Tenders of Bapco Upstream W L L
Tenders of Bapco Upstream W L L
BAPCO UPSTREAM W L L Tender
Energy, Oil and Gas
Bahrain
Bapco Upstream Is Planning To Install (5) Five Wellhead Compression Stations At Varying Capacities Since The Nag (non-associated Gas) Wellhead Pressure Continues To Decline Across The Awali Field. The Diesel Generators Are Used As Power Generation Source To Supply Back-up Power To The Power Distribution System Of The Facility In Case The Main Power Fails. As Part Of Nag Compression Facilities Project, Compression Facilities Ncf04 And Ncf07 Will Be Developed. In Order To Supply Back-up Power And To Avoid Any Operational Interruptions In The Facilities, 415v, 50hz. Diesel Generator Package Are Required To Be Installed In The Assigned Location.
Closing Date24 Jan 2024
Tender AmountRefer Documents
BAPCO UPSTREAM W L L Tender
Bahrain
The Product Is Used At Various Locations At Different Occasions. • It Is Used To Dilute The Products Like Demulsifier When The Injection Rate Required Is Low, But The Pumps Cannot Be Tailored To Pump Less As At Low Pumping Rates The Pumps Stall And Stop. Such Occasions Han Is Used To Make The Products Lean Through Dilution. • It Is Used Extensively In The Laboratory While Testing The Crudes For Their Bs&w By Centrifuge, By Dean & Stark, Other Multifarious Operations. It Is Used Extensively At Many Testing Protocols. • Han Is Used To Blend The Products Used During Pigging Operations Of The Pipelines, Flow Lines And Vessels Even. It Is One Of The Major Blends Of Solvents Used. • To Reduce The Viscosity And Improve The Pumpability Of The Products, It Is Used – Example, Demulsifier Injection At Dh.
Closing Date4 Feb 2024
Tender AmountRefer Documents
91-100 of 437 archived Tenders