Commercial Furniture Tender Results
Commercial Furniture Tender Results
Indian Army Tender Result
Goods
Paints and Enamels
GEM
Result Stage: Awarded (AOC Available)
India
CATEGORY: Synthetic enamel paint red 1st quality 4 ltr pack , Red oxide
primer 1st quality 4 ltr pack , D type CP handle of size
75mm , Synthetic enamel paint black 1st quality 4 ltr pack ,
Synthetic enamel paint OG 1st quality 4 ltr pack , Wooden
french polish in 4 ltr pack , Prelaminated particle board
exterior grade 8x4x19mm , Looking mirror
380mmx760mmx5mm , Plywood commercial 8x4x6mm one
side teak face , Synthetic enamel paint silver 1st quality 4
ltr pack , Hasp and staple aluminium 75mm , Varnish Oil in 4
ltr pack , Teak wood beading 18mmx4mm , Plywood
commercial 8x4x4mm one side teak face , Stainless steel D
type handles 75mm , Door magnet catcher as per
spectification , Door magnet catcher size as per
specification , Door magnet catcher size as per specificaiton
, Abressive cloth S 100 No size 25mmx50 Mtr , Synthetic
enamel white primer 4 ltr pack , Cloth malmel as per
specification , Peg hook brass 100mm long , Abressive cloth
S 60 No size 25mmx50Mtr , Lock brass for frawer w keys for
table steel , Mortis lock 100 and 65 , Knob anodised 32mm
with screw , Cloth green baize as per specification , Brush
paint 50mm , Bruch paint 50mm , Stainless steel D type
handles 100mm , But Hinges steel 100mm , Screw wood
steel 65x12mm , Turpentine oil 5 ltr pack , Peg hook brass
125mm long , Check Nut GI of 32mm dia , Brush paint
75mm , SR solution in 200gm pack , Iron clips for shelves
almirah large and Med steel , Nut and Bolts 5 and 8x10 full
thread , But hinges stee 50mm , Lakh Dana , Screw wood
steel 25x4mm , Creosote Oil furniture 1 ltr pack , Pilli mitti
400gm pack , Prelaminated particle board 9mm one side
teak , Sunmica 0.8mm8x4 , Cane plastic 4mm wide half
round , Tapestary cloth superior quality , Adhesive fevicol
SR 998 , Cane plastic 2mm wide half round , Glass 5mm
thick size 2x2 duly polished , Varnish clear , Screw wood
40mm , Long screw 15x200 , Long screw 20x200 , Looking
mirror for table dressing ladies , French Polish in 3 ltr pack ,
Looking Mirror for table dressing gents , Elbow GI 3 ways
32mm , Plywood commercial BWR 8x4x6mm , Paint white in
4 ltr pack , Cloth rexine coffee colour , Nails wire 2 , Screw
wood steel 20mm , Turkey Umber powder in 5 kg pack
Contract Date5 Dec 2022
This is an estimated contract date, exact date may vary.
Contract AmountINR 359.1 K (USD 4.2 K)
Indian Army Tender Result
Goods
Furnitures and Fixtures
GEM
Result Stage: Awarded (AOC Available)
India
Description: Plywood commercial 8x4x12mm,Plywood commercial 8x4x12mm,Plywood commercial 8x4x8mm,Plywood commerci
Contract Date5 Dec 2022
This is an estimated contract date, exact date may vary.
