Channelization by excavation to Design Cross Sections, Stone lining and Construction Of Foot Bridges within selected sections Of Nsukwao River Channel (LOT 1)
Channelization By Excavation To Design Cross Sections, Construction Of Stone Lining (250m) Of Selected Sections Of Nsukwao River Channel At Zongo Channel (lot 2)