Astm D Tenders
Astm D Tenders
FOOD AND DRUG ADMINISTRATION USA Tender
United States
Closing Date13 Aug 2024
Tender AmountRefer Documents
Details: Solicitation Number: 75f401-24-q- 1274346 contracting Office Address: Fda Winchester Engineering And Analytical Center 109 Holton Street, Winchester Ma 01890 subject: 9 Automated Condom Air Burst Machine classification Code: 6640 naics Code: 334516 response Date: 12 August 2024 At 4:30pm Edt Due Via Email To The Primary Point Of Contact Listed In The Sam.gov Webpage For This Combined Synopsis-solicitation. description: (i) Disclaimer: This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Proposals Are Being Requested And A Written Solicitation Will Not Be Issued. background weac Has Participated In Annual Interlab Round Robin Studies For Condom Air Burst Testing Based On The Astm D-3492 Standard. Weac Is The Only Fda Lab That Participates In The Robin Round Studies. Cdrh Relies On Weac’s Work With Air Burst Condom Testing. Weac Has Also Performed Air Burst Condom Testing On Suspected Counterfeit Condoms, Which Is Very Important For Public Health And Safety. Weac Is Also Involved In The Reviews And Revisions For The Astm And Iso-4074 Condom Standards. Our Feedback Is Based On Our Results From Condom Air Burst Testing. the Current Air Burst Machine Weac Uses Is Manual, Was Purchased In 1990, And Can Only Test 1 Condom At A Time. A New And Modern Automatic Condom Air Burst Machine That Can Test Multiple Condoms At The Same Time Would Be More Efficient And Increase Productivity For The Laboratory. objectives the Objectives Of The Requirement Are For The Contractor To: • Purchase One (1) Automated Condom Air Burst Machines For Weac. • Demonstrate System Functionalities And Acceptable Performance Per Manufacturer’s Specifications After Installation. • Provide Onsite Training On Basic Operation, Routine Maintenance, And System Troubleshooting. scope • The Requested Automated Condom Air Burst Machines Shall Be A Product With All The Software, Hardware, And Accessories, Necessary To Properly Conduct Condom Air Burst Round Robin Studies And Sample Analysis. (ii) This Acquisition Is Issued As A Request For Quote (rfq). (iii) The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-05 (iv) For Purposes Of This Acquisition, The Associated Naics Code Is 334516. The Small Business Size Standard Is 1,000 Employees. This Action Is Being Solicited As A Sole Source. (v) Line-item Structure: The Following Is A List Of Line-item Number(s) And Items, Quantities And Units Of Measure, (including Option(s), If Applicable) And Should Be Reflected In The Offeror’s Quote/proposal: line Item 0001: Automatic Condom Air Burst Machine (vi) Specifications/requirement: salient Characteristics at A Minimum, The Automated Condom Air Burst Machine Shall Meet The Following Specifications: • Accurate Inflation System (ais) For Determining Bursting Volume And Pressure Of Male Condoms (with Adapters Available For Female Condoms). • Shall Include Pc With Ms Excel And Application Software For Data Acquisition And Analysis. • Shall Be Installed In Soundproof Chambers • Shall Have The Ability To Test At Least 2 Condoms At The Same Time. • Shall Have An Automatic Push Button Operation Control. • Shall Have A Pressurized Air Regulator With Fine Filters. • Shall Have Spare Parts Including O-rings, Fuses, Spare Fine Filters, Pneumatic Connectors. • Displacement Calibration Instrument (dci) Which Would Allow In-house Calibrations And Eliminate The Cost Of External Calibration Services. • Shall Include A Length Mandrel For Male Condoms. • Shall Have Approximate Footprint Requirements For Each Individual Cabinet: Length: 2’, Width: 2’, Height: 5’. (each Cabinet Would Contain 1 Condom.) • Performance Specifications. Volume, And Pressure Accuracy: Within ± 1.0% Of The Measured Value. the Contractor Shall Provide Training On All Features To Include System Operations, Calibration, Optimization, And Basic Preventative Maintenance Procedures. This Shall Take Place Upon System Initial Qualification. trade And Service Specifications: the Instrument Must Be A Newly Manufactured Unit, Not Used And Refurbished Or Previously Used For Demonstration. fob Point Destination To Include Inside Delivery And Clean-up Of Area After Installation. the Entire System Must Be Warranted For Parts And Labor For 12 Months From The Date Of Formal Government Acceptance. The Vendor Must Also Be Capable Of Servicing The Instrument Through The Covered Warranty Period. The System Must Include At Least A One (1) Year Warranty And Shall Include At A Minimum: Coverage On All Non-consumable Items And Parts Supplied Including Base Instrument, Factory-certified Replacement Parts, Engineer Labor And Travel Costs. Any Equipment Repair And Maintenance Work Shall Be Performed By An Oem-trained Engineer. This Factory-trained Engineer Shall Have (verified By The Oem) The Following: 1) Access To Oem Factory Telephone Support; 2) Access To The Most Current Oem Factory Training For Both Hardware And Software Components; And 3) Access To All Current Oem Factory Parts, Not Build-to-order Parts. The Oem-trained Service Engineer Shall Not Use Salvaged Parts From Other Instruments For Performing Maintenance And Repairs. All Parts Used In Pm And Repairs Must Be Guaranteed, Factory-tested, Oem Quality Parts. instrument Operators Shall Have Access To A Technical Representative Call Center At No Additional Charge, For Technical Assistance And Trouble-shooting, Which Is Staffed By Senior Engineers To Provide A High Level Of Expertise For Troubleshooting The Instrument. preventative Maintenance (pm) Visit Shall Be Included For The Base Contract Year. This Visit Shall Be Inclusive Of All Parts, Labors, Travel, Consumables, And Supplies Which Are Necessary To Complete The Oem’s Suggested Pm Protocol. Service Engineers Which Perform This Service Shall Trained By The Oem. sufficient Familiarization Training For 3-5 Users Per Delivery Onsite Location Will Be Provided At Time Of Installation Or Shortly Thereafter (within 30 Days), Such That Operators May Independently Operate The Instrument And With Increased Familiarity And Proficiency. The Training Shall Include Manuals And Any Consumables To Be Used During Training. the Contractor Shall Provide Installation Qualification With An Employee Who Can Provide Proof Of Installation Qualification/operation Qualification (iq/oq) Certification. records And Reports: 1) The Contractor (and/or Any Subcontractor) Shall Ensure It Applications Designed And Developed For End Users (including Mobile Applications And Software Licenses) Run In The Standard User Context Without Requiring Elevated Administrative Privileges. 2) The Contractor (and/or Any Subcontractor) Shall Follow Secure Coding Best Practice Requirements, As Directed By United States Computer Emergency Readiness Team (us-cert) Specified Standards And The Open Web Application Security Project (owasp), That Will Limit System Software Vulnerability Exploits. 3) The Contractor (and/or Any Subcontractor) Shall Ensure That Computer Software Developed On Behalf Of Hhs/fda Or Tailored From An Open-source Product, Is Fully Functional And Operates Correctly On Systems Configured In Accordance With Government Policy And Federal Configuration Standards. The Contractor Shall Test Applicable Products And Versions With All Relevant And Current Updates And Patches Updated Prior To Installing In The Hhs/fda Environment. No Sensitive Data Shall Be Used During Software Testing. 4) The Contractor (and/or Any Subcontractor) Shall Protect Information That Is Deemed Sensitive From Unauthorized Disclosure To Persons, Organizations, Or Subcontractors Who Do Not Have A Need To Know The Information. Information Which, Either Alone Or When Compared With Other Reasonably-available Information, Is Deemed Sensitive Or Proprietary By Hhs/fda Shall Be Protected As Instructed In Accordance With The Magnitude Of The Loss Or Harm That Could Result From Inadvertent Or Deliberate Disclosure, Alteration, Or Destruction Of The Data. This Language Also Applies To All Subcontractors That Are Performing Under This Contract. the Contractor Shall, Commensurate With The Completion Of Each Service Call Relating To The First Year Warranty, Provide The End-user Of The Equipment With A Copy Of The Field Corrective Service Report Identifying The Equipment Name, Manufacturer, Model Number, And Serial Number Of The Equipment Being Repaired And Detailing The Reason For The Warranty Call, A Detailed Description Of The Work Performed. The Parts And The Test Equipment Used To Repair The System Shall Be On The Report. This Will Include The Name (s) And Contact Information Of The Engineer Who Performed The Repair, And For Information Purposes, The On-site Hours Expended, And Parts/components Replaced. security And Privacy Requirements section 2 Of Fda Security And Privacy Language Does Not Apply To Procurements For Only Hardware And Software Licenses. section 508 Compliance the Contractor Shall Be Familiar With Section 508 Requirements As Described At http://www.section508.gov/ In Order To Ensure That Documents Generated As Part Of The tasks Are Fully Section 508-accessible Using The Available Cots Tools. Each Order Will identify The Standards Applicable To That Order. (vii) Delivery: Delivery Is Required By 60 Days After Award. Delivery Shall Be Made To: poc: To Be Identified At Time Of Award. u. S. Fda Winchester Engineering And Analytical Center 109 Holton Street winchester, Ma 01890 acceptance Shall Be Performed At The Delivery Locations. The Fob Point Is Destination. (viii) The Provision At 52.212-1, Instructions To Offerors – Commercial Deviation 2018-o0018, Applies To This Acquisition. The Following Addenda Have Been Attached To This Provision: in Addition To The Requirements Set For The In Far 52.212-1, All Offers Responding To This Solicitation Must Provide Their Business Size In Relation To The Naics Code Contained In This Solicitation And Shall Identify Any Socioeconomic Categories To Which They Belong. (ix) Evaluation Criteria - The Specific Evaluation Criteria To Be Used Are As Follows: Lowest Price Technically Acceptable (x) Offerors Shall Include A Completed Copy Of The Provision At Far 52.212-3 (with Its Alternate I), Offeror Representations With Its Offer. (xi) The Clause At 52.212-4, Contract Terms And Conditions - Commercial Items, Applies To This Acquisition. The Following Addenda Have Been Attached To This Clause. (xii) The Clause At 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders - Commercial Items Applies To This Acquisition. The Following Additional Far Clauses Cited In This Clause Are Applicable: 52.204-10 Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) 52.209-6 Protecting The Government’ Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021) 52.219-28 Post-award Small Business Program Rerepresentation (feb 2024) 52.222-3 Convict Labor (jun 2003) 52.222-19 Child Labor--cooperation With Authorities And Remedies (feb 2024) 52.222-21 Prohibition Of Segregated Facilities (apr 2015) 52.222-26 Equal Opportunity (sep 2016) 52.222-35 Equal Opportunity For Veterans (jun 2020) 52.222-36 Equal Opportunity For Workers With Disabilities (jun 2020) 52.222-37 Employment Reports On Special Disabled Veterans, Veterans Of The Vietnam Era, And Other Eligible Veterans (jun 2020) 52.222-50 Combating Trafficking In Persons (nov 2021) 52.225-5 Trade Agreements (nov 2023) 52.225-13 Restrictions On Certain Foreign Purchases (feb 2021) 52.232-33 Payment By Electronic Funds Transfer—central Contractor Registration (oct 2018) (xiii) The Following Additional Contract Requirement(s) Or Terms And Conditions Apply: 52.204-7 System For Award Management (oct 2018) 52.204-13 System For Award Management Maintenance (oct 2018) 52.204-16 Commercial And Government Entity Code Reporting (jul 2016) 52.204-18 Commercial And Government Entity Code Maintenance (jul 2016) 52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2019) 52.232-40 Providing Accelerated Payments To Small Business Subcontractors (dec 2013) 353.222-70 Contractor Cooperation In Equal Employment Opportunity Investigations (dec 15) 252.239-73 Electronic And Information Technology Accessibility Notice (dec 15) (xiv) This Acquisition Is Rated Under The Defense Priorities And Allocations System (dpas) As N/a (xv) Date, Time, And Place Offers Are Due: Offers Due Via Email To Joshua.reid@fda.hhs.gov No Later Than (nlt) 4:30 Pm Est On 12 August 2024 (xvi) Name And Phone Number Of The Individual To Contact For Information Regarding The Solicitation: Joshua Reid, 954-271-9362
DEPT OF THE ARMY USA Tender
Healthcare and Medicine
United States
Closing Date23 Aug 2024
Tender AmountRefer Documents
