Qatarenergy Tender Result

View complete overview of Qatarenergy Tender Result

Qatarenergy Tender Result

Machinery and Tools
Contract Date24 Dec 2023
Contract Period1916 Days
Contract AmountQAR 28,69,59,314.16 (USD 7,86,10,384)

AOC Description

PROVISION OF FISHING, MILLING & DRILLING TOOLS AND SERVICES FOR OFFSHORE AND ONSHORE OPERATIONS-1. Contractor shall provide Contractor Personnel, services, supervision, testing, equipment, material, tools, consumables, associated services, Contractor Items, spares and each and every item of expense necessary for the provision of Fishing, Milling & Drilling Tools and Services in support of Drilling/ Workover Operations for Offshore and Onshore Wells. 2. Contractor is required to provide fishing, milling & drilling tools as per ANSI/ API Specification along with Contractor Personnel and the relevant technical support. 3. Contractor shall maintain an adequate stock of fully dressed or new all Fishing, Milling & Drilling tools and equipment with backup, such as but not limited to, the equipment listed in technical specification requirement, deploying sufficient qualified Contractor Personnel in Doha, to cover QatarEnergy operation requirements ready to perform the Services under the Contract on Call-Off basis at short notice. 4. Contractor Services may also be required at Site where any rig-less operations are under progress. 5. The Scope of Services are consisting of the following Parts: Part I – Offshore and Onshore Fishing, Milling & Drilling Tools and Services, which shall cover the requirement of an estimated volume of operations performed by five (5) rigs for offshore drilling and workover operations, barge operations, and seven (7) land rigs for onshore drilling and workover operations. Part I comprises the bulk of the Services or about 70%; and is further segregated into the following two (2) Sections in line with the proposed Contract Administration Strategy for Part I of the Tender: i. Section 1- representing 75% Volume of Services of Part I ii. Section 2 -representing 25% Volume of Services of Part I Part II – Specialized Onshore Section Milling Services, which shall cover the requirement of two (2) land rigs for onshore drilling and workover operations. Part II comprises the remaining part of the Services of about 30%. 6. Contract duration for the Services shall be sixty three (63) months from the Effective Date including three (3) months for initial mobilization and inspection.

Contact

  • Award Id

    GT23102900
  • Award No

    GC231029B0
  • Tender Id

    GT23102900 View
  • Tender Id

    GT23102900
  • Tender Authority

    Qatarenergy View
  • Purchaser Address

    QatarEnergy P.O. Box 3212, Doha, Qatar http://qatarenergy.qa
Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.