Architect Tenders

Architect Tenders

Province Of Iloilo Tender

Philippines
Details: Description Philippine Bidding Documents (as Harmonized With Development Partners) Improvement Of Manguna Check Dam At Brgy. Manguna, Cabatuan, Iloilo Bid No. Agr-23-1926-b Iloilo Provincial Government Sixth Edition Table Of Contents Glossary Of Terms, Abbreviations, And Acronyms 4 Section I. Invitation To Bid 7 Section Ii. Instructions To Bidders 9 1. Scope Of Bid 9 2. Funding Information 9 3. Bidding Requirements 9 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices 9 5. Eligible Bidders 10 6. Origin Of Associated Goods 10 7. Subcontracts 10 8. Pre-bid Conference 10 9. Clarification And Amendment Of Bidding Documents 10 10. Documents Comprising The Bid: Eligibility And Technical Components 11 11. Documents Comprising The Bid: Financial Component 11 12. Alternative Bids 11 13. Bid Prices 12 14. Bid And Payment Currencies 12 15. Bid Security 12 16. Sealing And Marking Of Bids 12 17. Deadline For Submission Of Bids 12 18. Opening And Preliminary Examination Of Bids 13 19. Detailed Evaluation And Comparison Of Bids 13 20. Post Qualification 13 21. Signing Of The Contract 13 Section Iii. Bid Data Sheet 14 Section Iv. General Conditions Of Contract 16 1. Scope Of Contract 16 2. Sectional Completion Of Works 16 3. Possession Of Site 16 4. The Contractor’s Obligations 16 5. Performance Security 17 6. Site Investigation Reports 17 7. Warranty 17 8. Liability Of The Contractor 17 9. Termination For Other Causes 17 10. Dayworks 18 11. Program Of Work 18 12. Instructions, Inspections And Audits 18 13. Advance Payment 18 14. Progress Payments 18 15. Operating And Maintenance Manuals 18 Section V. Special Conditions Of Contract 20 Section Vi. Specifications 21 Section Vii. Drawings 25 Section Viii. Bill Of Quantities 32 Section Ix. Checklist Of Technical And Financial Documents 43 Glossary Of Terms, Abbreviations, And Acronyms Abc – Approved Budget For The Contract. Arcc – Allowable Range Of Contract Cost. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Cda – Cooperative Development Authority. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Contractor – Is A Natural Or Juridical Entity Whose Proposal Was Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. Contractor As Used In These Bidding Documents May Likewise Refer To A Supplier, Distributor, Manufacturer, Or Consultant. Cpi – Consumer Price Index. Dole – Department Of Labor And Employment. Dti – Department Of Trade And Industry. Foreign-funded Procurement Or Foreign-assisted Project – Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Pcab – Philippine Contractors Accreditation Board. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Un – United Nations. Republic Of The Philippines Iloilo Provincial Government Section I. Invitation To Bid For Improvement Of Manguna Check Dam At Brgy. Manguna, Cabatuan, Iloilo Bid No. Agr-23-1926-b 1. The Iloilo Provincial Government, Through The 20% Nta Development Fund Fy-2023 – Water Supply System Intends To Apply The Sum Of P5,000,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Agr-23-1926-b For The Improvement Of Manguna Check Dam At Brgy. Manguna, Cabatuan, Iloilo For The Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Iloilo Provincial Government Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required One Hundred Fifty (150) Calendar Days. Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 4. Interested Bidders May Obtain Further Information From The Bids And Awards Committee Secretariat, 5th Floor, New Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City, Philippines And Inspect The Bidding Documents At The Address Given Below From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 15,2023 From Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Five Thousand Pesos (p5, 000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 6. The Iloilo Provincial Government Will Hold A Pre-bid Conference On December 22,2023 9:00 A.m. At Bids And Awards Committee Secretariat, 5th Floor, New Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City, Philippines, And/or Through Videoconferencing/webcasting Via Zoom Conference Which Shall Be Open To Prospective Bidders. The Default Meeting Id And Password Shall Be: Meeting Id: 434 085 1724 // Password: 0922 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address At Ground Floor, Lobby, Iloilo Provincial Capitol, Iloilo City On Or Before January 10, 2023 9:00 A.m.. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 9. Bid Opening Shall Be On January 10, 2023 9:00 A.m. At Bids And Awards Committee Secretariat, 5th Floor, New Iloilo Provincial Capitol, Bonifacio Drive, Iloilo City, Philippines. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Iloilo Provincial Government Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: 12. Atty. Raemman M. Lagrada Head, Bac Secretariat 5f New Iloilo Provincial Capitol Bonifacio Drive, Iloilo City Tel. No. (33) 336-0736 Fax No. (33) 337-7731 Email:iph_bacs@yahoo.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.iloilo.gov.ph December 11,2023 Atty. Dennis T. Ventilacion Bac Chairperson Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Iloilo Provincial Government Invites Bids For The Improvement Of Manguna Check Dam At Brgy. Manguna, Cabatuan, Iloilo With Project Identification Number Agr-23-1926-b. The Procurement Project (referred To Herein As “project”) Is For The Construction Of Works, As Described In Section Vi (specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For 2023 In The Amount Of Five Million Pesos (p5,000,000.00) 2.2. The Source Of Funding Is: A. 20% Nta Development Fund Fy 2023 – Water Supply System 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manual And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Invitation To Bid By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contracted Works And The Conditions For This Project, Such As The Location And The Nature Of The Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices The Procuring Entity, As Well As The Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted, If Necessary, By The Bidder To Current Prices Using The Psa’s Cpi, Except Under Conditions Provided For In Section 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184. A Contract Is Considered To Be “similar” To The Contract To Be Bid If It Has The Major Categories Of Work Stated In The Bds. 5.3. For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bidding Document Prepared For This Purpose. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.2 Of The 2016 Irr Of Ra No. 9184. 6. Origin Of Associated Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Fifty Percent (50%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address At Bac Office, 5th Floor, New Iloilo Provincial Capitol, Iloilo City And/or Through Videoconferencing As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 10.2. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 10.3. In Joint Ventures, A Special Pcab License, And Registration For The Type And Cost Of The Contract For This Project, Shall Be Required. Any Additional Type Of Contractor License Or Permit Shall Be Indicated In The Bds. 10.4. A List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen) Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data Shall Be Provided. These Key Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds. 10.5. A List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be, Must Meet The Minimum Requirements For The Contract Set In The Bds. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Ix. Checklist Of Technical And Financial Documents. 11.2. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.3. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12. Alternative Bids Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 13. Bid Prices All Bid Prices For The Given Scope Of Work In The Project As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Determined By The Neda And Approved By The Gppb Pursuant To The Revised Guidelines For Contract Price Escalation Guidelines. 14. Bid And Payment Currencies 14.1. Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 14.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 15. Bid Security 15.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 15.2. The Bid And Bid Security Shall Be Valid Until November 5, 2022. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 16. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission To The Given Website Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 17. Deadline For Submission Of Bids The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 18. Opening And Preliminary Examination Of Bids 18.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 18.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Entity’s Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of 2016 Revised Irr Of Ra No. 9184. 19.2. If The Project Allows Partial Bids, All Bids And Combinations Of Bids As Indicated In The Bds Shall Be Received By The Same Deadline And Opened And Evaluated Simultaneously So As To Determine The Bid Or Combination Of Bids Offering The Lowest Calculated Cost To The Procuring Entity. Bid Security As Required By Itb Clause 16 Shall Be Submitted For Each Contract (lot) Separately. 19.3. In All Cases, The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184 Must Be Sufficient For The Total Of The Abcs For All The Lots Participated In By The Prospective Bidder. 20. Post Qualification Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps), And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21. Signing Of The Contract The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds Section Iii. Bid Data Sheet Itb Clause 5.2 For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: A) Structural Works 7.1 The Procuring Entity Has Prescribed That Subcontracting Is Not Allowed. 10.3 [specify If Another Contractor License Or Permit Is Required.] 10.4 The Key Personnel Must Meet The Required Minimum Years Of Experience Set Below: Key Personnel General Experience Relevant Experience 1-project Engineer 1 Year 1 Year 1-material Engineer 1 Year 1 Year 1-agricultural & Biosystems Engineer 1 Year 1 Year 1-health & Safety Officer 1 Year 1 Year 1-foreman 1 Year 1 Year 10.5 The Minimum Major Equipment Requirements Are The Following: Equipment Capacity Number Of Units Bar Cutter - 1 Generator - 1 Welding Machine - 1 Plate Compactor - 1 Motorized Road Grader - 1 One Bagger Mixer - 1 Concrete Vibrator - 1 Steel Cutter - 1 Back Hoe (0.80 Cu.m) Dump Truck 12 Alternative Bids Are Not Allowed 15.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.2 Partial Bid Is Not Allowed 20 No Further Instructions. 21 The Additional Contract Documents Relevant To The Project That Are Required By The Procuring Entity Are: A. Construction Schedule And S-curve; B. Manpower Schedule; C. Construction Methods; D. Equipment Utilization Schedule; E. Construction Safety And Health Program Approved By The Department Of Labor And Employment; And F. Pert/cpm Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. 2. Sectional Completion Of Works If Sectional Completion Is Specified In The Special Conditions Of Contract (scc), References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Shall Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Possession Of Site 4.1. The Procuring Entity Shall Give Possession Of All Or Parts Of The Site To The Contractor Based On The Schedule Of Delivery Indicated In The Scc, Which Corresponds To The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 4.2. If Possession Of A Portion Is Not Given By The Above Date, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contract Time To Address Such Delay May Be Addressed Through Contract Extension Provided Under Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 4. The Contractor’s Obligations The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel Indicating Their Designation, In Accordance With Itb Clause 10.3 And Specified In The Bds, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 5. Performance Security 5.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr. 5.2. The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Ra No. 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 6. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 7. Warranty 7.1. In Case The Contractor Fails To Undertake The Repair Works Under Section 62.2.2 Of The 2016 Revised Irr, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property(ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 7.2. The Warranty Against Structural Defects/failures, Except That Occasioned-on Force Majeure, Shall Cover The Period From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. Specific Duration Of The Warranty Is Found In The Scc. 8. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 9. Termination For Other Causes Contract Termination Shall Be Initiated In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before, Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Stated In Itb Clause 4. 10. Dayworks Subject To The Guidelines On Variation Order In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 11. Program Of Work 11.1. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval The Said Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. The Submissions Of The Program Of Work Are Indicated In The Scc. 11.2. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 12. Instructions, Inspections And Audits The Contractor Shall Permit The Gop Or The Procuring Entity To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Of The Gop Or The Procuring Entity, As May Be Required. 13. Advance Payment The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum, Or At The Most Two Installments According To A Schedule Specified In The Scc, Subject To The Requirements In Annex “e” Of The 2016 Revised Irr Of Ra No. 9184. 14. Progress Payments The Contractor May Submit A Request For Payment For Work Accomplished. Such Requests For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 15. Operating And Maintenance Manuals 15.1. If Required, The Contractor Will Provide “as Built” Drawings And/or Operating And Maintenance Manuals As Specified In The Scc. 15.2. If The Contractor Does Not Provide The Drawings And/or Manuals By The Dates Stated Above, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 2 As Per Construction Schedule/contract Period 3.