Details: Description this Is A Combined Synopsis/solicitationforcommercial Productsorcommercial Servicesprepared In Accordance With The Format Infar Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes Only Thesolicitation; Proposals Are Being Requested And A Formalsolicitationwill Not Be Issued. this Is A Request For Quotation (rfq) Using Far Part 12, Acquisition Of Commercial Items; The Solicitation Number Is W519tc24qmode For The Pyrotechnic Production Equipment Modernization. the Solicitation And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2024-05. the Naics Code For This Procurement Is 325998 (all Other Miscellaneous Chemical Product And Preparation Manufacturing). The Small Business Size Standard For This Naics Is 500 Employees. The Product Service Code Is 3695 (miscellaneous Special Industry Machinery). offerors Must Be Registered Within The System For Award Management (sam) Databased At Time Of Response To This Solicitation. The Website For Sam Is Https://www.sam.gov/. addendum To 52.212-1, Instructions To Offerors – Commercial description Of Requirement clin 0001: Existing Pyrotechnics Equipment Removal* quantity: 1 Lot clin 0002: New Pyrotechnics Equipment & Installation* quantity: 1 Lot clin 0003: Training quantity: 1 Lot *clin 0001 And Clin 0002 Will Be Occurring Simultaneously. **see Enclosure 01 Building 126 Power, Enclosure 02 Building 126 Layout, And Attachment 0001 Statement Of Work Revised 11 July 2024 For More Information Regarding The Specifications Of The Pyrotechnic Production Modernization Requirement. site Visits: non-mandatory Site Visit: a Pre-award Non-mandatory Site Visit Will Be Held 30 July 2024 At Crane Army Ammunition Activity In Crane, In. please Provide A Response Via Email If You Will Be Attending The Open Site Visit No Later Than 12:30 Ct, 26 July 2024. There Will Be No Extensions To This Date. Any Interested Bidders Shall Email A Statement Of Interest To The Contracting Officer, Bryce Willett; Email Bryce.t.willett.civ@army.mil And Contract Specialist, Bridget Garnica; Email Bridget.m.garnica.civ@army.mil further Instructions On The Time And Location Will Be Provided Via Email To Those Interested Offerors. mandatory Site Visit: the Awardee Will Be Required To Attend A Mandatory Site Visit Which Is Scheduled To Be Held Three (3) Weeks After Award. Further Instructions On The Time And Location Will Be Provided To The Awardee. type Of Acquisition And Contract this Acquisition Is Issued As Full And Open Competition. Award Will Be Made Using Best Value, Resulting In A Single Award Firm Fixed Price Purchase Order. delivery And Location clin Description Suggested Lead Time 0001 Existing Pyrotechnics Equipment Removal; 1 Lot * 50 Weeks After Award 0002 New Pyrotechnics Equipment & Installation; 1 Lot* 50 Weeks After Award 0003 Training; 1 Lot 2 Weeks After Delivery Of Clin 0002 *clin 0001 And Clin 0002 Will Be Occurring Simultaneously. note: Early Delivery Is Acceptable At No Additional Cost To The Government. delivery Will Be Fob Destination At The Following Address: crane Army Ammunition Activity building 123 – Machine Shop 300 Highway 361 crane, In 47522-5001 crane Army Ammunition Activity Delivery Instructions caaa Receiving Hours Are 0700-1430, Mon – Thurs By Appointment Only; Includes Inert & Freight All Kind (fak). Appointments Shall Be Made Via Carrier Appointment System (cas). Carriers Without Access To The Cas System, Call (812)854-2199 Or (812)854-2339, 48 Hours Prior To Delivery For Appointment. Failure To Follow The Protocol Stated Herein And/or Obtain A Scheduled Delivery Time Prior To Delivery, May Result In The Truck Being Turned Away. packaging And Marking Requirements preservation, Packaging, And Packing Shall Be In Accordance With Astm D 3951 (commercial Packaging). quote Submission Requirements offerors Shall Submit The Following In Response To This Solicitation: price – Offerors Must Submit Completed Pricing Sheet At Attachment 0002. All Yellow-highlighted Sections Shall Be Completed. Prices Shall Be Stated To 2 Decimal Places. Clin 0001 And Clin 0002 Will Need To Be Priced Separately, However, They Will Be Occurring Simultaneously. completed Clause At Attachment 0003 – Far 52.204-24, Paragraph (d)(1) And (d)(2) completed Provisions At Attachment 0004 – Far 52.212-3 Alt 1, Paragraph (b) Only. quality Assurance - As Part Of The Proposal, Offerors Must Submit A Proposed Document Stating Their Best Inspection Methods To Ensure Quality. No Specific Format Is Required. basis For Award award Will Be Made To The Offeror Who Provides The Best Value To The Government Using A Tradeoff Process. best Value: The Expected Outcome Of The Acquisition That, In The Government’s Estimation, Provides The Greatest Overall Benefit In Response To The Requirement. tradeoff: The Government May Accept Other Than The Lowest Priced Quotation, When The Decision Is Consistent With The Evaluation Criteria And The Government Reasonably Determines That The Perceived Benefits Of A Higher Priced Quotation Warrant The Increase In Price. the Government Has Established Technical And Price As The Evaluation Factors. The Order Of Importance Is As Follows: factor 1: Technical Is More Important Than Price. factor 2: Total Price Is Not Expected To Be The Controlling Criteria In The Selection, But Price Importance Will Increase As The Differences Between The Evaluation Results For The Technical Criteria Decrease. in Accordance With Far 52.212-1(g), The Government Intends To Award A Contract Against This Solicitation Without Discussions, Unless Discussions Are Determined Necessary. total Evaluated Price Is Calculated As The Sum Of Clin 0001, Clin 0002, And Clin 0003. failure To Adhere To Any Instruction Required By This Rfq May Render The Quotation Ineligible For Award. evaluation Criteria the Government Will Evaluate Quotations As Follows: factor 1: Technical: the Government Will Evaluate Factor 1 – Technical, Using The Following Criteria: demonstration Of A Clear Understanding Of The Requirements And Deliverables To Include Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project And On The Offeror’s Expressed Ability To Successfully Measure A Quality Assurance. The Offerors Will Be Evaluated On Their Quality Assurance Document And Inspection Methods To Ensure Quality. if The Quoter Provides Statements Which Cause The Government To Question The Quoter’s Ability To Measure Quality Assurance, Such Statements Will Be Evaluated Accordingly. technical Will Be Evaluated Using The Following Standards In Table 1: table 1 technical Ratings description outstanding quotation Indicates An Exceptional Approach And Understanding Of The Requirements And Contains Multiple Strengths. Established Team Has An Extensive Background In Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project. Proposal Includes A Well-thought-out Quality Assurance Approach. good quotation Meets Requirements And Indicates A Thorough Level Of Expertise And Understanding Of The Requirements. Established Team Has Background In Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project. Proposal Includes A Solid Quality Assurance Approach. Strengths Outweigh Any Weaknesses. Risk Of Unsuccessful Performance (quality Assurance) Is Low. acceptable quotation Meets Requirements And Indicates An Adequate Level Of Expertise And Understanding Of The Requirements. Established Team Has Background In Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project. Proposal Quality Assurance Is Adequately Addressed, But Not Specific. Strengths And Weaknesses Are Offsetting Or Will Have Little Or No Impact On Task Order Performance. Risk Of Unsuccessful Performance Is Moderate. marginal quotation Does Not Demonstrate An Adequate Approach And Understanding Of The Requirements. Established Team Has Very Limited Background In Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project. Proposal Quality Assurance Is Flawed Or Is Too Vague For Government To Determine Acceptability. Riks Of Unsuccessful Performance Is High. unacceptable quotation Does Not Meet Requirements And Contains One Or More Deficiencies. Appropriate Team Has Not Been Established, Or Established Team Does Not Have Sufficient Background In Designing, Installing, And Proving Out Modern, Turn-key Manufacturing Systems Similar To The Size And Scope Of This Project Without Significant Government Oversight. No Risk Of Unsuccessful Performance Is High. If This Criterion Is Unacceptable, Additional Factors Will Not Be Evaluated And The Quotation Is Not Eligible For Award. definitions strength strength Is Defined As A Particular Aspect Of The Quoter’s Submission That Has Merit Or Exceeds Specified Performance Capability Requirements In A Way That Will Be Advantageous To The Government During Task Order Performance. weakness weakness Is Defined As Any Flaw In The Quotation That Increases The Risk Of Unsuccessful Task Order Performance. deficiency deficiency Is Defined As Any Material Failure Of A Quotation To Meet A Government Requirement Or A Combination Of Weaknesses In A Quotation That Increases The Risk Of Unsuccessful Task Order Performance To An Unacceptable Level. factor 2: Price the Government Will Evaluate Factor 2- Price, For The Following: compliance: Quotations Will Be Evaluated For Compliance Based Upon The Submission Requirements Contained In The Solicitation. price Reasonableness: The Quoter’s Price Quotation Will Be Evaluated To Determine Reasonableness. In Accordance With Far 31.201-3, A Price Is Reasonable If, In Its Nature And Amount, Does Not Exceed That Which Would Be Incurred By A Prudent Person In Conduct Of Competition Business. total Price Is Calculated As The Sum Of Clin 0001, Clin 0002, And Clin 0003. listing Of Attachments enclosure 01 - Building 126 Power enclosure 02 - Building 125 Layout attachment 0001 – Statement Of Work; Revised July2024 attachment 0002 – Price Sheet attachment 0003 – Far 52.204-24 attachment 0004 – Far 52.212-3 Alt 1 attachment 0005 - Solicitation Provisions & Clauses attachment 0006 -126 Data Collecting attachment 0007 - Qa's; 13aug2024 deadline For Submission offers Are Due On 23 August 2024 No Later Than 05:00 Pm Central Time. No Further Extensions Will Be Allowed. offers Shall Be Submitted In The Following Way: electronically Via Email To The Contract Specialist, Bridget Garnica At Bridget.m.garnica.civ@army.mil And Contracting Officer, Bryce Willett At Bryce.t.willett.civ@army.mil. Offerors Shall Include “w519tc24qmode Response – [insert Offeror’s Name]” Within The Subject Line. questions questions Shall Be Submitted In The Same Manner As Quotes; Electronically Via Email To The Contract Specialist And Contracting Officer Listed Above. **note: Interested Offerors Must Submit Any Questions Concerning This Solicitation At The Earliest Time Possible, To Enable The Buyer To Respond. Questions Not Received 72 Hours Prior To Close Of The Solicitation May Not Be Considered. end Of Addendum 52.212-1 ________________________________________________________________________________________________________ the Purpose Of This Amendment 0001 Is To Extend The Closing Date From 03 June To 10 June 2024 To Allow Additional Time To Submit A Quotation. In Addition, The Place Of Performance Was Updated To Reflect Crane, Indiana. All Other Terms And Conditions Of This Solicitation Remain The Same. ________________________________________________________________________________________________________ the Purpose Of This Amendment 0002 Is To Incorporate An Optional Pre-award Site Visit. This Site Visit Is Not Mandatory. A Scheduled Site Visit Is Planned For One Of The Two Days Next Week, 11-12 June 2024 At Crane Army Ammunition Activity. If You Plan On Attending The Site Visit, Please Provide A Response Via Email To The Following Contract Specialist, Bridget Garnica, At Bridget.m.garnica.civ@army.mil, And Contracting Officer, Bryce Willett, At Bryce.t.willett.civ@army.mil By Cob Friday, 07 June 2024. Further Information Regarding The Site Visit Will Be Provided To Those That Provide A Response Via Email. in Addition, The Closing Date For This Solicitation Has Been Extended To 21 June 2024. Quotes Shall Be Received No Later Than 12:30 Pm Central Time, 21 June 2024. ________________________________________________________________________________________________________ the Purpose Of This Amendment 0003 Is To Extend The Closing Date From 21 June To 28 June 2024 To Allow Additional Time To Answer Vendor Questions And Allow Sufficient Time To Submit A Quote. All Other Terms And Conditions Of This Solicitation Remain The Same. ________________________________________________________________________________________________________ the Purpose Of This Amendment 0004 Is To Re-open The Solicitation Due To A Change In The Requirement Package. Please Read The New Description, View Enclosures 01 And 02, And Attachments 0001 Through 0005. Quotes Shall Be Received No Later Than 16 August 2024.