Contract AmountINR 572.3 K (USD 6.8 K)
Indian Army Tender Result
Goods
Furnitures and Fixtures
GEM
Result Stage: Awarded (AOC Available)
India
CATEGORY: PVC Seat and back for chair , Plywood one side teak face ,
Block Board , PVC Seat for Chair Dinning , SunmicaFor
Furniture , Foam sheet 6 by 3 by 100mm , Foam sheet 6
by3 by 75mm , Synthetic Enamel Paint Gray 4 ltr Pack , Red
Oxide Primer 1st quality 4 lrt pack , D Type CP Handle of
size 75mm , Synthetic Enamel Paint Black 1st quality 4 ltr
pack , Synthetic Enamel Paint OG 1st quality 4 Ltr pack ,
Wooden French Polish in 4 ltr pack , Prelaminated Particle
Board exterior grade 8x4x9mm , Looking Mirror 380mm
X760mm X 5mm , Plywood commercial 8 by 4 by 6mm ,
Synthetic Enamel Paint Silver 4 ltr Pack , Hasp Staple
Aluminium , Varnish Oil in 4 Ltr Pack , Teak Wood beading
18mm x4mm , Plywood commercial 8x4x4mm , Stainless
Steel D type Handles 75mm , Door magnet catcher ,
Abressive cloth S100 No Size 25mm by 50Mtr , Synthetic
Enamel white primer 4 ltr pack , Cloth Malmel 1.2 mtr width
, Peg Hook Brass 100 mm long , Abressive cloth S 60 No
Size 25mm by 50Mtr , Lock brass for drawer keys for table
steel , Mortis lock100 by 65 , Knob anodised 32mm with
screw , Cloth Green baize 1.2 Mtr wide , Brush paint 50mm ,
Stainless Steel D type Handles 100mm , But Hinges steel
100mm , Screw wood steel 65 12mm , Turpentine Oil 5 ltr
Pack , Peg Hook Brass 125 mm long , Check Nut GI of 32mm
dia , Brush paint 75mm , SR solution in 200 grm pack , Iron
clips for shelves almirah , Nut Bolts , But Hinges steel 50mm
, Lakh Dana , Screw wood steel 25x4mm , Creosote Oil for
furniture 1 Ltr Pack , Pilli mitti 400 gm Pack , Putty for wood
works 400gm Pack , Foam cushion 560 X 530 X 100mm
Contract Date8 Sep 2022
This is an estimated contract date, exact date may vary.
Contract AmountINR 196.6 K (USD 2.3 K)
Ministry Of Defence - MOD Tender Result
Goods
Electrical Goods and Equipments...+2Electrical and Electronics, Machinery and Tools
GEM
Result Stage: Awarded (AOC Available)
India
CATEGORY: Starting Relay , Starting capacitor , Startig capacitor 30-100
mfd , Contractor , Running capacitor 2.5 - 6 uf , Running
capacitor 36 uf , Running capacitor45 BY 50uf , Propelleler
fan for 1.5 BY 2TR split AC , Condenser fan motor , Blower
motor , Refrigerant gas R-410A , Refrigerant gas R-32 ,
Refrigerant gas R-22 , 250 PSL mekr manifold digital
pressure gauge for referigerant filling to split AC , Copper
tubing dia 5 by 8 inch , Copper tubing dia 3 by 8 inch ,
Copper tubing dia 1 by 2 inch , Copper tubing dia 1 by 4
inch , Installation foam dia 5 by 8 inch , Installation foam dia
3 by 8 inch , Installation foam dia 1 by 2 inch , Installation
foam dia 1 by 4 inch , Single pole and neutral endorsure
with two pin and earth with 25 Amp MCB , MS powder
coated floor mounted for fixing condensing unit for split AC ,
Double stage vaccum pump , Ply wood 4mm thick BWR
grade size 8 ft x 4 ft , Ply wood 6mm thick BWR grade size 8
ft x 4 ft , Ply wood commercial 8 ft x 4 ft x 12mm , Pre
laminated partical board 8 ft x 4 ft x 19mm , PVC back for
chair varandha 4mm thick , PVC seat for chair dinning 4mm
thick , PVC seat for chair varandha 4mm thick , Screws steel
various sizes , Seat for chair tubular steel with arms , Seat
for chair tubular steel without arms , Teleschopic channel
12 inch , Top for table 3ft x 2ft , Top for table 3ftx3ft , Top
for table centre table , Top for table dinning 8 pers , Top for
table writing , Top for teapoy , Touch wood , Turpenitine oil ,
Varnish , Nails 0.5 inch , Nails 1 inch , Nails 1.5 inch , Nails 2
inch , Nails 2.5 inch , Plywood commercial 18 mm , 8 ft x 4
ft , Cane white , Cloth malmal white for Furniture Polish , Ply
wood 12mm thick BWR grade size8 ft x 4 ft , Ply wood one
side teak face 3mm thick 8 ft x 4 ft , Almirah handle CP ,
Almirah lock 4 lever 50mm , Laminated sheet 8 ft x 4 ft x
1mm , Paint Black in 4 ltr pack , Paint White in 4 ltr pack ,
Paint OG in 4 ltr pack , Fevicol in 1 kg pack , Foam cushion
size 21 inch x 22 inch x 4 , Knob fancy type , Lakhdana ,
Mirror for table dresseing gents size 380x760x5mm thick ,
Mirror for table dresseing ladies size 360x1220x5mm thick ,
Nylon newar 50-55mm wide 4 ply , Paint Brush 50mm ,
Paint Gray in 4 ltr pack , Peg hook aluminium , Pilli Mitti ,
Sprit , SR 50 Adhesive
Contract Date27 Jun 2022
This is an estimated contract date, exact date may vary.