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon Effectivity Of The Contracts. 6 No Further Instructions 7.2 [in Case Of Permanent Structures, Such As Buildings Of Types 4 And 5 As Classified Under The National Building Code Of The Philippines And Other Structures Made Of Steel, Iron, Or Concrete Which Comply With Relevant Structural Codes (e.g., Dpwh Standard Specifications), Such As, But Not Limited To, Steel/concrete Bridges, Flyovers, Aircraft Movement Areas, Ports, Dams, Tunnels, Filtration And Treatment Plants, Sewerage Systems, Power Plants, Transmission And Communication Towers, Railway System, And Other Similar Permanent Structures:] Fifteen (15) Years. 10 Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. 11.1 No Further Instructions 11.2 No Further Instructions 13 The Amount Of The Advance Shall Not Exceed 15% Of The Total Contract Price. 14 Materials And Equipment Delivered On The Site But Not Completely Installed Or Constructed Shall Not Be Included For Payment. 15.1 The Date By Which Operating And Maintenance Manuals Are Required Shall Be At Least 5 Days Before The Testing And Commissioning. The Date By Which “as Built” Drawings Are Required Prior To The Final Billing. 15.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is 1% Of The Final Contract Amount. Section Vi. Specification General Requirements All Works To Be Done Shall Be With First Class Workmanship And Shall Conform To The Plans And Specifications. All Materials To Be Used Shall Be Of Good Quality And Properly Inspected By The Authorized Representative Or The Engineer In-charge. The Provincial Agriculturist Is Reserved The Interest Of The Government. The Contractor Shall Be Liable For All Damages That Will Occur During The Construction Of The Project. Scope Of Works The Works Include Furnishing Of Labor, Materials, Tools, Equipment And Other Incidentals Necessary To Complete The Project Such As: Dam Works: I. Construction Of Camp, Mobilization And Other Temporary Facilities Ii. Diversion Of Water And Care Of Creek Iii. Dam Site (upstream/downstream) Construction Of Retaining Wall: I. Clearing, Grubbing, And Staking Ii. Excavation Works Iii. Concrete Works Development Of Site: I. Clearing And Grubbing Ii. Embankment Construction Of Pump House: I. Excavation Ii. Backfilling Iii. Embankment Iv. Concrete Works V. Steel Works Vi. Masonry Works Vii. Roofing Works Viii. Plastering Works Ix. Painting Works X. Installation Of Pump And Engine Set With Complete Accessories Improvement Of Irrigation Canal (existing): I. Clearing And Grubbing Ii. Demolition Works Iii. Concrete Works Iv. Gate Works General Condition A. The Works To Be Done Herein Shall Be The Improvement Of Manguna Check Dam As Of Approved And Of Quality Materials Completed As Per Plans, Details And Specifications. Supervision Of The Work Shall Be Done Under The Responsibility Of The Project Engineer With The Help Of The Construction Foreman. B. All Materials Employed And To Be Used In The Construction Shall Be Brand New, Unless Otherwise Or As Directed And Approved By The Project Engineer. C. Skilled Workmen And Workmanship Subject To Project Engineer’s Approval Shall Perform Methods Of The Construction In The Most Acceptable Manner. D. The Drawings Referred To In The Specifications Including Supplementary One, To Be Furnished As The Work Progress Are Intended To Cooperate With The Specification And To Form Part Hereof. Where Figures Are Given, They Are To Be Followed In Performance To Measurement By Scale. E. The Assigned Engineer Or Construction Foreman Shall Lay – Out The Building In Accordance With The Drawings And Directions On Plans As He Shall Not Only Responsible But Liable For Any Failure To Comply In This Respect With The Said Drawings, Specifications And Directions For Its Due And Accurate Location On The Lot. Project Sign Board / Billboard The Contractor Shall Ensure That The Project Site Is Identified With Information Billboard Which Shall Be Erected At The Beginning And Ending Of The Proposed Project. The Layout Of The Billboard Shall Accord To The Specifications Pursuant To The Commission On Audit (coa) Circular No. 2013-004 Issued On January 30, 2013. Coa Billboard Pao Billboard The Billboard’s Specifications Shall Conform To The Following Requirements: A. Tarpaulin, White, 8ft X 8ft (coa) And 4ft X 8ft (pao): B. Resolution: 70 Dpi; C. Font: Helvetica; D. Font Size: Main Information – 3”; E. Sub-information – 1”; F. Font Color: Black; G. Suitable Frame: Rigid Wood Or Steel Frame With Post; And, H. Posting: Outside Display At The Project Location After Award Has Been Made. Measurement The Supply And Erection Of Project Billboard Shall Be In Accordance With Provisions Of This Specification. Basis Of Payment No Additional Payment Shall Be Made In This Regard. Outline Specifications: Clearing And Grubbing Clearing And Grubbing And Cutting Of Trees Shall Include Handling, Salvaging, Piling And Disposing Off The Cleared Materials With All Leads And Lifts. Trees Shall Be Cut In Sections From The Top Downwards. All Timber Shall Not Be Used By The Contractor For Any Purpose And Shall Remain The Property Of The Provincial Agriculture Office. Clearing Shall Consist Of The Cutting, Removing And Disposal Of All Trees, Bushes, Shrubs, Grass, Weeds, Other Vegetation, Anthills, Rubbish, Fences, Top Organic Soil And Rocks And Boulders Exposed Or Lying On The Surface. The Construction Site Shall Be Leveled According To The Plans And Cleared Of Rubbish, Roots And Other Perishable And Objectionable Matters To A Suitable Subgrade. All Such Unsuitable Materials Shall Be Removed From The Construction Site And Spread Uniformly Over The Areas Adjacent To The Proposed Building, Or Otherwise Disposed Of As Maybe Directed By The Architect/engineer In-charge Of The Construction. Materials Obtained From Clearing And Grubbing Shall Be Disposed Off In Borrow Pits Or Other Suitable Places And Be Covered Up With Soil Or Gravel As Directed By The Engineer. The Burning Of Combustible Materials Shall Not Be Permitted. During The Period Of Commencement Of Works, The Contractor Shall Survey The Construction Area And Confirm The Levels. He Shall Immediately Notify The Engineer Of Any Discrepancies And Shall Agree With The Engineer Any Amended Values On The Plan. All Stations And Reference Points Shall Be Clearly Marked And Protected To The Satisfaction Of The Engineer. All Working Benchmarks Shall Be Near Major/medium Structure Sites. Accurate Establishment Of The Centerlines Based On The Drawing Is Required. The Existing Profile And Cross-section Shall Be Jointly Taken With The Engineer. Demolition And Disposal Works A. Demolition Operations: Do Not Damage Building Elements And Improvements Indicated To Remain. Storage Or Sale Of Items At Project Site Is Prohibited. B. Occupied Spaces: Do Not Close Or Obstruct Streets, Walks, Drives Or Other Occupied Or Used Spaces Or Facilities Without The Written Permission Of The Owner And The Authorities Having Jurisdiction. Do Not Interrupt Utilities Serving Occupied Or Used Facilities Without The Written Permission Of The Owner And Authorities Having Jurisdiction. If Necessary, Provide Temporary Utilities. C. Operations: Cease Operations If Public Safety Or Remaining Structures Are Endangered. Perform Temporary Corrective Measures Until Operations Can Be Continued Properly. D. Security: Provide Adequate Protection Against Accidental Trespassing. Secure Project After Work Hours. E. Clearing Operations Include The Removal Of Demolished Materials And Objectionable Matter, Protection Of Existing Structures/facilities Left Functional And Clearing To Allow For New Construction Protection Necessary To Prevent Damage To Existing Structures And Facilities. Likewise, Disposal Of Materials, Trash And Debris In A Safe And Acceptable Manner In Accordance With Applicable Laws And Ordinances. Miscellaneous Survey And Staking This Item, Shall Consist Of Furnishing The Necessary Equipment And Material To Survey, Stake, Calculate, And Record Data For The Control Of Work In Accordance With These Specifications And Conformity With The Lines, Grades And Dimensions Shown On The Plans Or As Established By The Engineer. Staking Activities Shall Be Included In The Construction Schedule To Be Submitted By The Contractor. Dates And Sequence Each Staking Activity Shall Be Included. The Engineer Shall Set Initial Reference Lines, Horizontal And Vertical Control Points, And Shall Furnish The Data For Use In Establishing Control For The Completion Of Each Element Of The Work. Data Relating To Horizontal And Vertical Alignments, Theoretical Slope Stake Catch Points, And Other Design Data Shall Be Furnished. The Contractor Shall Be Responsible For The True Settling Of The Works And Improvements And For Correctness Of Positions, Levels, Dimensions And Alignment Of All Parts Of The Works. He Shall Provide All Necessary Instruments, Appliances, Materials And Supplies, And Labor In Connection Therewith. The Contractor Shall Provide Survey Crew Supervisor At The Project Site Whenever Surveying/staking Is In Progress. Prior To Construction, The Engineer Shall Be Notified Of Any Missing Initial Reference Lines, Controls, Points, Or Stakes. The Engineer Shall Reestablish The Missing Initial Reference Lines, Controls, Points, Or Stakes. The Contractor For Convenient Use Of Government Furnished Data Shall Perform Additional Calculations. Immediate Notification Of Apparent Errors In The Initial Staking Or In The Furnished Data Shall Be Provided. All Initial Reference And Control Points Shall Be Preserved. At The Start Of Construction, All Disturbed And Initial Reference Or Control Points Necessary To The Works Shall Be Replaced. Before Surveying And Staking, The Contractor Shall Discuss And Coordinate The Following With The Engineer: 1. Surveying And Staking Methods 2. Stake Marking/concrete Monuments 3. Grade Control For Courses Of Material 4. Referencing 5. Structure Control 6. Any Other Procedures And Controls Necessary For The Work Work Shall Only Be Started After Staking For The Affected Work Is Accepted. The Construction And Staking Work May Be Spot-checked By Engineer For Accuracy, And Unacceptable Portions Of Work May Be Rejected. Rejected Work Shall Be Resurveyed. Acceptance Of The Construction Staking Shall Not Relieve The Contractor Or Responsibility For Correcting Errors Discovered During The Work And For Bearing All Additional Costs Associated With The Error Unless Such Error Is Based On Incorrect Data Supplied In Writing By The Engineer, In Which Case, The Expense In Rectifying The Same Shall Be The Expense Of The Government. In The Case Of “change” Or “changed Conditions” Which Involve Any Change In Stakeout, The Contractor Shall Coordinate With The Engineer And Facilitate The Prompt Reestablishment Of The Field Control For The Altered Or Adjusted Work. All Flagging, Lath, Stakes, And Other Staking Materials Shall Be Removed And Disposed After The Project Is Completed. Excavation Foundation Trench Shall Be Dug To The Exact Width And Depth And Levels As Indicated In The Drawings. Sides Of The Trenches Shall Be Vertical. In Case Soil Does Not Permit Vertical Sides, The Contractor Shall Protect The Sides With Timber Shoring. Excavated Earth Shall Not Be Placed Within 1.5 Meter Of The Edge Of The Trench. No Excavation Or Foundation Work Shall Be Filled In Or Covered Up Before The Inspection And Approval Of The Project Engineer. Backfilling, Embankment With Compaction And Gravel Bedding Use Earth Or Sand Free From Waste And Objectionable Materials. Place Backfill And Embank In Uniform Horizontal Layer Not More 150mm Thick At A Time, Puddle And Tamper Each Layer As Required To Make Firm Adequate Compaction. Fill Bottom Of Excavation For Structured Foundation With At Least 100mm Thick Gravel Before Placing Reinforcing Steel Bars And Pouring Concrete. Concrete And Plastering Works A. General: All Concrete Works To Be Done Herein Shall Be In Accordance With Aci Requirement And/ Or Standard Specifications As Adopted By The Government. B. Cement Shall Be Portland Cement (type1) With 40 Kgs/bag. C. Aggregate, Coarse: Gravel Shall Be River Run Gravel Or Broken Stones. Maximum Size: 1/5 Of The Nearest Dimension Between Sides Of Forms Of The Concrete, Or ¾ Of The Minimum Clear Spacing Between Reinforcing Bars, Or Between Reinforced Steel Bars And Forms Whichever Is Smaller. D. Aggregate, Fine: Sand Shall Be Clean, Hard, Coarse River Or Crushed Sand Free From Injurious Amount Of Clay Loam And Vegetable Matter. It Shall Conform To Astm C-33 Or C-330. E. Water To Be Used In Mixing Concrete Shall Be Clean And Free From Injurious Amount Of Deleterious Substances. F. Reinforcing Bars: Reinforcing Bars Shall Be Intermediate Grade And Deformed And Shall Have Minimum Yield Strength Of 275 Mpa (40,000 Psi) G. The Wires Shall Be Locally Produced G.i. Wire Gauge No. 16. H. Placing Reinforcement Provide Bars, Wire Fabrics, Wire Ties, Supports And Other Devices Necessary To Install And Secure Reinforcement. Reinforcement Shall Not Contain Rust, Scale Oil, Grease Clay And Foreign Substances That Would Reduce The Bond. Rusting Of Reinforcement Is A Basis Of Rejection If The Effective Cross-sectional Area Of The Normal Weight Per Foot Of The Reinforcement Has Been Reduced To Less Than Specified In Paragraph Entitled “reinforcing Bars”. Remove Loose Rust Prior To Placing Of Steel. Splices Shall Be Approved Prior To Use. Do Not Splice At Points Of Maximum Stress. Overlapped Welded Wire Fabric The Spacing Of The Cross Wires, Plus 50 Mm (2 Inches). I. All Concrete Cured For At Least Seven (7) Days To Twenty-eight (28) Days If Possible After Placement To Attain The Required Strength Of Concrete. J. After Forms Have Been Removed From Footings, Walls, Etc., And When Concrete Works Is Hard Enough To Resist Pressure Resulting From Fill, Back-filling May Then Be Done. Materials Excavated May Be Used For Back-filling. It Must Be Thoroughly Compacted And Rammed By Wetting, Tamping, And Rolling. K. Removal Of Forms: Forms Shall Be Removed In Such A Manners Not To Impair The Safety And Serviceability Of The Structures. L. Proportions For Concrete Materials For Retaining Wall And Pump House Shall Be “class A”; For The Irrigation Canal, Stilling Pool, And The Rest Shall Be Of Class “b”. M. Mixture For Plastering: Thickness Of Plaster Shall Be 12mm Thick, Class “b”. A Mixture Of Washed Sand And