________________________________________________________________________________________________________ the Purpose Of This Amendment 0005 Is To Incorporate A Few Questions And Answers, Listed As Attachment 0007 Dated 13 August 2024. In Conjunction With Attachment 0007 Is Attachment 0006 – 126 Data Collecting. No Further Questions Are Allowed. In Addition, The Closing Date For This Solicitation Has Been Extended To 23 August 2024. Quotes Shall Be Received No Later Than 5:00 Central Time, 23 August 2024. All Other Terms And Conditions Of This Solicitation Remain The Same.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date22 Nov 2024
Tender AmountRefer Documents
Details: The Department Of Defense (dod) Drug Demand Reduction Program (ddrp) Has A Requirement For Fda And Quality Management Documented 6-acetylmorphine Immunoassay Reagent Kits For Use With The Currently Installed Beckman Coulter Au5800 Series Systems. The Reagents Shall Be Capable Of Detecting 6-acetylmorphine In Human Urine Samples. Proposals Shall Comply With The Statement Of Work (sow). the Reagent Kits Are Required For A Period Of Performance (pop) Of Five (5) Years. The Estimated Number Of Tests Shall Accommodate Up To 500,000 Tests Per Month. only Original Equipment Manufacturer (oem) Of Reagents, Authorized Dealer, Authorized Distributor Or Authorized Reseller For The Proposed Reagents, Such That Oem Parameters, Quality Controls And Services Are Provided And Maintained By The Oem, Will Be Considered. All Storage, Shelf-life, And Expiration Dates Associated With The Reagents Shall Be In Accordance With The Oem Terms And Conditions, As Specified In The Sow. the Oem’s Reagent Product Shall Not Be Repackaged By The Offeror Unless Authorized, As Specified In The Sow. the Vendor Shall Comply With The Fda And Quality Management Documentation, As Specified In The Sow. the Vendor Shall Comply With The Reagent Preparation And Calibration Information, As Specified In The Sow. 1.1. Scope. The Materials Shall Be For The Initial (screen) Immunoassay For The Detection Of 6-acetylmorphine (6am) In Urine When Present At A Concentration Equal To Or Greater Than 10 Ng/ml The Reagent Shall Be Compatible With The Beckman Coulter Au5800 Series Clinical Chemistry Analyzers (hereafter Referred To As “analyzer”) In Use At The Department Of Defense (dod) Forensic Toxicology Drug Testing Laboratories (ftdtls), To Include The Armed Forces Medical Examiner System (afmes) Forensic Toxicology Division, Without Modification Of The Equipment. The Immunoassay Procedure Is Limited To A Two Reagent Assay Procedure. A Vendor’s Reagent Proposal Which Requires A Separate Pretreatment Of Each Testing Specimen Prior To Testing On The Analyzer Will Not Be Considered Acceptable. The Reagent Shall Be Compatible With The Optimal Throughput Of The Analyzer Systems And Shall Not Interfere With The Optimum Performance Of The Other Immunoassay Procedures Performed On These Instruments. The Reagent Shall Not Impose Additional Maintenance, Servicing, Or Calibration Requirements For The Optimum Performance Of The Contractor’s Reagent On The Analyzer. Immunoassay Kits Shall Have Clearance From The Fda In Order To Meet The Requirements Of Dodi 1010.16 Rev. (june 15, 2020). Immunoassay Kits Will Be Evaluated Based On Their Ability To Accurately Detect 6am Based On The Testing And Performance Characteristics In Conjuncture With All Evaluation Factors. 1.2. Sensitivity And Specificity. The Analyzer Shall Be Calibrated At 10 Ng/ml Using Dod Ftdtl Prepared And Certified Solutions Containing 6-am. The Controls Will Utilize The Same Compound As The Calibrator. The Reagent Shall Minimize Cross-reactivity With Structurally Similar Drugs/metabolites In Addition To The Drugs/metabolites On The Current Dod Drug Testing Panel, Listed Below (excluding The Compound Of Interest). The Reagent Shall Demonstrate Calibration Stability, As Evaluated By Frequency Of Control Failures, And Shall Require Calibration No More Than One Time During An 8 Hour Period. The Following Drug Cutoffs Are Currently Used By Dod For The Initial Immunoassay Screen And Chromatographic/spectrometric Confirmation Tests, Respectively. 1.3. Compliance With Food & Drug Administration (fda) Requirements. 1.3.1 Immunoassay Kits Are Considered Medical Devices And Shall Have Clearance From The Fda To Be Marketed. The Registration And Listing Process Specified By The Fda Shall Be Followed And The Manufacturer Shall Adhere To Good Manufacturing Processes In The Manufacture Of The Devices. Any Mandatory Recalls Of The Kits Provided Under The Resulting Contract And Any Other Problems That Require Notification To The Fda Shall Be Resolved As Required By The Fda Regulations Current At The Time. The Contractor Shall Notify The Contracting Officer Of Any Recall Or Fda Notification Within Two Working Days Of The Event. 1.3.2. Except As Provided Herein, The Reagents Supplied Throughout The Term Of This Contract Shall Be Identical To The Reagents Offered By The Contractor And Accepted By The Government At The Time Of The Contract Award. If, During The Course Of This Contract, The Manufacturer Wishes To Change Or Improve Its Kit, That Product Modification Shall Be Proposed In Writing To The Contracting Officer For Approval Prior To Its Incorporation Into The Kits To Be Delivered. The Contractor's Proposal Shall Include Documentation That Demonstrates That The Manufacturer Has Complied With All Applicable Fda Regulations, Including Those Concerning The Filing Of A New 510k Notice If Such Action And Subsequent Fda Clearance Are Warranted By The Nature Of The Modification. 1.4. Packaging. The Reagents Provided Shall Be In Volumes And Packaging That Are Convenient And Applicable To The Sample Throughput At The Ftdtls And Shall Not Result In The Loss Or Unnecessary Disposal Of More Than 3% Of The Working Volume Of Reagent. The Contractor Shall Not Be Required To Provide Calibrators/controls. The Reagents Shall Be Provided With An Instruction Sheet That Complies With All Requirements Of The Fda And Includes Data Demonstrating Specific Performance Characteristics, Such As Accuracy, Precision, Sensitivity, Specificity, Cross-reactivity, And Safety Precautions. The Instruction Sheet(s) Shall Include Procedures And Instrument Parameters Optimized For Ftdtl Operations As Represented In These Specifications And Cutoffs As Utilized By The Dod. The Government Shall Not Develop Procedures Or Optimize The Performance Of A Kit For The Contractor. Offeror Shall Not Repackage Or Relabel An Oem Product Unless Authorized. 1.5. Shelf Life. The Minimum Shelf Life Of Any Unopened Component Of The Assay Shall Be At Least 180 Days From The Date Of Delivery To The Ftdtl. All Storage, Shelf Life, And Expiration Dates Associated With The Reagents Shall Be In Accordance With The Oem Terms And Conditions. Once Kit Container Seals Are Broken And The Components Are Opened, The Shelf-life Shall Be At Least 14 Days. 1.6. The Ftdtls Intend To Use The Immunoassay Kits In A Manner Consistent With The Fda Approval. The Package Insert And Information For The Analyzer Settings Must Contain The Information Necessary For The Ftdtls To Use The Immunoassay Kits Consistent With The Device’s Fda Approval. This Ensures That The Ftdtls Can Use The Immunoassay Kits Properly And Derive The Full Benefit Of The Fda Approval. 2. Testing And Quality Control Protocol. 2.1. The Reagents Supplied Shall Be Compatible With The Calibration Requirements And Characteristics Of The Beckman Coulter Au5800 Series Clinical Chemistry Analyzers. Verification Of Each Calibration, At 10 Ng/ml, Shall Be Accomplished With A Drug Free Control And Open Controls At Target Concentrations Of 50-75% And 150-200% Of The Calibrator/cutoff. An Acceptable Verification Will Have Analytical Readings As Follows: Drug Free Control < 50-75% Control < Cutoff (calibrator) < 150-200% Control. The Batch May Also Contain Blind Negative And Positive Controls Distributed Throughout The Batch. 3. Performance Characteristics. 3.1. The Reagent Shall Be Capable Of Identifying Specimens As Positive For 6am When Present In Human Urine At Concentrations Equal To Or Greater Than 10 Ng/ml As Determined By The Current Immunoassay And Gas Chromatography-mass Spectrometry (gc-ms) Or Liquid Chromatography- Tandem Mass Spectrometry (lc-ms/ms) Procedures Utilized In The Ftdtls (and Afmes). 3.2. The Reagent Shall Be Capable Of Identifying Specimens As Negative For 6am When Present In Human Urine At Concentrations Below 10 Ng/ml As Determined By The Current Immunoassay And Gc-ms Or Lc-ms/ms Procedures Utilized In The Ftdtls (and Afmes). 3.3. The Reagent Performance, As Evaluated Through The Performance Of Controls, Shall Be Stable Over The Course Of The Day And Shall Not Require Re-calibration Within An Eight Hour Period. 3.4. The Reagent Shall Display Precision And Accuracy Both Within And Between Batches For Concentrations Ranging Between 50-200% Of The Calibrator Concentration. 3.5. The Reagent Shall Produce Non-overlapping Ranges For Samples Analyzed At 0%, 50%, 100%, 150%, And 200% Of The Calibrator Concentration. 3.6. The Reagent Shall Have Minimal Cross Reactivity With Analytes Other Than 6-am. 4. Quality Assurance Program Of The Manufacturing Process Shall Possess Current Iso-9000 Series Certification, Current Iso 13485 Series Or Include Documentation Of The Following Elements: 4.1. Chemicals And Reagents 4.1.1. Quality And Authenticity. All Materials Used In The Preparation Of Reagents Shall Be Verified As To Authenticity And Purity. Methods May Include, But Are Not Limited To, The Determination Of Melting Points, Gc-ms, Nuclear Magnetic Resonance, And Spectrophotometric Measurements. 4.1.2. Stability. The Kit And Each Kit Component Shall Be Shown To Be Stable And At The Correct Concentration Over The Period Of Use. Components That Are Homogeneous Solutions Shall Not Deteriorate Throughout The Period Of Use Of The Kit (from Date Of Preparation To Date Of Expiration). 4.2. Manufacturer’s Equipment 4.2.1. Preventative Maintenance. Routine Preventive Maintenance Procedures, Periodic Calibration, And Any Unscheduled Maintenance Shall Be Fully Documented And In Accordance With Recommendations Of The Manufacturer Of The Equipment. 4.2.2. Calibration And Operational Checks. All Instruments That Are Used To Check A Physical Parameter Of A Solution Or Material Shall Be Calibrated And Have Documentation Available To Demonstrate That All Required Operational Checks Have Been Completed. This Includes Ph Meters, Spectrometers, Micropipettes, Etc. 4.2.3. Temperature Checks. Water Baths, Refrigerators, Freezers, And Other Equipment That Is Intended To Maintain A Given Temperature Shall Be Periodically Validated For Accuracy And Routinely Verified For Correct Settings. 4.2.4. Glassware And Other Reusable Supplies. Appropriate Procedures For Cleaning And Inspecting Glassware And Other Reusable Materials Shall Be Established And Compliance Documented. 4.3. Antibody 4.3.1. Authenticity. The Prepared Antibody Shall Be Verified To Be Authentic And Its Purity Established. 4.3.2. Stability. The Antibody Shall Be Documented To Be Stable To The Expiration Date And The Immunoassay Shall Meet All Contract Specifications To The End Of Expiration Date (a Minimum Of 180 Days From Date Of Delivery To Ftdtl/afmes). 4.3.3. Specificity. Antibody Specificity Shall Be Verified For Each Lot And The Specificity Re-evaluated At Routine Intervals To Ensure Uniformity And Quality Of Preparations. The Reagent Shall Provide Performance Characteristics In Terms Of Sensitivity And Specificity For Detection Of 6am In Urine. Chemical Compounds That May Reasonably Be Found In Urine Resulting From Prescription Or Non-prescription Drug Use Shall Be Tested To Characterize Antibody Specificity. Specificity Testing May Include Biochemical Materials Produced Normally In The Human Body. 4.4. Immunoassays 4.4.1. Technical Performance. Performance Of Each Lot Of Reagent Shall Be Verified. The Verification Shall Establish, As A Minimum, The Appropriate Response To The Target Molecules And That All Other Parameters As Specified In The Contract Are Met. The Performance Parameters Involved In The Testing Procedures Shall Be Verified And Documented To Be Consistent Throughout The Shelf Life Of The Kit. 4.4.2. Manufacturer’s Production Manual. Procedures And Criteria Required To Validate All Components (and Materials) Employed During The Manufacture Of The Reagents In The Test Kits And The Operation Of The Completed Kit Over The Entire Period Of Shelf-life Of The Kit Shall Be Described In Detail. All Steps Of Each Quality Control Procedure Shall Be Described Thoroughly. 4.4.3. Records. The Production And Quality Control Records Generated By Each Procedure Performed Above Shall Be Maintained In A Systematic Fashion To Permit The Verification Of The Completion Of All Production Parameters And Shall Be Available For Inspection During The Term Of The Contract. 4.4.4. Corrective Action. When A Specified Quality Control Parameter Is Found To Be Out Of Limits, The Action Taken To Ensure Correction For Existing Kits (i.e., Notification) Shall Be Documented And Action Taken To Ensure That The Deficiency Does Not Reoccur. All Records Shall Be Retained. The Contracting Officer Shall Be Notified Within 2 Working Days Of Any Deficiencies In Existing Kits And Of All Corrective Actions For Consideration, I.e., Delivery Of Replacement Kits At No Cost To The Government. The Fda Shall Be Notified According To Its Regulations. 4.4.5. Lot Numbers. Lot Numbers Shall Be Used To Identify Reagents To Allow Tracking Of All Immunoassay Components. The Procedures Used To Assign Unique Lot Numbers For Each Solution Or Reagent Shall Be Described. A Single Lot Number For A Kit Shall Suffice If All Materials Used In That Lot Number Can Be Tracked To Identify The Materials And Procedures Used In The Preparation Of That Kit. 5. Packaging And Marking. 5.1. Thermal Protection For Biologic Reagents. The Contractor Shall Ship Biologic Reagent Items Used In The Reagent Kits In Insulated Thermal Containers To Ensure Protection Of The Reagents Against Thermal (heat And Cold) Damage Which Would Affect Reagent Performance Contained In The Statement Of Work Of This Contract. 5.2. Marking Of Shipments (commercially-packaged Items). Marking Shall Be In Accordance With Astm D 3951 15, "standard Practice For Commercial Packaging." 5.2.1. Additional Markings Include: Contract Number & Government Delivery Order Number. 5.3. Deteriorative Material Marking. The Contractor Shall Include As Part Of The Marking, The Following Information: (a) Expiration Date; (b) Required Storage Conditions For Each Kit Component; And (c) Type I Or Type Ii Shelf Life Date As Specified In Mil-std-129 For Each Unit Of Material, Issue, Package, Intermediate Container And Exterior Shipping Container.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date21 Aug 2024
Tender AmountUSD 2.4 Million This is an estimated amount, exact amount may vary.
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
desired And Required Time Of Delivery (june 1997)|29|0001aa|25 Ea.|540 Days|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/
a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
first Article Approval--contractor Testing (sep 1989)|10|one|0001|30|270|5450 Carlisle Pike, Mechanicsburg, Pa, 17050||||x||
buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11||||||||||||
progress Payments (nov 2021)|4|||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
list Of Solicitation Attachments|5|x|x|x|x|x|
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (feb 2024)|13|336612|1000||||||||||||
type Of Contract (apr 1984)|1|firm Fixed Price |
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
clause 52.211-9 Is Updated With The Correct Qty. Navsup Is Seeking Qty 25 Ea.
the Closing Date Is Hereby Extended Until 19 Aug 2024.
this Solicitation Closing Date Is Hereby Extended.
