Astm D Tenders
Astm D Tenders
U S COAST GUARD USA Tender
Aerospace and Defence
United States
Description: The United States Coast Guard Surface Forces Logistics Center Has A Requirement And Requesting Quotations For The Following Part:
item 1)
5985 99-578-7856
antenna
mfg Name: Thales Uk Ltd Land & Joint Systems
part_nbr: 604818-00
qty: 8 /ea
part Of As-200 Active Receive Side Of Rfds / Hfts
antenna, Hf, Active Rx 0.01 - 30 Mhz, Oem: Thales Defense & Security, Inc.
note: All Of These Items Must Be Individually Packaged, Protected And Marked
according To Mil-std-2073-1e W/change 1 7 January 2011 Military Packaging; Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, Heat-sealable; And Mil-std-129pch4 Military Marking (mil-std-129pch4 Military Marking, Page 39 Of Spec). Copies Included With This Saps Package.
note: All Units Composed Of Individual Piece Parts Which When Assembled Make One Unit Must Be Packed Within One Box. Please Contact Michael Beimel At 716-485-8107 If You Have Questions. Each Unit To Have Electrostatic Protection Iaw Type Iii, Class I Of Mil-prf-81705e_amendment-1 Barrier Materials, Flexible, Electrostatic Discharge Protective, Heat-sealable; If Required.
each Item To Be Individually Packaged Iaw The Following: Mil-std-2073-1e W/change 17 January 2011, Method 10 Astm-d-3951-10 Packing, Commercial (if Specifically Authorized By The Government)
each Item To Be Individually Marked Iaw The Following: Mil-std-129p Change 4, Sept 2007 Marking For Shipment And Storage
bar Coding Required, If Capable, To Comply With The Following: Mil-std-129pch4
military Marking. See 4.4, Page 47 Of This Specification For Identification Linear
(code 39) And 2d (pdf417) Bar Code Markings And Locations.
delivery Shall Be F.o.b. Destination To Uscg Surface Forces Logistics Center, 2401 Hawkins Point Road, Baltimore Md 21226
substitute Parts Are Not Acceptable. It Is Anticipated That A Non-competitive Sole Source Purchase Order Shall Be Awarded As A Result Of This Synopsis/solicitation. It Is The Government’s Belief That Only Thales And/or Their Authorized Distributors Can Provide This Unit. Concerns Having The Expertise And Required Capabilities To Provide This Item Are Invited To Submit Complete Information Discussing The Same Within Two (2) Calendar Days From The Day This Notice Posted. The Data Must Include Sufficient Detail To Allow The Coast Guard To Evaluate The Proposal Relative To The Requirements. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Distributor, And Verifying The Oem Will Supply Genuine Oem Parts.
this Is A Combined Synopsis/solicitation For A Commercial Item Prepared In Accordance With The Format Outlined In Far Subpart 12.6, 2025-01 11/12/2024 And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Naics Code For This Solicitation Is 237130 And The Business Size Standard Is 500. The Resultant Purchase Order Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far 13
the U.s. Coast Guard Intends To Award On An All Or None Basis To A Responsible Offeror Whose Offer Conforming To The Solicitation Will Be The Most Advantageous To The Government. Award Will Be Lowest Price Technically Acceptable. The Coast Guard Intends To Award On A Firm Fixed Price Contract.
all Responsible Sources May Submit A Quotation Via Email To Eric.i.goldstein@uscg.mil, Which If Timely Received, Shall Be Considered By The Agency. Companies Must Have Valid Duns Numbers And Be Registered With Systems For Award Management (sam) And Shall Provide The Company Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is Jan 22th, 2025 At _9:00 Am Eastern Standard Time
offerors Must Submit The Following Information On Their Quote:
disclosure: The Offeror Under This Solicitation Represents That [check One]:
__ It Is Not A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73;
__ It Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Has Submitted A Request For Waiver Pursuant To 3009.104-74, Which Has Not Been Denied; Or
__it Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Plans To Submit A Request For Waiver Pursuant To 3009.104-74. (g) A Copy Of The Approved Waiver, If A Waiver Has Already Been Granted, Or The Waiver Request, If A Waiver Has Been Applied For, Shall Be Attached To The Bid Or Proposal.
(end Of Provision)
the Following Far Clauses Provisions Apply To This Solicitation. Far 52.212-1, Instructions To Offerors-commercial Items (june 2020); Far 52.212-3, Offeror Representations And Certifications-commercial Items (november 2020) With Alternate I. Offeror(s) Must Include A Completed Copy Of Far 52.212-3 With Their Quote.
the Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Www.arnet.gov.; Far 52.212-4, Contract Terms And Conditions-commercial Items (oct 2018); Far 52.212-5, Contract Terms & Conditions Required To Implement Statutes Or Executive Orders-commercial Items (november 2020). The Following Clauses Listed Within Far 52.212-5 Are Applicable:
52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (june 2020)
52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (october 2022)
52.219-28, Post Award Small Business Program Rerepresentation (feb 2024)
52.222-3, Convict Labor (june 2003)
52.222-19, Child Labor—cooperation With Authorities And Remedies (feb 2024) (e.o. 13126).
52.222-21, Prohibition Of Segregated Facilities (apr 2015).
52.222-26, Equal Opportunity (sep 2016) (e.o. 11246).
52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793).
52.222-50, Combating Trafficking In Persons (nov 2021)
52.226-8, Encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024)
52.225-13, Restrictions On Certain Foreign Purchases (feb 2021)
52.232-33, Payment By Electronic Funds Transfer— System For Award Management (october 2018)
52.225-3, Buy American--free Trade Agreements--israeli Trade Act (nov 2023)
the Following Items Are Incorporated As Addenda To This Solicitation: Copies Of Hsar Clauses May Be Obtained Electronically At Www.dhs.gov.
cgap 3042.302-90 Valuation Requirements For The Acquisition Of Spare Parts Purchased For Inventory Control Points From Hq Contracts (oct 2008). Copies Of Cgap Clauses May Be Obtained Electronically At: Www.uscg.mil/acquisition/procurement/pdf/cim_4200_19h.pdf
Closing Date22 Jan 2025
Tender AmountRefer Documents
U S COAST GUARD USA Tender
Others
United States
Description: The United States Coast Guard Surface Forces Logistics Center Has A Requirement And Requesting Quotations For The Following Part:
item 1)
nsn: 6665-01-714-1340
gas Monitor
ultima X5000 Gas Monitor, H2s Gas Detection, 0 To 100 Ppm, With Analog Output, Relays, Organic Led Display And Touch Button Interface.
a-x5000 - Model
0 - Stainless Steel
m - Approval Authority - Fm
0 - Bluetooth Compatible
1 - Analog / Hart / Relays
26 - Gas , Hydrogen Sulphide (h2s)
00 - Room For Second Sensor, No Sensor Listed
0 - No Tag
each Item Shall Be Individually Packaged In Accordance With Mil-std-2073-1e Method 10 In An Appropriately Sized Astm-d5118 Heavy Duty Double-wall Fiberboard Box Cushioned As Appropriate To Prevent Damage From Movement Or External Impact.
marking Iaw Mil-std-129r Except Bar Coded Iaw Iso/iec-16388-2007, Code 39 Symbology
all Items Are Inspected When Delivered To The Coast Guard Warehouse. Failure To Meet The Requirements For Packaging, Packing, Marking (pp&m) And Bar-coding Will Result In The Item(s) Being Rejected And Possibly Returned To The Vendor. This Will Delay Payment. Any Questions Concerning The Pp&m Requirements Or Bar-coding Should Be Addressed With The Contracting Officer Prior To Contract Award.
mfg: Msa The Safety Company
pn: A-x5000-0-m-0-1-0-26-00-0
qty: 15 Ea
this Is A Combined Synopsis/solicitation For A Commercial Item Prepared In Accordance With The Format Outlined In Far Subpart 12.6, Fac 2025-02 (jan 3, 2025) And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Naics Code For This Solicitation Is 335519 And The Business Size Standard Is 600. The Resultant Purchase Order Will Be Awarded Using Simplified Acquisition Procedures In Accordance With Far 13.106 Apply.
substitute Parts Are Not Acceptable. It Is Anticipated That A Non-competitive Sole Source Purchase Order Shall Be Awarded As A Result Of This Synopsis/solicitation. It Is The Government’s Belief That Only Msa The Safety Company And/or Their Authorized Distributors Can Offer These Units. Concerns Having The Expertise And Required Capabilities To Provide This Item Are Invited To Submit Complete Information Discussing The Same Within Two (2) Calendar Days From The Day This Notice Posted. The Data Must Include Sufficient Detail To Allow The Coast Guard To Evaluate The Proposal Relative To The Requirements. The Information Submitted Must Include A Letter From The Oem Verifying The Offeror Is An Authorized Distributor Verifying The Oem Will Supply Genuine Oem Parts.
the U.s. Coast Guard Intends To Award On An All Or None Basis To A Responsible Offeror Whose Offer Conforming To The Solicitation Will Be The Most Advantageous To The Government. Award Will Be Lowest Price Technically Acceptable. The Coast Guard Intends To Award On A Firm Fixed Price Contract.
all Responsible Sources May Submit A Quotation, Which If Timely Received, Shall Be Considered By The Agency. Companies Must Have Valid Duns Numbers And Be Registered With Systems For Award Management (www.sam.gov) And Shall Provide The Company Tax Information Number (tin) With Their Offer. The Closing Date And Time For Receipt Of Quote Is January 22, 2025, At 10:00 Am Eastern Standard Time
offerors Must Submit The Following Information On Their Quote:
disclosure: The Offeror Under This Solicitation Represents That [check One]:
__ It Is Not A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73;
__ It Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Has Submitted A Request For Waiver Pursuant To 3009.104-74, Which Has Not Been Denied; Or
__it Is A Foreign Incorporated Entity That Should Be Treated As An Inverted Domestic Corporation Pursuant To The Criteria Of (hsar) 48 Cfr 3009.104-70 Through 3009.104-73, But It Plans To Submit A Request For Waiver Pursuant To 3009.104-74. (g) A Copy Of The Approved Waiver, If A Waiver Has Already Been Granted, Or The Waiver Request, If A Waiver Has Been Applied For, Shall Be Attached To The Bid Or Proposal
__hsar 3052.209-70 Prohibition On Contracts With Corporate Expatriates (june 2006)
(end Of Provision)
the Following Far Clauses Provisions Apply To This Solicitation. Far 52.212-1, Instructions To Offerors-commercial Items (sep 2023); Far 52.212-3, Offeror Representations And Certifications-commercial Items (may 2024) With Alternate I, Offeror(s) Must Include A Completed Copy Of Far 52.212-3 With Their Quote.
the Following Far Clauses Apply To This Solicitation. Offerors May Obtain Full Text Versions Of These Clauses Electronically At Www.acquisition.gov.; Far 52.212-4, Contract Terms And Conditions-commercial Items (nov 2023); Far 52.212-5, Contract Terms & Conditions Required To Implement Statutes Or Executive Orders-commercial Items (jan 2025).
the Following Clauses Listed Within Far:
52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015)
52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553)
52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77, 108-78 (19 U.s.c. 3805 Note)
the Following Clauses Listed Within 52.212-5 Are Applicable:
far 52.203-6 Restrictions On Subcontractor Sales To The Government (jun 2020, With Alternate I (nov 2021)
far 52.219-4, Notice Of Price Evaluation Preference For Hubzone Small Business Concerns (mar 2020)
52.204-10, Reporting Executive Compensation And First-tier Subcontract Awards (june 2020)
52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (june 2020) (31 U.s.c. 6101 Note).
far 52.219-28, Post Award Small Business Program Representation (feb 2024)(15 U.s.c. 632(a)(2)
far 52.222-3, Convict Labor (jun 2003)(e.o. 11755)
far 52.222-19 Child Labor-cooperation With Authorities And Remedies (feb 2024) (e.o. 13126)
far 52.222-21, Prohibition Of Segregated Facilities (april 2015)
far 52.222-26, Equal Opportunity (sep 2016)(e.o. 11246)
far 52.222-36, Equal Opportunity For Workers With Disabilities (jun 2020)
far 52.222-50, Combat Trafficking In Persons (nov 2021)(22 U.s.c. Chapter 78 And E.o. 13627)
far 52.225-1 Buy American Act-supplies (oct 2022)
far 52.225-3, Buy American Act-free Trade Agreement (nov 2023)(41 U.s.c. 10a-10d)
far 52.225-13, Restrictions On Certain Foreign Purchases (feb 2021)
52.232-33, Payment By Electronic Funds Transfer-system For Award Management (oct 2018)(31 U.s.c. 3332).
the Following Items Are Incorporated As Addenda To This Solicitation: Copies Of Hsar Clauses May Be Obtained Electronically At Www.dhs.gov.
cgap 3042.302-90 Valuation Requirements For The Acquisition Of Spare Parts Purchased For Inventory Control Points From Hq Contracts (oct 2008). Copies Of Cgap Clauses May Be Obtained Electronically At: Www.uscg.mil/acquisition/procurement/pdf/cim_4200_19h.pdf
Closing Date22 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n97113a|fbb|717-605-4356|joshua.d.martin76.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
inspection Of Supplies--fixed-price (aug 1996)|2|||
special Shipping And Marking Instructions|6|x||x||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|tbd|n/a|n/a|n/a|n/a|joshua.d.martin76.civ@us.navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
annual Representations And Certifications (may 2024)|13|332722|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
go To Www.https://beta.sam.gov/
click: Contract Opportunities And Enter The Solicitation Number. This Gives You Access To The Electronic Solicitation.
drawings Can Be Viewed Or Downloaded.
government Source Inspection Per Far 52.246-2 Is Required.
delivery_______________days.
all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited Inthe Mail, Transmitted By Facsimile, Or
Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
1. Scope
1.1 This Contract/purchase Order Contains The Requirements For Manufacture Of The Washer Flat Cres .
2. Applicable Documents
2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
drawing Data=2673184 |10001| T| |d|0001 | T|49998|0639426
document Ref Data=mil-std-130 | | |m |051202|a| | |
document Ref Data=astm-d2700 | | | |841026|a| | |
document Ref Data=nasm15795 | | | |000207|a| | |
document Ref Data=astm-a276 | | | |940315|a| | |
document Ref Data=astm-a380 | | | |880325|a| | |
document Ref Data=astm-a479/a479m | | | |940115|a| | |
document Ref Data=astm-a967 | | | |970331|a| | |
3. Requirements
3.1 Manufacturing And Design - The Washer Flat Cres Furnished Under This Contract/purchase Order Shall Meet The Material And Physical Requirements As Specified ;on Drawing 2673184p26 (10001) Rev T; .
3.2 Marking - Unless Marking Requirements Are Specified By A Document Or Drawing Cited In This Solicitation All Items Delivered Under This Contract/purchase Order Shall Be Marked And Identified In Accordance With The Applicable Military Standards And
specifications As Follows:
Mechanical Parts, Assemblies And Equipments - Mil-std-130
Electrical And Electronic Parts - Mil-std-1285, Method 1.
Electrical And Electronic Parts And Assemblies Not Covered
By Mil-std-1285-use Mil-std-130.
Electronic Equipment - Mil-std-454 Requirement Number 67.
Electrical Equipment - Mil-p-15024/5 (ships)
3.3 Configuration Control - Mil-std-973 Entitled "configuration Management", Paragraph 5.4.8, Configuration Control (short Form Procedure), Is Hereby Incorporated. The Contractor Shall Submit All Engineering Change Proposals In Accordance With Mil-std-973,
paragraph 5.4.8.2 And Appendix D. Requests For Deviations Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.3 And Appendix E. Requests For Waivers Shall Be Processed In Accordance With Mil-std-973, Paragraph 5.4.8.4 And Appendix E. (original
and Two Copies Shall Be Submitted To Contracting Officer, Navicp-mech, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
4. Quality Assurance
4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order,
the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The
specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements.
4.2 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any
inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance
does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material.
4.3 Records - Records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of Contract/purchase Order And For A Period Of 365 Calendar Days After Final Delivery Of Supplies.
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products.
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies.
C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410p, 101 Strauss Avenue
Indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
Contracting Officer
Navicp-mech
Code 87321
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From:
Commanding Officer
Navicp-mech
Code 009
5450 Carlisle Pike
P.o. Box 2020
Mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
Naval Inventory Control Point
Code 1 Support Branch
700 Robbins Avenue
Phildelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech.
6.2 Ordinance Document (od) Controlled Items - Award For An Item Will Be Made Only To The Vendor(s) Listed On ;od36190; . A Substitute Item Is Not Authorized Without Prior Testing And Approval.
Contractors Are Cautioned That Award Of This Contract/purchase Order Will Not Be Delayed Solely For The Purpose Of Approving Additional Sources.