Portland Cement. N. Concrete During And Immediately After Depositing Shall Be Thoroughly Compacted. The Compaction Shall Be Done By Mechanical Vibration. Vibration Shall Be Applied At The Point At The Point Of Deposit And In Area Of Freshly Deposited Concrete. The Vibrator Shall Be Inserted Into And Withdrawn From The Concrete Slowly And Gradually. The Vibration Shall Be Of Sufficient Duration And Intensity To Compact The Concrete Thoroughly But Shall Not Be Continued So As To Cause Segregation. Masonry Works A. For Concrete Wall, Use 4” X 8” X 16” Chb Or Its Equivalent. B. Minimum Comprehensive Strength Shall Be 700 Psi. Pump Sump • Constructed Pump Sump Will Be Placed At The Upstream Pool Of The Check Dam, Beside The Wall Of The Check Dam. • The Round Bars That Will Be Used In The Frame Will Be 16mm Diameter And With Screen Mesh Made Up Of 12mm Diameter Round Bars Welded Together. The Screen Will Be Spaced At 0.05m On Center. • The Concrete Mixture Shall Be Class “b”. Reinforced With 12mm Diameter Rebars Spaced At 0.20m On Center As Per Specified In The Plans. • The Screen Mesh Must Be Fastened To The Concrete Portion Of The Pump Sump. Fastener Must Be Partially Embedded To The Concrete. Any Form Of Fastener Will Do As Long As It Will Last. • The Contractor Shall Provide And A Small Rope Or Any Material That Will Hold The Screen Meshes Together And Will Not Corrode Easily. Embankment Of Site Scope Of Work • Prior To The Embankment Of The Site, The Site Must First Be Cleared And Grubbed. The Collected Garbage Can Be Disposed At The Sides Of The Embankment Where Structure Will Be Constructed. • Embank Must Be Graded To Distribute The Soil Evenly. It Must Also Be Subjected To Plate Compactors To Ensure The Compaction Of Soil • Embank Will Be Added Prior To The Construction Of Pump House And Clamps. • A Total Of 450 Cubic Meters Of Embank Shall Be Added To The Site Or Approximately Two (2) Meters From The Original Elevation Of The Site Shall Be The Total Height Of Compacted Embank, Whichever Requires The Least Amount Of Embank Volume. • The Contractor Must Ensure That The Site Is Thoroughly Compacted And Evenly Distributed. Irrigation Canal The Construction And Rehabilitation Plan For The Canal Involve Several Key Steps. Firstly, Addressing The Issue Of Backflow, The Canal's Interior Should Be Sloped Appropriately. Additionally, Any Damaged Sections, As Outlined In The Plan, Must Undergo Necessary Repairs. Clearing And Grubbing Of The Canal's Interior Region Are Essential Tasks. Five Meters From The Existing Canal's Starting Point, A Demolition Is Required. Prior Consultation With The Engineer Is Mandatory For Planning The Route Of The New Canal. For The Construction Process, A 50mm Thk Sub-base Course Precedes The Pouring Of Concrete. The Repair Of Concrete Braces In The Existing Canal Involves Partial Damage To Expose Reinforcement Bars, Followed By The Placement Of New Rebars And Pouring Fresh Concrete At 5-meter Intervals. The Concrete Mixture Should Adhere To Class “b” Standards, With 10mm Diameter Reinforcement Bars As Specified In The Plans. To Prevent Backflow, The Contractor Must Cut Up-sloping Portions Where The Canal Will Be Constructed. Additionally, Grooves For Gates Should Be Incorporated, Following The Specified Plans, With Any Changes Requiring Consultation With The Engineer. Commencing At Region F-f, Construction Of The New Canal Excludes Rehabilitation Beyond That Point. For Gate Installation, Holes On Both Sides Of The Irrigation Canal Are Necessary To Accommodate 4” Diameter Pvc Orange Pipe, Ensuring Easy Passage. Throughout The Entire Process, Collaboration And Communication With The Engineer Are Emphasized To Adhere To The Established Plan And Specifications. Stilling Pool • Stilling Pool Must Be Constructed At The End Point Of The Demolished Region Of The Existing Canal. It Must Be Connected To + The Existing Irrigation Canal. • Concrete Mixture Shall Be Class “b”. The Reinforcement Bars Shall Be 10mm Diameter As Per Specified In The Plans. • It Will Be Holed At The Back Portion To Allow For The Insertion Of The Discharge Pipe To Go Through. Ramp • On The Regions Where Ramps Are Required, It Must First Be Constructed Prior To The Construction Of Irrigation Canal. • Reinforcements Will Be 10mm Diameter On All Directions. • The Concrete Mixture Shall Be Class “b”. • Sloping Surface Of The Ramp Must Be Patterned With Horizontal Lines To Create Friction. • Three (3) Units Of Ramps Must Be Equidistant Throughout The Length Of The Irrigation Canal. Retaining Wall • Contractor May Excavate Some Portions Of Creek Bank And Excavated Materials May Be Used As An Embankment Material For The Construction Of Retaining Wall (downstream). The Contractor Should Consult The Engineer For Any Clarifications And Should Avoid Excavating Regions Where It Is Not Permitted. • Materials Used As An Embankment Should Be Compacted Thoroughly Prior To The Commencement Of Construction Of Retaining Wall, • Any Uneven Slope On The Region Where The Retaining Wall Will Be Constructed, Must Be Evened By The Contractor Using The Equipment At His Own Expense. • Prior To The Construction Of The Retaining Wall (upstream), The Contractor Must Have Demolished And Grubbed The Existing Retaining Wall And Finished The Embankment At The Site Where The Pumphouse Will Be Built. • The Demolished Portion Of The Check Dam, Existing Pump House, And Existing Canal Shall Be Placed At The Region Where The Region Where There Is An Opening To The Creek. The Materials Must Be Large Enough To Hold The Embank From Falling To The Creek. This Rubble Concrete Must Be Placed Prior To Placing Embanks. If There Is Any Confusion, The Contractor Should Immediately Ask The Engineer. • The Contractor Must Also Ensure That Now Vegetation Next To The Structure. Roots And Vegetation Adjacent To The Structure Must Be Cleared And Grubbed. • The Retaining Wall (upstream) Will Stick To The Existing Check Dam. • The Contractor Should Always Follow What Is Written On The Plan. If Any Changes Are To Be Made, They Should Ask For The Approval Of The Engineer. • The Concrete Mixture Shall Be Class “a”. Reinforcement Steel Bars Shall Be 12mm Diameter. • The Contractor Must Either Compact Or Remove The Soft Soil Where The Retaining Wall Will Be Constructed. Gate Works • A Total Of 10 Units Will Constructed Throughout The Length Of The Canal. Each Gates Must Be Spaced At Approximately 100m Apart. • Gates Should Be Fitted To The Groove That The Contractor Constructed. Pump House • Pumo House Shall Be 6m From The Existing Check Dam. • Wall Shall Be Made Of 2” Diameter Gi Pipe For The Frame And #6 Steel Matting, Welded On The 2” X 2” 3/16” Angle Bar. • Pipe Connections Must Be Shaped And Fully Welded On The • The Contractor Shall Provide Hinges; Two (2) For Each Door Leaf. He Must Also Provide Locally-made Door Locks. • All Metal Surface Shall Be Painted With Red Oxide Primer, Double-coated. • The Contractor Must Observe The 135 Degree Ties Hook. • Concrete Mixture Shall Be Class “a”. Pump And Engine Set Specification Pump End Suction Centrifugal Pump (6” Ø Suction And 5” Ø Discharge) Single Stage Bronze-fitted With Mechanical Seal Discharge Of 1000gpm Against 20m Tdh @ 1800 Rpm Pump And Engine Is Mounted On A Steel Base Frame. Engine Brand New Diesel Engine Four Cylinders Maximum Power Output: 38hp Water-cooled Complete With Heavy-duty Frame And Fuel Tank. Accessries 6” Hpp Pipes 6” C.i. Footvalve 6” Gate Valve 6” Check Valve Basic Hand Tools And Operation Manual 3” Ø Reflectorized Logo Of Iloilo Provincial Government And Morprogres. Pipe Installation It Should Be Installed By A Skilled Plumber To Ensure Quality Workmanship. Area Should Be Surveyed Prior To The Installation To Ensure Correct Elevation Of The Pipe And Concrete Canal. Please Refer To The Attached Plan For Specifications. • Pipe (both Suction And Discharge) Shall Be Supported By Clamps. Clamos Shall Be Placed At Every 5m-length Of The Pipe. • All Clamos Must Have A Height Of 1.60m From The Natural Ground, Regardless Of The Elevation Of Soil It Will Be Situated. • Concrete Class Shall Be Class “c” Roofing Works • Roofing Shall Be Made Of #26 Ordinary Corrugated Gi Sheet, Fastened With 2-1/2” Umbrella Nails And Sealed With Sealant. The Material Shall Be Brand New As Approved By The Engineer. • #26 Ordinary Gi Ridge Roll Shall Be Placed In The Middle Of The Roofing And Fastened With Nails. Section Vii. Drawings Annex A – Architectural Design Annex B- Project Billboard Plan Section Viii. Bill Of Quantities Bid No. Agr- 23-1926-b Item Description Quantity Unit Unit Cost Total Cost No. A. Dam Works 1.0 Construction Of Camp, Mobilization And Other Temporary Facilities 1.00 L.s Pesos And Ctvs. (p ) / L.s P 2.0 Diversion Of Water And Care Of Creek 1.00 L.s Pesos And Ctvs. (p ) / L.s P 3.0 Dam Site (upstream/downstream) 3.1 Demolition Works 32.00 Sq.m Pesos And Ctvs. (p ) / Sq.m P 3.2 Excavation 129.92 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.3 Filter Drain 482.40 Kgs Pesos And Ctvs. (p ) /kgs P 3.4 Wooden Control Gate 220.00 Sq.m Pesos And Ctvs. (p ) / Sq.m P 3.5 Collapsible Pier 1154.72 Kgs Pesos And Ctvs. (p ) / Kgs P B. Construction Of Retaining Wall 1.0 Clearing, Grubbing, And Staking 213.60 Sq.m Pesos And Ctvs. (p ) / Sq.m P 2.0 Excavation 67.00 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.0 Concrete Works 3.1 Concreting 66.89 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.2 Steel 3418.50 Kgs Pesos And Ctvs. (p ) / Kgs P 3.3 Formworks 196.00 Sq.m. Pesos And Ctvs. (p ) / Sq.m P C. Development Of Site 1.0 Clearing And Grubbing 242.40 Sq.m Pesos And Ctvs. (p ) / Sq.m P 2.0 Embankment 360.40 Cu.m Pesos And Ctvs. (p ) / Cu.m P D. Construction Of Pump House 1.0 Excavation 12.31 Cu.m Pesos And Ctvs. (p ) / Cu.m P 2.0 Backfilling 10.17 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.0 Embankment 14.34 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 4.0 Concrete Works 4.1 Concreting 6.58 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 4.2 Gravel Bedding 1.30 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 4.3 Steel 719.00 Kgs Pesos And Ctvs. (p ) / Kgs P 4.4 Formworks 67.48 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 5.0 Steel Works 750.00 Kgs Pesos And Ctvs. (p ) / Kgs P 6.0 Masonry Works 11.10 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 7.0 Roofing Works 8.00 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 8.0 Plastering Works 40.44 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 9.0 Painting Works 12.48 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 10.0 Installation Of Pump And Engine Set With Complete Accessories 1.00 L.s Pesos And Ctvs. (p ) / L.s P E. Improvement Of Irrigation Canal (existing) 1.0 Clearing And Grubbing 1000.00 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 2.0 Demolition Works 10.60 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 3.0 Concrete Works 3.1 Irrigation Canal 3.1.1 Concreting 5.62 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 3.1.2 Steel 25.90 Kgs Pesos And Ctvs. (p ) / Kgs P 3.1.3 Formworks 2.80 Sq.m. Pesos And Ctvs. (p ) / Sq.m P 3.2 Irrigation Canal (construction) 3.2.1 Concreting 136.90 Cu.m. Pesos And Ctvs. (p ) / Cu.m P 3.2.2 Sub-base Course 28.00 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.2.3 Steel 7212.00 Kgs Pesos And Ctvs. (p ) / Kgs P 3.2.4 Formworks 1632.00 Sq.m Pesos And Ctvs. (p ) / Sq.m P 3.3 Stilling Pool 3.3.1 Concreting 0.84 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.3.2 Steel 29.60 Kgs Pesos And Ctvs. (p ) / Kgs P 3.3.3 Formworks 7.18 Sq.m Pesos And Ctvs. (p ) / Sq.m P 3.4 Ramp 3.4.1 Concreting 7.05 Cu.m Pesos And Ctvs. (p ) / Cu.m P 3.4.2 Steel 658.60 Kgs Pesos And Ctvs. (p ) / Kgs P 3.4.3 Formworks 42.40 Sq.m Pesos And Ctvs. (p ) / Sq.m P 4.0 Gate Works 2.40 Sq.m Pesos And Ctvs. (p ) / Sq.m P Total Bid Cost In Figures P Total Bid Cost In Words Summary Of Costs Item No. Bid Amount A. Dam Works 1.0 Construction Of Camp, Mobilization And Other Temporary Facilities ₱ _____________________________ 2.0 Diversion Of Water And Care Of Creek ₱ _____________________________ 3.0 Dam Site (upstream/downstream) 3.1 Demolition Works ₱ _____________________________ 3.2 Excavation ₱ _____________________________ 3.3 Filter Drain ₱ _____________________________ 3.4 Wooden Control Gate ₱ _____________________________ 3.5 Collapsible Pier ₱ _____________________________ B. Construction Of Retaining Wall 1.0 Clearing, Grubbing, And Staking ₱ _____________________________ 2.0 Excavation ₱ _____________________________ 3.0 Concrete Works 3.1 Concreting ₱ _____________________________ 3.2 Steel ₱ _____________________________ 3.3 Formworks ₱ _____________________________ C. Development Of Site 1.0 Clearing And Grubbing ₱ _____________________________ 2.0 Embankment ₱ _____________________________ D. Construction Of Pump House 1.0 Excavation ₱ _____________________________ 2.0 Backfilling ₱ _____________________________ 3.0 Embankment ₱ _____________________________ 4.0 Concrete Works 4.1 Concreting ₱ _____________________________ 4.2 Gravel Bedding ₱ _____________________________ 4.3 Steel ₱ _____________________________ 4.4 Formworks ₱ _____________________________ 5.0 Steel Works ₱ _____________________________ 6.0 Masonry Works ₱ _____________________________ 7.0 Roofing Works ₱ _____________________________ 8.0 Plastering Works ₱ _____________________________ 9.0 Painting Works ₱ _____________________________ 10.0 Installation Of Pump And Engine Set With Complete Accessories ₱ _____________________________ E. Improvement Of Irrigation Canal (existing) 1.0 Clearing And Grubbing ₱ _____________________________ 2.0 Demolition Works ₱ _____________________________ 3.0 Concrete Works 3.1 Irrigation Canal 3.1.1 Concreting ₱ _____________________________ 3.1.2 Steel ₱ _____________________________ 3.1.3 Formworks ₱ _____________________________ 3.2 Irrigation Canal (construction) 3.2.1 Concreting ₱ _____________________________ 3.2.2 Sub-base Course ₱ _____________________________ 3.2.3 Steel ₱ _____________________________ 3.2.4 Formworks ₱ _____________________________ 3.3 Stilling Pool 3.3.1 Concreting ₱ _____________________________ 3.3.2 Steel ₱ _____________________________ 3.3.3 Formworks ₱ _____________________________ 3.4 Ramp 3.4.1 Concreting ₱ _____________________________ 3.4.2 Steel ₱ _____________________________ 3.4.3 Formworks ₱ _____________________________ 