East Riding Of Yorkshire Council Tender Result

View complete overview of East Riding Of Yorkshire Council Tender Result

East Riding Of Yorkshire Council Tender Result

Contract DateNA
Contract Period305 Days
Contract AmountRefer Documents 
Download

AOC Description

A63 Brough Junction Improvements-The proposed scheme replaces the existing 4 way traffic signal at the junction of the Welton Road/Water Lane(A63 slip road link)/Welton Low Road with a 3 way signalised roundabout, with Welton Low Road becoming a priority junction. It includes pedestrian and cycle improvements largely to improve the route to South Hunsley School to and from Brough. The existing junction is elevated and the new roundabout is elevated on an embankment to match the existing levels. The existing junct...

Contact

Unlock the Tender details for free
AOC Documents
Bidder Details Information
Report Missing Document

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.