Sustainable Energy Authority Of Ireland Tender Result

View complete overview of Sustainable Energy Authority Of Ireland Tender Result

Sustainable Energy Authority Of Ireland Tender Result

Contract Date6 Oct 2023
Contract Period90 Days
Contract AmountGBP 10,00,000 (USD 12,65,904.5)
Download

AOC Description

Project Management and Engineering Consultancy Services for the Development of the Atlantic Marine Energy Test Site (AMETS) Substation-SEAI sought a suitably qualified Consultant who will be wholly responsible for the delivery of the Project Management and Engineering Consultancy Services for the development of the Atlantic Marine Energy Test Site Substation and be responsible for executing all required stages of the Project:?Stage (ii): Familiarisation and Outline Design Development?Stage (iii): Tender Action, Evaluation, Award?Stage (iv): Design & Construction?Stage (v): Handover of WorksNote that Stage (i) (Preliminary Desig...

Contact

Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.