BARANGAY SAGRADA, PILI, CAMARINES SUR Tender
BARANGAY SAGRADA, PILI, CAMARINES SUR Tender
Costs
Summary
Rehabilitation & Improvement Of Multi-purpose Building/hall , Construction Projects ,barangay Sagrada, Pili, Camarines Sur
Description
Description Republic Of The Philippines Office Of The Punong Barangay Sagrada, Pili, Camarines Sur Bids And Awards Committee Contact No. +639857600284 Sagrada, Pili, Camarines Sur 4418 Invitation To Bid Rehabilitation And Improvement Of Multi-purpose Building/hall The Local Government Unit Of Sagrada, Pili, Camarines Sur Through The 20% Barangay Development Fund (bdf) (reprogrammed 2024) Intends To Apply The Sum Of Two Million Four Hundred Twenty Thousand Pesos (p2,420,000.00) Being The Approved Budget For The Contract (abc) To Payment Under The Contract For The Rehabilitation And Improvement Of Multi-purpose Building/hall. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Local Government Unit Of Sagrada, Pili Camarines Sur Now Invites Bids For The Rehabilitation And Improvement Of Multi-purpose Building/hall Is Required One Hundred Twenty Days (120 Day). Bidders Should Have Completed, Within 2 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Instructions To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. A Complete Set Of Bidding Documents Maybe Purchased By Interested Bidders On January 21, 2025 To February 10, 2025 At 8:00 Am. From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Thousand Pesos (p5,000.00) Only. Bid Must Be Delivered To The Address Below On Or Before February 10, 2025 At 8:00 Am. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb. Bid Opening Shall Be On February 10, 2025 2:00 P.m. At The Session Hall, Barangay Sagrada, Pili, Camarines Sur. Bids Will Be Opened In The Presence Of The Bidders Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Local Government Unit Of Sagrada, Pili, Camarines Sur Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Part I. General Requirements B.5 Project Billboard/signboard Est. Qty. : 1 Each A. Labor 1 Construction Foreman 1 Skilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 64 Sq.ft. Tarpauline (with Coa Format) 2 Pcs. 1/4" Marine Plywood 12 Pcs. 2" X 3" X 12' Coco Lumber 8 Pcs. 2" X 2" X 12' Coco Lumber 1 Kg. Assorted Cw Nails B.9 Mobilization/demobilization Est. Qty. : 1 L.s. 1 Lot Lump Sum Part Ii. Civil, Electrical, & Sanitary/plumbing Works A. Earthworks 801(1) Removal Of Structures And Obstruction Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 5 Unskilled Laborer B. Equipment 1 Unit Jack Hammer Handtools ( 10 % Of Labor) C. Materials 803(1)a Structure Excavation (common Soil) Est. Qty. : 11.42 M3 A. Labor 1 Construction Foreman 5 Unskilled Laborer B. Equipment Handtools ( 10 % Of Labor) C. Materials 804(4) Gravel Fill Est. Qty. : 5 M3 A. Labor 1 Construction Foreman 5 Unskilled Laborer B. Equipment Handtools ( 5 % Of Labor) C. Materials 2 M3 Boulder (apple Size) 3 M3 G 1" Crushed Gravel B. Plain And Reinforced Concrete Works 900(1)c1 Structural Concrete, Class A, 28 Days Est. Qty. : 19.91 M3 A. Labor 1 Construction Foreman 2 Skilled Laborer 4 Unskilled Laborer B. Equipment 1 Unit Concrete Vibrator 1 Unit 1-bagger Mixer Minor Tools ( 10 % Of Labor) C. Materials 21 M3 G 3/4 "crushed Gravel 12 M3 Albay Sand 185 Bags Portland Cement 40 Bags Sahara 902(1)a Reinforcing Steel Bars, Grade 40 Est. Qty. : 3,491.67 Kgs. A. Labor 1 Construction Foreman 5 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Bar Cutter, Single Phase (25 Mm Ø) 1 Unit Bar Bender Minor