4.0 Gate Works ₱ _____________________________ Total Bid Amount ₱ _____________________________ Section Ix. Checklist Of Technical And Financial Documents I. Technical Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages) In Accordance With Section 8.5.2 Of The Irr; Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (c) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided Under The Rules; And ⬜ (d) Special Pcab License In Case Of Joint Ventures; And Registration For The Type And Cost Of The Contract To Be Bid; And ⬜ (e) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (f) Project Requirements, Which Shall Include The Following: ⬜ A. Organizational Chart For The Contract To Be Bid; ⬜ B. List Of Contractor’s Key Personnel (e.g., Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; ⬜ C. List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership Or Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project, As The Case May Be; And ⬜ (g) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (h) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc). Class “b” Documents ⬜ (i) If Applicable, Duly Signed Joint Venture Agreement (jva) In Accordance With Ra No. 4566 And Its Irr In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Ii. Financial Component Envelope ⬜ (j) Original Of Duly Signed And Accomplished Financial Bid Form; And Other Documentary Requirements Under Ra No. 9184 ⬜ (k) Original Of Duly Signed Bid Prices In The Bill Of Quantities; And ⬜ (l) Duly Accomplished Detailed Estimates Form, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And ⬜ Cash Flow By Quarter. Bid Form For The Procurement Of Infrastructure Projects [shall Be Submitted With The Bid] Bid Form Date : Project Identification No. : To: [name And Address Of Procuring Entity] Having Examined The Philippine Bidding Documents (pbds) Including The Supplemental Or Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Declare That: A. We Have No Reservation To The Pbds, Including The Supplemental Or Bid Bulletins, For The Procurement Project: [insert Name Of Contract]; B. We Offer To Execute The Works For This Contract In Accordance With The Pbds; C. The Total Price Of Our Bid In Words And Figures, Excluding Any Discounts Offered Below Is: [insert Information]; D. The Discounts Offered And The Methodology For Their Application Are: [insert Information]; E. The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: [specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties], Which Are Itemized Herein And Reflected In The Detailed Estimates, F. Our Bid Shall Be Valid Within The Period Stated In The Pbds, And It Shall Remain Binding Upon Us At Any Time Before The Expiration Of That Period; G. If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract, Or A Performance Securing Declaration In Lieu Of The The Allowable Forms Of Performance Security, Subject To The Terms And Conditions Of Issued Gppb Guidelines12 For This Purpose; H. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; I. We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And J. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. K. We Likewise Certify/confirm That The Undersigned, Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute 12 Currently Based On Gppb Resolution No. 09-2020 And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For The [name Of Project] Of The [name Of The Procuring Entity]. L. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: Legal Capacity: Signature: Duly Authorized To Sign The Bid For And Behalf Of: Date: Bid Securing Declaration Form [shall Be Submitted With The Bid If Bidder Opts To Provide This Form Of Bid Security] Republic Of The Philippines) City Of ) S.s. Bid Securing Declaration Project Identification No.: [insert Number] To: [insert Name And Address Of The Procuring Entity] I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid Securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Procurement Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f),of The Irr Of Ra No. 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: A. Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; B. I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; And C. I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice] Omnibus Sworn Statement (revised) [shall Be Submitted With The Bid] Republic Of The Philippines ) City/municipality Of ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. [select One, Delete The Other:] [if A Sole Proprietorship:] I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. [select One, Delete The Other:] [if A Sole Proprietorship:] As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; [if A Partnership, Corporation, Cooperative, Or Joint Venture:] I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. [select One, Delete The Rest:] [if A Sole Proprietorship:] The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Partnership Or Cooperative:] None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; [if A Corporation Or Joint Venture:] None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Responsibilities As A Bidder In Compliance With The Philippine Bidding Documents, Which Includes: A. Carefully Examining All Of The Bidding Documents; B. Acknowledging All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C. Making An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D. Inquiring Or Securing Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This Day Of , 20 At , Philippines. [insert Name Of Bidder Or Its Authorized Representative] [insert Signatory’s Legal Capacity] Affiant [jurat] [format Shall Be Based On The Latest Rules On Notarial Practice]
Closing Date10 Jan 2024
Tender AmountPHP 5 Million (USD 89.9 K)

DEPT OF THE AIR FORCE USA Tender

United States
Tender Id: HQ-AFMC-A4N-Logisitics-IT-Enterprise-Architecture-Support | Hq Afmc/a4n Logistics, It, & Enterprise Architecture Support
Closing Date26 Oct 2024
Tender AmountRefer Documents 

Madhya Gujarat Vij Company Limited - MGVCL Tender

Services
Other Consultancy Services...+2Consultancy Services, Civil And Architectural Services
India
Tender Id: (O&M)/BD/HO/architect/2023/33 | Providing Architectural Consultancy Services For Renovation Of 2nd Floor A Wing
Closing Date10 Jan 2024
Tender AmountRefer Documents 

Province Of Cavite Tender

Philippines
Details: Description 1. 1 Pc Executive Table W/ Side Table: 3000mm X 1200mm Main Table, 600mm X 1500mm Side Table, Solid Wood With Natural Stone Table Top (black Marble Or Granite) And Black/d. Grey Leather Signature Area Unit Cost: Php 412,551.50 2. 1 Pc Executive Table W/ Side Table: 2500mm X 1000mm Study Table, 600mm X 1500mm Side Table, Solid Wood With Natural Stone Table Top (black Marble Or Granite) And Black/d. Grey Leather Signature Area Unit Cost: Php 325,770.00 3. 1 Pc Junior Executive Office Table Mdf With Veneer Finish And Black Leather Signing Area Unit Cost: Php 90,967.50 4. 1 Pc 10-seater Dining Table 1100mm X 2800mm Rectangular, Solid Wood Base With Natural Stone Table Top (black Marble Or Granite) Unit Cost: Php 298,450.00 5. 1 Pc 8-seater Dining Table 1600mm Diameter Round, Brown Natural Marble Top And Wood Base And Revolving Food Tray On Top Unit Cost: Php 205,020.00 6. 1 Pc 16-seater Dining Table 5500mm X 2500mm Oval Shape, Brown Natural Marble Top And Wood Base Unit Cost: Php 478,880.00 7. 1 Pc 4-seater Dining Table 1200mm Diameter Round, Brown Natural Marble Top And Wood Base Unit Cost: Php 93,800.00 8. 1 Pc 16-seater Private Meeting Room Table 5500mm X 2500mm Oval Shape, Solid Wood With Usb And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 750,500.00 9. 5 Pcs 20-seater Table 6000mm X 1500 Mm Rectangular, Mdf Wood Top Finish And Plain D. Grey Base With Usb And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 670,150.00 10. 3 Pcs 22-seater C-shape Conference Table 11700mm X 4500mm Mdf Wood Top Veneer Plain D. Grey Base With Usb And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 1,222,900.00 11. 1 Pc 13-seater Conference Table 4200mm X 3000mm X 750mm U-shape, Mdf Wood Top Veneer Plain D. Grey Base With Usb And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 740,200.00 12. 2 Pcs 14-seater Conference Table 2100mm X 2800mm O-shape Mdf Wood Top Veneer And Plain D. Grey Base With Usb And And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 720,400.00 13. 1 Pc 15-seater Conference Table 2900mm X 5400mm U-shape Mdf Wood Top Veneer And Plain D. Grey Base With Usb And And Power Ports On Sides And Hdmi Ports On Both Ends Unit Cost: Php 800,400.00 Lower Ground Floor 14. 99 Set Cafeteria Chairs And Table Set - Chairs With Built In Table: 1219mm X 1543 Mm - Stainless Steel Cafeteria Unit Cost: Php 63,800.00 Upper Ground Mezzanine Opdrrmo - Disaster Response Management 15. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 13 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 13 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 7 Pcs 1300lx1300hx30thk (mm) 13 Pcs 1000lx1300hx30thk (mm) 20 Pcs 600lx1300hx30thk (mm) 13 Pcs 400lx1300hx30thk (mm) 24 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 405,419.13 16. 1 Lot Office Desk - Main Table Top With Keyboard Tray, Counter/side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Counter Top 1 Pc Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Counter Table: 1300lx450wx1000h (mm) 1 Pc Main Table Top: 1360lx600wx750hx25thk (mm) 1 Pc Keyboard Tray: 540lx400wx40 (mm) 1 Pc Counter Table: 1360lx400wx1000h (mm) 1 Pc Side Table: 1000lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 1 Pc 1300lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 1 Pc 1000lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 55,857.58 General Administration & Support Services Division 17. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 16 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 16 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 10 Pcs 1300lx1300hx30thk (mm) 16 Pcs 1000lx1300hx30thk (mm) 25 Pcs 600lx1300hx30thk (mm) 15 Pcs 400lx1300hx30thk (mm) 31 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 510,423.16 18. 1 Lot Office Desk - Main Table Top With Keyboard Tray, Counter/side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 1 Pc Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Counter Table: 1300lx450wx1000hx25thk (mm) 1 Pc Main Table Top: 1360lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Counter Table: 1360lx400wx1000hx25thk (mm) 1 Pc Side Table: 1000lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 1 Pc 1300lx1300hx30thk (mm) 1 Pc 1360lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 1 Pc 1000lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 64,874.38 19. 1 Lot Workstation - Main Table Top With Keyboard Tray, Counter/side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Counter Top 3 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Side Table: 1000lx400wx750hx25thk (mm) 2 Pcs Counter Table: 1300lx450wx1000hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1300lx1300hx30thk (mm) 1 Pc 1000lx1300hx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 1 Pc 400lx1300hx30thk (mm) 6 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 88,491.33 3rd Floor Attic Mezzanine Office Of The Prov'l Population Officer 20. 1 Lot 4 Workstation - Main Table Top With Keyboard Tray, Counter Table, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Counter Top 2 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Counter Top: 1200lx400wx1000hx20thk (mm) 9 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Counter/side Table - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs And Damper; With Counter Top 13 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 13 Pcs Side Table: 900lx400wx750hx25thk (mm) 13 Pcs Counter Top: 1200lx400wx20thk (mm) Main Table Top With Keyboard Tray,side Table And Partitions/ Counter Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs And Damper; With Counter Top 1 Pc Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Side Table: 900lx400wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 1200lx1300hx30thk (mm) 14 Pcs 900lx1300hx30thk (mm) 13 Pcs 450lx1300hx30thk (mm) 36 Pcs 600lx1300hx30thk (mm) 15 Pcs Counter Partition: 1200lx1500hx30thk (mm) 34 Pcs Connector: 30thkx30thkx1500h (mm) 12 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 786,285.98 3rd Floor Attic Planning And Programming Division (peo) 21. 1 Lot Workstation - Main Table Top With Keyboard Tray And Partitions (ojt Carrel) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 14 Pcs Main Table Top: 2000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 14 Pcs 1400lx1300hx30thk (mm) 28 Pcs 600lx1300hx30thk (mm) 36 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 371,863.00 22. 1 Lot Engineers Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 24 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 24 Pcs Side Table: 1400lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 25 Pcs 1500lx1300hx30thk (mm) 16 Pcs 850lx1300hx30thk (mm) 39 Pcs 600lx1300hx30thk (mm) 8 Pcs 450lx1300hx30thk (mm) 45 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 858,759.96 23. 1 Lot New Engineers Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 5 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 850lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 5 Pcs 1400lx1300hx30thk (mm) 5 Pcs 850lx1300hx30thk (mm) 10 Pcs 600lx1300hx30thk (mm) 1 Pc 400lx1300hx30thk (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 172,171.45 Supplies Storage 24. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 900lx400wx750hx25thk (mm) 2 Pcs Counter Table Top: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 900lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 2 Pcs 450lx1300hx30thk (mm) 2 Pcs 1300lx1500hx30thk (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 85,088.20 Motorpool Division 25. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions (l-shape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 4 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 850lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 1400lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 4 Pcs 850lx1300hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 109,324.50 Provincial Agricultural Satellite Office 26. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side/counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 5 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx400wx750hx25thk (mm) 4 Pcs Counter Table Top: 1400lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1400lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 4 Pcs 900lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1500h (mm) 1 Pc 1400lx1300hx30thk (mm) 1 Pc 600lx1300hx30thk (mm) 2 Pcs 900lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 233,478.63 Provincial Veterinary Satellite Office 27. 1 Lot Workstation - Main Table Top With Keyboard Tray Side & Counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 4 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx400wx750hx25thk (mm) Counter Table Top: 1400lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1400lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 4 Pcs 900lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1500h (mm) 1 Pc 1400lx1300hx30thk (mm) 1 Pc 600lx1300hx30thk (mm) 2 Pcs 900lx1300hx30thk (mm) 2 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 215,616.13 Office Of The Prov'l Internal Audit Service 28. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side/counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 4 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx400wx750hx25thk (mm) Counter Table Top: 1400lx750wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1400lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 4 Pcs 900lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 187,275.00 Cavite Quality Management Office 29. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side/counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 3 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) 3 Pcs Counter Table Top: 1400lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1400lx1500hx30thk (mm) 4 Pcs 600lx1500hx30thk (mm) 3 Pcs 900lx1500hx30thk (mm) 3 Pcs 400lx1500hx30thk (mm) 8 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 138,512.50 Provincial Housing Development And Management Office 30. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side/counter Table And Partitions (l-shape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 9 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 9 Pcs Side Table: 900lx400wx750hx25thk (mm) 8 Pcs Counter Table Top: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 1300lx1500hx30thk (mm) 9 Pcs 600lx1500hx30thk (mm) 5 Pcs 900lx1500hx30thk (mm) 8 Pcs 400lx1500hx30thk (mm) 14 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 321,510.78 Tourism Cultural Affairs & Events Division And Tourism Services & Promotion Division 31. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side & Counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 4 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx400wx750hx25thk (mm) 4 Pcs Counter Table: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1300lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 4 Pcs 900lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 180,461.68 32. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table And Partitions (l-shape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 6 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 6 Pcs Side Table: 900lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 1300lx1300hx30thk (mm) 9 Pcs 600lx1300hx30thk (mm) 4 Pcs 900lx1300hx30thk (mm) 12 Pc Connector: 30thkx30thkx1300h (mm) 1 Pc 1400lx1300hx30thk (mm) 2 Pcs 600lx1300hx30thk (mm) 1 Pc 900lx1300hx30thk (mm) 2 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 202,550.85 Oppesm 33. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side & Counter Table And Partitions (lshape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper With Counter Table Top 8 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 8 Pcs Side Table: 900lx400wx750hx25thk (mm) 8 Pcs Counter Table: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 1300lx1500hx30thk (mm) 10 Pcs 600lx1500hx30thk (mm) 6 Pcs 900lx1500hx30thk (mm) 8 Pcs 400lx1500hx30thk (mm) 15 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 327,860.78 34. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table And Partitions (l-shape) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 900lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 1300lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 2 Pcs 900lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 67,129.88 Engineer Iv & Architect Iv 35. 1 Lot Workstation - Main Table Top With Keyboard Tray And Side Table And Partitions - Veneer Laminated Table Top With Built-in Pedestal And Footer With Provision For Raceway & Side Table Main Table: 1800lx700wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Side Table: 1000lx450wx800hx25thk (mm) 24 Pcs Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 1200lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 207,478.00 Secretaries 36. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 2000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 1400lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 1200lx1300hx30thk (mm) 3 Pcs 800lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 3 Pcs 500lx1300hx30thk (mm) 6 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 84,849.08 Second Floor Opg 37. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 40 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 40 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 40 Pcs 1500lx1300hx30thk (mm) 30 Pcs 1000lx1300hx30thk (mm) 70 Pcs 600lx1300hx30thk (mm) 11 Pcs 400lx1300hx30thk (mm) 79 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 1,388,465.30 38. 1 Lot Executive Assistant Workstation - Main Table Top With Keyboard Tray, Side Table & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 4 Pcs Main Table Top: 2500lx900wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 1800lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1400lx1300hx30thk (mm) 4 Pcs 1100lx1300hx30thk (mm) 16 Pcs 900lx1300hx30thk (mm) 12 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 243,085.68 Executive Assistant Staff 39. 1 Lot Executive Assistant Workstation 2 - Main Table Top With Keyboard Tray, Side Table & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 12 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) 12 Pcs Keyboard Tray: 540lx400wx40 (mm) 12 Pcs Side Table: 1000lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 12 Pcs 1300lx1300hx30thk (mm) 8 Pcs 1000lx1300hx30thk (mm) 14 Pcs 600lx1300hx30thk (mm) 12 Pcs 400lx1300hx30thk (mm) 22 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 384,874.08 40. 1 Lot Medical Mission Office Workstation - Main Table Top With Keyboard Tray, Side Table & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 8 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 8 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 1500lx1300hx30thk (mm) 8 Pcs 1000lx1300hx30thk (mm) 16 Pcs 600lx1300hx30thk (mm) 4 Pcs 400lx1300hx30thk (mm) 20 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 310,564.08 Psp Office 41. 1 Lot Psp Office Table - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1500lx1300hx30thk (mm) 4 Pcs 1000lx1300hx30thk (mm) 6 Pcs 600lx1300hx30thk (mm) 4 Pcs 400lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 154,622.04 Hr - Records Division 42. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 4 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1400lx1300hx30thk (mm) 4 Pcs 800lx1300hx30thk (mm) 8 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 150,960.00 43. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray And Side Table Counter Top & Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 4 Pcs Main Table Top: 1350lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) 4 Pcs Counter Top: 1360lx450wx20thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1350lx1500hx30thk (mm) 3 Pcs 800lx1500hx30thk (mm) 5 Pcs 600lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 8 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 169,686.64 Hr - Administrative Division 44. 1 Lot Workstation - Main Table Top With Keyboard Tray And Side & Counter Table - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 4 Pcs Main Table Top: 1350lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1350lx1500hx30thk (mm) 3 Pcs 800lx1500hx30thk (mm) 5 Pcs 600lx1500hx30thk (mm) 4 Pcs 400lx1500hx30thk (mm) 4 Pcs Counter Top: 1360lx450wx20thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1350lx1500hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 211,486.64 45. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1400lx1300hx30thk (mm) 3 Pcs 800lx1300hx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 930lx1300hx30thk (mm) 4 Pcs 450lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 185,071.13 Hr - Recruitment, Selection & Placement Division 46. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 5 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 5 Pcs 1400lx1300hx30thk (mm) 4 Pcs 800lx1300hx30thk (mm) 6 Pcs 600lx1300hx30thk (mm) 5 Pcs 400lx1300hx30thk (mm) 9 Pcs Connector: 30thkx30thkx1300h (mm) 5 Pcs Counter Top: 1400lx550wx25thk (mm) Unit Cost: Php 190,419.15 47. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1400lx1300hx30thk (mm) 3 Pcs 800lx1300hx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 111,185.89 Hr - Management Information System & Learning And Development Division 48. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 5 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 5 Pcs 1400lx1300hx30thk (mm) 4 Pcs 800lx1300hx30thk (mm) 6 Pcs 600lx1300hx30thk (mm) 5 Pcs 400lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 174,819.15 49. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1400lx1300hx30thk (mm) 3 Pcs 800lx1300hx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 111,185.89 50. 1 Lot Workstation 3 - Main Table Top With Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 6 Pcs Main Table Top: 1400lx700wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 6 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 1400lx1300hx30thk (mm) 3 Pcs 800lx1300hx30thk (mm) 9 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) 2 Pcs Counter Top: 1400lx550wx25thk (mm) Unit Cost: Php 196,979.78 51. 1 Lot Workstation 4 - Main Table Top With Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 3 Pcs 1400lx1500hx30thk (mm) 3 Pcs 800lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 1 Pc 400lx1500hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) 1 Pc Counter Top: 1400lx550wx25thk (mm) Unit Cost: Php 114,865.89 Provincial Government Legal Officer Provincial Legal Officer 52. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 5 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 5 Pcs 1400lx1500hx30thk (mm) 4 Pcs 800lx1500hx30thk (mm) 6 Pcs 600lx1500hx30thk (mm) 5 Pcs 400lx1500hx30thk (mm) 5 Pcs Counter Top: 1400lx550wx20thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 216,062.50 53. 1 Lot Workstation 2 - Main Table Top With Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 2 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 2 Pcs Side Table: 1000lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 2 Pcs 1400lx1300hx30thk (mm) 2 Pcs 800lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 1 Pc 400lx1300hx30thk (mm) 5 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 81,870.58 Atty Offices 54. 5 Pcs Atty I, Ii, Iii And Iv Office Table With Side Table - Veneer Laminated Table Top With Built-in Pedestal And Footer With Provision For Raceway & Side Table Main Table: 1800lx900wx800h Keyboard Tray: 540lx400wx40 (mm) Side Table: 1500lx450wx800hx25thk (mm) Unit Cost: Php 57,000.00 55. 2 Pcs Information And Security Desk - 25mm Thk Mdf Laminated Round Table With Shelves And Provision For Raceways And Base Footer With Marble Counter Top - 3600diax600wx1100h (mm) Unit Cost: Php 227,500.00 Examination/common Conference Room 56. 1 Pc 18 Seater Meeting Room Table - 30mm Table Thk In Veneer Finish With Net Box And Veneer Legs, 18 Seater - 6100lx1600wx800h Unit Cost: Php 225,000.00 57. 3 Pcs Compactor - For Legal Office (hr) - 5-layer Metal In Powder Coated Finish W/ 4 Shelves (5 Compartments), Catwalk Space At 800mm All Rack Are Movable W/ Mechanical Wheel Handle W/ Lock - 2260hx1200wx770d (mm) Unit Cost: Php 225,000.00 58. 3 Pcs Compactor - For Legal Office (hr) - 5-layer Metal In Powder Coated Finish W/ 4 Shelves (5 Compartments), Catwalk Space At 800mm All Rack Are Movable W/ Mechanical Wheel Handle W/ Lock - 2260hx1200wx400d (mm) Unit Cost: Php 223,000.00 3rd Floor Quality Control Division (peo) 59. 1 Lot Quality Control Division Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 13 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 13 Pcs Side Table: 900lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 13 Pcs 1500lx1300hx30thk (mm) 13 Pcs 900lx1300hx30thk (mm) 13 Pcs 450lx1300hx30thk (mm) 16 Pcs 600lx1300hx30thk (mm) 30 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 492,590.47 Construction Division 60. 1 Lot Secretary Table - Main Table Top With Keyboard Tray, Counter Table And Partitions 1 Pc Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 1 Pc Counter Table: 25mm Mdf Table Thk In Laminated Finish With Pvc Edging 1200lx400wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips 1 Pc And Laminated With Counter Table 1 Pc 1000lx1300hx30thk (mm) 1 Pc 850lx1300hx30thk (mm) 1 Pc 700lx1300hx30thk (mm) Partition Counter: Cleared Tempered W/ Opening And Counter Table, Laminated Finish 2 Pcs 1200lx1500wx30thk (mm) 3 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 50,738.13 61. 1 Lot Ojt Carrel - Main Table Top With Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 8 Pcs Main Table Top: 1000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 8 Pcs 1000lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 9 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 148,626.40 62. 1 Lot Construction Division Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 6 Pcs Main Table Top: 2000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 6 Pcs Side Table: 1400lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 2000lx1500hx30thk (mm) 6 Pcs 1400lx1300hx30thk (mm) 6 Pcs 900lx1300hx30thk (mm) 8 Pcs 600lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 350,211.74 63. 1 Lot Construction Division Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 2000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 1400lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 2000lx1500hx30thk (mm) 3 Pcs 900lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 141,080.87 64. 