Astm D Tenders

Astm D Tenders

DEPT OF THE ARMY USA Tender

Finance And Insurance Sectors
United States
Details: This Acquisition Will Be Competitively Award Firm-fixed-price (ffp) Contract To Each And All Qualifying Offeror Base On A Set Aside For A Small Business For Service Disable Veteran Owned Small Business (sdvosb) And Will Be Awarded Lowest Price Technically Acceptable (lpta). The Us Government Is Seeking Sources To Manufacture Two Configurations Of Performance Oriented Packaging (pop) Boxes. The First Configuration Will Be Used As Storage/shipping Containers For The Guided Multiple Launch Rocket System (gmlrs) And Low-cost Reduced Range Practice Rocket (lcrrpr) Warheads, Rocket Motors, And Residual Components (i.e. Fin Restraints, Igniters, And Fuses) And The Second Configuration Will Be Used To Package And Ship The Lcrrpr Igniter Component. A Pop Box Qualification Test Plan For Each Pop Box Configuration, Pop Box Test Report For Each Pop Box Configuration, And Quality Program Plan (qpp) Will Be Required Deliverables. A First Article Inspection (fai) And Production Line Validation (plv) With Us Government Participation Will Be Required At Production Start-up For Each Pop Box Configuration. This Procurement Will Have An Maximum Quantity Total Of 6,004 Pop Boxes Over A One-year Period. A Quantity Of 5,983 Boxes In Accordance With (iaw) Drawing 13640074 And 21 Boxes Iaw With Drawing 13081109. delivery Schedule: The U.s. Government Anticipates Weekly Deliveries Of Pop Boxes With A Maximum Of 288 Boxes Per Week In Accordance With Drawing 13640074 And Drawing 13081109. delivery Location: The U.s. Government Anticipates Pop Box Deliveries To The Following Location: 15604 W. Ar 274 Hwy camden, Ar 71701-5042 letterkenny Munitions Ctr the Government Will Provide The Pop Box Drawings And A Statement Of Work Detailing The Requirements Herein. Interested Firms Who Believe They Are Capable Of Providing This Requirement Are Invited To Indicate Their Interest By Providing: company Name, Company Address, Overnight Delivery Address (if Different From Mailing Address), Commercial And Government Entity (cage) Code, Point Of Contact, E-mail Address, And Telephone Number business Size (i.e. Large, Small Disadvantaged, Veteran Owned, Woman Owned, Etc.) affirmation Of Cleared Personnel tailored Capability Statement Addressing The Particulars Of This Effort; And Provide A Description Of Similar Services Offered To The Us Government And/or To Commercial Customers For The Past Three Years max Monthly Production Capacity/quantities Of Pop Boxes ability To Obtain And Maintain A Pop Box Certification In Accordance With Guidelines Set Forth In Title 49 Code Of Federal Regulations (cfr) And The American Society For Testing And Materials (astm) D4919, Testing Of Hazardous Materials Packaging ability To Establish A Quality Management System In Compliance To International Organization For Standardization (iso) Certification As9100 production Quantities At Which There Would Be A Price Break time Required After Receipt Of A Delivery Order Before A Fai And Plv Could Be Conducted time Required After Receipt Of A Delivery Order At Max Monthly Production Capacity For First Delivery To Be Completed describe Your Companies Experience Managing A Team Of Subcontractors. Briefly Discuss Previous Teaming Arrangements On Your Most Challenging Tasks That Provides Sufficient Detail For The Government To Understand The Scope And Complexity Of The Accomplished Tasks. Please Quantify The Magnitude Of The Effort, For Example: Number Of Full Time Equivalents Of The Prime, Total Ceiling Price, Current Obligation Amount, And The Number Of Subcontractors And Their Respective Business Size. please Note That Under A Small-business Set-aside, In Accordance With Far 52.219-14, (class Deviation 2019-o0003, Revision 2 (dated 5/3/19)) The Small Business Prime And Their Similarly Situated Subcontractors Must Perform At Least 50% Of The Work Themselves In Terms Of The Cost Of Performance. Provide An Explanation Of Your Company’s Intent To Perform As The Prime Contractor And/or Partner With Similarly Situated Subcontracts To Perform At Least 50% Of The Tasking Described In This Draft Sow. In Your Response, Please Annotate The Sow Paragraphs The Prime And Similarly Situated Subcontractors Will Perform. Do You Or Your Planned Subcontractors Anticipate Any Conflicts Of Interest That Would Require Mitigation Prior To Award? all Responses Shall Be Unclassified. all Assumptions, Including Any Assumed Us Government Support, Shall Be Clearly Identified. All Proprietary And Restricted Information Shall Be Clearly Marked. the Closing Date For This Rfp Is 24 May 2024. the Government Will Not Reimburse Contractors Or Responders To This Notice For Any Costs Incurred In Responding, Or Any Subsequent Exchange Of Information. All Responses Shall Be Transmitted Electronically To: monty Teasley contracting Officer monty.d.teasley.civ@army.mil u.s. Army Contracting Command ccam-pfa scott Killingsworth contract Specialist scott.w.killingsworth.civ@army.mil u.s. Army Contracting Command ccam-pfa place Of Contract Office Performance: army Contracting Command (acc) - Redstone (rsa) bldg 111 (1st Floor) hankins Rd. redstone Arsenal, Alabama 35898 united States
Closing Date24 May 2024
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Electrical Goods and Equipments...+1Electrical and Electronics
United States
Description: This Is A Combined Synopsis/solicitation For Commercial Item Contract, Prepared In Accordance With The Format In Subpart 12.6 Of The Far And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotations Are Being Requested And A Separate Written Solicitation Will Not Be Issued. solicitation Number 2124404b3000ac021 Applies, And Is Issued As A Request For Quotation. this Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-02(feb 2023). this Procurement Is 100% Set Aside For Small Business. The North American Industry Classification System (naics) Code Is 423210 And The Business Size Standard Is 100 Ppl. U.s. Coast Guard Surface Forces Logistics Center Intends To Award A Firm Fixed Price Contract. all Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By The Agency Companies Must Be Registered With System For Award Management (sam) @ Www.sam.gov And Shall Provide The Company Sam Id & Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is _may 31, 2024_, At _12_ P.m. Eastern Standard Time. Item 0001 – Nsn 2540 01-626-0326 armor, Port Front armor,supplemental,small Arms-fragmentation Protective. end Item Identification Support Of The 32 Ft Tpsb. special Features Port Front Ballistic Paneling. Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0002 – Nsn 2540 01-626-4309 armor, Stbd Front armor,supplemental,small Arms-fragmentation Protective. agav End Item Identification Support Of The 32 Ft Tpsb. feat Special Features Stbd Front Ballistic Paneling. mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb101s Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0003 – Nsn 2540 01-626-4547 armor, Port Mid ballistic Panel For The 32 Tpsb Port Mid. each Ballistic Panel Is To Be Individually Cushioned In Medium Density Foam Cut To Snugly Fit Contents In All Dimensions And Packed In An appropriately Sized Astmd6251 Type Ii, Class 1 Woodcleated Panel Board Shipping Box Or Astm-d6880 Class 2 Heavy Duty Screwed Wooden Box. Each Packaged Is To Be Marked Iaw Mil-std-129r And Bar Coded Iaw Iso/iec-16388-2007, Code 39 Symbology. mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb103p Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0004 – Nsn 2540 01-626-4746 armor, Stbd Mid ballistic Panel Used On 32' Tpsb Starboard Side Coxswain Chair. mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb103s Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0005 – Nsn 2540 01-626-5100 armor, Port Rear mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb104p Quantity: 2 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0006 – Nsn 2540 01-626-5145 armor, Stbd Rear mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb104s Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0007 – Nsn 2540 01-626-4375 armor, Stbd Corner 32tpsb Stbd Corner Ballistic Panel mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb102s Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ Item 0008 – Nsn 2540 01-626-4356 armor, Port Corner armor Supplemental mfg Name: Leading Technology Composites, Inc. part_nbr: 32tpsb102p Quantity: 1 Ea Delivery Date: 07/27/2024 Unit Price:_______________ Total: _____________ place Of Delivery Is: Uscg Yard, 2401 Hawkins Point Road, Bldg 88,, Baltimore, Md 21226. **** Please Quote Prices Fob Destination. **** the Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Http://www.arnet.gov/far. Far 52.212-1 Instructions To Offerors-commercial Items (mar 2023). 1. Parties Responding To This Solicitation May Submit Their Offer In Accordance With Their Standard Commercial Practices (e.g. On Company Letterhead, Formal Quote Form, Etc.) But Must Include The Following Information: A) Company’s Complete Mailing And Remittance Addresses, B) Discounts For Prompt Payment If Applicable C) Cage Code, D) Sams Unique Entity Id, e) Taxpayer Id Number. offerors Shall Agree To The Delivery Condition By The Government. offerors Shall Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Items With Their Offer. 52.212-2 Evaluation-commercial Items (oct 2014). – Delivery, Pricing And Relevant Past Performance Are The Evaluation Factors. This Is A Commercial Item Acquisition. Award Will Be Made To Lowest Cost Technically Acceptable. All Evaluation Factors Will Be Considered As Delivery Is As Important As Cost. The Government Intends To Award On An All Or None Basis To A Responsible Offeror Whose Offer Conforms To The Solicitation, And Provides The Government With The Lowest Cost Technically Acceptable And Meeting Our Pdd. The Evaluation And Award Procedures In Far 13.106 Apply. far 52.212-3 Offeror Representations And Certifications-commercial Items (oct 2018) With Alt 1 Included Are To Be Submitted With Your Offers. far 52.212-4 Contract Terms And Conditions-commercial Items (dec 2022) Applies To This Acquisition. far 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Orders, Commercial Items (mar 2023).the Following Clauses Listed In 52.212-5 Are Incorporated: 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (jun 2020) (pub.l. 109-282)(31 U.s.c. 6101 Note). 52.204-13, System For Award Management Registration (oct 2018) 52.219-6, Notice Of Total Small Business Aside (nov 2020) (15 U.s.c. 644). 52.219-28, Post Award Small Business Program Rerepresentation (mar 2023) (15 U.s.c. 632 (a)(2). 52.222-3 Convict Labor (june 2003) (e.o. 11755) 52.222.19 Child Labor-cooperation With Authorities And Remedies (jan 2018) (eo 11755) 52.222-26 Equal Opportunity (sep 2016)(e.o. 11246) 52.222-36, Affirmative Action For Workers With Disabilities (jul 2014) (29 U.s.c. 793). 52.222-50, Combating Trafficking In Persons (jan 2019) (22u.s.c.chapter78 And E.o. 13627) 52.223-18, Contractor Policy To Ban Text Messaging While Driving (aug 2011) (e.o. 13513). 52.225-1, Buy American-supplies (oct 2022) (41u.s.c.chapter83) 52.225-13, Restrictions On Certain Foreign Purchases (jun 2008) (e.o.’s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury). 52.232-33 Payment By Electronic Funds Transfer Central Contractor Registration (oct 2018)(31.s.c. 3332). 52.222-41, Service Contract Act Of 1965 (aug 2018) (41 U.s.c. 351, Et Seq.). 52.222-42, Statement Of Equivalent Rates For Federal Hires (may 2014)(29 U.s.c. 206 And 41 U.s.c. 351, Et Seq.). 52.233-3 Protest After Award (aug. 1996.) 52.233-4 Applicable Law For Breach Of Contract Chain (oct.2004). defense Priorities And Allocations System (dpas): N/a quotes Are Due By 12:00 Pm Est On 31 May 2024. Quotes May Be Emailed To Brandie.r.dunnigan@uscg.mil poc Is Brandie Dunnigan, Procurement Agent, 410-762-6446.
