Tender Results of Qatarenergy
Tender Results of Qatarenergy
Qatarenergy Tender Result
Qatar
Contract Date1 Feb 2015
Contract AmountQAR 25.8 Million (USD 7.1 Million)
MISCELLANEOUS MAINTENANCE SERVICES ON CALL-OFF BASIS IN DUKHAN FIELDS-To carry out all Civil and Building Maintenance and small power industrial Electrical Maintenance works on call off basis for all Operating Plant Facilities, Distribution Network Facilities, Dukhan Support Services Area, Qatar Petroleum Support Facilities Area, Dukhan Training Ground, Dukhan Township and Dukhan Sewage Treatment Plants within the Dukhan Fields.
Qatarenergy Tender Result
Qatar
Contract Date19 Oct 2014
Contract AmountQAR 81.3 Million (USD 22.3 Million)
NEW SOUR GAS COMPRESSOR PROJECT, NGL-3, MESAIEED.-NGL-3 Plant was built in the year 1990 to process the Gas and Condensate feed stock from North Field Alfa (NFA). The plant basically consists of a Gas Processing section and a Condensate processing section. The feed stock to NGL-3 currently comprises PS-4 gas combined with Al-Shaheen gas and PS-4 condensate. The Gas and Condensate feed stock from North Field Alpha are transported by pipe lines to NGL-3 Plant at the Mesaieed Industrial Area for NGL extraction and Condensate stabilization. Feed Gas from North Field Alpha and Al-Shaheen are processed in NGL-3 Gas processing plant consisting of AGR, SRU, and NGL Extraction units. Condensate from NFA is processed in Condensate Fractionation plant where a rich gas stream is stripped out as a result of Condensate stabilization. This stripped gas (called Sour Gas) - is routed to NGL-3 Extraction unit using the Existing Sour Gas Compressor (6112-K-01) to process it along with main gas feed from NFA. The Existing Sour Gas Compressor (6112-K-01) has no standby unit and therefore, whenever this existing compressor trips due to any reason, Sour Gas stream is flared resulting in loss of NGL components and black smoke in the area. QP has decided to provide a new standby Sour Gas compressor - which is referred to as “New Compressor” and the associated New Sour Gas After Cooler. The New Compressor (6112-K-01A) and New After Cooler (6112-E-05A) are to be installed close to the existing Sour Gas Compressor (6112-K-01) in the NGL-3 Plant. 1.2,,SCOPE OF WORK : The scope of work for this Project mainly includes design, detail engineering, procurement, installation and commissioning of the following: ",,Install new Sour Gas Compressor, 6112-K-01A as well as the associate auxiliary equipment, i.e. lube oil system and dry gas seal system. ",,Install new Knock Out Drum, 6112-V-03A. ",,Install new Sour Gas Cooler, 6112-E-05A and new Lube Oil Cooler, 6112-E-08A. ",,Installation of the required equipment foundation, compressor house shelter, sour gas and lube oil cooler supporting structure, necessary supports and access platform including the EOT crane for compressor maintenance. ",,Installation of instrumentation system for monitoring, control and
Qatarenergy Tender Result
Qatar
Contract Date10 Aug 2014
Contract AmountQAR 21 Million (USD 5.7 Million)
UPGRADE TSE DBN.NETWORK,CCTV SVY.& REFURBISH SEWERS-MESAIEED-QP intends to award this CONTRACT for the upgrade of Treated Sewage Effluent (TSE) distribution network,CCTV Survey and GRP Lining work,and refurbishment of the existing sewerage network in Mesaieed. The CCTV survey and rehabilitation of certain sections of the sewerage network have been carried out in the recent past. The Scope of Work of this CONTRACT shall cover the remaining defective areas of the sewerage network in the catchment area of other pumping stations.