Contractors Desiring To Provide A Substitute Item Are Urged To Contact The Government Pco To Arrange For Testing And, If Approved, Added To The Od
as An Approved Source Of Supply For Subsequent Procurements.
on Drawing 2673184p26 (10001) Rev T
\
Closing Date21 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001|four|750||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |na|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|na|na|n39040 - Certifications|na|na|s
ee Dd 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
limitation Of Liability--high-value Items ($100k)(feb 1997)|1||
limitations On Pass-through Charges (jun 2020)|1||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|332919|750 Employees||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
facsimile Proposals (oct 1997)|1||
type Of Contract (apr 1984)|1|firm Fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Amendment Is Issued Due To Quantity Change Of Requirement. Closing Date Extended To 27 Jan 2025.
this Amendment Is Issued To Extend Closing Date To 10 Sep 2024.
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mech.
2.drawings Associated With This Solicitation Will Be Made Available On The New Beta.sam Website, But Will Be Restricted Access Which Needs To Be Approved. Once Access Has Been Requested, Interested Vendors Should Email The Poc Listed On The Solicitation To Inform
them Of The Request.
3. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
4. This Is A Rated Order Certified For National Defense Use,and The Contractor Will Follow All The Requirements Ofthe Defense Priorities And Allocations Systemregulation (15 Cfr 700).
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
drawing Data=h684-1505a01 |53711| A|er |d|0001 | A|49998|0059711
drawing Data=h684-1505a01 |53711| A|er |d|0002 | A|49998|0060531
drawing Data=h684-1505a01 |53711| A|er |d|0003 | A|49998|0166290
drawing Data=h684-1505a05 |53711| A|er |d|0001 | A|49998|0039892
drawing Data=h684-1505a05 |53711| A|er |d|0001.1 | A|49998|0011824
drawing Data=h684-1505a05 |53711| A|er |d|0002 | A|49998|0068709
drawing Data=h684-1505a05 |53711| A|er |d|0003 | A|49998|0049591
drawing Data=h684-1505a05 |53711| A|er |d|0004 | A|49998|0064381
drawing Data=h684-1505a05 |53711| A|er |d|0005 | A|49998|0066716
drawing Data=h684-1505a05 |53711| A|er |d|0006 | A|49998|0019662
drawing Data=h684-1505a05 |53711| A|er |d|0007 | A|49998|0277934
drawing Data=h684-1505a05 |53711| A|er |d|0008 | A|49998|0228605
drawing Data=h684-1505a05 |53711| A|er |d|0009 | A|49998|0202813
drawing Data=h684-1505a08 |53711| A|er |d|0001 | A|49998|0063220
drawing Data=h684-1505a08 |53711| A|er |d|0001.1 | A|49998|0023665
drawing Data=h684-1505a08 |53711| A|er |d|0002 | A|49998|0111529
drawing Data=h684-1505a08 |53711| A|er |d|0003 | A|49998|0076624
drawing Data=h684-1505a08 |53711| A|er |d|0004 | A|49998|0043485
drawing Data=h684-1505a08 |53711| A|er |d|0005 | A|49998|0052444
drawing Data=h684-1505a08 |53711| A|er |d|0006 | A|49998|0060448
drawing Data=h684-1505a08 |53711| A|er |d|0007 | A|49998|0228873
drawing Data=h684-1505a10 |53711| A|er |d|0001 | A|49998|0051242
drawing Data=h684-1505a10 |53711| A|er |d|0001.1 | A|49998|0019823
drawing Data=h684-1505a10 |53711| A|er |d|0002 | A|49998|0064955
drawing Data=h684-1505a10 |53711| A|er |d|0003 | A|49998|0016187
drawing Data=h684-1505a10 |53711| A|er |d|0004 | A|49998|0039176
drawing Data=h684-1505a10 |53711| A|er |d|0005 | A|49998|0092840
drawing Data=h684-1505a11 |53711| A|er |d|0001 | A|49998|0044912
drawing Data=h684-1505a11 |53711| A|er |d|0001.1 | A|49998|0030478
drawing Data=h684-1505a11 |53711| A|er |d|0002 | A|49998|0072815
drawing Data=h684-1505a11 |53711| A|er |d|0003 | A|49998|0192093
drawing Data=h684-1505a11 |53711| A|er |d|0004 | A|49998|0178728
drawing Data=h684-1505a17 |53711| B|er |d|0001 | B|49998|0037760
drawing Data=h684-1505a17 |53711| B|er |d|0001.1 | B|49998|0035207
drawing Data=h684-1505a17 |53711| B|er |d|0001.2 | B|49998|0022573
drawing Data=h684-1505a17 |53711| B|er |d|0002 | B|49998|0054795
drawing Data=h684-1505a17 |53711| B|er |d|0003 | B|49998|0069519
drawing Data=h684-1505a17 |53711| B|er |d|0004 | B|49998|0033609
drawing Data=h684-1505a18 |53711| B|er |d|0001 | B|49998|0036238
drawing Data=h684-1505a18 |53711| B|er |d|0001.1 | B|49998|0028959
drawing Data=h684-1505a18 |53711| B|er |d|0001.2 | B|49998|0017111
drawing Data=h684-1505a18 |53711| B|er |d|0002 | B|49998|0054081
drawing Data=h684-1505a18 |53711| B|er |d|0003 | B|49998|0030868
drawing Data=h684-1505a22 |53711| A|er |d|0001 | A|49998|0041854
drawing Data=h684-1505a22 |53711| A|er |d|0001.1 | A|49998|0031258
drawing Data=h684-1505a22 |53711| A|er |d|0002 | A|49998|0049185
drawing Data=h684-1505a22 |53711| A|er |d|0003 | A|49998|0041149
drawing Data=h684-1505a22 |53711| A|er |d|0004 | A|49998|0200472
drawing Data=h684-1505a26 |53711| A|er |d|0001 | A|49998|0042850
drawing Data=h684-1505a26 |53711| A|er |d|0001.1 | A|49998|0021670
drawing Data=h684-1505a26 |53711| A|er |d|0002 | A|49998|0053195
drawing Data=h684-1505a26 |53711| A|er |d|0003 | A|49998|0201664
drawing Data=h684-1505a41 |53711| B|er |d|0001 | A|49998|0679677
drawing Data=h684-1505a45 |53711| A|er |d|0001 | A|49998|0259819
drawing Data=h684-1505a47 |53711| A|er |d|0001 | A|49998|0209879
drawing Data=h684-1505a53 |53711| B|er |d|0001 | B|49998|9999999
drawing Data=h684-1505a54 |53711| A|er |d|0001 | A|49998|1149113
drawing Data=h684-1505a63 |53711| A|er |d|0001 | A|49998|0231978
drawing Data=2621-625-03 |96169|al| |d|0001 |al|00026|0000000
drawing Data=2640-809x10 |96169| C| |d|0001 | C|00026|0000000
drawing Data=7285297 |53711| E| |d|0001 | E|49998|0862180
drawing Data=7285297 |53711| E| |d|0002 | E|49998|0392982
drawing Data=7285297 |53711| E| |d|0003 | E|49998|0280881
drawing Data=7285297 |53711| E| |d|0004 | E|49998|0204692
drawing Data=7286781 |53711| A| |d|0000.cov | A|49998|0039333
drawing Data=7286781 |53711| A| |d|0001 | A|49998|0079794
drawing Data=7286781 |53711| A| |d|0002 | A|49998|0037296
drawing Data=7286781 |53711| A| |d|0003 | A|49998|0009867
drawing Data=7286781 |53711| A| |d|0004 | A|49998|0010513
drawing Data=7286781 |53711| A| |d|0005 | A|49998|0026590
drawing Data=7286781 |53711| A| |d|0006.1 | A|49998|0060938
drawing Data=7286781 |53711| A| |d|0006.2 | A|49998|0058985
drawing Data=7286781 |53711| A| |d|0006.3 | A|49998|0056660
drawing Data=7286781 |53711| A| |d|0006.4 | A|49998|0057452
drawing Data=7286781 |53711| A| |d|0006.5 | A|49998|0062979
drawing Data=7286781 |53711| A| |d|0006.6 | A|49998|0022145
drawing Data=7286781 |53711| A| |d|0006.7 | A|49998|0036865
drawing Data=7286781 |53711| A| |d|0007.1 | A|49998|0024658
drawing Data=7286781 |53711| A| |d|0007.10 | A|49998|0039600
drawing Data=7286781 |53711| A| |d|0007.11 | A|49998|0038232
drawing Data=7286781 |53711| A| |d|0007.12 | A|49998|0026294
drawing Data=7286781 |53711| A| |d|0007.2 | A|49998|0034537
drawing Data=7286781 |53711| A| |d|0007.3 | A|49998|0034247
drawing Data=7286781 |53711| A| |d|0007.4 | A|49998|0034359
drawing Data=7286781 |53711| A| |d|0007.5 | A|49998|0035392
drawing Data=7286781 |53711| A| |d|0007.6 | A|49998|0034156
drawing Data=7286781 |53711| A| |d|0007.7 | A|49998|0033150
drawing Data=7286781 |53711| A| |d|0007.8 | A|49998|0039657
drawing Data=7286781 |53711| A| |d|0007.9 | A|49998|0040668
drawing Data=7286781 |53711| A| |d|0008.1 | A|49998|0028730
drawing Data=7286781 |53711| A| |d|0008.2 | A|49998|0043722
drawing Data=7286781 |53711| A| |d|0008.3 | A|49998|0012156
drawing Data=7286781 |53711| A| |d|0008.4 | A|49998|0008759
drawing Data=7286781 |53711| A| |d|0009 | A|49998|0175577
drawing Data=7286781 |53711| A| |d|0010 | A|49998|0134538
drawing Data=7286781 |53711| A| |d|0011 | A|49998|0172553
drawing Data=7286781 |53711| A| |d|0011.1 | A|49998|0087153
drawing Data=7286781 |53711| A| |d|0012 | A|49998|0126678
drawing Data=7286781 |53711| A| |d|0013 | A|49998|0100923
drawing Data=7286781 |53711| A| |d|0014 | A|49998|0137217
drawing Data=7286781 |53711| A| |d|0015 | A|49998|0088404
drawing Data=7286781 |53711| A| |d|0016 | A|49998|0138405
drawing Data=7286781 |53711| A| |d|0017 | A|49998|0112913
drawing Data=7286781 |53711| A| |d|0018 | A|49998|0112286
drawing Data=7286781 |53711| A| |d|0019 | A|49998|0114952
drawing Data=8617511 |53711| N| |d|0001 | N|49998|3447332
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b138 | | | |110101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b367 | | | |220401|a| | |
document Ref Data=astm-b369 | | | |200401|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=astm-d6456 | | | |100801|a| | |
document Ref Data=sae Ams 6931 | | |d |171201|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-dtl-32258 | | | |210601|a|2 | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Towed Sonar Hull And Backup Ball Valve Assembly Must Be In Accordance With Naval Sea Systems Command Drawing 7286781 And All Drawings And Engineering Referrals Provided With This Contract/purchase Order, Except As Amplified Or Modified Herein.;
3.2 ;adiprene L100, Durometer 50-60 Shore A Is An Acceptable Alternate Material For The Static Seal (part 27) Of Navsea Drawing 7286781.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781;
material - ;astm-b369, Alloy Uns C96400;
part - ;shear Sleeve, Part 18 Of Drawing 7286781;
material - ;astm-b138, Uns C67500, Temper H02;
part - ;shear Seal Rod, Part 20 Of Drawing 7286781;
material - ;qq-n-286, Form 2, Annealed And Age Hardened;
part - ;valve Stem, Part 23, And Static Seal Shaft, Part 26 Of Drawing 7286781;
material - ;astm-b150, Alloy C63200, Rod, Temper Tq50 Or Tq55;
part - ;plug, Piece 17a Of Drawing 2621-625-03;
material - ;qq-n-281 With Mechanical Properties In Accordance With General Note 16 On Drawing 2621-625-03;
part - ;studs, Part 88 Of Drawing 7286781;
material - ;mil-dtl-1222, Type Iv, Qq-n-286, Annealed And Age Hardened;
part - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781;
material - Qq-n-281, Class A Or B, With Chemical Composition In Accordance With Mil-dtl-32258.
note: All Material Must Be The Same Class.
self-locking Element - For 250 Degree Nuts Use Astm-d6456, Type 1 Or Astm-d4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 Degree Nuts Use Astm-d6456, Type 1.
part - ;ball, Piece 17li Of Drawing 8617511;
material - Sae-ams-6931
or
centrifugally Cast 6al-4v, Astm-b367, Grade C-5, With Mechanical Properties As Listed In Supplementary Requirement S6.
note: Mechanical Properties For Bars, Forgings And Forging Stock Over 10" Must Be As Specified In The Applicable Drawing. If The Mechanical Properties Are Not Provided In The Drawing, The Mechanical Properties Specified In Sae-ams-6931 Table 2 For Material 6"
to 10", Must Be Applied.
part - ;seats (q3), Piece 16 Of Drawing 7285297;
material - Md71-gg Mearthane (graphite Filled Urethane). Material Must Be Manufactured By Mearthane Products Inc. Cranston, Ri. (properties Specified Below Only)
item Property Astm Test Method Value
(a) Hardness D2240 70 +/- 5 Shore D
(b) Specific Gravity D792 1.18 +/- 0.02
(c) Tensile Strength D412 (diec) 5000 Psi Min
(d) Compression-defl D575 700 Psi Min @ 2% Def.
(e) Tensile Impact D1822 300 Ft-lb/sq In
(note 1) (type L Specimen)
(f) Water Absorption D570 1.5% Max
(1 Week At R.t.)
note 1: These Values Are Minimum Averages. Separate Specimen Values May Not Vary More Than 25% Under The Specified Minimum.
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
attribute - Annealing And Age Hardening
item - ;shear Seal Rod, Part 20, And Stud, Part 88 Of Drawing 7286781;
performance - Qq-n-286
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;self-locking Heavy Hex Nuts, Part 89 Of Drawing 7286781;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027 With Sampling In Accordance With Mil-dtl-32258;
test - ;visual Inspection (root Layer);
item - ;weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;visual Inspection (final Layer);
item - ;weldments;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - Weldability Test Of Astm-b369 Material
item - ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781;
performance - Astm-b369
acceptance - Astm-b369
test - Pressure Tests
item - Each Assembly
performance - ;general Notes 7001, 7003, 7006, And 7008;
acceptance - ;general Notes 7001, 7003, 7006, And 7008;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;mil-dtl-32258;
acceptance - ;mil-dtl-32258;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm D6456, Type 1 Or Astm D4066, Group 01, Class 1 Or 2, Grade 1, 2, 3, 4, 5, Or 6;
3.5 Radiography Is Required On ;body, Part 1, And Dynamic Seal Housing, Part 3 Of Drawing 7286781; .
3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.7 Seat Stack Height Measurement - To Ensure That Each Seat Is Within Tolerance, Check Each Seat Singularly By Measuring The Seat Height Over The Ball. This Measurement Is Calculated By Adding One-half Ball Diameter To The Half Stack Height Dimension On The
drawing. Limits Are Determined By The Ball Diameter Tolerance And The Half Stack Height Tolerance. Check Dimensions By Measuring From The Seat Back Face To Top Of Ball. Manufacturers Of Seats That Do Not Have A Ball Of The Required Size Available Will Be
required To Manufacture A Dummy Ball Or Segment Of A Ball With Sufficient Spherical Surface To Check The Above Dimension.
3.8 A Visual Inspection Shall Be Performed On The Finished Seat With Acceptance Criteria On Critical Surfaces Per Csd167 In The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/.
3.9 Ball Spherical Surface Waviness - Unless Otherwise Specified On Drawing, All Sealing Area Surfaces Must Have A Spherical Surface Waviness Which Does Not Exceed 0.0005 Inches Of Height Per Inch Of Spherical Surface. Roughness And Waviness Ratings Must
apply In A Direction Which Yields The Maximum Rating, Normally Perpendicular To The Lay.
3.10 ;surface Waviness Must Be Verified Prior To Teflon Coating.;
3.11 Chemours Company (formerly Dupont) Teflon Coating 850g-204 And 852g-201. Use Of Chemours Company (formerly Dupont) Teflon Coating 851n-204 And 852n-201 Is Acceptable Until Exhausted - Teflon Coating Of Ball(s) Must Be In Accordance With General Note ;8;
of Drawing ;8617511; .
3.11.1 Naval Ordnance Systems Command Od 10362 First Revision Dated 15 Aug 1961 Is Provided By Contract Support Library Reference Number Csd018 In Ecds At Https://register.nslc.navy.mil/
3.11.2 Csd099 Provides Guidance For Acceptance/rejection Of Teflon-coated Valve Balls After Valve Assembly Production Testing.
