Tender Results of Rail Coach Factory
Tender Results of Rail Coach Factory
Rail Coach Factory - RCF Tender Result
Ireps
NA
Contract Date20 Dec 2024
Contract AmountINR 30.3 Million (USD 357.1 K)
33520951: FERRITIC STEEL SHEET 3X1250X2100MM., as per Drawing: RDSO SPEC. NO. C-K201, GRADE X2CRNI12 (409M) TABLE 1&2, HEAT TREATMENT CONDITION 2B AS PER TABLE-5., Packing Instruction: STAINLESS STEEL SHEETS,
Rail Coach Factory - RCF Tender Result
Machinery and Tools
Ireps
India
Contract Date20 Dec 2024
Contract AmountINR 50.7 Million (USD 596.2 K)
Set Of Euro Bowl And Electro-pneumatic Pressurised Flushing
system For Lhb Coaches And Set Of Lavatory Pan And Electro-
pneumatic Pressurised Flushing System For Lhb Coaches
Rail Coach Factory - RCF Tender Result
Software and IT Solutions
Ireps
NA
Contract Date19 Dec 2024
Contract AmountINR 253.6 K (USD 2.9 K)
834301010011: Supply, installation & commissioning of interactive Smart board, 75 inches with OPS. Specifications and Scope as per attached ANNEXURE - "A".
Rail Coach Factory - RCF Tender Result
Scraps
Ireps
India
Contract Date19 Dec 2024
Contract AmountINR 741.8 K (USD 8.7 K)
Pillar, As Per Drawing: Lw14123 Alt. 'd', Packing Instruction: No Special Packing Requi
red. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be
protected With Suitable Covering To Prevent It From Damage. However Transit Dam
age If Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty
period: 30 Months After The Date Of Delivery ] ]
consignee Shell Depot, Rcf Punjab 1671.00 Numbers
inspection Details Stage Inspection Not Required
2 33690080 Goods (y) Stock --- Yes Tpi Inr
agency
Rail Coach Factory - RCF Tender Result
Scraps
Ireps
India
Contract Date19 Dec 2024
Contract AmountINR 1 Million (USD 12.8 K)
Pillar, As Per Drawing: Lw14123 Alt. 'd', Packing Instruction: No Special Packing Requi
red. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be
protected With Suitable Covering To Prevent It From Damage. However Transit Dam
age If Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty
period: 30 Months After The Date Of Delivery ] ]
consignee Shell Depot, Rcf Punjab 1671.00 Numbers
inspection Details Stage Inspection Not Required
2 33690080 Goods (y) Stock --- Yes Tpi Inr
agency
Rail Coach Factory - RCF Tender Result
Scraps
Ireps
India
Contract Date19 Dec 2024
Contract AmountINR 2 Million (USD 24.4 K)
Pillar, As Per Drawing: Lw14123 Alt. 'd', Packing Instruction: No Special Packing Requi
red. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If Any Are To Be
protected With Suitable Covering To Prevent It From Damage. However Transit Dam
age If Any Shall Be At The Cost Of Supplier., Proction Procedure: Na, Quality Plan: Na [ Warranty
period: 30 Months After The Date Of Delivery ] ]
consignee Shell Depot, Rcf Punjab 1671.00 Numbers
inspection Details Stage Inspection Not Required
2 33690080 Goods (y) Stock --- Yes Tpi Inr
agency
Rail Coach Factory - RCF Tender Result
Other Consultancy Services
Ireps
India
Contract Date19 Dec 2024
Contract AmountINR 4.5 Million (USD 53 K)
869095540014: Facility Management Services - Lumpsum Based Brand: Facility-management-service-facility-management-services-lump-sum-based (detailed Description/specification As Per Product # 1 Of Gem Contract No. G
11-20 of 10000 active Tender Results