Qatarenergy Tender Result
Qatar
Contract Date3 Jul 2014
Contract AmountQAR 6.4 Million (USD 1.7 Million)
MISCELLANEOUS MAINTENANCE SUPPORT SERVICES AT CONTRACTOR'S WORKSHOP-CONTRACTOR shall have and maintain a fully equipped and adequately manned workshop in Qatar to support the following maintenance SERVICES required by QP at its offshore locations: a) overhaul of pumps, air compressors, diesel engines, pedestal cranes air and hoists b) balancing of rotors c) cold and hot metalization d) wire Rope fabrication, repair and testing e) load testing and colour coding of lifting items/equipment by QP approved third party certifying body. f) repair/testing of lifting equipment (this shall include, but not be limited to, crane components, forklifts, gas cylinder racks, chain pulleys, chain blocks, bow shackles, ‘D’ shackles, hooks, pull lifts, wire rope slings and the like.) g) blasting and painting services h) various repair, refurbishment works of offshore equipment (this shall include, but not be limited to, parts of heaters, exchangers, gauges, pumps and its parts there of, diesel engines and their components, components of turbines and process compressors, tanks, vessels, pipe lines, valves, generators, welding machines and the like). i) various fabrications, welding and machining works j) repair/refurbishment of chemical tote tanks k) hydrostatic/hydraulic/nitrogen/pneumatic pressure testing and l) N
Qatarenergy Tender Result
Qatar
Contract Date6 Apr 2014
Contract AmountQAR 37.4 Million (USD 10.2 Million)
EPIC SECURITY BUILDING, BOUNDARY WALL, & LANDSCAPING IN RLC-The scope of the project is to provide the security buildings, Main Gate Entrance area, Security Boundary Fence and landscaping works for the Multi-purpose Adminstration Complex (MPAC) development in Ras Laffan, including tie-ins to the existing utilities created under MPAC Phase 1. The following are the main features of the Scope; Temporary Security Facilities for MPAC Phase 1 buildings Main Security Entrance Gate with associated canopy and three guard houses. Gate Security Building Boundary Security Fence including gates and CCTV cameras. Soft and hard landscaping for main access road, security building and main gate areas Utilities and access ways Grading and storm water drainage system Demolition and removal of Temporary Security Facility.
Qatarenergy Tender Result
Qatar
Contract Date2 Mar 2014
Contract AmountQAR 3.8 Million (USD 1 Million)
PUR MAINT CONF INST IMPL TRAIN WELL INTEGRITY MANAGEMENT SYS-The following will be included in the scope of the project ",,Purchase a system to automate the current business processes and requirements of the well integrity departments ",,Installation and configuration of the system as required supporting the business and the technical requirements as specified ",,Purchase any required hardware to satisfy the system requirements and/or busienss requirements ",,One (1) year guarantee period after implementation completion and project acceptance. ",,Annual warranty, for five (5) years, maintenance on software and hardware after completion of guarantee period. ",,User and system administration training
Qatarenergy Tender Result
Qatar
Contract Date1 May 2013
Contract AmountQAR 5.8 Million (USD 1.6 Million)
PROVISION OF ELECTRONIC PTW SYSTEM FOR OFFSHORE OPERATIONS-The following will be included in the scope of the project ",,Purchase an electronic permit to work system to automate the current business processes and requirements of the Offshore Engineering departments ",,Customization of the system as required supporting the business and the technical requirements as specified ",,Integration of the system with SAP as required supporting the business and the technical requirements as specified ",,Installation and configuration of the system as required supporting the business and the technical requirements as specified ",,Purchase any required hardware to satisfy the system requirements and/or business requirements ",,One (1) year guarantee period after implementation completion and project acceptance. ",,Annual warranty, for five (5) years, maintenance on software and hardware after completion of guarantee period. ",,User and system administration training
Qatarenergy Tender Result
Qatar
Contract Date17 Mar 2013
Contract AmountQAR 80.2 Million (USD 22 Million)
REPAIR OF WHARVES AND JETTIES AT MESAIEED PORT-Repair of the following wharves and jetties at the Mesaieed Port 1.,,NGL-Jetty and Dolphins 2.,,Refinery Wharf (Berth 6) 3.,,General Cargo Wharves (Berth 9&10) 4.,,Small Boat Harbour 5.,,QATEX Wharf (Berth 4) 6.,,QASCO (Berth 1,2, & 3) 7.,,QAPCO Wharves (Berth 18 & 19) 8.,,QAFCO Jetty -1
Qatarenergy Tender Result
Qatar
Contract Date10 Feb 2013
Contract AmountQAR 8.1 Million (USD 2.2 Million)
PROVSN OF SERVCS FOR CASING CORROSN EVALUATION & STRENGTHNG OF OFFSHORE WELLS-Scope of this Contract is to evaluate the corrosion damage to the Outer casing, fill it up with bio-degradable inhibiter fluid to protect from further atmospheric corrosion and strengthen the well structure by cementing the annulus of conductor and outer casing for the weakened outer casing at offshore location on Call-off basis. The CONTRACT duration will be (37) calendar months from the EFFECTIVE DATE including mobilization period of one (1) calendar month
Qatarenergy Tender Result
Qatar
Contract Date28 Jan 2013
Contract AmountQAR 99.5 Million (USD 27.3 Million)
OVERHAUL/REPLACEMENT OF CRUDE OIL STORAGE TANKS T-5007,T-5005 & T-5051 IN HALUL-Major Overhaul/Replacement of 03 crude Oil Tanks T-5007, T-5005 & T-5051 at Halul Island ; Work shall include procurement, installation and commissioning; Tentative Start Date:01/08/2012 Duration: 3.5 years.
521-530 of 560 active Tender Results