52.211-9 Is Added.
this Amendment Is Issued To Incorporate Clin 0001ad For Fat Pricing.
the Closing Date Of This Solicitation Is 3 May 2024.
all Other Terms And Conditions Remain The Same.
this Solicitation Requires First Article Testing. See Far 52.209-3 First Article Approval Contractor Testing For More Details..
this Requirement Requires Access To Noforn And/or Navalnuclear Propulsion Information. See Local Text Wsstermhz12 For Further Information. If You Wish To Obtain A Copy Of The Drawings, Please Download The Security Agreement Form From Sam.gov And Email The
completed, Signed Form Toscott.r.youngblood2.civ@us.navy.mil
the Solicitation Closing Date Is Hereby Extended Until April 26 2024.
please Follow Instructions Outlined In Section L: Of This Solicitation.
wsstermlz02: Offerors Shall Provide A Quality Assurance Manual. Only Those Sources With An Acceptable Quality Assurance Manual Are Eligible For Award Under This Solicitation.
this Solicitation Uses Lpta Criteria Outlined In This Solicitation.
if Drawings Are Included In The Solicitation, Access Needs To Berequested On The Individual Solicitation Page On Contracts Opportunities On The Governments Beta.sam Website. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=eb-2937 |96169| B|sp |d|0001 | B|49998|0568465
drawing Data=eb-2937 |96169| B|sp |d|0002 | B|49998|0262311
drawing Data=eb-2937 |96169| B|sp |d|0003 | B|49998|0457001
drawing Data=eb-2937 |96169| B|sp |d|0004 | B|49998|0494479
drawing Data=eb-2937 |96169| B|sp |d|0005 | B|49998|0557624
drawing Data=eb-2937 |96169| B|sp |d|0006 | B|49998|0572669
drawing Data=eb-2937 |96169| B|sp |d|0007 | B|49998|0588302
drawing Data=eb-2937 |96169| B|sp |d|0008 | B|49998|0487356
drawing Data=eb-2937 |96169| B|sp |d|0009 | B|49998|0641401
drawing Data=eb-2937 |96169| B|sp |d|0010 | B|49998|0609048
drawing Data=eb-2937 |96169| B|sp |d|0011 | B|49998|0332061
drawing Data=h261-0102d74 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h621-0102a01 |53711| A|er |d|0001 | A|49998|0037852
drawing Data=h621-0102a01 |53711| A|er |d|0002 | A|49998|0022265
drawing Data=h621-0102a01 |53711| A|er |d|0003 | A|49998|0045427
drawing Data=h621-0102a01 |53711| A|er |d|0004 | A|49998|0032629
drawing Data=h621-0102a01 |53711| A|er |d|0005 | A|49998|0033163
drawing Data=h621-0102a01 |53711| A|er |d|0006 | A|49998|0041453
drawing Data=h621-0102a01 |53711| A|er |d|0007 | A|49998|0122787
drawing Data=h621-0102a01 |53711| A|er |d|0008 | A|49998|0075868
drawing Data=h621-0102a02 |53711| A|er |d|0001 | A|49998|0038259
drawing Data=h621-0102a02 |53711| A|er |d|0002 | A|49998|0014346
drawing Data=h621-0102a02 |53711| A|er |d|0003 | A|49998|0053725
drawing Data=h621-0102a02 |53711| A|er |d|0004 | A|49998|0063527
drawing Data=h621-0102a02 |53711| A|er |d|0005 | A|49998|0064236
drawing Data=h621-0102a02 |53711| A|er |d|0006 | A|49998|0037645
drawing Data=h621-0102a02 |53711| A|er |d|0007 | A|49998|0036363
drawing Data=h621-0102a02 |53711| A|er |d|0008 | A|49998|0037448
drawing Data=h621-0102a02 |53711| A|er |d|0009 | A|49998|0039414
drawing Data=h621-0102a02 |53711| A|er |d|0010 | A|49998|0160700
drawing Data=h621-0102a02 |53711| A|er |d|0011 | A|49998|0134109
drawing Data=h621-0102a03 |53711| A|er |d|0001 | A|49998|0021078
drawing Data=h621-0102a03 |53711| A|er |d|0001.1 | A|49998|0019129
drawing Data=h621-0102a03 |53711| A|er |d|0001.2 | A|49998|0025775
drawing Data=h621-0102a03 |53711| A|er |d|0001.3 | A|49998|0039912
drawing Data=h621-0102a03 |53711| A|er |d|0001.4 | A|49998|0026761
drawing Data=h621-0102a03 |53711| A|er |d|0002 | A|49998|0057736
drawing Data=h621-0102a03 |53711| A|er |d|0003 | A|49998|0069402
drawing Data=h621-0102a03 |53711| A|er |d|0004 | A|49998|0052923
drawing Data=h621-0102a03 |53711| A|er |d|0005 | A|49998|0044205
drawing Data=h621-0102a03 |53711| A|er |d|0006 | A|49998|0053927
drawing Data=h621-0102a03 |53711| A|er |d|0007 | A|49998|0039873
drawing Data=h621-0102a03 |53711| A|er |d|0008 | A|49998|0047671
drawing Data=h621-0102a03 |53711| A|er |d|0009 | A|49998|0042694
drawing Data=h621-0102a03 |53711| A|er |d|0010 | A|49998|0039885
drawing Data=h621-0102a03 |53711| A|er |d|0011 | A|49998|0044703
drawing Data=h621-0102a03 |53711| A|er |d|0012 | A|49998|0042919
drawing Data=h621-0102a03 |53711| A|er |d|0013 | A|49998|0037692
drawing Data=h621-0102a03 |53711| A|er |d|0014 | A|49998|0039760
drawing Data=h621-0102a03 |53711| A|er |d|0015 | A|49998|0041011
drawing Data=h621-0102a03 |53711| A|er |d|0016 | A|49998|0048557
drawing Data=h621-0102a03 |53711| A|er |d|0017 | A|49998|0014830
drawing Data=h621-0102a03 |53711| A|er |d|0018 | A|49998|0013294
drawing Data=h621-0102a03 |53711| A|er |d|0019 | A|49998|0166561
drawing Data=h621-0102a03 |53711| A|er |d|0020 | A|49998|0139744
drawing Data=h621-0102a03 |53711| A|er |d|0021 | A|49998|0189793
drawing Data=h621-0102a03 |53711| A|er |d|0022 | A|49998|0139891
drawing Data=h621-0102a03 |53711| A|er |d|0023 | A|49998|0121265
drawing Data=h621-0102a03 |53711| A|er |d|0024 | A|49998|0105221
drawing Data=h621-0102a03 |53711| A|er |d|0025 | A|49998|0114189
drawing Data=h621-0102a03 |53711| A|er |d|0026 | A|49998|0198610
drawing Data=h621-0102a03 |53711| A|er |d|0027 | A|49998|0115665
drawing Data=h621-0102a03 |53711| A|er |d|0028 | A|49998|0083415
drawing Data=h621-0102a05 |53711| A|er |d|0001 | A|49998|0034604
drawing Data=h621-0102a05 |53711| A|er |d|0001.1 | A|49998|0012203
drawing Data=h621-0102a05 |53711| A|er |d|0002 | A|49998|0064744
drawing Data=h621-0102a05 |53711| A|er |d|0003 | A|49998|0127671
drawing Data=h621-0102a07 |53711| A|er |d|0001 | A|49998|0043518
drawing Data=h621-0102a07 |53711| A|er |d|0001.1 | A|49998|0014077
drawing Data=h621-0102a07 |53711| A|er |d|0002 | A|49998|0063639
drawing Data=h621-0102a07 |53711| A|er |d|0003 | A|49998|0044605
drawing Data=h621-0102a07 |53711| A|er |d|0004 | A|49998|0044015
drawing Data=h621-0102a108 |53711| A|er |d|0001 | A|49998|0918547
drawing Data=h621-0102a11 |53711| A|er |d|0001 | A|49998|0043094
drawing Data=h621-0102a11 |53711| A|er |d|0001.1 | A|49998|0018658
drawing Data=h621-0102a11 |53711| A|er |d|0002 | A|49998|0060012
drawing Data=h621-0102a11 |53711| A|er |d|0003 | A|49998|0035375
drawing Data=h621-0102a11 |53711| A|er |d|0004 | A|49998|0055587
drawing Data=h621-0102a11 |53711| A|er |d|0005 | A|49998|0037265
drawing Data=h621-0102a11 |53711| A|er |d|0006 | A|49998|0039785
drawing Data=h621-0102a11 |53711| A|er |d|0007 | A|49998|0041585
drawing Data=h621-0102a11 |53711| A|er |d|0008 | A|49998|0036148
drawing Data=h621-0102a11 |53711| A|er |d|0009 | A|49998|0208132
drawing Data=h621-0102a121 |53711| A|er |d|0001 | A|49998|0709114
drawing Data=h621-0102a125 |53711| A|er |d|0001 | A|49998|0435504
drawing Data=h621-0102a168 |53711| A|er |d|0001 | A|49998|1501235
drawing Data=h621-0102a17 |53711| A|er |d|0001 | A|49998|0037341
drawing Data=h621-0102a17 |53711| A|er |d|0001.1 | A|49998|0019205
drawing Data=h621-0102a17 |53711| A|er |d|0002 | A|49998|0066302
drawing Data=h621-0102a17 |53711| A|er |d|0003 | A|49998|0062923
drawing Data=h621-0102a17 |53711| A|er |d|0004 | A|49998|0126037
drawing Data=h621-0102a188 |53711| A|er |d|0001 | |49998|1432274
drawing Data=h621-0102a22 |53711| C|er |d|0001 | |49998|0855198
drawing Data=h621-0102a22 |53711| C|er |d|0001.1 | B|49998|0028535
drawing Data=h621-0102a22 |53711| C|er |d|0001.2 | B|49998|0033887
drawing Data=h621-0102a22 |53711| C|er |d|0001.3 | B|49998|0012002
drawing Data=h621-0102a22 |53711| C|er |d|0002 | B|49998|0077551
drawing Data=h621-0102a22 |53711| C|er |d|0003 | B|49998|0038816
drawing Data=h621-0102a22 |53711| C|er |d|0004 | B|49998|0120742
drawing Data=h621-0102a22 |53711| C|er |d|0005 | B|49998|0068506
drawing Data=h621-0102a22 |53711| C|er |d|0006 | B|49998|0120902
drawing Data=h621-0102a39 |53711| A|er |d|0001 | A|49998|0043492
drawing Data=h621-0102a39 |53711| A|er |d|0001.1 | A|49998|0033724
drawing Data=h621-0102a39 |53711| A|er |d|0002 | A|49998|0062801
drawing Data=h621-0102a39 |53711| A|er |d|0003 | A|49998|0071199
drawing Data=h621-0102a48 |53711| B|er |d|0001 | B|49998|0037377
drawing Data=h621-0102a48 |53711| B|er |d|0001.1 | B|49998|0024643
drawing Data=h621-0102a48 |53711| B|er |d|0001.2 | B|49998|0022539
drawing Data=h621-0102a48 |53711| B|er |d|0001.3 | B|49998|0027931
drawing Data=h621-0102a48 |53711| B|er |d|0001.4 | B|49998|0036544
drawing Data=h621-0102a48 |53711| B|er |d|0002 | B|49998|0071446
drawing Data=h621-0102a48 |53711| B|er |d|0003 | B|49998|0035428
drawing Data=h621-0102a48 |53711| B|er |d|0004 | B|49998|0039985
drawing Data=h621-0102a50 |53711| A|er |d|0001 | A|49998|0041731
drawing Data=h621-0102a50 |53711| A|er |d|0001.1 | A|49998|0029231
drawing Data=h621-0102a50 |53711| A|er |d|0001.2 | A|49998|0036383
drawing Data=h621-0102a50 |53711| A|er |d|0002 | A|49998|0054429
drawing Data=h621-0102a50 |53711| A|er |d|0003 | A|49998|0030654
drawing Data=h621-0102a50 |53711| A|er |d|0004 | A|49998|0061856
drawing Data=h621-0102a50 |53711| A|er |d|0005 | A|49998|0057108
drawing Data=h621-0102a50 |53711| A|er |d|0006 | A|49998|0056135
drawing Data=h621-0102a50 |53711| A|er |d|0007 | A|49998|0060035
drawing Data=h621-0102a50 |53711| A|er |d|0008 | A|49998|0059823
drawing Data=h621-0102a50 |53711| A|er |d|0009 | A|49998|0023352
drawing Data=h621-0102a50 |53711| A|er |d|0010 | A|49998|0040524
drawing Data=h621-0102a50 |53711| A|er |d|0011 | A|49998|0051452
drawing Data=h621-0102a50 |53711| A|er |d|0012 | A|49998|0057922
drawing Data=h621-0102a50 |53711| A|er |d|0013 | A|49998|0022848
drawing Data=h621-0102a50 |53711| A|er |d|0014 | A|49998|0035871
drawing Data=h621-0102a50 |53711| A|er |d|0015 | A|49998|0038701
drawing Data=h621-0102a50 |53711| A|er |d|0016 | A|49998|0028302
drawing Data=h621-0102a50 |53711| A|er |d|0017 | A|49998|0088297
drawing Data=h621-0102a50 |53711| A|er |d|0018 | A|49998|0155682
drawing Data=h621-0102a50 |53711| A|er |d|0019 | A|49998|0124972
drawing Data=h621-0102a50 |53711| A|er |d|0020 | A|49998|0118121
drawing Data=h621-0102a50 |53711| A|er |d|0021 | A|49998|0077344
drawing Data=h621-0102a50 |53711| A|er |d|0022 | A|49998|0128466
drawing Data=h621-0102a51 |53711| A|er |d|0001 | A|49998|0040110
drawing Data=h621-0102a51 |53711| A|er |d|0001.1 | A|49998|0027168
drawing Data=h621-0102a51 |53711| A|er |d|0002 | A|49998|0060056
drawing Data=h621-0102a51 |53711| A|er |d|0003 | A|49998|0061789
drawing Data=h621-0102a52 |53711| A|er |d|0001 | A|49998|0039953
drawing Data=h621-0102a52 |53711| A|er |d|0001.1 | A|49998|0032355
drawing Data=h621-0102a52 |53711| A|er |d|0002 | A|49998|0062662
drawing Data=h621-0102a52 |53711| A|er |d|0003 | A|49998|0037395
drawing Data=h621-0102a52 |53711| A|er |d|0004 | A|49998|0035793
drawing Data=h621-0102a57 |53711| A|er |d|0001 | A|49998|0168427
drawing Data=h621-0102a71 |53711| A|er |d|0001 | A|49998|0169469
drawing Data=h621-0102a99 |53711| B|er |d|0001 | B|49998|5824730
drawing Data=h775-1512a1 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a10 |53711| A|er |d|0001 | |49998|1565029
drawing Data=h775-1512a2 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a3 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a4 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a5 |53711| A|er |d|0001 | |49998|0228403
drawing Data=h775-1512a6 |53711| A|er |d|0001 | |49998|0063013
drawing Data=h775-1512a7 |53711| A|er |d|0001 | |49998|0176895
drawing Data=h775-1512a8 |53711| A|er |d|0001 | |49998|0271962
drawing Data=h775-1512a9 |53711| A|er |d|0001 | |49998|0335202
drawing Data=6984052 |53711| D| |d|0001 | D|00026|0000000
drawing Data=6985426 |53711| A| |d|0000.a | A|49998|0035751
drawing Data=6985426 |53711| A| |d|0001 | A|49998|0074079
drawing Data=6985426 |53711| A| |d|0002 | A|49998|0062500
drawing Data=6985426 |53711| A| |d|0003 | A|49998|0008982
drawing Data=6985426 |53711| A| |d|0004 | A|49998|0010717
drawing Data=6985426 |53711| A| |d|0005 | A|49998|0030344
drawing Data=6985426 |53711| A| |d|0006.1 | A|49998|0061541
drawing Data=6985426 |53711| A| |d|0006.10 | A|49998|0022748
drawing Data=6985426 |53711| A| |d|0006.2 | A|49998|0061465
drawing Data=6985426 |53711| A| |d|0006.3 | A|49998|0055809
drawing Data=6985426 |53711| A| |d|0006.4 | A|49998|0059727
drawing Data=6985426 |53711| A| |d|0006.5 | A|49998|0059513
drawing Data=6985426 |53711| A| |d|0006.6 | A|49998|0023040
drawing Data=6985426 |53711| A| |d|0006.7 | A|49998|0040218
drawing Data=6985426 |53711| A| |d|0006.8 | A|49998|0051132
drawing Data=6985426 |53711| A| |d|0006.9 | A|49998|0057425
drawing Data=6985426 |53711| A| |d|0007.1 | A|49998|0024885
drawing Data=6985426 |53711| A| |d|0007.10 | A|49998|0037342
drawing Data=6985426 |53711| A| |d|0007.11 | A|49998|0032807
drawing Data=6985426 |53711| A| |d|0007.12 | A|49998|0037061
drawing Data=6985426 |53711| A| |d|0007.13 | A|49998|0036308
drawing Data=6985426 |53711| A| |d|0007.14 | A|49998|0040683
drawing Data=6985426 |53711| A| |d|0007.15 | A|49998|0028030
drawing Data=6985426 |53711| A| |d|0007.2 | A|49998|0038133
drawing Data=6985426 |53711| A| |d|0007.3 | A|49998|0037181
drawing Data=6985426 |53711| A| |d|0007.4 | A|49998|0035304
drawing Data=6985426 |53711| A| |d|0007.5 | A|49998|0035595
drawing Data=6985426 |53711| A| |d|0007.6 | A|49998|0035487
drawing Data=6985426 |53711| A| |d|0007.7 | A|49998|0032536
