.00 Hose Bibb Faucet Pcs 16.00 Tissue Paper Holder Pcs 16.00 Floor Drain Pcs 20.00 B. Sewer Line And Vent System Lot 1.00 C. Waterline System Lot 1.00 D. Storm Drainage System Lot 1.00 E. Others (tank) Ibc Tanks (1000l) - Rainwater Catchment Set 4.00 Water Tank - 1000l Set 2.00 Booster Pump, 1.5hp Set 1.00 Septic Tank Lot 1.00 Grand Total Cost (inclusive Of Ocm, Profit And Vat) I Hereby Certify To Comply With All The Above Technical Specifications As Per Prices Quoted In The Bill Of Quantities. Name Of Company/bidder Signature Over Printed Name Of Date Representatives Section Ix. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A. Gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B. Any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b) Registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document; And ⬜ (c) Mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (e) Tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (h) Philippine Contractors Accreditation Board (pcab) License; Or Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (i) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (j) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (k) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (l) The Prospective Bidder’s Audited Financial Statements, Showing, Among Others, The Prospective Bidder’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (m) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (n) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (o) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (p) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (q) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ (r) Cash Flow By Quarter. Bid Form For The Procurement Of Infrastructure Projects [shall Be Submitted With The Bid] _________________________________________________________________________ Bid Form Date : _________________ Project Identification No. : _________________ To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: A. We Have No Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Project: [insert Name Of Contract]; B. We Offer To Execute The Works For This Contract In Accordance With The Pbds; C. The Total Price Of Our Bid In Words And Figures, Excluding Any Discounts Offered Below Is: [insert Information]; D. The Discounts Offered And The Methodology For Their Application Are: [insert Information]; E. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein And Reflected In The Detailed Estimates, F. Our Bid Shall Be Valid Within The A Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; G. If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The The Allowable Forms Of Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines For This Purpose; H. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; I. We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And J. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. K. We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The [name Of Project] Of The [name Of The Procuring Entity]. L. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: ___________________________________________________________________ Legal Capacity: ____________________________________________________________ Signature: ________________________________________________________________ Duly Authorized To Sign The Bid For And Behalf Of: __________________________________ Date: ___________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A. Owner’s Name B. Address C. Telephone Nos. Nature Of Work Bidder’s Role A. Date Awarded B. Date Started C. Date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1 Notice Of Award (for Government Projects) 2 Notice To Proceed (for Government Projects) 3 Contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-01-infra: Construction Of 2-storey Agroforestry Building With Rainwater Catchment Facility Location Of The Project : Doña Remedios Trinidad, Bulacan Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A. Owner Name B. Address C. Telephone Nos. Nature Of Work Contractor’s Role A. Amount At Award B. Amount At Completion C. Duration A. Date Awarded B. Contract Effectivity C. Date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information, Certificate Of Good Performance Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] _________________________________________________________________________ Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] Republic Of The Philippines) City Of _______________________) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [[insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Net Financial Contracting Capacity Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date: _______________________________________
Closing Date2 Dec 2024
Tender AmountPHP 25 Million (USD 424 K)
4091-4100 of 4108 active Tenders