Tools ( 10 % Of Labor) C. Materials 125 Pcs. 10mm Ø Rsb 158 Pcs. 12mm Ø Rsb 185 Pcs. 16mm Ø Rsb 20 Pcs. 20mm Ø Rsb 135 Kgs. #16 G.i. Tie Wire 903(1) Formworks And Falseworks Est. Qty. : 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 5 Unskilled Laborer Stripping 1 Construction Foreman 3 Unskilled Laborer B. Equipment 5 Sets H-frame 1.7m X 1.2m, Set 2 Pcs H-frames 4 Pcs Diagonal Cross Braces 4 Pcs Horizontal Braces 8 Pcs Joint Pins Minor Tools ( 10 % Of Labor) C. Materials 25 Pcs. 1/4" Marine Plywood 1,200 Bd.ft. Coco Lumber Consumables ( 5 % Of Material Cost) C. Finishing And Other Civil Works C.1. Fabricated Materials 1006(6) Steel Doors & Frame Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D1 - Steel Grille Door (0.90m X 2.10m) (installed) (see Plan For Details) 1 Set D5 - Steel Fire Exit Door (installed) (see Plan For Details) 1010(2)a Flush Door Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D2 - D2- 1/4" Thk. Marine Plywood Flush Door With 2" X 5" (installed) (see Plan For Details) 1007(1)b Aluminum Framed Glass Windows Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set D2 - D3- 1/4" Thk. Tinted Tempered Glass On Powder Coated Alum. Framed Swing Door (installed) (see Plan For Details) 1043(2) Pvc Doors And Frames Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set W1- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 1008(2) Aluminum Glass Windows Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set W1- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 6 Sets W2- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 3 Sets W3- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed With Fixed Glass (installed) (see Plan For Details) 1 Set W5- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed (installed) (see Plan For Details) 1 Set W6- Awning Window With 1/4" Thk. Tinted Glass On Powder Coated Alum. Framed (installed) (see Plan For Details) 1009(2) Jalousie Window Est. Qty. 1 L.s. A. Labor Included In Material Cost B. Equipment Included In Material Cost C. Materials 1 Set W4- Tinted Glass Jalousie Window Blades On Anolok Alum. Framing (jalou Plus)(installed) (see Plan For Details) C.2. Carpentry And Joinery Works 1003(1)a1 4.5mm Fiber Cement Board On Metal Frame Ceiling Est. Qty. 59.75 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 23 Pcs. 4.5 Mm. Hardieflex Sheet (1.2 M. X 2.4 M.) 69 Pcs. Double Metal Furring 22 Pcs. Carrying Channel 60 Pcs. Hanger Bars/rod 359 Pcs. Wall Clip 15 Pcs. Wall Angle 2 Box Blind Rivet (500pcs/box) 239 Pcs. 1" Metal Screw Consumables ( 5 % Of Material Cost) 1003(4) Cabinets Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Set Wall Counter With Cabinet 2 Pcs. Fabrication Of Conference Tables (60cm X 190cmx78cm High) 1 Pc. Fabrication Of Conference Tables (60cm X 200cmx78cm High) C.3. Masonry Works 1003(1)a1 100mm Chb Non-load Bearing (including Reinforcing Steel) Est. Qty. 73.02 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 959 Pcs. 100 Mm Thk Chb (non-load Bearing) 44 Bags Portland Cement 5 M3 Albay Sand 66 Pcs. 10mm Ø Rsb 9 Kgs. #16 G.i. Tie Wire C.4. Finishes 1027(1) Plain Cement Plaster Finish Est. Qty. 269.94 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 95 Bags Portland Cement 13 M3 Albay Sand 1018(6) Textured Glazed Tiles Est. Qty. 12.60 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 5 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 83 Pcs. 400 X 400 Glazed Floor Tiles Non Skid 8 Bags Portland Cement 1 M3 Albay Sand 2 Bags Tile Grout (2kg.) 2 Bags Tile Adhesive (25 