3.12 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd099; In Ecds At Https://register.nslc.navy.mil/
3.13 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.14 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.15 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222.
3.15.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of
the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows:
a. Proper Product Lot Control And Traceability Must Be In Place.
b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar.
c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar.
e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be
performed On Studs As Required In Paragraph 4.5.2.7.e.
3.15.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The
"alternate Mechanical Testing" Provision.
3.15.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners
must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To
the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above.
3.16 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.16.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.16.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.17 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must
be Performed On A Full Size Fastener.)
3.17.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.17.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.18 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.19 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.19.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.19.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.19.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.20 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.21 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.22 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.23 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245356; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.24 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.24.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.24.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.24.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.25 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.26 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.26.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
3.27 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
^ Quality Assurance Requirements ^
3.28 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.28.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For
radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend
only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been
previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.28.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.)
3.28.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To
shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs (reader Sheets)
(d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet)
3.29 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.30 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.30.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.30.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.30.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.30.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.30.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.30.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.30.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.30.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.30.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.30.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.30.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.30.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.31 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Heavy Hex Nuts Must Be Marked In Accordance With Mil-dtl-32258; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of
mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To
coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.31.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.32 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.32.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/non-acceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.32.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.32.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.32.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.32.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.33 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.33.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices
and For Verification Of Their Accuracy And Condition.
3.33.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.34 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.35 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.35.1 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.35.2 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.35.3 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must
be Established. Records Of This Effort Must Be Available For Review By The Government.
3.35.4 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.36 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.36.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.36.2 Inspection For Completeness And Proper Type.
3.36.3 Verification Of Material Quality Received.
3.36.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.36.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.36.6 Identification And Protection From Improper Use Or Disposition.
3.36.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.36.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.36.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.37 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.37.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.38 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number For Metallic Material Or Batch Of Non-metallic Material, As Applicable, Which Must Also Be Marked On The
material. This Traceability Marking On The Material Must Provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples
must Be Taken No Less Than Once In Every Eight Hours Of Operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The
finished Component.
3.38.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.38.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.38.3 Permanent Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;ball Must Be Marked In The Waterway And The Seats Must Be Marked On The Outer Cylindrical Surface.;
3.38.4 Seat Marking - Each Seat Must Be Permanently Marked In Accordance With Mil-std-792, Type I And As Stated Below, Except For Teflon Seats, Which Must Only Be Tagged. Type Ix Marking May Be Substituted For Type I, Provided The Minimum Character Size
scribed By The Marking Tool Must Be Approximately 3/32 Inch High To Insure Legibility. Permanent Marking Is Not Permitted On Teflon Seats.
seat Marking Requirements Must Maintain Complete Traceability To Certification Oqe. Seat Marking Must Be Either Heat/lot Or Batch Number, A Vendor Traceability Number/code, Or A Combination Thereof And Must Be Unique To The Material Certification.
3.38.5 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.39 See Cdrl-di-misc-81020 (chemical And Mechanical) And Cdrl Di-misc-80678 (seat Material) - Material Certifications - The Following Material Certification Requirements Apply:
3.39.1 Metallic Material - Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As
applicable, Of The Material Supplied.
3.39.2 Non-metallic Material - The Contractor Must Furnish The Applicable Test Reports For Each Heat/lot/batch Of Seat Material. Material Certification Test Reports Must Include, In Addition To The Specification, The Class, Form, Grade, Type, Process, And/or
composition, As Applicable, Of The Material Supplied.
3.39.3 Re-identification And Re-certification Of Metallic Material Is Required When The Material Is Subjected To A Process Which Alters Its Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical
composition Or Mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A
process Is Used During Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The
altered Material Must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties
are Altered, The Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number _______________ And Heat Treat Number ______________________
(when Applicable)
_________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.)
3.39.4 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.39.5 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.39.6 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.40 Material Handling - The Written Material Control Process Must Include The Following:
3.40.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.40.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.40.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.40.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption.
Closing Date27 Jan 2025
Tender AmountRefer Documents
U S COAST GUARD USA Tender
Aerospace and Defence
United States
Details: Request For Quote 70z08525q40023b00
quote Due Nlt: 1/22/2025, 12 Pm Est
item Required Delivery Date: 01/30/25
naics 332911
this Is A Combined Synopsis/solicitation For Commercial Items, Prepared In Accordance With The Format In Subpart 12.6 Of The Far Part 12 - Acquisition Of Commercial Products And Commercial Services | Acquisition.gov And As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested And A Separate Written Solicitation Will Not Be Issued.
request For Quote Number In Header Applies And Is Used As The Solicitation Number. This Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2005-87, Effective, 7 March 2016.
it Is Anticipated That A Competitive Price Purchase Order Shall Be Awarded As A Result Of This Synopsis/solicitation. All Responsible Sources May Submit A Quotation, (vendor Must Have An Active Registration In Sam.gov Prior To Award) Which If Timely Received, Shall Be Considered By This Agency.
payments Are Net 30 And Will Be Made In Accordance With The Far 52.232-25 Prompt Payment Clause 52.232-25 Prompt Payment. | Acquisition.gov.
all Acquisitions Expected To Exceed $10k Can Also Be Found On Sam.gov Under The Same Solicitation/rfq Listed In The Header.
the U.s. Coast Guard, Surface Forces Logistics Center (sflc) Intends To Award A Firm Fixed Price Purchase Order.
the United States Coast Guard Surface Forces Logistics Center Has A Requirement For The Following Items:
vendor Shall Provide:
vendor Name:
vendor Address:
vendor Sam.gov Uei:
vendor Phone:
vendor Email:
all Items Listed In The Below Parts List And No Substitutions Will Be Authorized Without Approval From Uscg Sflc Technical Experts.
for Inquiries Please Contact:
poc: Gina Baran
email: Gina.m.baran@uscg.mil
line 1
nsn: 4810 01-511-3173
description: Valve, Linear, Directional Cntrl
mfg Name: Bosch Rexroth Corporation
part_nbr: 1602-002-712
qty: 4 Ea
unit Price: _______________
total Price (shipping Must Be Included): ____________
** Total Cost Shall Have Delivery And Any Freight Charges To Zip Code 21226 Included. **
** Shipping: Fob Destination Required. **
description:
use P/n: R978728777, Stack Type Directional Valve.
primary Relief 3000 Psi.
35 Gpm.
handle Kit Included.
end Item Ident Hydraulic Anchor Windlass,
p/n X2317 Aboard 175 Ft Wlm
coast Guard Vessels
special Features Mobile Stack Type
directional Control Valve;
inlet Standard Closed
center; Directional Control
section Low Boy Section
(port Options Not Available
with This Section); Spool
operation Spring Centered;
port Options High Boy Not
machined For Port Options
both "a" And "b"; Standard
end Cover; Standard Section
with No Optional
compensator Pressure
control; Solid Pressure
compensator Spool Available
in Lb, Hb, Hbp, And Hbr
sections With Standard Main
spool Maximum Work Port
flow 35 Gpm
preservation, Packing, & Marking Shall Be In Accordance With Specifications:
individually Packaged In Accordance With Mil-std-2073-i E Method 10, Using Weatherresistant Paperboard Folding With Waterproof Barrier Materials And Cushioned In A Double Layer Of 3/4 In Bubble Wrap And Packed In An Appropriately Sized Astm-d5118 Double-wall Fiberboard Box.
each Package Is To Be Marked Iaw Mil-std-129r And Bar Coded Iaw Iso/iec-16388-2007, Code 39 Symbology.
label Will List:
item Name
part Number
nsn
qnty (example 1 Ea)
contract Order Number Or Pr Number.
item Required Delivery Date: 1/30/2025
if Unable To Meet Required Delivery Date, Please Provide Dd: ________
- No Substitutions.
are You Able To Meet Packaging Requirements? Yes ___ No ____
** Total Cost Shall Have Delivery And Any Freight Charges To Zip Code 21226 Included. **
** Shipping: Fob Destination Required. **
ship To:
Uscg Surface Forces Logistics Center
2401 Hawkins Point Road
Receiving Room- Building 88
Baltimore, Md 21226
preparation For Delivery
all Material Must Be Shipped To U.s. Coast Guard Surface Forces Logistics Center, 2401 Hawkins Point Road, Receiving Room- Bldg 88, Baltimore, Md, 21226 For This Purchase Order. Material Must Be Accompanied By An Itemized Packaging List Securely Attached To The Outside Of The Shipment.
all Packing Lists Shall Cite The Purchase Order Number With The Packaging In Such A Manner To Ensure Identification Of The Material Provided.
material Shall Be Packed For Shipment Using Military Packaging, For Examples In Packaging Please Reference Mil-std-2073-1e. Material Must Be Packaged In Such A Manner As To Afford Adequate Protection To The Item Against Corrosion, Deterioration, And Physical Damage During Shipment From The Supply Course To Surface Forces Logistics Center Locations.
packaging Shall Provide Adequate Protection For Warehouse Storage And Shipments From The Warehouse.
all Deliveries Are To Be Made Monday Through Friday Between The Hours Of 8am To 3pm.
please Make Sure That Any Changes In Delivery Timeframes Or Tracking Information Get Sent To Gina.m.baran@uscg.mil.
u.s. Coast Guard Approved Label Should Have The Following:
national Stock Number (nsn)
item Name
part Number
purchase Order Number
the Words “coast Guard Sflc Material” Condition (a)
quantity And Unit Of Issue (i.e) (1-ea)
invoicing In Ipp
it Is Now A Requirement That All Invoicing For Purchase Orders Will Now Be Entered And Processed Through Https://www.ipp.gov.
all Invoices Must Contain The Following Information: Cg Contract Number, Vendor’s Invoice Number, Vendor’s Uei, Uei & Tins Number, Cage Number, Po Item Number, Description Of Supplies Or Services, Unit Prices And Extended Totals (invoices For Purchase Orders Awarded By Surface Force Logistics Center, Baltimore Are To Be Sumitted As Non-po In Ipp).
to Submit An Invoice, Vendor Must Have Access To Www.ipp.gov. Additionally, A Copy Of The Invoice Must Also Be Sent To The Po Issuing Office At: Gina.m.baran@uscg.mil
Closing Date22 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Contact Information|4|n743.6|wvx|564-230-3066|francine.a.pommells.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
variation In Quantity (apr 1984)|3|5%|0%|total Contract Quantity|
time Of Delivery (june 1997)|20|0001|450|365 Days||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report - Certifications Combo-receiving Report & Invoice - Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd1
423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332722|600||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
this Solicitation Is Amended To Extend The Closing Date To 10jan2025.
1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On Fileat Navsup Wss Mech.
2. Navsup Wss Mech Will Be Considering Past Performance In The Evaluation Ofoffers. See Clause 252.213-7000.
3. The Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls After Receipt
final Delivery Of Material (365 Livery Days )
please Quote Actual Delivery Days
early And Incremental Delivery Is Acceptable At No Additional Cost To Thegovernment.
4. This Procurement Is Issued Pursuant To Emergency Acquisition Flexibilities.
5. A Variation In Quantity Of +5% Of The Total Contract Quantity Is Allowed.see Far 52.211-16 For Further Details.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
3. Requirements
3.1 Manufacture And Design - The Item Furnished Under This Contract/purchase Order Must Meet The Requirements As Specified In Nasm25027, Except As Amplified Or Modified Herein. Nasm25027 Ordering Data Information Is Provided Below.
(a) Nuts, Self Locking, 250 F, 450 F, And 800 F; Nasm25027
(b) Part Number - ;ms17828-22c;
(c) Preservation, Packaging, And Marking Requirements Must Be As Specified Elsewhere In The Contract/purchase Order.
3.2 The Unit Of Issue Is Each.
the Contractor Is Required To Provide One Additional Fastener For Each Uniquely Identified Heat/lot Of Material In Each Shipment. Complete Traceability Must Be Maintained On This Extra Fastener.
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;nut, Self Locking Hexagon;
material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn.
all Material Must Be From The Same Class.
self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing (if Any) Per Applicable Specifications Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;nut, Self Locking Hexagon;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm-d4066, Group 01, Class 1, Grade 1;
3.5 See Cdrl Di-ndti-80809 (fat Self Locking Nuts) - First Article Testing - Certifications Are Required For The Following Tests On The Items Listed Below:
test - Fat (consisting Of Qualification Inspections In Table Xiii Of Nasm25027)
item - Self-locking Nuts
performance - ;paragraph 3.2 And Table Xiii Of Nasm25027;
acceptance - ;paragraph 3.2 And Table Xiii Of Nasm25027;
this Requirement May Be Satisfied By The Submission Of The Approval Letter Of Previously Performed Qualification Testing As Fat.
this Requirement May Also Be Satisfied By The Submission Of A Letter From Previously Qualified Manufacturers Stating That They Were Previously Qualified And That Their Production Methods Represented By The Qualification Tests Have Not Changed.
distributors May Also Satisfy This Requirement By Submitting Proof (certificate Of Compliance, Invoice, Etc.) That The Material Was Obtained From A Qualified Source.
for Heavy Hex Nuts, The Above Documentation For The Same Size And Material Standard Hex Nut Is Acceptable, Except When Specific Performance Characteristics, Such As Mechanical Properties, Are Called Out Elsewhere Within This Contract. These Specific Performance
characteristics Must Be Satisfied For Fat.
for Heavy Hex Nuts Manufactured In Accordance With Mil-dtl-32258, The Fat Must Be Performed In Accordance With Nasm25027 And Mil-n-25027/1.
3.6 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.7 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.9 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.9.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A
copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.9.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.9.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.11 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.11.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.12 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify
the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma)
office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.16.2 Inspection For Completeness And Proper Type.
3.16.3 Verification Of Material Quality Received.
3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.16.6 Identification And Protection From Improper Use Or Disposition.
3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity
for Withholding The Material From Use.
3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.16.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements.
3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein.
3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;in Accordance With Qq-n-281; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition,
grade, Type, Finish, And/or Composition, As Applicable, Of The Material Supplied.
3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability
marking Used With The Altered Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ________________ And Heat Treat Number ________________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.20 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking
requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible
provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.20.1 Fasteners Must Be Marked In Accordance With ;nasm 17828. Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's Identification Symbol, Material Symbol, And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V,
viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be
marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective Compounds.
3.20.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location
if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of
the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.21 Material Handling - The Written Material Control Process Must Include The Following:
3.21.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.21.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.21.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking
must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.21.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.21.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.22 Receiving Inspection -
3.22.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.22.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.23 Discrepancy Reporting -
3.23.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.24 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.24.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.24.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.24.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports
must Also Be 100% Inspected For Completeness And Legibility.
3.24.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.25 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
; - 10/20/2016 - Updated Ecds Url
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 14 - Within 120 Days After Contract Award, Forward One Copy To The Pco.
the Review (approval/disapproval) Must Be Within 120 Days From The Date Of Of Receipt.
this Requirement May Be Satisfied By The Submission Of One Of The Following:
- A Copy Of The First Article Test Report
- A Copy Of The Approval Letter For Previously Performed First Article Testing
- The Letter Of Qualification Acceptance.
distributors May Also Satisfy This Requirement By Submitting Proof (certificate Of Compliance, Invoice, Etc.) That The Material Was Obtained From A Qualified Source.
for Heavy Hex Nuts, The Above Documentation For The Same Size Standard Hex Is Acceptable.