drawing Data=6985426 |53711| A| |d|0007.8 | A|49998|0038400
drawing Data=6985426 |53711| A| |d|0007.9 | A|49998|0042559
drawing Data=6985426 |53711| A| |d|0008.1 | A|49998|0029133
drawing Data=6985426 |53711| A| |d|0008.2 | A|49998|0046621
drawing Data=6985426 |53711| A| |d|0008.3 | A|49998|0014013
drawing Data=6985426 |53711| A| |d|0008.4 | A|49998|0012670
drawing Data=6985426 |53711| A| |d|0009 | A|49998|0088388
drawing Data=6985426 |53711| A| |d|0010 | A|49998|0157697
drawing Data=6985426 |53711| A| |d|0011 | A|49998|0138726
drawing Data=6985426 |53711| A| |d|0012 | A|49998|0189061
drawing Data=6985426 |53711| A| |d|0013 | A|49998|0134718
drawing Data=6985426 |53711| A| |d|0014 | A|49998|0123397
drawing Data=6985426 |53711| A| |d|0015 | A|49998|0118040
drawing Data=6985426 |53711| A| |d|0016 | A|49998|0113699
drawing Data=6985426 |53711| A| |d|0017 | A|49998|0118200
drawing Data=6985426 |53711| A| |d|0018 | A|49998|0071113
drawing Data=6985426 |53711| A| |d|0019 | A|49998|0068598
drawing Data=6985426 |53711| A| |d|0020 | A|49998|0116804
drawing Data=6985426 |53711| A| |d|0021 | A|49998|0075838
drawing Data=6985426 |53711| A| |d|0022 | A|49998|0097724
drawing Data=6985426 |53711| A| |d|0023 | A|49998|0069126
drawing Data=6985426 |53711| A| |d|0024 | A|49998|0155576
drawing Data=6985426 |53711| A| |d|0025 | A|49998|0143738
drawing Data=6985426 |53711| A| |d|0026 | A|49998|0127085
drawing Data=6985426 |53711| A| |d|0027 | A|49998|0123826
drawing Data=6985426 |53711| A| |d|0028 | A|49998|0109249
drawing Data=6985426 |53711| A| |d|0029 | A|49998|0121330
drawing Data=6985426 |53711| A| |d|0030 | A|49998|0087896
drawing Data=6985426 |53711| A| |d|0031 | A|49998|0124616
drawing Data=6985426 |53711| A| |d|0032 | A|49998|0234515
drawing Data=6985426 |53711| A| |d|0033 | A|49998|0126707
drawing Data=6985426 |53711| A| |d|0034 | A|49998|0128215
drawing Data=6985426 |53711| A| |d|0035 | A|49998|0072619
drawing Data=6985426 |53711| A| |d|0036 | A|49998|0076247
drawing Data=7069152 |53711| A| |d|0001 | A|49998|2185285
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-b209 | | | |070801|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b564 | | | |191101|a| | |
document Ref Data=astm-a574 | | | |120401|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=asme-b18.3 | | | |120101|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-a-200 | | |a |980901|a| | |
document Ref Data=sae Ams-qq-a-200 |0008| |a |150501|a| | |
document Ref Data=sae Ams-qq-a-250 | | |a |040801|a| | |
document Ref Data=sae Ams-qq-a-250 |0011| | |970801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=t9074-bd-gib-010/0300 | | |2 |121218|a| | |
3. Requirements
3.1 ;the Aft Desurger Assembly Is Required To Be In Accordance With Naval Sea System Command Drawing 6985426 Part Number A2 And All Eb Ers Invoked In This Contract, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;desurger Head, Part 2-1;
material - ;t9074-bd-gib-010/0300, Appendix E, Grade Hy-80, Forged;
part - ;tailpiece, Part 2-2;
material - ;sae Ams-qq-s-763, Cl 304, Cond A;
part - ;bushing, Part 6-1;
material - ;astm-b150, Uns C63200, Tq50 Or Tq55;
part - ;barrel, Part 22;
material - ;astm-b564 Forged, Uns N06625, Condition Annealed And Meeting The Mechanical Properties Of General Note 7006. Chrome Plated In Accordance With General Note 7021;
part - ;piston, Part 23;
material - ;sae Ams-qq-a-250/11, Alloy 6061, Temper T651 Or Astm B209, Alloy 6061, Temper T651. Anodized In Accordance With General Note 2221;
part - ;tie Rod, Part 24;
material - ;astm A193, Grade B7;
part - ;piston Rod, Part 25;
material - ;sae Ams-qq-a-200/8, Alloy 6061, Temp T6. Anodized In Accordance With General Note 2221 And Plated In Accordance With General Note 7202;
part - ;self-locking Nut, Part 78;
material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. All Material Must Be From The Same Class.
self-locking Element- Astm-d4066, Group 01, Class 1 Or 2, Grade 1
part - ;self-locking Cap Screw, Part 79;
material - ;mil-dtl-1222, Type Ii, Qq-n-286, Solution Annealed And Age Hardened And Marked .k. Self-locking Element To Be In Accordance With Mil-dtl-18240. Cross Drill 2 Holes Iaw Asme-b18.3;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;tailpiece, Part 2-2;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;ultrasonic Inspection;
item - ;bushing, Part 6-1 (with A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material);
performance - ;t9074-as-gib-010/271;
acceptance - ;general Note 125 Of Drawing 6985426;
test - ;ultrasonic Inspection;
item - ;barrel, Part 22 (starting Material);
performance - ;eb-2937, Paragraph 4.5.4;
acceptance - ;eb-2937, Paragraph 4.5.4;
test - ;ultrasonic Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/0300, Appendix E;
acceptance - ;t9074-bd-gib-010/0300, Appendix E;
test - ;magnetic Particle Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/0300, Appendix E;
acceptance - ;t9074-bd-gib-010/0300, Appendix E;
test - ;liquid Penetrant Inspection;
item - ;tie Rod, Part 24;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;self-locking Nut, Part 78;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027;
test - Quality Conformance/compliance Inspection
item - ;hy-80 Starting Material;
performance - ;t9074-bd-gib-010/0300, Appendix E;
acceptance - ;t9074-bd-gib-010/0300, Appendix E;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm-d4066, Group 01, Class 1, Grade 1;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
test - ;liquid Penetrant Inspection;
item - ;self-locking Cap Screw, Part 79;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
attribute - Annealing And Age Hardening
item - ;self-locking Cap Screw, Part 79;
performance - Qq-n-286
test - ;hydrostatic Test;
item - ;each Assembly;
performance - ;note 7400 Of Drawing 6985426;
acceptance - ;note 7400 Of Drawing 6985426;
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. 30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.5 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.5.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.5.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.7 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must Be
performed On A Full Size Fastener.)
3.7.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.7.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.8 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.9 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.9.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.9.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.9.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Certification Is Required For The Following As Identified Further Below:
- Process Control Plan
- Qualification Plan
- Qualification Testing (first Article)
all Manufacturing Facilities Which Have Been Approved To An Earlier Revision Of This Specification Are Required To Meet The Recertification Requirements Of T9074-bd-gib-010/0300 Revision 2. An Updated Process Control Plan Incorporating Any Changes Necessary To
meet The Requirements Of T9074-bd-gib-010/0300 Revision 2 Must Be Submitted.
re-certification Of The First Article Approval Of Vendor Facilities, Processes, And Manufacturing Methods Is Required Every 5 Years And Must Meet All The Requirements Of T9074-bd-gib-010/0300. The Certification Must Be Current At The Delivery Date Of Procured
products.
3.11.1 Qualification Testing (first Article Inspection) - See Di-ndti-80809 (first Article Test Report) - Certification Is Required For The Following Test On The Items Listed Below:
test - First Article Inspection
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
acceptance - T9074-bd-gib-010/0300
previous Fat Approvals That Were Based Upon Previous Specifications Are Not Valid For Meeting The Requirements Of T9074-bd-gib-010/0300 Revision 2, Unless Otherwise Approved By Navsea.
the Contractor May Request The Fat Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval, Provided It Meets The Requirements Of This Contract/purchase Order.
3.11.2 Process Control Plan - See Di-ndti-80809 (process Control Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Process Control Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Pcp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Pcp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.11.3 Qualification Plan - See Di-ndti-80809 (qualification Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Qualification Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Qp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Qp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.12 ;see Cdrl Di-forg-80412 (forging Manufacturing Sketches) - Forging Sketches Are Required For The Desurger Head, Part 2-1, Per T9074-b-gib-010/0300, Appendix E.;
3.13 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures
qualified Under S9074-aq-gib-010/248 For All Production And Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.14 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.15 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply.
3.16 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.17 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.17.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.17.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.17.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.18 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.19 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.19.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.20 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.21 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.21.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.21.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.21.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.21.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.21.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.21.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.21.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.21.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.21.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.21.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.21.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.21.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.22 See Cdrls Di-misc-80875 (brazing Procedures) And Di-misc-80876 (braze Proc Qual Data) - Prior To Performing Any Brazing, The Applicable Brazing Procedure Qualification Data Must Be Submitted. Brazing Procedures Must Be Submitted For Information With
the Supporting Procedure Qualification Data. Brazing Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. If The Contractor's Qualification Data Has Previously Been Approved By The Navy
for This Or Other Contracts, A Copy Of The Original Approval Letter Must Besubmitted In Lieu Of The Qualification Data. (note: Letters Extendingapproval Of Qualification Data Based On Previous Approvals Are Not Acceptableto Fulfill This Requirement. The
approval Letter Must Reference The Applicable Brazing Procedure And/or Brazing Procedure Qualification Data Number.)
3.23 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.23.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.23.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.23.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.23.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.23.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.24 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.24.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.24.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.25 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.25.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.25.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.25.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.25.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.25.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.26 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.26.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.26.2 Inspection For Completeness And Proper Type.
3.26.3 Verification Of Material Quality Received.
3.26.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.26.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.26.6 Identification And Protection From Improper Use Or Disposition.
3.26.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.26.8 For Gfe Material,
DEPT OF THE NAVY USA Tender
United States
Closing Date22 Aug 2024
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|to Be Determined (tbd)|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45|
transportation Of Supplies By Sea (jan 2023)|2|||
federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12|||||||||||||
annual Representations And Certifications (may 2024)|13|334513|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
a Material Irpod Is Available Through Bpmi. A Vendor Review Of The Irpod Is Mandatory.
please Specify (if Other Than 60 Days) ______________ Days.if You Are Submitting Your Quote Via Email Or Neco,please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Depositedin The Mail, Transmitted By Facsimile, Or
sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents Asdetailed Herein.