Contract AmountINR 2 Million (USD 24 K)
The World Bank Tender Result
Result Stage: Awarded (AOC Available)
Dominican Republic
Description: Acquisition of 3 Mobile Commercial offices for Edeeste (Bodywork, furniture and Equipment)
Contract Date24 Feb 2022
Contract AmountDOP 6.9 Million (USD 122.9 K)
VETERANS AFFAIRS, DEPARTMENT OF USA Tender Result
Result Stage: Awarded (AOC Available)
United States
B.3 Statement Of Work
1. Contract Title: Janitorial Services For The Child Care Center
2. General Information: This Is A Non Personnel Services Contract To Provide Janitorial Services For The
veteran Affairs Portland Healthcare System Vermont Hills Family Life Center. The Government Shall
not Exercise Any Supervision Or Control Over The Contract Service Providers Performing The Service
herein. Such Contract Service Providers Shall Be Accountable Solely To The Contractor, Who In Turn Is
responsible To The Government.
3. Description Of Services: The Contractor Shall Provide All Personnel, Supervision, And Other And Non Personal Services Necessary To Ensure That Janitorial Services Are Performed At The Vermont Hills Family Life Center As Defined In This Performance Work Statement (pws). The Contractor Shall Perform To The Standards In This Contract.
4. Background: This Is A New Requested Service. This Service Is Required Because The Veteran Affairs
portland Healthcare System Is Lacking The Necessary Staff To Facilitate The Appropriate Cleaning Of The
vermont Hills Family Life Center. Because This Is A Child Care Center, It Is Critical That The Infection
control Requirements Are Met Daily.
5. Period Of Performance: The Period Of Performance Shall Be For A Base Year Plus Four (4) One Year
option Periods.
6. Specific Tasks:
6.1 Offices, Entrances, Conference Rooms, Hallways, Common Areas:
a) Dust Horizontal Surfaces Desk, Credenza, Counter, And File Cabinet Tops Daily
b) Spot Clean Horizontal Surfaces For Removal Of Coffee Rings And Spillage Daily
c) All Doors, Handles, Windows Cleaned And Disinfected Daily
d) Internal Glass Partitions Cleaned Of Fingerprints And Smudges Daily
e) Doors And Walls Cleaned Of Fingerprints And Smudges Daily
f) Empty All Waste Paper Receptacles And Replace Waste Receptacle Liners Daily
g) Clean And Disinfect Trash Receptacles As Needed, But No Less Thank 1x Per Month
h) Disinfect All Telephone Receivers And Dust Phone Bases Daily
i) Disinfect Light Switches, Light Switch Plate Covers, And Door Handles Daily
j) Clean And Sanitize Drinking Fountains Daily
k) Polish All Drinking Fountains And Sinks Daily
l) High Dusting Air Vents, Hvac Return Air, Tops Of Doors, Door Frames, Ceiling Corners Weekly
m) Low Dusting Front And Sides Of Desks, Legs Of Chairs, Tables, And Chair Bases Weekly
n) Furniture Vacuum Fabric And Wipe Down Other Surfaces To Remove Dust And Lint 2x Per Month