Closing Date10 Jan 2025
Tender AmountRefer Documents
DEFENSE LOGISTICS AGENCY USA Tender
Aerospace and Defence
United States
Details: This Is A Sources Sought Notice And Is For “information Purposes Only” To Prepare A One-time Buy For Nsn 4240-01-548-2264, Pr Number 7009054052. This Is Not A Request For Proposals, Quotations Or Bids. This Notice Is For Informational And Planning Purposes Only And Shall Not Be Construed As A Solicitation Or An Obligation Or Commitment By The Government. This Notice Is Intended Strictly For Market Research Pursuant To Far Part 10. The Purpose Of This Notice Is To Obtain Information Regarding The Availability And Capability Of Qualified Businesses That Are Capable Of Executing The Potential Contract. The Government Is Not Obligated And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Notice. Your Response To The Information Requested Will Assist The Government In Determining The Appropriate Acquisition Method. No Solicitation Exists At This Time.
the Government Intends To Purchase Approximately 1,500 Ea (w25g1u New Cumberland Facility, New Cumberland Pa 17070-5002 Us) Of Nsn 4240-01-548-2264, Slide, Escape, Aircraft. It Is To Be Manufactured By Approved Sources Only. Parties Interested In Becoming An Approved Source For This Item Are Encouraged To Complete A Source Approval Request (sar) Package.
pr 7009054052
nsn: 4240-01-548-2264
fsc: 4240 – Safety & Rescue Equipment
naics Code: 339113
item Description: Hood, Chemical-biological
avon Protection Systems Inc. (1lew5), P/n: 71013/2
estimated Quantity: 1,500 Ea
estimated Delivery: 90 Days Ado
stock Location: W25g1u
w1a8 Dla Distribution
ddsp New Cumberland Facility
2001 Normandy Drive Door 113 To 134
new Cumberland Pa 17070-5002 Us
hood, Chemical-biological
ra001: This Document Incorporates Technical And/or Quality Requirements
(identified By An 'r' Or An 'i' Number) Set Forth In Full Text In The
dla Master List Of Technical And Quality Requirements Found On The Web
at:
http://www.dla.mil/hq/acquisition/offers/eprocurement.aspx
for Simplified Acquisitions, The Revision Of The Master In Effect On The
solicitation Issue Date Or The Award Date Controls. For Large
acquisitions, The Revision Of The Master In Effect On The Rfp Issue Date
applies Unless A Solicitation Amendment Incorporates A Follow-on
revision, In Which Case The Amendment Date Controls.
rq038: Chemical And Biological Defense Equipment First Article Test
(fat), Production Lot Test (plt), And Fat Waivers
rd002, Covered Defense Information Applies
rp001: Dla Packaging Requirements For Procurement
rq011: Removal Of Government Identification From Non-accepted Supplies
rq003: Configuration Change Management For Edgewood For Chemical,
biological Center Materials - Engineering Change Proposal Request For
variance (deviation Or Waiver)
rq009: Inspection And Acceptance At Origin
rq032: Export Control Of Technical Data
this Item Has Technical Data Some Or All Of Which Is Subject To
export-control Of Either The International Traffic In Arms Regulations
(itar) Or The Export Administration Regulations (ear), And Cannot Be
exported Without Prior Authorization From Either The Department Of State
or The Department Of Commerce. Export Includes Disclosure Of Technical
data To Foreign Persons And Nationals Whether Located In The United
states Or Abroad. This Requirement Applies Equally To Foreign National
employees And U.s. Companies And Their Foreign Subsidiaries. Dfars
252.225-7048 Is Applicable To This Data.
the Defense Logistics Agency (dla) Limits Distribution Of Export-control
technical Data To Dla Contractors That Have An Approved Us/canada Joint
certification Program (jcp) Certification, Have Completed The
introduction To Proper Handling Of Dod Export-controlled Technical Data
training And The Dla Export-controlled Technical Data Questionnaire
(both Are Available At The Web Address Given Below), And Have Been
approved By The Dla Controlling Authority To Access The
export-controlled Data. Instructions For Obtaining Access To The
export-controlled Data Can Be Found At:
https://www.dla.mil/logistics-operations/enhanced-validation/
to Be Eligible For Award, Offerors And Any Sources Of Supply Proposed
for Use Are Required To Have An Approved Jcp Certification And Have
been Approved By The Dla Controlling Authority To Access
export-controlled Data Managed By Dla. Dla Will Not Delay Award In
order For An Offeror Or Its Supplier To Apply For And Receive Approval
by The Dla Controlling Authority To Access The Export-controlled Data.
note: The Cited Drawing Is A Source Controlled
drawing And As Of The Date Of This Solicitation
only The Source(s) Cited On The Drawing Have
been Approved. Even Though Sources And Approved
part Numbers Are Provided, The Items
furnished Must Meet The Requirements Of The
cited Drawing. Offerors Who Are Interested In
qualifying Their Product For Purpose Of Future
acquisition Must Contact The Cognizant Design
activity Specified On The Source Controlled
drawing.
also, May Include Additional Approved Sources
that Have Not Been Reflected On The Drawing At
this Time.
class I Ozone Depleting Chemicals Are Not To Be
used Nor Incorporated In Any Items To Be
delivered Under This Contract.this Prohibition
supersedes All Specification Requirements But
does Not Alleviate Any Product Requirements.
substitute Chemicals Must Be Submitted For
approval Unless They Are Authorized By The
specification Requirements.
this Is An Identified Chemical Biological Defense Equipment Item.
all Packaged Items Of Supply Shall Be Marked Iaw Mil-std-129.
military Packaging Is Required. Requirements Defining Levels Of
packaging Shall Be Iaw Mil-std-2073-1. If Special Packaging
instructions (spi) Are Provided In The Technical Data Package (tdp), The
spi’s Requirements Will Take Precedence Over Mil-std-2073-1 Where
applicable.
for All Chemical Biological Items, The First Article Test (fat) Waiver
timeframe Is Reduced To One (1) Year. The Use Of The Army Combat
capabilities Development Command Chemical Biological Center Devcom Cbc
form 081 Is Required For All First Article Test Waivers, (note: Do Not
use A Dd Form 1694 “request For Variance (or Waiver)” For A Fat Waiver).
include Rq038 In The Material Master For All Chemical Biological Items.
this Supersedes The Three (3) Year Waiver Time Frame Allowed In
procurement Note H03- Supplemental First Article Testing Requirements.
lot Numbering
other Lot Numbering Applies
ea-h-2247 W/am3 Rev.a
- Within Specification Ea-h-2247a W/am4, Dated 04 March 2019, Paragraph
2.2.2, Replace "71013/2" With "5-1-4391-20".
- Within Specification Ea-h-2247a W/am4, Dated 04 March 2019, Government
furnished Property Referenced Within Paragraph 3.6 Is Already With The
contractor, And Will Not Be Provided.
- Within Specification Ea-h-2247a W/am4, Dated 04 March 2019, Page 10,
table Ii, Change The Following:
from: "*test Specimens Shall Be Swatches Prepared From One Lot Of
hood Material."
to: "*test Specimens Shall Be Swatches Prepared From One Lot Of
hoods. No More Than 1 Swatch Shall Be Taken From 1 Hood, And Each Swatch
shall Contain A Seam."
- On Spi P5-1-4391-20, Revision -, Dated 7 Nov 2019, Page 2, Remark E:
use Closure Method 2b7 For Intermediate Packaging.
- On Spi P5-1-4391-20, Revision -, Dated 7 Nov 2019, Page 2, Remark F:
sealing Method B Of Astm D1974
-use The Following Information To Fill Out Dd Form 1423:
1. Data Item No. A001
2. Title Of Data Item: First Article Test Report
3. Subtitle:
4. Authority: Di-ndti-80809b
5. Contract Reference: Section E; Clause 52.209-3
6. Requiring Ofc: Fcdd-cbe-sqi
7. Lt
8. App Code:
9. Dist. Statement Required: D
10. Frequency: As Req
11. As Of Date:
12. Date Of First Submission: As Req
13. Date Of Sub:
14. Distribution / A. Addressees B. Copies Draft / 1 Final Copy See
address Code // Distribution Address Attachment //
15. Total: 1
16. Remarks:
*first Article Test Report Shall Be Submitted Thru The Qar. See The
contract Clauses Pertaining To First Article Test Reports For In
structions Regarding Submission And Disposition Reports. Submit
electronically Thru The Qar To The Contract Specialist/pco. The Contract
specialist Will Provide The Report Electronically To Devcom Cbc-qa Poc.
**the Govt Has 30 Days After Receipt Of Fatr For Approval/disapproval.de
zqa07 Object Text Id St
critical Application Item
avon Protection Systems Incorporated 1lew5 P/n 71013/2
iaw Basic Drawing Nr 81361 5-1-4391
revision Nr Dtd 11/26/2019
part Piece Number:
iaw Reference Std Nr Mil-std-147e(3)
revision Nr E Dtd 09/05/2024
part Piece Number:
iaw Reference Std Nr Mil-std-810h(1)
revision Nr H Dtd 05/18/2022
part Piece Number:
iaw Reference Std Nr Mil-std-2073-1e(4) Not 1
revision Nr E Dtd 06/27/2024
part Piece Number:
iaw Reference Drawing Nr 81361 Prf-ea-h-2247a-am4
revision Nr Dtd 03/04/2019
part Piece Number:
iaw Reference Drawing Nr 81361 5-1-4391-20
revision Nr Dtd 12/02/2024
part Piece Number:
iaw Reference Qap 14153 Sqap-fat3
revision Nr Dtd 06/15/2022
part Piece Number:
iaw Reference Qap 14153 Sqap-plt3
revision Nr Dtd 06/15/2022
part Piece Number:
iaw Reference Drawing Nr 81361 5-1-4391-20
revision Nr Dtd 11/26/2019
part Piece Number:
iaw Reference Qap 14153 Sqap-015482264
revision Nr Dtd 12/07/2024
part Piece Number:
pkging Data - Mil-std-2073-1e
qup:001 Pres Mthd:zz Clng/dry:z Presv Mat:zz
wrap Mat:zz Cush/dunn Mat:zz Cush/dunn Thkness:z
unit Cont:zz Opi:a
intrmdte Cont:zz Intrmdte Cont Qty:zz
pack Code:u
marking Shall Be In Accordance With Mil-std-129.
special Marking Code:00 -00 No Special Marking
palletization Shall Be In Accordance With Rp001: Dla Packaging
requirements For Procurement
place A Red X And The Words "short Box" On The Front Of Any Box That Has
a Short Quantity, Then Place That Box/boxes With The Markings Showing On
the Top Front Of The Pallet Load.
Closing Date3 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
desired And Required Time Of Delivery (june 1997)|29|0001aa|9 Ea|548|0001ab|10 Ea|548 Days||||||||||||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a|n/a
|n/a|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery |one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
first Article Approval--government Testing (sep 1989)|7|1|0001aa |200|receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270.4(207-438-5898) Kittery Maine, 03904|30|x||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
progress Payments (nov 2021)|4|||||
list Of Award Attachments|5||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (may 2024)|13|336612|1000||||||||||||
type Of Contract (apr 1984)|1|firm Fixed Price|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
provision 252.204-7024 Is Hereby Removed From This Solicitation. This Is Not An Evaluation Factor For Award.
\
this Solicitation Requires First Article Testing
see Far 52.209-4 For More Details.
dd1423 Data Item A001 May Be Waived If Already On File At Navsup Wss Mechanicsburg.
any Contract Awarded As A Result Of This Solicitation Will Be"do" Rated Order Certified For National Defense Use Under The Defense Priorities Andallocations System (dpas).
if Drawings Are Included In The Solicitation, Access Needs To Berequested On The Individual Solicitation Page On Contractsopportunities On The Government's Sam Website. Afterrequesting Access, Send An Email To The Primary Poc Listed Onthe Solicitation.
this Requirement Requires Access To Noforn And/or Navalnuclear Propulsion Information. See Local Text Wsstermhz12for Further Information. If You Wish To Obtain A Copy Of Thedrawings, Please Download The Security Agreement Form Fromsam.gov And Email The Completed,
signed Form To Scott.r.youngblood2.civ@us.navy.mil.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=eb-2937 |96169| B|sp |d|0001 | B|49998|0568465
drawing Data=eb-2937 |96169| B|sp |d|0002 | B|49998|0262311
drawing Data=eb-2937 |96169| B|sp |d|0003 | B|49998|0457001
drawing Data=eb-2937 |96169| B|sp |d|0004 | B|49998|0494479
drawing Data=eb-2937 |96169| B|sp |d|0005 | B|49998|0557624
drawing Data=eb-2937 |96169| B|sp |d|0006 | B|49998|0572669
drawing Data=eb-2937 |96169| B|sp |d|0007 | B|49998|0588302
drawing Data=eb-2937 |96169| B|sp |d|0008 | B|49998|0487356
drawing Data=eb-2937 |96169| B|sp |d|0009 | B|49998|0641401
drawing Data=eb-2937 |96169| B|sp |d|0010 | B|49998|0609048
drawing Data=eb-2937 |96169| B|sp |d|0011 | B|49998|0332061
drawing Data=h261-0102d74 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h621-0102a01 |53711| A|er |d|0001 | A|49998|0037852
drawing Data=h621-0102a01 |53711| A|er |d|0002 | A|49998|0022265
drawing Data=h621-0102a01 |53711| A|er |d|0003 | A|49998|0045427
drawing Data=h621-0102a01 |53711| A|er |d|0004 | A|49998|0032629
drawing Data=h621-0102a01 |53711| A|er |d|0005 | A|49998|0033163
drawing Data=h621-0102a01 |53711| A|er |d|0006 | A|49998|0041453
drawing Data=h621-0102a01 |53711| A|er |d|0007 | A|49998|0122787
drawing Data=h621-0102a01 |53711| A|er |d|0008 | A|49998|0075868
drawing Data=h621-0102a02 |53711| A|er |d|0001 | A|49998|0038259
drawing Data=h621-0102a02 |53711| A|er |d|0002 | A|49998|0014346
drawing Data=h621-0102a02 |53711| A|er |d|0003 | A|49998|0053725
drawing Data=h621-0102a02 |53711| A|er |d|0004 | A|49998|0063527
drawing Data=h621-0102a02 |53711| A|er |d|0005 | A|49998|0064236
drawing Data=h621-0102a02 |53711| A|er |d|0006 | A|49998|0037645
drawing Data=h621-0102a02 |53711| A|er |d|0007 | A|49998|0036363
drawing Data=h621-0102a02 |53711| A|er |d|0008 | A|49998|0037448
drawing Data=h621-0102a02 |53711| A|er |d|0009 | A|49998|0039414
drawing Data=h621-0102a02 |53711| A|er |d|0010 | A|49998|0160700
drawing Data=h621-0102a02 |53711| A|er |d|0011 | A|49998|0134109
drawing Data=h621-0102a03 |53711| A|er |d|0001 | A|49998|0021078
drawing Data=h621-0102a03 |53711| A|er |d|0001.1 | A|49998|0019129
drawing Data=h621-0102a03 |53711| A|er |d|0001.2 | A|49998|0025775
drawing Data=h621-0102a03 |53711| A|er |d|0001.3 | A|49998|0039912
drawing Data=h621-0102a03 |53711| A|er |d|0001.4 | A|49998|0026761
drawing Data=h621-0102a03 |53711| A|er |d|0002 | A|49998|0057736
drawing Data=h621-0102a03 |53711| A|er |d|0003 | A|49998|0069402
drawing Data=h621-0102a03 |53711| A|er |d|0004 | A|49998|0052923
drawing Data=h621-0102a03 |53711| A|er |d|0005 | A|49998|0044205
drawing Data=h621-0102a03 |53711| A|er |d|0006 | A|49998|0053927
drawing Data=h621-0102a03 |53711| A|er |d|0007 | A|49998|0039873
drawing Data=h621-0102a03 |53711| A|er |d|0008 | A|49998|0047671
drawing Data=h621-0102a03 |53711| A|er |d|0009 | A|49998|0042694
drawing Data=h621-0102a03 |53711| A|er |d|0010 | A|49998|0039885
drawing Data=h621-0102a03 |53711| A|er |d|0011 | A|49998|0044703
drawing Data=h621-0102a03 |53711| A|er |d|0012 | A|49998|0042919
drawing Data=h621-0102a03 |53711| A|er |d|0013 | A|49998|0037692
drawing Data=h621-0102a03 |53711| A|er |d|0014 | A|49998|0039760
drawing Data=h621-0102a03 |53711| A|er |d|0015 | A|49998|0041011