\
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
mark The Packaging Label With The Nomenclature That Is Cited In The Irpod. Zz=clean,mark Per Irpod, Green Poly Bags Are Required To Maintain The Cleaning. Additional Pkg Outside The Bag Is Required As Per The Pkg Code. Tape A Face Protector, Made From Astm-d-4727
over Face Of Gauge Outside Of The Bag. date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev). date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
DEPT OF THE NAVY USA Tender
United States
Closing Date7 Mar 2024
Tender AmountRefer Documents
Description: Contact Information|4|n743.30|wvf|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/
a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil |
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (mar 2023)|13|332722|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
dd1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be Do Rated Order Certified For National Defense Use Under The Defense Priorities And Allocationssystem (dpas).
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.1.1 Li-soc Item - It Has Been Determined That This Item Falls Within Both The Level I Boundary And The Scope Of Certification (soc) Boundary.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;v3d10352 99517 M B;
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=sae Ams 5643 | | |v |180101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| |
document Ref Data=qpl 18240 | | |qpd|120521|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 ;screw, Cap, Socket Head, Self-locking, To Be In Accordance With Vacco Drawing V3d10352, Item 19, Part Number V2d11684-8a, Except As Amplified Or Modified Herein.;
3.2 ;note: Self-locking Element To Be In Accordance With Mil-dtl-18240 And Astm-d4066.;
3.3 The Unit Of Issue Is Each.
the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener.
3.4 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;screw, Cap, Socket Head, Self-locking - Item 19;
material - ;sae-ams-5643, Condition H-1025;
3.5 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;liquid Penetrant Inspection;
item - ;screw, Cap, Socket Head, Self Locking - Item 19;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
3.6 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.6.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.6.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.6.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.7 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.8 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.8.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance.
3.8.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.8.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change.
3.9 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.10 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.10.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^
3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.12 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.12.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.12.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.12.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.12.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.12.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.13 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.13.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.13.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.14 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.14.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.14.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.14.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.14.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.14.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.15 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.15.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.15.2 Inspection For Completeness And Proper Type.
3.15.3 Verification Of Material Quality Received.
3.15.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.15.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.15.6 Identification And Protection From Improper Use Or Disposition.
3.15.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.15.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.15.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.16 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements.
3.16.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.17 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.18 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.18.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Sae Ams-5643; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition,
grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied.
3.18.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability
marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ________________ And Heat Treat Number ________________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.18.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.18.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.18.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.19 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking
requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.19.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except Socket Head Cap Screws Of Sae-ams-5643, Conditions H-1025 Material Is Material Designator Smm.; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For
grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A
minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.19.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location
if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of
the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.20 Material Handling - The Written Material Control Process Must Include The Following:
3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking
must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.20.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.20.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.21 Receiving Inspection -
3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.21.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.22 Discrepancy Reporting -
3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.23.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports
must Also Be 100% Inspected For Completeness And Legibility.
3.23.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;- 10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Oct 05 2006 - Added Configuration Control Definitions; date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
DEPT OF THE NAVY USA Tender
Others
United States
Closing Date20 Feb 2024
Tender AmountRefer Documents
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (comb0)||tbd|n00104|tbd|tbd|see Schedule|tbd|||n/a||||||
inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|30 |
transportation Of Supplies By Sea (jan 2023)|2|||
annual Representations And Certifications (mar 2023)|13|334513|750||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
unless Otherwise Specified, Pricing For This Quotation
is Valid For 60 Days After The Closing Date As Indicated On The Quotation.
please Specify (if Other Than 60 Days) ______________ Days.
if You Are Submitting Your Quote Via Email Or Neco,
please Specify The Number Of Days Pricing Is Valid.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
the Bpmi Ecommerce Website Is Being Moved To A New Url (https://logistics.unnpp.gov/ecommerce) Effective 17 July, 2019. The Current Site Address (https://logistics.bpmionline.net) Will Be Active Until 1 August, 2019, But We Encourage You To Ensure You Are Able To Access The New Website At Your Earliest Convenience. If You Have Any Questions, Please Contact The Poc Listed Below.
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
mark The Packaging Label With The Nomenclature Identified By The Irpod.zz=clean/pkg Per Irpod,outside Of The Greenpoly Bag, Use Gt Cushioning.tape Outside Of Greenpoly A Face Plate Made Of Astm D 4727 To Protect The Gage Face. Make Sure Gage Is Secure And Can Not
shift Inside A Close Fitting Box. date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev). date Of First Submission=045 Dac
submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After
contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required.
a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services.
di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Closing Date17 May 2024
Tender AmountRefer Documents
Description: Contact Information|4|n792.02|lpe|2156972582|timikanicholson@navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement|8|x||||||||
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports9|n/a|n/a|n00383|n/a|n/a|n/a|n/a|||||||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (jun 2003)|6|365 Days|45 Days After The Last Delivery Under The Contract |||||
equal Opportuity For Workers With Disabilities (jun 2020)|2|||
buy American-free Trade Agreements-balance Of Payments Program - Basic (nov\23)|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5||||||
buy American--balance Of Payments Program (nov 2014)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (mar 2023)|13|336413|1250||||||||||||
facsimile Proposals (oct 1997)|1||
notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x|
this Solicitation Is Hereby Extended Until 5/17/2024.
this Requirement Will Be Limited To Government Approved Sources. This Solicitation Will Be Using Competitive Procedures.
submission Of An Offer Indicates Acceptance Of, And Compliance With, The Requirement To Be An Approved Source For This Item.
offers Will Be Evaluated Based On The Non-price Factors Of Capacity, Delivery, And Past Performance, And When Combined, Those Non-price Factors Being More Important Than Price. Proposal Submission Should Include Non-price Factors And Price On One Document.
offeror's Are Required To Submit Recent (within The Past Three Years) And Relevant Past Performance References With The Submission Of Their Offer.
relevant Past Performance Demonstrates The Offeror's Past Performance Manufacturing (or Repair) An Item Of The Same Or Similar Scope, Complexity And Magnitude Relative To The Instant Requirement. The Submission Of Past Performance Should Be Limited To Three
relevant Contracts. Any Contract Beyond Three Years Will Not Be Accepted As Relevant Past Performance.
the Closing Date For This Solicitation Is Listed On Page 1.
the Quotes May Be E-mailed To The Below Address And Must Be Received On Or Before 2:00 Pm Est Of The Closing Date.
the Offeror Shall Submit One Unit Price Per Clin And The Unit Price Should Be Firm Fixed Price.
request That Proposals Submitted To Be Valid For 120 Days In Response To The Solicitation.
\
1. Scope
1.1 Container Shell Material Is ;laminate; .
1.2 Manufacturing Process Is ;vacuum Forming; .
1.3 Pre-award / Post Award Requirements:
due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended.
1.4 When Discrepancies Exist Between These Requirements And Those On Current
manufacturer's Drawings,contact Code ;buyer On Page 1; Or Code N241.10
1.5 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;naval Air Systems Command; Drawing Number ( ;30003; ) ;3321as700; , Revision ;latest; And All Details And Specifications Referenced Therein.
1.6 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be
provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification.
1.7 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c.
2. Applicable Documents
drawing Data=dl3321as700 |30003| | |a| | | |
drawing Data=3321as004 |30003| A| |a| | | |
drawing Data=3321as005 |30003| B| |a| | | |
drawing Data=3321as006 |30003| A| |a| | | |
drawing Data=3321as007 |30003| A| |a| | | |
drawing Data=3321as008 |30003| A| |a| | | |
drawing Data=3321as011 |30003| A| |a| | | |
drawing Data=3321as012 |30003| A| |a| | | |
drawing Data=3321as013 |30003| B| |a| | | |
drawing Data=3321as047 |30003| | |a| | | |
drawing Data=3321as050 |30003| A| |a| | | |
drawing Data=3321as612 |30003| | |a| | | |
drawing Data=3321as613 |30003| | |a| | | |
drawing Data=3321as617 |30003| | |a| | | |
drawing Data=3321as700 |30003| | |a| | | |
drawing Data=3321as701 |30003| | |a| | | |
drawing Data=3321as702 |30003| | |a| | | |
drawing Data=3321as703 |30003| | |a| | | |
drawing Data=3321as704 |30003| | |a| | | |
drawing Data=3321as705 |30003| | |a| | | |
drawing Data=3321as706 |30003| | |a| | | |
drawing Data=3321as707 |30003| | |a| | | |
drawing Data=3321as708 |30003| | |a| | | |
drawing Data=3321as709 |30003| | |a| | | |
drawing Data=3321as710 |30003| | |a| | | |
drawing Data=3321as711 |30003| | |a| | | |
drawing Data=3321as714 |30003| | |a| | | |
drawing Data=3321as715 |30003| | |a| | | |
drawing Data=3321as716 |30003| | |a| | | |
drawing Data=3321as718 |30003| | |a| | | |
drawing Data=3321as719 |30003| | |a| | | |
document Ref Data=fed-std-101 | | |c |881014|a| |03|
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
3. Requirements
3.1 Reference To Cadmium Plating Shall Be Deleted And The Following Substituted: "finish Shall Be Electrodeposited Alkaline Zinc-nickel Alloy In Accordance With Astm B 841 Class 1, Type B, Grade 3."
3.2 The Shock Mount Listed In The Drawing Package (whether Identified As Sole Source, Recommended, Or Suggested) Has Been Tested And Approved For The Shock Mitigation System Of This Container. No Other Shock Mount May Be Substituted Without Written Permission
of Naval Inventory Control Point, Philadelphia Unless An Alternate Is Specifically Indentified In This Contract. ;ha King Shock Mount Approved As Alternate See Eco-330; Is An Approved Alternate Mount.
contact Code ;buyer On Page 1; Or Code N241.10 To Arrange For First Article Test Location
3.3 Welding And Welder Qualifications Shall Be In Accordance With Aws D1.1
for Steel, Aws D1.2 Or Mil-w-22248,class 4 For Aluminum, Aws D1.3
for Sheet Steel And Aws D1.6 For Stainless Steel. Proper Controls Shall Be Used To Prevent Melt Through Or Burn Through. For Aluminum, Filler For Welding 6061 Alloy Shall Be 4043: Filler For Welding 5000 Series Alloys
to Themselves Or To 6061 Shall Be 5356 Or 5556. In Addition,welding And
weld Inspection Shall Include:
(1) Visual Inspection Shall Include 5x (5power) Magnification When A Suspect
condition Is To Be Examined Beyond The Capability Of Normal Vision.
(2) Critical And Major Welds May Be Subjected To Further Non Destructive
testing (such As Dye Penetrant Inspection)as Prescribed By The Buying Activity.
(3) Proper Documentation Shall Be Available For Review By Government Personnel.
3.4 Work Instructions. Work Instructions Shall Be Posted At Theoperator's Work Station Giving Procedures To Control The Welding Process, I.e., Filler Material, Weld Size, Electrical And Gas Characteristics, Including Flow Rate.
3.5 Materials And Materials Control. The Quality Program Shall Assure That The Materials Used In Fabrication Or Processing, I.e., Base Metals And Weld Filler Material, Be Inspected And Conform To The Applicable Physical, Chemical And Other Technical
requirements (supplier's Certification Is Sufficient).
3.6 Controls. Weld Filler Materials Shall Be Clearly Identified And Segregated From Each Other Both When In Storage And At The Work Station. Work Station Environment Shall Be Controlled To Prevent Conditions Adverse To Proper Gas Shielding.
3.7 Cleaning. Parts To Be Welded Shall Be Cleaned To Remove Surface Soils Such As Oils, Waxes, Grease, Inks, Etc. Except That Uninhibited Alkaline Solutions Such As Sodium Hydroxide Shall Not Be Used.
3.8 Deoxidizing. The Cleaned Parts Shall Be Chemically Deoxidized No More Than 10 Days Prior To Welding To Remove Thick Surface Oxide Films. (if The Material Or Work Is Exposed To An Outdoor Environment, This Time Limit Shall Be Reduced To A Maximum Of 3 Days,
to Account For Atmospheric Effects.) Mechanical Cleaning Methods Shall Be Applied Just Prior To The Actual Start Of Welding, To Remove Any Reoxidation Or Residual Thin Oxide Films.
3.8.1 Chemical Treatment. An Acid Deoxidizing Treatment Shall Be Applied By Either Immersion Or Brushing/wiping. Deoxidizers Acceptable For Use Shall Include Nitric Acid, Sulfuric Chromic, Phosphoric Chromic, Or Equivalent Solutions. Sodium Hydroxide
solutions Shall Not Be Used. Care Shall Be Taken To Assure 100% Solution Coverage Of The Area To Be Welded. To Allow An Adequately Sized Deoxidized Area For Good Welding, The Solution Shall Be Applied To An Area Extending At Least 2 Inches From The Weld Site,
or Ending At Any Closer Adjacent Edge.
