Tender Results of Rail Coach Factory
Tender Results of Rail Coach Factory
Rail Coach Factory - RCF Tender Result
Goods
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
73112008
hex Nut M 8, As Per Drawing: Is:1364(part-3)-1992,6 Coating As Per Mdts-057, Pac
king Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub
during Transportation. The Item Should Be Packed With Adequate Strength. Transit Dam
age , If Any , Shall Be At The Cost Of Supplier., Quality Plan: N.a. [ Warranty Period: 30 Month
s After The Date Of Delivery ] ]
consignee Furnishing Depot, Rcf Punjab 350.00 Kg
Contract Date20 Jan 2025
Contract AmountINR 20.9 K (USD 242.29266)
Rail Coach Factory - RCF Tender Result
Goods
Machinery and Tools
Ireps
Result Stage: Awarded (AOC Available)
India
73112008
hex Nut M 8, As Per Drawing: Is:1364(part-3)-1992,6 Coating As Per Mdts-057, Pac
king Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub
during Transportation. The Item Should Be Packed With Adequate Strength. Transit Dam
age , If Any , Shall Be At The Cost Of Supplier., Quality Plan: N.a. [ Warranty Period: 30 Month
s After The Date Of Delivery ] ]
consignee Furnishing Depot, Rcf Punjab 350.00 Kg
Contract Date20 Jan 2025
Contract AmountINR 164.9 K (USD 1.9 K)
Rail Coach Factory - RCF Tender Result
Ireps
Result Stage: Awarded (AOC Available)
NA
73562221: CSK HD SCREW M6X90 STAINLESS STEEL, as per Drawing: IS:1365-2005 A2-70 TO IS:1367(PART-14)-1984, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRAN
Contract Date20 Jan 2025
Contract AmountINR 382.3 K (USD 4.4 K)
Rail Coach Factory - RCF Tender Result
Goods
Scraps
Ireps
Result Stage: Awarded (AOC Available)
India
33690121
pillar, As Per Drawing: Lw14112 Alt. 'c', Packing Instruction: No Special Packing Re
quired. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be
protected With Suitable Covering To Prevent It From Damage. However Transit Damage I
f Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty
period: 30 Months After The Date Of Delivery ] ]
consignee Shell Depot, Rcf Punjab 4078.00 Numbers
inspection
details Stage Inspection Not Required
Contract Date20 Jan 2025
Contract AmountINR 1.7 Million (USD 20.2 K)
Rail Coach Factory - RCF Tender Result
Goods
Scraps
Ireps
Result Stage: Awarded (AOC Available)
India
33690121
pillar, As Per Drawing: Lw14112 Alt. 'c', Packing Instruction: No Special Packing Re
quired. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be
protected With Suitable Covering To Prevent It From Damage. However Transit Damage I
f Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty
period: 30 Months After The Date Of Delivery ] ]
consignee Shell Depot, Rcf Punjab 4078.00 Numbers
inspection
details Stage Inspection Not Required
Contract Date20 Jan 2025
Contract AmountINR 2.6 Million (USD 30.4 K)
21-30 of 10000 active Tender Results