drawing Data=h621-0102a03 |53711| A|er |d|0016 | A|49998|0048557
drawing Data=h621-0102a03 |53711| A|er |d|0017 | A|49998|0014830
drawing Data=h621-0102a03 |53711| A|er |d|0018 | A|49998|0013294
drawing Data=h621-0102a03 |53711| A|er |d|0019 | A|49998|0166561
drawing Data=h621-0102a03 |53711| A|er |d|0020 | A|49998|0139744
drawing Data=h621-0102a03 |53711| A|er |d|0021 | A|49998|0189793
drawing Data=h621-0102a03 |53711| A|er |d|0022 | A|49998|0139891
drawing Data=h621-0102a03 |53711| A|er |d|0023 | A|49998|0121265
drawing Data=h621-0102a03 |53711| A|er |d|0024 | A|49998|0105221
drawing Data=h621-0102a03 |53711| A|er |d|0025 | A|49998|0114189
drawing Data=h621-0102a03 |53711| A|er |d|0026 | A|49998|0198610
drawing Data=h621-0102a03 |53711| A|er |d|0027 | A|49998|0115665
drawing Data=h621-0102a03 |53711| A|er |d|0028 | A|49998|0083415
drawing Data=h621-0102a05 |53711| A|er |d|0001 | A|49998|0034604
drawing Data=h621-0102a05 |53711| A|er |d|0001.1 | A|49998|0012203
drawing Data=h621-0102a05 |53711| A|er |d|0002 | A|49998|0064744
drawing Data=h621-0102a05 |53711| A|er |d|0003 | A|49998|0127671
drawing Data=h621-0102a108 |53711| A|er |d|0001 | A|49998|0918547
drawing Data=h621-0102a11 |53711| A|er |d|0001 | A|49998|0043094
drawing Data=h621-0102a11 |53711| A|er |d|0001.1 | A|49998|0018658
drawing Data=h621-0102a11 |53711| A|er |d|0002 | A|49998|0060012
drawing Data=h621-0102a11 |53711| A|er |d|0003 | A|49998|0035375
drawing Data=h621-0102a11 |53711| A|er |d|0004 | A|49998|0055587
drawing Data=h621-0102a11 |53711| A|er |d|0005 | A|49998|0037265
drawing Data=h621-0102a11 |53711| A|er |d|0006 | A|49998|0039785
drawing Data=h621-0102a11 |53711| A|er |d|0007 | A|49998|0041585
drawing Data=h621-0102a11 |53711| A|er |d|0008 | A|49998|0036148
drawing Data=h621-0102a11 |53711| A|er |d|0009 | A|49998|0208132
drawing Data=h621-0102a121 |53711| A|er |d|0001 | A|49998|0709114
drawing Data=h621-0102a125 |53711| A|er |d|0001 | A|49998|0435504
drawing Data=h621-0102a168 |53711| A|er |d|0001 | A|49998|1501235
drawing Data=h621-0102a17 |53711| A|er |d|0001 | A|49998|0037341
drawing Data=h621-0102a17 |53711| A|er |d|0001.1 | A|49998|0019205
drawing Data=h621-0102a17 |53711| A|er |d|0002 | A|49998|0066302
drawing Data=h621-0102a17 |53711| A|er |d|0003 | A|49998|0062923
drawing Data=h621-0102a17 |53711| A|er |d|0004 | A|49998|0126037
drawing Data=h621-0102a188 |53711| A|er |d|0001 | |49998|1432274
drawing Data=h621-0102a22 |53711| C|er |d|0001 | |49998|0855198
drawing Data=h621-0102a22 |53711| C|er |d|0001.1 | B|49998|0028535
drawing Data=h621-0102a22 |53711| C|er |d|0001.2 | B|49998|0033887
drawing Data=h621-0102a22 |53711| C|er |d|0001.3 | B|49998|0012002
drawing Data=h621-0102a22 |53711| C|er |d|0002 | B|49998|0077551
drawing Data=h621-0102a22 |53711| C|er |d|0003 | B|49998|0038816
drawing Data=h621-0102a22 |53711| C|er |d|0004 | B|49998|0120742
drawing Data=h621-0102a22 |53711| C|er |d|0005 | B|49998|0068506
drawing Data=h621-0102a22 |53711| C|er |d|0006 | B|49998|0120902
drawing Data=h621-0102a39 |53711| A|er |d|0001 | A|49998|0043492
drawing Data=h621-0102a39 |53711| A|er |d|0001.1 | A|49998|0033724
drawing Data=h621-0102a39 |53711| A|er |d|0002 | A|49998|0062801
drawing Data=h621-0102a39 |53711| A|er |d|0003 | A|49998|0071199
drawing Data=h621-0102a48 |53711| B|er |d|0001 | B|49998|0037377
drawing Data=h621-0102a48 |53711| B|er |d|0001.1 | B|49998|0024643
drawing Data=h621-0102a48 |53711| B|er |d|0001.2 | B|49998|0022539
drawing Data=h621-0102a48 |53711| B|er |d|0001.3 | B|49998|0027931
drawing Data=h621-0102a48 |53711| B|er |d|0001.4 | B|49998|0036544
drawing Data=h621-0102a48 |53711| B|er |d|0002 | B|49998|0071446
drawing Data=h621-0102a48 |53711| B|er |d|0003 | B|49998|0035428
drawing Data=h621-0102a48 |53711| B|er |d|0004 | B|49998|0039985
drawing Data=h621-0102a50 |53711| A|er |d|0001 | A|49998|0041731
drawing Data=h621-0102a50 |53711| A|er |d|0001.1 | A|49998|0029231
drawing Data=h621-0102a50 |53711| A|er |d|0001.2 | A|49998|0036383
drawing Data=h621-0102a50 |53711| A|er |d|0002 | A|49998|0054429
drawing Data=h621-0102a50 |53711| A|er |d|0003 | A|49998|0030654
drawing Data=h621-0102a50 |53711| A|er |d|0004 | A|49998|0061856
drawing Data=h621-0102a50 |53711| A|er |d|0005 | A|49998|0057108
drawing Data=h621-0102a50 |53711| A|er |d|0006 | A|49998|0056135
drawing Data=h621-0102a50 |53711| A|er |d|0007 | A|49998|0060035
drawing Data=h621-0102a50 |53711| A|er |d|0008 | A|49998|0059823
drawing Data=h621-0102a50 |53711| A|er |d|0009 | A|49998|0023352
drawing Data=h621-0102a50 |53711| A|er |d|0010 | A|49998|0040524
drawing Data=h621-0102a50 |53711| A|er |d|0011 | A|49998|0051452
drawing Data=h621-0102a50 |53711| A|er |d|0012 | A|49998|0057922
drawing Data=h621-0102a50 |53711| A|er |d|0013 | A|49998|0022848
drawing Data=h621-0102a50 |53711| A|er |d|0014 | A|49998|0035871
drawing Data=h621-0102a50 |53711| A|er |d|0015 | A|49998|0038701
drawing Data=h621-0102a50 |53711| A|er |d|0016 | A|49998|0028302
drawing Data=h621-0102a50 |53711| A|er |d|0017 | A|49998|0088297
drawing Data=h621-0102a50 |53711| A|er |d|0018 | A|49998|0155682
drawing Data=h621-0102a50 |53711| A|er |d|0019 | A|49998|0124972
drawing Data=h621-0102a50 |53711| A|er |d|0020 | A|49998|0118121
drawing Data=h621-0102a50 |53711| A|er |d|0021 | A|49998|0077344
drawing Data=h621-0102a50 |53711| A|er |d|0022 | A|49998|0128466
drawing Data=h621-0102a51 |53711| A|er |d|0001 | A|49998|0040110
drawing Data=h621-0102a51 |53711| A|er |d|0001.1 | A|49998|0027168
drawing Data=h621-0102a51 |53711| A|er |d|0002 | A|49998|0060056
drawing Data=h621-0102a51 |53711| A|er |d|0003 | A|49998|0061789
drawing Data=h621-0102a52 |53711| A|er |d|0001 | A|49998|0039953
drawing Data=h621-0102a52 |53711| A|er |d|0001.1 | A|49998|0032355
drawing Data=h621-0102a52 |53711| A|er |d|0002 | A|49998|0062662
drawing Data=h621-0102a52 |53711| A|er |d|0003 | A|49998|0037395
drawing Data=h621-0102a52 |53711| A|er |d|0004 | A|49998|0035793
drawing Data=h621-0102a57 |53711| A|er |d|0001 | A|49998|0168427
drawing Data=h621-0102a71 |53711| A|er |d|0001 | A|49998|0169469
drawing Data=h621-0102a99 |53711| B|er |d|0001 | B|49998|5824730
drawing Data=h775-1512a1 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a10 |53711| A|er |d|0001 | |49998|1565029
drawing Data=h775-1512a2 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a3 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a4 |53711| A|er |d|0001 | |00026|0000000
drawing Data=h775-1512a5 |53711| A|er |d|0001 | |49998|0228403
drawing Data=h775-1512a6 |53711| A|er |d|0001 | |49998|0063013
drawing Data=h775-1512a7 |53711| A|er |d|0001 | |49998|0176895
drawing Data=h775-1512a8 |53711| A|er |d|0001 | |49998|0271962
drawing Data=h775-1512a9 |53711| A|er |d|0001 | |49998|0335202
drawing Data=6984052 |53711| D| |d|0001 | D|00026|0000000
drawing Data=6985426 |53711| A| |d|0000.a | A|49998|0035751
drawing Data=6985426 |53711| A| |d|0001 | A|49998|0074079
drawing Data=6985426 |53711| A| |d|0002 | A|49998|0062500
drawing Data=6985426 |53711| A| |d|0003 | A|49998|0008982
drawing Data=6985426 |53711| A| |d|0004 | A|49998|0010717
drawing Data=6985426 |53711| A| |d|0005 | A|49998|0030344
drawing Data=6985426 |53711| A| |d|0006.1 | A|49998|0061541
drawing Data=6985426 |53711| A| |d|0006.10 | A|49998|0022748
drawing Data=6985426 |53711| A| |d|0006.2 | A|49998|0061465
drawing Data=6985426 |53711| A| |d|0006.3 | A|49998|0055809
drawing Data=6985426 |53711| A| |d|0006.4 | A|49998|0059727
drawing Data=6985426 |53711| A| |d|0006.5 | A|49998|0059513
drawing Data=6985426 |53711| A| |d|0006.6 | A|49998|0023040
drawing Data=6985426 |53711| A| |d|0006.7 | A|49998|0040218
drawing Data=6985426 |53711| A| |d|0006.8 | A|49998|0051132
drawing Data=6985426 |53711| A| |d|0006.9 | A|49998|0057425
drawing Data=6985426 |53711| A| |d|0007.1 | A|49998|0024885
drawing Data=6985426 |53711| A| |d|0007.10 | A|49998|0037342
drawing Data=6985426 |53711| A| |d|0007.11 | A|49998|0032807
drawing Data=6985426 |53711| A| |d|0007.12 | A|49998|0037061
drawing Data=6985426 |53711| A| |d|0007.13 | A|49998|0036308
drawing Data=6985426 |53711| A| |d|0007.14 | A|49998|0040683
drawing Data=6985426 |53711| A| |d|0007.15 | A|49998|0028030
drawing Data=6985426 |53711| A| |d|0007.2 | A|49998|0038133
drawing Data=6985426 |53711| A| |d|0007.3 | A|49998|0037181
drawing Data=6985426 |53711| A| |d|0007.4 | A|49998|0035304
drawing Data=6985426 |53711| A| |d|0007.5 | A|49998|0035595
drawing Data=6985426 |53711| A| |d|0007.6 | A|49998|0035487
drawing Data=6985426 |53711| A| |d|0007.7 | A|49998|0032536
drawing Data=6985426 |53711| A| |d|0007.8 | A|49998|0038400
drawing Data=6985426 |53711| A| |d|0007.9 | A|49998|0042559
drawing Data=6985426 |53711| A| |d|0008.1 | A|49998|0029133
drawing Data=6985426 |53711| A| |d|0008.2 | A|49998|0046621
drawing Data=6985426 |53711| A| |d|0008.3 | A|49998|0014013
drawing Data=6985426 |53711| A| |d|0008.4 | A|49998|0012670
drawing Data=6985426 |53711| A| |d|0009 | A|49998|0088388
drawing Data=6985426 |53711| A| |d|0010 | A|49998|0157697
drawing Data=6985426 |53711| A| |d|0011 | A|49998|0138726
drawing Data=6985426 |53711| A| |d|0012 | A|49998|0189061
drawing Data=6985426 |53711| A| |d|0013 | A|49998|0134718
drawing Data=6985426 |53711| A| |d|0014 | A|49998|0123397
drawing Data=6985426 |53711| A| |d|0015 | A|49998|0118040
drawing Data=6985426 |53711| A| |d|0016 | A|49998|0113699
drawing Data=6985426 |53711| A| |d|0017 | A|49998|0118200
drawing Data=6985426 |53711| A| |d|0018 | A|49998|0071113
drawing Data=6985426 |53711| A| |d|0019 | A|49998|0068598
drawing Data=6985426 |53711| A| |d|0020 | A|49998|0116804
drawing Data=6985426 |53711| A| |d|0021 | A|49998|0075838
drawing Data=6985426 |53711| A| |d|0022 | A|49998|0097724
drawing Data=6985426 |53711| A| |d|0023 | A|49998|0069126
drawing Data=6985426 |53711| A| |d|0024 | A|49998|0155576
drawing Data=6985426 |53711| A| |d|0025 | A|49998|0143738
drawing Data=6985426 |53711| A| |d|0026 | A|49998|0127085
drawing Data=6985426 |53711| A| |d|0027 | A|49998|0123826
drawing Data=6985426 |53711| A| |d|0028 | A|49998|0109249
drawing Data=6985426 |53711| A| |d|0029 | A|49998|0121330
drawing Data=6985426 |53711| A| |d|0030 | A|49998|0087896
drawing Data=6985426 |53711| A| |d|0031 | A|49998|0124616
drawing Data=6985426 |53711| A| |d|0032 | A|49998|0234515
drawing Data=6985426 |53711| A| |d|0033 | A|49998|0126707
drawing Data=6985426 |53711| A| |d|0034 | A|49998|0128215
drawing Data=6985426 |53711| A| |d|0035 | A|49998|0072619
drawing Data=6985426 |53711| A| |d|0036 | A|49998|0076247
drawing Data=7069152 |53711| A| |d|0001 | A|49998|2185285
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=astm-a193 | | | |200515|a| | |
document Ref Data=astm-b209 | | | |070801|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b564 | | | |191101|a| | |
document Ref Data=astm-a574 | | | |120401|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=asme-b18.3 | | | |120101|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-18240 | | |f |000313|a| 1| |
document Ref Data=qpl 25027 | | |17 |000207|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-a-200 | | |a |980901|a| | |
document Ref Data=sae Ams-qq-a-200 |0008| |a |150501|a| | |
document Ref Data=sae Ams-qq-a-250 |0011| | |970801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=t9074-bd-gib-010/0300 | | |2 |121218|a| | |
3. Requirements
3.1 ;desurger Assembly Fwd To Be In Accordance With Naval Sea System Command Drawing 6985426 Part A3 And All Eb Ers Invoked In This Contract, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;head Desurger, Part 3-1;
material - ;t9074-bd-gib-010/0300, Grade Hy-80, Forged, Appendix E;
part - ;tailpiece Fwd Part 3-2;
material - ;sae Ams-qq-s-763, Cl 304, Cond A;
part - ;bushing Part 6-1;
material - ;astm-b150 Uns C63200, Tq50 Or Tq55;
part - ;barrel Part 22;
material - ;astm-b564 Forged, Uns N06625, Condition Annealed And Meeting The Mechanical Properties Of General Note 7006. Chrome Plated In Accordance With General Note 7021;
part - ;piston Part 23;
material - ;sae Ams-qq-a-250/11, Alloy 6061, Temper T651 Or Astm B209, Alloy 6061, Temper T651. Anodized In Accordance With General Note 2221;
part - ;rod Tie Part 24;
material - ;astm-a193 Grade B7;
part - ;rod Piston Part 25;
material - ;sae-ams- Qq-a-200/8 Alloy 6061, Temper T6 Anodized In Accordance With General Note 2221 And Plated In Accordance With General Note 7202;
part - ;nut, Self-locking Part 78;
material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn. All Material Must Be From The Same Class.
self-locking Element- Astm-d4066, Group 01, Class 1 Or 2, Grade 1
part - ;self Locking Cap Screw, Part 79;
material - ;mil-dtl-1222, Type Ii, Qq-n-286, Solution Annealed And Age Hardened And Marked .k. Self-locking Element To Be In Accordance With Mil-dtl-18240. Cross Drill 2 Holes Iaw Ansi-b18.3;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - ;ultrasonic Inspection;
item - ;bushing Part 6-1(with A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material);
performance - ;t9074-as-gib-010/271;
acceptance - ;general Note 125 Of Drawing 6985426;
test - ;ultrasonic Inspection;
item - ;barrel Part 22 (starting Material);
performance - ;eb-2937, Paragraph 4.5.4;
acceptance - ;eb-2937, Paragraph 4.5.4;
test - ;ultrasonic Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/300 Appendix E;
acceptance - ;t9074-bd-gib-010/300 Appendix E;
test - ;magnetic Particle Inspection;
item - ;hy-80 Forged Material;
performance - ;t9074-bd-gib-010/300 Appendix E;
acceptance - ;t9074-bd-gib-010/300 Appendix E;
test - Quality Conformance/compliance Inspection
item - ;hy-80 Starting Material;
performance - ;t9074-bd-gib-010/300, Appendix E;
acceptance - ;t9074-bd-gib-010/300, Appendix E;
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;tailpiece, Part 3-2;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;rod Tie Part 24;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;nut Self Locking Part 78;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027;
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm-d4066, Group 01, Class 1, Grade 1;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
test - ;liquid Penetrant Inspection;
item - ;screw Cap Self Locking Part 79;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
attribute - Annealing And Age Hardening
item - ;screw Cap Self Locking Part 79;
performance - Qq-n-286
test - ;hydrostatic Test;
item - ;each Assembly;
performance - ;note 7400 Of Drawing 6985426;
acceptance - ;note 7400 Of Drawing 6985426;
3.4 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig/-0psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of Thesmallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
30 Minutes / - 0 Minutes. Above 2500 Psig, The Pressure Tolerance Must Be +2%/-0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
The Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In
this Contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be + 60 Minutes/- 0 Minutes.