3.8.2 Mechanical Means. Immediately Prior To Welding, Mechanical Cleaning Methods Shall Be Applied To The Weld Areas Previously Chemically Treated To Assure Removal Of Residual Or Reformed Oxides, If Any. Acceptable Methods Of Mechanical Cleaning Include
stainless Steel Wire Brushing, Scraping, Filing, Or Sanding. However, Abrasives Containing Iron And Its Oxides, Steel Wool And Wire, And Copper Alloy Based Wire, Which May Become Embedded With Galvanically Active Metals And Accelerate Corrosion Of Aluminum
alloys Shall Not Be Used. Mechanical Methods Shall Be Vigorous Enough To Adequately Remove Any Residual Oxide Films, But Gentle Enough To Avoid Forming An Excessively Rough Surface In The Comparatively Soft Metal Underneath.
welding And Welder Qualifications Shall Meet Current Aws D1.2 Standards.
additionally, Cleaning Preperations Shall Be In Accordance With Mil-c-5541
and The Cleaning Paragraph Located In The Welding Requirements Section Of The Contract
when A First Article Is Required, The Contractor Shall Submit A Paper Copy Of The Drawings (size 11" X 17"), Contracts And Approved Ecp's Eco's, Deviations Waivers, And Modifications In The Records Recepticle Or Inside The Container Submitted For The First
article.
name Plate To Be In Accordance With (80132) 15930, With The Exception Of The Data Matrixes And Alpha-numeric Serial Number
3.9 One Third (1/3) Unit Of Desiccant (mil-d-3464, Type Ii Nondusting) Per Cubic Foot Of Container Interior Volume Shall Be Placed In Desiccant Holder Of Each Container At Time Of Shipment.
fms Nameplate Requirements - Property Of Statement On Nameplate (80132) 15930 Changed From "property Of Us Navy" To "property Of (insert Fms Country)". Contact Buyer On Page 1 For Clarification.
4. Quality Assurance
4.1 The Tests To Be Performed Under The First Article Approval Clause (far 52.209-4) Of The Contract Are Listed Below.
4.1.1 Dimensional Test (special) ;to Drawing (30003) 3321as700 And Sub-drawings Is Applicable;
4.1.2 Requirements Of: ;to Drawing (30003) 3321as700 And Sub-drawings Is Applicable;
4.1.3 Form: ;applies;
4.1.4 Fit: ;n/a;
4.1.5 Function ;applies;
4.1.6 Compliance With Drawing ( ;30003; ) ;3321as700; , Revision ;latest; And Specifications Referenced Therein.
4.2 In Addition To The Above Tests, The First Article(s) To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With Contract Requirements Requirements.
4.3 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Testing.
4.4 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;10,000; For The First Article Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government Will
require Such Testing.
4.5 Disposition Of Fat Samples
4.5.1 ;zero; Sample(s) Shall Not Be Returned To The Contractor Because They Shall Be Destroyed During Testing.
4.5.2 ;all; Unless Otherwise Provided For In The Contract, Sample(s) Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The
sample(s) Have Inspection Approval From The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment.
;n/a; Sample(s) Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due.
4.6 Test Sample Coating Instructions
4.6.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative.
4.7 Fat Approval Criteria
4.7.1 Far 52.209-4 Applies
(a) The Contractors Shall Deliver ;one (1); ; Unit(s) Of The Following Cage ( ;30003; ; ) Part Number ;3321as700; ; , Revision ;latest; ; Within ;120; ; Calendar Days From The Date Of This Contract To The Government At
;contact Byuer On Page One To Arrange For First Article Test Location.; ;
marking Of Test Sample(s) Shipping Container Shall Be As Follows, Citing This Contract Number: "for First Article Testing. Not Rfi Material. Do Not Take Up In Stock Contract Number:____________"
for First Article Test, The Shipping Documentation Shall Contain This Contract Number And Lot/item Identification. The Characteristics That The First Article Must Meet And The Testing Requirements Are Specified Elsewhere In This Contract.
(b) Upon Shipment Of First Article Sample(s), Two (2) Copies Of The Material Inspection And Receiving Report (dd Form 250) Bearing The Qar's Signature And Indication Of Preliminary Inspection Shall Be Forwarded To The Navicp- Philadelphia Code Cited In Block
10.a Of Sf33, With Duplicate Copies To Navicp Code 072 And To The Designated Test Facility. The Envelopes Shall Be Clearly Marked: "do Not Open In Mail Room".
within ;90; ; Days After Receipt Of The Samples, The Test Site Shall Complete Testing/evaluation And Submit Two (2) Copies Of Their Test Report With Conclusions And Recommendations To The Navicp Code Cited In Block 10.a Of The Sf33.
(c) Within ;60; ; Calendar Days After The Government Receives The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional
approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The Contractor.
a Notice Of Disapproval Shall Cite Reasons For Disapproval.
(d) If The First Article Is Disapproved, The Contractor, Upon Government Request, Shall Submit An Additional First Article For Testing. After Each Request, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First Article Or
select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Furnish Any Additional First Article To The
government Under The Terms And Conditions And Within The Time Specified By The Government. The Government Shall Act On This First Article Within The Time Limit Specified In Paragraph (b) Above. The Government Reserves The Right To Require An Equitable
adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any Additional Costs To The Government Related To These Tests.
(e) If The Contractor Fails To Deliver Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract
(f) Unless Otherwise Provided In The Contract, The Contractor -
(1) May Deliver The Approved First Article As Part Of The Contract Quantity, Provided It Meets All Contract Requirements For Acceptance And Was Not Consumed Or Destroyed In Testing: And
(2) Shall Remove And Dispose Of Any First Article From The Government Test Facility At The Contractors Expense.
(g) If The Government Does Not Act Within The Time Specified In Paragraph (b) Or (c) Above The Contracting Officer Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance
dates And/or The Contract Price, And Any Other Contractual Term Affected By The Delay.
(h) The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts Support, And Repair Of The First Article During Any First Article Test.
(i) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Of, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be
allocable To This Contract For (1) Progress Payments, Or (2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government
(j) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To This Effect With Each First Article.
(k) The Contractor Shall Provide Specific Written Notification To The Procuring Contracting Officer Informing Him/her Of The Shipment Of Any Article(s) Furnished In Accordance With This Clause. Such Notification Must Be Addressed To The Attention Of The
navicp Code Specified In Block 10.a Of The Sf33, With Copies To Navicp Code 072 And To The Testing Activity. Failure To Provide Such Notification Shall Excuse The Government From Any Delay In Performing First Article Testing And Informing The Contractor Of
the Results Thereof.
(l) Fourteen (14) Days Prior To Shipment Of First Article Samples, The Contractor Shall Notify The Designated Test Facility In Writing Of The Anticipated Shipping Date, With An Information Copy To The Pco, Navicp Philadelphia, Attn: (cite Code Found In Block
10.a Of The Sf33). The Contractor Shall Also Arrange For Preliminary Inspection Of Test Samples By The Dcmc/qar.
4.8 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate)
(a) Unless Otherwise Specified In The Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The
government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That:
(i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And
(ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run
additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That:
(i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer,
and
(ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause.
(note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section
1001.)
(b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And One
that Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First Article
approval Requirements
(c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The
government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule
he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements)
within Days:
item No. _______________ Quantity:_______ After Date Of Contract:__________
the Waterproof Test Per Astm-d-951 Is No Longer Required For This Container. Proper Inspection Of The Container To The Drawing (with Emphasis On The Closure And Rivets) Is Sufficient To Ensure Water Will Not Penetrate The Container.
instrumented Drop Tests Are Not Required For These Containers. The Design Has Been Proven Over Years Of Use And The Fat Should Test The Integrity Of The First Article Rather Than The Design Capability.
delete "type B With Yellow Chromate Conversion Coating " From Note 3 Of Drawing3321as011. Chromate Conversion Coating Includes Hexavalent Chromium Which Is Listed As Restricted By The Restriction Of Hazardous Substance Directive (rohs)2002/95/ec Which Has Been
adopted By The European Union In February 2003.
4.9 100% Production Leak Test. Each Container, Uninstrumented And Without Dummy Load, Shall Be Raised To A Height Of 18 Inches And Allowed To Fall Freely To A Concrete Or Similarly Hard Surface, Landing Flat On Its Base. The Container Shall Then Be Prepared
for Testing By Sealing All Breathing Devices And Inserting Suitable Pressurized Fittings And Gauges. The Container Shall Be Closed And Sealed In A Normal Manner. The Pneumatic-pressure Technique Of Method 5009 Of Federal Test Method Standard No. 101c Shall Be
used To Detect Leakage. An Initial Pressure Setting Equal To 1.0 + 0.1 - 0 Psig Shall Be Used. After Stabilization, Pressure Shall Be Monitored For Thirty Minutes. Any Loss In Pressure In Excess Of 0.05 Psig (adjusted For Changes In Temperature And Barometric
pressure) Shall Be Cause For Rejection. Warning
container May Explode Or Fasteners May Fail During Test. Use Protective Barriers To Avoid Injury To Personnel.
all Costs And Responsibilities Related To The First Article Test Submission Container Shipment To And From The First Article Test Facility Are To Be Borne By The Contractor.
5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes - Not Applicable
DEPT OF THE NAVY USA Tender
Electrical Goods and Equipments...+2Machinery and Tools, Electrical and Electronics
United States
Closing Date26 Jan 2024
Tender AmountUSD 936.3 K This is an estimated amount, exact amount may vary.
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|||||||||
desired And Required Time Of Delivery (june 1997)|29|0001|22|180|||||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a||||||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
small Business Subcontracting Plan (sep 2023)|4||x|||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
small Business Program Representations (sep 2023)|4|333998|700|x||
annual Representations And Certifications (mar 2023)|13|333998|700||||||||||||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data (nov 2021))|7||||||||
type Of Contract (apr 1984)|1|firm Fixed Price|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data--basic (jan 2023))|1|| The Response Time For This Solicitation Has Been Extended. The Response Time For This Solicitation Has Been Extended. The Response Time For This Solicitation Has Been Extended.
unless Otherwise Specified, Pricing For This Request For Proposal Is Valid For 90 Days After The Closing Date As Indicated On The Proposal. Please Specify (if Other Than 90 Days) ______________ Days.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Consideredto Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
or Sent By Other Electronic Commerce Methods, Such Asemail. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
in Order For Your Offer To Be Considered, You Must Submit The Entire Rfp Completed And Signed, Prior To The Closing Date/time Listed On The Rfp. Neco Offers Will Not Be Accepted.
technical Documents Associated With This Solicitation, Such As Drawings, Individual Repair Part Ordering Data (irpod), Strs And Other Procurement Related Documents May Be Obtained At: Https://logistics.unnpp.gov/ecommerce. This Website Requires A Password And
pre-registration. Please Contact The E-commerce Help Desk At 518-395-4357 To Register Or For Help Logging Into The Website.
a Hard Copy Of The Individual Repair Part Ordering Data (irpod) And/or Drawings Will Not Be Mailed To You.
to Request A Copy Of The Solicitation, Please Contact The Contracting Officer Listed And Provide Your Cage Code.
section "s" Of Clause 52.212-4, Order Of Precedence, Is Not Applicable To This Procurement.
solicitation P.o.c. Joseph.j.darcy2.civ@us.navy.mil
1. Scope
1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence.
2. Applicable Documents
2.1 Applicable Documents;
technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At
(https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To
the Award.
this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator.
3. Requirements
3.1 Navsup Wss-mech Code N94 Additional Technical Documentation
order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004
a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of
any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows:
1. Amendments To The Purchase Order/contract
2. Schedule Of Supplies Of The Purchase Order/contract.
3. Terms And Conditions Of The Purchase Order/contract.
4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable.
5. Any Invoked Standard Technical Requirements (strs).
6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable.
7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable.
b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval
for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later.
c. Use Of Document Revisions In Their Entirety:
1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document).
d. Vendor Waiver/deviations On Critical Contracts.
1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected.
2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation
is Submitted Or Prior To Manufacture.
3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With
your Request.
4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or
replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation.
5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided.
6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within
five Working Days After Receipt.
e. Exclusion Of Mercury
1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract.
4. Quality Assurance
4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod).
the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein.
records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract.
5. Packaging
5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts
applies.
(1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing,
and Marking.
requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc.
(a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States,
"components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)".
(2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply:
(a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other
requirements Identified Within The Irpod.
the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods.
(b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements
for The Use Of Green Poly Bags, Then They Are Required And Take Precedence.
(4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From:
contracting Officer
navsup Wss-mech
code N943
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On
post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document.
2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents.
6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of
abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423.
block A: Is The Actual Contract Line Item No.
block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order.
block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp.
block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased.
block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes.
block F: Is The Successful Offerors Name And Or Cage Code.
block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp).
block H: Self Explanatory.
block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp.
block J: Self Explanatory.
block 1: Is The Exhibit Line Item Number (elin).
block 2: Is The Title Of The Data Item Cited In Block 4.
block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification.
block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order.
block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found.
block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item.
block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract.
block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format.
block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals.
block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423.
block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16.
block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable.
block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423.
block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.)
block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14.
block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data.
block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition.
block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable.
both The Wood Crate And Case Are To Be Placed Into One Weather Resistant Triple Wall Fiber Box Meeting The Requirements Of Astm-d5168class 2. A Skid Designed To Prevent Tipping Needs To Be Placed At The Bottom Of This Box For Lifting Purposes.this Box Will Serve
as The Unit Container And Will Not Need To Be Over Packedwith A Shipper.additional Marking Should Be Added To This Tri Wall Container Saying "do Not Separate Case And Woodbox."
mark The Packaging Label With The Nomencalture Cited On The Irpod date Of First Submission=eoc
submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock
number And Item Nomenclature Specified In The Schedule Of Supply/services.
di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control
number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev).