Kgs.) Consumables ( 5 % Of Material Cost) 1018(3) Granite Tiles Est. Qty. 23.45 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 1 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 69 Pcs. 600 X 600 Glazed Floor Tiles Non Skid 8 Bags Portland Cement 1 M3 Albay Sand 4 Bags Tile Grout (2kg.) 4 Bags Tile Adhesive (25 Kgs.) Consumables ( 5 % Of Material Cost) 1018(1) Glazed Tiles Est. Qty. 14.84 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 99 Pcs. 400 X 400 Ceramic Glazed Floor Tiles 5 Bags Portland Cement 1 M3 Albay Sand 2 Bags Tile Grout (2kg.) 3 Bags Tile Adhesive (25 Kgs.) Consumables ( 5 % Of Material Cost) 1018(2) Unglazed Tiles Est. Qty. 2.65 M2 A. Labor 1 Construction Foreman 2 Skilled Laborer 5 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 18 Pcs. 400 X 400 Ceramic Unglazed Floor Tiles 1 Bags Portland Cement 1 M3 Albay Sand 1 Bags Tile Grout (2kg.) Consumables ( 5 % Of Material Cost) C.5. Paint Works 1032(1)a Painting Works (masonry Painting) Est. Qty. 329.59 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 8 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 8 Gal. Concrete Neutralizer 14 Gal. Concrete Sealer/primer 17 Gal. Patching Compound 17 Bags Skim Coat 8 Pail Semi-gloss Paint Consumables ( 5 % Of Material Cost) 1032(1)c Painting Works (metal Painting) Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 2 Gal. Red Oxide Primer 16 Gal. Enamel Paint 9 Gal. Paint Thinner Consumables ( 5 % Of Material Cost) C.6. Steel Works 1047(1) Structural Steel Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 4 Skilled Laborer 5 Unskilled Laborer B. Equipment 1 Welding Machine, Electric Driven Minor Tools ( 10 % Of Labor) C. Materials 8 Pcs. 2" X 4"x 6m Steel Channel 10 Pcs. 3/16" X 2" X 2" X 20' Angle Bar 25 Pcs. 1/8" X 1 1/2" X 2" X 20' Angle Bar 3 Pcs. 3/16" X 2" X 20' Flat Bar 23 Pcs. 2" X 4" X 20' Steel Purlins (1.5mm) 14 Kgs. Welding Rod Consumables ( 5 % Of Material Cost) C.7. Roofing Works 1013(1) Corrugated Metal Roofing Est. Qty. 55.04 M2 A. Labor 1 Construction Foreman 3 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Welding Machine, Electric Driven Minor Tools ( 10 % Of Labor) C. Materials 20 Pcs. #26 X 1m X 5m, 5 Rib Type Roof (pre-painted) 10 Pcs. #26 X 8' Plain G.i. Gutters 15 Pcs. #26 G.i. Fascia, 8' 10 Pcs. 1/2" X 10" X 10' Hardi Senepa 2,000 Pcs. Metal Tekscrew 9 Boxes 1/8" Ø X 1/2" Blind Rivets 7 Box 3/16" Ø X 1/2" Blind Rivets 68 Mts. 10mm Thk. Insulation Roof Blanket 14 Pcs. P.g.i. Gutter Straps & Supports Consumables ( 5 % Of Material Cost) D. Plumbing/sanitary Works 1002(4) Sanitary/ Plumbing Fixtures Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 4 Skilled Laborer 4 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 1 Set Water Closets, Brauhm, White With Bidette And Complete Accessories 1 Set Lavatory, Brauhm Or Hcg, Counter Type White With Drain Accessories & Faucet & Supply Accessories 1 Set Urinal, White Hcg, Complete With Drain Accessories And Water Supply Fittings And Accessories. 