Department Of Defense United States Tender Result

View complete overview of Department Of Defense United States Tender Result

Department Of Defense United States Tender Result

Contract Date21 Sep 2023
Contract Period15 Days
Contract AmountUSD 49,79,070 

AOC Description

Item Unique Identification And Valuation (mar 2022)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|||tbd|||||n/a| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss-n00104| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2||| integrity Of Unit Prices (nov 2021)|1|x| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Data--basic (mar 2014)|2||| small Business Subcontracting Plan (oct 2022)|4||x||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (feb 2019)|2||| requirements For Certified Cost Or Pricing Data And Data Other Than Certified Cost Or Pricing Data-modifications (nov 2021))|7|||||||| alternate A, Annual Representations And Certifications (nov 2020)|13|x|x|||||||||||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (may 2022)|13|334290|750|||||||||||| cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1|| type Of Contract (apr 1984)|1|firm Fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| requirements For Certified Cost Or Pricing Data And Data Other Than Certifiedcost Or Pricing Data--basic (jun 2019))|1|| amendment Is Issued To Reduce The Total Quantity To 50 Each As Shown On The Following Page. all Other Terms And Conditions Remain Unchanged. amendment Is Issued To Increase The Quantity On This Solicitation From 16 Each To 116 Each As Identified By The Incorporation Of Line Item 0001ac Shown In The Following Pages. this Quantity Increase Results In Additional Clauses Being Incorporated Due To The Increase In The Estimated Dollar Value Exceeding The Threshold For Tina (truth In Negotiations Act.) the Additional Clauses Are Listed Within The Following Pages Of This Amendment. the Solicitation Closing Date Is Extended To 03 April 2023. all Other Terms And Conditions Remain Unchanged. this Amendment Is Issued To Remove The Remarks Listed With Clin 0001 On Page 2 Of 52 That Begin "per E-mail This Day" As It Is Not Applicable To This Solicitation. in Addition, The Closing Date Is Extended To 8/12/2022. all Other Terms And Conditions Remain Unchanged. \ proposals Submitted Via Neco Are Not Acceptable. Vendors Must Complete, Sign And Return A Copy Of The Rfp By Including It As An Attachment To An Email Directed To The Contract Specialist At Tonya.nearhood1@navy.mil. inspection Of Material Will Be At: _____________________________________________________________________ inspection Of Packaging And Final Acceptance Of Material Will Be At: ______________________________________________________________________ required Delivery Is 510 Days After Date Of Contract. quoted Delivery Is ____ Days Adc. Incremental Deliveries Are Encouraged, However Final Delivery Should Be Completed Wtihin 510 Days Adc the Threshold For A Small Business Subcontracting Plan Is $750k. If Your Pricing Proposal Exceeds $750k And You Are A Large Business Under The Naics Code Specified, An Initial Subcontracting Plan Is Required To Be Submitted Along With Your Proposal. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. \ 1. Scope 1.1 This Contract/purchase Order Contains The Requirements For Manufacture And The Contract Quality Requirements For The Nrp,module,acoustic . 2. Applicable Documents 2.1 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.1.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Shall Take Precedence. Nothing In This Contract/purchase Order, however, Shall Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. document Ref Data=mil-std-129 | | |p |041029|a| |03| document Ref Data=mil-std-130 | | |m |051202|a| | | document Ref Data=iso9001 | | | |010417|a| | | 3. Requirements 3.1 Cage Code/reference Number Items - The Nrp,module,acoustic Furnished Under This contract/purchase Order Shall Be The Design Represented By Cage Code(s) reference Number(s). Cage _______ Ref. No. ;52088 77c961405g3; 3.2 Marking - This Item Shall Be Physically Identified In Accordance with ;mil-std-129; . 