U S SPECIAL OPERATIONS COMMAND USSOCOM USA Tender
United States
Closing Date9 Sep 2024
Tender AmountRefer Documents
Details: 1.0 Contracting Office: headquarters, United States Special Operations Command (ussocom), Special Operation Forces Acquisition, Technology, And Logistics (sof At&l), Directorate Of Contracting (sof At&l-k), 7701 Tampa Point Boulevard, Macdill Afb, Florida. 2.0 Introduction: ussocom Is Issuing This Request For Information As Part Of A Market Survey. This Request For Information (rfi) Is For Information Purposes Only And Issued In Accordance With The Federal Acquisition Regulation (far) Part 10, Market Research. Rfi’s Are A Market Research Tool Used To Determine Potential And Eligible Businesses Capable Of Providing The Services Described Herein, Determine The Extent Of Available Commercial Products And/or Services Available, As Well As Determining Other Aspects Of Competition And Defining The Government’s Requirement. There Are No Funds Available To Pay For The Preparation Of Response To This Notice. This Rfi Does Not Constitute An Invitation For Bids (ifb), A Request For Proposal (rfp), A Solicitation, A Request For Quote (rfq) Or An Indication The Government Will Contract For The Items Provided By Any Responder(s). The Government Will Not Reimburse Responder(s) For Any Costs Associated With The Preparation Or Submission Of The Information Requested. Response To This Rfi Is Strictly Voluntary And Will Not Affect Any Potential Offeror's Ability To Submit An Offer If A Solicitation Is Released. The Government Will Disregard Any Requests For A Solicitation Package. The Government Does Not Intend To Award A Contract Based On This Rfi Or Otherwise Pay For The Information Requested. The Government Will Not Return Submissions To The Responders. The Government May Request Responders Provide Additional Information/details Based On Their Initial Submissions. any Resulting Contract Will Require, At A Minimum, Secret Level Security Clearances For All Contractor Personnel And Facility Access At The Time Of Contract Award. There Is A Potential Requirement For A Higher Level Of Clearance Access For Certain Locations. anticipated Places Of Performance: ft Huachuca, Az launch And Recovery Element, Site (oconus), United States Central Command (centcom) mission Control Element, Ft Liberty, Nc launch And Recovery Element, United States Indo-pacific Command (usindopacom) (oconus) (option) 3.0 Description: ussocom Is Seeking To Identify Contractors Capable Of Providing Contractor-owned / Contractor-operated (coco) Intelligence, Surveillance, And Reconnaissance (isr) Services In Support Of Department Of Defense (dod) Combat And Contingency Operational Requirements. This Rfi Is Related To Support For Land-based Operations To Provide Reliable Delivery Of Sensor Data. Contractors Would Be Responsible For Resources To Produce Sensor Data, Such As Trained Personnel, Non-developmental Uas Equipment, Certifications, Operation And Maintenance, Spares, And Product Support. Contracted Services Would Be In Direct Support Of Oconus Isr Missions Requiring Around-the-clock Imagery And Other Sensor Capability In Support Of Those Missions. Contractors Shall Be Capable Of Providing Isr Services On A Normal And Surge Basis, 24 Hours A Day / 7 Days A Week. Pre-deployment, Deployment, And Post-deployment Support Would Be Required, And Would Entail Execution Of A Variety Of Responsibilities Inherent To Execution Of Such Support, Including But Not Limited To, Equipment Transportation, Export Control Licensing, Insurance, Personnel Travel, Processing For Overseas Movement And Accountability, Visa Coordination, Compliance With Requirements At Dfars 252.225-7040, Contractor Personnel Supporting Us Armed Forces Deployed Outside The Us, Compliance With Dod Instruction 3020.41, Operational Contract Support, As Well As Others. 4.0 Responses: responses Are Requested From All Interested And Capable Sources With Systems Answering The Questions In Section 8.0. Please Respond With A White Paper Via Electronic Mail No Later Than 30 Calendar Days After The Posting Of This Rfi. Responses Shall Be Limited To No More Than 15 Single-sided 8.5 X 11-inch Pages, No Smaller Than 12-point Font, And 1-inch Margins. Responses Shall Be Compatible With Microsoft Office And Adobe Products. Photographs, Pictures, And Hyperlinks Are Permitted. Newspaper Column Formatting, Fold Out Pages, Or Zip Files Are Not Permitted. It Is The Respondent’s Responsibility To Monitor This Site For The Release Of Any Follow-on Information. responses Shall Include Your Cage Code, Unique Entity Identifier Number, Current Number Of Employees, Annual Revenue History, Office Location(s), The Respondent's Web Page Url, And A Statement Regarding Current Small Or Large Business Status Based On The Designated Naics Code. please Submit Responses Via Electronic Media (pdf, Word, Excel, Etc.) To The Points Of Contact Listed Below. amy Chauvin, Contracting Officer, Amy.e.chauvin.civ@socom.mil. courtesy Copies: Jude Lucien, Contract Specialist, Jude.d.lucien.civ@socom.mil; Kerry Mcdonald, Contract Specialist, Kerry.a.mcdonald.civ@socom.mil. 5.0 Proprietary Information: responders Are Required To Segregate And Clearly Mark Proprietary Information. Responses To This Rfi That Indicate The Information Therein Is Proprietary Or Represents Confidential Business Information Will Be Received And Held In Confidence For Us Government Use Only. Please Be Advised That All Submissions Become Government Property And Will Not Be Returned. 6.0 Contractor Support: the Government Will Utilize Contractor Consultant/advisors To Assist With The Execution Of This Rfi. All Advisors Shall Comply With Procurement Integrity Laws And Signed Non-disclosure Agreements With Ussocom. The Government Will Take All Necessary And Required Actions To Avoid Conflicts Of Interest And Ensure Advisors Comply With Safeguarding Proprietary Data. 7.0 Requirements: ussocom Is Specifically Interested In Uas Isr Services Capable Of The Following Performance Parameters. The Government Requests That Interested Vendors Submit A Brief Capability Statement Package Demonstrating Ability To Perform The Services Based On The Parameters In This Section. The Following Parameters Constitute Mandatory Minimum Requirements: endurance: A Minimum Of 30 Hours In Mission Configuration With Sufficient Fuel Reserves. operational Range: At Least 400 Nautical Miles (nm)from The Ground Control Station Located At The Launch Site, With A Single Air Vehicle. on Station Time: 10 Hours’ Time-on-station (tos) At Maximum Range. datalink Range (communications And Full Motion Video (fmv)): Line Of Sight With Type-1 Encryption Utilizing The Bandwidth Efficient Common Data Link (be-cdl) Waveform. simultaneous, Multi-intelligence (multi-int) Capable With Fmv Sensor(s) And An Electronic Warfare (ew) Type Sensor. fmv: Electro Optic (eo)/ Infrared (ir) National Imagery Interpretability Rating Scale (niirs) Of Level 7 Or Above For Eo And Ir When Taken From The Uav At An Altitude Of 10,000 Feet Above Ground Level (agl) At A 45-degree Slant Range. global Positioning System (gps) Precise Positioning Service (pps) Receiver. operate In Contested/degraded Situations (uas Shall Be Capable Of A Minimum 74db Of Gps Anti-jamming For All Phases Of Flight). operate In Austere Environments. the Air Vehicle (av) Shall Operate On Commonly Available Fuels At Forward-deployed Locations, Such As Mil-dtl-5624, Grade Jp-4/jp-5; Mil-dtl-83133 Grade Jp-8/jp-8+100; Astm D910, Aviation Gasoline Grade 100ll; And Their Equivalent Nato And Commercial Versions. in Accordance With Dodi 8510.01, Risk Management Framework (rmf) For Dod Information Technology, Obtain An Authorization To Operate (ato) From The Ussocom/j6, Or Reciprocity Ato Inherited From Another Dod Service Branch Are Acceptable. meet The Ndaa2023 Section 817 Requirements For Country Of Origin Of Uas And Critical Components. submission Of A Data Package That Contains Engineering Data Necessary To Support Air Force Military Flight Clearance In Accordance With Afpd 62-6 And Afi 62-601. 8.0 Questions the Respondent Should Include Detailed Information In Response To The Questions Listed Below. general Info what Is Your Experience And Maturity (a) With Manufacturing And Developing Unmanned Aircraft System Products And (b) With Providing Isr Services? what Is The Technology Readiness Level (trl) Of Your Candidate Uas As Described In The Dod Technology Readiness Assessment Handbook? is The Uas Currently Available On One Or More Gsa Schedules? If So, Which One(s)? did You Receive Funding To Develop Your Uas From A Government Agency? have You Deployed And Operated This Uas Oconus? If So, Please Provide The Contract Number. have You Sold This Uas To United States Federal Government? If So, Please Provide The Contract Number. (b) Uas Operating Parameters/configuration: 1. Describe How The Uas Satisfies The Minimum Requirements Stated In Paragraph 4.0 Above. In Addition, Describe The Following: (a) System's Anti-jam Capabilities. (b) System's Alternative Positioning, Navigation, And Timing (apnt) Solutions Capabilities In A Degraded/contested Gps Environment. (c) System's Weather Limitations To Include But Not Limited To Ice, Rain, And Wind. (d) System's Environmental Limitations (altitude, Temperature, Etc.). (1) System's Level Of Compliance With Mil-std-461g. (2) System's Level Of Compliance With Mil-dtl-901e (grade B). (e) System's Ability To Remain Visually And Audibly Non-detectable At Operating Altitude. (f) Data Link Used To Include Waveform, Operational Frequency Band, Analog Or Digital, And Encryption Capabilities. (g) Data Link Range At Different Operating Altitudes. (h) How Ground Control Station Communicates With The Air Vehicle Should The System Be Operating In A Beyond Line Of Sight (blos) Situation. (i) How Is The Air Vehicle Launched And Recovered? (1) How Many Launches, Recoveries, And Total Flight Hours Have Been Successfully Accomplished For This Configuration? (j) Describe Staffing Requirements At The Organizational Level. (1) How Many People Are Required To Operate The Uas? (2) How Many People Are Required To Maintain The Uas? (k) Provide Data Supporting That The Uas Has Been Tested In A Relevant Operational Environment, Including Day And Night Video, If Available. (l) Has The Uas Conducted Field User Evaluations For The U.s. Government? If So, Please Provide The Following: (1) Applicable (unclassified) Results As To What Was Demonstrated (2) Any Changes Since The Demonstration, As Relevant To This Rfi (3) U. S. Government Point Of Contact. (m) What Software Operating System And Autopilot Does The Uas Use? Was The Software/autopilot Developed And Coded In The U.s.? Does The Operating Software Interface With Dod Software And Dod Mapping Imagery Software Or Does It Require Company Proprietary Software To Operate The System? (n) How Does The Uas Download And Store Data Through The Ground Control Station And For How Long? (o) Is The Uas Controlled Under The International Traffic In Arms Regulations (itar)? (p) Do You Have An Export Configuration? If So, Please Describe The Export Configuration. (q) Has Critical Program Information (cpi) Or Critical Technology (as Defined In The Dodi 5200.39) That Requires Anti-tamper Protection And/or Low Observable Requirements Been Identified For The Uas? (unclassified Responses Only) (c) Training And Field Support: 1. Describe Any Other Ancillary Equipment That Is Not Included As Part Of The System Configuration, Such As Calibration Equipment. 2. Indicate Whether There Are Existing Operational And Maintenance Publications Or Manuals. 3. Provide The Uas's Sparing Requirements Based On9,000flight-hours Peryear Per Site 4. Describe The Uas's Facility And Infrastructure Requirements At A Fielded Site. 5. Describe Continental United States (conus) And Outside The Continental United States (oconus) Field Support On The Uas While Deployed To Include Harsh Or Hostile Environments Overseas. 6. Describe The Existing Training Curriculum (course Type Classes, Devices, Duration, Training Location And Any Certification Requirement Timelines). 7. Provide Any Other System Features That The Uas Has That Are Unique And Stand Out From Other System Platforms. (d) Cybersecurity Support 1. Describe Whether The System Has Undergone A Dod Sanctioned Ato Or Iatt Using The Risk Management Framework (rmf) Process Prescribed In Dodi 8510.01. 2. Does The System Have An Active Authority To Operate/interim Authority To Test From A Dod Service Branch? If So, Which Branch? 3. Can Artifacts Be Provided To Support A Ussocom Ato? 4. Describe The Current Processes That You Have Implemented To Ensure The System Meets The Information Security Requirements Established Within The Nist 800-53 Sp Framework. 5. Has The System Undergone Cybersecurity Test And Evaluation? 6. Is There A Network Architectural Diagram For The System? If So, Does This Include Component/subcomponent Interfaces, Information Flow, Ports, Protocols, And Ip Addressing Used? 7. Does The System Have A System Security Plan (ssp) Outlining Its Implementation Status With Security Controls? 8. Has The System Undergone Network Vulnerability Scans, And Network Enumeration Scans (nessus, Wireshark, Nmap, Etc.)? 9. Does The System Have A List Of Hardware Used To Process, Store, And Transmit Information? (i.e., Full Bill Of Material (bom)) 10. Does The System Have A Complete List Of The Software Used On The System And Its Function(s)? (i.e., Software Bill Of Material (sbom) 11. Have Software Assurance Techniques Been Applied To The System, Ensuring Origins Of The Code And That It Is Free From Vulnerabilities (secure Sdlc, Code Scanning, Quality Checks, Patch Management Planning, Software Testing, Configuration Control, And Sbom)? 12. Describe How Your Company Has Implemented Enterprise Cybersecurity Standards Onto Your Resident It Equipment To Be Ability To Process, Store, And Transmit Dod Controlled Unclassified Information (cui). 13. Is The Company's It Infrastructure Capable Of Meeting The Requirements Directed In Dfars 252.204-7012 For Safeguarding Covered Defense Information And Cyber Incident Reporting? 14. Has The Company Assessed Their Cybersecurity Implementation Against The Nist Sp 800-171 Sp Framework? 15. Has Your Company Undergone A Cybersecurity Maturity Model Certification (cmmc)? 16. Does The Company Have An Enterprise Ssp?
731-740 of 806 archived Tenders