o) Vacuum, Sweep Or Dust Mop All Hard Surface Floors Daily
6.2 Non Carpeted Floors (hard Floors: Ceramic, Resilient Tile (vct) And Concrete).
thoroughly Mop All Hard Surface Floors Daily. Maintain Hard Floors Free Of Grit, Soil, Dust, Scuff And Heel
marks, Stains, Spills, Debris, Litter And Other Foreign Matter By Effective Routine Cleaning. Accomplish
cleaning By The Most Appropriate Method (vacuum, Sweep, Dust Mop, Damp Mop, Spot Clean And
machine Scrub, Etc.) And With Cleaning Solutions If Applicable, For The Specific Floor Type. After Cleaning,
ensure Floor Surfaces To Include Grout Have A Uniform, Clean Appearance Without Streaks, Swirl Marks,
detergent Residue, Or Any Evidence Of Soil, Stain, Film, Or Standing Water. Clean Baseboards, Corners, And
wall/floor Edges Once A Month. Move Chairs, Trash Receptacles, And Other Easily Moveable Items To
maintain Floors Underneath These Items And Return Them To Their Original And Proper Positions After
cleaning. All Flooring That Requires A Finish Will Be Stripped And Waxed Quarterly Using Approved Floor Care Products.
6.3 Carpeted Floors.
maintain Carpets Free Of Soil, Dirt, Debris, Litter And Other Foreign Matter By Performing Wall To Wall
vacuuming Of The Carpeted Areas Daily And Removing Spots And Small Spills From Carpets Daily. Detail
vacuum Carpet Edges And Corners Along Walls And Partitions And Dust All Baseboards Once Monthly.
a) Both Installed Carpeted Areas In The Infant And The Toddler Areas To Be Appropriately
cleaned (extracted) Quarterly. Spot Cleaning Or Emergent Cleaning Due Accidental Soil Will Be On A As Needed Basis, Called In By Either The Cor, Housekeeping Officer Or Designated Ems Official
b) All Interior Throw Carpets To Be Appropriately Cleaned (extracted) Once Per Month.
6.4 Child Restrooms And Staff Restrooms:
a) Clean And Disinfect Counter Tops, Wash Basins, Toilets, Toilet Seats And Urinals Daily
b) Clean And Disinfect All Dispensers, Fixtures, And Mirrors Daily
c) Empty Trash Receptacles Daily
d) Empty Sanitary Napkin Receptacle And Disinfect Daily
e) Spot Clean Partition Tile And Walls Daily
f) Restock Hand Soap And Paper Products Daily
g) Disinfect Partition Handles, Door Handles, And Light Switches Daily
h) Clean And Sanitize Outside Surfaces Of Dispensers And Trash Receptacles Daily
i) Polish All Dispensers, Fixtures, And Mirrors Daily
j) Sweep And Thoroughly Mop Floor With Germicidal Solution Daily
k) Clean And Disinfect Restroom Partitions And Walls Around Toilets And Urinals Daily
l) High Dust Tops Of Partitions, Air Vents, Mirror Frames, And Tops Of Doors Daily
6.6 Break Areas:
a) Counters, And Table Tops Cleaned With Approved Disinfectant Daily
b) Fronts Of Counters And Chairs Cleaned Daily
c) Sinks Cleaned With Approved Disinfectant Daily
d) Wipe Down Outside Of Refrigerator And Microwave 2x Per Week
e) Inside Of Microwave Cleaned 1x Per Week
f) Trash Removed Daily, Receptacle Cleaned As Needed
g) Coffee Machines Turned Off
h) Sink Thoroughly Scoured Using Liquid Cleanser Daily
i) Table Bases And Chair Legs Cleaned 1x Per Month
6.7 Child Care Areas (infant, 2.5 3 Year, Toddler, General Area And Outside Play Area):
a) Dust Horizontal Surfaces Daily
b) Clean And Disinfect All Toys And Furniture In Play Areas With Food Grade Child Safe Disinfectant
daily
c) Spot Clean Horizontal Surfaces For Removal Of Soil Daily With Food Grade Child Safe Disinfectant
d) All Doors, Handles, Windows Cleaned And Disinfected Daily
e) Internal Glass Partitions Cleaned Of Fingerprints And Smudges Daily
f) Walls Cleaned Of Fingerprints And Smudges Daily
g) Empty All Waste Paper Receptacles And Replace Waste Receptacle Liners Daily
h) Clean And Disinfect Trash Receptacles As Needed, But No Less Thank 1x Per Month
i) Clean And Disinfect All Frequently Touched Surfaces On Outside Play Equipment Daily
7. Immunizations: All Contractor Employees Assigned To Clean The Child Care Center Shall Be Free Of Communicable Diseases, To Include Tuberculosis, Prior To Entering The Facility. The Contractor Shall Be Responsible For Providing Certification That All Of Its Employees Meet These Requirements. Employee Immunizations (including Cost And Scheduling) Are The Responsibility Of The Contractor.