1 Lot Construction Division Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper With Counter Top 9 Pcs Main Table Top: 2000lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 9 Pcs Side Table: 1400lx500wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 9 Pcs 2000lx1500hx30thk (mm) 10 Pcs 1400lx1300hx30thk (mm) 5 Pcs 900lx1300hx30thk (mm) 15 Pcs 600lx1300hx30thk (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) 9 Pcs Counter Top: 2000lx400wx25thk (mm) Unit Cost: Php 538,342.61 65. 1 Lot Construction Division Workstation 2 - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 7 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 7 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 7 Pcs 1500lx1300hx30thk (mm) 7 Pcs 900lx1300hx30thk (mm) 2 Pcs 450lx1300hx30thk (mm) 14 Pcs 600lx1300hx30thk (mm) 16 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 279,040.50 Records Section (peo) 66. 1 Lot Records Section Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1650lx1300hx30thk (mm) 4 Pcs 1350lx1300hx30thk (mm) 8 Pcs 700lx1300hx30thk (mm) 2 Pcs 500lx1300hx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 171,173.40 67. 1 Lot Records Section Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 5 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx400wx750hx25thk (mm) 5 Pcs Counter Table: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 5 Pcs 1300lx1300hx30thk (mm) 5 Pcs 900lx400wx750h (mm) 5 Pcs 400lx1300hx30thk (mm) 6 Pcs 600lx1300hx30thk (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 192,388.00 68. 1 Lot Researchers Worstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx400wx750hx25thk (mm) 2 Pcs Counter Table: 1500lx450wx25thk (mm) 3 Pcs 1500lx1300hx30thk (mm) 3 Pcs 900lx1300hx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 2 Pcs Partition W/ Counter Table: 450lx1300hx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 126,994.50 Peo Maintenance Division 69. 1 Lot Maintenance Division - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 5 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx450wx750hx25thk (mm) 5 Pcs Counter Table: 1500lx400wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 5 Pcs 1500lx1500hx30thk (mm) 10 Pcs 600lx1500wx750h (mm) 5 Pcs 900lx1500hx30thk (mm) 3 Pcs 400lx1500hx30thk (mm) 4 Pcs 700lx1500hx30thk (mm) 11 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 278,550.00 70. 1 Lot Maintenance Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 2 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 1500lx1300hx30thk (mm) 2 Pcs 900lx1300wx750h (mm) 4 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300hx30thk (mm) 6 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 86,458.00 Peo Waterworks Division 71. 1 Lot Workstation Single Type - Main Table Top W/ Keyboard Tray, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 4 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 4 Pcs 1500lx1500hx30thk (mm) 6 Pcs 600lx1500wx30thk (mm) 2 Pcs Counter Table: 1500lx400wx25thk (mm) 6 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 127,525.00 72. 1 Lot Workstation Single Type - Main Table Top W/ Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 3 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 3 Pcs 1500lx1300hx30thk (mm) 4 Pcs 600lx1300wx30thk (mm) 12 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 83,457.18 73. 1 Lot Workstation - Main Table Top W/ Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1500lx1500hx30thk (mm) 4 Pcs 600lx1500wx30thk (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 101,477.90 Peo Accounting Section 74. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 1000lx400wx750hx25thk (mm) 4 Pcs Counter Top: 1300lx450wx750h (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Top 3 Pcs 1300lx1500hx30thk (mm) 5 Pcs 900lx1500wx30thk (mm) 4 Pcs 600lx1500wx30thk (mm) 8 Pcs 400lx1500wx30thk (mm) 8 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 176,486.64 75. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 3 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1500lx1300hx30thk (mm) 3 Pcs 1000lx1300wx30thk (mm) 5 Pcs 600lx1300hx30thk (mm) 2 Pcs 400lx1300wx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 113,681.53 Peo Administrative Division 76. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 8 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 8 Pcs Side Table: 1000lx450wx750hx25thk (mm) 8 Pcs Counter Table: 1300lx450wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 8 Pcs 1300lx1500hx30thk (mm) 8 Pcs 1500lx1300wx30thk (mm) 8 Pcs 1000lx1300wx30thk (mm) 10 Pcs 600lx1300wx30thk (mm) 8 Pcs 400lx1300wx30thk (mm) 18 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 448,381.44 Ppdo Plans And Programs Division 77. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 5 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx450wx750hx25thk (mm) 5 Pcs Counter Table: 1500lx400wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 5 Pcs 1500lx1500hx30thk (mm) 5 Pcs 900lx1500wx30thk (mm) 10 Pcs 600lx1500wx30thk (mm) 1 Pc 400lx1500wx30thk (mm) 11 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 246,850.00 78. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 6 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 6 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 1500lx1300hx30thk (mm) 6 Pcs 900lx1300wx30thk (mm) 10 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 16 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 237,444.64 Ppdo Special Project Project Division 79. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 4 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) 4 Pcs Counter Table: 1500lx400wx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 4 Pcs 1500lx1300hx30thk (mm) 4 Pcs 900lx1300wx30thk (mm) 8 Pcs 600lx1300wx30thk (mm) 1 Pc 400lx1300wx30thk (mm) 8 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 167,419.76 80. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 3 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 3 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 3 Pcs 1500lx1300hx30thk (mm) 1 Pc 450lx1300wx30thk (mm) 3 Pcs 900lx1300wx30thk (mm) 6 Pcs 600lx1300wx30thk (mm) 7 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 120,235.75 Ppdo Research, Statistics, Monitoring & Evaluation Division 81. 1 Lot Rsme Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 4 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) 4 Pcs Counter Table: 1500lx400wx800h (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 4 Pcs 1500lx1300hx30thk (mm) 4 Pcs 900lx1300wx30thk (mm) 8 Pcs 600lx1300wx30thk (mm) 1 Pc 400lx1300wx30thk (mm) 9 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 171,056.00 82. 1 Lot Rsme Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 6 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 6 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 1500lx1500hx30thk (mm) 6 Pcs 900lx1500wx30thk (mm) 12 Pcs 600lx1500wx30thk (mm) 2 Pcs 450lx1500wx30thk (mm) 14 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 281,485.00 Ppdo Administrative Division 83. 1 Lot Administrative Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 4 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) 4 Pcs Counter Table: 1500lx400wx800h (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 4 Pcs 1500lx1300hx30thk (mm) 4 Pcs 900lx1300wx30thk (mm) 5 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 8 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 168,916.00 84. 1 Lot Administrative Division Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 5 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 5 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 5 Pcs 1500lx1500hx30thk (mm) 5 Pcs 900lx1500wx30thk (mm) 9 Pcs 600lx1500wx30thk (mm) 2 Pcs 450lx1500wx30thk (mm) 11 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 229,725.00 85. 1 Lot Administrative Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 2 Pcs 1500lx1500hx30thk (mm) 2 Pcs 900lx1500wx30thk (mm) 4 Pcs 600lx1500wx30thk (mm) 1 Pc 450lx1500wx30thk (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 95,157.50 Picad - Media & Research Division 86. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 8 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 8 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 8 Pcs 1300lx1300hx30thk (mm) 8 Pcs 900lx1300wx30thk (mm) 16 Pcs 600lx1300wx30thk (mm) 7 Pcs 400lx1300wx30thk (mm) 18 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 319,349.52 Picad - I.t. Division 87. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 1000lx400wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1300lx1300hx30thk (mm) 4 Pcs 1000lx1300wx30thk (mm) 6 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 143,052.04 Picad Administrative Division 88. 1 Lot Staff Workstation - Main Table Top W/ Keyboard Tray, Side Table, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 8 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 8 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated With Counter Table 4 Pcs 1300lx1300hx30thk (mm) 5 Pcs 900lx1300wx30thk (mm) 5 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 17 Pcs Connector: 30thkx30thkx1300h (mm) Partitions: 30mm Thk Aluminum Framing In Laminated Finish With 100mm Raceway In Powder Coated Finish 4 Pcs 1300lx450wx25thk (mm) 5 Pcs 900lx1500wx30thk (mm) 6 Pcs 600lx1500wx30thk (mm) 3 Pcs 400lx1500wx30thk (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) 4 Pcs Counter Top: 1400lx400wx25thk (mm) Unit Cost: Php 291,449.40 Pg-cops 89. 1 Lot Cops Table - Main Table Top With Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 9 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 14 Pcs 600lx1300hx30thk (mm) 7 Pcs 1200lx1300wx30thk (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 170,334.11 90. 1 Lot Cops Table - Main Table Top With Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 5 Pcs Main Table Top: 1200lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 6 Pcs 600lx1300hx30thk (mm) 5 Pcs 1200lx1300wx30thk (mm) 6 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 96,641.45 Road Safety Division 91. 1 Lot Staff Workstation - Main Table Top With Keyboard Tray And Partitions (cluster Of 14) - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 14 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 20 Pcs 600lx1300hx30thk (mm) 11 Pcs 1300lx1300wx30thk (mm) 18 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 274,210.75 Opdrrmo 92. 1 Lot Opdrrmo Table - Main Table Top With Keyboard Tray And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 10 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 10 Pcs 1300lx1300hx30thk (mm) 14 Pcs 600lx1300wx30thk (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 228,160.00 Receiving Area 93. 1 Lot Information Table - Main Table Top With Keyboard Tray, Counter Top And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 1 Pc 1500lx1300hx30thk (mm) 2 Pcs 600lx1300wx30thk (mm) 2 Pcs Connector: 30thkx30thkx1300h (mm) Information Window Partition: Cleared Tempered Glass With Opening Counter Table And Laminated 1 Pc 1500lx1500hx30thk (mm) 2 Pcs 600lx1500wx30thk (mm) 1 Pc Counter Top: 1500l X 400 X 25thk 2 Pcs 1950l X 400 X 25thk 2 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 71,930.00 Picto Ict Operation Division 94. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 13 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 13 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 13 Pcs 1300lx1300hx30thk (mm) 13 Pcs 900lx1300wx30thk (mm) 23 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 28 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 457,654.22 95. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table, Fixed Cabinet And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps & Keyboard Tray In Laminated Finish W/ Laminated Damper With Fixed Cabinet 4 Pcs Main Table Top: 1300lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 4 Pcs Side Table: 900lx450wx750hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 4 Pcs 1300lx1300hx30thk (mm) 4 Pcs 900lx1300wx30thk (mm) 5 Pcs 600lx1300wx30thk (mm) 4 Pcs 400lx1300wx30thk (mm) 9 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 143,169.76 96. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 2 Pcs Main Table Top: 1300lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 2 Pcs Side Table: 900lx450wx800hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 2 Pcs 1300lx1300hx30thk (mm) 3 Pcs 900lx1300wx30thk (mm) 3 Pcs 600lx1300wx30thk (mm) 2 Pcs 400lx1300wx30thk (mm) 5 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 80,539.82 97. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 9 Pcs Main Table Top: 1300lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 9 Pcs Side Table: 900lx450wx800hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 9 Pcs 1300lx1300hx30thk (mm) 9 Pcs 900lx1300wx30thk (mm) 18 Pcs 600lx1300wx30thk (mm) 2 Pcs 400lx1300wx30thk (mm) 16 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 318,534.46 Picto Education & Training Division 98. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 16 Pcs Main Table Top: 1300lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 16 Pcs Side Table: 900lx450wx800hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 15 Pcs 1300lx1300hx30thk (mm) 16 Pcs 900lx1300wx30thk (mm) 27 Pcs 600lx1300wx30thk (mm) 10 Pcs 400lx1300wx30thk (mm) 35 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 568,961.54 Picto Isda Division 99. 1 Lot Ict Operation Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 20 Pcs Main Table Top: 1500lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 20 Pcs Side Table: 900lx450wx800hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 19 Pcs 1500lx1300hx30thk (mm) 33 Pcs 600lx1300wx30thk (mm) 12 Pcs 400lx1300wx30thk (mm) 43 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 649,104.64 Administrative Division 100. 1 Lot Administrative Division - Main Table Top W/ Keyboard Tray, Side Table And Partitions - 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps W/ Laminated Legs & Damper 14 Pcs Main Table Top: 1300lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40 (mm) 14 Pcs Side Table: 900lx450wx800hx25thk (mm) Partitions: Cleared Tempered W/ Frosted Glass Strips And Laminated 18 Pcs 1500lx1300hx30thk (mm) 18 Pcs 900lx1300wx30thk (mm) 36 Pcs 600lx1300wx30thk (mm) 43 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 632,072.00 101. 