3.5 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.6 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.6.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.6.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.7 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.8 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must Be
performed On A Full Size Fastener.)
3.8.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.8.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.9 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.10 Certification Is Required For The Following As Identified Further Below:
- Process Control Plan
- Qualification Plan
- Qualification Testing (first Article)
all Manufacturing Facilities Which Have Been Approved To An Earlier Revision Of This Specification Are Required To Meet The Recertification Requirements Of T9074-bd-gib-010/0300 Revision 2. An Updated Process Control Plan Incorporating Any Changes Necessary To
meet The Requirements Of T9074-bd-gib-010/0300 Revision 2 Must Be Submitted.
re-certification Of The First Article Approval Of Vendor Facilities, Processes, And Manufacturing Methods Is Required Every 5 Years And Must Meet All The Requirements Of T9074-bd-gib-010/0300. The Certification Must Be Current At The Delivery Date Of Procured
products.
3.10.1 Qualification Testing (first Article Inspection) - See Di-ndti-80809 (first Article Test Report) - Certification Is Required For The Following Test On The Items Listed Below:
test - First Article Inspection
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
acceptance - T9074-bd-gib-010/0300
previous Fat Approvals That Were Based Upon Previous Specifications Are Not Valid For Meeting The Requirements Of T9074-bd-gib-010/0300 Revision 2, Unless Otherwise Approved By Navsea.
the Contractor May Request The Fat Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval, Provided It Meets The Requirements Of This Contract/purchase Order.
3.10.2 Process Control Plan - See Di-ndti-80809 (process Control Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Process Control Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Pcp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Pcp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.10.3 Qualification Plan - See Di-ndti-80809 (qualification Plan) - Certification Is Required For The Following Attribute On The Items Listed Below:
attribute - Qualification Plan
item - ;hy-80 Starting Material;
performance - T9074-bd-gib-010/0300
the Qp Must Be Reviewed And Approved By Navsea Prior To Initiating First Article Testing. The Contractor May Request The Qp Submission Requirement Be Waived By Providing The Pco With Evidence Of Navsea Approval.
3.11 ;see Cdrl Di-forg-80412 (forging Manufacturing Sketches) Forging Sketches Are Required For The Head Desurger, Part 3-1, Per T9074-bd-gib-010-0300, Appendix E.;
3.12 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.12.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.12.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.12.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.13 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.13.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.13.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.13.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.14 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.15 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures
qualified Under S9074-aq-gib-010/248 For All Production And Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.16 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.17 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.17.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.17.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.17.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.18 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.19 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.19.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.20 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.21 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222, Except The Self-locking Hex Nuts Must Be Marked In Accordance With Nasm 17828. Nasm 17828 Nuts Must Be Marked On The Wrenching Surface With The Manufacturer's
identification Symbol, Material Symbol And Heat/lot Traceability Code; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574, And 4340 Which Must Be Marked
by Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The Application Of Protective
compounds.
3.21.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.22 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
3.23 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item Made To T9074-bd-gib-010/0300, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12).
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. The Revision Of The Process Control Plan Used And The Date Of Most Recent First Article Approval Or Recertification.
5. Actual Data Of Specified Chemical And Mechanical Tests And A Record Of The Final Heat Treatment (if Applicable).
6. Qualitative Results Of Nondestructive Tests And Other Inspections Or Tests.
7. The Melt Processes Used And The Melting Source Of The Material If The Contractor Is Not The Melter.
8. A Statement That Each Lot Has Been Sampled, Tested, And Inspected In Accordance With The Specification Requirements And That The Manufacturer Has Maintained Adequate Manufacturing Procedures Demonstrated In First Article Testing As Listed And Maintained As
specified In Paragraph 4.3.2 Of T9074-bd-gib-010/0300 And Quality Assurance Practices To Produce A Product That Meets The Chemical And Mechanical Property Requirements Specified Throughout The Product.
9. A Statement That Each Lot Meets All Specification Requirements.
10. Contractor's Or Authorized Personnel's Signature.
3.24 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.24.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.24.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.24.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.24.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.24.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.24.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.24.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.24.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.24.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.24.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.24.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.24.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.25 See Cdrls Di-misc-80875 (brazing Procedures) And Di-misc-80876 (braze Proc Qual Data) - Prior To Performing Any Brazing, The Applicable Brazing Procedure Qualification Data Must Be Submitted. Brazing Procedures Must Be Submitted For Information With
the Supporting Procedure Qualification Data. Brazing Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. If The Contractor's Qualification Data Has Previously Been Approved By The Navy
for This Or Other Contracts, A Copy Of The Original Approval Letter Must Besubmitted In Lieu Of The Qualification Data. (note: Letters Extendingapproval Of Qualification Data Based On Previous Approvals Are Not Acceptableto Fulfill This Requirement. The
approval Letter Must Reference The Applicable Brazing Procedure And/or Brazing Procedure Qualification Data Number.)
3.26 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.26.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.26.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.26.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.26.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.26.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.27 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.27.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.27.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.28 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactur
Closing Date13 Jan 2025
Tender AmountRefer Documents
National Institutes Of Health Tender
Others
United States
Details: Sources Sought Announcement
title: Laboratory Casework System
id: Ss-niaid-25-2250915
post Date: January 7, 2025
response Date: January 17, 2025
naics: 337127
introduction
this Is A Sources Sought Notice. This Is Not A Solicitation For Proposals, Proposal Abstracts, Or Quotations. The Purpose Of This Notice Is To Obtain Information Regarding The Availability And Capability Of All Qualified Sources To Perform A Potential Requirement.
background, Purpose, Objectives
the Division Of Intramural Research (dir) Office Of Operations Management (oom) Is A Component Of Niaid, One Of The Largest Institutes Of The National Institutes Of Health (nih). For More Than 65 Years, Dir Has Been At The Forefront Of Research On Immunologic, Allergic, And Infectious Diseases. Their Discoveries Promote The Development Of New Vaccines, Diagnostics, And Therapeutics That Improve Human Health. Dir Scientists Study All Aspects Of Infectious Diseases, Including The Causative Agents, Vectors, And Pathogenesis In Human And Animal Hosts. Clinical Research Is Integral To The Dir Mission, Enabling Key Lab Discoveries To Be Rapidly Translated Into Methods To Prevent, Diagnose, Or Treat Disease.
the Rocky Mountain Lab’s Oom Renovation’s Division Is Requesting A Laboratory Casework System To Augment Their Existing System. The Casework Is Being Ordered For Laboratory Spaces 3118, 3119, And 3120 To Support The Incoming Tenure-track Principal Investigator In The Laboratory Of Neurological Infections And Immunity (lnii) At Rml. The Incoming Principal Investigator Will Be Instrumental In Advancing The Mission Of Rml.
the Casework Will Consist Of New Alpha Modular Casework That Matches The Specifications And Design Currently Utilized In The Quad Building (3120) And Alpha Modular Casework Found In Building 28. This Casework Is Flexible, Durable, And Designed To Accommodate The Evolving Needs Of Cutting-edge Scientific Research. The Current Laboratory Spaces Are Outdated And No Longer Meet The Needs Of Modern Scientific Research. Upgrading To The Alpha Modular Casework Will: Provide Greater Flexibility For Adapting Workspaces To Various Research Needs.
the Casework System Must Be Compatible With The Existing Laboratory Casework System. The Required Laboratory Casework System Must Be Modular, Durable, Customizable, And Meet Nih Design Requirements Manual (drm) Specifications And Biosafety Standards. The Required Laboratory Casework Is Essential To Support The Mission Of The National Institutes Of Health (nih) And Affiliated Agencies. This Procurement Will Equip The Labs With High-quality, Durable, And Modular Casework That Meets The Stringent Performance And Biosafety Requirements Necessary For Cutting-edge Research. This Action Ensures Researchers Have Access To Functional And Standardized Workspaces Critical For Advancing Scientific Discovery And Operational Efficiency.
the Need For Continuity In Laboratory Infrastructure Is Paramount. Currently, A Significant Portion Of The Existing Laboratory Furniture And Casework Is Sourced From Innovative Laboratory Systems. This Consistency Ensures Seamless Integration With Existing Infrastructure, Minimizes Disruptions, And Facilitates Ongoing Maintenance Using In-house Expertise And Stocked Replacement Parts.
description Of Need: See Attachment
project Requirements
successful Offerors Must Have The Knowledge, Skill, Ability, And Resources To Reliably Provide A Brand Name Or Equal To Laboratory Casework System. The Casework Must Integrate Seamlessly With Existing Infrastructure And Meet The Following Specifications:
cabinet Material: Steel Cabinet Bodies, Drawer Bodies, Shelves, Drawer Heads And Door Assemblies Shall Be Fabricated From Cold Rolled Steel And Chemically Resistant Finishes To Withstand The Rigors Of A Research Environment And Meet Sefa 8 Industry Standards. Sefa-standards-and-its-importance-for-lab-furniture
materials
a. General Requirements:
it Is The Intent Of This Specification To Provide A High-quality Steel Cabinet Specifically Designed For The Laboratory Environment.
b. Steel:
1. Cold Rolled Steel:
Cold Rolled Sheet Steel Shall Be Prime Grade 12, 14, 16, 18 And 20 Gauge U.s. Standard; Roller
Leveled, And Shall Be Treated At The Mill To Be Free Of Scale, Ragged Edges, Deep Scratches Or
Other Injurious Effects.
c. Hardware And Trim:
1. The Cabinets And Drawers Must Meet Sefa 8 Specifications A. Drawer And Door Pulls Shall
Construction
a. Steel Cabinet Construction:
1. General:
A. The Steel Furniture Shall Be Of Modern Design And Shall Be Constructed In Accordance With
The Best Practices Of The Sefa 8 Industry Standards.
B. Each Cabinet Shall Be Complete So That Units Can Be Relocated At Any Subsequent Time
Without Requiring Field Application Of Finished Ends Or Other Such Parts.
2. Steel Gauges: Gauges Of Steel Used In Construction Of Cases Shall Be 18 Gauge, Except As
Follows:
A. Leveling Bolt Reinforcements 12 Gauge.
B. Top And Intermediate Front Horizontal Rails, Apron Rails, Hinge Reinforcements, And
Reinforcement Gussets, 16 Gauge.
C. Drawer Assemblies, Door Assemblies, Bottom, Bottom Back Rail, Toe Space Rail, And
Adjustable Shelves, 20 Gauge.
b. Base Cabinets:
1. The Cabinets Construction Must Meet Sefa 8 Standards And Shall Be Formed Into Not Less
Than An L Formation At Top, Bottom, Back And A 3/4" Wide Front C Formation.
c. Special Purpose Storage Cabinets:
1. Acid Storage Fume Hood Cabinets:
Acid Storage Fume Hood Cabinets Shall Utilize The Same Gauges Of Steel And Construction
Features As Other Base Cabinets Except They Shall Be Completely Lined With A One Piece
Polyethylene Corrosion Resistant Liner According To The Sefa 8 Standards.
2. Solvent Storage Cabinets: Solvent Storage Cabinets Shall Be Specifically Designed For The
Storage Of Flammable And Combustible Liquids. Construction Shall Be Based Upon The
Requirements Listed By Ufc, Osha And Nfpa No. 30 1993, And Cabinets Shall Be Fm
Approved And Labeled. The Bottoms, Top, Sides And Doors Shall Be Fabricated Of 18 Gauge
Steel And Shall Be All Double Panel Construction With A 1 1/2" Air Space Between Panels.
The Cabinet Shall Be Labeled: "flammable Keep Fire Away".
3. Vacuum Pump Cabinets:
Vacuum Pump Cabinets Shall Utilize The Sefa 8 Standards For Construction. Each Cabinet
Shall Be Furnished With A 1½" Diameter Pvc Vent Pipe In The Back For Venting Or Access To
The Fume Hood Above.
d. Upper Cabinet Construction:
1. Upper Cabinets Shall Meet The Sefa 8 Standards.
2. Solid Panel Doors Shall Consist Of An Inner And Outer Door Pan. The Door Assembly Shall Be
3/4" Thick And Contains Sound Deadening Material.
3. Sliding Doors Shall Be Suspended From The Top In A Roll Formed Steel Track Fastened To The
Cabinet Top And Shall Glide On Nylon Rollers. Track Shall Be So Designed To Prevent
Accidental Removal Of Doors.
4. Swinging Doors Over 36" High Shall Be Hung On Three Or More Hinges.
5. Plate Glass Doors Shall Operate Based On Sefa 8 Standards.
e. Steel Full Height Cabinet Construction:
1. Full Height Storage Cabinets Shall Have A Finished Interior Same As Exterior.
2. Cabinet Tops Shall Be Formed Into A Channel Shape At Front With Flange At Rear And Sides For
Electro-welding Cabinet Top To Cabinet Back And Ends.
3. Solid Panel Doors Shall Consist Of Inner And Outer Pan Formations Mechanically Assembled
After Painting And Comply With Sefa 8 Standards.
4. Swinging Doors Over 36" High Shall Be Hung On Three Hinges.
performance Requirements
a. Steel Casework Construction Performance:
1. Base Cabinets Shall Be Constructed To Support At Least A Uniformly Distributed Load 200
Pounds Per Square Foot Of Cabinet Top Area, Including Working Surface Without
Objectionable Distortion Of Interference With Door And Drawer Operation.
b. Steel Paint System Finish And Performance Specification:
1. Steel Paint System Finish: After Cold Rolled Steel And Textured Steel Component Parts
Have Been Completely Welded Together And Before Finishing, They Shall Be Given A Pre Paint
Treatment To Provide To The Finish System To The Steel And To Aid In The Prevention Of
Corrosion. The Completed Finish System In Standard Colors Shall Meet The Performance Test
Requirements Specified Under Performance Test Results.
2. Performance Test Results:
The Surfaces Must Perform And Withstand Chemical Corrosion Based On Sefa Standard For
Chemical Spot Tests;
The Surface Must Withstand A Certain Level Of Heat According To Sefa 8 Standard For Heat
Resistance;
The Surface Must Withstand A Certain Level Of Impact According To Sefa 8 Standard For
Impact Resistance;
The Surface 18 Gauge Steel Strip Must Withstand A Certain Level Of Bending According To
Sefa 8 Standard For The Bending Test;
The Surface Coating Must Past The Astm D2197 68 “standard Method Of Test For
Adhesion Of Organic Coatings";
The Surface Paint Film Hardness Shall Meet Industry The Sefa Standard For The Hardness
Test.
work Surfaces
tops , Sinks, And Cupsinks Surfaces Are To Meet The Sepa 8 Standards.
the Contractor Shall Provide:
1. Delivery And Installation Services To Ensure Proper Placement And Integration With
Existing Infrastructure.
2. Maintenance Support, Including Access To Spare Parts, Troubleshooting Assistance, And
Technical Support During Normal Business Hours.