Closing Date31 May 2024
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Machinery and Tools
United States
Description: The United States Coast Guard Surface Forces Logistics Center Has A Requirement And Is Requesting Quotations For The Following Part: item 1) nsn: 4320-25-160-7781 rotary Pump jets 15 Md-d-assy jets 15mb-d Vacuumarator Pump And Motor capacity: 15m3/hr flushing Capacity At 50hz: 120 Fl Ushes/hr flushing Capacity 60hz: 150 Fl Ushes/hr outside Dimensions: 554x214x332 Mm.(lxwxh) electric Motor: Mez 7aa 90l-02 pump Casing Material: Bronze rotor Housing Material: Stainless Steel Aisi 316 pump Rotor Material: Bronze pump Knives Material: Stainless Steel Aisi 316 pump Shaft Material: Stainless Steel Aisi 316 connection Inlet: 50 connection Outlet: 50 total Weight: 408 Lbs ***** Due To Issues With Items From Jets Not Meeting Pp&m Requirements When Received At The Warehouse And The Difficulty With Vendors Correcting The Pp&m, The Vendors need To Be Reminded Of The Following. There Will Be A Delay In Payment Or Items Being Shipped Back At Their Expense If The Items Do Not Meet Pp&m Requirements And They Will Be Held To The Contracted Price At The Time Of Award. ***** each Pump/motor Assembly Shall Be Individually Packaged And Packed In Accordance With Mil-std-2073-1e Method 10 Inside A Type V, Style B Covered Crate With Lag Bolts conforming To Astm D6039 Utilizing Cushioning, Blocking And Bracing As Appropriate To Prevent Movent And Damage From External Impact, Shipping And Handling. each Package Shall Be Marked Iaw Mil-std-129r Except Bar Coded Iaw Iso/iec-16388-2007, Code 39 Symbology. all Items Are Inspected When Delivered To The Coast Guard Warehouse. Failure To Meet The Requirements For Packaging, Packing, Marking (pp&m) And Bar-coding Will result In The Item(s) Being Rejected And Possibly Returned To The Vendor. This Will Delay Payment. Any Questions Concerning The Pp&m Requirements Or Bar-coding Should be Addressed With The Contracting Officer Prior To Contract Award. mfg: B.v. Technisch Bureau Uittenbogaart pn: 200015003 qty: 12 Ea the Items Are Used On Various Us Coast Guard Vessels. All Items Shall Be Individually Packaged And Marked Iaw The Above Packaging Requirements. Inspection And Acceptance Shall Take Place At Destination After Verification Of Preservation, Individual Packaging And Marking/bar Coding Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. delivery Shall Be F.o.b. Destination To Uscg Surface Forces Logistics Center, 2401 Hawkins Point Road, Baltimore Md 21226 note: No Drawings, Specifications Or Schematics Are Available From This Agency. brand Name Part Is Mandatory To Be Considered For Award, Offers Of “equal” Products Must Meet The Salient Physical, Functional, Or Performance Characteristic Specified In This Solicitation And Uscg Will Determine If Alternate Part Is Acceptable. this Is A Combined Synopsis/solicitation For A Commercial Item Prepared In Accordance With The Format Outlined In Far Subpart 12.6, Fac 2024-03 (feb 2024) And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Naics Code For This Solicitation Is 333914 And The Business Size Standard Is 750. The Resultant Purchase Order Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far 13.106 Apply. the U.s. Coast Guard Intends To Award On All Or None Basis To A Responsible Offeror Whose Offer Conforming To The Solicitation Will Be The Most Advantageous To The Government. Award Will Be Lowest Price Technically Acceptable. The Coast Guard Intends To Award On A Firm Fixed Price Contract. all Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By The Agency. Companies Must Have Valid Duns Numbers And Be Registered With System For Award Management (www.sam.gov) And Shall Provide The Company Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is May 6, 2024. At 10:00 Am Eastern Standard Time. offerors Must Submit The Following Information On Their Quote: disclosure: The Offeror Under This Solicitation Represents That [check One]: __ It Is Not A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73; __ It Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Has Submitted A Request For Waiver Pursuant To 3009.104-74, Which Has Not Been Denied; Or __it Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Plans To Submit A Request For Waiver Pursuant To 3009.104-74. (g) A Copy Of The Approved Waiver, If A Waiver Has Already Been Granted, Or The Waiver Request, If A Waiver Has Been Applied For, Shall Be Attached To The Bid Or Proposal. _hsar 3052.209.70 Prohibition On Contracts With Corporate Expatriates (june 2006) (end Of Provision) the Following Far Clauses Provisions Apply To This Solicitation. Far 52.212-1, Instructions To Offerors-commercial Items (sep 2023); Far 52.212-3, Offeror Representations And Certifications-commercial Items (feb 2024) With Alternate I. Offeror(s) Must Include A Completed Copy Of Far 52.212-3 With Their Quote. the Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Www.arnet.gov.; Far 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023); Far 52.212-5, Contract Terms & Conditions Required To Implement Statutes Or Executive Orders-commercial Items (feb 2024) the Following Clauses Listed Within Far: 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77, 108-78 (19 U.s.c. 3805 Note) the Following Clauses Listed Within 52.212-5 Are Applicable: far 52.203-6 Restrictions On Subcontractor Sales To The Government (jun 2020, With Alternate I (nov 2021) far 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (mar 2020) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (june 2020) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (june 2020) (31 U.s.c. 6101 Note). far 52.219-28, Post Award Small Business Program Representation (sep 2023)(15 U.s.c. 632(a)(2) far 52.222-3, Convict Labor (jun 2003)(e.o. 11755) far 52.222-19 Child Labor-cooperation With Authorities And Remedies (jan 2022) (e.o. 13126) far 52.222-21, Prohibition Of Segregated Facilities (april 2015) far 52.222-26, Equal Opportunity (sep 2016)(e.o. 11246) far 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) far 52.222-50, Combat Trafficking In Persons (october 2020)(22 U.s.c. Chapter 78 And E.o. 13627) far 52.223-18 Contractor Policy To Ban Text Messaging While Driving (jun 2020) (e.o. 13513) far 52.225-1 Buy American Act-supplies (oct 2022) far 52.225-3, Buy American Act-free Trade Agreement (oct 2022)(41 U.s.c. 10a-10d) far 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018)(31 U.s.c. 3332). The Following Items Are Incorporated As Addenda To This Solicitation: Copies Of Hsar Clauses May Be Obtained Electronically At Www.dhs.gov. gap 3042.302-90 Valuation Requirements For The Acquisition Of Spare Parts Purchased For Inventory Control Points From Hq Contracts (oct 2008). copies Of Cgap Clauses May Be Obtained Electronically At: Ww.uscg.mil/acquisition/procurement/pdf/cim_4200_19h.pdf
Closing Date6 May 2024
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

United States
Description: The United States Coast Guard Surface Forces Logistics Center Has A Requirement And Is Requesting Quotations For The Following Part: item 1) nsn: 5965-01-564-6185 loudspeaker Driver Assy oem: Hose-mccann Communications driver Assy 100w, W/3ft Tube p/n: Hm387-2087mb-3 nsn: 5965-01-564-6185 all Of These Items Must Be Individually Packaged, Protected And Marked According To Mil-std-2073-1e W/change 1 7 January 2011 Military Packaging; Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, Heat-sealable (if Required); And Mil-std-129r Military Marking For Shipment And Storage (mil-std-129r, Section 5, Page 22 Of Spec). Copies Included With This Saps package. each Unit To Have Electrostatic Protection Iaw Type Iii, Class I Of Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, Heat-sealable; If Required. each Item To Be Individually Packaged Iaw The Following: Mil-std-2073-1e W/change 1 7 January 2011, Method 10. astm-d-3951-10 Packing, Commercial (if Specifically Authorized By The Government). each Item To Be Individually Marked Iaw The Following: Mil-std-129r 14 Feb 2014 Marking For Shipment And Storage. bar Coding Required, If Capable, To Comply With The Following: Mil-std-129r 14 Feb 2014 Military Marking For Shipment And Storage. See Section 5, Page 22 Of This specification For Identification Linear (code 39) And 2d (pdf417) Bar Code Markings And Locations. mfg: Hose-mccann Communications pn: Hm387-2087mb-3 qty: 25 Ea the Items Are Used On Various Us Coast Guard Vessels. All Items Shall Be Individually Packaged And Marked Iaw The Above Packaging Requirements. Inspection And Acceptance Shall Take Place At Destination After Verification Of Preservation, Individual Packaging And Marking/bar Coding Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. delivery Shall Be F.o.b. Destination To Uscg Surface Forces Logistics Center, 2401 Hawkins Point Road, Baltimore Md 21226 note: No Drawings, Specifications Or Schematics Are Available From This Agency. brand Name Part Is Mandatory To Be Considered For Award, Offers Of “equal” Products Must Meet The Salient Physical, Functional, Or Performance Characteristic Specified In This Solicitation And Uscg Will Determine If Alternate Part Is Acceptable. this Is A Combined Synopsis/solicitation For A Commercial Item Prepared In Accordance With The Format Outlined In Far Subpart 12.6, Fac 2024-05 (may 2024) And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Naics Code For This Solicitation Is 334290 And The Business Size Standard Is 800. The Resultant Purchase Order Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far 13.106 Apply. the U.s. Coast Guard Intends To Award On All Or None Basis To A Responsible Offeror Whose Offer Conforming To The Solicitation Will Be The Most Advantageous To The Government. Award Will Be Lowest Price Technically Acceptable. The Coast Guard Intends To Award On A Firm Fixed Price Contract. all Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By The Agency. Companies Must Have Valid Duns Numbers And Be Registered With System For Award Management (www.sam.gov) And Shall Provide The Company Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is July 16, 2024. At 10:00 Am Eastern Standard Time. offerors Must Submit The Following Information On Their Quote: disclosure: The Offeror Under This Solicitation Represents That [check One]: __ It Is Not A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73; __ It Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Has Submitted A Request For Waiver Pursuant To 3009.104-74, Which Has Not Been Denied; Or __it Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Plans To Submit A Request For Waiver Pursuant To 3009.104-74. (g) A Copy Of The Approved Waiver, If A Waiver Has Already Been Granted, Or The Waiver Request, If A Waiver Has Been Applied For, Shall Be Attached To The Bid Or Proposal. _hsar 3052.209.70 Prohibition On Contracts With Corporate Expatriates (june 2006) (end Of Provision) the Following Far Clauses Provisions Apply To This Solicitation. Far 52.212-1, Instructions To Offerors-commercial Items (sep 2023); Far 52.212-3, Offeror Representations And Certifications-commercial Items (may 2024) With Alternate I. Offeror(s) Must Include A Completed Copy Of Far 52.212-3 With Their Quote. The Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Www.arnet.gov.; Far 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023); Far 52.212-5, Contract Terms & Conditions Required To Implement Statutes Or Executive Orders-commercial Items (may 2024) the Following Clauses Listed Within Far: 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77, 108-78 (19 U.s.c. 3805 Note) the Following Clauses Listed Within 52.212-5 Are Applicable: far 52.203-6 Restrictions On Subcontractor Sales To The Government (jun 2020, With Alternate I (nov 2021) far 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (mar 2020) 52.219-6, Notice Of Total Small Business Set-aside (nov 2020)(15 U.s.c. 644) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (june 2020) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (june 2020) (31 U.s.c. 6101 Note). far 52.219-28, Post Award Small Business Program Representation (feb 2024)(15 U.s.c. 632(a)(2) far 52.222-3, Convict Labor (jun 2003)(e.o. 11755) far 52.222-19 Child Labor-cooperation With Authorities And Remedies (jan 2022) (e.o. 13126) far 52.222-21, Prohibition Of Segregated Facilities (april 2015) far 52.222-26, Equal Opportunity (sep 2016)(e.o. 11246) far 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) far 52.222-50, Combat Trafficking In Persons (nov 2021)(22 U.s.c. Chapter 78 And E.o. 13627) far 52.225-1 Buy American Act-supplies (oct 2022) far 52.225-3, Buy American Act-free Trade Agreement (oct 2023)(41 U.s.c. 10a-10d) far 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018)(31 U.s.c. 3332). The Following Items Are Incorporated As Addenda To This Solicitation: Copies Of Hsar Clauses May Be Obtained Electronically At Www.dhs.gov. gap 3042.302-90 Valuation Requirements For The Acquisition Of Spare Parts Purchased For Inventory Control Points From Hq Contracts (oct 2008). copies Of Cgap Clauses May Be Obtained Electronically At: Ww.uscg.mil/acquisition/procurement/pdf/cim_4200_19h.pdf
Closing Date16 Jul 2024
Tender AmountRefer Documents 

U S COAST GUARD USA Tender

Software and IT Solutions
United States
Description: The United States Coast Guard Surface Forces Logistics Center Has A Requirement And Is Requesting Quotations For The Following Parts: item 1) nsn: 7010-01-632-1316 ethernet Server, Perle perle Iolan Sds4 4-port Secure Device Server Eia-232 422 485 - 4 X Rj-454 Port P/n: 04030304 all Of These Items Must Be Individually Packaged, Protected And Marked According To Mil-std-2073-1e W/change 1 7 January 2011 Military Packaging; Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, heat-sealable (if Required); And Mil-std-129r Military Marking For Shipment And Storage (mil-std-129r, Section 5, Page 22 Of Spec). each Unit To Have Electrostatic Protection Iaw Type Iii, Class I Of Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, Heat-sealable; If Required. each Item To Be Individually Packaged Iaw The Following: Mil-std-2073-1e W/change 1 7 January 2011, Method 10. astm-d-3951-10 Packing, Commercial (if Specifically Authorized By The Government). each Item To Be Individually Marked Iaw The Following: Mil-std-129r 14 Feb 2014 Marking For Shipment And Storage. bar Coding Required, If Capable, To Comply With The Following: Mil-std-129r 14 Feb 2014 Military Marking For Shipment And Storage. See Section 5, Page 22 Of This specification For Identification Linear (code 39) And 2d (pdf417) Bar Code Markings And Locations. mfg: Perle Systems, Inc. pn: 04030304 qty: 111 Ea the Items Are Used On Various Us Coast Guard Vessels. All Items Shall Be Individually Packaged And Marked Iaw The Above Packaging Requirements. Inspection And Acceptance Shall Take Place At Destination After Verification Of Preservation, Individual Packaging And Marking/bar Coding Requirements And Confirmation Of No Damage During Transit. Failure To Comply With Packaging Requirements Will Result In Rejection And Nonpayment. delivery Shall Be F.o.b. Destination To Uscg Surface Forces Logistics Center, 2401 Hawkins Point Road, Baltimore Md 21226 note: No Drawings, Specifications Or Schematics Are Available From This Agency. brand Name Part Is Mandatory To Be Considered For Award, Offers Of “equal” Products Must Meet The Salient Physical, Functional, Or Performance Characteristic Specified In This Solicitation And Uscg Will Determine If Alternate Part Is Acceptable. this Is A Combined Synopsis/solicitation For A Commercial Item Prepared In Accordance With The Format Outlined In Far Subpart 12.6, Fac 2024-03 (feb 2024) And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Naics Code For This Solicitation Is 334118 And The Business Size Standard Is 1000. The Resultant Purchase Order Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far 13.106 Apply. the U.s. Coast Guard Intends To Award On All Or None Basis To A Responsible Offeror Whose Offer Conforming To The Solicitation Will Be The Most Advantageous To The Government. Award Will Be Lowest Price Technically Acceptable. The Coast Guard Intends To Award On A Firm Fixed Price Contract. all Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By The Agency. Companies Must Have Valid Duns Numbers And Be Registered With System For Award Management (www.sam.gov) And Shall Provide The Company Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is Apr 25, 2024. At 10:00 Am Eastern Standard Time. offerors Must Submit The Following Information On Their Quote: disclosure: The Offeror Under This Solicitation Represents That [check One]: __ It Is Not A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73; __ It Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Has Submitted A Request For Waiver Pursuant To 3009.104-74, Which Has Not Been Denied; Or __it Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Plans To Submit A Request For Waiver Pursuant To 3009.104-74. (g) A Copy Of The Approved Waiver, If A Waiver Has Already Been Granted, Or The Waiver Request, If A Waiver Has Been Applied For, Shall Be Attached To The Bid Or Proposal. _hsar 3052.209.70 Prohibition On Contracts With Corporate Expatriates (june 2006) (end Of Provision) the Following Far Clauses Provisions Apply To This Solicitation. Far 52.212-1, Instructions To Offerors-commercial Items (sep 2023); Far 52.212-3, Offeror Representations And Certifications-commercial Items (feb 2024) With Alternate I. Offeror(s) Must Include A Completed Copy Of Far 52.212-3 With Their Quote. the Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Www.arnet.gov.; Far 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023); Far 52.212-5, Contract Terms & Conditions Required To Implement Statutes Or Executive Orders-commercial Items (feb 2024) the Following Clauses Listed Within Far: 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77, 108-78 (19 U.s.c. 3805 Note) the Following Clauses Listed Within 52.212-5 Are Applicable: far 52.203-6 Restrictions On Subcontractor Sales To The Government (jun 2020, With Alternate I (nov 2021) far 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (mar 2020) far 52.219-6, Notice Of Small Business Set-aside (nov2020)(15 U.s.c 644) 52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (june 2020) 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (june 2020) (31 U.s.c. 6101 Note). far 52.219-28, Post Award Small Business Program Representation (sep 2023)(15 U.s.c. 632(a)(2) far 52.222-3, Convict Labor (jun 2003)(e.o. 11755) far 52.222-19 Child Labor-cooperation With Authorities And Remedies (jan 2022) (e.o. 13126) far 52.222-21, Prohibition Of Segregated Facilities (april 2015) far 52.222-26, Equal Opportunity (sep 2016)(e.o. 11246) far 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) far 52.222-50, Combat Trafficking In Persons (october 2020)(22 U.s.c. Chapter 78 And E.o. 13627) far 52.223-18 Contractor Policy To Ban Text Messaging While Driving (jun 2020) (e.o. 13513) far 52.225-1 Buy American Act-supplies (oct 2022) far 52.225-3, Buy American Act-free Trade Agreement (oct 2022)(41 U.s.c. 10a-10d) far 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021) 52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018)(31 U.s.c. 3332). The Following Items Are Incorporated As Addenda To This Solicitation: Copies Of Hsar Clauses May Be Obtained Electronically At Www.dhs.gov. gap 3042.302-90 Valuation Requirements For The Acquisition Of Spare Parts Purchased For Inventory Control Points From Hq Contracts (oct 2008). copies Of Cgap Clauses May Be Obtained Electronically At: Ww.uscg.mil/acquisition/procurement/pdf/cim_4200_19h.pdf
Closing Date25 Apr 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n742.4|wv1|(717) 605-7562|amanda.a.gowdy.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E | inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|n/a|tbd|n00104|tbd|material-s4306a; Certifications-n39040|n50286|tbd|133.2|n/a|n/a|certifications-n39040|n/a|n/a|see D d Form 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery |one Year From Date Of Delivery ||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332911|750 (# Of Employees)|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|x|| the Following Has Been Amended. 1. The Quantity For Line Item 0001aa Has Been Reduced From 2 To 1. 2. The Language In The Following Clauses Have Been Updated. Please Reference The Following Pages To View The Updates. 252.223-7001 52.213-4 52.246-26 3. The Hour And Date For Receipt Of Offers Has Been Extended To 4:30pm Local Time On 04 October 2024. \ 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. The Following Proposed Delivery Schedule Applies: submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. final Delivery Of Material Will Be On Or Before 634 Days After Effective Date Of The Resulting Contract. 3. Any Contract Awarded As A Result Of This Solicitation Will Be Dx Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 4. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers In Accordance With Far 13.106(a)(2). 5. Offerors Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfq (announcement), Because The Rfq (announcement) Includes An Annex (information) Classified At The Confidential Level Which Will Be Released Only To offerors Possessing The Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nispom)(dod 5220-22-m) And Industrial Security Regulation (dod 5220.22-r). \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;6404016 - Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.3.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.3 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401 drawing Data=6404016 |53711| B| |f|0001 | B|00026|0000000 drawing Data=6404588 |53711| D| |d|0001 | D|49998|0490007 drawing Data=6404588 |53711| D| |d|0001.a | D|49998|0328255 drawing Data=6404588 |53711| D| |d|0001.b | C|49998|0612241 drawing Data=6404588 |53711| D| |d|0001.c | D|49998|0287371 drawing Data=6404588 |53711| D| |d|0002 | D|49998|0254123 drawing Data=6404588 |53711| D| |d|0002.a | D|49998|0250619 drawing Data=6404588 |53711| D| |d|0002.b | D|49998|0234743 drawing Data=6404588 |53711| D| |d|0002.c | B|49998|0394811 drawing Data=6404588 |53711| D| |d|0002.d | B|49998|0270348 drawing Data=6404588 |53711| D| |d|0003 | D|49998|0338372 drawing Data=6404588 |53711| D| |d|0003.a | D|49998|0345833 drawing Data=6404588 |53711| D| |d|0003.b | D|49998|0356758 drawing Data=6404588 |53711| D| |d|0004 | D|49998|0307601 drawing Data=6404588 |53711| D| |d|0004.a | D|49998|0293472 drawing Data=6404588 |53711| D| |d|0005 | D|49998|0260163 drawing Data=6404588 |53711| D| |d|0006 | D|49998|0250693 drawing Data=6404588 |53711| D| |d|0007 | D|49998|0205935 drawing Data=6404588 |53711| D| |d|0008 | C|49998|0234879 drawing Data=6404588 |53711| D| |d|0009 | D|49998|0195600 drawing Data=6404588 |53711| D| |d|0010 | D|49998|0151285 drawing Data=6404588 |53711| D| |d|0011 | C|49998|0258729 drawing Data=6404588d01 |53711| A|dn |d|0001 | A|49998|0040258 drawing Data=6404588d01 |53711| A|dn |d|0002 | A|49998|0032817 drawing Data=6404588d01 |53711| A|dn |d|0003 | A|49998|0053358 drawing Data=6404588d01 |53711| A|dn |d|0003.a | A|49998|0053800 drawing Data=6404588d01 |53711| A|dn |d|0003.b | A|49998|0031480 drawing Data=6404588d01 |53711| A|dn |d|0004 | A|49998|0019008 drawing Data=6404588d01 |53711| A|dn |d|0005 | A|49998|0038315 drawing Data=6404588d01 |53711| A|dn |d|0006 | A|49998|0038323 drawing Data=6404588d01 |53711| A|dn |d|0007 | A|49998|0040823 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b139 | | | |121001|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=sae Ams 2631 | | |e |170701|a| | | document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=astm-d6456 | | | |100801|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-dtl-32258 | | | |210601|a|2 | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |811118|c|1 | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Complete 1/2 Inch Hull And Backup Ball Valve Must Be In Accordance With Navsea Drawing 801-6404588 Assembly 98 And Dn 6404588d01, Less Barrel Nuts (find No. 46), Except As Amplified Or Modified Herein.; 3.1.1 ;the Three 0.56 Diameter Holes On Tailpiece Find No. 4 As Shown In Section 5-6f Of Drawing 6404588, Must Not Be Drilled.; 3.1.2 ;hole For Find No. 18 Is Shown Out Of Position In Section 7-6c On Drawing 6404588. Assembly View On Sheet 3 Incorrectly Shows Hole In Body Insert, Find No. 56 For Stem, Find No. 5 As A Through Hole.; 3.1.3 ;drawing 6404588 Section 9-2f Is In Error: The Stem Slot Does Not Extend Through The Ball Diameter.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Find No. 14 And Tailpiece, Find No. 4 Of Drawing 6404588; material - ;astm-b369, Alloy Uns C96400; part - ;stems, Find No. 5 And Find No. 6 Of Drawing 6404588; material - ;qq-n-286, Alloy Uns N05500, Form 2, Cold Drawn, Annealed And Age Hardened; part - ;continuous Thread Studs, Find No. 16 Of Drawing 6404588; material - ;mil-dtl-1222, Type Iv, Qq-n-286, Alloy Uns N05500, Annealed And Age Hardened; part - ;self-locking Heavy Hex Nuts, Find No. 20 Of Drawing 6404588; material - Qq-n-281, Class A Or B, With Chemical Composition In Accordance With Mil-dtl-32258. note: All Material Must Be The Same Class. self-locking Element - For 250 Degree Nuts Use Astm-d6456, Type 1 Or Astm-d4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 Degree Nuts Use Astm-d6456, Type 1. part - ;stem Retaining Nut, Find No. 9 Of Drawing 6404588; material - ;astm B139 Uns C51000 Temper H04; part - ;insert, (q3), Find No. 56 Of Drawing 6404588; material - ;mil-c-15726, Alloy C71500; part - ;ball, Find No. 1 And Ball, Find No. 2 Of Drawing 6404588; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3), Find No. 3 Of Drawing 6404588; material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only) item Property Astm Test Method Value (a) Hardness D2240 70 +/- 5 Shore D (b) Specific Gravity D792 1.18 +/- 0.02 (c) Tensile Strength D412 (diec) 5000 Psi Min (d) Compression-defl D575 700 Psi Min @ 2% Def. (e) Tensile Impact D1822 300 Ft-lb/sq In (note 1) (type L Specimen) (f) Water Absorption D570 1.5% Max (1 Week At R.t.) note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - ;ultrasonic Testing Is Required For Sae Ams 6931 Starting Material Per Note 15 On Drawing 801-6404588; item - ;balls, Find No. 1 And 2; performance - ;in Accordance With Sae Ams 6931 And Sae Ams 2631; acceptance - ;sae Ams 2631; test - Quality Conformance Tests item - Self-locking Nuts performance - ;mil-dtl-32258; acceptance - ;mil-dtl-32258; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm D6456, Type 1 Or Astm D4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5, Or 6; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Annealing And Age Hardening item - ;stems Find No. 5 And 6 And Continuous Threaded Stud Find No. 16; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - ;liquid Penetrant Inspection; item - ;continuous Thread Stud, Find No. 16; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Heavy Hex Nuts, Find No. 20; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027 With Sampling In Accordance With Mil-dtl-32258; test - Weldability Test Of Astm-b369 Material item - ;body, Find No. 14 And Tailpiece, Find No. 4; performance - Astm-b369 acceptance - Astm-b369 test - Pressure Tests item - Each Assembly performance - ;general Note 17 A, B, C, D, E, F, G, H, And I Of Drawing 6404588; acceptance - ;general Note 17 A, B, C, D, E, F, G, H, And I Of Drawing 6404588; test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.5 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;drawing 830-6404016, Rev B; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark the Working Pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.6 Radiography Is Required On ;body Find No. 14 And Tailpiece Find No. 4; . 3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.8 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.9 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;4.f.; of Drawing ;803-4384678; . 3.9.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.9.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.10 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/ 3.11 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.12 ;surface Waviness Must Be Verified Prior To Teflon Coating; 3.13 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.14 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.15 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On the Drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.16 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.16.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.16.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.17 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.17.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.17.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.18 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.18.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.18.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.18.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.19 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.20 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.21 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.21.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.21.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.21.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.22 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 884245644; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.23 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.25 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.26 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.26.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.26.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.26.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.27 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.28 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.29 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met. 3.29.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.29.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'') 3.29.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.29.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.29.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.29.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.29.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.29.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.29.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.29.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.29.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified Thateach Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.29.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.30 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.30.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal. 3.30.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.) 3.30.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (reader Sheets) (d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet) 3.31 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.31.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.31.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.31.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.31.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.31.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.32 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.32.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.32.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.33 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.34 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.34.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.34.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.34.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.34.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.35 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.35.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.35.2 Inspection For Completeness And Proper Type. 3.35.3 Verification Of Material Quality Received. 3.35.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.35.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.35.6 Identification And Protection From Improper Use Or Disposition. 3.35.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.35.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.35.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.36 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.36.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.37 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.37.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.37.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.37.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing. Self-locking Hex Nuts To Be Marked On The Hex Flats. Ball Must Be Marked In The Waterway and The Seats To Be Marked On The Outer Cylindrical Surfaces.; 3.37.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.37.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.38 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.38.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.38.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.38.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.38.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.38.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.38.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.39 Material Handling - The Written Material Control Process Must Include The Following: 3.39.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.39.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.39.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.39.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.39.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.39.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And marking Location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.40 Receiving Inspection 3.40.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.40.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.41 Discrepancy Reporting 3.41.1 Nonconforming Products Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To The Responsible Sub-tier supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.42 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.42.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.42.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.42.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.42.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.42.5 Sampling For Certification Of Non-metallic Material Must Be On The Basis Of One Set Of Test Specimens From Each Heat/lot Or Batch. 3.43 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Heavy Hex Nuts Must Be Marked In Accordance With Mil-dtl-32258; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.43.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.44 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/comp