2 Pcs Information Desk - 25mm Thk Mdf Laminated Round Table With Shelves And Provision For Raceways And Base Footer With Marble Countertop - 3600dia X 600w X 1100h (mm) Unit Cost: Php 227,500.00 Upper Ground Floor Provincial Administrator Internal Affairs 102. 1 Lot Workstation- Main Table Top With Keyboard Tray, Side Table And Partitions And Counter Top 25mm Mdf Table In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 1 Pc Side Table: 1500l X 400w X 750h 25thk (mm) 1 Pc Side Table: 1800l X 400w X 750h 25thk (mm) 2 Pcs Side Table: 1000l X 400w X 750h 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs Partitions: 1500l X 1300h X 30thk (mm) 2 Pcs 1300l X 1300h X 30thk (mm) 2 Pcs 1000l X 1300h X 30thk (mm) 10 Pcs 600l X 1300h X 30thk (mm) 2 Pcs 400l X 1300h X 30thk (mm) 2 Pcs 1500l X 1500h X 30thk (mm) 1 Pc 1000l X 1500h X 30thk (mm) 2 Pcs Connector: 30thk X 30thk X 1300h (mm) 2 Pcs 30thk X 30thk X 1500h (mm) 2 Pcs Counter Top: 1500l X 250w X 25thk (mm) 1 Pc 1000l X 250w X 25thk (mm) Unit Cost: Php 178,613.52 103. 1 Lot Admin Officers Workstation- Main Table Top With Keyboard Tray, Side Table Top And Partitions 25mm Mdf Table Thk In Laminated Finish With Pvc Edging, Grommet Caps 3 Pcs Main Table Top: 1500l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 3 Pcs Side Table Top: 1000l X 400w 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Partitions: 1500l X 1500h X 30thk (mm) 3 Pcs 1000l X 1500h X 30thk (mm) 6 Pcs 600l X 1500h X 30thk (mm) 7 Pcs Connector: 30thk X 30thk X 1500h (mm) Unit Cost: Php 147,987.50 Bac Office 104. 1 Lot Workstation - Main Table Top With Keyboard Tray, Side Table And Partitions 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 16 Pcs Main Table Top: 1500l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 16 Pcs Side Table: 1000l X 400w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 16 Pcs Partition: 1500l X 1300h X 30thk (mm) 16 Pcs 1000l X 1300h X 30thk (mm) 29 Pcs 600l X 1300h X 30thk (mm) 6 Pcs 400l X 1300 X 30thk (mm) 34 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 594,488.16 105. 1 Lot L-shaped Workstation - Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Laminated Legs & Damper 8 Pcs Main Table Top: 1500l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 8 Pcs Side Table: 1000l X 400w X 750h X 25thk (mm) 6 Pcs Partition: 1500l X 1300h X 30thk (mm) 8 Pcs 1000l X 1300h X 30thk (mm) 15 Pcs 600l X 1300h X 30thk (mm) 4 Pcs 400l X 1300 X 30thk (mm) 3,750.00 22 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 293,894.08 106. 1 Lot Workstation With Counter- Main Table Top, Keyboard Tray, Counter Top And Partition Partition Is Cleared Tempered Glass With Opening And Counter Table 2 Pcs Side Partition: 1500l X 1500h X 30thk (mm) 2 Pcs Main Table Top: 1500l X 600w X 750h Keyboard Tray: 540l X 400w X 40h (mm) 2 Pcs Counter Top: 1500l X 400w X 750h X 25thk (mm) 2 Pcs Side Table: 1000l X 400w X 750h (mm) 2 Pcs Partition: 1000l X 1300h X 750h (mm) 2 Pcs 600l X 1300h X 750h (mm) 2 Pcs 450l X 1300h X 750h (mm) 5 Pcs Connector: 30thk X 30thk X 1500h (mm) Unit Cost: Php 88,091.02 107. 1 Pc Driver Station 25mm Mdf Laminated Table Top With Powder Coated Metal Legs; 10 Seaters With Outlet Box 2800l X 820w X 800h (mm) Unit Cost: Php 68,750.00 Provincial Administrator- Community Affairs 108. 1 Lot Work Station- Main Table Top, Keyboard Tray, Partition And Counter Table Top 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 15 Pcs Main Table Top: 1000l X 600wx 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs Counter Table Top: 1000l X 400w X 25thk (mm) 13 Pcs Partition: 1000l X 1300h X 30thk (mm) 19 Pcs 600l X 1300h X 30thk (mm) 19 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 258,082.23 109. 1 Lot Work Station 2- Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper; With Counter Top 21 Pcs Main Table Top: 1500l X 600wx 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 21 Pcs Side Table: 800l X 550w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 21 Pcs Partition: 1500l X 1300h X 30thk (mm) 21 Pcs 800l X 1300h X 30thk (mm) 33 Pcs 600l X 1300h X 30thk (mm) 8 Pcs 400l X 1300l X 30thk (mm) 23 Pcs Connector: 30thk X 30thk X 1300h (mm) 2 Pcs Counter Table Top: 1000l X 400w X 25thk (mm) Unit Cost: Php 749,576.25 110. 1 Lot Record Staff 2 Work Station- Main Table Top, Keyboard Tray, Side Table And Partition 25mm Table Thk Laminated Finish With Pvc Edging And Grommet Caps 8 Pcs Main Table Top: 1500l X 600wx 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 8 Pcs Side Table: 1000l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 8 Pcs Partition: 1500l X 1300h X 30thk (mm) 8 Pcs 1000l X 1300h X 30thk (mm) 8 Pcs 600l X 1300h X 30thk (mm) 8 Pcs 400l X 1300l X 30thk (mm) 8 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 285,524.08 Person With Disability Affairs Office 111. 1 Lot Work Station- Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminted Finish With Pvc Edging, Grommet Caps, With Laminated Legs & Damper 6 Pcs Main Table Top: 1500l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 6 Pcs Side Table Top: 950l X 400w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 6 Pcs Partition: 1500l X 1300h X 30thk (mm) 6 Pcs 950l X 1300h X 30thk (mm) 12 Pcs 600l X 1300h X 30thk (mm) 2 Pcs 400l X 1300h X 30thk (mm) 1 Pc Connector: 30thk X 30thk X 1300h (mm) 1 Pc Partition: 950l X 1500h X 30thk (mm) 1 Pc 600l X 1500h X 30thk (mm) 4 Pcs Connector: 30thk X 30thk X 1500h (mm) Unit Cost: Php 244,665.00 E- Registration 112. 1 Lot Staff Work Station- Main Table Top, Keyboard Tray, Side Table And Partition Side Table And Partition 25mm Mdf Table Thk In Laminted Finish With Pvc Edging, Grommet Caps, With Laminated Full Legs & Damper Edging, Grommet Caps, With Laminated Full Llegs & Damper Damper 4 Pcs Main Table Top: 1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Side Table Top: 950l X 400w X 750h X 25thk (mm) 4 Pcs Partition: 1500l X 1300h X 750h (mm) 4 Pcs 1300l X 1300h X 750h (mm) 2 Pcs 1000l X 1300h X 750h (mm) 10 Pcs Connector: 30thk X 30thk X 1300h (mm) Partition: Cleared Tempered Glass With Opening And Counter Table Laminated Finish 4 Pcs Partition: 1300l X 1500h X 30thk (mm) Unit Cost: Php 203,421.02 113. 1 Lot Staff Work Station 2- Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminted Finish With Pvc Edging, Grommet Caps, With Laminated Full Legs & Damper 2 Pcs Main Table Top: 1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 2 Pcs Side Table Top: 950l X 400w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs Partition: 1350l X 1300h X 30thk (mm) 2 Pcs 1000l X 1300h X 30thk (mm) 4 Pcs 600l X 1300h X 30thk (mm) 2 Pcs 400l X 1300h X 30thk (mm) 6 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 91,252.02 Pswdo Promotive 114. 1 Lot L-shaped Workstation With Counter Table - Main Table Top, Keyboard Tray, Side Table, Counter Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps With Counter Table Top 8 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 8 Pcs Side Table: 1000l X 400w X 750h X 25thk (mm) 8 Pcs Counter Table: 1360l X 400w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Partition: 1360l X 1500h X 30thk (mm) 6 Pcs 1000l X 1500h X 30thk (mm) 11 Pcs 600l X 1500h X 30thk (mm) 6 Pcs 450l X 1500 X 30thk (mm) 11 Pcs Connector: 30thk X 30thk X 1500h (mm) Unit Cost: Php 248,813.54 115. 1 Lot L-shaped Workstation - Main Table Top, Keyboard Tray, Side Table, Counter Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 4 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 4 Pcs Side Table: 1000l X 400w X 750h (mm) 4 Pcs Counter Table: 1360l X 400w X 750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Partition: 1360l X 1300h X 30thk (mm) 4 Pcs 1000l X 1300h X 30thk (mm) 8 Pcs 600l X 1300h X 30thk (mm) 2 Pcs 450l X 1300 X 30thk (mm) 10 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 158,993.38 Pswdo Screening 116. 1 Lot L-shaped Workstation - Main Table Top,keyboard Tray,side Table, With Counter Top And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps And Counter Table Top 4 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 4 Pcs Side Table: 1000l X 400w X 750h X 25thk (mm) 4 Pcs Counter Table: 1360l X 400w X 750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Partition: 1360l X 1500h X 30thk (mm) 5 Pcs 1000l X 1500h X 30thk (mm) 5 Pcs 600l X 1500h X 30thk (mm) 4 Pcs 400l X 1500h X 30thk (mm) 9 Pcs Connector: 30thk X 30thk X 1500thk (mm) Unit Cost: Php 160,643.89 117. 1 Lot L-shaped Workstation - Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 3 Pcs Main Table Top: 1360l X 600w X 750h (mm) Keyboard Tray: 540l X 400w X 40h (mm) 3 Pcs Side Table: 1000l X 400w X 750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 3 Pcs Partition: 1360l X 1300h X 30thk (mm) 3 Pcs 1000l X 1300h X 30thk (mm) 5 Pcs 600l X 1300h X 30thk (mm) 3 Pcs 400l X 1300h X 30thk (mm) 8 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 111,821.93 Pswdo Protective 118. 1 Lot L-shaped Work Station- Main Table Top, Keyboard Tray, Side Table, Counter Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs And Damper; With Counter Top 7 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 7 Pcs Side Table: 1000l X 400w X 750h X 25thk (mm) 7 Pcs Counter Table: 1360l X 400w X 750h 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 7 Pcs Partition: 1360l X 1500h X 30thk (mm) 8 Pcs 1000l X 1500h X 30thk (mm) 8 Pcs 600l X 1500h X 30thk (mm) 8 Pcs Connector: 30thk X 30thk X 1500h (mm) Unit Cost: Php 236,333.30 119. 1 Lot L-shaped Workstation 2- Main Table Top, Keyboard Tray, Side Table, Counter Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 8 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 8 Pcs Side Table: 1000l X 400w X 750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 8 Pcs Partition: 1360l X 1300h X 30thk (mm) 6 Pcs 1000l X 1300h X 30thk (mm) 10 Pcs 600l X 1300h X 30thk (mm) 8 Pcs 400l X 1300 X 30thk (mm) 16 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 256,227.46 120. 5 Pcs Information Desk 25mm Thk Mdf Laminated Round Table With Shelves And Provision For Raceways And Base Footer With Marble Counter Top 3600dia X 600w X 1100h Location: Upper Ground Floor *security- 2pcs *information Counter And Lobby- 2pcs *info/sec Hallway- 1pc Unit Cost: Php 227,500.00 Pswdo Consultation Room 121. 1 Lot Staff Work Station- Main Table Top, Keyboard Tray, Side Table And Partition 25mm Mdf Table Thk In Laminted Finish With Pvc Edging; Grommet Caps 3 Pcs Main Table Top: 1360l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 3 Pcs Side Table Top: 1000l X 400w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 3 Pcs Partition: 1360l X 1300h X 30thk (mm) 3 Pcs 1000l X 1300h X 30thk (mm) 6 Pcs 600l X 1300h X 30thk (mm) 3 Pcs 400l X 1300h X 30thk (mm) 9 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 117,051.93 "sangunian Building Upper Ground Floor " 122. 1 Lot "office Of The Board Member Workstation -main Table Top With Keyboard Tray,side Table And Partition" 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 72 Pcs Main Table Top:1200l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 72 Pcs Side Table: 750l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 70 Pcs Middle Partition: 1200l X 1300h X 30thk (mm) 2 Pcs 800l X 1300h X 30thk (mm) 74 Pcs 750l X 1300h X 30thk (mm) 2 Pcs 700l X 1300h X 30thk (mm) 116 Pcs 600l X 1300h X 30thk (mm) 56 Pcs 450l X 1300h X 30thk (mm) 140 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 2,534,635.16 123. 1 Lot Division Chief Office Table Workstation- Main Table Top With Keyboard Tray, Side Table And Partition 25mm Thk Free Standing Table In Laminated Finish With Pvc Edging; Grommet Caps, And Keyboard Tray In Laminated Finish With Legs & Damper 18 Pcs Main Table Top:1400l X 600w X 800h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 18 Pcs Side Table: 900l X 450w X 800h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 22 Pcs Middle Partition: 1400l X 1300h X 30thk (mm) 20 Pcs 1200l X 1300h X 30thk (mm) 1 Pc 1100l X 1300h X 30thk (mm) 4 Pcs 1000l X 1300h X 30thk (mm) 17 Pcs 900l X 1300h X 30thk (mm) 1 Pc 800l X 1300h X 30thk (mm) 4 Pcs 750l X 1300h X 30thk (mm) 14 Pcs 700l X 1300h X 30thk (mm) 13 Pcs 600l X 1300h X 30thk (mm) 13 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 872,167.38 Office Of The Vice Governor 124. 1 Lot "staff Of The Vice Governor Workstation-main Table Top With Keyboard Tray,side Table And Partition" 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 19 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 19 Pcs Side Table: 800l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 13 Pcs Middle Partition: 1300l X 1300h X 30thk (mm) 22 Pcs Side Partition: 800l X 1300h X 30thk (mm) 26 Pcs 600l X 1300h X 30thk (mm) 106,080.00 18 Pcs 450l X 1300h X 30thk (mm) 75,937.50 36 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 639,343.50 125. 1 Lot "staff Of The Vice Governor Workstation 2 - Main Table Top With Keyboard Tray,side Table And Partition With Counter Table" 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 2 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 2 Pcs Side Table: 800l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 1 Pc Counter Table Top:1300l X 400w X 25thk (mm) 1 Pc 1500l X 400w X 25thk (mm) 3,250.00 1 Pc 1200l X 400w X 25thk (mm) 3,150.00 2 Pcs Main Table Partition:1300l X 1500h X 30thk (mm) 2 Pcs Side Table Partition:800l X 1500h X 30thk (mm) 3 Pcs 600l X 1300h X 30thk (mm) 12,240.00 2 Pcs 450l X 1300h X 30thk (mm) 8,437.50 3 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 82,372.50 Office Of The Vice Governor 126. 1 Pc Executive Table With Side Table 2500mm X 1000mm Study Table And 550mm X 1200mm Side Table Solid Wood With Natural Stone Unit Cost: Php 355,770.00 Lower Ground Floor Sanggunian Building 127. 1 Lot "e-library Section Workstation-main Table Top With Keyboard Tray, And Partition" 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps 30 Pcs Main Table Top:1100l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 34 Pcs Side Partition: 1100l X 1300h X 30thk (mm) 36 Pcs 600l X 1300h X 30thk (mm) 146,880.00 36 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 589,927.04 E-library Section Table With Counter Top 128. 