2 Pc 4 X 4 Ss Floor Drins With Strainer 1 Pc Ss Faucet 1 Set 10" Exhaust Fan (ceiling Type) 1 Pc. 70cm X 80 Cm Facial Mirror 2 Rolls Teflon Tape 1001(9) Storm Drainage And Downspout Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 4 Skilled Laborer 3 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 10 Pcs. 3"ø X 10" Pvc Pipe 12 Pcs. 3"ø X 45° Pvc Elbow 3 Pcs. 3"ø X 90° Pvc Elbow 18 Pcs. 3"ø Pipe Straps And Accessories 3 Pcs. 3"ø Ss, Downspout Strainer 1 Liter Solvent 1002(24) Waterline Works Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 2 Skilled Laborer 2 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 8 Pcs. 3/4"ø X 4m, Ppr Pipes, (#16) 4 Pcs. 1/2"ø X 4m, Ppr Pipes, (#16) 2 Pcs. 3/4"ø Gate Valve, Ppr 8 Pcs. 3/4"ø Elbow Ppr 15 Pcs. 1/2"ø Elbow Ppr 4 Pcs. 3/4" X 1/2" Ppr Tee Reducer 4 Pcs. 1/2"ø Ppr Threaded Tee 5 Pcs. 1/2" Ø Cap 3 Pcs. 3/4 X 1/2" Couplings 2 Liter Solvent 1001(8) Sewerline Works Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 4 Skilled Laborer 5 Unskilled Laborer B. Equipment Minor Tools ( 10 % Of Labor) C. Materials 6 Pcs. 4"ø X 3m Pvc Pipe 3 Pcs. 3"ø X 3m Pvc Pipe 4 Pcs. 2"ø X 3m Pvc Pipe 2 Pcs. 2"ø Ordinary P-trap With Clean Out 1 Pcs. 4"ø X 90° Pvc Elbow 2 Pcs. 4"ø X 45° Pvc Elbow 5 Pcs. 4"ø X 4"ø Pvc Tee 5 Pcs. 4"ø X 3"ø Coupling Reducer 5 Pcs. 3"ø Clean Out 1 Pcs. 4"ø X 2"ø Pvc Tee 3 Pcs. 4"ø X 3"ø Pvc Wye 3 Pcs. 4"ø X 4"ø Pvc Wye 3 Pcs. 2"ø X 2"ø Pvc Tee 8 Pcs. 2"ø X 2"ø X 90° Pvc Elbow 1 Pcs. 3"ø X 2"ø Pvc Tee 2 Pcs. 3"ø X 45° Pvc Elbow 2 Liter Solvent E. Electrical Works 1100(10) Conduit Boxes And Fittings Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 3 Skilled Laborer 8 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 60 Pcs. 1/2"ø X 10' Pvc, Pns Conduit Pipe 10 Pcs. 3/4"ø X 10' Pvc, Pns Conduit Pipe 42 Pcs. Octagonal Junction Box Gauge #16 Deep Type (101mm X 101mm X 53mm) 24 Pcs. Utility Box Gauge #16, Deep Type (50mm X 101mm X 53mm) Consumables ( 5 % Of Material Cost) 1101(33) Wires And Wiring Devices Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 1 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 150 M. 2.0mm² Thhn Wires, Stranded 100 M. 3.5mm² Thhn Wires, Stranded 60 M. 5.5mm² Thhn Wires, Stranded 30 M. 8.0mm² Thhn Wires, Stranded 3 Sets Single Pole Swtch With Plate 2 Sets 2-gang Switch With Plate 4 Sets 3-gang Switch With Plate 14 Pcs. Duplex Convenience Outlet, Grounding Type (unversal),240v 2 Pcs. Special Purpose Outlet, Grounding Type (unversal),240v Consumables ( 5 % Of Material Cost) 1102(1) Panelboard With Main & Branch Breakers Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 1 Skilled Laborer 2 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 1 Set 70 At, 2p, 230v Circuit Breaker 2 Sets 30 At, 2p, 230v Circuit Breaker 2 Sets 20 At, 2p, 230v Circuit Breaker 2 Sets 15 At, 2p, 230v Circuit Breaker 1 Set 8-hole Panel Board Consumables ( 5 % Of Material Cost) 1103(1) Lighting Fixtures Est. Qty. 1 L.s. A. Labor 1 Construction Foreman 4 Skilled Laborer 6 Unskilled Laborer B. Equipment 1 Unit Electric Edger/grinder 1 Unit Electric Drill C. Materials 5 Sets Chandelier, Small Type 12 Sets Pinlights, 3"ø 6 Watts, Dl 17 Sets Pinlights, 3 1/2"ø 9 Watts, Dl 2 Sets Pinlights, 3 1/2"ø 14 Watts, Dl, Tiltable 4 Sets Pinlights, 11 Watts, Dl 4 Sets Cove Lights, 3m Long, Tri-color 3 Sets Wall Bracket Lights 2 Sets Emergency Lights F. Mechanical Works 1200(13) Airconditioning Est. Qty. 1 L.s. A. Labor B. Equipment C. Materials 1 Set 2.0hp Wall Mounted Type Inverter (installed) 1 Set 1.0hp Wall Mounted Type Inverter (installed) Pre-bid - January 28, 2025, 1:00pm Bid Evaluation - February 12, 2025 Post-qualification - February 14, 2025 Notice Of Award - February 17, 2025 Notice To Proceed - February 20, 2025 For Further Information, Please Refer To: Abel B. Hernandez Bac Chairman/ Brgy. Kagawad Lgu-sagrada, Pili, Camarines Sur +639857600284
Contact
Tender Id
07de97d0-c708-34e9-b6a0-21e8d3fc3608Tender No
11675393Tender Authority
BARANGAY SAGRADA, PILI, CAMARINES SUR ViewPurchaser Address
-Website
http://notices.philgeps.gov.ph