Spain Tender Results

Spain Tender Results

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Services for the transfer and adaptation of the Córdoba Central Traffic Control (CTC) equipment to adapt the Córdoba Traffic Regulation Centre.
Contract Date18 Dec 2024
Contract AmountEUR 761 K (USD 788.8 K)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works for the construction project to remove level crossings at PP.KK. 376/350 and 376/537 on the Venta de Baños to Santander Line, in the municipality of Alar del Rey (Palencia).
Contract Date18 Dec 2024
Contract AmountEUR 5.2 Million (USD 5.3 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works corresponding to the "Project to build an extension of the siding to 750 metres of useful length at the stations of Arcos de Jalón (Soria) and Sigüenza (Guadalajara)".
Contract Date18 Dec 2024
Contract AmountEUR 6.9 Million (USD 7.2 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Second request against the Framework Agreement for vegetation control on conventional and narrow gauge lines of the General Interest Railway Network (RFIG). 6 lots. Lot 2. Northern Operations Subdirectorate.
Contract Date18 Dec 2024
Contract AmountEUR 8.3 Million (USD 8.6 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Execution of works for construction projects to improve accessibility, evacuation and ventilation conditions in the event of fire at the Doce de Octubre and Puente Alcocer underground commuter train stations
Contract Date18 Dec 2024
Contract AmountEUR 18.5 Million (USD 19.2 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Drafting of the construction project and execution of the works for the standardization and modernization of the blockades on the Oviedo - Infiesto section
Contract Date18 Dec 2024
Contract AmountEUR 18.7 Million (USD 19.4 Million)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Lot 1: Inspection service at ADIF fuel facilities by OCA 2025-2029, central area
Contract Date18 Dec 2024
Contract AmountRefer Documents 

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Lot 2: Inspection service at ADIF fuel facilities by OCA 2025-2029, southern zone
Contract Date18 Dec 2024
Contract AmountRefer Documents 

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Lot 1: Supply of equipment for the extension of sidings to 750 metres of useful length at the stations of Paracuellos-Sabiñán, Morés and Épila (Zaragoza)
Contract Date18 Dec 2024
Contract AmountRefer Documents 

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Lot 3: Supply of equipment for the extension of sidings to 750 metres of useful length at the stations of Arcos de Jalón (Soria) and Sigüenza (Guadalajara).
Contract Date18 Dec 2024
Contract AmountRefer Documents 
51-60 of 10000 active Tender Results