1 Lot Workstation- Main Table Top With Keyboard Tray, Counter Table Top And Partition 25mm Table Thk In Laminated Finish With Pvc Edging; Grommet Caps And Keyboard Tray In Laminated Finish With Damper 4 Pcs Main Table Top:1000l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Middle Partition: 1000l X 1500h X 30thk (mm) 5 Pcs 600l X 1500h X 30thk (mm) 4 Pcs Counter Table Top: 1000l X 500w X 30thk (mm) 5 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 79,558.20 Legislative Operations Division 129. 1 Lot Workstation- Main Table Top With Keyboard Tray,side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 21 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 21 Pcs Side Table: 800l X 550w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 21 Pcs Middle Partition: 1300l X 1300h X 30thk (mm) 21 Pcs Side Partition: 1300l X 1300h X 30thk (mm) 19 Pcs 800l X 1300h X 30thk (mm) 37 Pcs 600l X 1300h X 30thk (mm) 7 Pcs 450l X 1300h X 30thk (mm) 41 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 897,883.25 Legislative Operations Division 130. 1 Lot Table With Counter Top Workstation - Main Table Top With Keyboard Tray,side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 5 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 5 Pcs Side Table: 800l X 550w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 5 Pcs Side Partition: 1300l X 1300h X 30thk (mm) 5 Pcs 800l X 1300h X 30thk (mm) 10 Pcs 600l X 1300h X 30thk (mm) 1 Pc 450l X 1300h X 30thk (mm) 11 Pcs Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 176,796.25 131. 1 Lot Workstation - Main Table Top With Keyboard Tray,side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging: Grommet Caps; With Laminated Legs & Damper 6 Pcs "main Table Top:1100l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 4 Side Partition: 1100l X 1300h X 30thk (mm) 8 600l X 1300h X 30thk (mm) 32,640.00 6 Connector: 30thk X 30thk X 1300thk (mm) Unit Cost: Php 98,172.74 Records & Information Division 132. 1 Lot Workstation - Main Table Top With Keyboard Tray,side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 14 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 14 Pcs Side Table: 800l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 14 Pcs Middle Partition: 1300l X 1300h X 30thk (mm) 14 Pcs 800l X 1300h X 30thk (mm) 28 Pcs 600l X 1300h X 30thk (mm) 3 Pcs 450l X 1300h X 30thk (mm) 31 Pcs Connector: 30thk X 30thk X 1300h (mm) 8 Pcs Counter Table Top: 1300l X 400w X 25thk (mm) Unit Cost: Php 496,103.25 "office Of The Sanggunian Panlalawigan Administrative Division" 133. 1 Lot Workstation - Main Table Top With Keyboard Tray,side Table And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 20 Pcs Main Table Top:1300l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) 20 Pcs Side Table: 800l X 450w X 750h X 25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 24 Pcs Middle Partition: 1300l X 1300h X 30thk (mm) 20 Pcs 800l X 1300h X 30thk (mm) 40 Pcs 600l X 1300h X 30thk (mm) 10 Pcs 450l X 1300h X 30thk (mm) 41 Pcs Connector: 30thk X 30thk X 1300h (mm) 7 Pcs Counter Table Top: 1400l X 400w X 25thk (mm) Unit Cost: Php 781,757.50 "office Of The Sanggunian Panlalawigan Archive Section" 134. 1 Lot Workstation - Main Table Top With Keyboard Tray And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 6 Pcs Main Table Top: 1100l X 600w X 750h X 25thk (mm) Keyboard Tray: 540l X 400w X 40h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs Middle Partition: 1100l X 1300h X 30thk (mm) 8 Pcs 600l X 1300h X 30thk (mm) 6 Pcs Connector: 30thk X 30thk X 1300h (mm) Unit Cost: Php 98,172.74 *finance Building Lower Ground Provincial Accounting Office 135. 1 Lot Work Stations-main Table Top With Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 41 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 41 Pcs Side Table: 800lx450wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 41 Pcs 1400lx1300hx30thk (mm) 32 Pcs 800lx1300hx30thk (mm) 72 Pcs 600lx1300hx30thk (mm) 13 Pcs 450lx1300hx30thk (mm) 80 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 1,471,316.58 136. 1 Lot Provincial Accounting Office Work Station With Table Top-main Table Top With Keyboard Tray, Side Table, Partition, And Counter Top 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper; With Counter Table Top 1 Pc Main Table Top: 2450lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 7 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 7 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition Is Cleared Tempered With Frosted Glass Strips And Laminated 7 Pcs 1500lx1300hx30thk 6 Pcs 800lx1300hx30thk (mm) 11 Pcs 600lx1300hx30thk (mm) 4 Pcs 450lx1300hx30thk (mm) 14 Pcs Connector: 30thkx30thkx1500h (mm) 1 Pc Counter Top: 2450lx400wx25thk (mm) 7 Pcs Counter Top: 1500lx400wx25thk (mm) Unit Cost: Php 301,957.42 Provincial Budget Office 137. 1 Lot Work Stations-main Table Top With Keyboard Tray, Side Table, Partition, Side Partition, And Counter Top 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 20 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 20 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 17 Pcs 1400lx1300hx30thk (mm) 28 Pcs 600lx1300hx30thk (mm) 15 Pcs 800lx1300hx30thk (mm) 8 Pcs 450lx1300hx30thk (mm) 39 Pcs Connector: 30thkx30thkx1500h (mm) 35 Pcs Connector: 30thkx30thkx1300h (mm) 3 Pcs Counter Top: 1500lx400wx20thk (mm) Unit Cost: Php 690,231.50 *finance Building Upper Ground Provincial Treasurer's Office Administrative Division 138. 1 Lot Main Table Top With Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 12 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 12 Pcs Side Table: 800lx550wx750hx25thk (mm) 1 Pc Counter Table: 1400lx400wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 7 Pcs 1400lx1300hx30thk (mm) 6 Pcs 800lx1300hx30thk (mm) 15 Pcs 600lx1300hx30thk (mm) 11 Pcs 450lx1300hx30thk (mm) 16 Pcs Connector: 30thkx30thkx1300h (mm) 3 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 354,602.66 139. 1 Lot Assistant Department Head & Admin. Chief-main Table Top With Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 3 Pcs Main Table Top: 1500lx600wx800hx25thk (mm) Side Table: 1000lx450wx800hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1500lx1300hx30thk (mm) 1 Pc 900lx1300hx30thk (mm) 1 Pc 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 1 Pc Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 61,875.00 Commission On Audit 140. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 6 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 6 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 6 Pcs 1400lx1300hx30thk (mm) 6 Pcs 800lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 3 Pcs 450lx1300hx30thk (mm) 15 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 232,377.03 Supervising Auditor's Office 141. 1 Lot Staff Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 4 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 3 Pcs Side Table: 800lx450wx750hx25thk (mm) 2 Pcs Counter Table: 1400lx450wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1400lx1300hx30thk (mm) 2 Pcs 800lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1500h (mm) 5 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 105,659.01 Information Counter At Hallway Near Coa 142. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 2 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 1 Pc Side Table: 800lx550wx750hx25thk (mm) 2 Pcs Counter Table: 1400lx450wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1400lx1300hx30thk (mm) 1 Pc 800lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 3 Pcs Connector: 30thkx30thkx1500h (mm) Unit Cost: Php 68,018.51 Provincial Treasurer's Office Field Supervision Division 143. 1 Lot Staff Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 2 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 2 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1400lx1300hx30thk (mm) 2 Pcs 800lx1300hx30thk (mm) 4 Pcs 600lx1300hx30thk (mm) 2 Pcs 450lx1300hx30thk (mm) 5 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 81,677.76 Field Supervision Division 144. 1 Lot Field Chief Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 1 Pc Main Table Top: 1400lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 1 Pc Side Table: 800lx450wx800hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1500lx1300hx30thk (mm) 2 Pcs 900lx1300hx30thk (mm) 3 Pcs 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 2 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 73,106.75 Revenue Operation Station 145. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 10 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 10 Pcs Side Table: 800lx550wx750hx25thk (mm) 4 Pcs Counter Table: 1400lx450wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 6 Pcs 1400lx1300hx30thk (mm) 6 Pcs 800lx1300hx30thk (mm) 8 Pcs 600lx1300hx30thk (mm) 6 Pcs 450lx1300hx30thk (mm) 9 Pcs Connector: 30thkx30thkx1500h (mm) 14 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 287,166.00 146. 1 Lot Revenue Chief Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, Connector And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 1 Pc Main Table Top: 1500lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 1 Pc Side Table: 1000lx450wx800hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 2 Pcs 1500lx1300hx30thk (mm) 4 Pcs 900lx1300hx30thk (mm) 2 Pcs 600lx1300hx30thk (mm) 1 Pc 450lx1300hx30thk (mm) 3 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 83,791.99 Cash Recipients, Toru Division & Cash Disbursement Division 147. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, Door, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 28 Pcs Main Table Top: 1400lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 32 Pcs Side Table: 800lx550wx750hx25thk (mm) 11 Pcs Counter Table: 1400lx400wx750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 32 Pcs 1400lx1300hx30thk (mm) 32 Pcs 800lx1300hx30thk (mm) 64 Pcs 600lx1300hx30thk (mm) 22 Pcs 450lx1300hx30thk (mm) 12 Pcs Door: 600lx1300hx30thk (mm) 25 Pcs Connector: 30thkx30thkx1500h (mm) 50 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 1,295,107.00 148. 1 Lot C.d,c.r & Toru Chief Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 3 Pcs Main Table Top: 1500lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) Side Table: 1000lx450wx800hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 3 Pcs 1500lx1300hx30thk (mm) 2 Pcs 1350lx1300hx30thk (mm) 3 Pcs 1110lx1300hx30thk (mm) 2 Pcs 1000lx1300hx30thk (mm) 2 Pcs 600lx1300hx30thk (mm) 4 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 158,748.45 Provincial Assessor's Office Assessment Standard Division 149. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 13 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 13 Pcs Side Table: 800lx450wx750hx25thk (mm) 9 Pcs Counter Table: 1500lx400wx750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 9 Pcs 1500lx1300hx30thk (mm) 11 Pcs 800lx1300hx30thk (mm) 15 Pcs 600lx1300hx30thk (mm) 12 Pcs 450lx1300hx30thk (mm) 12 Pcs Connector: 30thkx30thkx1500h (mm) 10 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 455,594.50 150. 1 Lot Division Chief Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 1 Pc Main Table Top: 1500lx600wx800hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 1 Pc Side Table: 1000lx450wx800hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 3 Pcs 1500lx1300hx30thk (mm) 1 Pc 1000lx1300hx30thk (mm) 1 Pc 600lx1300hx30thk (mm) 1 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 62,255.51 Administrative Division 151. 1 Lot Staff Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 7 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 7 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 7 Pcs 1500lx1300hx30thk (mm) 8 Pcs 800lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 4 Pcs 450lx1300hx30thk (mm) 2 Pcs Counter Table: 1500lx400wx750h (mm) 15 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 279,014.41 Tax Mapping Division 152. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Partition, Counter Table 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 11 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 11 Pcs Side Table: 800lx450wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs 1500lx1300hx30thk (mm) 8 Pcs 800lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 3 Pcs 450lx1300hx30thk (mm) 6 Pcs Counter Table: 1500lx400wx750w (mm) 5 Pcs Connector: 30thkx30thkx1500h (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 307,623.77 Records Division 153. 1 Lot Staff Workstation-main Table Top With Table Top, Keyboard Tray, Side Table, Counter Table, And Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 19 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 19 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 19 Pcs 1500lx1300hx30thk (mm) 19 Pcs 800lx1300hx30thk (mm) 23 Pcs 600lx1300hx30thk (mm) 15 Pcs 450lx1300hx30thk (mm) 8 Pcs Counter Table: 1500lx400wx750w (mm) 30 Pcs Connector: 30thkx30thkx1500h (mm) 6 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 736,963.72 Property Valuation Division 154. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs & Damper 7 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 7 Pcs Side Table: 800lx550wx750hx25thk (mm) 5 Pcs Counter Table: 1500lx400wx750h (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 7 Pcs 1500lx1300hx30thk (mm) 8 Pcs 800lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 3 Pcs 450lx1300hx30thk (mm) 15 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 287,197.66 Evaluation Division 155. 1 Lot Staff Workstation-main Table Top With Keyboard Tray, Side Table, Counter Table, Partition 25mm Mdf Table Thk In Laminated Finish With Pvc Edging; Grommet Caps; With Laminated Legs And Damper 7 Pcs Main Table Top: 1500lx600wx750hx25thk (mm) Keyboard Tray: 540lx400wx40h (mm) 7 Pcs Side Table: 800lx550wx750hx25thk (mm) Partition: Cleared Tempered With Frosted Glass Strips And Laminated 4 Pcs 1500lx1300hx30thk (mm) 8 Pcs 800lx1300hx30thk (mm) 12 Pcs 600lx1300hx30thk (mm) 3 Pcs 450lx1300hx30thk (mm) 2 Pcs Counter Table: 1500lx400wx750h (mm) 4 Pcs Connector: 30thkx30thkx1500h (mm) 11 Pcs Connector: 30thkx30thkx1300h (mm) Unit Cost: Php 248,711.27 Note: 1. All Items Must Have One (1) Year Warranty On Hardware. 2.bidder Shall Bid For The Entire Lot. Bid For Selected Lot Only Will Be Disqualified Invitation To Bid For This Project Is Also Posted At Www.cavite.gov.ph
Closing Date19 Aug 2024
Tender AmountPHP 62.8 Million (USD 1 Million)
4661-4670 of 4664 archived Tenders