3. Detailed Product Documentation And Training Materials To Assist Laboratory Staff With Casework
Operation And Maintenance. Training Materials May Be Tailored To Suit The Specific Needs Of
Nih Laboratories.
the Government Anticipates Awarding A Firm Fixed Price Purchase Order, After Solicitation For This Requirement.
delivery /installation Location:
hamilton, Mt 59840
capability Statement/information Sought
all Capable Vendors Should Respond With A Brief Capability Statement By January 17, 2025 At 10:00 Am Est. The Capability Statement Must Include The Ability To Provide The Required Brand Name Or Equal Products, As Per Specifications, And That Are Compatible With The Innovative Laboratory Casework System. Capability Statement Must Include Place Of Manufacturer As Per Executive Order 14005-ensuring The Future Is Made In All Of America By All Of America's Workers. “buy America” Or “buy American,” That Require, Or Provide A Preference For, The Purchase Or Acquisition Of Goods, Products, Or Materials Produced In The United States, Including Iron, Steel, And Manufactured Goods Offered In The United States”.
if Your Organization Has The Potential Capacity To Support This Requirement, Please Provide The Following Information: 1) Organization Name, Address, Point Of Contact, Email Address, Website Address, Telephone Number, Uei Number And Size And Type Of Ownership For The Organization; And 2) Respondents Shall Indicate If They Are The Manufacturer Or The Distributor Of The Required Laboratory Casework System And Shall Include Basic Information On Product Specifications. If An Equal Product Is Recommended (not Specific To The Brand Proposed) Then Sufficient Details Shall Be Provided By The Respondent Describing How The Equal Product Being Recommended, Meets The Minimum Specifications Of The Requirement.
capability Statements Should Also Include Documentation Indicating That Offerors Business Size As Determined By The Small Business Administration’s Table Of Size Standards Located At: (https://www.sba.gov/content/small-business-size-standards) For Naics 337127. This Sba Size Standard Is Currently 1250 Employees But Is Subject To Change. Prospective Offerors May Also Note Whether They Meet Any Other Socio-economic Business Categories Such As 8(a), Hub-zone, Or Service-disabled Veteran When Submitting Their Capability Statement.
submission Instructions
interested Businesses Who Consider Themselves Qualified To Provide The Above-listed Items Are Invited To Submit A Response To This Sources Sought Notice By January 17, 2025 At 10:00 Am Est. All Responses Under This Sources Sought Notice Must Be Submitted All Responsible Sources That Could Provide Comparable Services May Submit A Capability Statement. All Required Documents Must Be Submitted Via The Niaid Electronic Simplified Acquisition Submission System (esass) Website At Https://esass.nih.gov By January 17, 2024 10:00 Am. All Vendors Must Register In The Esass System To Submit Their Documentation. Instructions On How To Register /submit Documents Are Included On The Website. All Responses Received By The Closing Date Of This Synopsis Will Be Considered By The Government.
disclaimer And Important Notes
this Notice Does Not Obligate The Government To Award A Contract Or Otherwise Pay For The Information Provided In Response. The Government Reserves The Right To Use Information Provided By Respondents For Any Purpose Deemed Necessary And Legally Appropriate. Any Organization Responding To This Notice Should Ensure That Its Response Is Complete And Sufficiently Detailed To Allow The Government To Determine The Organization’s Qualifications To Perform The Work. Respondents Are Advised That The Government Is Under No Obligation To Acknowledge Receipt Of The Information Received Or Provide Feedback To Respondents With Respect To Any Information Submitted. After A Review Of The Responses Received, A Pre-solicitation Synopsis And Solicitation May Be Published In Federal Business Opportunities. However, Responses To This Notice Will Not Be Considered Adequate Responses To A Solicitation.
confidentiality
no Proprietary, Classified, Confidential, Or Sensitive Information Should Be Included In Your Response. The Government Reserves The Right To Use Any Non-proprietary Technical Information In Any Resultant Solicitation(s).
Closing Date17 Jan 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n742.11|wr3dd|717-605-7574|ashton.k.perry.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|clin 0001|twelve (12)|770 Days||||||||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (jan 2023)|16|certifications - Stand-alone Receiving Report; Material - Receiving Report & Invoice Combo|material - Inspect & Accept At Source|tbd|n00104|tbd|material-s4306a ; Certifications- N39040|n50286|tbd|133.2|n/a|n/a|
certifications - N39040|n/a|n/a|see Dd1423.|port_ptnh_wawf_notification@navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (oct 2024)|2|||
requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7||||||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (jan 2025)|13|336612|1,000 (# Of Employees)||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data (may 2024))|1||
1. The Purpose Of This Amendment Is To Remove The Following Clauses From The Solicitation:
52.225-5, Trade Agreements
52.225-6, Trade Agreements Certificate
2. All Other Terms And Conditions Remain Unchanged And In Full Effect.
\
1. This Is An Advanced Equipment Repair Program (aerp) Requirement.
2. Dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
3. Certifications Shall Be Submitted In Wawf At Least 20 Days Prior To Therequired Delivery Date To Allow Time For Portsmouth Nsy Review.
4. The Following Proposed Delivery Schedule Applies:
weld Procedures And Qualification Data 120 Days After Contract Award Prior To
performing Any Welding. Review (approval/disapproval) Must Be Accomplished Within 60 Days From Date Of Receipt
radiographic Shooting Sketches (rss) 45 Days After Contract Award Prior Toperforming Radiography. Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt.
production Radiography (pr) 135 Days After Approval Of Radiographic Shootingsketches. Review (approval/disapproval) Must Be Accomplished Within 30 Days From Date Of Receipt.
5. All Contractual Documents (i.e. Contracts, Purchase Orders, Delivery Orders,task Orders, And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile,
Or Sent By Other Electronic Commercemethods Such As Email. The Government's Acceptance Of The Contractor's Proposalconstitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein.
6.the Resultant Award Of This Solicitation Will Be Issued Bilaterally,requiring The Contractor's Written Acceptance Prior To Execution.
7. If Requirement Will Be Packaged At A Location Different From The Offeror;saddress, The Offeror Shall Provide The Name, Address, And Cage Of Thefacility.
8. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certifiedfor National Defense Under The Defense Priorities And Allocations System(dpas). Provision 52.211-13, Notice Of Priority Rating For National Defense,emergency Preparedness, And Energy
program Use, Shall Be Inserted Insolicitations When The Contract To Be Awarded Shall Be A Rated Order.
9. Offerors Must Have A Valid U.s. Security Clearance Of Confidential Or Higher In Order To Respond To This Rfp N0010425rzb38, Because The Rfpn0010425rzb38 Includes An Annex Classified At The Confidential Level Which Willbe Released Only To Offerors Possessing The
Appropriate Clearance. All Classified Material Must Be Handled In Accordance With The National Industrial Security Program Operating Manual (nspom)(dod 5220-22-m) And Industrial Security Regulation (dod5220.22-r)
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
The Classified Documents And Security Level Are: ;6984058 - Confidential;
2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.3.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=erh692-1805a10 |96169| B| |d|0001 | B|49998|0058869
drawing Data=erh692-1805a10 |96169| B| |d|0001.1 | B|49998|0055255
drawing Data=erh692-1805a10 |96169| B| |d|0001.2 | B|49998|0033791
drawing Data=erh692-1805a10 |96169| B| |d|0002 | B|49998|0069436
drawing Data=erh692-1805a10 |96169| B| |d|0003 | B|49998|0089424
drawing Data=erh692-1805a10 |96169| B| |d|0004 | B|49998|0060019
drawing Data=erh692-1805a10 |96169| B| |d|0005 | B|49998|0065743
drawing Data=erh692-1805a10 |96169| B| |d|0006 | B|49998|0062436
drawing Data=erh692-1805a10 |96169| B| |d|0007 | B|49998|0065697
drawing Data=erh692-1805a10 |96169| B| |d|0008 | B|49998|0064144
drawing Data=erh692-1805a10 |96169| B| |d|0009 | B|49998|0064780
drawing Data=erh692-1805a10 |96169| B| |d|0010 | B|49998|0066997
drawing Data=erh692-1805a10 |96169| B| |d|0011 | B|49998|0054689
drawing Data=erh692-1805a10 |96169| B| |d|0012 | B|49998|0050491
drawing Data=erh692-1805a10 |96169| B| |d|0013 | B|49998|0040719
drawing Data=erh692-1805a10 |96169| B| |d|0014 | B|49998|0258455
drawing Data=erh692-1805a10 |96169| B| |d|0015 | B|49998|0268176
drawing Data=erh692-1805a10 |96169| B| |d|0016 | B|49998|0291139
drawing Data=erh692-1805a10 |96169| B| |d|0017 | B|49998|0483371
drawing Data=erh692-1805a10 |96169| B| |d|0018 | B|49998|0196426
drawing Data=erh692-1805a10 |96169| B| |d|0019 | B|49998|0107977
drawing Data=erh692-1805a10 |96169| B| |d|0020 | B|49998|0109066
drawing Data=erh692-1805a10 |96169| B| |d|0021 | B|49998|0153771
drawing Data=erh692-1805a10 |96169| B| |d|0022 | B|49998|0149700
drawing Data=erh692-1805a10 |96169| B| |d|0023 | B|49998|0125724
drawing Data=erh692-1805a10 |96169| B| |d|0024 | B|49998|0137127
drawing Data=erh692-1805a10 |96169| B| |d|0025 | B|49998|0163750
drawing Data=erh692-1805a10 |96169| B| |d|0026 | B|49998|0249017
drawing Data=erh692-1805a10 |96169| B| |d|0027 | B|49998|0163495
drawing Data=erh692-1805a14 |96169| A| |d|0001 | A|49998|0053363
drawing Data=erh692-1805a14 |96169| A| |d|0001.1 | A|49998|0048132
drawing Data=erh692-1805a14 |96169| A| |d|0001.2 | A|49998|0012616
drawing Data=erh692-1805a14 |96169| A| |d|0002 | A|49998|0078717
drawing Data=erh692-1805a14 |96169| A| |d|0003 | A|49998|0061819
drawing Data=erh692-1805a14 |96169| A| |d|0004 | A|49998|0061022
drawing Data=erh692-1805a14 |96169| A| |d|0005 | A|49998|0039463
drawing Data=erh692-1805a14 |96169| A| |d|0006 | A|49998|0180622
drawing Data=erh692-1805a14 |96169| A| |d|0007 | A|49998|0164848
drawing Data=erh692-1805a14 |96169| A| |d|0008 | A|49998|0193363
drawing Data=erh692-1805a16 |96169| A| |d|0001 | A|49998|0056815
drawing Data=erh692-1805a16 |96169| A| |d|0001.1 | A|49998|0016081
drawing Data=erh692-1805a16 |96169| A| |d|0002 | A|49998|0076230
drawing Data=erh692-1805a16 |96169| A| |d|0003 | A|49998|0257234
drawing Data=erh692-1805a2 |96169| A| |d|0001 | A|49998|0064579
drawing Data=erh692-1805a2 |96169| A| |d|0002 | A|49998|0045127
drawing Data=erh692-1805a2 |96169| A| |d|0003 | A|49998|0064187
drawing Data=erh692-1805a2 |96169| A| |d|0004 | A|49998|0209005
drawing Data=erh692-1805a20 |96169| A| |d|0001 | A|49998|0055592
drawing Data=erh692-1805a20 |96169| A| |d|0001.1 | A|49998|0039945
drawing Data=erh692-1805a20 |96169| A| |d|0002 | A|49998|0083858
drawing Data=erh692-1805a20 |96169| A| |d|0003 | A|49998|0065519
drawing Data=erh692-1805a20 |96169| A| |d|0004 | A|49998|0075278
drawing Data=erh692-1805a20 |96169| A| |d|0005 | A|49998|0205744
drawing Data=erh692-1805a20 |96169| A| |d|0006 | A|49998|0134871
drawing Data=erh692-1805a20 |96169| A| |d|0007 | A|49998|0280400
drawing Data=erh692-1805a22 |96169| A| |d|0001 | A|49998|0053056
drawing Data=erh692-1805a22 |96169| A| |d|0001.1 | A|49998|0040743
drawing Data=erh692-1805a22 |96169| A| |d|0002 | A|49998|0086329
drawing Data=erh692-1805a22 |96169| A| |d|0003 | A|49998|0155222
drawing Data=erh692-1805a22 |96169| A| |d|0004 | A|49998|0173328
drawing Data=erh692-1805a23 |96169| B| |d|0001 | B|49998|0054707
drawing Data=erh692-1805a23 |96169| B| |d|0002 | B|49998|0059708
drawing Data=erh692-1805a23 |96169| B| |d|0003 | B|49998|0015391
drawing Data=erh692-1805a23 |96169| B| |d|0004 | B|49998|0033167
drawing Data=erh692-1805a23 |96169| B| |d|0005 | B|49998|0029130
drawing Data=erh692-1805a24 |96169| B| |d|0001 | B|49998|0052935
drawing Data=erh692-1805a24 |96169| B| |d|0001.1 | B|49998|0021175
drawing Data=erh692-1805a24 |96169| B| |d|0001.2 | B|49998|0046182
drawing Data=erh692-1805a24 |96169| B| |d|0001.3 | B|49998|0022405
drawing Data=erh692-1805a24 |96169| B| |d|0002 | B|49998|0088930
drawing Data=erh692-1805a24 |96169| B| |d|0003 | B|49998|0170585
drawing Data=erh692-1805a27 |96169| B| |d|0001 | B|49998|0058457
drawing Data=erh692-1805a27 |96169| B| |d|0001.1 | B|49998|0050626
drawing Data=erh692-1805a27 |96169| B| |d|0001.2 | B|49998|0045875
drawing Data=erh692-1805a27 |96169| B| |d|0001.3 | B|49998|0067842
drawing Data=erh692-1805a27 |96169| B| |d|0001.4 | B|49998|0040835
drawing Data=erh692-1805a27 |96169| B| |d|0002 | B|49998|0088669
drawing Data=erh692-1805a27 |96169| B| |d|0003 | B|49998|0097284
drawing Data=erh692-1805a27 |96169| B| |d|0004 | B|49998|0170590
drawing Data=erh692-1805a28 |96169| A| |d|0001 | A|49998|0043965
drawing Data=erh692-1805a29 |96169| B| |d|0001 | B|49998|0066769
drawing Data=erh692-1805a29 |96169| B| |d|0001.1 | B|49998|0037115
drawing Data=erh692-1805a29 |96169| B| |d|0001.2 | B|49998|0046131
drawing Data=erh692-1805a29 |96169| B| |d|0002 | B|49998|0092560
drawing Data=erh692-1805a29 |96169| B| |d|0003 | B|49998|0148173
drawing Data=erh692-1805a29 |96169| B| |d|0004 | B|49998|0237977
drawing Data=erh692-1805a5 |96169| A| |d|0001 | A|49998|0054329
drawing Data=erh692-1805a5 |96169| A| |d|0001.1 | A|49998|0041525
drawing Data=erh692-1805a5 |96169| A| |d|0001.2 | A|49998|0028816
drawing Data=erh692-1805a5 |96169| A| |d|0002 | A|49998|0088317
drawing Data=erh692-1805a5 |96169| A| |d|0003 | A|49998|0051068
drawing Data=erh692-1805a5 |96169| A| |d|0004 | A|49998|0081532
drawing Data=erh692-1805a5 |96169| A| |d|0005 | A|49998|0073394
drawing Data=erh692-1805a5 |96169| A| |d|0006 | A|49998|0079885
drawing Data=erh692-1805a5 |96169| A| |d|0007 | A|49998|0055120
drawing Data=erh692-1805a5 |96169| A| |d|0008 | A|49998|0060177
drawing Data=erh692-1805a5 |96169| A| |d|0009 | A|49998|0056586
drawing Data=erh692-1805a5 |96169| A| |d|0010 | A|49998|0072207
drawing Data=erh692-1805a5 |96169| A| |d|0011 | A|49998|0050781
drawing Data=erh692-1805a5 |96169| A| |d|0012 | A|49998|0054895
drawing Data=erh692-1805a5 |96169| A| |d|0013 | A|49998|0053120
drawing Data=erh692-1805a5 |96169| A| |d|0014 | A|49998|0055598
drawing Data=erh692-1805a5 |96169| A| |d|0015 | A|49998|0037341
drawing Data=erh692-1805a5 |96169| A| |d|0016 | A|49998|0041355
drawing Data=erh692-1805a5 |96169| A| |d|0017 | A|49998|0014793
drawing Data=erh692-1805a5 |96169| A| |d|0018 | A|49998|0208431
drawing Data=erh692-1805a5 |96169| A| |d|0019 | A|49998|0230578
drawing Data=erh692-1805a5 |96169| A| |d|0020 | A|49998|0227752
drawing Data=erh692-1805a5 |96169| A| |d|0021 | A|49998|0156401
drawing Data=erh692-1805a5 |96169| A| |d|0022 | A|49998|0086544
drawing Data=erh692-1805a6 |96169| A| |d|0001 | A|49998|0052356
drawing Data=erh692-1805a6 |96169| A| |d|0001.1 | A|49998|0029696
drawing Data=erh692-1805a6 |96169| A| |d|0002 | A|49998|0061577
drawing Data=erh692-1805a6 |96169| A| |d|0003 | A|49998|0213053
drawing Data=erh692-1805a6 |96169| A| |d|0004 | A|49998|0159937
drawing Data=erh692-1805a6 |96169| A| |d|0005 | A|49998|0081174
drawing Data=erh692-1805a8 |96169| A| |d|0001 | A|49998|0045984
drawing Data=erh692-1805a8 |96169| A| |d|0001.1 | A|49998|0029643
drawing Data=erh692-1805a8 |96169| A| |d|0002 | A|49998|0062370
drawing Data=erh692-1805a8 |96169| A| |d|0003 | A|49998|0057451
drawing Data=erh692-1805a8 |96169| A| |d|0004 | A|49998|0058330
drawing Data=erh692-1805a8 |96169| A| |d|0005 | A|49998|0071878
drawing Data=erh692-1805a8 |96169| A| |d|0006 | A|49998|0069393
drawing Data=erh692-1805a8 |96169| A| |d|0007 | A|49998|0234907
drawing Data=erh692-1805a8 |96169| A| |d|0008 | A|49998|0252467
drawing Data=erh692-1805a8 |96169| A| |d|0009 | A|49998|0166340
drawing Data=erh692-1805a9 |96169| A| |d|0001 | A|49998|0061879
drawing Data=erh692-1805a9 |96169| A| |d|0001.1 | A|49998|0046983
drawing Data=erh692-1805a9 |96169| A| |d|0001.2 | A|49998|0032606
drawing Data=erh692-1805a9 |96169| A| |d|0002 | A|49998|0065986
drawing Data=erh692-1805a9 |96169| A| |d|0003 | A|49998|0088361
drawing Data=erh692-1805a9 |96169| A| |d|0004 | A|49998|0045642
drawing Data=erh692-1805a9 |96169| A| |d|0005 | A|49998|0060379
drawing Data=erh692-1805a9 |96169| A| |d|0006 | A|49998|0060325
drawing Data=erh692-1805a9 |96169| A| |d|0007 | A|49998|0054999
drawing Data=erh692-1805a9 |96169| A| |d|0008 | A|49998|0066982
drawing Data=erh692-1805a9 |96169| A| |d|0009 | A|49998|0061293