Closing Date4 Oct 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Aerospace and Defence
United States
Description: Contact Information|4|n97113a|faa|717-605-4356|joshua.d.martin76.civ@us.navy.mil| Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| Inspection Of Supplies--fixed-price (aug 1996)|2||| General Information-fob-destination|1|b| Wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd|n/a|n/a|n/a|n/a|joshua.d.martin76.civ@us.navy.mil| Note For Contractor/administrative Contracting Officer|3|||| Navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| Notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| Alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| Annual Representations And Certifications (mar 2023)|13|336415|1250|||||||||||| Notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| Shelf Life: 7; Shelf Life Action Code: C0 View The Drawings: Go To Www.https://www.sam.gov Click: Contract Opportunities And Enter The Solicitation Number. This Gives You Access To The Electronic Solicitation. Drawings Can Be Viewed Or Downloaded. Government Source Inspection Per Far 52.246-2 Is Required. Delivery_______________days. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor'sproposal Constitutes Bilateral Agreement To "issue" Contractual Documents Asdetailed Herein. 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture Of The Zinc Rich Coating . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.1.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.3 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Drawings Shall Take Precedence. Nothing In This Contract/purchase Order, However, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. Drawing Data=56293 |53711| 4|od |d|0000.a | 4|49998|0018500 Drawing Data=56293 |53711| 4|od |d|0000.b | 3|49998|0021965 Drawing Data=56293 |53711| 4|od |d|0000.c | 2|49998|0024872 Drawing Data=56293 |53711| 4|od |d|0000.cov | 4|49998|0038973 Drawing Data=56293 |53711| 4|od |d|0000.d | 1|49998|0026986 Drawing Data=56293 |53711| 4|od |d|0000.ii | 4|49998|0015689 Drawing Data=56293 |53711| 4|od |d|0000.iii | -|49998|0026790 Drawing Data=56293 |53711| 4|od |d|0000.iv | -|49998|0008318 Drawing Data=56293 |53711| 4|od |d|0000.v | -|49998|0037946 Drawing Data=56293 |53711| 4|od |d|0001.1 | -|49998|0039238 Drawing Data=56293 |53711| 4|od |d|0001.2 | -|49998|0024017 Drawing Data=56293 |53711| 4|od |d|0002.1 | 2|49998|0019410 Drawing Data=56293 |53711| 4|od |d|0003.1 | 1|49998|0028858 Drawing Data=56293 |53711| 4|od |d|0003.2 | -|49998|0028844 Drawing Data=56293 |53711| 4|od |d|0003.3 | -|49998|0031180 Drawing Data=56293 |53711| 4|od |d|0003.4 | -|49998|0032024 Drawing Data=56293 |53711| 4|od |d|0003.5 | -|49998|0012193 Drawing Data=56293 |53711| 4|od |d|0004.1 | 4|49998|0027622 Drawing Data=56293 |53711| 4|od |d|0004.2 | -|49998|0021502 Drawing Data=56293 |53711| 4|od |d|0004.3 | -|49998|0015474 Drawing Data=56293 |53711| 4|od |d|0005.1 | 1|49998|0028854 Drawing Data=56293 |53711| 4|od |d|0005.2 | -|49998|0033261 Drawing Data=56293 |53711| 4|od |d|0005.3 | -|49998|0035235 Drawing Data=56293 |53711| 4|od |d|0005.4 | 2|49998|0036465 Drawing Data=56293 |53711| 4|od |d|0005.5 | 2|49998|0021294 Drawing Data=56293 |53711| 4|od |d|0005.5a1 | -|49998|0012105 Drawing Data=56293 |53711| 4|od |d|0005.5a2 | 2|49998|0061537 Drawing Data=7124153 |53711| B| |d|0001 | B|49998|0143012 Document Ref Data=mil-prf-26915 | | |d |061020|a| | | Document Ref Data=astm-d2794 | | | |941003|a| | | Document Ref Data=mil-dtl-31000 | | |c |040709|a| | | Document Ref Data=astm-d3363 | | | |941003|a| | | Document Change Data=dod-d-1000 |mil-dtl-31000 3. Requirements 3.1 Manufacturing And Design - The Zinc Rich Coating Furnished Under This Contract/purchase Order Shall Meet The Material And Physical Requirements As Specified ;on Drawing 7124153-001gl; . 3.2 Marking - Unless Marking Requirements Are Specified By A Document Or Drawing Cited In This Solicitation All Items Delivered Under This Contract/purchase Order Shall Be Marked And Identified In Accordance With The Applicable Military Standards And Specifications As Follows: Mechanical Parts, Assemblies And Equipments - Mil-std-130 Electrical And Electronic Parts - Mil-std-1285, Method 1. Electrical And Electronic Parts And Assemblies Not Covered By Mil-std-1285-use Mil-std-130. Electronic Equipment - Mil-std-454 Requirement Number 67. Electrical Equipment - Mil-p-15024/5 (ships) 3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973, Paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original And Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.4 Shelf Life Requirement - The Following Is Excerpts From Dod 4140.27-m Shelf Life Management Manual. This Requirement Is Mandated By Mil-std-129p Referenced Under The Preservation, Packing And Marking Portion Of This Tdp. 2-12. 85 Percent Shelf-life Remaining Requirement Applicable To Acquisition/procurement A. Acquisition/procurement Documentation Shall Specify That Shelf-life Items/material Will Have Not Less Than 85 Percent (allowing For Rounding To Whole Months) Of Shelf-life Remaining At Time Of Receipt By The First Government Activity. Any Delivery From A Contractor Not Having At Least 85 Percent Shelf-life Remaining Shall Normally Be Considered Non-conforming. Refer To Appendix E Of This Manual To Determine The Amount Of Time That 85% Equates To In Terms Of Remaining Shelf Life For Type I Or Type Ii Shelf-life Codes. B. In Supporting Imminent Use Or Consumption, The 85% Shelf-life Remaining On Receipt By First Government Activity May Be Modified Or Adjusted As Deemed Prudent At The Discretion Of Pms And Imms, When Support Alternative Arrangements Such As Ec, Pv, Dvd Or Local Purchase Are Effected. Use Of Support Alternatives For Shipment/delivery To Storage Facilities As Stock Will Conform To The 85% Rule. 2-13. Contractor Marking. Shelf Life Items Will Be Marked For Identification And Control. Markings, Shown Below The Item Identification Data Are Required On All Units, Intermediate, And Exterior Packs Or Unpacked Items, Shall Be Per Mil Std 129, Mil-std-130, Mil Std 290 (fsc 9150 Only), Or Fed Std 123, (references (m) Through (p)) Respectively, And Will Include The Following: A. For Type I Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Rubber Products Only), Date Assembled, Or Date Packed (subsistence Only); And Expiration Date. B. For Type Ii Shelf Life Items: Apply One, As Appropriate; Date Manufactured, Date Cured (for Elastomeric And Other Rubber Products Only), Date Assembled, And Date Packed (subsistence Only), And Inspect/test Date. C. For Both Type I And Type Ii Markings In Subparagraphs A And B Above: The Date Shall Be Expressed By The Numeric Month And The Last 2 Digits Of The Calendar Year; I.e., 06/95, With The Day Of That Month Being The Last Day. D. Different Dates On Identical Items. When Two Or More Unit Packs Of Identical Items Bear Different Dates Of Manufacture, Dates Of Cure, Dates Of Pack, Or Dates Of Assembly, The Earliest Date Shall Be Shown On The Shipping Container. E. For Type I Drugs And Biologicals: The Expiration Date Only Is Required. The Expiration Date Should Be Marked In Accordance With Fed-spec Ppp C 186 (reference (q)). Manufacturer Date Shall Not Be Shown For Medical Items Having Expiration Dates. F. For Cure-dated Items: Shelf Life Markings On Physical Material Are Expressed By Month Or Quarter And Year Designations (i.e., 11/2001,or 3q2001). Shelf Life Periods End On The Last Day Of The Cited Month Or Quarter. Appendix E Shelf Life Codes Required Number Of Months/quarters Remaining Upon Receipt By The First Government Activity Type I Type Ii Months Quanters Shelf Life Period Non-deteriorative 0 0 N/a N/a No Shelf-life Applies (zero) (zero) 01 Month A N/a 25 Days N/a 02 Months B N/a 50 Days N/a 03 Months C 1 75 Days N/a 04 Months D N/a 3 1 05 Months E N/a 4 1 06 Months F 2 5 2 09 Months G 3 8 3 12 Months (1.00-years) H 4 10 3 15 Months (1.25-years) J N/a 13 4 18 Months (1.50-years) K 5 15 5 21 Months (1.75-years) L N/a 18 6 24 Months (2.00-years) M 6 21 7 27 Months (2.25-years) N N/a 23 8 30 Months (2.50-years) P N/a 26 9 36 Months (3.00-years) Q 7 31 10 48 Months (4.00-years) R 8 41 14 60 Months (5.00-years) S 9 51 17 72 Months (6.00-years) I N/a 61 20 84 Months (7.00-years) T N/a 71 24 96 Months (8.00-years U N/a 82 27 Variable Such As: V N/a 77, 113, 26, 38, 61 90, 132,216,228, Etc. 184, 194 65, Etc. Months Or Any Other Etc. Number Of Months Not Specifically Assigned. 120 Months (10-years) W N/a 102 34 180 Months (15-years) Y N/a 153 51 240 Months (20-years) Z N/a 204 68 Shelf-life Period Greater N/a X 85 Percent 85 Percent Than 60 Months For Type Of Number Of Number Ii Extendible Items Months Months 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchause Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, The Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Reqiurements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The Specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Reqiurements. 4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any Inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance Does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. If You Have A Problem Connecting To The Dodssp Website, Please Contact Either The Subscription Service Desk (215)697-2569, Or The Special Assistance Desk (215)697-2667. The Dodssp Customer Service Staff Is Available Every Business Day Between The Hours Of 7:30 Am And 4:00 Pm Eastern Time To Answer Your Questions Or Assist In Solving Any Problems You Might Encounter When Ordering From The Dodssp Collection Of Defense Specifications And Standards, Federal Specifications And Standards Used By Dod, And Other Dod Standardization Documents. Mail Requests Should Be Submitted To: Navy Publishing And Printing Service (subscriptions) Building 4d 700 Robbins Ave. Phildelphia, Pa. 19111 Attn: Dodssp Requests Can Be Transmitted To Dodssp Via Fax Number (215)697-1462. A. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. B. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 D. Ordnance Documents (od) - Ordnance Documents May Be Obtained By Submitting A Request To: Commanding Officer Naval Surface Warfare Center Port Hueneme Div Code 5a00 Port Hueneme, California 93043 E. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For Certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. F. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 H. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 I. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. P/n: 7124153-001gl
Closing Date25 Mar 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Machinery and Tools
United States
Description: Contact Information|4|n742.10|wv2|(717) 605-4056|madison.m.gray4.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection/acceptance Point|6||||||| general Information-fob-destination|1|n50286| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice And Receiving Report (combo) Certifications - Stand-alone Receiving Report |n/a|tbd|n00104|tbd|material - S4306a; Certifications - N64498|n50286|tbd|tbd|n/a|n/a|certifications - N64498|n/a|n/ a|see Dd Form 1423|n/a| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (feb2024))|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (feb 2024)|13|332911|750 (# Of Employees)|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1. Navsup Wss Mechanicsburg Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000 And Navsup Wss Term Wsstermmz01. 2. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Sent Either In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Methods, Such As Email. The Government's Acceptance Of The Contract Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. 3. The Following Delivery Schedule Applies: radiographic Shooting Sketches (rss) 45 Days Adc Dd approval Of Radio Rss 30 Days After Receipt production Radiography (pr) 135 Days After Approval Of Rss Ddapproval Of Pr weld Procedures 120 Days After Contract Award approval Must Be Obtained Prior To Performing Welding submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduled Delivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. final Delivery Of Material Shall Be On Or Before 450 Days After The Effective Date Of The Contract. 4. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See Far Clause 52.211-14, Notice Of Priority Rating For National Defense, emergency Preparedness, And Energy Program Use. 5. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 6. Drawings Associated With This Solicitation Will Be Made Available On The Individual Solicitation Page On Contracts Opportunities On The Sam.gov Website. drawings Have Restricted Access Which Needs To Be Approved. Once Access Has Been Requested, Qualified Contractors Shall Email The Poc Listed On The Solicitation To Inform Them Of The Request. 7. This Requirement Requires Access To Classified Drawings. These Drawings Are Not Required To Submit A Quote, However In The Event Of An Award, A Facility Clearance May Be Required In Accordance With Far 52.204-2. 8. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254). The Classified Documents And Security Level Are: ;6404016 - Confidential; 2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.3.1 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.3.