3.3 Changes In Design, Material Servicing, Or Part Number - Except For A Code 1 Change, Which Shall Be Processed As Provided In The Code Statement Shown Below, No Substitution Of Items Shall Be Made Until The Spcc Contracting Officer Has Been Notified And approval Has Been Given By Issuance Of A Written Change Order. When Any Change In Design, Material, Servicing Or Part Number Is Made To Replace Or Substitute Any Item To Be Furnished On This Contract/purchase Order, The Contractor Shall Furnish, For The substituting/replacement Item, A Drawing And An Explanation Of The Reason For The Change, Or A Detailed Description Of The Change, Explaining The Reason Therefore. If Finished Detail Drawings Are Not Available, Shop Drawings Inthe Form Used By The Manufacturer will Be Acceptable For Government Evaluation. When Notifying The Contracting Officer Of The Reasons For Making Substitutions, The Type Of Change Shall Be Indicated By Code Number In Accordance With One Of The Following Statements: code 1: Part Number Change/minor Design Change - If The Manufacturer's Part Number Or Item Design Indicated Thereon Has Changed, But Form, Fit And Function Of The Item Is Not Affected Thereby, And The Design Change Meets The Criteria For Minor, By Not effecting Form, Fit, Function, Reliability Or Safety , Supply The Item And Advise Spcc Immediately Of The New Part Number, Furnishing A Detail Drawing And/or A Detailed Description Of The Change, As Applicable. code 2: Assembly (or Set Or Kit) Not Furnished - Used Following Detail Parts. code 3: Part Not Furnished Separately - Use Assembly. code 4: Part Redesigned - Old And New Parts Are Completely Interchangeable. code 5: Part Redesigned - New Part Replaces Old. Old Part Cannot Replace New. code 6: Part Redesigned - Parts Not Interchangeable. 3.4 Mercury Free - The Material Supplied Under This Contract/purchase Order Is Intended For Use On Submarines/surface Ships And Therefore Shall Contain No Metallic Mercury And Shall Be Free From Mercury Contamination. Mercury Contamination Of The Material will Be Cause For Rejection. If The Inclusion Of Metallic Mercury Is Required As A Functional Part Of The Material Furnished Under This Contract, The Contractor Shall Obtain Written Approval From The Procurement Contracting Officer Before Proceeding With Manufacture. The contractor's Request Shall Explain In Detail The Requirements For Mercury, Identify Specifically The Parts To Contain Mercury, And Explain The Method Of Protection Against Mercury Escape. Such A Request Will Be Forwarded Directly To The Procurement Contracting officer With A Copy To The Applicable Government Inspector. Upon Approval By The Contracting Officer, The Vendor Will Provide A "warning Plate" Stating That Metallic Mercury Is A Functional Part Of The Item And Will Include Name And Location Of That Part. The Use Of Mercury, Mercury Compounds, Or Mercury-bearing Instruments And/or Equipment In A Manner Which Might Cause Contamination In The Manufacture, Assembly, Or Test Of Material On This Contract Is Prohibited. The Most Probable Causes Of contamination Are Direct-connected Manometers, Mercury Vacuum Pumps, Mercury Seals, Or The Handling Of Mercury In The Immediate Vicinity. Mercury Switches, Mercury In Glass Thermometers, Standard Cells And Other Items Containing Mercury May Be Used If They Are located So As Not To Constitute A Contamination Hazard. If External Contamination By Metallic Mercury Occurs Or Is Suspected, The Following Test May Be Used To Determine Whether Contamination By Metallic Mercury Exists Or Whether Corrective Cleaning Measures Have Been Effective. Enclose The Equipment In A polyethylene Bag Or Close-fitting Airtight Container For Eight Hours At Room Temperature (70 Degrees F Minimum).sample The Trapped Air And If Mercury Vapor Concentration Is 0.01 Mg/cu Meter Or More, The Material Is Mercury Contaminated Insofar As The requirements Of This Contract Are Concerned. These Requirements Shall Be Included In Any Subcontract Or Purchase Order Hereunder And The Contractor Shall Insure Subcontractor Compliance With These Requirements. Technical Questions Pertaining To These Requirements Shall Be Referred To The Procurement Contracting Officer Via The Cognizant Administrative Contracting Officer. For Background, The Following Information Is Provided: Mercury Is Corrosive To Gold, Silver, Nickel, Stainless Steels, Aluminum And Copper Alloys. Stainless Steels, Nickel, And Copper Alloys Are Widely Used In Reactor Plants And Other Submarine/surface Ship Systems. Accidental Trapping Of Mercury In A component Could Cause Serious Damage To Vital Parts. Mercury Is Also Toxic If Inhaled, Ingested, Or Absorbed Through The Skin. It Is Evident That Grave Consequences Could Result From Small Amounts Of Mercury Vapor Present In An Unreplenished Submarine/surface ship Atmosphere. 