drawing Data=erh692-1805a9 |96169| A| |d|0010 | A|49998|0249722
drawing Data=erh692-1805a9 |96169| A| |d|0011 | A|49998|0185935
drawing Data=h692-1805a1 |53711| A|er |d|0001 | A|49998|0124800
drawing Data=h692-1805a108 |53711| A|er |d|0001 | A|49998|1749473
drawing Data=h692-1805a112 |53711| A|er |d|0001 | A|49998|1735163
drawing Data=h692-1805a117 |53711| A|er |d|0001 | A|49998|0336981
drawing Data=h692-1805a36 |53711| A|er |d|0001 | A|49998|3525344
drawing Data=h692-1805a39 |53711| A|er |d|0001 | A|49998|2322180
drawing Data=h692-1805a42 |53711| A|er |d|0001 | A|49998|2129693
drawing Data=h692-1805a45 |53711| A|er |d|0001 | A|49998|1044520
drawing Data=h692-1805a47 |53711| A|er |d|0001 | A|49998|0942219
drawing Data=h692-1805a48 |53711| A|er |d|0001 | A|49998|1147467
drawing Data=h692-1805a49 |53711| A|er |d|0001 | A|49998|0874778
drawing Data=h692-1805a50 |53711| A|er |d|0001 | A|49998|2444022
drawing Data=h692-1805a54 |53711| A|er |d|0001 | A|49998|2038034
drawing Data=h692-1805a60 |53711| E|er |d|0001 | E|49998|2662465
drawing Data=h692-1805a64 |53711| D|er |d|0001 | D|49998|0045314
drawing Data=h692-1805a64 |53711| D|er |d|0002 | D|49998|0046811
drawing Data=h692-1805a64 |53711| D|er |d|0003 | D|49998|0020837
drawing Data=h692-1805a64 |53711| D|er |d|0004 | D|49998|0009860
drawing Data=h692-1805a64 |53711| D|er |d|0005 | D|49998|0014534
drawing Data=h692-1805a64 |53711| D|er |d|0006 | D|49998|0047048
drawing Data=h692-1805a64 |53711| D|er |d|0007 | D|49998|0032696
drawing Data=h692-1805a64 |53711| D|er |d|0008 | D|49998|0035483
drawing Data=h692-1805a64 |53711| D|er |d|0009 | D|49998|0046901
drawing Data=h692-1805a64 |53711| D|er |d|0010 | D|49998|0012022
drawing Data=h692-1805a64 |53711| D|er |d|0011 | D|49998|0033286
drawing Data=h692-1805a64 |53711| D|er |d|0012 | D|49998|0030524
drawing Data=h692-1805a64 |53711| D|er |d|0013 | D|49998|0029695
drawing Data=h692-1805a64 |53711| D|er |d|0014 | D|49998|0031647
drawing Data=h692-1805a64 |53711| D|er |d|0015 | D|49998|0031818
drawing Data=h692-1805a64 |53711| D|er |d|0016 | D|49998|0036726
drawing Data=h692-1805a64 |53711| D|er |d|0017 | D|49998|0021180
drawing Data=h692-1805a73 |53711| A|er |d|0001 | A|49998|5362927
drawing Data=h692-1805a85 |53711| B|er |d|0001 | B|49998|1554163
drawing Data=h692-1805a87 |53711| A|er |d|0001 | A|49998|0271668
drawing Data=h692-1805a88 |53711| A|er |d|0001 | A|49998|0319661
drawing Data=h692-1805a89 |53711| B|er |d|0001 | B|49998|0495358
drawing Data=h692-1805a9 |53711| A|er |d|0001 | A|49998|3105459
drawing Data=h692-1805a90 |53711| B|er |d|0001 | B|49998|1820669
drawing Data=h692-1805a91 |53711| A|er |d|0001 | A|49998|1745170
drawing Data=h692-1805a92 |53711| A|er |d|0001 | A|49998|2236282
drawing Data=h692-1805a95 |53711| A|er |d|0001 | A|49998|2575036
drawing Data=2625-010x08 |96169| A| |d|0001 | A|49998|0825199
drawing Data=5959311c5 |53711| A|er |d|0001 | A|49998|0687003
drawing Data=6984058 |53711| A| |d|0001 | A|00026|0000000
drawing Data=7067878 |53711| A| |d|0000.a | A|49998|0055935
drawing Data=7067878 |53711| A| |d|0001 | A|49998|0087250
drawing Data=7067878 |53711| A| |d|0002 | A|49998|0092836
drawing Data=7067878 |53711| A| |d|0003 | A|49998|0013085
drawing Data=7067878 |53711| A| |d|0004 | A|49998|0016641
drawing Data=7067878 |53711| A| |d|0005 | A|49998|0040694
drawing Data=7067878 |53711| A| |d|0006.1 | A|49998|0082343
drawing Data=7067878 |53711| A| |d|0006.2 | A|49998|0073258
drawing Data=7067878 |53711| A| |d|0006.3 | A|49998|0094913
drawing Data=7067878 |53711| A| |d|0006.4 | A|49998|0022877
drawing Data=7067878 |53711| A| |d|0006.5 | A|49998|0046043
drawing Data=7067878 |53711| A| |d|0007.01 | A|49998|0034852
drawing Data=7067878 |53711| A| |d|0007.02 | A|49998|0063518
drawing Data=7067878 |53711| A| |d|0007.03 | A|49998|0065396
drawing Data=7067878 |53711| A| |d|0007.04 | A|49998|0067087
drawing Data=7067878 |53711| A| |d|0007.05 | A|49998|0066694
drawing Data=7067878 |53711| A| |d|0007.06 | A|49998|0064384
drawing Data=7067878 |53711| A| |d|0007.07 | A|49998|0063971
drawing Data=7067878 |53711| A| |d|0007.08 | A|49998|0075575
drawing Data=7067878 |53711| A| |d|0007.09 | A|49998|0061690
drawing Data=7067878 |53711| A| |d|0007.10 | A|49998|0049467
drawing Data=7067878 |53711| A| |d|0007.11 | A|49998|0038500
drawing Data=7067878 |53711| A| |d|0008.1 | A|49998|0035321
drawing Data=7067878 |53711| A| |d|0008.2 | A|49998|0043555
drawing Data=7067878 |53711| A| |d|0008.3 | A|49998|0014656
drawing Data=7067878 |53711| A| |d|0009 | A|49998|0258332
drawing Data=7067878 |53711| A| |d|0010 | A|49998|0266122
drawing Data=7067878 |53711| A| |d|0011 | A|49998|0292941
drawing Data=7067878 |53711| A| |d|0012 | A|49998|0489518
drawing Data=7067878 |53711| A| |d|0013 | A|49998|0187950
drawing Data=7067878 |53711| A| |d|0014 | A|49998|0112705
drawing Data=7067878 |53711| A| |d|0015 | A|49998|0138164
drawing Data=7067878 |53711| A| |d|0016 | A|49998|0214006
drawing Data=7067878 |53711| A| |d|0017 | A|49998|0169091
drawing Data=7067878 |53711| A| |d|0018 | A|49998|0173572
drawing Data=7067878 |53711| A| |d|0019 | A|49998|0134953
drawing Data=7067878 |53711| A| |d|0020 | A|49998|0173655
drawing Data=7067878 |53711| A| |d|0021 | A|49998|0277216
drawing Data=7067878 |53711| A| |d|0022 | A|49998|0181070
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=qq-n-281 | | |d |851023|a|2 | |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-b369 | | | |200401|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=astm-e1417 | | | |160615|a| | |
document Ref Data=astm-e1444 | | | |160601|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=astm-d4066 | | | |130701|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=mil-c-15726 | | |f |911008|a|1 | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=qpl 25027 |0017| | |000207|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a|1 | |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |081118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=aia/nas Nasm 17828 | | |1 |130430|a| | |
document Ref Data=aia/nas Nasm 25027 | | |1 |121221|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 ;complete Tank Assembly, To Be In Accordance With Navsea Drawing 595-7067878, Assembly A10/a11, And All Engineering Reports Included With This Contract/purchase Order, Except As Amplified Or Modified Herein.;
3.2 ;the Correct Width Of The O-ring Groove Shown In Detail View 21-3d Of Navsea Drawing 7067878 Is .375/.385 Inches.;
3.3 ;wiper Strip, Part 18, Must Be In Accordance With Navsea Drawing 803-5959311 Note 2 K (3) (e) And Engineering Report Er5959311c5.;
3.4 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;body, Tank, Part 43; Flange, Tank, Part 44; Flange, Tank, Part 45;
material - ;astm-b369, Uns C96400;
part - ;rod, Tail, Part 46;
material - ;astm-b150, C63200;
part - ;threadpiece, Union, Part 51;
material - ;mil-c-15726, Alloy C71500, Form Rod,temper 060;
part - ;stud, Parts 47, 53, And 54;
material - ;mil-dtl-1222, Type Iv, Grade 500, Qq-n-286, Annealed And Age Hardened;
part - ;nut, Hex, Self-locking, Parts 48 And 50;
material - Qq-n-281, Class A Annealed (hot Finished Or Cold Drawn) Or Class B Cold Drawn.
all Material Must Be From The Same Class.
self-locking Element- Astm-d4066, Group 01, Class 1, Grade 1
3.5 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Quality Conformance Tests
item - Self-locking Nuts
performance - ;nasm25027;
acceptance - ;nasm25027;
attribute - Certificate Of Completion
item - Self-locking Nut Nonmetallic Insert
performance - ;astm-d4066, Group 01, Class 1, Grade 1;
attribute - Certificate Of Compliance
item - Self-locking Nuts
performance - This Certificate Must State That Self-locking Nuts Were Manufactured By An Approved Source. Approved Sources Are Those Listed On Qpl-25027 For The Appropriate Fastener. This Qpl May Also Be Considered As Approved Sources For Heavy Hex
self-locking Nuts.
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
attribute - Annealing And Age Hardening
item - ;stud, Parts 47, 53, And 54;
performance - Qq-n-286
test - ;liquid Penetrant Inspection;
item - ;stud, Parts 47, 53, And 54;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;dye Penetrant Inspection For Non-magnetic Grades;
item - ;nut, Hex, Self-locking, Parts 48 And 50;
performance - T9074-as-gib-010/271 Or Astm-e1417/astm-e1444
(method C Solvent Removal Techniques Must Not Be Used On Thread)
acceptance - ;nasm25027;
test - Weldability Test Of Astm-b369 Material
item - ;body, Tank, Part 43; Flange, Tank, Part 44; Flange, Tank, Part 45;
performance - Astm-b369
acceptance - Astm-b369
test - Pressure Tests
item - Each Assembly
performance - ;general Notes 7012 & 7013 Of Drawing 7067878;
acceptance - ;general Notes 7012 & 7013 Of Drawing 7067878;
test - 5x Visual Magnification Or Dye Penetrant Inspection (root Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
test - Visual And Dye Penetrant Inspection (final Layer)
item - Weldments
performance - T9074-as-gib-010/271
acceptance - Mil-std-2035
3.6 Radiography Is Required On ;body, Tank, Part 43; Flange, Tank, Part 44; Flange, Tank, Part 45; Joint J0003; And Joint J0004. Radiography Is Required For Weldments And Must Be Identified To The Weld Joint; .
3.7 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.8 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;6984058 Rev A; And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To Mark The Working
pressure On The Item Does Not Apply And Is Strictly Prohibited.
3.9 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.10 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.10.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.10.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.11 K-monel Fasteners - K-monel Externally Threaded Fasteners Must Have Mechanical Properties Determined In Accordance With Mil-dtl-1222. Test Results Must Include Tensile, Yield, Elongation And Hardness As Required By Mil-dtl-1222. (the Hardness Tests Must
be Performed On A Full Size Fastener.)
3.11.1 Studs Require An Axial Tensile Test In Accordance With Mil-dtl-1222.
3.11.2 Headed Fasteners Require A Wedge Tensile Test As Specified Elsewhere In This Contract/purchase Order.
3.12 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222.
3.12.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of
the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows:
a. Proper Product Lot Control And Traceability Must Be In Place.
b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar.
c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar.
e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be
performed On Studs As Required In Paragraph 4.5.2.7.e.
3.12.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The
"alternate Mechanical Testing" Provision.
3.12.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners
must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To
the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above.
3.13 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.14 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.14.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.14.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.14.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.15 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.16 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.17 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.18 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 929997033; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.19 Component Identification - An Aerp Serial Number Will Be Assigned To Each Component And A Nameplate Will Be Provided By Navsup Wss Mech, Code N97121, As Government Furnished Equipment (gfe) Prior To Packaging And Shipment. The Contractor Is Requested To
notify Navsup Wss Mech, Code N97121 When The Manufacturing Process Is Ready For The Nameplate(s), Allowing Sufficient Time For Mailing. Additional Details Are Clarified In The Referenced Refurbishment Instruction Or Procurement Specification From Submepp.
3.20 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing, Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Repair Welding Is Not
permitted On ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.21 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.21.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.21.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.21.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.22 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.23 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.24 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.24.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.25 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.26 See Cdrls Di-misc-80875 (welding Procedures) And Di-misc-80876 (weld Procedure Qualification Data) - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In
addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As Part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.26.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.26.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz.")
3.26.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.26.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.26.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.26.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.26.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.26.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.26.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.26.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.26.11 See Cdrl Di-misc-80678 (consumed Weld Metal) - A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.26.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.27 Radiography (rt) - Radiography Must Be Performed In Accordance With T9074-as-gib-010/271. Rt Acceptable Criteria For Castings To Be Criticality Level I Per The Applicable Table Of S9074-ar-gib-010a/278. Rt Acceptance Criteria For Weldments To Be Per The
applicable Table Of S9074-ar-gib-010a/278 (p-1 Piping) Or Mil-std-2035, Class 1, As Applicable.
3.27.1 See Cdrl Di-misc-80678 (rss) - The Contractor Or Activity Performing The Radiography Must Be Responsible For Preparing The Radiographic Shooting Sketches (rss) In Accordance With T9074-as-gib-010/271. Shooting Sketch Approval Is Not Required For
radiography Of Weldments. The Radiographic Standard Shooting Sketches (rsss) Referenced On The Applicable Drawing May Be Used, However, Since T9074-as-gib-010/271 Permits A Variety Of Processes, The Rsss May Not Be Applicable As They Will Not Necessarily Depend
only On The Coverage Requirements, But Also On The Equipment And Procedures Of The Particular Radiographic Facility. Approval Of These Shooting Sketches Or Radiographic Standard Shooting Sketches Is Required Per S9074-ar-gib-010a/278. If This Data Has Been
previously Approved By A Navy Activity, The Original Approval Letter Must Be Submitted At The Same Time As Rt Film And Reader Sheet Submittal.
3.27.2 All Pieces Radiographed Must Be Permanently Marked With "rt" And A Unique Rt Serial Number. (the Unique Rt Serial Number Must Be Directly Traceable To The Rt Film.)
3.27.3 See Cdrl Di-misc-80678 (production Radiography) - Production Radiography Requires Final Acceptance By The Navy. The Items Listed Below Must Be Submitted For Final Acceptance, Cataloging, File, And Retention. They Must Be Submitted And Approved Prior To
shipment Of The Applicable Hardware. However, When The Source Certification Clause Is Invoked, They Must Be Submitted A Minimum Of Forty-five (45) Working Days Prior To The Date Of Source Certification Inspection.
(a) Film
(b) Rss/rsss
(c) Rs (reader Sheets)
(d) Documentation Record Listing The Part Number, Heat/lot Traceability, And Theunique Rt Serial Number (which Is Traceable To The Rt Film And Reader Sheet)
3.28 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.28.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.28.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.28.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.28.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.28.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.29 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.29.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.29.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.30 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.30.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.30.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.30.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.30.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.30.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure
Closing Date29 Jan 2025
Tender AmountRefer Documents
51-60 of 69 archived Tenders