applicable Immunizations Include:
mumps Measles
rubella Tetanus
diphtheria Polio
hepatitis B Varicella
tuberculosis Skin Test Influenza
covid-19
8. Required Documentation: Provide A Summary Listing Of All Contractor Employees To Work At The Child Care Center. Listing Shall Include Name, Position, Dates Of Background Check And Certification Of Immunization Requirements Compliance. In The Event That A Contractor Employee Is Replaced, Even Temporarily, The Replacement Shall Meet All Requirements As Set Forth Prior To Beginning Work. Failure To Fulfill These Requirements, In Sufficient Time To Replace An Employee Shall Not Relieve The Contractor Of Its Responsibilities In Accordance With This Pws. Failure To Provide These Statements Will Prohibit Contractor Employee Entrance Into The Child Care Center. The Contractor Shall Update The Listing As Necessary And Provide A Current Copy To The Contract Officer S Representative (cor). The Contractor Shall Submit Both A Negative Test Report For Each Employee (as Provided By Either The Public Health Department Or
employee S Doctor) And Current Immunizations Records To The Child Care Center Director Prior To The
employee Starting Work, As Well As One Week Prior To The Start Of Each Option Year.
9. Contract Employee Interaction: Physical Contact Between Contractor Employees And Children Shall Not Be Allowed And All Contractor Employees Shall Not Be Alone With Children Unsupervised.
10. Cleaning, Disinfecting And Sanitizing Solutions: The Contractor Shall Store All Disinfecting, Cleaning, And Sanitizing Solutions In Their Original, Labeled Containers. Only Ems Approved And Provided Germicidal/sporicidal Will Be Used In Performance Of The Contract Cleaning Of The Vermont Hills Childcare Center.
11. Cleaning Equipment/materials/supplies: All Cleaning Chemicals, Equipment And Tools Needed To Meet The Specific Tasks Will Be Provided By The Facility. Contractor Shall Ensure All Items Used Are Kept Secure From Inadvertent Access By Va Employees Or Visitors Within The Vermont Hills Child Care Center.
12. Safety Data Sheet (sds): All Chemical Sds Will Be Maintained By Environmental Management Services And Be Provided Upon Request.
13. Hazardous Material Identification: Sds Documents Are Required Per The Federal Code Of Regulations: 40 Cfr Part 302 And The Latest Version Of Federal Standard No. 313 (including Revisions Adopted During The Term Of The Contract) For Any Other Material Designated By The Government As Potentially Hazardous And Requiring Safety Controls. You Can Find This Information At: Http://www.gsa.gov/portal/mediaid/206235/filename/fedstd 313e.action And Ttp://www.ecfr.gov/cgi Bin/textidx?tpl=/ecfrbrowse/title40/40cfr302_main_02.tpl.
14. Safety: The Contractor Shall At All Times, Exercise Care And Caution In Performing The Duties Described In The Pws So As Not To Cause Injury To Themselves Or Other Persons. The Contractor Shall Perform The Assigned Tasks And Duties In A Safe Manner In Accordance With The Occupational Safety & Health Administration (osha) In 29 Cfr 1910.1200 (https://www.osha.gov/employers/index.html). The Contractor Shall Be Responsible For Any Damage To Government And/or Personal Staff Property. All Damage By The Contractor Shall Be Repaired Or Replaced By The Contractor At No Additional Cost To The Government. The Contractor Shall Be Responsible For Ensuring All Equipment, Tools, And Supplies Used In The Performance Of A Contract Resulting From This Solicitation Meet Necessary Safety Requirements And Employees Have Full Working Knowledge Of Their Use.