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=df330613c10 |53711| A|er |d|0001 | A|49998|0178040 drawing Data=df330613c11 |53711| B|er |d|0001 | B|49998|0307832 drawing Data=4384678 |80064| C| |d|0001 | C|49998|1136401 drawing Data=4384678c01 |53711| C|dn |d|0001 | C|49998|0067532 drawing Data=4384678c01 |53711| C|dn |d|0002 | C|49998|0045081 drawing Data=4384678c01 |53711| C|dn |d|0003 | C|49998|0030946 drawing Data=4384678c02 |53711| C|dn |d|0001 | C|49998|0041260 drawing Data=4384678c03 |53711| C|dn |d|0001 | C|49998|0035403 drawing Data=4384678c04 |53711| C|dn |d|0001 | C|49998|0040252 drawing Data=4384678c05 |53711| C|dn |d|0001 | C|49998|0033942 drawing Data=4384678c06 |53711| C|dn |d|0001 | C|49998|0033961 drawing Data=4385050 |80064| C| |d|0001 | C|49998|0451442 drawing Data=4385050 |80064| C| |d|0002 | C|49998|0678090 drawing Data=4385050 |80064| C| |d|0003 | C|49998|0767802 drawing Data=4385050 |80064| C| |d|0004 | C|49998|0647579 drawing Data=4385050 |80064| C| |d|0005 | C|49998|0676019 drawing Data=4385050 |80064| C| |d|0006 | C|49998|0560045 drawing Data=4385050 |80064| C| |d|0007 | C|49998|0427112 drawing Data=4385050 |80064| C| |d|0008 | C|49998|0680510 drawing Data=4385050 |80064| C| |d|0009 | C|49998|0574591 drawing Data=4385050 |80064| C| |d|0010 | C|49998|0463459 drawing Data=4385050 |80064| C| |d|0011 | C|49998|0562323 drawing Data=4385050 |80064| C| |d|0012 | C|49998|0533163 drawing Data=4385050 |80064| C| |d|0013 | C|49998|0430211 drawing Data=4385050 |80064| C| |d|0014 | C|49998|0553678 drawing Data=4385050 |80064| C| |d|0015 | C|49998|0424546 drawing Data=4385050 |80064| C| |d|0016 | C|49998|0511681 drawing Data=4385050 |80064| C| |d|0017 | C|49998|0490597 drawing Data=4385050 |80064| C| |d|0018 | C|49998|0161231 drawing Data=4385050-c4 |53711| -|1n |d|0001 | -|49998|0040208 drawing Data=6404016 |53711| B| |f|0001 | B|00026|0000000 drawing Data=6405351 |53711| A| |d|0001 | A|49998|0068528 drawing Data=6405351 |53711| A| |d|0001.a | A|49998|0043345 drawing Data=6405351 |53711| A| |d|0002 | A|49998|0024372 drawing Data=6405351 |53711| A| |d|0003 | A|49998|0048337 drawing Data=6405351 |53711| A| |d|0004 | A|49998|0099367 drawing Data=6405351 |53711| A| |d|0004.a | A|49998|0066936 drawing Data=6405351 |53711| A| |d|0005 | A|49998|0052935 drawing Data=6405351 |53711| A| |d|0005.a | A|49998|0045852 drawing Data=6405351 |53711| A| |d|0006 | A|49998|0069025 drawing Data=6405351 |53711| A| |d|0006.a | A|49998|0074653 drawing Data=6405351 |53711| A| |d|0006.b | A|49998|0067651 drawing Data=6405351 |53711| A| |d|0006.c | A|49998|0068861 drawing Data=6405351 |53711| A| |d|0006.d | A|49998|0066196 drawing Data=6405351 |53711| A| |d|0006.e | A|49998|0068551 drawing Data=6405351 |53711| A| |d|0006.f | A|49998|0071144 drawing Data=6405351 |53711| A| |d|0006.g | A|49998|0072373 drawing Data=6405351 |53711| A| |d|0006.h | A|49998|0069052 drawing Data=6405351 |53711| A| |d|0006.j | A|49998|0053342 drawing Data=6405351 |53711| A| |d|0007 | A|49998|0036178 drawing Data=6405351 |53711| A| |d|0008 | A|49998|0047650 drawing Data=6405351 |53711| A| |d|0008.a | A|49998|0046214 drawing Data=6405351 |53711| A| |d|0009 | A|49998|0033667 drawing Data=6405351 |53711| A| |d|0010 | A|49998|0033949 drawing Data=6405351 |53711| A| |d|0011 | A|49998|0038121 drawing Data=6405351 |53711| A| |d|0012 | A|49998|0034092 drawing Data=6405351 |53711| A| |d|0013 | A|49998|0061596 drawing Data=6405351 |53711| A| |d|0013.a | A|49998|0047323 drawing Data=6405351 |53711| A| |d|0013.b | A|49998|0042959 drawing Data=6405351 |53711| A| |d|0013.c | A|49998|0034536 drawing Data=6405351 |53711| A| |d|0013.d | A|49998|0041758 drawing Data=6405351 |53711| A| |d|0014 | A|49998|0028916 drawing Data=6405351 |53711| A| |d|0015 | A|49998|0033225 drawing Data=6405351 |53711| A| |d|0016 | A|49998|0032954 drawing Data=6405351 |53711| A| |d|0017 | A|49998|0032993 drawing Data=6405351 |53711| A| |d|0017.a | A|49998|0028430 drawing Data=6405351 |53711| A| |d|0018 | A|49998|0041883 drawing Data=6405351 |53711| A| |d|0019 | A|49998|0018102 drawing Data=6405351 |53711| A| |d|0020 | A|49998|0040978 drawing Data=6405351 |53711| A| |d|0021 | A|49998|0024729 drawing Data=6405351 |53711| A| |d|0022 | A|49998|0022918 drawing Data=6405351 |53711| A| |d|0023 | A|49998|0022338 drawing Data=6405351 |53711| A| |d|0024 | A|49998|0025996 drawing Data=6405351 |53711| A| |d|0025 | A|49998|0020041 drawing Data=6405351 |53711| A| |d|0026 | A|49998|0022424 drawing Data=6405351 |53711| A| |d|0027 | A|49998|0025693 drawing Data=6405351 |53711| A| |d|0028 | A|49998|0025617 drawing Data=6405351 |53711| A| |d|0029 | A|49998|0054176 drawing Data=6405351 |53711| A| |d|0030 | A|49998|0035399 drawing Data=6405351 |53711| A| |d|0031 | A|49998|0020856 drawing Data=6405351 |53711| A| |d|0032 | A|49998|0023935 drawing Data=6405351 |53711| A| |d|0033 | A|49998|0022020 drawing Data=6405351 |53711| A| |d|0034 | A|49998|0031023 drawing Data=6405351 |53711| A| |d|0035 | A|49998|0022084 drawing Data=6405351 |53711| A| |d|0036 | A|49998|0023967 drawing Data=6408529 |53711| C| |d|0001 | C|49998|0471414 drawing Data=6408529 |53711| C| |d|0001.a | C|49998|0332904 drawing Data=6408529 |53711| C| |d|0001.b | C|49998|0345072 drawing Data=6408529 |53711| C| |d|0002 | C|49998|0298556 drawing Data=6408529 |53711| C| |d|0002.a | C|49998|0303003 drawing Data=6408529 |53711| C| |d|0002.b | C|49998|0319148 drawing Data=6408529 |53711| C| |d|0002.c | C|49998|0235527 drawing Data=6408529 |53711| C| |d|0002.d | B|49998|0276389 drawing Data=6408529 |53711| C| |d|0002.e | B|49998|0260935 drawing Data=6408529 |53711| C| |d|0002.f | B|49998|0243303 drawing Data=6408529 |53711| C| |d|0003 | C|49998|0270451 drawing Data=6408529 |53711| C| |d|0003.a | C|49998|0288663 drawing Data=6408529 |53711| C| |d|0003.b | C|49998|0307445 drawing Data=6408529 |53711| C| |d|0003.c | C|49998|0292708 drawing Data=6408529 |53711| C| |d|0003.d | C|49998|0299361 drawing Data=6408529 |53711| C| |d|0003.e | C|49998|0281233 drawing Data=6408529 |53711| C| |d|0003.f | C|49998|0334124 drawing Data=6408529 |53711| C| |d|0003.g | C|49998|0313284 drawing Data=6408529 |53711| C| |d|0003.h | C|49998|0300646 drawing Data=6408529 |53711| C| |d|0003.j | C|49998|0279814 drawing Data=6408529 |53711| C| |d|0003.k | C|49998|0297569 drawing Data=6408529 |53711| C| |d|0003.l | C|49998|0289795 drawing Data=6408529 |53711| C| |d|0004 | C|49998|0238167 drawing Data=6408529 |53711| C| |d|0005 | A|49998|0142890 drawing Data=6408529 |53711| C| |d|0006 | B|49998|0198379 drawing Data=6408529 |53711| C| |d|0007 | A|49998|0157342 drawing Data=6408529 |53711| C| |d|0008 | A|49998|0166003 drawing Data=6408529 |53711| C| |d|0009 | B|49998|0203178 drawing Data=6408529 |53711| C| |d|0010 | A|49998|0107019 drawing Data=6408529 |53711| C| |d|0011 | C|49998|0192483 drawing Data=6408529 |53711| C| |d|0012 | A|49998|0104270 drawing Data=6408529 |53711| C| |d|0013 | A|49998|0099090 drawing Data=6408529 |53711| C| |d|0014 | A|49998|0107926 drawing Data=6408529 |53711| C| |d|0015 | C|49998|0204749 drawing Data=6408529 |53711| C| |d|0016 | C|49998|0152364 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b139 | | | |121001|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=astm-b505 | | | |180301|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=mil-std-2132 | | |d |080310|f| |01| document Ref Data=sae Ams 2631 | | |e |171201|a| | | document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=astm-d6456 | | | |100801|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-dtl-32258 | | | |210601|a|2 | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Complete 2 Inch Combination Hull And Backup Ball Valve Required To Be In Accordance With Naval Sea Systems Command Drawing 6408529 Assembly 94 And All Dns, Drns And Ers Provided With This Contract/purchase Order (less Actuator Find Number 42 Of navsea Drawing 6408529 And Hull Fasteners Find Numbers 69, 70 Of Navsea Drawing 6408529), Except As Amplified Or Modified Herein.; 3.1.1 ;bolt And Dowel Pin Holes On Mounting Flange(s) And Dowel Pin Holes For Actuator Locating Must Not Be Drilled.; 3.1.2 ;find Numbers 47, 50, 55, 56, And 57 Of Drawing 6408529 Must Be Supplied In A Bag Attached To The Valve.; 3.1.3 ;all Actuator Associated Mounting Parts Must Be Supplied In Bag Attached To The Valve.; 3.1.4 ;dimension For Find Number 14 On Navsea Drawing 6408529 Sheet 10 From Datum B To The End Of The 1.0 Inch Radius Is 1.688 Inches.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Find Number 72-s1 And Tailpiece, Find Number 80-s1 Of Drawing 6408529; material - ;astm-b369, Alloy Uns 96400; part - ;continuous Threaded Studs, Find Number 62 Of Drawing 6408529; material - ;mil-dtl-1222, Type Iv, Qq-n-286, Alloy Uns N05500, Annealed And Age Hardened; part - ;self-locking Heavy Hex Nuts, Find Number 43 Of Drawing 6408529; material - Qq-n-281, Class A Or B, With Chemical Composition In Accordance With Mil-dtl-32258. note: All Material Must Be The Same Class. self-locking Element - For 250 Degree Nuts Use Astm-d6456, Type 1 Or Astm-d4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 Degree Nuts Use Astm-d6456, Type 1. part - ;stem Retaining Nuts, Find Numbers 10 And 12 Of Drawing 6408529; material - ;astm-b505, Alloy C90300 Or, As An Alternate Material, Astm-b139, Alloy C51000, Temper H04 With The Following Minimum Mechanical Properties: 55 Ksi Tensile Strength, 22 Ksi Yield Strength, 18% Elongation; part - ;insert (q3), Find Number 68-s1 Of Drawing 6408529; material - ;qq-n-281, Class A, Form 1, Hot Finished Or Cold Drawn, Annealed; part - ;straight Ball, Find Number 7 And Angle Ball, Find Number 8 Of Drawing 6408529; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3), Find Number 9 Of Drawing 6408529; material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only) item Property Astm Test Method Value (a) Hardness D2240 70 +/- 5 Shore D (b) Specific Gravity D792 1.18 +/- 0.02 (c) Tensile Strength D412 (diec) 5000 Psi Min (d) Compression-defl D575 700 Psi Min @ 2% Def. (e) Tensile Impact D1822 300 Ft-lb/sq In (note 1) (type L Specimen) (f) Water Absorption D570 1.5% Max (1 Week At R.t.) note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum. 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Quality Conformance Tests item - Self-locking Nuts performance - ;mil-dtl-32258; acceptance - ;mil-dtl-32258; attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm D6456, Type 1 Or Astm D4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5, Or 6; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Annealing And Age Hardening item - ;stems Find Number 14 And Find Number 15 And Continuous Threaded Studs Find Number 62 Of Drawing 6408529; performance - Qq-n-286 test - Ultrasonic Inspection On Starting Material item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract; performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286 acceptance - Qq-n-286 test - ;liquid Penetrant Inspection; item - ;continuous Threaded Studs, Find Number 62 On Drawing 6408529; performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222 acceptance - Mil-dtl-1222 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Heavy Hex Nuts Find Number 43 On Drawing 6408529; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027 With Sampling In Accordance With Mil-dtl-32258; test - ;dye Penetrant Inspection; item - ;stem, Find Number 15; And Insert (q3), Find Number 68-s1 Of Drawing 6408529; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 test - ;ultrasonic Testing Is Required For Sae Ams 6931 Starting Material Per Note 16 On Drawing 801-6408529; item - ;straight Ball, Find Number 7 And Angle Ball, Find Number 8 Of Drawing 6408529; performance - ;sae-ams-6931 And Sae-ams-2631; acceptance - ;sae-ams-2631; test - Weldability Test Of Astm-b369 Material item - ;body, Find Number 72-s1 And Tailpiece, Find Number 80-s1 Of Drawing 6408529; performance - Astm-b369 acceptance - Astm-b369 test - ;production Test; item - ;each Assembly; performance - ;general Note 18 Of Drawing 6408529; acceptance - ;general Note 18 Of Drawing 6408529; test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification 3.4 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.6 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.7 Radiography Is Required On ;body, Find Number 72-s1 And Tailpiece, Find Number 80-s1 Of Drawing 6408529; . 3.8 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;drawing 830-6404016, Revision B; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To mark The Working Pressure On The Item Does Not Apply And Is Strictly Prohibited. 3.9 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;4.f.; of Drawing ;803-4384678; . 3.9.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.9.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.10 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/ 3.11 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.12 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.13 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.14 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On the Drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.15 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.16 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.16.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.16.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.17 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.17.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.17.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.20 Installation Of Titanium Shims Must Be Performed Using Section 6.1.3 Of The Procedure Provided In Csd158 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. Paragraph 6.1.3.9 Is Not Applicable. 3.20.1 Use Of Alternative Epoxies, Other Than The Epoxies Listed In Equipment/material Section Of Csd158, Must Be Requested As Stated Elsewhere In The Contract/purchase Order. 3.21 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.21.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.21.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.21.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.22 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.23 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 884245640; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.24 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;astm-b505 Alloy C90300 And Qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.25 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.25.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.25.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.25.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.26 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.27 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.27.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.28 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.30 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.30.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.30.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.30.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.30.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.30.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.30.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.30.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.30.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.30.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.30.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.30.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.30.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.31 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.31.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal. 3.31.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.) 3.31.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (reader Sheets) (d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet) 3.32 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.32.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.32.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.32.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.32.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.32.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.33 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.33.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.33.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.34 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.35 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.35.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.35.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.35.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.35.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.36 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.36.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.36.2 Inspection For Completeness And Proper Type. 3.36.3 Verification Of Material Quality Received. 3.36.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.36.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.36.6 Identification And Protection From Improper Use Or Disposition. 3.36.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.36.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.36.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.37 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.37.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.38 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.38.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.38.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.38.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing. Self-locking Heavy Hex Nuts To Be Marked On The Hex Flats. Balls To Be Marked On The waterway And Seats To Be Marked On The Outer Cylindrical Surface; 3.38.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.38.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.39 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.39.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.39.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.39.3 Re-identificatio
Closing Date28 May 2024
Tender AmountUSD 357.8 K 
This is an estimated amount, exact amount may vary.

