Tender Results of Bangladesh Water Development Board
Tender Results of Bangladesh Water Development Board
Bangladesh Water Development Board - BWDB Tender Result
Result Stage: Awarded (AOC Available)
Bangladesh
Construction of Embankment of Halda River along the Left Bank from Km 50.940 to Km 51.740 = 700.00 m of Fakira Chand area under Paindong Union, Upazila: Fatikchari, District: Chattogram in connection with Fatikchari FCDI Project under "Operational Expenditure for Repair and Maintenance of Goods and Services (Economic Code 3258137)" under Chattogram WD Division-1, BWDB, Chattogram during the year 2024-2025.
Contract Date24 Dec 2024
Contract AmountBDT 9.1 Million (USD 76.9 K)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Bank Protective Work Along The Bank Of Kaptai Lake From Km 0.000 To Km 0.050 = 50.00 M And From Km 0.140 To 0.200 = 60m; Total = 110m At Killamuro Area; Upazila: Rangamati Sadar Under Rangamati Wd Division, Bwdb, Kaptai In Connection With Non-development Budget (economic Code No. 3258137) During The Year 2024-2025. (ndr/ranga/w-11/2024-25)
Contract Date24 Dec 2024
Contract AmountBDT 10.1 Million (USD 84.7 K)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Bank Protection Work Along The Right Bank Of Chandaria Khal At Sheik Para Area From Km. 0.000 To Km. 0.300 = 0.300 Km, At Barua Para Area From Km. 0.00 To Km. 0.150 = 0.150 Km, Left Bank Of Chandaria Khal At Noyab Ali Chowdhury Bari To Liyakot Ali Sowdaghar Bari From Km. 0.000 To Km. 0.225 = 0.225 Km And Left Bank Of Chandaria Khal From Km. 0.000 To Km. 0.250 = 0.250 Km At Binoy Basi Jaladas Bari ; Total Length = 0.925 Km Under Adp Project In Boalkhali Upazila, Dist-chattagram Under Rangamati Wd Division, Bwdb, Kaptai, During The Year 2024-25. (pr-09/adp/2024-25)
Contract Date24 Dec 2024
Contract AmountBDT 122.2 Million (USD 1 Million)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Bank Protection Work Along The Left Bank Of Karnafuly River At Charondwip To Ibrahim Khal From Km. 0.000 To Km. 0.140 = 0.140 Km, Chowdhury Khal To Mosjit Ghat From Km. 0.000 To Km. 0.120 = 0.120 Km And Varamba Ghat To Vanga Pukur Area From Km. 0.000 To Km. 0.240 = 0.240 Km Total Length = 0.500 Km Under Adp Project In Boalkhali Upazila, Dist-chattogram Rangamati O&m Division, Bwdb, Kaptai , During The Year 2024-25. (pr-02/adp/2024-25)
Contract Date24 Dec 2024
Contract AmountBDT 131.8 Million (USD 1.1 Million)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Bank Protection Work Along The Left Bank Of Boalkhali Khal From Km. 0.000 To Km. 0.250 = 0.250km Near Nanayarmar Ghat Area, Right Bank Of Boalkhali Khal From Km. 0.000 To Km. 0.300 = 0.300 Km Near Dhumghat Texghar Area And Right Bank Near Dumukhu Area From Km. 0.000 To Km. 0.250 = 0.250 Km Total Length = 0.800 Km Under Adp Project In Boalkhali Upazila, Dist.-chattogram Under Rangamati Wd Division, Bwdb, Kaptai, During The Year 2024-25. (pr-06/adp/2024-25)
Contract Date24 Dec 2024
Contract AmountBDT 147 Million (USD 1.2 Million)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Manufacturing, Supply & Installation Of 1 (one) No. Pedestal Type Lifting Device, Repair, Maintenance & Re-installation Of 4 (four) Nos. M.s. Vertical Lift Gate (size: 1.65m X 1.875m) & 3 (three) Nos. Pedestal Type Lifting Device At Chakkutub 2-vent & Ahsanganj 2-vent Regulator Of Raktadaha Luhachura Beel Drainage Scheme Of Naogaon Water Development Division Under Bogura Mechanical Division, Bwdb, Bogura During The Fy 2024-25.
Contract Date23 Dec 2024
Contract AmountBDT 312.6 K (USD 2.6 K)
Bangladesh Water Development Board - BWDB Tender Result
Result Stage: Awarded (AOC Available)
Bangladesh
Repair, Maintenance & Re-installation of 8 (Eight) nos. M.S. Vertical Lift Gate (Size: 1.65m x 1.875m) & 8 (Eight) nos. Pedestal type lifting device at Mohonganj 3-vent (both side) & Shubhipara 1-vent (both side) Regulator of Barnai Project of Rajshahi Water Development Division under Bogura Mechanical Division, BWDB, Bogura during the FY 2024-25.
Contract Date23 Dec 2024
Contract AmountBDT 359.7 K (USD 3 K)
Bangladesh Water Development Board - BWDB Tender Result
Result Stage: Awarded (AOC Available)
Bangladesh
Manufacturing, Supplying & Installation of 1 no. M.S Flap Gate and 1 no. M.S Lift Gate with 1 no. Hand Wheel Type Hoisting Device at Kachuakhali 1 Vent Regulator of Bhola WD Division-2 under Workshop Division, BWDB, Tejgaon, Dhaka during the FY 2024-2025.
Contract Date23 Dec 2024
Contract AmountBDT 365.8 K (USD 3 K)
Bangladesh Water Development Board - BWDB Tender Result
Result Stage: Awarded (AOC Available)
Bangladesh
Manufacturing, Supply & Installation of 1 (One) no. M.S. Vertical Lift Gate (Size: 1.15m x 1.275m) & 3 (Three) nos. Pedestal type lifting device; Repair, Maintenance & Re-installation of 2 (Two) nos. M.S. Vertical Lift Gate (Size: 1.65m x 1.875m) at Haribhanga 2-vent & Mohishmari 1-vent Regulator of Chalan Beel Project of Natore Water Development Division under Bogura Mechanical Division, BWDB, Bogura during the FY 2024-25.
Contract Date23 Dec 2024
Contract AmountBDT 472.4 K (USD 3.9 K)
Bangladesh Water Development Board - BWDB Tender Result
Works
Result Stage: Awarded (AOC Available)
Bangladesh
Manufacturing, Supply & Installation Of 2 (two) Nos. M.s. Vertical Lift Gate (size: 1.15m X 1.275m) & 3 (three) Nos. Pedestal Type Lifting Device; Repair & Maintenance Of 2 (two) Nos. M.s. Vertical Lift Gate (size: 1.65m X 1.875m) & 1 (one) No. Pedestal Type Lifting Device At Protappur 2-vent And Chadmowa 2-vent Regulator Of Protappur Irrigation Project Of Bogura Water Development Division Under Bogura Mechanical Division, Bwdb, Bogura During The Fy 2024-25.
Contract Date23 Dec 2024
Contract AmountBDT 521.4 K (USD 4.3 K)
211-220 of 801 active Tender Results