15. Dress And Appearance: All Contractor Employees Shall Wear Proper Identification Badges Or Other Identifying Apparel While On The Premises. All Contractor Employees Will Be Presentable And Dressed In A Manner That Promotes A Positive Va Image.
16. Key Control: The Contractor Shall Establish And Implement Methods To Ensure All Keys And/or Access Cards Issued To The Contractor By The Government Are Not Lost Or Misplaced And Are Not Used By Unauthorized Persons. The Contractor Shall Not Duplicate Any Keys Issued By The Government. The Contractor Shall Immediately Report To The Cor Any Occurrences Of Lost Or Duplicated Keys. In The Event Keys (other Than Master Keys) Are Lost Or Duplicated, The Contractor May Be Required, Upon Written Direction Of The Contracting Officer, To Re Key Or Replace The Affected Lock Or Locks Without Cost To The Government. The Government May, At Its Option, Replace The Affected Lock Or Locks Or Perform Re Keying And Deduct The Cost Of Such From Payment(s) Due The Contractor.
17. Schedules: The Contractor Shall Submit An Annual Schedule For Performance Of Services As Described In The Pws To The Cor For Acceptance.
18. Phase Out Plan: To Ensure A Smooth Transition In The Change Of Work Effort, The Contractor Shall Develop A Phase Out Plan. Upon Expiration Of This Contract, A Successor (either The Government Or Another Contractor) May Continue These Services. The Successor Will Require Assistance From The Incumbent Contractor, Which Shall Give Its Best Efforts And Cooperation To Accept An Orderly And Efficient Transition.
19.service Summary: The Contract Service Requirements Are Summarized In The Performance Objectives That Relate Directly To Mission Essential Items. The Performance Threshold Briefly Describes The Minimally Acceptable Levels Of Service For Each Requirement. The Service Summary And The Contractor S Quality Control Plan Provide Information On Contract Requirements, The Expected Levels Of Contractor Performance And The Expected Methods Of Government Surveillance And Confirmation Of Services Provided. These Thresholds Are Critical To Mission Success. Procedures As Set Forth In Federal Acquisition Regulation (far) Clause 52.212 4, Contract Terms And Conditions Commercial Items, Will Be Used To Remedy All Deficiencies.
**see Service Summary Table Below.
table 1 Service Summary
performance Objective
pws Para.
performance Threshold
remedy
method Of Assessment
office, Entrances, Conference Rooms, Hallways, Common Areas
6.1
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
non-carpeted Floors (hard Floors: Ceramic, Resilient Tile (vct) And Concrete)
6.2
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
carpeted Floors
6.3
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
restrooms
6.4
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
break Areas
6.5
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
child Care Areas (infant, 2.5-3 Year, Toddler, General Area And Outside Play Area)
6.6
no More Than Three Valid Defects Per Month
re-performance Within Two Hours Of Notification By Cor
periodic Surveillance, Customer Complaint
quality Control - Inspection Procedures Are Followed And Documented In Quality Control Plan
21.
no More Than One Valid Defect Per Month.
the Contractor Shall Provide A Written Corrective Action Report
periodic Surveillance, Customer Complaint
20. Quality Control: The Contractor Shall Develop And Maintain A Quality Control Program To Ensure Janitorial Services Are Performed In Accordance With Commonly Accepted Commercial Practices And Services As Identified In This Pws. Develop And Implement Procedures To Identify And Prevent Non Performance And Continual Repeat Of Defective Services. As A Minimum, Develop Quality Control Procedures Addressing The Areas Identified In The Table Above.
21. Quality Control Plan (qcp): A Written Qcp Shall Be Submitted To The Contracting Officer (co) Per Instructions In The Requirement Solicitation. The Qcp Shall Specifically Address The Contractor S Strategy To Provide Quality Workmanship, Continual Process Improvement And Correction Of Deficiencies As Required.