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001|four|750|||||||||||||||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|s ee Dd 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (sep 2023)|4||||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (jan 2023)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| progress Payments (nov 2021)|4||||| limitation Of Liability--high-value Items ($100k)(feb 1997)|1|| limitations On Pass-through Charges (jun 2020)|1|| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| list Of Award Attachments|5|||||| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|13|332919|750 Employees|||||||||||| cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| instructions To Offerors -- Competitive Acquisition (nov 2021)|2||| facsimile Proposals (oct 1997)|1|| type Of Contract (apr 1984)|1|firm Fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Is Issued To Extend Closing Date To 10 Sep 2024. 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech. 2.drawings Associated With This Solicitation Will Be Made Available On The New Beta.sam Website, But Will Be Restricted Access Which Needs To Be Approved. Once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform them Of The Request. 3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000. 4. This Is A Rated Order Certified For National Defense Use,and The Contractor Will Follow All The Requirements Ofthe Defense Priorities And Allocations Systemregulation (15 Cfr 700). 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. drawing Data=h684-1505a01 |53711| A|er |d|0001 | A|49998|0059711 drawing Data=h684-1505a01 |53711| A|er |d|0002 | A|49998|0060531 drawing Data=h684-1505a01 |53711| A|er |d|0003 | A|49998|0166290 drawing Data=h684-1505a05 |53711| A|er |d|0001 | A|49998|0039892 drawing Data=h684-1505a05 |53711| A|er |d|0001.1 | A|49998|0011824 drawing Data=h684-1505a05 |53711| A|er |d|0002 | A|49998|0068709 drawing Data=h684-1505a05 |53711| A|er |d|0003 | A|49998|0049591 drawing Data=h684-1505a05 |53711| A|er |d|0004 | A|49998|0064381 drawing Data=h684-1505a05 |53711| A|er |d|0005 | A|49998|0066716 drawing Data=h684-1505a05 |53711| A|er |d|0006 | A|49998|0019662 drawing Data=h684-1505a05 |53711| A|er |d|0007 | A|49998|0277934 drawing Data=h684-1505a05 |53711| A|er |d|0008 | A|49998|0228605 drawing Data=h684-1505a05 |53711| A|er |d|0009 | A|49998|0202813 drawing Data=h684-1505a08 |53711| A|er |d|0001 | A|49998|0063220 drawing Data=h684-1505a08 |53711| A|er |d|0001.1 | A|49998|0023665 drawing Data=h684-1505a08 |53711| A|er |d|0002 | A|49998|0111529 drawing Data=h684-1505a08 |53711| A|er |d|0003 | A|49998|0076624 drawing Data=h684-1505a08 |53711| A|er |d|0004 | A|49998|0043485 drawing Data=h684-1505a08 |53711| A|er |d|0005 | A|49998|0052444 drawing Data=h684-1505a08 |53711| A|er |d|0006 | A|49998|0060448 drawing Data=h684-1505a08 |53711| A|er |d|0007 | A|49998|0228873 drawing Data=h684-1505a10 |53711| A|er |d|0001 | A|49998|0051242 drawing Data=h684-1505a10 |53711| A|er |d|0001.1 | A|49998|0019823 drawing Data=h684-1505a10 |53711| A|er |d|0002 | A|49998|0064955 drawing Data=h684-1505a10 |53711| A|er |d|0003 | A|49998|0016187 drawing Data=h684-1505a10 |53711| A|er |d|0004 | A|49998|0039176 drawing Data=h684-1505a10 |53711| A|er |d|0005 | A|49998|0092840 drawing Data=h684-1505a11 |53711| A|er |d|0001 | A|49998|0044912 drawing Data=h684-1505a11 |53711| A|er |d|0001.1 | A|49998|0030478 drawing Data=h684-1505a11 |53711| A|er |d|0002 | A|49998|0072815 drawing Data=h684-1505a11 |53711| A|er |d|0003 | A|49998|0192093 drawing Data=h684-1505a11 |53711| A|er |d|0004 | A|49998|0178728 drawing Data=h684-1505a17 |53711| B|er |d|0001 | B|49998|0037760 drawing Data=h684-1505a17 |53711| B|er |d|0001.1 | B|49998|0035207 drawing Data=h684-1505a17 |53711| B|er |d|0001.2 | B|49998|0022573 drawing Data=h684-1505a17 |53711| B|er |d|0002 | B|49998|0054795 drawing Data=h684-1505a17 |53711| B|er |d|0003 | B|49998|0069519 drawing Data=h684-1505a17 |53711| B|er |d|0004 | B|49998|0033609 drawing Data=h684-1505a18 |53711| B|er |d|0001 | B|49998|0036238 drawing Data=h684-1505a18 |53711| B|er |d|0001.1 | B|49998|0028959 drawing Data=h684-1505a18 |53711| B|er |d|0001.2 | B|49998|0017111 drawing Data=h684-1505a18 |53711| B|er |d|0002 | B|49998|0054081 drawing Data=h684-1505a18 |53711| B|er |d|0003 | B|49998|0030868 drawing Data=h684-1505a22 |53711| A|er |d|0001 | A|49998|0041854 drawing Data=h684-1505a22 |53711| A|er |d|0001.1 | A|49998|0031258 drawing Data=h684-1505a22 |53711| A|er |d|0002 | A|49998|0049185 drawing Data=h684-1505a22 |53711| A|er |d|0003 | A|49998|0041149 drawing Data=h684-1505a22 |53711| A|er |d|0004 | A|49998|0200472 drawing Data=h684-1505a26 |53711| A|er |d|0001 | A|49998|0042850 drawing Data=h684-1505a26 |53711| A|er |d|0001.1 | A|49998|0021670 drawing Data=h684-1505a26 |53711| A|er |d|0002 | A|49998|0053195 drawing Data=h684-1505a26 |53711| A|er |d|0003 | A|49998|0201664 drawing Data=h684-1505a41 |53711| B|er |d|0001 | A|49998|0679677 drawing Data=h684-1505a45 |53711| A|er |d|0001 | A|49998|0259819 drawing Data=h684-1505a47 |53711| A|er |d|0001 | A|49998|0209879 drawing Data=h684-1505a53 |53711| B|er |d|0001 | B|49998|9999999 drawing Data=h684-1505a54 |53711| A|er |d|0001 | A|49998|1149113 drawing Data=h684-1505a63 |53711| A|er |d|0001 | A|49998|0231978 drawing Data=2621-625-03 |96169|al| |d|0001 |al|00026|0000000 drawing Data=2640-809x10 |96169| C| |d|0001 | C|00026|0000000 drawing Data=7285297 |53711| E| |d|0001 | E|49998|0862180 drawing Data=7285297 |53711| E| |d|0002 | E|49998|0392982 drawing Data=7285297 |53711| E| |d|0003 | E|49998|0280881 drawing Data=7285297 |53711| E| |d|0004 | E|49998|0204692 drawing Data=7286781 |53711| A| |d|0000.cov | A|49998|0039333 drawing Data=7286781 |53711| A| |d|0001 | A|49998|0079794 drawing Data=7286781 |53711| A| |d|0002 | A|49998|0037296 drawing Data=7286781 |53711| A| |d|0003 | A|49998|0009867 drawing Data=7286781 |53711| A| |d|0004 | A|49998|0010513 drawing Data=7286781 |53711| A| |d|0005 | A|49998|0026590 drawing Data=7286781 |53711| A| |d|0006.1 | A|49998|0060938 drawing Data=7286781 |53711| A| |d|0006.2 | A|49998|0058985 drawing Data=7286781 |53711| A| |d|0006.3 | A|49998|0056660 drawing Data=7286781 |53711| A| |d|0006.4 | A|49998|0057452 drawing Data=7286781 |53711| A| |d|0006.5 | A|49998|0062979 drawing Data=7286781 |53711| A| |d|0006.6 | A|49998|0022145 drawing Data=7286781 |53711| A| |d|0006.7 | A|49998|0036865 drawing Data=7286781 |53711| A| |d|0007.1 | A|49998|0024658 drawing Data=7286781 |53711| A| |d|0007.10 | A|49998|0039600 drawing Data=7286781 |53711| A| |d|0007.11 | A|49998|0038232 drawing Data=7286781 |53711| A| |d|0007.12 | A|49998|0026294 drawing Data=7286781 |53711| A| |d|0007.2 | A|49998|0034537 drawing Data=7286781 |53711| A| |d|0007.3 | A|49998|0034247 drawing Data=7286781 |53711| A| |d|0007.4 | A|49998|0034359 drawing Data=7286781 |53711| A| |d|0007.5 | A|49998|0035392 drawing Data=7286781 |53711| A| |d|0007.6 | A|49998|0034156 drawing Data=7286781 |53711| A| |d|0007.7 | A|49998|0033150 drawing Data=7286781 |53711| A| |d|0007.8 | A|49998|0039657 drawing Data=7286781 |53711| A| |d|0007.9 | A|49998|0040668 drawing Data=7286781 |53711| A| |d|0008.1 | A|49998|0028730 drawing Data=7286781 |53711| A| |d|0008.2 | A|49998|0043722 drawing Data=7286781 |53711| A| |d|0008.3 | A|49998|0012156 drawing Data=7286781 |53711| A| |d|0008.4 | A|49998|0008759 drawing Data=7286781 |53711| A| |d|0009 | A|49998|0175577 drawing Data=7286781 |53711| A| |d|0010 | A|49998|0134538 drawing Data=7286781 |53711| A| |d|0011 | A|49998|0172553 drawing Data=7286781 |53711| A| |d|0011.1 | A|49998|0087153 drawing Data=7286781 |53711| A| |d|0012 | A|49998|0126678 drawing Data=7286781 |53711| A| |d|0013 | A|49998|0100923 drawing Data=7286781 |53711| A| |d|0014 | A|49998|0137217 drawing Data=7286781 |53711| A| |d|0015 | A|49998|0088404 drawing Data=7286781 |53711| A| |d|0016 | A|49998|0138405 drawing Data=7286781 |53711| A| |d|0017 | A|49998|0112913 drawing Data=7286781 |53711| A| |d|0018 | A|49998|0112286 drawing Data=7286781 |53711| A| |d|0019 | A|49998|0114952 drawing Data=8617511 |53711| N| |d|0001 | N|49998|3447332 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b138 | | | |110101|a| | | document Ref Data=astm-b150 | | | |190401|a| | | document Ref Data=qq-n-281 | | |d |851023|a| 2| | document Ref Data=qq-n-286 | | |g |001207|a| | | document Ref Data=astm-b367 | | | |220401|a| | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=astm-e1417 | | | |160615|a| | | document Ref Data=astm-e1444 | | | |160601|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=astm-d4066 | | | |130701|a| | | document Ref Data=astm-d6456 | | | |100801|a| | | document Ref Data=sae Ams 6931 | | |d |171201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=mil-dtl-15024 | | |g |180303|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=qpl 25027 | | |17 |000207|a| | | document Ref Data=mil-dtl-32258 | | | |210601|a|2 | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |181118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | | document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;complete Towed Sonar Hull And Backup Ball Valve Assembly Must Be In Accordance With Naval Sea Systems Command Drawing 7286781 And All Drawings And Engineering Referrals Provided With This Contract/purchase Order, Except As Amplified Or Modified Herein.; 3.2 ;adiprene L100, Durometer 50-60 Shore A Is An Acceptable Alternate Material For The Static Seal (part 27) Of Navsea Drawing 7286781.; 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781; material - ;astm-b369, Alloy Uns C96400; part - ;shear Sleeve, Part 18 Of Drawing 7286781; material - ;astm-b138, Uns C67500, Temper H02; part - ;shear Seal Rod, Part 20 Of Drawing 7286781; material - ;qq-n-286, Form 2, Annealed And Age Hardened; part - ;valve Stem, Part 23, And Static Seal Shaft, Part 26 Of Drawing 7286781; material - ;astm-b150, Alloy C63200, Rod, Temper Tq50 Or Tq55; part - ;plug, Piece 17a Of Drawing 2621-625-03; material - ;qq-n-281 With Mechanical Properties In Accordance With General Note 16 On Drawing 2621-625-03; part - ;studs, Part 88 Of Drawing 7286781; material - ;mil-dtl-1222, Type Iv, Qq-n-286, Annealed And Age Hardened; part - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781; material - Qq-n-281, Class A Or B, With Chemical Composition In Accordance With Mil-dtl-32258. note: All Material Must Be The Same Class. self-locking Element - For 250 Degree Nuts Use Astm-d6456, Type 1 Or Astm-d4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 Degree Nuts Use Astm-d6456, Type 1. part - ;ball, Piece 17li Of Drawing 8617511; material - Sae-ams-6931 or centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6. note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6" to 10", Must Be Applied. part - ;seats (q3), Piece 16 Of Drawing 7285297; material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only) item Property Astm Test Method Value (a) Hardness D2240 70 +/- 5 Shore D (b) Specific Gravity D792 1.18 +/- 0.02 (c) Tensile Strength D412 (diec) 5000 Psi Min (d) Compression-defl D575 700 Psi Min @ 2% Def. (e) Tensile Impact D1822 300 Ft-lb/sq In (note 1) (type L Specimen) (f) Water Absorption D570 1.5% Max (1 Week At R.t.) note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum. 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification attribute - Annealing And Age Hardening item - ;shear Seal Rod, Part 20, And Stud, Part 88 Of Drawing 7286781; performance - Qq-n-286 test - ;dye Penetrant Inspection For Non-magnetic Grades; item - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781; performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444 (method C Solvent Removal Techniques Must Not Be Used On Thread) acceptance - ;nasm25027 With Sampling In Accordance With Mil-dtl-32258; test - ;visual Inspection (root Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - ;visual Inspection (final Layer); item - ;weldments; performance - ;t9074-as-gib-010/271; acceptance - ;mil-std-2035; test - Weldability Test Of Astm-b369 Material item - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781; performance - Astm-b369 acceptance - Astm-b369 test - Pressure Tests item - Each Assembly performance - ;general Notes 7001, 7003, 7006, And 7008; acceptance - ;general Notes 7001, 7003, 7006, And 7008; test - Quality Conformance Tests item - Self-locking Nuts performance - ;mil-dtl-32258; acceptance - ;mil-dtl-32258; attribute - Certificate Of Compliance item - Self-locking Nuts performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex self-locking Nuts. attribute - Certificate Of Completion item - Self-locking Nut Nonmetallic Insert performance - ;astm D6456, Type 1 Or Astm D4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5, Or 6; 3.5 Radiography Is Required On ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781; . 