Tender Results of Offshore Renewable Energy
Tender Results of Offshore Renewable Energy
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Warehouse Floor Upgrade-Upgrade to strength of warehouse flooring
Contract Date22 Feb 2024
Contract AmountGBP 45 K (USD 56.6 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Business Support Consultancy for Technology Innovation & Green Growth for Offshore Renewables (TIGGOR2) - ORE/23/119-The structure of TIGGOR 2 will be similar to TIGGOR 1. However, ORE Catapult would like to secure the services of a consultancy. The chosen contractor will deliver the Business Support Programme (BSP) on behalf of ORE Catapult. ORE Catapult have prepared an Invitation to Tender (ITT) document to identify a suitable Business Support Programme delivery partner. The chosen partner will be required to deliver support to 26 businesses from September 2023 to February 2025 whilst ensuring that acti...
Contract Date22 Feb 2024
Contract AmountGBP 200 K (USD 251.6 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Accelerometer Monitoring Equipment-Eleven-I to supply Accelerator Monitoring Equipment
Contract Date21 Feb 2024
Contract AmountGBP 39.9 K (USD 50.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Business Support Consultancy for Technology, Innovation & Green Growth for Offshore Renewables (TIGGOR2) - ORE/23/119-The structure of TIGGOR 2 will be similar to TIGGOR 1. However, ORE Catapult would like to secure the services of a consultancy. The chosen contractor will deliver the Business Support Programme (BSP) on behalf of ORE Catapult. ORE Catapult have prepared an Invitation to Tender (ITT) document to identify a suitable Business Support Programme delivery partner. The chosen partner will be required to deliver support to 26 businesses from September 2023 to February 2025 whilst ensuring that activiti...
Contract Date21 Feb 2024
Contract AmountGBP 197.7 K (USD 248.8 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Vertical Pull Frame ORE/24/026-x3 off Vertical Pull Frames to enhance our testing capability as we are moving to a pull down methodology of testing blades, we have x5 off Vertical Pull Frames already but we own x7 off winches so this will allow a Vertical Pull Frame for each winch and a spare frame.
Contract Date20 Feb 2024
Contract AmountGBP 65.7 K (USD 83 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
RFQ0187 Vertical Pull Frame ORE24026-We are procuring these x3 off Vertical Pull Frames to enhance our testing capability as we are moving to a pull down methodology of testing blades, we have x5 off Vertical Pull Frames already but we own x7 off winches so this will allow a Vertical Pull Frame for each winch and a spare frame.
Contract Date20 Feb 2024
Contract AmountGBP 65.7 K (USD 83.1 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Acoustic Monitoring Equipment-Mistras Group to supply a 16 Channel Acoustic Emission Monitoring System (AEMS)
Contract Date15 Feb 2024
Contract AmountGBP 47.9 K (USD 60.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Technology Development Centre-ORE Catapult is extending its operations at its Blyth site to create a Technology Development Centre (“TDC”) by refurbishing a storage shed, currently known as Shed D. The aspiration for the refurbished building and the new office space is for it to both reflect and inspire the innovative and renewable energy creative nature of the business. ORE Catapult require the fabric of the building to be refurbished and to create a two (2) storey office space within the building.
Contract Date13 Feb 2024
Contract AmountGBP 2.2 Million (USD 2.8 Million)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Technology Development Centre-ORE Catapult is extending its operations at its Blyth site to create a Technology Development Centre (“TDC”) by refurbishing a storage shed, currently known as Shed D. The aspiration for the refurbished building and the new office space is for it to both reflect and inspire the innovative and renewable energy creative nature of the business. ORE Catapult require the fabric of the building to be refurbished and to create a two (2) storey office space within the building.
Contract Date12 Feb 2024
Contract AmountGBP 2.2 Million (USD 2.8 Million)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Subsea vs Floating Substations - Technoeconomic Comparison - ORE/23/013-The Consultant will be required to define the floating and subsea systems for two case study sites. For consistency, baseline sites from previous FOW CoE projects will be used where possible. Gaps in knowledge and technology will be identified to define a roadmap towards commercial readiness by 2025 to 2030. Experience from previous/ongoing projects will play a key role in this task e.g. previous OREC projects on inter-array cable topology (DC06) and mooring and cable installation (DC07). Key un...
Contract Date8 Feb 2024
Contract AmountGBP 95 K (USD 119.5 K)
61-70 of 194 active Tender Results