3.5 Electrostatic Discharge Control - The Contractor Shall Comply With The Electrostatic Discharge Control Requirements Established In Mil-std-1686. 4. Quality Assurance 4.1 Responsibility For Inspection - Unless Otherwise Specified In The Contract/purchase Order, The Contractor Is Responsible For The Performance Of All Inspection Requirements As Specified Herein. Except As Otherwise Specified In The Contract/purchase Order, the Contractor May Use His Own Or Any Other Facilities Suitable For The Performance Of The Inspection Requirements Specified Herein, Unless Disapproved By The Government. The Government Reserves The Right To Perform Any Of The Inspections Set Forth In The specification Where Such Inspections Are Deemed Necessary To Assure Supplies And Services Conform To Prescribed Requirements. 4.2 Quality System Requirements - The Supplier Shall Provide And Maintain A Quality System Acceptable To The Government. The Quality System Requirements Shall Be In Accordance With Iso 9001. 4.2.1 ;suppliers Currently Using And Maintaining Inspection System Requirements To mil-i-45208 Are Granted Permission To Utilize Mil-i-45208 If Desired.; 4.3 Responsibility For Compliance - All Items Must Meet All Requirements Of This Contract/purchase Order. The Inspection Set Forth In This Specification Shall Become A Part Of The Contractor's Overall Inspection System Or Quality Program. The Absence Of Any inspection Requirements Shall Not Relieve The Contractor Of The Responsibility Of Assuring That All Products Or Supplies Submitted To The Government For Acceptance Comply With All Requirements Of The Contract/purchase Order. Sampling In Quality Conformance does Not Authorize Submission Of Known Defective Material, Either Indicated Or Actual, Not Does It Commit The Government To Acceptance Of Defective Material. 4.4 Records Of Inspection - (this Requirement Is Not Applicable To Government Purchase Orders) Records Of All Inspection Work Performed By The Contractor, As Referenced Elsewhere In This Contract, Shall Be Kept Complete And Available To The Government During the Performance Of The Contract And For A Period Of Four Years After Final Delivery Of Supplies. 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Shall Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documents That Are Required By Private Industry In Fulfillment Of Contractual Obligations In Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Of The Applicable Societies. C. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410p, 101 Strauss Avenue Indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contract Number, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: Contracting Officer Navicp-mech Code 87321 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered From: Commanding Officer Navicp-mech Code 009 5450 Carlisle Pike P.o. Box 2020 Mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Shall Be Obtained By Submitting A Request On Dd Form 1425 To Navicp-mech. 6.2 Notice To Distributors/offerors - Consideration For Award Of Contract Shall Be Given Only To Authorized Distributors Of The Original Manufacturer's Item Represented In This Solicitation. If You Desire To Be Considered As A Potential Source For Award Of this Contract, Proof Of Being An Authorized Distributor Shall Be Provided On Company Letterhead Signed By A Responsible Company Official And Sent With Your Offer To The Procurement Contracting Officer.

Contact

Unlock the Tender details for free

Bidder Details

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Bidder AddressThis Information is for unsubscribed user
  • Award Amount234234234200
  • Qualified BiddersThis is message for unregistered
  • Lowest Bidder662
  • Number of Bids99
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.