Tender Results of Offshore Renewable Energy
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Hub Adaptors Machining - ORE/24/041-Contract award notice for request for quotations issued to five companies to carry out for the following; o34holes - M56 -> M64 for NC 9352 o38holes M56 -> M64 for NC 9354 •The existing M56 holes are threaded to 163mm.
Contract Date29 Mar 2024
Contract AmountGBP 74.1 K (USD 93.6 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Lorry Mounted Crane - ORE/24/043-Contract award notice for the following; Lorry mounted crane with operator and slinger signaler to facilitate the dismantle of the Dynamic Cable Flex Fatigue Test Rig and then the reassemble and installation of the the test rig in its original planned location.
Contract Date29 Mar 2024
Contract AmountGBP 50 K (USD 63.1 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Shore Power Unit - ORE/23/132-Contract Award Notice ORE Catapult has identified an opportunity to introduce shore power provision in the Port of Grimsby. Central to ORECs activities will be further development of the Operation and Maintenance Centre of Excellence (OMCE) in Grimsby. The high level plan for the introduction of the National Clean Maritime Demonstration Hub (NCMDH) requires an introduction of various fuelling infrastructure, namely implementing electrical charging provisions (shore power).
Contract Date29 Mar 2024
Contract AmountGBP 507.3 K (USD 640.6 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
RFQ0196 RFQ277-041 Universal Space Plates-We procured these Universal Space Plates (Flap) to enhance our testing capability as we are moving to a pull down methodology of testing blades.
Contract Date28 Mar 2024
Contract AmountGBP 59.2 K (USD 74.7 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
SBRI - SAT Apps Network Sharing ORE/ACC/260324-The purpose of this single source justification is to supply a 2 x Radios (including appropriate licenses) as part of the SBRI - SAT Apps Network Sharing Project to extend the current 5G Network specific to the project to meet the requirements for future use on offshore remote sensor projects.
Contract Date26 Mar 2024
Contract AmountGBP 55.6 K (USD 70.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Shore Power Unit - ORE/23/132-Contract Award Notice ORE Catapult has identified an opportunity to introduce shore power provision in the Port of Grimsby. Central to ORECs activities will be further development of the Operation and Maintenance Centre of Excellence (OMCE) in Grimsby. The high level plan for the introduction of the National Clean Maritime Demonstration Hub (NCMDH) requires an introduction of various fuelling infrastructure, namely implementing electrical charging provisions (shore power).
Contract Date28 Mar 2024
Contract AmountGBP 507.3 K (USD 642.9 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Shore Power Unit - ORE/23/132-ORE Catapult has identified an opportunity to introduce shore power provision in the Port of Grimsby. Central to OREC's activities will be further development of the Operation and Maintenance Centre of Excellence (OMCE) in Grimsby. The high level plan for the r introduction of the National Clean Maritime Demonstration Hub (NCMDH) requires an introduction of various fuelling infrastructure, namely implementing electrical charging provisions (shore power).
Contract Date1 Apr 2024
Contract AmountGBP 500 K (USD 631.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Roof Netting Repairs (Storm Damage) - ORE/24/036-Roof netting repairs to Offshore House, 3MW Drivetrain Facility, DARE Building, CPTC, BTF2 and 15MW Drivetrain Facility
Contract Date27 Mar 2024
Contract AmountGBP 38.1 K (USD 48.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Automated Drone Technology - ORE/23/125 - Award Notice-Coptrz to supply a drone to replace the manual process of carrying out blade inspections with technologies that will autonomise the process.
Contract Date26 Mar 2024
Contract AmountGBP 51.4 K (USD 65.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Supply Chain Stakeholder Engagement - ORE/23/120-Hydrogen in the UK has huge potential, linked to offshore wind capacity. It is expected that exports of green hydrogen generated by offshore wind could be as much as £48 billion per year, gross value added to the economy of approximately £200 billion and as many as 120,000 jobs. With the ability to produce green hydrogen, it would make sense to use this generated fuel for the maritime industry.
Contract DateNA
Contract AmountGBP 39.9 K (USD 50.5 K)