3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.7 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension. 3.8 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/. 3.9 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay. 3.10 ;surface Waviness Must Be Verified Prior To Teflon Coating.; 3.11 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;8; of Drawing ;8617511; . 3.11.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/ 3.11.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing. 3.12 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/ 3.13 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories: huntington Alloys, A Special Metals Company attn: Bill Bolenr 3200 Riverside Drive huntington, Wv 257059 phone: (304) 526-5889 fax: (304) 526-5973 metallurgical Consultants, Inc. attn: W. M. Buehler 4820 Caroline po Box 88046 houston, Tx 77288-0046 phone: (713) 526-6351 fax: (713) 526-2964 naval Surface Warfare Center, Carderock Division attn: Eric Focht Code 614 9500 Macarthur Blvd west Bethesda, Md 20817-5700 phone: (301) 227-5032 fax: (301) 227-5576 teledyne Allvac attn: Dr. W. D. Cao 2020 Ashcraft Ave. monroe, Nc 28110 phone: (704) 289-4511 fax: (704) 289-4269 westmoreland Mechanical Testing And Research Inc. attn: Andrew Wisniewski p.o. Box 388 youngstown, Pa 15696-0388 mannesmann Rohrenwerke mannesmann Forschungsinstitut (mfi) attn: Dr. Weiss postfach 251160 47251 Duisburg germany phone: 011-49-0203-9993194 fax: 011-49-0203-9994415 thyssenkrupp Vdm Usa, Inc. attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 houston, Tx 77065-4939 phone: (281) 955-6683 3.14 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.15 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222. 3.15.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows: a. Proper Product Lot Control And Traceability Must Be In Place. b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar. c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar. e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be performed On Studs As Required In Paragraph 4.5.2.7.e. 3.15.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The "alternate Mechanical Testing" Provision. 3.15.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above. 3.16 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286. 3.16.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286. 3.16.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be cut Or Ground Only. 3.17 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must be Performed On A Full Size Fastener.) 3.17.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222. 3.17.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order. 3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.20 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.22 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.23 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245356; ) Must Be Added. When No Plate Is Specified, An Identification plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached. 3.24 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.24.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.24.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.24.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.25 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.26 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.26.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.27 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. ^ Quality Assurance Requirements ^ 3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable. 3.28.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal. 3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.) 3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection. (a) Film (b) Rss/rsss (c) Rs (reader Sheets) (d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet) 3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.30 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.30.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.30.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.") 3.30.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And the Contract. 3.30.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.30.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.30.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.30.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.30.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.30.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.30.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.30.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.30.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Heavy Hex Nuts Must Be Marked In Accordance With Mil-dtl-32258; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds. 3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.32 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.32.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.32.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.32.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.32.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.32.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.33 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.33.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices and For Verification Of Their Accuracy And Condition. 3.33.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.34 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.35 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.35.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.35.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.35.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must be Established. Records Of This Effort Must Be Available For Review By The Government. 3.35.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.36 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.36.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.36.2 Inspection For Completeness And Proper Type. 3.36.3 Verification Of Material Quality Received. 3.36.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.36.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.36.6 Identification And Protection From Improper Use Or Disposition. 3.36.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.36.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.36.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.37 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.37.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.38 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The finished Component. 3.38.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.38.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.38.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;ball Must Be Marked In The Waterway And The Seats Must Be Marked On The Outer Cylindrical Surface.; 3.38.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats. seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification. 3.38.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.39 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply: 3.39.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As applicable, Of The Material Supplied. 3.39.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or composition, As Applicable, Of The Material Supplied. 3.39.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number _______________ And Heat Treat Number ______________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.39.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.39.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.39.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.40 Material Handling - The Written Material Control Process Must Include The Following: 3.40.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.40.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.40.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.40.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformanc
Closing Date10 Sep 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Aerospace and Defence
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n713.26|ghc|(717) 605-1884|joseph.d.weaver22.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208| inspection Of Supplies--fixed-price (aug 1996)|2||| wide Area Workflow Payment Instructions (jan 2023)|16|combo Invoice & Receiving||tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss| equal Opportunity (sep 2016)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic (nov2023))|5|||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (nov 2023))|5|||||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (mar 2023)|13|332911|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Purpose Of This Amendment Is To Allow Additional Time For Quotations To Besubmitted In Accordance With Solicitation N00104-24-q-lc29. all Other Terms And Conditions Of The Solicitation Shall Remain Unchanged. \ Accelerated Delivery Is Encouraged And Accepted Before The Delivery Date(s) Listed In The Schedule. ^^ "all Freight Is Fob Origin. this Rfq Is For Repair. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution.. Verify Nomenclature, Part Number, And Nsn Prior To Responding. the Government Is Seeking A Repair Turnaround Time (rtat) Of: 126 Days government Source Inspection (gsi) Is Required. please Note Freight Is Handled By Navy Cav Or Proxy Cav As Stated In Navsupwssfa24 Or Navsupwssfa25. your Quote Should Include The Following Information: Quote Amount And Rtat Unit Price:__________ Total Price:__________ Repair Turnaround Time (rtat): _______ Days if Your Company Is Not Quoting The Government's Required Repair Turnaround Time (rtat) Or Earlier, Provide Your Company's Capacity Constraints? _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ repair Turnaround Time (rtat): The Resultant Contractual Delivery Requirement Is Measured From Asset Return To The Date Of Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition asset At The Contractors Facility As Reflected In The Aaction Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth regular Business Day After Receipt And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtats Established In This contract. Check One: Firm-fixed-price ___ Estimated ___ Nte ___ Return Material Authorization # (rma), If Applicable:__________ Delivery Vehicle (if Delivery Order Requested) (if Your Company Has A Current Boa/idiq, For Example) :__________________ Testing And Evaluation If Beyond Repair T&e Fee/price (if Asset Is Determined Br/ber): If An Item Is Determined Br, And The Contractor Provides Documentation That Costs Were Incurred During Evaluation And Determination Of Br, The Contracting Officer Will Negotiate A Reduced Contract Price, Not-to exceed (nte) $___________associated With The Repair Effort To Reflect The Br Status Of The Equipment. The T&e Fee (if Asset Is Determined Br/ber) Was Determined/computed Based On:______________________________________. Awardee Info & Performance Location Awardee Cage: __________ Inspection & Acceptance Cage, If Not Same As ""awardee Cage"": __________ Facility/subcontractor Cage (where The Asset Should Be Shipped), If Not Same As ""awardee Cage"":__________ Iot Compare Repair Price To Price To Buy New New Unit Price:__________ New Unit Delivery Lead-time:__________ "important Note: Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Per Unit/per Month The Contractor Is Late - Any Delay Determined To Be Excusable (e.g. Government Delay) Will Not Result In A Price Reduction. If A price Reduction Is Required Due To Unexcusable Contractor Delay, The Contracting Officer Will Implement The Aforementioned Price Reduction Via A ""reconciliation Modification"" At The End Of The Contract Performance. Price Reductions Made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default. in Reference To The Above Important Note, The Contractor Provides The Following Price Reduction Amount Per Unit Per Month The Contractor Does Not Meet The Rtat: $__________, Up To A Maximum Of: $_________." poc:j.weaver (n713.26) email:joseph.d.weaver22.civ@us.navy.mil \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Repair And The Contract Quality Requirements For The Valve,globe . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.1.2 The "document Changes" Section Provides Supersessions/changes To Referenced Documents. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. drawing Data=6397408 |53711| C| |a|0001 | C|49998|0111026 drawing Data=6397408 |53711| C| |a|0002 | C|49998|0118636 drawing Data=6397408 |53711| C| |a|0003 | C|49998|0142391 drawing Data=6397408 |53711| C| |a|0004 | C|49998|0208918 drawing Data=6397408 |53711| C| |a|0005 | C|49998|0241375 drawing Data=6397408 |53711| C| |a|0005.a | C|49998|0050515 drawing Data=6397408 |53711| C| |a|0006 | C|49998|0067907 drawing Data=6397408 |53711| C| |a|0007 | C|49998|0067608 drawing Data=6397408 |53711| C| |a|0008 | C|49998|0067863 drawing Data=6397408 |53711| C| |a|0009 | C|49998|0069222 drawing Data=6397408 |53711| C| |a|0010 | C|49998|0074289 drawing Data=6397408 |53711| C| |a|0011 | C|49998|0065239 drawing Data=6397408 |53711| C| |a|0012 | C|49998|0069859 drawing Data=6397408 |53711| C| |a|0013 | C|49998|0073427 drawing Data=6397408 |53711| C| |a|0014 | C|49998|0091929 drawing Data=6397408 |53711| C| |a|0015 | C|49998|0105563 drawing Data=6397408 |53711| C| |a|0016 | C|49998|0099773 drawing Data=6397408 |53711| C| |a|0017 | C|49998|0110220 drawing Data=6397408 |53711| C| |a|0018 | C|49998|0071921 drawing Data=6397408 |53711| C| |a|0019 | C|49998|0060319 drawing Data=6397408 |53711| C| |a|0020 | C|49998|0072085 drawing Data=6397408 |53711| C| |a|0021 | C|49998|0051612 drawing Data=6397408 |53711| C| |a|0022 | C|49998|0081751 drawing Data=6397408 |53711| C| |a|0023 | C|49998|0052349 drawing Data=6397408 |53711| C| |a|0024 | C|49998|0081047 drawing Data=6397408 |53711| C| |a|0025 | C|49998|0053254 drawing Data=6397408 |53711| C| |a|0026 | C|49998|0082632 drawing Data=6397408 |53711| C| |a|0027 | C|49998|0054641 drawing Data=6397408 |53711| C| |a|0028 | C|49998|0070455 drawing Data=6397408 |53711| C| |a|0029 | C|49998|0049806 drawing Data=6397408 |53711| C| |a|0030 | C|49998|0071412 drawing Data=6397408 |53711| C| |a|0031 | C|49998|0050521 drawing Data=6397408 |53711| C| |a|0032 | C|49998|0076499 drawing Data=6397408 |53711| C| |a|0033 | C|49998|0052954 drawing Data=6397408 |53711| C| |a|0034 | C|49998|0123838 drawing Data=6397408 |53711| C| |a|0035 | C|49998|0133851 drawing Data=6397408 |53711| C| |a|0036 | C|49998|0138006 drawing Data=6397408 |53711| C| |a|0037 | C|49998|0124220 drawing Data=6397408 |53711| C| |a|0038 | C|49998|0087064 drawing Data=6397408 |53711| C| |a|0039 | C|49998|0105463 drawing Data=6397408 |53711| C| |a|0040 | C|49998|0092263 drawing Data=6397408 |53711| C| |a|0041 | C|49998|0098859 drawing Data=6397408 |53711| C| |a|0042 | C|49998|0110718 drawing Data=6397408 |53711| C| |a|0043 | C|49998|0060485 drawing Data=6397408 |53711| C| |a|0044 | C|49998|0093955 drawing Data=6397408 |53711| C| |a|0045 | C|49998|0061510 drawing Data=6397408 |53711| C| |a|0046 | C|49998|0111652 drawing Data=6397408 |53711| C| |a|0047 | C|49998|0107134 drawing Data=6397408 |53711| C| |a|0048 | C|49998|0079527 drawing Data=6397408 |53711| C| |a|0049 | C|49998|0104723 drawing Data=6397408 |53711| C| |a|0050 | C|49998|0073178 drawing Data=6397408 |53711| C| |a|0051 | C|49998|0050581 drawing Data=6397408 |53711| C| |a|0051.a | C|49998|0042631 drawing Data=6397408 |53711| C| |a|0052 | C|49998|0192884 drawing Data=6397408 |53711| C| |a|0053 | C|49998|0217044 drawing Data=6397408 |53711| C| |a|0054 | C|49998|0198162 drawing Data=6397408 |53711| C| |a|0055 | C|49998|0221571 drawing Data=6397408 |53711| C| |a|0056 | C|49998|0114011 document Ref Data=mil-std-100 | | |g |011214|a| | | document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=mil-std-798 | | | |880229|a| |01| document Ref Data=mil-a-8625 | | |f |030915|a| 1| | document Ref Data=mil-c-15726 | | |f |911008|a| 1| | document Ref Data=mil-b-24480 | | |a |910326|a| | | document Ref Data=mil-i-45208 | | |a |961001|a|2 | | document Ref Data=mil-s-46163 | | |a |010323|a| 2| | document Ref Data=mil-r-83248 | | |c |010621|a| | | document Ref Data=astm-b164 | | | |930215|a| | | document Ref Data=astm-d2000 | | | |910225|a| | | document Ref Data=mil-prf-20042 | | |e |990916|a| | | document Ref Data=astm-b209m | | | |931115|a| | | document Ref Data=astm-a231/a231m | | | |941003|a| | | document Ref Data=astm-b26/b26m | | | |920515|a| | | document Ref Data=astm-a276 | | | |940315|a| | | document Ref Data=astm-b36/b36m | | | |910222|a| | | document Ref Data=astm-b446 | | | |941003|a| | | document Ref Data=astm-a479/a479m | | | |940115|a| | | document Ref Data=astm-d523 | | | |890331|a| | | document Ref Data=astm-b61 | | | |930215|a| | | document Ref Data=astm-d751 | | | |890428|a| | | document Ref Data=mil-prf-81733 | | |d |980515|a| | | document Ref Data=iso9001 | | | |010417|a| | | document Ref Data=mil-std-973 | | | |000930|a| |03| document Change Data=mil-f-20042 |mil-prf-20042 document Change Data=mil-s-81733 |mil-prf-81733 document Change Data=qq-a-601 |astm-b26 3. Requirements 3.1 ;the Valve Assembly Shall Be Repaired/refurbished In Accordance With Naval Sea Systems Command Drawing 803-6397408. Assembly Part Number 803-6397408-assy 92 Applies. One Manual Operator Wrench, Test Fitting, One 3/8 Inch Union Nut (pc 199), Female tailpiece (pc 200), And O-ring (pc 204) Shall Be Supplied With Each Valve Assembly.; 3.1.1 ;each Valve Assembly Shall Be Completely Disassembled, Cleaned, And Visually And Dimensionally Examined For Evidence Of Wear Or Damage. All Defective Parts Shall Be Repaired Or Replaced. 100% Replacement Of The Following Parts Are Required: Seat, Disk, disk Gasket, Diaphragm, And O-ring Seals. The Valve Shall Be Assembled And Tested As Specified Elsewhere In The Purchase Order/contract.; 3.2 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 3.3 Configuration Control In Accordance With Mil-std-973 Short Form Procedures - The Requirements Of Mil-std-973 Are Hereby Invoked In The Contract/purchase Order. The Tailoring Notes Stated In The Order Cited In Paragraph 6.2.1.3 Are Stated Below: A. Considered, Tailoring Implemented B. Automated Processing And Submittal Is Not Required. Interactive Access To Digital Data Is Not Required. C. Configuration Audits Are Not Required. D. Contractor's Configuration Management Plan Is Not Requried. E. Configuration Terminology Development Documentation Is Required. F. Only Paragraphs 5.3.3.2, 5.3.6.4, 5.3.6.7, 5.3.6.7.3 Are Required. G. Fcd Is Not Required. H. Acd And Pcd Is Not Required. I. Not Applicable (na) To This Contract/purchase Order. J. Na To This Contract/purchase Order. K. Na To This Contract/purchase Order. L. Paragraph 5.3.6 With The Exception Of Paragraph 5.3.6.5 And 5.3.6.7.1 Are Required. M. Paragraph 5.3.6.6 And 5.3.6.6.2 Are Required. N. Paragraph 5.3.6.6.1 Is Not Required Unless Specifically Cited Elsewhere In Section "c" Of This Contract/purchase Order. O. The Marking Requirement Is Stated Elsewhere In Section "c" Of This Contract/purchase Order. P. Interface Requirements Are As Specified On The Drawings Provided With This Contract/purchase Order Or The Primary Equipment Performance Mil-spec Or Std Cited In Section "c" Of This Contract/purchase Order. Q. Na To This Contract/purchase Order. R. All Class I Changes To Either A Government Owned Configuration Identification (ci) Or Baseline Configuration Shall Be Submitted To The Procurement Contracting Officer For Review And Subsequent Approval - Conditional Approval Or Disapproval. Ndi, Cots, And Pdi Items Previously Accepted By The Government Shall Be Submitted As Above. This Process Does Not Excuse The Contractor From Initially Offering To The Government An Item Which Meets The Minimum Technical And Operational Requirements Set Forth In This Contract/ Purchase Order. S. Preliminary Change Notices And Advance Change Study Notices Are Not Required. T. Na To This Contract/purchase Order. U. And V. Class Ii Engineering Change Proposal (ecp) May Be Carried Through Provided The Government Qar Reviews And Concurs With The Classification Review Which Resulted In The Ecp Being Classified As Class Ii. W. Paragraph 5.4.3 Is Required. X. Paragraph 5.4.4 Is Required. Y. Nors Are Not Required For This Contract/purchase Order. Z. Short Form Procedures Are Allowed. Aa. Paragraph 5.5.2 Is Not Required For This Contract/purchase Order. Ab. Paragraph 5.5.7 Is Not Required For This Contract/purchase Order. Ac. Paragraph 5.5.8 Is Not Required For This Contract/purchase Order. Ad. Paragraph 5.6.2 Is Not Required For This Contract/purchase Order. Ae. Paragarph 5.6.3 Is Not Required For This Contract/purchase Order. Af. Paragraph 5.4.2.2.3.2b Is Not Required For This Contract/purchase Order. 3.3.1 Configuration Control - When The Contractor Has Received Authorization On A Prior Contract For The Same Nsn For The Use Of A Drawing Of A Later Revision Status, That Authorization Is Hereby Extended To All Succeeding Contracts/purchase Orders Until another Drawing Revision Is Approved. The Contractor Will Notify The Pco Of This Occurrence In Each Instance, In The Response To The Solicitation. Such Notification Shall Be In Writing Setting Forth The Contract Under Which The Prior Authorization Was Granted, the Date Of The Granting Of The Authorization, And The Name Of The Granting Authority. Contractors Shall Also Refer Technical Inquiries (other Than Those Covered By Mil-std-973) On Company Letterhead Signed By A Responsible Company Official, With Copies Distributed As Stated Below. The Original And Two Copies Of All Contractor Generated Correspondence Regarding Configuration Shall Be Submitted To Contracting Officer, Navicp-mech, P.o. Box 2020, Mechanicsburg, Pa 17055-0788. Contractors Are Cautioned That Implementing Engineering Changes, Waivers, Deviations Or Technical Inquiries Into The Contract/purchase Order Without Approval Of The Contracting Officer Will Be At The Sole Risk Of The Contractor. 3.4 Qualification Requirements - This Item Contains Components That Must Be Manufactured By A Government Qualified Products List (qpl) Supplier. 3.5 Marking - This Item Shall Be Physically Identified In Accordance with ;general Note 7 Of Drawing 803-6397408; . 3.6 Production Lot Approval (contractor Testing) - Production Lot Test And Approval Is Required. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Inspection System Requirements - The Supplier Shall Provide And Maintain An Inspection/quality System Acceptable To The Government. The Inspection System Requirements For This Contract/purchase Order Shall Be In Accordance With Mil-i-45208. Suppliers certified To Perform Under Iso 9001 Or Iso 9002 Are Granted Permission To Utilize The One Desired In Lieu Of Mil-i-45208. 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies. 4.5 Production Lot Test (contractor) - The Contractor Shall Perform 100% Production Testing In Accordance With ;general Notes 6.a Thru 6.c Of Drawing 803-6397408; . 4.6 Production Lot Test/inspection Report - The Contractor Shall Prepare And Submit A Report In Accordance With The Contract Data Requirements List (dd Form 1423). each Lot Of Diaphragm Material Shall Be Tested In Accordance With General Notes 6.d Of Drawing 803-6397408. Certification Of Tests Are Required. 4.7 Visual, Dimensional, Mechanical Examination - Each Valve,globe Shall Be 100% Inspected In Accordance With ;drawing 803-6397408; . 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 7 (seven) Seperate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer. date Of First Submission=asreq ;paragraphs 10.2.2 (b,c,d) And 10.2.3 Of Di-ndti-80492 Do Not Apply. Block 12-submit For Dcmao Approval Upon Completion Of Test. Forward Approvedcopy With Dd Form 250 To Navicp-m Pco At Time Of Shipment.; block 12 - Resubmit No Later Than ;30; Days After Disapproval. date Of First Submission=asreq ;paragraphs 10.2.2, 10.2.3, 10.3.1, And 10.4 Of Di-misc-80678 Do Not Apply. Certification Shall Be For Tests Specified By General Notes 6.d Of Drawing 803-6397408. Submit For Dcmao Approval Upon Completion Of Tests. Forward Approved Copy With Dd Form 250 To navicp-m Pco At Time Of Shipment.; block 12 - Resubmit No Later Than ;30; Days After Disapproval.
Closing Date13 Mar 2024
Tender AmountRefer Documents 
661-670 of 814 archived Tenders