22. Quality Assurance: The Cor Shall Inspect And Evaluate The Contractor S Performance To Ensure Services Are Iaw Requirements Set Forth In This Pws. The Cor Shall Be Responsible For Initially Receiving, Validating, And Recording Customer Complaints. When The Contractor S Performance Is Deemed Unacceptable, The Cor Will Notify The Contractor S Quality Control Representative. The Service Shall Be Re Performed By The Contractor At No Additional Cost To The Government And Re Inspected By The Cor. When A Performance Threshold Has Not Been Met, The Cor Will Initiate And Provide The Co A Contract Discrepancy Report (cdr) For Issuance To The Contractor. The Contractor Shall Respond To The Cdr Iaw Instructions Provided And Return It To The Co Within 10 Calendar Days Of Receipt.
23. Performance Assessment/periodic Surveillance: This Method Requires The Cor To Employ A Spot Check Style Of Evaluation Based On The Contractor S Incorporated Cleaning Frequency Schedule (cfs). Periodic Surveillances And Validations Will Be Conducted On A Scheduled Basis (daily, Weekly, Monthly, Quarterly, Semi Annual Or Annually) And May Be Adjusted, Based On Quality Trends. The Cfs Or Modified Version Thereof Shall Be Used For Cor Scheduled Inspections And Results Documentation. Any Unsatisfactory Inspection (defect) Result Shall Be Recorded, And The Contractor Shall Re Perform The Service After Notification Iaw Table 1. Exceeding The Performance Threshold For Any Of These Performance Objectives In Any One-month Period Shall Result In Further Action As Appropriate. All Remedies Shall Be Rendered Iaw Far Clause 52.212 4, Contract Terms And Conditions Commercial Items.
24. Performance Assessment/customer Complaints: The Cor Will Receive And Investigate Complaints. The Cor Shall Be Responsible For Initially Validating Customer Complaints. The Co Shall Make Final Determination Of The Validity Of Customer Complaint(s) In Cases Of Disagreement Between The Cor And The Contractor. Validated Customer Complaints Shall Result In Corrective Action By The Contractor Iaw Table 1. Exceeding The Performance Threshold For Performance Objectives In Any One-month Period Shall Result In Further Action As Appropriate. All Remedies Shall Be Rendered Iaw Far Clause 52.212 4, Contract Terms And Conditions Commercial Items.
25. Hours Of Operation: The Contractor Is Responsible For Conducting Business After Hours, No Earlier
than 6:30pm, Monday Friday. The Contractor Must At All Times Maintain An Adequate Workforce For
the Uninterrupted Performance Of All Tasks Defined Within This Pws. When Hiring Personnel, The
contractor Shall Keep In Mind That The Stability And Continuity Of The Workforce Are Essential.
26. Federal Holidays: The Contractor Is Not Required To Perform Services On The Following Federal Holidays As Stated Below:
new Year S Day Labor Day
martin Luther King Jr. S Birthday Columbus Day
president S Day Veterans Day
memorial Day Thanksgiving Day
juneteenth National Independence Day Christmas Day
independence Day
27. Security Requirement: All Contractor Employees Are Subject To The Same Level Of Investigation As Va
employees Who Have Access To Va Sensitive Information Or Access To Va Facilities. The Background
investigation Includes The Following Requirements: 1) Completed Documentation 2) Fingerprints 3)
completion Of Opm S E Qip Questionnaire. The Contractor Is Required To Fulfill All Security Requirements.
the Contractor Employees, Upon Completion Of Fingerprinting, And An Initial Suitability Determination,
may Be Authorized Tentative Access To Start The Performance Period Of The Contract, But Only On
condition Of Completion Of All Security Requirements. This Requirement Is Applicable To All Subcontractor
personnel Requiring The Same Access. The Contractor Shall Bear The Expense Of Obtaining Background
investigations. If The Investigation Is Conducted By The Office Of Personnel Management (opm) Through
the Va, The Contractor Shall Reimburse The Va Within 30 Days.
Contract Date17 Feb 2022
Contract AmountUSD 214.5 K
71-80 of 230 active Tender Results